Projects / Apple Reno Technology Park Data Center Campus / Timeline

Apple Reno Technology Park Data Center Campus, in order

What happened with this project, oldest first: the stages it reached, what the county and its cities decided, and every dated step on the record. Each entry links its source.

2 events, July 1, 2013 to June 2026. Also on the record, under the month each belongs to: 4 figures from other sources and 1 line that is not an event of its own. The facts, newest first: the record; the place: Nevada.

A plain date is the day it happened, as the source states it, or as the line's own sentence states it ("voted on July 6"), which is where the line sits even when it was filed later. "Reported" and a date is the day a source published a line that carries no date of its own. Those lines, and lines that describe rather than report an act, sit under their month rather than on the timeline, with what was said and the figures other sources gave. Every timeline on the site reads its lines by this one rule. How dates are read.

Stages

  1. running

Now: running. A stage is the record's status after the entry that set it (the definitions).

2013 1 event

  1. (content date)

    running

    Apple planned a 137 acre, 18,20 MW solar array adjacent to its Reno data center in partnership with NV Energy, expected to generate approximately 43.5 million kilowatt hours of clean energy per year. [1]

2026 1 event

  1. (the month its own sentence names; no day is given; filed under Sep 7, 2026)

    Decision · Reno (city)

    Reno City Council approved a 30 day moratorium on accepting and processing new data center applications in June with 6-1 vote nnbw.com (opens in a new tab)

  2. Also in September 2026: 4 figures from other sources and 1 line that is not an event of its own
    1. (source date; the content gives no date of its own)

      Figure · News From The States

      48 percent: NV Energy achieved nearly 48 percent renewable portfolio standard compliance in 2025, above the 34 percent requirement as of that year News From The States (opens in a new tab) local outlet

    2. (source date; the content gives no date of its own)

      Figure · News From The States

      12 percent: If new gas burning plants were operating in 2025, Nevada emissions would have increased by nearly 12 percent according to Nevadans for Clean Affordable Reliable Energy analysis News From The States (opens in a new tab) local outlet

    3. (source date; the content gives no date of its own)

      Figure · News From The States

      652,000 homes: Gas burning plants would burn about three times as much methane gas as NV Energy's entire Northern Nevada residential and commercial customer base in 2025, or enough gas to supply about 652,000 homes News From The States (opens in a new tab) local outlet

    4. (source date; the content gives no date of its own)

      Figure · News From The States

      360 MW: Two gas power plants would generate more than 360 megawatts of electricity using methane gas fired engines News From The States (opens in a new tab) local outlet

    5. (source date; the content gives no date of its own)

      Decision · Reno (city)

      Reno extended the moratorium through August 2027 and determined to adopt new regulations at that time nnbw.com (opens in a new tab)

On the timeline: a stage change; an entry that reports an act on the day the source or its own sentence gives; and a decision, a published scorecard event on a row at or under the record's county, that reports an act. Under the months: a statement that names this record, a figure another source gave about it, matched by place and developer, an entry dated only by the day its source was published, and an entry or a decision that describes rather than reports an act. Each is on the record in its own right and keeps its own link.

For researchers
Stage
running
Events on the timeline
2
Under the months
5
Stage changes
1
Decisions
2
Statements
0
Figures
4
Entries and decisions under the months
1

Researcher view · basis and source tier on every row · docket and Census GEOIDs · citation and export tools