Aligned PIT-01 (Project Phoenix), in order

What happened with this project, oldest first: the stages it reached, what the county and its cities decided, and every dated step on the record. Each entry links its source.

4 events, October 31, 2025 to September 14, 2026. Also on the record, under the month each belongs to: 2 statements, 4 figures from other sources and 19 dates when source pages were read and verified. The facts, newest first: the record; the place: Pennsylvania.

A plain date is the day it happened, as the source states it, or as the line's own sentence states it ("voted on July 6"), which is where the line sits even when it was filed later. "Reported" and a date is the day a source published a line that carries no date of its own. Those lines, and lines that describe rather than report an act, sit under their month rather than on the timeline, with what was said and the figures other sources gave. Every timeline on the site reads its lines by this one rule. How dates are read.

2025 1 event

  1. (content date)

    waiting on permits

    The Pennsylvania DEP received the project's first permit application on October 31, 2025; its tracker lists the project as permits under review (7 permits across Phases 1 and 2: 1 issued, 3 pending, 1 withdrawn, 2 not yet submitted). [3]

2026 3 events

  1. (content date)

    proposed

    A sprawling data center campus has been proposed adjacent to the former Bruce Mansfield power plant in Beaver County. triblive.com (opens in a new tab) news outlet

  2. (source date; the content gives no date of its own)

    being built

    Groundbreaking held September 10 for Project Phoenix data center complex in Shippingport [6]

  3. (source date; the content gives no date of its own)

    being built

    Groundbreaking held September 10 for Project Phoenix data center campus [11]

  4. Also in September 2026: 2 statements, 4 figures from other sources and 19 dates when source pages were read and verified
    1. (source date; the content gives no date of its own)

      Entry

      Facility features closed loop cooling system requiring zero water for operational cooling [6]

    2. (source date; the content gives no date of its own)

      Entry

      Project Phoenix will utilize dedicated onsite power source versus local electrical grid [6]

    3. (source date; the content gives no date of its own)

      Entry

      Three building campus built on former Bruce Mansfield coal fired power plant site in Shippingport Industrial Park [6]

    4. (source date; the content gives no date of its own)

      Entry

      Project Phoenix is a 2 GW data center campus in Shippingport [6]

    5. (source date; the content gives no date of its own)

      Entry

      Project Phoenix features closed loop cooling system that requires no water for operational cooling [8]

    6. (source date; the content gives no date of its own)

      Entry

      Project Phoenix built on former Bruce Mansfield coal fired power plant site [8]

    7. (source date; the content gives no date of its own)

      Entry

      Groundbreaking held for Project Phoenix data center complex in Shippingport [8]

    8. (source date; the content gives no date of its own)

      Entry

      Three building campus featuring closed loop cooling system requiring zero water for operational cooling [11]

    9. (source date; the content gives no date of its own)

      Entry

      Project Phoenix built on former Bruce Mansfield coal fired power plant site in Shippingport Industrial Park [11]

    10. (the day the page was read; it gives no date of its own)

      Entry

      Aligned Data Centers lists Aligned PIT-01 at Shippingport, Pennsylvania on its own page of data center locations, read September 14, 2026. [2]

    11. (source date; the content gives no date of its own)

      Figure · Beaver County Radio

      3,000 jobs: Project Phoenix expected to support 3,000 jobs in construction Beaver County Radio (opens in a new tab) news outlet

    12. (source date; the content gives no date of its own)

      Figure · Beaver County Radio

      2 GW: Project Phoenix data center capacity 2 gigawatts Beaver County Radio (opens in a new tab) news outlet

    13. (source date; the content gives no date of its own)

      Figure · Beaver County Radio

      640 jobs: Project Phoenix will create more than 640 full time operational roles Beaver County Radio (opens in a new tab) news outlet

    14. (source date; the content gives no date of its own)

      Figure · Beaver County Radio

      10,000,000,000 dollars: Project Phoenix expected to drive 10 billion dollars in regional economic investment Beaver County Radio (opens in a new tab) news outlet

    15. (source date; the content gives no date of its own)

      Entry

      Project Phoenix is a 2 GW three facility campus in Pennsylvania that has broken ground. [9]

    16. (source date; the content gives no date of its own)

      Entry

      On site natural gas power generation will feed the servers and eventually send surplus electricity back to PJM grid [7]

    17. (source date; the content gives no date of its own)

      Entry

      Project Phoenix site is 660 acres on the former Bruce Mansfield coal plant footprint [7]

    18. (source date; the content gives no date of its own)

      Entry

      Project Phoenix broke ground as a three facility, 2 gigawatt campus [7]

    19. (said in the source itself)

      Statement · John Erickson, Shippingport Mayor

      John Erickson, Shippingport Mayor, said Project Phoenix honors the legacy of commercial nuclear energy and opens a new chapter by rebuilding the historic site Washington Examiner (opens in a new tab) national outlet

    20. (source date; the content gives no date of its own)

      Entry

      Shippingport Industrial Park site is adjacent to Shippingport Power Station, a former coal power plant being redeveloped into natural gas energy campus [5]

    21. (source date; the content gives no date of its own)

      Entry

      Project Phoenix site is located in Shippingport Industrial Park, Beaver County, 30 miles northwest of Pittsburgh [5]

    22. (source date; the content gives no date of its own)

      Entry

      Project Phoenix will use dedicated on site power source rather than local electrical grid [5]

    23. (source date; the content gives no date of its own)

      Entry

      Project Phoenix is a 2GW data center campus with three facilities [5]

    24. (source date; the content gives no date of its own)

      Entry

      Aligned breaks ground on Project Phoenix data center campus in Shippingport [5]

    25. (said in the source itself)

      Statement · John Erickson, Shippingport Mayor

      Shippingport Mayor John Erickson said the project will create thousands of jobs datacenterdynamics.com (opens in a new tab) trade press

On the timeline: a stage change; an entry that reports an act on the day the source or its own sentence gives; and a decision, a published scorecard event on a row at or under the record's county, that reports an act. Under the months: a statement that names this record, a figure another source gave about it, matched by place and developer, an entry dated only by the day its source was published, and an entry or a decision that describes rather than reports an act. Each is on the record in its own right and keeps its own link.

For researchers
Stage
being built
Events on the timeline
4
Under the months
25
Stage changes
4
Decisions
0
Statements
2
Figures
4
Entries and decisions under the months
19