Data Center Record.

Ohio U.S. Senate special election 2026: where the candidate stands on data centers

4 candidates on the November 3, 2026 ballot, from the Franklin County Board of Elections' list (opens in a new tab). Across the candidates, the record holds 8 sourced statements, 0 bills sponsored, and 0 roll call votes on data center measures. 3 candidates did not win and are in the Did not win fold below. The officeholder comes first, then the Republican and Democratic nominees together by last name, then everyone else by last name; in each group a candidate with a statement or vote on the record comes first (how the order works). Each has the same space. The list: 2026 General Election Candidates (Franklin County Board of Elections), Revised September 22, 2026 (Revised September 22, 2026).

Checked · How the record reads leaders · Report a change · Corrections

Reported winner

Who won the Ohio U.S. Senate special election in 2026?

Sherrod Brown won the Ohio U.S. Senate special election (reported by AP, November 3, 2026). Sherrod Brown's stance on data centers: Of 8 statements on the record, 3 raised concerns about data centers and 5 carry no label.

Reported by AP, November 3, 2026. Associated Press, 2026 Ohio U.S. Senate Election Results (opens in a new tab). Sherrod Brown's page.

This is the reported result, not the state's. When the state certifies the race, this reads Certified winner and the state's own results page is the source.

The candidates

  1. Sherrod Brown, Democratic candidate for U.S. Senate (special election), Ohio

    Sherrod Brown

    Democratic · Reported winner (AP, called November 3, 2026)

    Of 8 statements on the record, 3 raised concerns about data centers and 5 carry no label.

    What they said

    0 3 0

    8 statements · 0 votes on the record

    Photo: US Congress, public domain (opens in a new tab), via Wikimedia Commons (opens in a new tab), cropped.

    Sherrod Brown's page · In their own words

Did not win, November 3, 2026 3

These candidates were on the ballot and did not win. Each line gives the status, the day and the source. What each has said about data centers stays on their own page, which is kept as an archive.

No longer in this race 1

These candidates are off the November 3 ballot. Each line gives the status, the day and the source; what each has said about data centers stays on their own page.

A candidate leaves a race before the general election by losing the primary, withdrawing or being disqualified, and the record writes it only where a source says so. How the record follows each candidacy.

Certified write in candidates 3

These candidates are not printed on the November 3 ballot. A voter writes in the name, and the votes count because an official election list certifies the candidacy: the state's own, or a county election board's where the state publishes none. Each line names the list that certifies it; what each has said about data centers stays on their own page.

Labels are applied by the record's published rules: two readings of each statement, and a third that reads its source where the two differ. Every label sits beside its statement and its source, and any label can be challenged through Report a change, with the correction logged on the corrections page.

In their own words

Where does Sherrod Brown stand on data centers?

Of 8 statements on the record, 3 raised concerns about data centers and 5 carry no label.

Statements 8 statements
  1. · paraphrased

    Sherrod Brown, Democratic nominee, promised to make data centers pay the full cost of their electricity use and said local communities deserve more transparency and a say on whether to allow data center construction

    The Highland County Press (opens in a new tab) · Full quote, context and sources

  2. · paraphrased

    Sherrod Brown claimed that Senator Jon Husted gave billions in tax breaks to Big Tech to build data centers in Ohio, making Ohioans foot the bill.

    The Philadelphia Inquirer (opens in a new tab) · Full quote, context and sources

  3. · paraphrased

    Sherrod Brown, Democratic candidate for Senate, makes Jon Husted's data center record central to Ohio's Senate race, casting him as the face of data centers and arguing companies received large tax breaks while Ohio residents face higher electricity bills

    Newsweek (opens in a new tab) · Full quote, context and sources

  4. · paraphrased

    Sherrod Brown statement in 2015 celebrating Amazon data center in central Ohio saying the facility is great news for New Albany and central Ohio

    Fox News (opens in a new tab) · Full quote, context and sources

  5. · paraphrased

    Brown's campaign placed an ad on September 4 attacking data centers in Ohio

    streamlinefeed.co.ke (opens in a new tab) · Full quote, context and sources

  6. · paraphrased

    Brown said data center companies should use union labor, local communities should have input on project locations, and tax breaks should be limited

    WSYX (opens in a new tab) · Full quote, context and sources

  7. · paraphrased

    Sherrod Brown said Jon Husted was point man for more than 200 data centers coming into Ohio with big tax breaks, no local input, and higher electric rates

    WSYX (opens in a new tab) · Full quote, context and sources

  8. · paraphrased · Classification note: Verified against source context

    Ohio Democratic Senate candidate Sherrod Brown is running an ad calling incumbent Sen. Jon Husted the 'face of data centers' for supporting tax breaks and economic benefits

    Brookings (opens in a new tab) · Full quote, context and sources

Candidates and their order come from the Franklin County Board of Elections' list (opens in a new tab), verified October 15, 2026. Every candidate, by state · How the record reads leaders.

Are you a candidate in this race or on the campaign? Ask for a correction or send a statement, or email corrections@datacenterrecord.org.

Every race in Ohio, and where each candidate stands

Researcher view · basis and source tier on every row · docket and Census GEOIDs · citation and export tools

Commercial and bulk data