Digital Realty Ashburn, in order
What happened with this project, oldest first: the stages it reached, what the county and its cities decided, and every dated step on the record. Each entry links its source.
8 events, August 27, 2013 to March 23, 2026. Also on the record, under the month each belongs to: 1 date when a source page was read and verified. The facts, newest first: the record; the place: Virginia.
A plain date is the day it happened, as the source states it, or as the line's own sentence states it ("voted on July 6"), which is where the line sits even when it was filed later. "Reported" and a date is the day a source published a line that carries no date of its own. Those lines, and lines that describe rather than report an act, sit under their month rather than on the timeline, with what was said and the figures other sources gave. Every timeline on the site reads its lines by this one rule. How dates are read.
Stages
2013 1 event
-
(content date)
running
Virginia DEQ issued a minor New Source Review air permit (Article 6, 9VAC5-80) to DuPont Fabros Technology, Inc. and Alshain Ventures, LLC, registration 73370 (permit action 73370-12), Loudoun County, on August 27, 2013. The permit document authorizes 132 emergency backup generators totaling 294.75 MW of permitted backup generator rating at 44490 Chillum Place (ACC2), 44520 Hastings Drive (ACC3), 44480 Hastings Drive (ACC4), 44521 Hastings Drive (ACC5), 44461 Chillum Place (ACC6), and 44393 Hastings Drive (ACC7), Ashburn, Virginia 20147. [1]
2016 1 event
-
(content date)
Entry
Virginia DEQ issued a minor New Source Review air permit (Article 6, 9VAC5-80) to Elk Ventures, LLC, registration 73370 (permit action 73370-15), Loudoun County, on December 7, 2016. The permit document authorizes 20 emergency backup generators totaling 45 MW of permitted backup generator rating at 21745 Sir Timothy Drive (ACC 9), Ashburn, Virginia 20147. [2]
2017 2 events
-
(content date)
Entry
Virginia DEQ issued a minor New Source Review air permit (Article 6, 9VAC5-80) to Gazelle Ventures, LLC, registration 73370 (permit action 73370-16), Loudoun County, on August 23, 2017. The permit document authorizes 18 emergency backup generators totaling 40.5 MW of permitted backup generator rating at 21744 Sir Timothy Drive (ACC 10), Ashburn, Virginia 20147. [3]
-
(content date)
Entry
Virginia DEQ issued a minor New Source Review air permit (Article 6, 9VAC5-80) to Digital Loudoun Pkwy Center North, LLC, registration 73670 (permit action 73670-12), Loudoun County, on October 4, 2017. The permit document authorizes 112 emergency backup generators totaling 280.1 MW of permitted backup generator rating at 43791 Devin Shafron Drive and 43940 Digital Loudoun Plaza, Ashburn, Virginia 20147. [4]
2022 1 event
-
(content date)
Entry
Virginia DEQ issued a minor New Source Review air permit (Article 6, 9VAC5-80) to Digital Loudoun 3 & 4, LLC and Digital Loudoun 5, LLC, registration 74126 (permit action 74126-4), Loudoun County, on October 12, 2022. The permit action supersedes the earlier permit action dated June 14, 2021. The permit document authorizes 245 emergency backup generators totaling 715.85 MW of permitted backup generator rating at 44274, 44372, 44751, and 44540 Round Table Plaza (IAD 39, IAD 40, IAD 41, and IAD 73), Ashburn, Virginia 20147. [6]
2025 2 events
-
(content date)
Entry
Virginia DEQ issued a Title V federal operating air permit (Article 1, 9VAC5-80) to Digital Loudoun Pkwy Center North, LLC, registration 73670 (permit action 73670-14), Loudoun County, on March 14, 2025. The permit document authorizes 112 emergency backup generators totaling 280.1 MW of permitted backup generator rating at 43791 Devin Shafron Drive and 43940 Digital Loudoun Plaza, Ashburn, Virginia 20147. [5]
-
(content date)
Entry
Virginia DEQ issued a minor New Source Review air permit (Article 6, 9VAC5-80) to Digital Western Lands, LLC, registration 74212 (permit action 74212-3), Loudoun County, on October 10, 2025. The permit action supersedes the earlier permit action dated October 31, 2024. The permit document authorizes 12 emergency backup generators totaling 21.25 MW of permitted backup generator rating at 43695, 43704, 43705, 43714, and 43715 Efficiency Drive (Buildings 5 through 9), Ashburn, Virginia 20147. [7]
2026 1 event
-
(content date)
Entry
Virginia DEQ issued a minor New Source Review air permit (Article 6, 9VAC5-80) to Digital Filigree, LLC, registration 74308 (permit action 74308-1), Loudoun County, on March 23, 2026. The permit document authorizes 30 emergency backup generators totaling 88 MW of permitted backup generator rating at 21780 Filigree Court, Ashburn, VA (Loudoun County). [8]
-
Also in September 2026: 1 date when a source page was read and verified
-
(the day the page was read; it gives no date of its own)
Entry
Digital Realty lists Digital Realty ACC4, Digital Realty ACC5, Digital Realty ACC6, Digital Realty ACC7, Digital Realty IAD12, Digital Realty IAD14, Digital Realty IAD24, Digital Realty IAD35, Digital Realty IAD37, Digital Realty IAD38, Digital Realty IAD39, Digital Realty IAD40, Digital Realty Northern Virginia at Ashburn, Virginia on its own page of data center locations, read September 14, 2026. [10]
-
On the timeline: a stage change; an entry that reports an act on the day the source or its own sentence gives; and a decision, a published scorecard event on a row at or under the record's county, that reports an act. Under the months: a statement that names this record, a figure another source gave about it, matched by place and developer, an entry dated only by the day its source was published, and an entry or a decision that describes rather than reports an act. Each is on the record in its own right and keeps its own link.
For researchers
- Stage
- running
- Events on the timeline
- 8
- Under the months
- 1
- Stage changes
- 1
- Decisions
- 0
- Statements
- 0
- Figures
- 0
- Entries and decisions under the months
- 1