Data center laws in Montana

1 rule at the state level: 1 statute. Each says what it requires in the words of its text, with the effective date the text gives and a link to the bill or order.

Last verified

Rules on the record
1
Passed
1
Statutes
1

Rules in Montana

  • H.B. 424 Statute

    Revise taxes for class 17 data center property

    Passed passed May 13, 2025. 2025 Regular Session. This status is read from the bill's own record, not written here.

    H.B. 424 of the 2025 Regular Session was signed on May 13, 2025. The legislature titles it: Revise taxes for class 17 data center property.

    What it requires

    Where power from a generator owned by a qualified data center is sold to a public utility or an electric cooperative, the price may not exceed the cost of production, which the act defines to take in the generator's capital cost, depreciation, the wages and benefits of the people running it, fuel, operating supplies, utilities and contracted services, and to leave out corporate...

    Where power from a generator owned by a qualified data center is sold to a public utility or an electric cooperative, the price may not exceed the cost of production, which the act defines to take in the generator's capital cost, depreciation, the wages and benefits of the people running it, fuel, operating supplies, utilities and contracted services, and to leave out corporate administration, travel and corporate legal services. The buying utility or cooperative may audit the generator's operating costs once a year at its own expense. A qualified data center is a facility on contiguous parcels in single ownership of at least 300,000 square feet costing at least $150 million, or of at least 25,000 square feet of new or expanded area costing at least $50 million over 48 months. A facility still under construction takes the class seventeen classification only where the taxpayer certifies before March 1 of the first year claimed that it will meet those tests within two years, and onsite generation counts as used onsite only where at least 80 percent of production is consumed there, metered at the point of generation and certified each year.

    Describes the act as enacted.

    The text: bills.legmt.gov (opens in a new tab) primary source

    Last verified September 20, 2026.

A law here is one statute, utility commission order, tariff, tax rule, moratorium or bill at the state level. What it requires is taken from the text, never summarized from coverage; a date the text does not give is left empty. Its status is one of five, defined on the laws index. The dated events beneath a law are the scorecard entries that cite it.

Bills tracked

6 bills tracked in the Montana legislature: 3 signed into law, 3 failed or died. A row opens its own page, with its history, each recorded vote and the legislature's own text. A resolution states a position and does not change the law.

No official summary on file for any of these 6 bills; each links to the legislature's page for the text.

Signed into law 3

Failed or died 3

6 bills tracked in Montana; 2025 Regular Session, legislature adjourned. No data center bills found as of October 26, 2026. Search terms: data center, data centre, large load, hyperscale, computing facility, server farm, high load factor (indirect), energy intensive facility (indirect), large electric load (indirect), digital asset mining (indirect), cryptocurrency mining (indirect), qualified technology facility (indirect), colocation (indirect), moratorium (with another term), sales tax exemption (with another term). The search on LegiScan. (opens in a new tab)

Bill data from LegiScan (opens in a new tab), licensed CC BY 4.0 (opens in a new tab). The record chooses the bills, writes each stage in its own words and cites the legislature's own page for every bill. LegiScan is credited as the finder; the citation is the legislature's own page. How bills and votes are recorded.

This page as data CSV JSON
Cite this page

Data Center Record, "Data center laws in Montana", https://datacenterrecord.org/laws/mt. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change

Researcher view · basis and source tier on every row · docket and Census GEOIDs · citation and export tools

Commercial and bulk data