Project Jupiter, in order
What happened with this project, oldest first: the stages it reached, what the county and its cities decided, and every dated step on the record. Each entry links its source.
8 events, October 2025 to October 19, 2026. Also on the record, under the month each belongs to: 55 statements, 33 figures from other sources and 37 dates when source pages were read and verified. The facts, newest first: the record; the place: New Mexico.
A plain date is the day it happened, as the source states it, or as the line's own sentence states it ("voted on July 6"), which is where the line sits even when it was filed later. "Reported" and a date is the day a source published a line that carries no date of its own. Those lines, and lines that describe rather than report an act, sit under their month rather than on the timeline, with what was said and the figures other sources gave. Every timeline on the site reads its lines by this one rule. How dates are read.
2025 1 event
-
Also in August 2025: 2 statements
-
(content date; reported from elsewhere)
Statement · Susanna Chaparro, District 4 Commissioner
This sounds to be a wonderful thing for Doña Ana County, but there's a right way and a wrong way to do this. I would like more community engagement. We, as a community, need to understand what will be happening in our county.
El Paso Matters (opens in a new tab) news outlet -
(content date; reported from elsewhere)
Statement · Lanham Napier, Chairman and Co-founder
We are now at a point in our technology development where we can develop these resources in a very sustainable, innovative way.
El Paso Matters (opens in a new tab) news outlet
-
-
Also in September 2025: 1 statement
-
(content date; reported from elsewhere)
Statement · Sam Altman, Chief Executive Officer
AI can only fulfill its promise if we build the compute to power it. That compute is the key to ensuring everyone can benefit from AI and to unlocking future breakthroughs. We're already making historic progress toward that goal through Stargate and moving quickly not just to meet its initial commitment, but to lay the foundation for what comes next.
El Paso Matters (opens in a new tab) news outlet
-
-
(the month its own sentence names; no day is given; filed under Sep 18, 2026)
Entry
New Mexico Office of the State Engineer authorized emergency drilling in October 2025 [26]
-
Also in December 2025: 1 statement
-
(content date; reported from elsewhere)
Statement · Colin Cox, Senior Attorney
They've split it into two separate plants that are 'minor sources' to avoid having to monitor their actual air quality impacts, which are going to be huge. They're coming up to 99.9% of the threshold for when they'd have to do additional work.
Source New Mexico (opens in a new tab) local outlet
-
2026 7 events
-
(the month its own sentence names; no day is given; filed under Sep 24, 2026)
Entry
Oracle announced as tenant of Project Jupiter in January 2026 [1]
-
(source date; the content gives no date of its own)
reported
New tensions flared over Project Jupiter data center in southern New Mexico [80]
-
Also in June 2026: 2 figures from other sources
-
(source date; the content gives no date of its own)
Figure · Source New Mexico
1,500 jobs: Project Jupiter would create up to 1,500 long term jobs according to campaign materials Source New Mexico (opens in a new tab) local outlet
-
(source date; the content gives no date of its own)
Figure · Source New Mexico
4,000 jobs: Project Jupiter would create 4,000 construction jobs according to campaign materials Source New Mexico (opens in a new tab) local outlet
-
-
(the month its own sentence names; no day is given; filed under Sep 24, 2026)
Entry
Natural gas pipeline extension rejected by state officials in July 2026 [1]
-
Also in July 2026: 4 statements
-
(said in the source itself)
Statement · Micaela Lara Cadena, Angelica Rubio, Eleanor Chávez, Carrie Hamblen
The moratorium proposal would pause new large scale data center projects while the state develops rules for water use, energy demand, emissions, ratepayer impacts and community benefits Organ Mountain News (opens in a new tab) local outlet
-
(said in the source itself)
Statement · David Baake, Western Resource Advocates
David Baake, attorney and energy policy consultant for Western Resource Advocates, told New Mexico lawmakers that Project Jupiter's fuel cell microgrid would emit more than all existing power plants in New Mexico combined Source New Mexico (opens in a new tab) local outlet
-
(said in the source itself)
Statement · David Baake
Project Jupiter's emissions would put the state back at 2005 levels of CO2 from the electric sector, undoing more than 20 years of progress Source New Mexico (opens in a new tab) local outlet
-
(said in the source itself)
Statement · David Baake
The Microgrid Oversight Act, state legislation proposed to more closely regulate microgrids and require compliance with Energy Transition Act requirements, died after clearing the Senate Source New Mexico (opens in a new tab) local outlet
-
-
(the day its own sentence names; filed under Sep 17, 2026)
Entry
Court lifted stay imposed on August 23 that had paused air permit proceeding and water use for Project Jupiter [24]
-
Also in August 2026: 1 figure from another source
-
(source date; the content gives no date of its own)
Figure · spokesman.com
130,000,000,000 USD: At least 75 data center projects worth about $130 billion combined were blocked or delayed by local opposition during first three months of 2026 spokesman.com (opens in a new tab) local outlet
-
-
(the day its own sentence names; filed under Sep 24, 2026)
Entry
New Mexico Supreme Court stayed air permit proceeding for proposed microgrid serving campus on Sept. 14 [33]
-
(content date)
Entry
Oracle issued a force majeure notice to STACK Infrastructure on September 24, allowing it to protect itself contractually if Project Jupiter fails to launch as planned in 2028 [50]
-
Also in September 2026: 40 statements, 30 figures from other sources and 37 dates when source pages were read and verified
-
(said in the source itself)
Statement · Deb Haaland, Democratic gubernatorial nominee
Haaland supports a moratorium on new data center development until strong guardrails are established in law and practice. Searchlight New Mexico (opens in a new tab) local outlet
-
(said in the source itself)
Statement · Deb Haaland, Democratic gubernatorial nominee
Deb Haaland, Democratic nominee for governor, said during a primary debate in May that data centers do not have the best interests of the community at heart. Searchlight New Mexico (opens in a new tab) local outlet
-
(source date; the content gives no date of its own)
Figure · Searchlight New Mexico
165,000,000,000 USD: Project Jupiter is a $165 billion data center campus intended to host AI infrastructure for companies like Oracle and OpenAI. Searchlight New Mexico (opens in a new tab) local outlet
-
(source date; the content gives no date of its own)
Figure · Searchlight New Mexico
12,400 USD: Oracle contributed $12,400 to Deb Haaland's gubernatorial campaign in the June 28 September 7 reporting period. Searchlight New Mexico (opens in a new tab) local outlet
-
(source date; the content gives no date of its own)
Figure · Source New Mexico
3,700,000 dollars: Elevate New Mexico paid nearly 3.7 million by Project Jupiter developer for pro Project Jupiter advertising Source New Mexico (opens in a new tab) local outlet
-
(source date; the content gives no date of its own)
Figure · Searchlight New Mexico
74,800 USD: Individuals associated with Clayco and Oracle donated approximately $74,800 to Deb Haaland beyond corporate contributions. Searchlight New Mexico (opens in a new tab) local outlet
-
(source date; the content gives no date of its own)
Figure · Source New Mexico
3,400,000 dollars: Oracle advertising campaign spent 3.4 million between January and April on media production, polling and consulting Source New Mexico (opens in a new tab) local outlet
-
(source date; the content gives no date of its own)
Figure · Source New Mexico
3,400,000 dollars: New Mexico State Ethics Commission said Oracle spent 3.4 million on advertisements for Project Jupiter Source New Mexico (opens in a new tab) local outlet
-
(source date; the content gives no date of its own)
Entry · Moratorium
Haaland's moratorium would not affect Project Jupiter, the Oracle- and OpenAI backed artificial intelligence data center campus under construction at the Santa Teresa Industrial Park. [25]
-
(source date; the content gives no date of its own)
Entry · Moratorium
Court unpaused regulatory proceedings that had been frozen since August, allowing air quality permit hearing to move forward [23]
-
(said in the source itself)
Statement · Deb Haaland, gubernatorial candidate
Haaland's eight pronged proposal requires data centers to build their own renewable energy infrastructure, use closed loop cooling systems, require prevailing wage union jobs, meet renewable energy and zero carbon requirements, meet clean air standards, post decommissioning bonds, and comply with community accountability measures. lcsun-news.com (opens in a new tab) national outlet
-
(content date; reported from elsewhere)
Statement · Martin Heinrich, U.S. Senator
U.S. Senator Martin Heinrich called for the Senate to pass his GRID Savings Act requiring data centers to pay for their own grid connections and upgrades, opposing voluntary compliance. KSFR (opens in a new tab) local outlet
-
(said in the source itself)
Statement · Michael Egbert, Oracle spokesperson
BrabenderCox received $3.44 million from Oracle for media production, consulting, and polling related to Project Jupiter Santa Fe New Mexican (opens in a new tab) local outlet
-
(said in the source itself)
Statement · Deb Haaland, New Mexico Democratic gubernatorial nominee
Deb Haaland, Democratic gubernatorial nominee, said she would sign an executive order to pause all new large scale data center proposals if elected Source New Mexico (opens in a new tab) local outlet
-
(said in the source itself)
Statement · Deb Haaland, New Mexico Democratic gubernatorial nominee
Haaland's proposed guardrails include: prohibiting non disclosure agreements; requiring developers to build renewable energy infrastructure; requiring closed loop cooling systems; prioritizing hiring New Mexicans for union jobs; mandating compliance with clean energy goals; adhering to high standards for light pollution and noise; and imposing decommission bonds Source New Mexico (opens in a new tab) local outlet
-
(said in the source itself)
Statement · Deb Haaland, gubernatorial candidate
Deb Haaland, a Democratic gubernatorial candidate, would support legislation for a statewide data center moratorium and said if elected she would institute a temporary statewide moratorium by executive order on her first day in office. lcsun-news.com (opens in a new tab) national outlet
-
(said in the source itself)
Statement · reporting
Haaland's campaign received contributions from entities involved with Project Jupiter, including a maximum contribution of 12,400 dollars from Oracle America and Oracle Cloud Infrastructure CEO Clay Magouyrk. lcsun-news.com (opens in a new tab) national outlet
-
(said in the source itself)
Statement · Mariel Nanasi, New Energy Economy Executive Director
Mariel Nanasi, Executive Director of New Energy Economy, said plaintiffs sought a fair opportunity for public to obtain evidence and test claims before state decides whether to authorize the data center Source New Mexico (opens in a new tab) national outlet
-
(content date; reported from elsewhere)
Statement · Deb Haaland, New Mexico gubernatorial candidate
Deb Haaland said if elected governor she will sign an executive order on day one establishing a moratorium for new large scale data center projects until legislative guardrails are passed, prioritizing local jobs, renewable energy, and water use framework. KSFR (opens in a new tab) local outlet
-
(said in the source itself)
Statement · Campaign finance reports
Haaland received donations from Oracle and its CEO, developer of Project Jupiter Source New Mexico (opens in a new tab) local outlet
-
(said in the source itself)
Statement · Gregg Hull, gubernatorial candidate
Gregg Hull, Republican gubernatorial candidate, said a blanket ban on data centers sends the wrong message and prefers local control with statewide protections for water and energy rates, with project by project evaluation. lcsun-news.com (opens in a new tab) national outlet
-
(said in the source itself)
Statement · Gregg Hull, Republican gubernatorial nominee for governor
Gregg Hull, Republican gubernatorial nominee, said a moratorium signals New Mexico is closed for business and that he prefers to fix guardrails rather than shut down the data center industry Source New Mexico (opens in a new tab) local outlet
-
(source date; the content gives no date of its own)
Figure · Santa Fe New Mexican
3,440,000 USD: Oracle spent $3.44 million on political consulting between January and April 2026 for Project Jupiter advocacy Santa Fe New Mexican (opens in a new tab) local outlet
-
(source date; the content gives no date of its own)
Figure · Santa Fe New Mexican
3,700,000 USD: Elevate New Mexico received $3.7 million from Yucca Growth Infrastructure for an advertising campaign supporting Project Jupiter Santa Fe New Mexican (opens in a new tab) local outlet
-
(source date; the content gives no date of its own)
Figure · Santa Fe New Mexican
4,700,000,000 USD: Project Jupiter is expected to deliver $4.7 billion in economic benefits, create 7,000 construction jobs and support 1,500 ongoing jobs Santa Fe New Mexican (opens in a new tab) local outlet
-
(source date; the content gives no date of its own)
Entry
S&P downgraded Oracle in July, leaving its corporate rating one notch above junk [27]
-
(source date; the content gives no date of its own)
Entry · Moratorium
Haaland said her moratorium would not affect Project Jupiter, the Oracle- and OpenAI backed artificial intelligence data center campus under construction at the Santa Teresa Industrial Park. [22]
-
(said in the source itself)
Statement · Gregg Hull, gubernatorial candidate
Republican Gregg Hull said he does not support a statewide moratorium on data centers and believes local governments should make those decisions, with projects evaluated on their own merit. KOB 4 (opens in a new tab) local outlet
-
(said in the source itself)
Statement · Deb Haaland, gubernatorial candidate
Haaland released a list of eight protections for data center development including no backroom deals, no energy rate increases, water protections through closed loop systems, New Mexico jobs and union wages, renewable energy and zero carbon compliance, clean air and habitat protections, decommissioning bonds, and community accountability. KOB 4 (opens in a new tab) local outlet
-
(said in the source itself)
Statement · Gregg Hull, Republican candidate for New Mexico governor
Gregg Hull, Republican candidate for New Mexico governor, said he would use existing laws such as New Mexico's Local Economic Development Act to impose restrictions and negotiate deals with large scale companies KUNM (opens in a new tab) local outlet
-
(said in the source itself)
Statement · reporting
Haaland's campaign received contributions from entities associated with Project Jupiter, including donations from Oracle executives totalling over 87,000 dollars according to Hull campaign analysis. KOB 4 (opens in a new tab) local outlet
-
(said in the source itself)
Statement · Gregg Hull, gubernatorial candidate
Hull said he supports legislation to protect water and electric rates, including a ban on using potable water and requiring data centers to pay for their own electrical infrastructure. KOB 4 (opens in a new tab) local outlet
-
(said in the source itself)
Statement · Raul Torrez, New Mexico Attorney General
New Mexico Attorney General Raul Torrez argued the Water Code's narrow emergency exception does not authorize approval without notice and hearing for a change and that the Office of the State Engineer ignored its own guidance. KFOX (opens in a new tab) local outlet
-
(said in the source itself)
Statement · Gregg Hull, Republican candidate for New Mexico governor
Hull said he would trust local counties and municipalities to make decisions about data centers in concert with the Economic Development Office, similar to Project Jupiter KUNM (opens in a new tab) local outlet
-
(said in the source itself)
Statement · Deb Haaland, Democratic candidate for New Mexico governor
Deb Haaland, Democrat candidate for New Mexico governor, said she would sign an executive order on day one issuing a moratorium on new large scale data center projects until protections are in place KUNM (opens in a new tab) local outlet
-
(said in the source itself)
Statement · Martin Heinrich, U.S. Senator
Heinrich proposed an alternative bill that would require the Federal Energy Regulatory Commission to issue rules for data centers using 150 megawatts or more to pay for certain grid upgrades Deseret News (opens in a new tab) local outlet
-
(said in the source itself)
Statement · Deb Haaland, Democratic gubernatorial nominee
Haaland mentioned geothermal energy as a potential source to power new data centers in New Mexico. Buffalo’s Fire (opens in a new tab) news outlet
-
(said in the source itself)
Statement · Deb Haaland, Democratic candidate for New Mexico governor
Haaland said required protections would include data centers building their own renewable energy infrastructure and having robust plans to prevent environmental harms KUNM (opens in a new tab) local outlet
-
(said in the source itself)
Statement · Deb Haaland, gubernatorial candidate
Democratic nominee Deb Haaland said she would sign an executive order on day one of her governorship to pause new data centers until the state adopts stronger protections. KOB 4 (opens in a new tab) local outlet
-
(source date; the content gives no date of its own)
Figure · Finimize
89 to 91 cents on dollar: Oracle's Project Jupiter data center loans trading at 89-91 cents on the dollar Finimize (opens in a new tab) news outlet
-
(source date; the content gives no date of its own)
Figure · KFOX
100,000,000 gallons: A totalizing meter shows the well for Project Jupiter has pumped more than 100 million gallons of groundwater from the Lower Rio Grande Basin. KFOX (opens in a new tab) local outlet
-
(source date; the content gives no date of its own)
Figure · Finimize
18,000,000,000 USD: Project Jupiter loan package totals approximately $18 billion Finimize (opens in a new tab) news outlet
-
(source date; the content gives no date of its own)
Figure · Finimize
95,000,000,000 USD: Oracle forecasting up to $95 billion of capital expenditure for fiscal 2027 Finimize (opens in a new tab) news outlet
-
(source date; the content gives no date of its own)
Figure · lcsun-news.com
197,000,000 gallons: Center for Biological Diversity reported that the well at Project Jupiter has supplied over 197 million gallons for construction lcsun-news.com (opens in a new tab) local outlet
-
(source date; the content gives no date of its own)
Figure · Finimize
25,000,000,000 USD: Oracle expecting up to $25 billion of customer repayments Finimize (opens in a new tab) news outlet
-
(said in the source itself)
Statement · Deb Haaland, gubernatorial candidate
Candidate for governor Deb Haaland announced support for a data center moratorium. KSFR (opens in a new tab) local outlet
-
(said in the source itself)
Statement · Martin Heinrich, U.S. Senator
U.S. Senator Martin Heinrich took to the Senate floor to push for greater accountability for data centers. KSFR (opens in a new tab) local outlet
-
(said in the source itself)
Statement · Gregg Hull, Republican gubernatorial candidate
Hull said he would require data centers to overbuild power supply by minimum of 20 megawatts and deliver excess energy to grid The Eastern New Mexico News (opens in a new tab) local outlet
-
(said in the source itself)
Statement · Deb Haaland, Democratic gubernatorial candidate
Democratic gubernatorial candidate Deb Haaland announced support for a statewide moratorium on data centers until they meet an eight part plan including water protections, no utility rate increases and using renewable energy The Eastern New Mexico News (opens in a new tab) local outlet
-
(said in the source itself)
Statement · Gregg Hull, Republican gubernatorial candidate
Hull cited campaign finance records showing Haaland received over $87,000 in contributions from Oracle and Project Jupiter executives The Eastern New Mexico News (opens in a new tab) local outlet
-
(said in the source itself)
Statement · Gregg Hull, Republican gubernatorial candidate
Republican gubernatorial candidate Gregg Hull said a moratorium is not needed, as state and local governments have protections through permits The Eastern New Mexico News (opens in a new tab) local outlet
-
(said in the source itself)
Statement · Gregg Hull, Republican gubernatorial candidate
Hull said he would require data centers to build a $50 million desalinization plant to produce water from brackish water The Eastern New Mexico News (opens in a new tab) local outlet
-
(said in the source itself)
Statement · Oracle, company spokesperson
Oracle claimed construction uses non potable water from existing New Mexico water rights holder for dust control and other construction activities. KUNR Public Radio (opens in a new tab) local outlet
-
(source date; the content gives no date of its own)
Figure · KUNR Public Radio
197,000,000 gallons: New Mexico State Engineer reported that 197 million gallons have been used in construction to date. KUNR Public Radio (opens in a new tab) local outlet
-
(source date; the content gives no date of its own)
Entry
Increased scrutiny followed by denial of a key permit raised questions about whether the data center will come online as planned [29]
-
(source date; the content gives no date of its own)
Entry
Oracle sent Blue Owl a force majeure notice about Project Jupiter data center in New Mexico [29]
-
(source date; the content gives no date of its own)
Entry
Green Chile pipeline was delayed from August 2026 target to February 2027 after New Mexico State Land Office denied right of way permits. [35]
-
(source date; the content gives no date of its own)
Entry
Oracle issued a force majeure notice to Blue Owl, the project developer unit, due to facility delays relative to the 2028 launch date. [35]
-
(source date; the content gives no date of its own)
Entry
Project Jupiter's Green Chile natural gas pipeline was delayed from August 2026 to February 2027. [41]
-
(source date; the content gives no date of its own)
Entry
Project Jupiter has a 2028 launch date target. [41]
-
(source date; the content gives no date of its own)
Entry
Oracle sent a force majeure notice to Project Jupiter's developer in New Mexico. [41]
-
(source date; the content gives no date of its own)
Entry
Oracle sends force majeure notice on Project Jupiter data center in New Mexico [39]
-
(source date; the content gives no date of its own)
Entry
Oracle sent force majeure notice to Blue Owl Capital seeking payment deferral if project misses 2028 deadline [1]
-
(source date; the content gives no date of its own)
Entry
A natural gas pipeline needed for the facility has faced delays after permit denials [38]
-
(source date; the content gives no date of its own)
Entry
Oracle issued Request for Proposals to develop 2GW of renewable energy capacity in New Mexico for Project Jupiter [1]
-
(source date; the content gives no date of its own)
Entry
Project has faced denial of key permit amid growing public backlash over power demands and local impacts of massive data centers [42]
-
(source date; the content gives no date of its own)
Entry
Oracle invoked force majeure provision to delay payments if Project Jupiter is delayed and facility does not come online in 2028 [42]
-
(source date; the content gives no date of its own)
Entry
Oracle issued force majeure notice to Project Jupiter developers [40]
-
(source date; the content gives no date of its own)
Entry
Project Jupiter was scheduled to come online in 2028. [34]
-
(source date; the content gives no date of its own)
Entry
Oracle sent a force majeure notice to the developer building Project Jupiter due to regulatory hurdles and local opposition. [34]
-
(source date; the content gives no date of its own)
Entry
Natural gas pipeline needed for facility has faced delays after permit denials [38]
-
(source date; the content gives no date of its own)
Entry
Project Jupiter data center in New Mexico targeting 2028 completion [38]
-
(source date; the content gives no date of its own)
Entry
Oracle seeks to defer payments if Project Jupiter fails to come online in 2028 as planned [37]
-
(source date; the content gives no date of its own)
Entry
Oracle sent a contractual notice tied to Project Jupiter seeking protection if construction delays disrupt its 2028 target [38]
-
(source date; the content gives no date of its own)
Entry
New Mexico Supreme Court let permitting resume on September 17, 2026 [36]
-
(source date; the content gives no date of its own)
Entry
Gas pipeline serving site has twice been denied a state land crossing [36]
-
(source date; the content gives no date of its own)
Entry
Natural gas pipeline to serve campus has faced delays and legal challenges involving water and air quality permits [33]
-
(source date; the content gives no date of its own)
Entry
Oracle sends force majeure notice seeking to defer payments if project delays beyond 2028 opening [33]
-
(source date; the content gives no date of its own)
Entry
Oracle data center delay reported in mid day stock market news [31]
-
(source date; the content gives no date of its own)
Entry
Oracle issued force majeure notice on major data center project in New Mexico where it is primary tenant [30]
-
(source date; the content gives no date of its own)
Entry
Oracle sent force majeure notice to Project Jupiter developer seeking to delay payments if data center misses 2028 operational target [28]
-
(source date; the content gives no date of its own)
Entry
Oracle sent a force majeure notice to Blue Owl Capital unit seeking to delay payments if data center fails to come online in 2028 [32]
-
(source date; the content gives no date of its own)
Entry
Energy Transfer pipeline delayed to February 1, 2027 after regulatory denials. [48]
-
(source date; the content gives no date of its own)
Entry
Project planned to come online in 2028. [48]
-
(source date; the content gives no date of its own)
Entry
Oracle sent force majeure notice to Blue Owl Capital on Project Jupiter after energy permit denial and pipeline delay. [48]
-
(source date; the content gives no date of its own)
Entry
Oracle says Project Jupiter construction remains on schedule despite force majeure notice. [49]
-
(source date; the content gives no date of its own)
Entry
Oracle declared force majeure over possible power delays to Project Jupiter data center in New Mexico to delay transition to higher rent payments. [49]
-
(said in the source itself)
Statement · Oracle
Oracle states Project Jupiter remains on planned schedule despite force majeure notice. Investing.com (opens in a new tab) national outlet
-
(said in the source itself)
Statement · Jackson Ader, KeyBanc analyst
KeyBanc analyst Jackson Ader noted Oracle is in the most tenuous cash position among its rivals, with payment schedules misaligned to actual construction progress. Investing.com (opens in a new tab) national outlet
-
(said in the source itself)
Statement · Clay Magouyrk, co-CEO at Oracle
Clay Magouyrk, co CEO at Oracle, stated neither Project Jupiter sites will have impact on FY 2027 revenue or earnings guidance SuaraGarut.ID (opens in a new tab) international outlet
-
(said in the source itself)
Statement · Gil Luria, head of technology research at D.A. Davidson
Gil Luria, head of technology research at D.A. Davidson, stated that Oracle's New Mexico data center is unlikely to be canceled despite state and local government pushback CNBC (opens in a new tab) national outlet
-
(source date; the content gives no date of its own)
Figure · finance.biggo.com
18,000,000,000 dollars: About 18 billion dollars of debt tied to campus quoted at 89 to 91 cents on the dollar finance.biggo.com (opens in a new tab) international outlet
-
(source date; the content gives no date of its own)
Figure · finance.biggo.com
4 percent: Oracle shares fell about 4 percent in premarket trading Thursday finance.biggo.com (opens in a new tab) international outlet
-
(source date; the content gives no date of its own)
Figure · ai-cio.com
16 states: According to the National Conference on State Legislatures, 16 states are considering bans on new data center builds ai-cio.com (opens in a new tab) news outlet
-
(source date; the content gives no date of its own)
Figure · Seeking Alpha
2.45 GW: Project Jupiter is designed to handle 2.45 gigawatts of power. Seeking Alpha (opens in a new tab) national outlet
-
(source date; the content gives no date of its own)
Figure · Data Center Dynamics
165,000,000,000 USD: Stack and BorderPlex Digital Assets building Project Jupiter with up to $165 billion investment Data Center Dynamics (opens in a new tab) trade press
-
(source date; the content gives no date of its own)
Figure · Data Center Dynamics
4,700,000,000 USD: Project Jupiter expected to bring more than $4.7 billion in economic benefit to New Mexico Data Center Dynamics (opens in a new tab) trade press
-
(source date; the content gives no date of its own)
Figure · Investing.com
165,000,000,000 dollars: Project Jupiter is estimated at 165 billion dollars. Investing.com (opens in a new tab) national outlet
-
(source date; the content gives no date of its own)
Figure · SuaraGarut.ID
7,400,000,000 dollars: Oracle reported strong cloud infrastructure revenue surge of 121 percent to 7.4 billion dollars in fiscal first quarter SuaraGarut.ID (opens in a new tab) international outlet
-
(source date; the content gives no date of its own)
Figure · Data Center Dynamics
1,000,000 USD: Oracle announced up to $1 million funding for carbon capture and sequestration research at Project Jupiter Data Center Dynamics (opens in a new tab) trade press
-
(source date; the content gives no date of its own)
Figure · Investing.com
2.45 GW: Project Jupiter has a capacity of 2.45 gigawatts. Investing.com (opens in a new tab) national outlet
-
(source date; the content gives no date of its own)
Figure · TheEnergyMag
18,000,000,000 USD: Campus secured $18 billion in loans from consortium of banks TheEnergyMag (opens in a new tab) news outlet
-
(source date; the content gives no date of its own)
Figure · Data Center Dynamics
2.5 GW: Project Jupiter is a 2.5GW data center campus in New Mexico Data Center Dynamics (opens in a new tab) trade press
-
(source date; the content gives no date of its own)
Figure · Yahoo Finance
2.45 GW: Project Jupiter designed to handle 2.45 gigawatts of power Yahoo Finance (opens in a new tab) national outlet
-
(source date; the content gives no date of its own)
Figure · Seeking Alpha
165,000,000,000 dollars: Project Jupiter is estimated to cost 165 billion dollars. Seeking Alpha (opens in a new tab) national outlet
-
(said in the source itself)
Statement · Deb Haaland
Haaland noted that while the majority of New Mexicans she speaks with are not in favor of nuclear power, developers have increasingly proposed building small nuclear reactors on site to power data centers ictnews.org (opens in a new tab) news outlet
-
(said in the source itself)
Statement · Gregg Hull, Republican gubernatorial nominee
Gregg Hull, Republican gubernatorial nominee, said he does not support a moratorium but believes data centers need to be sited responsibly with accountability for water use, energy impact, and community input ictnews.org (opens in a new tab) news outlet
-
-
(content date)
proposed
Oracle reported that construction on Project Jupiter data center campus is moving quickly with strong progress on site, and will achieve 100% carbon free energy matching by 2031. finance.yahoo.com (opens in a new tab) national outlet
-
Also in October 2026: 7 statements
-
(content date; reported from elsewhere)
Statement · KR Sridhar, Bloom Energy CEO
KR Sridhar, Bloom Energy CEO, stated that Bloom boxes are fungible and can be redirected from one location to another after shipment, unlike conventional power plants TradingView (opens in a new tab) national outlet
-
(content date; reported from elsewhere)
Statement · Raúl Torrez, New Mexico Attorney General
New Mexico Attorney General Raúl Torrez filed with the Federal Energy Regulatory Commission arguing that the commission's review of the proposed Green Chile gas pipeline for Project Jupiter was inadequate because it did not account for the data center's environmental impacts. New Mexico Political Report (opens in a new tab) local outlet
-
(said in the source itself)
Statement · Julia Gentin, Santa Fe New Mexican
GOP Rep. Nicole Chavez is facing an investigation into her ties to Project Jupiter through both her role in the Legislature and her husband's lobbying work Santa Fe New Mexican (opens in a new tab) local outlet
-
(content date; reported from elsewhere)
Statement · Ari Peskoe, Director, Electricity Law Initiative
We've never had a national climate law passed by Congress. And so what we've had in this country are primarily state and local efforts
Yahoo (opens in a new tab) national outlet -
(content date; reported from elsewhere)
Statement · Dave DuBois, State Climatologist
going to undo a lot of the very expensive and very meaningful work a lot of people are doing
Yahoo (opens in a new tab) national outlet -
(content date; reported from elsewhere)
Statement · Manny Sanchez, Commission Chair
connecting to the utility would violate the IRB unless it were amended
Albuquerque Journal (opens in a new tab) local outlet -
(content date; reported from elsewhere)
Statement · Sofia Leyva, University of New Mexico Senior
I'm really concerned for the future here in my home, a place that is so arid and so dry already. As an artist, AI really concerns me in that aspect as well. It's been taking a lot of creative work from people who have grown up here.
Albuquerque Journal (opens in a new tab) local outlet
-
On the timeline: a stage change; an entry that reports an act on the day the source or its own sentence gives; and a decision, a published scorecard event on a row at or under the record's county, that reports an act. Under the months: a statement that names this record, a figure another source gave about it, matched by place and developer, an entry dated only by the day its source was published, and an entry or a decision that describes rather than reports an act. Each is on the record in its own right and keeps its own link.
For researchers
- Stage
- proposed
- Events on the timeline
- 8
- Under the months
- 125
- Stage changes
- 2
- Decisions
- 0
- Statements
- 55
- Figures
- 33
- Entries and decisions under the months
- 37