Cologix Minneapolis Carrier Hotel Campus (MIN1 to MIN3), in order
What happened with this project, oldest first: the stages it reached, what the county and its cities decided, and every dated step on the record. Each entry links its source.
1 event, March 4, 2015. Also on the record, under the month each belongs to: 1 figure from another source and 2 dates when source pages were read and verified. The facts, newest first: the record; the place: Minnesota.
A plain date is the day it happened, as the source states it, or as the line's own sentence states it ("voted on July 6"), which is where the line sits even when it was filed later. "Reported" and a date is the day a source published a line that carries no date of its own. Those lines, and lines that describe rather than report an act, sit under their month rather than on the timeline, with what was said and the figures other sources gave. Every timeline on the site reads its lines by this one rule. How dates are read.
Stages
2015 1 event
-
(source date; the content gives no date of its own)
running
Cologix opened its third data center in Minneapolis [4]
2024 2 under the months
-
Also in June 2024: 1 figure from another source and 1 date when a source page was read and verified
-
(source date; the content gives no date of its own)
Entry
Cologix acquired a data center from vXchnge in Minneapolis [5]
-
(source date; the content gives no date of its own)
Figure · Data Center Knowledge
60,000 square feet: Cologix now has 60,000 square feet of space at 511 Building in Minneapolis Data Center Knowledge (opens in a new tab) trade press
-
2026 1 under the months
-
Also in September 2026: 1 date when a source page was read and verified
-
(the day the page was read; it gives no date of its own)
Entry
Cologix lists Cologix MIN1, Cologix MIN2, Cologix MIN3, Cologix MIN4, Cologix MIN5, Cologix NNJ2, Cologix NNJ3, Cologix NNJ4, Cologix SV1 at Minneapolis, Minnesota on its own page of data center locations, read September 14, 2026. [1]
-
On the timeline: a stage change; an entry that reports an act on the day the source or its own sentence gives; and a decision, a published scorecard event on a row at or under the record's county, that reports an act. Under the months: a statement that names this record, a figure another source gave about it, matched by place and developer, an entry dated only by the day its source was published, and an entry or a decision that describes rather than reports an act. Each is on the record in its own right and keeps its own link.
For researchers
- Stage
- running
- Events on the timeline
- 1
- Under the months
- 3
- Stage changes
- 1
- Decisions
- 0
- Statements
- 0
- Figures
- 1
- Entries and decisions under the months
- 2