Tooele Valley Data Center

A developer's proposal for a data center in Tooele Valley has been met with community concerns and plans are reported to be on pause. It is reported, as reported May 5, 2026.

How much water it would use and who would use it have not been disclosed.

Last verified · 12 sources, 0 primary · A skeleton record: built from one source, not yet reviewed in depth by a person. · How to read this page

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Land
40,000 acres
third party estimate [3]
Power it would draw
500 MW
third party estimate [4]
Water
Not disclosed
Who leads it
Utah Inland Port Authority
as stated by the source
Who would use it
Not disclosed
Jobs once it runs
Not disclosed
Tax each year
Not disclosed
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs 500 MW third party estimate [4] attheu.utah.edu September 25, 2026
How much water it would use Not disclosed
How loud it would be Not disclosed
Jobs once it runs Not disclosed
Tax it would pay each year Not disclosed

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Utah Inland Port Authority as stated by the source September 25, 2026
Who is constructing it Not disclosed
How much land 40,000 acres third party estimate [3] fox13now.com September 25, 2026
Where its power comes from Not disclosed
Grid connection Not disclosed
How it is cooled Not disclosed

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water useA state water right filing or a water supply agreement.
  • Who would use itA lease announcement or a tenant named in a filing.
  • Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.

What was decided

Acts of Tooele County and the cities in it about data centers, on the record with their source. A rule about the area is not a decision about this record.

DateWhoDecisionSource
Tooele County restrictive Tooele County Council agreed to pause ordinance 2024-11 governing land use and regulation for data centers at the request of citizens youtube.com
Tooele County restrictive The group TooeleCARES delivered a letter signed by more than 1,100 Utahns calling on the Utah Inland Port Authority to decline to authorize bonds or public financing for the Interstate Technology Park Public Infrastructure District utahnewsdispatch.com
Tooele County restrictive Tooele County leaders have paused considering any data center applications until after the county planning commission and council consider a data center ordinance expected in October and November utahnewsdispatch.com
Tooele County restrictive Tooele County currently has a moratorium on data center facilities. youtube.com
Tooele County restrictive A letter signed by more than 1000 Tooele residents was presented at the state capitol requesting the port authority stop a data center from being built near the Great Salt Lake. youtube.com
Tooele County restrictive Dozens of Tooele County residents opposed data centers at planning commission meeting kutv.com
9 earlier decisions on the county's rows
DateWhoDecisionSource
Tooele County restrictive Tooele County planning commission held meeting on new zoning rules for data centers kutv.com
Tooele County restrictive Residents protested a project area and ordinance during a public hearing in Tooele County that could allow for a data center to be built yahoo.com
Tooele County restrictive Tooele County community members are weighing in on how the county should prepare for future data centers and other large developments as leaders consider new zoning rules. kutv.com
Tooele County restrictive There is currently a moratorium on data centers in place in Tooele County. youtube.com
Tooele County restrictive Tooele County does not have a land use classification for a data center. youtube.com
Tooele County restrictive Hundreds of residents gathered in person and online to oppose the proposed Tooele data center project youtube.com
Tooele County restrictive Tooele County has a moratorium on data centers youtube.com
Tooele County restrictive One person was escorted out of a Tooele public meeting by law enforcement after the discussion got heated youtube.com
Tooele County restrictive Tooele commissioners are weighing a possible ordinance to prepare for future data centers and other large developments youtube.com

What happened

  1. (source date; the content gives no date of its own)

    The Utah Inland Port Authority board created the project area near Burmester Road and I-80 in 2023 [11]

  2. Moratorium (source date; the content gives no date of its own)

    Until Tooele County lifts its moratorium, not much will be done on the project. [12]

  3. (source date; the content gives no date of its own)

    The proposed wastewater treatment plant discharge would contain arsenic and high salinity [10]

  4. (source date; the content gives no date of its own)

    Data center located in Hansel Valley, Utah [3]

  5. (source date; the content gives no date of its own)

    Project plans to rely on natural gas from the Ruby Pipeline, though alternative methods like wind, solar and battery technology are mentioned as possible [3]

  6. · Status: rumored (source date; the content gives no date of its own)

    Stratos Project data center combines water cooling and air cooling methods [3]

The full Tooele Valley Data Center timeline, in order

18 corrections to this record

Every correction, with its reason
  1. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  2. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  3. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  4. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  5. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  6. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  7. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

  8. · the kind of source of a history entry

    Tier after resolution (2026-09-21). The source on file is utahnewsdispatch.com, the publisher's own page. The item reached the record through Google News: "data center" Utah, which the record carries at tier 1, and the approve copied the feed's tier onto this row. The tier now comes from the outlet, which the record already carries at tier 4 on 6 rows of sources. DECISIONS section 7. The speaker, the claim, the date and the url are unchanged. The day's label corrections.

  9. · the kind of source of a history entry

    Tier after resolution (2026-09-21). The source on file is upr.org, the publisher's own page. The item reached the record through Google News: "data center" Utah, which the record carries at tier 1, and the approve copied the feed's tier onto this row. The tier now comes from the outlet, which the record already carries at tier 4 on 4 rows of sources. DECISIONS section 7. The speaker, the claim, the date and the url are unchanged. The day's label corrections.

  10. · the kind of source of a history entry

    Tier after resolution (2026-09-21). The source on file is utahnewsdispatch.com, the publisher's own page. The item reached the record through Google News: "data center" Utah, which the record carries at tier 1, and the approve copied the feed's tier onto this row, from the wrapper https://news.google.com/rss/articles/CBMizgFBVV95cUxOMkZZQWI3X18zZU50S1ctb2JHNlJfT3RIZ0Fhd2RzaDYxQjlPQ0NLdURpRll2VVdfWE1sTzFXUHNmdXlhaHFBMDdtUGdCUGxaZG1GTlYtTjhqVlVtaWpqYjNJeWhFaGowN0h1eWMzeGZWa2I1ZWpmaWp0cDEtcl9qNE44VGpiZFN4dFR5ZnExdHJvQmh4SmVuWWNRWlpKdXk4ZmVTQS1fRkdkWW11WU9GeUdxb09iYjdEX0lYWTlVZC1LUVpVdGtUYzQ1d3QxQQ. The tier now comes from the outlet, which the record already carries at tier 4 on 6 rows of sources. DECISIONS section 7. The speaker, the claim, the date and the url are unchanged. The day's label corrections.

  11. · the kind of source of a history entry

    Tier after resolution (2026-09-21). The source on file is utahnewsdispatch.com, the publisher's own page. The item reached the record through Google News: "data center" Utah, which the record carries at tier 1, and the approve copied the feed's tier onto this row. The tier now comes from the outlet, which the record already carries at tier 4 on 6 rows of sources. DECISIONS section 7. The speaker, the claim, the date and the url are unchanged. The day's label corrections.

  12. · the kind of source of a history entry

    Tier after resolution (2026-09-21). The source on file is upr.org, the publisher's own page. The item reached the record through Google News: "data center" Utah, which the record carries at tier 1, and the approve copied the feed's tier onto this row. The tier now comes from the outlet, which the record already carries at tier 4 on 4 rows of sources. DECISIONS section 7. The speaker, the claim, the date and the url are unchanged. The day's label corrections.

  13. · the kind of source of a history entry

    Tier after resolution (2026-09-21). The source on file is utahnewsdispatch.com, the publisher's own page. The item reached the record through Google News: "data center" Utah, which the record carries at tier 1, and the approve copied the feed's tier onto this row. The tier now comes from the outlet, which the record already carries at tier 4 on 6 rows of sources. DECISIONS section 7. The speaker, the claim, the date and the url are unchanged. The day's label corrections.

  14. · the draft of a status history row

    Published on a project that was still a draft skeleton and still short of the record's skeleton minimum rule; returned to draft on 2026-09-17 pending the project meeting the rule or a person's approval. The old and new text.

  15. · the draft of a status history row

    Published on a project that was still a draft skeleton and still short of the record's skeleton minimum rule; returned to draft on 2026-09-17 pending the project meeting the rule or a person's approval. The old and new text.

  16. · the draft of a status history row

    Published on a project that was still a draft skeleton and still short of the record's skeleton minimum rule; returned to draft on 2026-09-17 pending the project meeting the rule or a person's approval. The old and new text.

  17. · the draft of a status history row

    Published on a project that was still a draft skeleton and still short of the record's skeleton minimum rule; returned to draft on 2026-09-17 pending the project meeting the rule or a person's approval. The old and new text.

  18. · the draft of a status history row

    Published on a project that was still a draft skeleton and still short of the record's skeleton minimum rule; returned to draft on 2026-09-17 pending the project meeting the rule or a person's approval. The old and new text.

Every correction on the record is on the corrections page.

What was said

Rep. Paul Cutler said artificial intelligence has changed data center size, impact and policy questions, and that lawmakers need to think about things differently.
Paul Cutler, state representative · July 29, 2026 · paraphrased · KMYU local outlet
Macrina Wilkins of Associated General Contractors of America said data center construction jobs might max at 10,000 but broader economic models include indirect and induced effects
Macrina Wilkins, director of market insights, Associated General Contractors of America · May 11, 2026 · paraphrased · KUTV local outlet

Every statement about data centers in Utah, by speaker

17 more statements on this page

unnamed resident, Tooele County

Tooele residents are concerned about water supply impacts from a data center near the local aquifer

September 4, 2026, YouTube · YouTube video · the record (Paraphrased; said in the source itself)

Ben Hart

Utah Inland Port Authority will not move forward with data centers until Tooele County has proper permitting, regulatory, and zoning process in place

September 4, 2026, YouTube · YouTube video · the record (Paraphrased; said in the source itself)

Ben Hart

Utah Inland Port Authority stated they are not offering tax incentives for data centers and have no official plans for them in project areas

September 4, 2026, YouTube · YouTube video · the record (Paraphrased; said in the source itself)

unnamed news anchor, paraphrasing state officials

Tooele County is not ready for the data center, according to state officials.

September 3, 2026, YouTube · YouTube video · the record (Paraphrased; said in the source itself)

Tooele residents expressed concerns that tax dollars should not subsidize data center development that they believe harms the community.

September 3, 2026, ABC4 Utah · ABC4 Utah local outlet · the record (Paraphrased; said in the source itself)

Utah officials and investors at Beehive Energy Alliance

Workforce shortages, not funding or ideas, may be the real constraint on energy project delivery in Utah

August 18, 2026, TechBuzz News · TechBuzz News local outlet · the record (Paraphrased; said in the source itself)

Tooele County residents voiced opposition to a potential data center, urging decision makers to do the right thing.

August 13, 2026, ABC4 Utah · ABC4 Utah local outlet · the record (Paraphrased; said in the source itself)

BYU civil engineering professor

Sowby said the approval process for data centers depends largely on whether a project is proposed within city limits, outside incorporated areas, or involving state and federal agencies.

July 29, 2026, KMYU · KMYU local outlet · the record (Paraphrased; said in the source itself)

BYU civil engineering professor Robert Sowby stated there is no single person or agency responsible for approving a large scale data center.

July 29, 2026, KMYU · KMYU local outlet · the record (Paraphrased; said in the source itself)

unnamed resident

It is much easier to prevent data centers from being built than to hold them accountable later.

July 28, 2026, YouTube · YouTube video · the record (Paraphrased; said in the source itself)

unnamed resident

There are deep concerns about water usage with data center projects.

July 28, 2026, YouTube · YouTube video · the record (Paraphrased; said in the source itself)

Ben Hart

Utah Inland Port Authority fully supports the Tooele County data center moratorium

July 28, 2026, YouTube · YouTube video · the record (Paraphrased; said in the source itself)

Tooele commissioners

The proposed ordinance is about creating rules before a company submits a proposal, not in relation to any specific data center or project

July 23, 2026, YouTube · YouTube video · the record (Paraphrased; said in the source itself)

investor

Kevin O'Leary claimed the Stratos Project could generate 10,000 construction jobs and 2,000 permanent jobs

May 11, 2026, KUTV · KUTV local outlet · the record (Paraphrased; said in the source itself)

Kevin O'Leary, developer, stated sustainability is at the heart of proposals regarding air quality, water use, heat and noise pollution

May 5, 2026, FOX 13 News Utah · FOX 13 News Utah local outlet · the record (Paraphrased; said in the source itself)

Spencer Cox, Governor of Utah

Governor Cox stated that concerns about water and power use contain incorrect information and the state will not allow centers to take all power or increase utility rates.

April 30, 2026, KUTV · KUTV local outlet · the record (Paraphrased; said in the source itself)

Spencer Cox, Governor of Utah

Governor Cox stated the project is built for this use, is right next to a natural gas pipeline so they can build their own energy, and is not next to somebody's house.

April 30, 2026, KUTV · KUTV local outlet · the record (Paraphrased; said in the source itself)

The site

Where in Tooele County is not in the public record. The pin marks the county seat, not a building, and the outline is the county.

  • This record: Proposed, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 12 other published records in Utah
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

Where
Tooele County, Utah
How exactly it is located
County level, the county seat
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at a county seat.

Questions about this project

5 questions answered from the record

Answered from the rows on this page.

How big is Tooele Valley Data Center?

The record has 2 measures of its size: 500 MW (third party estimate, source) and 40,000 acres (third party estimate, source). Each figure names who gave it and links to the source.

Who is building Tooele Valley Data Center?

Utah Inland Port Authority is the developer. No construction contractor is named on the record yet.

How much power and water does Tooele Valley Data Center say it needs?

Power: 500 MW (third party estimate, source). Water: not disclosed by any source on file.

Where does Tooele Valley Data Center stand today?

It is reported, as reported May 5, 2026. The newest entry, reported September 4, 2026: The Utah Inland Port Authority board created the project area near Burmester Road and I-80 in 2023 [11].

What has Tooele County decided about it?

Tooele County (rated restrictive): Tooele County Council agreed to pause ordinance 2024-11 governing land use and regulation for data centers at the request of citizens (reported September 4, 2026, source); and Tooele County: The group TooeleCARES delivered a letter signed by more than 1,100 Utahns calling on the Utah Inland Port Authority to decline to authorize bonds or public financing for the Interstate Technology Park Public Infrastructure District (reported September 4, 2026, source). 15 events are on the county's rows; a rule about the area is not a decision about this record.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Concerns swirl over a developer’s push for a Tooele Valley data center, but plans are on pause - Utah News Dispatch, Utah News Dispatch, September 4, 2026, local outlet
  2. Tooele residents voice concerns over proposed data center - abc4.com, abc4.com, September 3, 2026, local outlet
  3. Kevin O'Leary disputes environmental impact claims from his massive Utah data center project, FOX 13 News Utah, May 5, 2026, local outlet
  4. ‘The Elephant in the Desert’ - The University of Utah, The University of Utah, August 3, 2026, local outlet
  5. Utahns speak out as yet another data center is planned near the Great Salt Lake - The Salt Lake Tribune, The Salt Lake Tribune, July 28, 2026, local outlet
  6. Dozens of Tooele County residents oppose data centers at planning commission - KUTV, KUTV, August 12, 2026, local outlet
  7. Experts question job projections for massive Utah data center, KUTV, May 11, 2026, local outlet
  8. Tooele Valley’s Proposed Data Center: A Clear Look at What’s Happening - Grow The Flow - Utah, Grow The Flow - Utah, August 18, 2026, local outlet
  9. Tooele County residents worry proposed changes could bring a data center to the area - Utah Public Radio, Utah Public Radio, August 13, 2026, local outlet
  10. Hundreds gather in person and online in opposition to proposed Tooele data center, YouTube, July 28, 2026, video
  11. 'Tooele Cares' group pushes back against data centers, YouTube, September 4, 2026, video
  12. Tooele residents voice concerns over proposed data center, YouTube, September 3, 2026, video

12 sources on file.

Cite this record

Data Center Record, "Tooele Valley Data Center", https://datacenterrecord.org/projects/tooele-valley-data-center-ut, last verified September 25, 2026.

Last verified , first recorded . Every correction is logged on the corrections page and under What happened.

Cite this page

Data Center Record, "Tooele Valley Data Center", https://datacenterrecord.org/projects/tooele-valley-data-center-ut. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.

The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Slug
tooele-valley-data-center-ut
Status value
rumored
Stage
Proposed
Tier
skeleton
Tags
skeleton
Place id
us/ut/tooele-county
Coordinates
40.53056, -112.29861
Location precision
county
Location source
County seat (Tooele), Wikidata, placed at county level
Coordinate source
wikidata county seat
Location source number
Not disclosed
Location last verified
September 16, 2026
EPA registry id
Not disclosed
Use type values
not_disclosed
Tenancy value
not_disclosed
Cooling type value
not_disclosed
Capacity basis
third_party_estimate
Water basis
not_disclosed, gallons_per_day
Acreage basis
third_party_estimate
Interconnection value
not_disclosed
Capacity, if disclosed
500 MW, third party estimate
Rating of the county's rows
Restrictive
Published
2026-09-04
Last verified
2026-09-25