East Houston data center (Chron)

East Houston residents previously fought a data center project that has returned with a new proposal. It is reported; the record holds no sourced date for when it reached that stage.

How much power it needs, how much water it would use and who would use it have not been disclosed.

Last verified · 2 sources, 0 primary · A skeleton record: built from one source, not yet reviewed in depth by a person. · How to read this page

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Land
Not disclosed
Power it would draw
Not disclosed
Water
Not disclosed
Who leads it
Not disclosed
Who would use it
Not disclosed
Jobs once it runs
Not disclosed
Tax each year
Not disclosed
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs Not disclosed
How much water it would use Not disclosed
How loud it would be Not disclosed
Jobs once it runs Not disclosed
Tax it would pay each year Not disclosed

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Not disclosed
Who is constructing it Not disclosed
How much land Not disclosed
Where its power comes from Not disclosed
Grid connection Not disclosed
How it is cooled Not disclosed

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water useA state water right filing or a water supply agreement.
  • Who would use itA lease announcement or a tenant named in a filing.
  • Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
  • Who is behind itA land record, a zoning application or a company's own announcement.
  • Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.

What happened

No dated entry is on the record yet.

2 corrections to this record

Every correction, with its reason
  1. · the draft of a reference figures row

    The record could not read this figure's source: the page answered HTTP 403, so no text of it reached the classifier, which scored card 11769 from the headline alone, and the number came from the headline; published by the bulk approve of 2026-09-25. A reference figure needs a source the record read: returned to draft, off every page, until a readable source that states it is cited (docs/batch-unread-figures-0929.md). The old and new text.

  2. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

Every correction on the record is on the corrections page.

What was said

MD Anderson Cancer Center delayed two projects planned for next five years due to data center boom impacts
Karen Mooney, MD Anderson Cancer Center · September 8, 2026 · paraphrased · Bisnow trade press
Paul Bettencourt, state senator, said counties do not have the legal authority to ban data center construction
Paul Bettencourt, State Senator (R-Houston), chair of Senate Local Government Committee · June 11, 2026 · paraphrased · Houston Public Media local outlet

Every statement about data centers in Texas, by speaker

15 more statements on this page

Synjyn Dodd, Hoar Construction

Data centers have tied up large swaths of steel and concrete supply

September 8, 2026, Bisnow · Bisnow trade press · the record (Paraphrased; said in the source itself)

Karen Mooney, MD Anderson Cancer Center

Data center development in Texas is straining demand for construction materials and equipment

September 8, 2026, Bisnow · Bisnow trade press · the record (Paraphrased; said in the source itself)

Chris Tomlinson, journalist

Counties asked Attorney General Ken Paxton what power they retained, and he did not answer six months later

August 27, 2026, YouTube · YouTube video · the record (Paraphrased; said in the source itself)

Chris Tomlinson, journalist

Abbott and Republican lawmakers passed multiple laws providing property tax cuts to data centers

August 27, 2026, YouTube · YouTube video · the record (Paraphrased; said in the source itself)

Chris Tomlinson, journalist

Governor Greg Abbott invited data center companies to Texas and promised low taxes, regulations, cheap electricity and water

August 27, 2026, YouTube · YouTube video · the record (Paraphrased; said in the source itself)

Meta spokesperson

Meta pledged to pay for own infrastructure and launched fund for water and energy infrastructure investment

August 10, 2026, Houston Public Media · Houston Public Media local outlet · the record (Paraphrased; said in the source itself)

OpenAI pledged to pay for own infrastructure, support new electricity sources and minimize water usage

August 10, 2026, Houston Public Media · Houston Public Media local outlet · the record (Paraphrased; said in the source itself)

Republican Party of Texas Legislative Priorities Committee member and Bexar County judge candidate

Patrick Von Dohlen said at least a quarter of 160 plus testimony speakers were concerned about AI data centers

June 11, 2026, Houston Public Media · Houston Public Media local outlet · the record (Paraphrased; said in the source itself)

Republican Party of Texas proposes prohibiting all tax payer funded incentives, property tax abatements, corporate welfare, or economic development packages for data centers

June 11, 2026, Houston Public Media · Houston Public Media local outlet · the record (Paraphrased; said in the source itself)

Republican Party of Texas proposes requiring major data centers to secure their own independent power generation and non potable water sources

June 11, 2026, Houston Public Media · Houston Public Media local outlet · the record (Paraphrased; said in the source itself)

Republican Party of Texas convention delegate

Rolando Garcia said data centers use massive amounts of water and electricity, and Texas is already having problems with its electrical grid and water infrastructure

June 11, 2026, Houston Public Media · Houston Public Media local outlet · the record (Paraphrased; said in the source itself)

Republican Party of Texas proposes granting cities and counties final authority over zoning, land development, and comprehensive planning decisions for data centers

June 11, 2026, Houston Public Media · Houston Public Media local outlet · the record (Paraphrased; said in the source itself)

Republican Party of Texas Legislative Priorities Committee named regulating AI as the 15th of its top 15 priorities for the 2027 Legislature

June 11, 2026, Houston Public Media · Houston Public Media local outlet · the record (Paraphrased; said in the source itself)

Republican Party of Texas proposes mandating that data center construction companies pay full impact fees to compensate communities

June 11, 2026, Houston Public Media · Houston Public Media local outlet · the record (Paraphrased; said in the source itself)

State Senator (R-Houston), chair of Senate Local Government Committee

Paul Bettencourt said he is open to Texas' 254 counties having more input on data centers but stressed critical importance to state and country economic development

June 11, 2026, Houston Public Media · Houston Public Media local outlet · the record (Paraphrased; said in the source itself)

The site

Where in Harris County is not in the public record. The pin marks the county seat, not a building, and the outline is the county.

  • This record: Proposed, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 53 other published records in Texas
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

Where
Houston, Harris County, Texas
How exactly it is located
County level, the county seat
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at a county seat.

Questions about this project

4 questions answered from the record

Answered from the rows on this page.

Who is building East Houston data center (Chron)?

Not disclosed. No source on file names the developer. The sources read for this record are listed under Sources.

How much power and water does East Houston data center (Chron) say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does East Houston data center (Chron) stand today?

It is reported; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What has Houston or Harris County decided about it?

No decision by Houston or Harris County about data centers is on the record. The Harris County page and the Texas scorecard list every rated row the day a person publishes one.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Gov. Greg Abbott touts tech company cooperation, following Trump criticism of data center policy - Houston Public Media, Houston Public Media, August 10, 2026, local outlet
  2. East Houston residents fought a data center. Now it's back - Chron, Chron, September 1, 2026, local outlet

2 sources on file.

Cite this record

Data Center Record, "East Houston data center (Chron)", https://datacenterrecord.org/projects/east-houston-data-center-chron-tx, last verified September 17, 2026.

Last verified , first recorded . Every correction is logged on the corrections page and under What happened.

Cite this page

Data Center Record, "East Houston data center (Chron)", https://datacenterrecord.org/projects/east-houston-data-center-chron-tx. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.

The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Slug
east-houston-data-center-chron-tx
Status value
rumored
Stage
Proposed
Tier
skeleton
Tags
skeleton
Place id
us/tx/harris-county/houston
Coordinates
29.76278, -95.38306
Location precision
county
Location source
County seat (Houston), Wikidata, placed at county level
Coordinate source
wikidata county seat
Location source number
Not disclosed
Location last verified
September 16, 2026
EPA registry id
Not disclosed
Use type values
not_disclosed
Tenancy value
not_disclosed
Cooling type value
not_disclosed
Capacity basis
not_disclosed
Water basis
not_disclosed, gallons_per_day
Acreage basis
Not disclosed
Interconnection value
not_disclosed
Capacity, if disclosed
Not disclosed
Rating of the county's rows
Not disclosed
Published
2026-09-04
Last verified
2026-09-17