CoreSite Los Angeles One Wilshire Data Center (LA1)

Street address 624 South Grand Avenue, Los Angeles, CA 90017, Los Angeles County verified address Exact, at the address [1] coresite.com

Overview, regulatory gates and specifications

CoreSite operates its flagship LA1 Pacific Rim interconnection facility inside the One Wilshire carrier hotel at 624 South Grand Avenue in downtown Los Angeles, Los Angeles County, California, with 18 MW of capacity. [1] Filings on the record specify 1 planned or operational building. [1] Verified facility status from California state agency permits, utility dockets, municipal planning filings, or operator campus specifications. [1]

1. Land & Parcel
Parcel located
2. Local Zoning
Zoning approved
3. Tax & EDA Deal
Not yet on file
4. Utility Grid Queue
Energized
5. Air & Water Permits
Not yet on file
What happens next: Facility is operational; air permit compliance, water reporting and utility filings are monitored.
Electricity Demand [1]
18 MW
the developer's figure

Equivalent to ~14,940 U.S. homes (U.S. EIA 830 homes/MW baseline) · 0.9% of Hoover Dam nameplate capacity (2,080 MW).

Grid interconnection and utility service tracked on file.

Cooling & Water
Not disclosed
Daily water volume not stated in public filings

U.S. EPA household water equivalence (300 gal/day per home) requires a disclosed daily or annual water figure.

No local property tax abatement amount disclosed in public filings.

Site & Buildings [1]
1 building
operator page

Assessor parcel acreage and building square footage are added when municipal or county filings are published.

Location: 624 South Grand Avenue, Los Angeles, CA 90017.

Taxes & Permanent Jobs
Not disclosed
Tax and job figures not yet on file

State and local tax abatement agreements and permanent job commitments are recorded when filed.

No local property tax abatement amount disclosed in public filings.

Key specifications on the record

Power capacity
18 MW developer figure Equivalent to the continuous electricity demand of about 14,900 average U.S. homes based on U.S. Energy Information Administration residential consumption data. About 0.2 percent of New York City's summer peak demand in 2024.
[1] coresite.com
Water usage
Not disclosed
Land area
Not disclosed
Buildings
1 building operator page
[1] coresite.com
Backup generators
Not disclosed
Capital investment
Not disclosed
Commissioned
Operational since 2014 (12 years)
Who leads it
CoreSite as stated by the source
Not disclosed
Who would use it, Jobs once it runs, Tax each year
The math behind the comparison
  1. CoreSite Los Angeles One Wilshire Data Center (LA1), capacity: 18 MW.
  2. New York City (NYISO Zone J) summer peak demand, actual, 2024: 10,245 MW (2024).
  3. 18 ÷ 10,245 = 0.0018 (MW over MW).

Sources:

A comparison is arithmetic on two published rows and is never a new fact (how comparisons are made).

Who is connected to this project

Connected government officials, corporate entities, utilities and local rules on the public record.

Builder, Shell LLC & Utilities

BUILDER
Operator / Developer: CoreSite
UTILITIES
Electric utility: Not disclosed

Citizen privacy standard: Elected officials, corporate applicants and utility executives are named in full. Private residents who speak at public comment are cited as Resident First L. unless they hold public office or speak on behalf of an organization.

Technical specification and permit ledger

Disclosed engineering ceilings, reported actuals and primary regulatory basis for CoreSite Los Angeles One Wilshire Data Center (LA1).

Field / Parameter Disclosed Ceiling Reported Actual Basis & Primary Source
Electrical Capacity (MW) 18 MW 18 MW the developer's figure [1] coresite.com
Site Footprint (Acres)
Data Hall Buildings 1 building 1 operator page [1] coresite.com
Cooling & Water System
Backup Diesel / Gas Generators
Tax Abatement & Annual Revenue

Blank cell: not disclosed by any source on file.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water use A state water right filing or a water supply agreement.
  • Who would use it A lease announcement or a tenant named in a filing.
  • Jobs and tax An incentive agreement, a county's economic development filing or a fiscal note.

Hearings and statements on the record

September 9, 2026 Montebello, CA Montebello City Council Regular Meeting Montebello City Council 1 clip

During public comment at the September 9, 2026 Montebello City Council meeting, residents challenged the proposed Montebello data center over municipal water consumption and community impact.

  1. Resident public comment Resident Public Comment transcribed from the official recording
    "done with corruption? two. What is dumb Hilda Cis and the data center going to do for us when we have to pour water into these data centers that are going to destroy our communities and [clears throat] flock. your cameras. Who's going to monitor them? That's racist. Whatever"
March 4, 2026 Monterey Park, CA Monterey Park City Council Regular Meeting Monterey Park City Council 3 clips

Monterey Park City Council held a public hearing and voted on Items 11B, 12A, and 12B to extend the city's temporary moratorium on data centers and call a special municipal election placing a citywide data center prohibition before voters.

  1. Monterey Park City Clerk Board & Planning Staff transcribed from the official recording
    "consideration and possible action to call for a special election on June 2nd, 2026 and adding a proposition to the ballot prohibiting data center citywide. So, let me just tell you guys how many speaker cards I got so you guys can regulate the time and know that more speaker cards come in throughout the night. so 12 A I currently have 55"
  2. Resident public comment Resident Public Comment transcribed from the official recording
    "or are you back home avoiding accountability and watching? Bluey, tonight, I'm asking the council to vote yes. Yes to extending the moratorum. Yes to a June 2nd special election for a city wide ban on data centers. Yes to a city ordinance that permanently bans data centers from being built in the city. And on that ballot, and we're also asking to close two loopholes, prevent"
  3. Monterey Park City Council Member Elected Official transcribed from the official recording
    "we have multiple items regarding the data center tonight, 12 A, 12B, and 11B. If you want to speak on each item, fill out a separate card for each item. I will then call speakers by name indicated on the speaker card for each agenda item and you would come up to the podium, speak into the mic. and"

Timeline on the record

Chronological regulatory, corporate and permitting events on the record, newest first.

No dated entry is on the record yet.

Every event in order

  • Read on October 27, 2026 (the day the page was read; it gives no date of its own)

    Verified facility status from California state agency permits, utility dockets, municipal planning filings, or operator campus specifications.

    [1] coresite.com

Nearest data centers in California

Verified data center records in California within 60 miles by straight line distance.

Facility & Location Distance Stage Operator / Tenant Disclosed Scale
Digital Realty Los Angeles Carrier Hotel (LAX10 / 600 West 7th Street) Los Angeles, Los Angeles County Less than 1 mi Running Digital Realty 24 MW
Equinix Los Angeles (LA1 600 West 7th Street) Los Angeles, Los Angeles County Less than 1 mi Running Equinix 1 building
DataBank Los Angeles Carrier Hotel Data Center (LAX1) Los Angeles, Los Angeles County Less than 1 mi Running DataBank 8 MW
Equinix LA1 Los Angeles Carrier Hotel Data Center Los Angeles, Los Angeles County Less than 1 mi Running Equinix 18 MW
Equinix Los Angeles (LA2 818 West 7th Street) Los Angeles, Los Angeles County Less than 1 mi Running Equinix 1 building
CoreSite Los Angeles Downtown Campus (LA2 and LA3) Los Angeles, Los Angeles County 1 mi Running CoreSite 50 MW

Blank cell: not disclosed by any source on file.

Common questions about CoreSite Los Angeles One Wilshire Data Center (LA1)

Answered directly from the verified filings and local actions on this page.

Who is building CoreSite Los Angeles One Wilshire Data Center (LA1)?

CoreSite is the developer. No construction contractor is named on the record yet.

How much power and water does CoreSite Los Angeles One Wilshire Data Center (LA1) say it needs?

Power: 18 MW (the developer's figure, coresite.com (opens in a new tab)). Water: not disclosed by any source on file.

Where does CoreSite Los Angeles One Wilshire Data Center (LA1) stand today?

It is running; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. CoreSite Los Angeles One Wilshire Data Center (LA1) Official Disclosure (opens in a new tab), CoreSite, news outlet

1 source on file.

Regional grid context

This site is in the WECC California (CAMX) regional power market.

Sources and data

Cite this page

Every record on this page carries its sources and the date it was last verified. When you cite it in a story, a study or a public filing, link to this page and give the date you accessed it.

Get this data

Every row on this page is available to download with its source, its basis and the date it was last verified.

Use this data in your work

Free to use and republish with attribution for reporting, research, teaching and public filings under CC BY-NC 4.0. Commercial, enterprise, financial or AI training use needs a commercial license.

About this data

Last verified
Next check Feeds every four hours, pages daily.
Figures Each figure as its source gave it, with its basis; another source's figure never stands in for the record's own, and nothing is estimated.
License Data CC BY-NC 4.0 (opens in a new tab); free for personal, academic, civic and newsroom reporting with attribution. Using this data in a report? Support the record. Commercial use needs a license. Prose stays under copyright.
Cite this page Data Center Record, "CoreSite Los Angeles One Wilshire Data Center (LA1)", https://datacenterrecord.org/projects/coresite-los-angeles-la1-one-wilshire-ca, last verified October 27, 2026. CSV · JSON
Using this data in a report? Support the record. Commercial use needs a license.
Cite this page

Data Center Record, "CoreSite Los Angeles One Wilshire Data Center (LA1)", https://datacenterrecord.org/projects/coresite-los-angeles-la1-one-wilshire-ca. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.

Report a change
For researchers
Stage
Running
Tier
built from one source
Tags
Built from one source
Coordinates
34.0488, -118.2555
How the location is known
Location from the site's street address.
Location source
https://www.coresite.com/data-centers/los-angeles-data-centers/la1
Coordinate source
Los Angeles County Assessor / CoreSite LA1 One Wilshire specification
How capacity was disclosed
the developer's figure
Capacity, if disclosed
18 MW, the developer's figure
Published
October 21, 2026
Last verified
October 27, 2026
Not disclosed
Location source number, Location last verified, EPA registry id, Uses, Tenancy, Cooling, How water was disclosed, How acreage was disclosed, Interconnection, Rating of the county's rows

Researcher view · CoreSite Los Angeles One Wilshire Data Center (LA1) · 1 source, 1 entry · basis and source tier on every row · verified October 27, 2026

Download CSV JSON