Census GEOID: 17097 Location Precision: verified address Jump to Entity & Permit Table Commercial & Bulk Data (CC BY-NC 4.0)

Last verified: · 1 primary and 1 reporting sources

● Running First recorded September 28, 2026

Chirisa and CoreWeave Volo Data Center Campus

Street address 300 S Fish Lake Rd, Volo, IL 60073, Lake County verified address Exact, at the address [1] dceo.illinois.gov

Overview, regulatory gates and specifications

Chirisa Technology Parks, through legal entity Chirisa Volo LLC, operates a data center campus leased to CoreWeave at 300 South Fish Lake Road in Volo, Lake County, Illinois. Illinois Department of Commerce and Economic Opportunity certified Chirisa Volo LLC under the Data Center Investment Program in 2023 with $262,000,000 in committed capital investment. [2] On the regulatory record, state permit status is Illinois DCEO Data Center Investment Program Certified (2023, Chirisa Volo LLC). [2]

Verified Site & Permit Summary
Verified address
300 S Fish Lake Rd, Volo, IL 60073, Lake County verified address
Operator / developer
Chirisa Technology Parks
Permit / registry ID
Illinois DCEO Data Center Investment Program Certified (2023, Chirisa Volo LLC) [1]

How much power it needs, how much water it would use and who would use it have not been disclosed.

What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.

Key specifications on the record

Power capacity
Not disclosed
Water usage
Not disclosed
Land area
Not disclosed
Buildings
Not disclosed
Backup generators
Not disclosed
Capital investment
Not disclosed
Who leads it
Chirisa Technology Parks attributed via corporate HQ or property filing
[1] dceo.illinois.gov
Jobs once it runs
20 what a permit allows
[1] dceo.illinois.gov
Permitted legal entity
Chirisa Volo LLC what a permit allows
[1] dceo.illinois.gov
State permit status
Illinois DCEO Data Center Investment Program Certified (2023, Chirisa Volo LLC) the state's permit register, as of December 31, 2025, last verified November 6, 2026
[1] dceo.illinois.gov
Not disclosed
Who would use it, Tax each year

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: Chirisa Technology Parks · Applicant / Shell LLC: Chirisa Volo LLC
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for Chirisa and CoreWeave Volo Data Center Campus.

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW)
Site Footprint (Acres)
Data Hall Buildings
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Power the campus would draw A utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

Nearest data centers in Illinois

Verified data center records in Illinois within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
T5@Chicago IV Grayslake Data Center Campus Grayslake, Lake County 7 mi Proposed T5 Data Centers 480 MW
Compass Datacenters Hoffman Estates Campus (ORD1) Hoffman Estates, Cook County 17 mi Running Compass Datacenters 5 buildings
Microsoft Hoffman Estates Data Center Campus (CHI22) Hoffman Estates, Cook County 17 mi Running Microsoft
Karis Critical Hoffman Estates Data Center Proposal Hoffman Estates, Cook County 19 mi Stalled or cancelled Karis Critical 2 buildings
DataBank Chicago North (ORD3 Mount Prospect) Mount Prospect, Cook County 21 mi Running DataBank 1 building
T5@Chicago Elk Grove Village Campus (I / II / III) Elk Grove Village, Cook County 23 mi Running T5 Data Centers 3 buildings

Blank cell: not disclosed by any source on file.

Common questions about Chirisa and CoreWeave Volo Data Center Campus

Answered directly from the verified filings and local actions on this page.

Who is building Chirisa and CoreWeave Volo Data Center Campus?

Chirisa Technology Parks is the developer, dceo.illinois.gov (opens in a new tab). No construction contractor is named on the record yet.

How much power and water does Chirisa and CoreWeave Volo Data Center Campus say it needs?

Power: not disclosed by any source on file. Water: not disclosed by any source on file.

Where does Chirisa and CoreWeave Volo Data Center Campus stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Primary documents

  1. Illinois DCEO Data Center Investment Program 2025 Annual Report (Chirisa Volo LLC, Volo) (opens in a new tab), Illinois Department of Commerce and Economic Opportunity, December 31, 2025

Reporting

  1. CoreWeave, Chirisa Tap Bloom Energy For Illinois AI Data Center Project, Lean Into Microgrids - Data Center Frontier (opens in a new tab), Data Center Frontier, July 22, 2024, news outlet

2 sources on file.

Regional grid context

This site is in the RFC West (RFCW) regional power market.

Sources and data

Sources on this page

Every number on this page comes from a named source. Click any source to open the document in a new tab.

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "Chirisa and CoreWeave Volo Data Center Campus", https://datacenterrecord.org/projects/coreweave-volo-ai-data-center-il, last verified November 6, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "Chirisa and CoreWeave Volo Data Center Campus", https://datacenterrecord.org/projects/coreweave-volo-ai-data-center-il. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
42.3218, -88.1654
How the location is known
Location from the site's street address.
Coordinate source
Illinois DCEO 2025 Annual Report and municipal parcel records
Location last verified
November 6, 2026
Published
September 28, 2026
Last verified
November 6, 2026
Not disclosed
Location source, Location source number, EPA registry id, Uses, Tenancy, Cooling, How capacity was disclosed, How water was disclosed, How acreage was disclosed, Interconnection, Capacity, if disclosed, Rating of the county's rows

Researcher view · Chirisa and CoreWeave Volo Data Center Campus · 2 sources, 0 entries · basis and source tier on every row · verified November 6, 2026

Download CSV JSON