Projects / Indiantown Warfield Boulevard Data Center Proposal / Timeline

Indiantown Warfield Boulevard Data Center Proposal, in order

What happened with this project, oldest first: the stages it reached, what the county and its cities decided, and every dated step on the record. Each entry links its source.

2 events, April 30, 2026 to September 2, 2026. Also on the record, under the month each belongs to: 4 statements, 6 figures from other sources and 1 date when a source page was read and verified. The facts, newest first: the record; the place: Florida.

A plain date is the day it happened, as the source states it, or as the line's own sentence states it ("voted on July 6"), which is where the line sits even when it was filed later. "Reported" and a date is the day a source published a line that carries no date of its own. Those lines, and lines that describe rather than report an act, sit under their month rather than on the timeline, with what was said and the figures other sources gave. Every timeline on the site reads its lines by this one rule. How dates are read.

Stages

  1. proposed
  2. stalled

Now: proposed. A stage is the record's status after the entry that set it (the definitions).

2026 2 events

  1. (content date)

    proposed

    FPL owned property was annexed into Indiantown from unincorporated Martin County [2]

  2. Also in May 2026: 1 figure from another source
    1. (source date; the content gives no date of its own)

      Figure · www.tcpalm.com

      5,722 acres: Tesoro Groves is 5,722 acres and permits data centers and light industrial projects www.tcpalm.com (opens in a new tab) local outlet

  3. Also in August 2026: 1 date when a source page was read and verified
    1. (source date; the content gives no date of its own)

      Entry

      Village Attorney Wade Vose submitted resignation shortly after election results published [1]

  4. (content date)

    stalled

    A data center debate in Indiantown, Florida resulted in the termination of the village manager, reflecting serious local conflict over the project. [1]

  5. Also in September 2026: 4 statements and 1 figure from another source
    1. (content date; reported from elsewhere)

      Statement · Janet Smith, Interim Village Attorney

      I have statutory exceptions that the Council can use for trade secrets. If someone is bringing forward a proposal considered a trade secret and they're willing to indemnify the Village while they speak to us so we can protect their records, then we have that opportunity. So, an NDA should not be needed. Hometown News Treasure Coast (opens in a new tab) news outlet

    2. (content date; reported from elsewhere)

      Statement · Janet Smith, Interim Village Attorney

      What we would like to proffer to the Council is two ordinances. They will both have to go through planning and zoning and come before you on two separate readings. You will have public comment at each of those meetings. The first one is the moratorium that we feel will be legally defensible. The second one is the transparency ordinance. Hometown News Treasure Coast (opens in a new tab) news outlet

    3. (source date; the content gives no date of its own)

      Figure · Treasure Coast News

      19 counties: A survey from the Florida Association of Counties reported that 19 counties have instituted data center moratoriums, 7 have banned them, 12 are considering moratoriums, and 3 have rejected moratoriums. Treasure Coast News (opens in a new tab) national outlet

    4. (said in the source itself)

      Statement · Adam Kramer, Project Executive

      Project executive Adam Kramer stated the facility would not rely on Indiantown's water supply. cbs12.com (opens in a new tab) local outlet

    5. (said in the source itself)

      Statement · Adam Kramer, Project Executive

      Adam Kramer stated the project would generate $44 million a year of tax revenue from energy use going directly into infrastructure projects to support rural Martin County and Indiantown. cbs12.com (opens in a new tab) local outlet

  6. Also in October 2026: 4 figures from other sources
    1. (source date; the content gives no date of its own)

      Figure · Treasure Coast News

      100 data centers: There currently are more than 100 data centers in Florida. Treasure Coast News (opens in a new tab) local outlet

    2. (source date; the content gives no date of its own)

      Figure · Treasure Coast News

      2 miles: Data centers generate noise that can be heard up to 2 miles from a facility, with worst noise up to 3,000 feet from center. Treasure Coast News (opens in a new tab) local outlet

    3. (source date; the content gives no date of its own)

      Figure · Treasure Coast News

      19 counties: Edward Ciampi cited Florida Association of Counties data showing 19 counties have instituted moratoriums, 7 have banned data centers, 12 are considering moratoriums and 3 have rejected a moratorium. Treasure Coast News (opens in a new tab) local outlet

    4. (source date; the content gives no date of its own)

      Figure · Treasure Coast News

      100 MW: A hyperscale data center can use 100 megawatts equivalent to use of 80,000 to 100,000 homes. Treasure Coast News (opens in a new tab) local outlet

On the timeline: a stage change; an entry that reports an act on the day the source or its own sentence gives; and a decision, a published scorecard event on a row at or under the record's county, that reports an act. Under the months: a statement that names this record, a figure another source gave about it, matched by place and developer, an entry dated only by the day its source was published, and an entry or a decision that describes rather than reports an act. Each is on the record in its own right and keeps its own link.

For researchers
Stage
proposed
Events on the timeline
2
Under the months
11
Stage changes
2
Decisions
0
Statements
4
Figures
6
Entries and decisions under the months