Creekstone Energy Delta Data Center
Creekstone Energy is developing a data center in Delta, Utah, and has announced technology it claims can generate new water from natural gas combustion, commissioning a University of Utah study to verify the technology. It is reported; the record holds no sourced date for when it reached that stage.
How much power it needs, how much water it would use and who would use it have not been disclosed.
How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.
What is known
Each figure as its source gave it. The number in brackets is its place in the source list.
- Land
- Not disclosed
- Power it would draw
- Not disclosed
- Water
- Not disclosed
- Who leads it
- Creekstone Energy
- as stated by the source
- Who would use it
- Not disclosed
- Jobs once it runs
- Not disclosed
- Tax each year
- Not disclosed
Every field, with who said it and when (Researcher view)
Impact figures
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| How much power it needs | Not disclosed | |||
| How much water it would use | Not disclosed | |||
| How loud it would be | Not disclosed | |||
| Jobs once it runs | Not disclosed | |||
| Tax it would pay each year | Not disclosed |
The record's fields
| Field | Value | Who says so | Source | Last verified |
|---|---|---|---|---|
| Who is building it | Creekstone Energy | as stated by the source | September 17, 2026 | |
| Who is constructing it | Not disclosed | |||
| How much land | Not disclosed | |||
| Where its power comes from | Not disclosed | |||
| Grid connection | Not disclosed | |||
| How it is cooled | Not disclosed |
The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.
Still not public, and where it would show up
The record adds each the day a source gives it. Why these documents.
- Water useA state water right filing or a water supply agreement.
- Who would use itA lease announcement or a tenant named in a filing.
- Power the campus would drawA utility or public service commission docket, an interconnection filing, or an air permit for an on site plant.
- Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.
What happened
No dated entry is on the record yet.
4 corrections to this record
Every correction, with its reason
-
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
-
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
-
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
-
· the kind of source of a history entry
The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.
Every correction on the record is on the corrections page.
The site
Where in Delta is not in the public record. The pin marks the center of Delta, not a building, and the outline is the county.
Tap a pin for the data center, the parcel for its record
- This record: Proposed, ringed
- data center
- Dashed edge: the exact site is not in the public record
- Smaller pins: 12 other published records in Utah
Details
- this record's location, ringed
- parcel outline, from the county parcel record
- city limits, U.S. Census Bureau, on a town level record
- county boundary
The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.
- Where
- Delta, Utah
- How exactly it is located
- Town level, the center of the city
- The parcel
- No parcel outline in the public record
- Nearest homes
- Not computed for a record placed at a place center
- Nearest records
- Nearest records are not computed for a record placed at the center of its town.
Questions about this project
4 questions answered from the record
Who is building Creekstone Energy Delta Data Center?
-
Creekstone Energy is the developer. No construction contractor is named on the record yet.
How much power and water does Creekstone Energy Delta Data Center say it needs?
-
Power: not disclosed by any source on file. Water: not disclosed by any source on file.
Where does Creekstone Energy Delta Data Center stand today?
-
It is reported; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.
What has Delta or its county decided about it?
-
No decision by Delta or its county about data centers is on the record. The Utah scorecard lists every rated row the day a person publishes one.
Sources
Reporting
- Creekstone Energy, University of Utah studying feasibility of novel water generation technology, KSL, September 9, 2026, local outlet
- $10bn Creekstone Energy Data Center in Utah Plans Water Recovery from Natural Gas Combustion - constructionreviewonline.com, constructionreviewonline.com, September 9, 2026, local outlet
- Developer of Delta data center announces ‘revolutionary’ tech to turn natural gas into water - Utah News Dispatch, Utah News Dispatch, September 9, 2026, local outlet
- Creekstone Energy Launches Project Oasis: A New Standard for Water Stewardship in Data Center Infrastructure - Business Wire, Business Wire, September 9, 2026, local outlet
- Delta data center company claims it can create new water, commissions U of U study to verify - abc4.com, abc4.com, September 9, 2026, local outlet
5 sources on file.
Cite this record
Data Center Record, "Creekstone Energy Delta Data Center", https://datacenterrecord.org/projects/creekstone-energy-delta-data-center-ut, last verified September 17, 2026.
Cite this page
Data Center Record, "Creekstone Energy Delta Data Center", https://datacenterrecord.org/projects/creekstone-energy-delta-data-center-ut. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.
The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.
For researchers
- Slug
- creekstone-energy-delta-data-center-ut
- Status value
- rumored
- Stage
- Proposed
- Tier
- skeleton
- Tags
- skeleton
- Place id
- us/ut
- Coordinates
- 39.3622611, -112.5472481
- Location precision
- city
- Location source
- City centroid (Delta), U.S. Census Bureau TIGERweb, public domain, placed at city level
- Coordinate source
- tigerweb city centroid
- Location source number
- Not disclosed
- Location last verified
- September 17, 2026
- EPA registry id
- Not disclosed
- Use type values
- not_disclosed
- Tenancy value
- not_disclosed
- Cooling type value
- not_disclosed
- Capacity basis
- not_disclosed
- Water basis
- not_disclosed, gallons_per_day
- Acreage basis
- Not disclosed
- Interconnection value
- not_disclosed
- Capacity, if disclosed
- Not disclosed
- Rating of the county's rows
- Not disclosed
- Published
- 2026-09-16
- Last verified
- 2026-09-17