Every act on the record for North Carolina, on the day it happened, newest first by month. Under each month, one tap away, the background, plans and statements the same sources carried. The counts are the state hub's records; nothing is estimated.

The record by year

On the record as of October 27, 2026.

An act sits on the day it happened: the day its own sentence names, or the day its source gives for it. An act the record knows only from the date of the article that reported it sits under that article's month, one tap away, marked Reported with the article's date. So do background, plans and statements, which are not acts. The same act reported by several sources is one line with the reports behind it, on its day where any of them dates it. The milestones alone, for every state, are on the timeline.

18 acts on the line for North Carolina, from 91 dated lines in the records' histories and the scorecard. 34 more acts are dated only by the article that reported them and sit under their month. 6 lines report an act already listed. 33 lines are background, plans or statements. 6 lines sit on a date other than the one they were filed under, because their own sentence names the day, the month or the year it happened; each says so. Where a line sits is read from its own words and the row is never changed (how dates are read).

Narrow the acts
Kind
Topic

Each count is the number of lines on this page the chip keeps. Topics are matched from the words of each line and are a finding aid, not a fact about the event.

2026 17 acts on the line from 18 reports; 33 reported, dated only by the article; 33 lines of background, plans and statements

October 2026 3 acts on the line

  1. Moratorium Charlotte, North Carolina

    Charlotte City Council held a public hearing on October 14, 2026 ahead of an October 26 vote to extend the city's 150 day data center moratorium by up to 11 months

    bisnow.com (opens in a new tab), trade press

  2. Moratorium Avery County, North Carolina

    Avery County Commissioners postponed a public hearing on a proposed moratorium on data centers, cryptocurrency mining and similar uses because the county missed advertising requirements

    averyjournal.com (opens in a new tab), news outlet

  3. Moratorium adopted Raleigh, North Carolina

    Raleigh enacted a data center moratorium just last week

    bisnow.com (opens in a new tab), trade press

September 2026 5 acts on the line; 21 reported; 19 lines of background, plans and statements

  1. Denial North Carolina

    North Carolina Utilities Commission voted 3-1 on September 18 to deny Duke Energy Progress a certificate of public convenience and necessity for a 255 megawatt gas fired peaker turbine at the Smith Energy Complex in Richmond County.

    marcellusdrilling.com (opens in a new tab), trade press

  2. Moratorium rejected Chatham County, North Carolina

    A state judge rejected the one year moratorium on new data center projects

    law360.com (opens in a new tab), trade press

  3. Hearing Guilford County, North Carolina

    County staff gave commissioners an overview of data center development covering land use, infrastructure, utilities, economic development and policy options on September 17, 2026

    yahoo.com (opens in a new tab), national outlet

  4. Approval Stokes County, North Carolina

    Stokes County commissioners voted three to two on September 14 to approve rezoning for Walnut Cove area data center proposed by Engineered Land Solutions

    thestokesnews.com (opens in a new tab), news outlet

  5. Moratorium reported Historic Charlotte building site data center, Charlotte, North Carolina

    The Charlotte Water moratorium on data center applications is scheduled to expire November 5

    yahoo.com (opens in a new tab), national outlet (dated only by the report that carried it, so under the month of the report)

Reported in September 2026, dated only by the article that carried them: 21 acts
  1. North Carolina

    Senate Bill 730 (Ratepayer Protection Act) passed the House 69-44 with support from only two Democrats and two independents formerly Democrats

    wakeweekly.com (opens in a new tab), news outlet (dated only by the report that carried it, so under the month of the report)

  2. Denial North Carolina

    North Carolina Utilities Commission rejected Duke Energy permit for 255MW gas power plant in Richmond County, citing uncertain data center demand and conflict with ratepayer protection pledge.

    canarymedia.com (opens in a new tab), trade press (dated only by the report that carried it, so under the month of the report)

    1 more report of this
    1. Reported September 21 North Carolina Utilities Commission rejected a 250 megawatt natural gas plant proposed by Duke Energy to power a 21 building Amazon data center campus under construction near Charlotte foreignpolicyjournal.com (opens in a new tab)
  3. Rate rule North Carolina

    Attorney General Jeff Jackson filed a proposal with the North Carolina Utilities Commission to create a separate rate class for data centers and other exceptionally large users of electricity

    nsjonline.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

    1 more report of this
    1. Reported September 21 North Carolina Attorney General Jeff Jackson proposed a new rate class for data center customers at Duke Energy wakeweekly.com (opens in a new tab)
  4. Moratorium Lee County, North Carolina

    Citizens opposed to a proposed data center on Lower Moncure Road requested Lee County Board of Commissioners place moratorium and UDO amendment discussions on the meeting agenda

    rantnc.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  5. Moratorium Lee County, North Carolina

    Opponents requested county enact data center moratorium and adopt changes to Unified Development Ordinance

    rantnc.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  6. Denial North Carolina

    North Carolina regulators denied Duke Energy's $584 million gas turbine proposal near Hamlet

    wral.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  7. North Carolina

    North Carolina State Historic Preservation Office recommended a protective buffer of around 100 feet for cemeteries on the Burnette Road site

    witn.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  8. Guilford County, North Carolina

    Staff recommended a text amendment to define county rules surrounding data centers and establish standards and regulations

    yahoo.com (opens in a new tab), national outlet (dated only by the report that carried it, so under the month of the report)

  9. Stokes County, North Carolina

    Stokes County commissioners voted 3-2 to move forward with a rezoning proposal for a hyperscale data center

    wxii12.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  10. Moratorium adopted Newport, North Carolina

    Newport approves a moratorium on data center development

    witn.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  11. Moratorium North Carolina

    47 local governments in North Carolina adopted moratoriums on approving new data centers as of September 9, 2026

    cardinalpine.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  12. Moratorium adopted Swain County, North Carolina

    Swain County adopted a one year moratorium on data center development

    wlos.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  13. Moratorium adopted Jackson County, North Carolina

    Jackson County adopted a one year moratorium on data center development

    wlos.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  14. Moratorium adopted Macon County, North Carolina

    Macon County and the Town of Franklin adopted a one year moratorium on data center development

    wlos.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  15. Moratorium adopted Haywood County, North Carolina

    Haywood County and Canton adopted a one year moratorium on data center development

    wlos.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

    1 more report of this
    1. Reported September 15 Haywood County and Clyde adopted a one year moratorium on data center development wlos.com (opens in a new tab)
  16. Moratorium adopted Buncombe County, North Carolina

    Buncombe County and Asheville adopted a one year moratorium on data center development

    wlos.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

    1 more report of this
    1. Reported September 15 Buncombe County and Woodfin adopted a one year moratorium on data center development wlos.com (opens in a new tab)
  17. Moratorium adopted Hendersonville, North Carolina

    Hendersonville adopted a one year moratorium on data center development

    wlos.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  18. Moratorium adopted Brevard, North Carolina

    Brevard adopted permanent zoning regulations governing data center development instead of a temporary moratorium

    wlos.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  19. Moratorium adopted Southport, North Carolina

    Southport Board of Aldermen unanimously approved a 15 month moratorium on new data center approvals

    wwaytv3.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  20. Moratorium adopted McDowell County, North Carolina

    McDowell County approved six month moratorium on data center development

    carolinacoastonline.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  21. Litigation Historic Charlotte building site data center, Charlotte, North Carolina

    The Court Arcade was demolished this past week to make way for a three story 29,000 square foot data center

    wbtv.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

Also on the record for September 2026, not acts of their own: 19 lines of background, plans and statements
  1. North Carolina

    Duke Energy is planning to build two gas fired plants in Davidson and Davie counties that would produce twice the amount of energy as its existing Buck Combined Cycle plant.

    greensboro.com (opens in a new tab) (a plan or a schedule, not an act yet)

  2. North Carolina

    Duke may appeal the N.C. Utilities Commission's rejection of its request to add 3.32 gigawatts of new power production in Richmond County.

    greensboro.com (opens in a new tab) (a plan or a schedule, not an act yet)

  3. North Carolina

    The commission cited data center power costs and allocation as the reason for denying the plant.

    marcellusdrilling.com (opens in a new tab) (a description, not an act)

  4. New Hanover County, North Carolina

    New Hanover County leaders reconsidering how local development rules handle data centers

    wect.com (opens in a new tab) (no act in the sentence)

  5. Lee County, North Carolina

    Lee County Board of Commissioners did not include moratorium or UDO discussion on agenda for September 22 meeting

    rantnc.com (opens in a new tab) (a description, not an act)

  6. Greene County, North Carolina

    Greene County has no pending or submitted building permit for a data center in the entire county

    witn.com (opens in a new tab) (a description, not an act)

  7. Greene County, North Carolina

    Burnette Road site is still available and actively being marketed for industrial development

    witn.com (opens in a new tab) (a description, not an act)

  8. Guilford County, North Carolina

    County Commissioner Chairman Skip Alston mentioned plans to make a motion asking commissioners to start the process toward a 180 day moratorium on data centers

    yahoo.com (opens in a new tab) (a plan or a schedule, not an act yet)

  9. Guilford County, North Carolina

    Guilford County's Unified Development Ordinance does not currently specifically define a data center; they are treated as light or heavy industrial and defined as warehouses

    yahoo.com (opens in a new tab) (a description, not an act)

  10. North Carolina

    North Carolina attorney general urged the state Utilities Commission to create a new rate class for Duke Energy data center customers to ensure they pay fair rates.

    law360.com (opens in a new tab) (a statement; who said what is on the statements pages)

  11. North Carolina

    Duke Energy's 6.8% rate increase request for January 1 remains in litigation

    reflector.com (opens in a new tab) (a description, not an act)

  12. North Carolina

    Attorney General Jeff Jackson proposes North Carolina Utilities Commission create new rate class for Duke Energy data center customers

    reflector.com (opens in a new tab) (a plan or a schedule, not an act yet)

  13. North Carolina

    House Democratic proposal from April included new rate class with tiered rate schedule, parked in Rules Committee

    reflector.com (opens in a new tab) (no act in the sentence)

  14. Stokes County, North Carolina

    Commissioners voting for rezoning: Sonya Cox, Keith Wood, and Rick Morris

    thestokesnews.com (opens in a new tab) (no act in the sentence)

  15. Stokes County, North Carolina

    Commissioners voting against rezoning: Brad Chandler and Wayne Barneycastle

    thestokesnews.com (opens in a new tab) (no act in the sentence)

  16. North Carolina

    At least 47 North Carolina local governments have adopted moratoriums on data center development

    nbc39.com (opens in a new tab) (a description, not an act)

  17. North Carolina

    Raleigh residents are urging city leaders to pause data center development

    nbc39.com (opens in a new tab) (a description, not an act)

  18. North Carolina

    At least 30 other counties and towns in North Carolina have imposed pauses or bans on data center development

    carolinacoastonline.com (opens in a new tab) (a description, not an act)

  19. North Carolina

    Historic landmark designated by Mecklenburg County preserves buildings

    yahoo.com (opens in a new tab) (no act in the sentence)

August 2026 3 acts on the line; 10 reported; 13 lines of background, plans and statements

  1. Statement Lee County, North Carolina

    More than 150 residents attended a Lee County Board of Commissioners meeting on August 18, 2026 to oppose a proposed data center facility on Lower Moncure Road

    rantnc.com (opens in a new tab), local outlet

  2. reported Lee County data center, Lee, North Carolina

    A proposed 90 megawatt data center is planned near Cumnock on Lower Moncure Road with plans to drill beneath Deep River

    rantnc.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  3. Cancellation cancelled Southeast Raleigh data center, Raleigh, North Carolina

    Beacon Partners withdrew its proposal to build a data center on Jones Sausage Road

    wral.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

Reported in August 2026, dated only by the article that carried them: 10 acts
  1. North Carolina

    North Carolina Division of Air Quality issued air quality permits for backup power generation and Duke Energy generators

    wunc.org (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  2. Moratorium adopted Cary, North Carolina

    Cary, NC adopted a data center pause or moratorium

    govtech.com (opens in a new tab), national outlet (dated only by the report that carried it, so under the month of the report)

  3. Moratorium adopted Cary, North Carolina

    Cary approved an 18 month moratorium on data centers

    abc11.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  4. Lee County, North Carolina

    Lee County commissioners signed off on changes to permit data centers in light industrial zones

    thecooldown.com (opens in a new tab), national outlet (dated only by the report that carried it, so under the month of the report)

  5. Moratorium adopted Durham County, North Carolina

    Durham County adopted a 9 month pause on data centers

    wral.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  6. Moratorium Durham County, North Carolina

    Durham County voted for a pause on data centers

    govtech.com (opens in a new tab), national outlet (dated only by the report that carried it, so under the month of the report)

    1 more report of this
    1. Reported August 26 Durham County, NC paused data center development wunc.org (opens in a new tab)
  7. Lee County, North Carolina

    Lee County Board of Commissioners rejected a resolution urging the North Carolina General Assembly to research and enact legislation for data centers

    rantnc.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  8. Moratorium Lee County, North Carolina

    Eric Davidson, a newly appointed Republican commissioner, offered a motion to impose a 90 day moratorium on new data centers but withdrew it after County Attorney Whitney Parrish advised commissioners lacked authority to enact a moratorium without following state mandated procedures

    rantnc.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

  9. Moratorium adopted Alamance County, North Carolina

    Alamance County commissioners approved a 1 year data center moratorium

    myfox8.com (opens in a new tab), news outlet (dated only by the report that carried it, so under the month of the report)

  10. Moratorium adopted Waxhaw, North Carolina

    Town of Waxhaw unanimously approved a 12 month moratorium on data centers

    wbtv.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

Also on the record for August 2026, not acts of their own: 13 lines of background, plans and statements
  1. North Carolina

    Duke Energy permitted to operate 57 diesel generators for one year during construction

    wunc.org (opens in a new tab) (a description, not an act)

  2. North Carolina

    Amazon permitted to operate 588 backup generators on site for maintenance and power outages

    wunc.org (opens in a new tab) (a description, not an act)

  3. Lee County, North Carolina

    PointOne Data Centers plans an 11 building campus on land originally permitted for a business park

    thecooldown.com (opens in a new tab) (a plan or a schedule, not an act yet)

  4. Lee County, North Carolina

    Public outcry and outrage over Lee County data center project

    thecooldown.com (opens in a new tab) (no act in the sentence)

  5. North Carolina

    Data center criticism is a focus in North Carolina's Senate race

    spectrumlocalnews.com (opens in a new tab) (a description, not an act)

  6. North Carolina

    2019 consent order with North Carolina required Chemours to provide safe drinking water to affected residents and reduce air emissions

    wral.com (opens in a new tab) (a description, not an act)

  7. Durham County, North Carolina

    Durham County leaders weigh data center moratorium with exemptions for smaller ones

    abc11.com (opens in a new tab) (no act in the sentence)

  8. Brunswick County, North Carolina

    Brunswick County commissioners opposed data center development at June 1 meeting, citing utility strain and minimal jobs

    newsargus.com (opens in a new tab) (no act in the sentence)

  9. North Carolina

    North Carolina Senate Bill 730 (Ratepayer Protection Act) defines data centers as facilities with peak monthly electricity demand of 100 megawatts or greater and passed state house 69-44

    newsargus.com (opens in a new tab) (a description, not an act)

  10. Shallotte, North Carolina

    Shallotte ordinance requires data centers be 1,000 feet or more from schools, daycares, parks, libraries, churches or residential care facilities

    newsargus.com (opens in a new tab) (a description, not an act)

  11. Macon County, North Carolina

    Macon County residents asked for a data center moratorium

    highlandsnews.com (opens in a new tab) (a statement; who said what is on the statements pages)

  12. Greensboro, North Carolina

    Greensboro establishes 180 day data center moratorium

    yahoo.com (opens in a new tab) (a description, not an act)

  13. North Carolina

    More than 20 North Carolina communities have paused data center activity

    yahoo.com (opens in a new tab) (a description, not an act)

June 2026 3 acts on the line; 1 reported

  1. North Carolina

    House Republican proposal stalled in Senate in June, included study to recommend new rate class

    reflector.com (opens in a new tab), local outlet (the month its own sentence names; no day is given; filed under Sep 16, 2026)

  2. Moratorium adopted Charlotte, North Carolina

    Charlotte Water imposed a 150 day moratorium on new data center applications in June while officials study infrastructure capacity and environmental concerns

    yahoo.com (opens in a new tab), national outlet (the month its own sentence names; no day is given; filed under Sep 4, 2026)

  3. Moratorium adopted Charlotte, North Carolina

    Charlotte enacted its 150 day moratorium in June 2026 following local outcry against data centers

    bisnow.com (opens in a new tab), trade press (the month its own sentence names; no day is given; filed under Jun 1, 2026)

Reported in June 2026, dated only by the article that carried it: 1 act
  1. North Carolina

    North Carolina House passed bill to crack down on data centers

    wral.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

May 2026 No acts on the line; 1 line of background, plans and statements

Also on the record for May 2026, not acts of their own: 1 line of background, plans and statements
  1. Lee County, North Carolina

    Lee County commissioners will vote on an extension to their data center moratorium

    walb.com (opens in a new tab) (a plan or a schedule, not an act yet)

March 2026 No acts on the line; 1 reported

Reported in March 2026, dated only by the article that carried it: 1 act
  1. Charlotte, North Carolina

    Data center zoning decision was made off I-85 in Charlotte area

    charlotteobserver.com (opens in a new tab), local outlet (dated only by the report that carried it, so under the month of the report)

February 2026 2 acts on the line from 3 reports

  1. Moratorium Chatham County, North Carolina

    Superior Court Judge John Morris awarded summary judgment to Eco TIP West, ruling the developer has vested property rights in its data center project despite the county moratorium enacted in February 2026.

    law360.com (opens in a new tab), trade press (the month its own sentence names; no day is given; filed under Sep 18, 2026)

  2. Moratorium adopted Chatham County, North Carolina

    Chatham County enacted a moratorium on new data centers in February 2026.

    law360.com (opens in a new tab), trade press (the month its own sentence names; no day is given; filed under Sep 18, 2026)

    1 more report of this
    1. February, no day given Chatham County enacted a one year moratorium on new data center projects in February law360.com (opens in a new tab)

January 2026 1 act on the line

  1. Ordinance Shallotte, North Carolina

    Shallotte adopted unified development ordinance amendment in January limiting data center uses to Heavy Industrial zoning district

    newsargus.com (opens in a new tab), local outlet (the month its own sentence names; no day is given; filed under Aug 24, 2026)

2025 1 act on the line

2025, no month given 1 act

  1. Litigation Historic Charlotte building site data center, Charlotte, North Carolina

    Digital Realty bought the Court Arcade building in 2025 from Shamrock Management Corporation for 9.5 million dollars

    wbtv.com (opens in a new tab), local outlet (the year its own sentence names; filed under Sep 7, 2026)

2024 0 acts on the line; 1 reported, dated only by the article

May 2024 No acts on the line; 1 reported

Reported in May 2024, dated only by the article that carried it: 1 act
  1. Acquisition Google Lenoir data center, Lenoir, North Carolina

    Google bought more land at Lenoir data center

    datacenterknowledge.com (opens in a new tab), trade press (dated only by the report that carried it, so under the month of the report)