Data Center Record.

Reported Built from one source

Bitdeer Milam County AI and HPC Data Center

Bitdeer purchased 200 acres in Milam County, Texas, to expand its AI and HPC data center operations. It is reported; the record holds no sourced date for when it reached that stage.

How much water it would use and who would use it have not been disclosed.

Last verified · 8 sources, 0 primary · A skeleton record: built from one source, not yet reviewed in depth by a person. · How to read this page

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Land
255 acres
the developer's figure [6]
Power it would draw
742 MW
the developer's figure [6]
Water
Not disclosed
Who leads it
Bitdeer
as stated by the source
Who would use it
Not disclosed
Jobs once it runs
Not disclosed
Tax each year
Not disclosed
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs 742 MW the developer's figure [6] marketscreener.com September 25, 2026
How much water it would use Not disclosed
How loud it would be Not disclosed
Jobs once it runs Not disclosed
Tax it would pay each year Not disclosed

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Bitdeer as stated by the source September 25, 2026
Who is constructing it Not disclosed
How much land 255 acres the developer's figure [6] marketscreener.com September 25, 2026
Where its power comes from Not disclosed
Grid connection Not disclosed
How it is cooled Not disclosed

How much power it needs, also reported: 3 GW, 2026 (Stock Titan: Bitdeer has approximately 3.0 GW of total power capacity across its global portfolio); 742 MW, 2026 (Stock Titan: Existing plans expected to scale interconnected grid capacity to 742 MW) .

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water useA state water right filing or a water supply agreement.
  • Who would use itA lease announcement or a tenant named in a filing.
  • Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.

What happened

No dated entry is on the record yet.

2 corrections to this record

Every correction, with its reason
  1. · the draft of a reference figures row

    The record could not read this figure's source: the page answered HTTP 403, so no text of it reached the classifier, which scored card 11759 from the headline alone, and the number came from the headline; published by the bulk approve of 2026-09-25. A reference figure needs a source the record read: returned to draft, off every page, until a readable source that states it is cited (docs/batch-unread-figures-0929.md). The old and new text.

  2. · the kind of source of a history entry

    The source was labeled with the Google News search that found it; it now carries its outlet's tier (the record's rules of 2026-09-23). The link did not change. The day's label corrections.

Every correction on the record is on the corrections page.

The site

Where in Milam County is not in the public record. The pin marks the county seat, not a building, and the outline is the county.

  • This record: Proposed, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
  • Smaller pins: 53 other published records in Texas
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

Where
Milam County, Texas
How exactly it is located
County level, the county seat
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at a county seat.

Comparisons

1 metric with more than one figure

Every figure on the record for the same thing, the record's own or the document's first, each with who gave it, its date and its basis.

Capacity at full buildout

3 figures, 2 sources
742 MWDeveloper's figure

marketscreener.com, Sep 1, 2026

Show each source's words
  • 3 GW, Stock Titan: Bitdeer has approximately 3.0 GW of total power capacity across its global portfolio
  • 742 MW, Stock Titan: Existing plans expected to scale interconnected grid capacity to 742 MW

Questions about this project

7 questions answered from the record

Answered from the rows on this page.

How big is Bitdeer Milam County AI and HPC Data Center?

The record has 2 measures of its size: 742 MW (the developer's figure, source) and 255 acres (the developer's figure, source). Each figure names who gave it and links to the source.

Who is building Bitdeer Milam County AI and HPC Data Center?

Bitdeer is the developer. No construction contractor is named on the record yet.

Who will use Bitdeer Milam County AI and HPC Data Center?

Not disclosed. No source on file names a tenant, says whether the site is single or multi tenant, or states what it is for. The record keeps the use as not disclosed until one does; see Who it serves.

How much power and water does Bitdeer Milam County AI and HPC Data Center say it needs?

Power: 742 MW (the developer's figure, source). Water: not disclosed by any source on file.

Where does Bitdeer Milam County AI and HPC Data Center stand today?

It is reported; the date it reached that stage is not sourced, only the day a page was read. No dated entry is on the record yet.

What has Milam County decided about it?

No decision by Milam County about data centers is on the record. The Milam County page and the Texas scorecard list every rated row the day a person publishes one.

What is still unknown about Bitdeer Milam County AI and HPC Data Center?

Not disclosed by any source on file: how much water it would use, how loud it would be, jobs once it runs, tax it would pay each year, who is constructing it, where its power comes from, grid connection, how it is cooled. No missing primary document is listed for this record yet; What the record lacks is where one appears when a person names it.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. SoftBank's SB Energy to build and operate OpenAI's 1.2GW Stargate data center in Milam County, Texas, Data Center Dynamics, January 12, 2026, trade press
  2. Bitdeer buys 200 acres in Milam County, Texas, to expand AI and HPC data center - Data Center Dynamics, Data Center Dynamics, September 4, 2026, trade press
  3. Bitdeer Announces Acquisition of 200 Acres Near Rockdale, GlobeNewswire, September 1, 2026, local outlet
  4. A roughly $100 million cash purchase gives Bitdeer 200 Texas acres for AI infrastructure., Stock Titan, September 1, 2026, local outlet
  5. Bitdeer acquires 200 acres near Rockdale facility in Texas (BTDR:NASDAQ), Seeking Alpha, September 1, 2026, local outlet
  6. Bitdeer Technologies Group Acquires 200 Acres Near Rockdale Facility In Milam County Texas To Support AI HPC Infrastructure Development, marketscreener.com, September 1, 2026, local outlet
  7. Bitdeer Stock In Focus After Texas Land Purchase For AI Expansion, simplywall.st, September 11, 2026, local outlet
  8. Jackson Walker Represents Bitdeer in Milam County Land Acquisition, Jackson Walker LLP, September 15, 2026, local outlet

8 sources on file.

Cite this record

Data Center Record, "Bitdeer Milam County AI and HPC Data Center", https://datacenterrecord.org/projects/bitdeer-milam-county-ai-and-hpc-data-center-tx, last verified September 25, 2026.

Last verified , first recorded . Every correction is logged on the corrections page and under What happened.

Cite this page

Data Center Record, "Bitdeer Milam County AI and HPC Data Center", https://datacenterrecord.org/projects/bitdeer-milam-county-ai-and-hpc-data-center-tx. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.

The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Slug
bitdeer-milam-county-ai-and-hpc-data-center-tx
Status value
rumored
Stage
Proposed
Tier
skeleton
Tags
skeleton
Place id
us/tx/milam-county
Coordinates
30.8544, -96.9786
Location precision
county
Location source
County seat (Cameron), Wikidata, placed at county level
Coordinate source
wikidata county seat
Location source number
Not disclosed
Location last verified
September 16, 2026
EPA registry id
Not disclosed
Use type values
not_disclosed
Tenancy value
not_disclosed
Cooling type value
not_disclosed
Capacity basis
developer_estimate
Water basis
not_disclosed, gallons_per_day
Acreage basis
developer_estimate
Interconnection value
not_disclosed
Capacity, if disclosed
742 MW, the developer's figure
Rating of the county's rows
Not disclosed
Published
2026-09-04
Last verified
2026-09-25