Data Center Record.
Daily Record

June 21, 2024

2 entries published that day, the everything feed by the day each row entered the record; the timeline lists milestones alone, by the day they happened. Each is one sourced row of the record: what happened, where, and where it came from. Nothing here is an article and nothing is unapproved.

  1. Red Oak, TX Reference figure

    the Electrical Distributor magazine. The facility's opening will create more than 200 jobs.: 200 jobs. Red Oak, TX, 2024. the Electrical Distributor magazine local outlet (reported on this date) (source date; the content gives no date of its own)

  2. Texas News item

    Schneider Electric Opens Data Center Integration Facility - the Electrical Distributor magazine. Schneider Electric opens a 105,000 square foot integration facility in Red Oak, Texas for prefabricated modular data center solutions. the Electrical Distributor magazine, 2024-06-21. the Electrical Distributor magazine local outlet (reported on this date) (reported on; the source's own date)

    TXcompass-red-oak-campus-tx

A row's day is the day the event happened, or, where a source gives only its own publication date, that date. The same rows appear on the record pages they belong to; this page is the dated log of them. A row read in a tier 1 query feed is a lead, not an entry, and appears on its record page only.