Data centers in Turkey, Texas
Turkey has 1 data center on the record; it is being built. No city rule about data centers is on the record for Turkey yet. Hall County's own decisions are on the Hall County page.
How to read this page. Every count comes from the records on this page and links to where it is counted. Nothing is published until a person reads its source, and a figure no source gives reads Not disclosed; nothing is estimated. A rating changes only when a person sets it.
The data center in Turkey
Every Turkey record 1 record · blank cell: not disclosed · sort by any column
| Facility and county | Stage | Operator | Power (MW) | Latest entry |
|---|---|---|---|---|
| QTS Hall County Turkey, Hall County | Being built | QTS Data Centers |
A blank cell means not disclosed by any source on file. Power is the developer's figure or a permit's, each linked on the record.
| Record | Place | Stage | Operator | MW | Basis | Located | Tier | Verified |
|---|---|---|---|---|---|---|---|---|
| QTS Hall County | Turkey, Hall | Being built | QTS Data Centers | centroid | 2 | 2026-10-24 |
Tier 1: an official or company source. Tier 2: a news report resolving to the outlet's own page. Located: a site coordinate from a permit, a parcel or an address, or the county or town centroid. Verified: the last day a person read the source. A blank cell means not disclosed by any source on file.
The county and nearby counties
Distances run between the centers the Census Bureau gives each place. Every Texas county.
Disclosed figures
nothing disclosed by 1 record
Power, water, jobs and tax
| Figure | Disclosed total | Disclosed | Without a figure | Basis |
|---|---|---|---|---|
| Power | 0 | 1 | ||
| Water, stated per day | 0 | 1 | ||
| Water, stated per year | 0 | 1 | ||
| Permanent jobs | 0 | 1 | ||
| Tax each year | 0 | 1 |
A blank total means no record disclosed the figure; the count without one says how many.
Summed only where a record disclosed the figure; a record with no figure adds nothing and is counted as not disclosed. Water is summed per day and per year separately, as the sources stated it, and never converted. A tax claim given as a range is summed at both ends.
By what the facilities are for
| Use | Records | Power | Water | Jobs | Tax each year |
|---|---|---|---|---|---|
| No stated use | 1 |
A blank cell means no record with that use disclosed the figure.
A record that lists several uses counts once under each. Each cell is the sum over the records with that use, disclosed rows only.
What the facilities are for
No source on file states what any of the 1 tracked facility in Turkey is for.
How the facilities are cooled
No source on file states how any of the 1 tracked facility in Turkey is cooled.
About this data
Report a correction · Send a tip about Turkey · The rows here are part of the Texas export.
Cite this page
Data Center Record, "Data center records in Turkey, Hall County, Texas", https://datacenterrecord.org/states/tx/hall-county/turkey. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.
For researchers
- Level
- city
- Census GEOID
- 4873964
- Census geography
- Incorporated place, Turkey city
- Rating
- Not rated