Data Center Record.
Census GEOID: 49053 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 1 primary source

● Running Recorded January 15, 2026 · 1 Building

Tonaquint St. George Data Center

Street address 1108 W. 1600 South, St. George, UT 84770, Washington County verified address Exact, at the address [1] Tonaquint St. George facility specification and Washington County Assessor parcel at 1108 W. 1600 South, St. George.

Overview, regulatory gates and specifications

Tonaquint Data Centers operates a single building regional colocation facility at 1108 W. 1600 South in St. George, Washington County, Utah. [1] Tonaquint operates its single building St. George colocation data center in Washington County. [1]

Verified Site & Permit Summary
Verified address
1108 W. 1600 South, St. George, UT 84770, Washington County verified address
Operator / developer
Tonaquint Data Centers
Permit / registry ID
Tonaquint Data Centers on file [1]

How much power it needs, how much water it would use and who would use it have not been disclosed.

What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
1 building operator page
[1] tonaquint.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2018 (8 years)
Who leads it
Tonaquint Data Centers as stated by the source
[1] tonaquint.com
Not disclosed
Who would use it, Jobs once it runs, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Tonaquint Data Centers
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Tonaquint St. George Data Center.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings 1 building 1 operator page [1] tonaquint.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

  1. · Status: running (content date)

    Tonaquint operates its single building St. George colocation data center in Washington County.

    [1] tonaquint.com

Every event in order

Nearest data centers in Utah

No other verified data center record in Utah is located within 60 miles of this site. Browse all data centers in Utah.

Common questions about Tonaquint St. George Data Center

Answered directly from the verified filings and local actions on this page.

Who is building Tonaquint St. George Data Center?

Tonaquint Data Centers is the developer, tonaquint.com (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Tonaquint St. George Data Center say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Tonaquint St. George Data Center stand today?

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. Tonaquint St. George Data Center Facility Specification (opens in a new tab), Tonaquint Data Centers, January 15, 2026

1 source on file.

Regional grid context

This site is in the Northwest Power Pool (NWPP) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Tonaquint St. George Data Center", https://datacenterrecord.org/projects/tonaquint-data-center-saint-george-ut, last verified October 23, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Tonaquint St. George Data Center", https://datacenterrecord.org/projects/tonaquint-data-center-saint-george-ut. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
reviewed in depth
Tags
Reviewed in depth
Coordinates
37.081472, -113.607242
How the location is known
Location from the site's street address.
Location source
Tonaquint St. George facility specification and Washington County Assessor parcel at 1108 W. 1600 South, St. George.
Coordinate source
Washington County Assessor parcel at 1108 W. 1600 South, St. George
Location source number
[1]
Location last verified
October 23, 2026
Published
October 21, 2026
Last verified
October 23, 2026
Not disclosed
EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Tonaquint St. George Data Center · 1 source, 1 entry · basis and source tier on every row · verified October 23, 2026

Download CSV JSON