123NET operates its flagship DC1 carrier neutral data center at 24700 Northwestern Highway in Southfield, Oakland County, Michigan. [1] Filings on the record specify disclosed capacity of 10 MW (the developer's figure), 1 planned or operational building. [1] Verified facility status from Michigan EGLE permits, MPSC dockets, township planning records, or operator campus specifications. [1]
Equivalent to ~8,300 U.S. homes (U.S. EIA 830 homes/MW baseline) · 0.5% of Hoover Dam nameplate capacity (2,080 MW).
Grid interconnection and utility service tracked on file.
U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.
No local property tax abatement amount disclosed in public filings.
Assessor parcel acreage and building square footage are added when municipal or county filings are published.
Location: 24700 Northwestern Highway, Southfield, MI 48075.
State and local tax abatement agreements and permanent job commitments are recorded when filed.
No local property tax abatement amount disclosed in public filings.
Sources:
A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).
Connected government officials, corporate entities, utilities and local rules on the public record.
Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.
Disclosed engineering ceilings, reported actuals and primary regulatory basis for 123NET Southfield Data Center Campus (DC1).
| Field / Parameter | Permitted / Disclosed Ceiling | Reported Actual | Basis & Primary Source |
|---|---|---|---|
| Electrical Capacity (MW) | 10 MW | 10 MW | the developer's figure [1] 123.net |
| Site Footprint (Acres) | |||
| Data Hall Buildings | 1 building | 1 | operator page [1] 123.net |
| Cooling & Water System | |||
| Backup Diesel / Gas Generators | |||
| Tax Abatement & Annual Revenue |
Blank cell: not disclosed by any source on file.
The record adds each the day a source gives it. Why these documents.
Acts of Oakland County and Southfield about data centers, on the record with their source. A rule about the area is not a decision about this record.
| Date | Who | Decision | Source |
|---|---|---|---|
| Wixom | Wixom has imposed a moratorium and adopted new zoning rules | cbsnews.com (opens in a new tab) | |
| Wixom | Wixom in Oakland County has been sued by developers claiming the moratorium is unlawful | michiganindependent.com (opens in a new tab) | |
| Wixom | Wixom implemented a 180 day data center moratorium | michiganadvance.com (opens in a new tab) |
WXYZ TV Detroit | Channel 7 report on Wixom City Council and community proceedings in Wixom, MI: Wixom City Council moves to regulate data centers with new ordinance (August 12, 2026).
"Changing the city's zoning ordinance to specifically regulate data centers. Now, this is a story we've been covering for months. What you're seeing here is aerial video of where the data center would go right along. I-96 in Wixom now the city of breaks and has been developing data center regulation since late 2025 and even adopted a temporary moratorium on city leaders. Study the issue last night council began reviewing proposed changes that would"
"Alicia. Yeah. This data dana center debate took over city council meeting yesterday and it was under the category unfinished business. And I think that's how a lot of that only with some city leaders, but also residents are feeling when it comes to this debate. Now, there is one month left on the six month moratorium when it comes to data center development. And as the clock ticks city council is now released from the time that this rules surrounding data"
"Where can they be located? What qualifies as a data center and what will the city's rules be like with noise coming from cooling systems and even fuel storage. With some industrial one, which is partner with sans one is looking to build a 55 acre 3 building complex currently tree covered area off of Wixom road near pontiac trail. Many people at the meeting, please with city leaders having some guidelines. All of this puts me at ease"
Using this data in a report? Support the record.
WXYZ TV Detroit | Channel 7 report on Wixom City Council and community proceedings in Wixom, MI: Wixom residents to weigh in on data center ordinance as city council meets (July 14, 2026).
"concerns. Township officials are considering a 12 year tax break for Oracle and Open AI. Well, now in the next hour, the Wixom City Council will consider a proposed data center on Wixom Road near Pontiac Trail, but this would require the council to waive their moratorium on data centers. 7 News Detroit reporter Whitney Bernie is in Wixom, where she found a lot of data center apprehension from the"
"It's a waste of money. It's a waste of water. It's a waste of resources. There are a lot of opinions. I'm worried about the electricity. I'm worried about the low numbers of employees that work at these places. I'm concerned that they're asking for tax breaks already. Absolutely not. Those guys can pay for their own stuff. Take it out there where, you know, where there's space. Arizona, New Mexico, California."
"worked to draft an ordinance specifically regulating data centers. As the countdown ticks down for that 6 month moratorium to expire, City Council is set to hear what could be included in that legislation at their meeting Tuesday. So, people will have the opportunity at this meeting to make that public comment and give feedback to council about what they think about the ordinance amendment or about what they think ought to be done. City Manager Steve Brown says the council will also consider lifting the"
Using this data in a report? Support the record.
Chronological regulatory, corporate and permitting events on the record, newest first.
No dated entry is on the record yet.
Read on October 27, 2026 (the day the page was read; it gives no date of its own)
Verified facility status from Michigan EGLE permits, MPSC dockets, township planning records, or operator campus specifications.
Verified data center records in Michigan within 60 miles by straight line distance.
| Facility & Location | Distance | Stage | Operator / Tenant | Disclosed Scale |
|---|---|---|---|---|
| ManagedWay and 123NET Southfield Data Center (SFJ2 / DC2) Southfield, Oakland County | Less than 1 mi | Running | ManagedWay | 8 MW |
| 365 Data Centers Detroit (DT1) Southfield, Oakland County | 1 mi | Running | 365 Data Centers | 4 MW |
| EdgeConneX Detroit Data Center (DET01) Southfield, Oakland County | 2 mi | Running | EdgeConneX | 8 MW |
| Liberty Center One Royal Oak Data Center Royal Oak, Oakland County | 5 mi | Running | Liberty Center One | 4 MW |
| ManagedWay Troy Data Center (TYM1) Troy, Oakland County | 8 mi | Running | ManagedWay | 5 MW |
| Otava Metro Detroit Data Center (Westland) Westland, Wayne County | 13 mi | Running | Otava | 6 MW |
Blank cell: not disclosed by any source on file.
Answered directly from the verified filings and local actions on this page.
123NET is the developer. No construction contractor is named on the record yet.
Power: 10 MW (the developer's figure, 123.net (opens in a new tab)). Water: not disclosed by any source on file.
It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.
Wixom (rated restrictive): Wixom has imposed a moratorium and adopted new zoning rules (reported October 7, 2026, cbsnews.com (opens in a new tab)); and Wixom: Wixom in Oakland County has been sued by developers claiming the moratorium is unlawful (reported October 1, 2026, michiganindependent.com (opens in a new tab)). 3 events are on the county's rows; a rule about the area is not a decision about this record.
1 source on file.
This site is in the RFC Michigan (RFCM) regional power market.
Every number on this page comes from a named source. Click any source to open the document in a new tab.
If a link has moved or a document has changed, let us know and we will update the record and log the change.
Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.
Data Center Record. 123NET Southfield Data Center Campus (DC1). Last verified October 27, 2026. https://datacenterrecord.org/projects/123net-dc1-24700-northwestern-hwy-southfield-mi. Accessed November 17, 2026.
Every row on this page is available to download with its source, its basis and the date it was last verified.
Download this page's records (CSV) JSON
Licensed CC BY-NC 4.0. Say where it came from and do not sell it or use it to train a commercial model without a license.
Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.
Data Center Record takes no money from data center developers, operators, utilities or trade groups. That rule does not change for licensing.
Data Center Record is an independent project and takes no money from data center developers, operators, utilities or trade groups. Reader support keeps the record free to read, with no ads and no paywall.
Last verified , first recorded . Every correction is logged on the corrections page. Report a correction · Send a tip about 123NET Southfield Data Center Campus (DC1)