Vermaland data center, in order
What happened with this project, oldest first: the stages it reached, what the county and its cities decided, and every dated step on the record. Each entry links its source.
2 events, August 25, 2026 to September 8, 2026. Also on the record, under the month each belongs to: 1 statement and 4 dates when source pages were read and verified. The facts, newest first: the record; the place: Arizona.
A plain date is the day it happened, as the source states it, or as the line's own sentence states it ("voted on July 6"), which is where the line sits even when it was filed later. "Reported" and a date is the day a source published a line that carries no date of its own. Those lines, and lines that describe rather than report an act, sit under their month rather than on the timeline, with what was said and the figures other sources gave. Every timeline on the site reads its lines by this one rule. How dates are read.
2026 2 events
-
(source date; the content gives no date of its own)
reported
A data center is proposed near Eloy and Picacho Peak in Pinal County, Arizona [5]
-
Also in August 2026: 1 statement and 1 date when a source page was read and verified
-
(source date; the content gives no date of its own)
Entry
Developer reduced proposal from 59 buildings to 11 with two gas fired power plants planned [11]
-
(said in the source itself)
Statement · Neighbors
Neighbors raised concerns about water, air quality, noise, wildlife and property values AZ Family (opens in a new tab) local outlet
-
-
(source date; the content gives no date of its own)
cancelled
Vermaland proposed building 59 buildings and two gas fired power plants on 3,300 acres south of Eloy. [6]
-
Also in September 2026: 3 dates when source pages were read and verified
-
(source date; the content gives no date of its own)
Entry
Pinal County Board of Supervisors voted 4 to 1 against the Vermaland data center project. [1]
-
(source date; the content gives no date of its own)
Entry
Vermaland proposed to use less water by implementing a closed loop cooling system. [6]
-
(source date; the content gives no date of its own)
Entry
In response to opposition, Vermaland scaled the project back to 11 buildings and one gas fired power plant. [6]
-
On the timeline: a stage change; an entry that reports an act on the day the source or its own sentence gives; and a decision, a published scorecard event on a row at or under the record's county, that reports an act. Under the months: a statement that names this record, a figure another source gave about it, matched by place and developer, an entry dated only by the day its source was published, and an entry or a decision that describes rather than reports an act. Each is on the record in its own right and keeps its own link.
For researchers
- Stage
- cancelled
- Events on the timeline
- 2
- Under the months
- 5
- Stage changes
- 2
- Decisions
- 0
- Statements
- 1
- Figures
- 0
- Entries and decisions under the months
- 4