Upper Merion data center
A developer vowed to push forward with a data center project after plans were denied by the Upper Merion Board of Supervisors. It is reported, as reported August 17, 2026.
How much power it needs, how much water it would use and who would use it have not been disclosed.
How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.
What is known
Each figure as its source gave it. The number in brackets is its place in the source list.
- Land
- Not disclosed
- Power it would draw
- Not disclosed
- Water
- Not disclosed
- Who leads it
- Not disclosed
- Who would use it
- Not disclosed
- Jobs once it runs
- Not disclosed
- Tax each year
- Not disclosed
Every field, with who said it and when (Researcher view)
Impact figures
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| How much power it needs | Not disclosed | |||
| How much water it would use | Not disclosed | |||
| How loud it would be | Not disclosed | |||
| Jobs once it runs | Not disclosed | |||
| Tax it would pay each year | Not disclosed |
The record's fields
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| Who is building it | Not disclosed | |||
| Who is constructing it | Not disclosed | |||
| How much land | Not disclosed | |||
| Where its power comes from | Not disclosed | |||
| Grid connection | Not disclosed | |||
| How it is cooled | Not disclosed |
The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.
Still not public, and where it would show up
The record adds each the day a source gives it. Why these documents.
- Water useA state water right filing or a water supply agreement.
- Who would use itA lease announcement or a tenant named in a filing.
- Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
- Who is behind itA land record, a zoning application or a company's own announcement.
- Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.
What was decided
Acts of Montgomery County and Upper Merion about data centers, on the record with their source. A rule about the area is not a decision about this record.
| Date | Who | Decision | Source |
|---|---|---|---|
| Upper Merion | Upper Merion Township board rejected proposal for five data centers totaling over 4.6 million square feet relying on natural gas turbines and diesel backup generators | northeasttimes.com | |
| Upper Merion | Developer sued Upper Merion Township planning commission and board of supervisors; vote scheduled for Thursday pending court order | cbsnews.com |
What happened
-
· Status: rumored (source date; the content gives no date of its own)
MLP Ventures proposal includes closed loop water system [1]
The full Upper Merion data center timeline, in order
2 corrections to this record
Every correction, with its reason
-
· the site acres of a projects row
The site read 4 acres. The source's figure was 4 million square feet, a floor area, and the approval wrote the number as acres. Returned to not disclosed, as it was before. The old and new text.
-
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
Every correction on the record is on the corrections page.
The site
Where in Montgomery County is not in the public record. The pin marks the county seat, not a building, and the outline is the county.
Tap a pin for the data center, the parcel for its record
- This record: Proposed, ringed
- data center
- Dashed edge: the exact site is not in the public record
- Smaller pins: 19 other published records in Pennsylvania
Details
- this record's location, ringed
- parcel outline, from the county parcel record
- city limits, U.S. Census Bureau, on a town level record
- county boundary
The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.
- Where
- Upper Merion, Montgomery County, Pennsylvania
- How exactly it is located
- County level, the county seat
- The parcel
- No parcel outline in the public record
- Nearest homes
- Not computed for a record placed at a place center
- Nearest records
- Nearest records are not computed for a record placed at a county seat.
Questions about this project
4 questions answered from the record
Who is building Upper Merion data center?
-
Not disclosed. No source on file names the developer. The sources read for this record are listed under Sources.
How much power and water does Upper Merion data center say it needs?
-
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
Where does Upper Merion data center stand today?
-
It is reported, as reported August 17, 2026. The newest entry, reported August 17, 2026: MLP Ventures proposal includes closed loop water system [1].
What has Upper Merion or Montgomery County decided about it?
-
Upper Merion (rated restrictive): Upper Merion Township board rejected proposal for five data centers totaling over 4.6 million square feet relying on natural gas turbines and diesel backup generators (reported September 13, 2026, source); and Upper Merion: Developer sued Upper Merion Township planning commission and board of supervisors; vote scheduled for Thursday pending court order (reported August 17, 2026, source). 2 events are on the county's rows; a rule about the area is not a decision about this record.
Sources
Reporting
- Upper Merion Township, Pennsylvania, sued over proposed data centers, www.cbsnews.com, August 17, 2026, local outlet
- Developer vows to push forward with data center after plans denied by Upper Merion Board of Supervisors - 6abc Philadelphia, 6abc Philadelphia, August 14, 2026, local outlet
2 sources on file.
Cite this record
Data Center Record, "Upper Merion data center", https://datacenterrecord.org/projects/upper-merion-data-center-pa, last verified September 25, 2026.
Cite this page
Data Center Record, "Upper Merion data center", https://datacenterrecord.org/projects/upper-merion-data-center-pa. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.
The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.
For researchers
- Slug
- upper-merion-data-center-pa
- Status value
- rumored
- Stage
- Proposed
- Tier
- skeleton
- Tags
- skeleton
- Place id
- us/pa/montgomery-county/upper-merion
- Coordinates
- 40.12, -75.3417
- Location precision
- county
- Location source
- County seat (Norristown), Wikidata, placed at county level
- Coordinate source
- wikidata county seat
- Location source number
- Not disclosed
- Location last verified
- September 16, 2026
- EPA registry id
- Not disclosed
- Use type values
- not_disclosed
- Tenancy value
- not_disclosed
- Cooling type value
- not_disclosed
- Capacity basis
- not_disclosed
- Water basis
- not_disclosed, gallons_per_day
- Acreage basis
- Not disclosed
- Interconnection value
- not_disclosed
- Capacity, if disclosed
- Not disclosed
- Rating of the county's rows
- Restrictive
- Published
- 2026-09-04
- Last verified
- 2026-09-25