A federal permitting bill that also changes who pays for grid costs caused by data centers. Section 2107 directs federal regulators to make data centers and other computing loads pay for both existing transmission and new transmission upgrades built for them. It also bars utilities from shifting new retail costs caused by these loads onto other customers and requires financial assurances from the large users. The November 7 manager's amendment dropped the 20 MW threshold, so these protections apply regardless of size. The amendment added Section 2117, a Department of Energy program that gives state, local and Tribal governments technical help on data center impacts; the department must stay neutral and cannot approve, deny or delay siting. On permitting, the bill gives challengers 150 days to sue over a federal environmental review instead of six years and lengthens Clean Water Act discharge permits and Section 404 general permits from five to ten years.
Sponsors Sen. Shelley Moore Capito (R, WV); Sen. Mike Lee (R, UT); Sen. Sheldon Whitehouse (D, RI); Sen. Martin Heinrich (D, NM)
Subjects None on file. The legislature's own list.
The record's tags tariffs, permitting Added by the record so a count or a filter can tell these apart; the legislature did not write them.
Related measuresH.R. 2347 (119th Congress). H.R. 2347 is the legislative vehicle in the Senate carrying the November 7, 2026 manager's substitute for S. 5653, the Bipartisan American Affordability and Jobs Act of 2026. Neither row is merged: each measure keeps its own record, its own history and its own page.
In a procedural vote rather than final passage, the Senate voted 73 to 25 (roll call 257, 2 not voting) to invoke cloture on the motion to proceed to H.R. 2347, the legislative vehicle carrying S. 5653. The bill has not passed; if it passes a final Senate vote, it goes to the House. senate.gov (opens in a new tab)primary source[4], the roll call The official action text: On Cloture on the Motion to Proceed H.R. 2347: Cloture on the Motion to Proceed Agreed to.
November 7, 2026Introduced
The four lead sponsors released a manager's substitute on the legislative vehicle H.R. 2347, removing the 20 MW threshold from the retail cost protections in Section 2107 and adding Section 2117 to give state, local and Tribal governments neutral Department of Energy technical help on data center impacts. c2es.org (opens in a new tab)news outlet[2] The official action text: Manager's substitute released on legislative vehicle H.R. 2347.
September 30, 2026Introduced
Senators Shelley Moore Capito, Mike Lee, Sheldon Whitehouse and Martin Heinrich introduced S. 5653, the Bipartisan American Affordability and Jobs Act of 2026. c2es.org (opens in a new tab)news outlet[2] The official action text: Introduced in Senate.
Newest first. A stage is never overwritten; each entry carries the source it rests on. The status at the top is derived from the newest entry. The action text in Researcher mode is the legislature's own wording.
Recorded votes
U.S. Senate, roll call 257, November 9, 2026 at 17:31:00
On Cloture on the Motion to Proceed H.R. 2347
Procedural vote, not final passage.
Cloture on the Motion to Proceed Agreed to: 73 yea, 25 nay, 0 present, 2 not voting. Three fifths vote required.
Positions are the clerk's own words. Member names are as the clerk prints them. D 21 yea, 23 nay, 1 not voting; R 51 yea, 1 nay, 1 not voting; I 1 yea, 1 nay.
A position is recorded exactly as the clerk records it. The record does not say which way was right. A member's stated reason for a vote, where the record has one, is a statement on the speakers roster, not a column here.
Third party estimates
Grid Strategies, November 2026
55 billion dollars over 10 years from data centers under the BAAJA transmission pricing rule · Basis: third party estimate
Grid Strategies estimates the bill's transmission pricing rule would collect about $55 billion from data centers over 10 years, about $35 billion for existing transmission and $20 billion for new upgrades, or roughly $6 billion a year. The estimate covers 40.3 GW of data center load outside Texas, led by PJM (13.4 GW, $2.31 billion a year) and MISO (16.7 GW, $2.25 billion a year). If every state adopted the bill's retail protections, data centers could also pay up to about $136 billion over 10 years for new generation; Grid Strategies calls this an upper bound.
Rhodium Group estimates the bill would lower average residential electricity prices 3 to 4 percent in 2035 compared with current policy, saving residential customers $36 billion to $56 billion through 2035, or $41 to $66 per household bill in 2035. Prices fall in 46 to 48 of the 48 contiguous states modeled. Savings are credited to the bill as a whole; Rhodium does not split them between the data center rules and permitting.
I think it would be a serious mistake, particularly in the wake of the astonishing election results last week.
Gore said he opposes the bill and urged lawmakers to reconsider, arguing it would lock in new pipelines and fossil fuel facilities and that the new Congress could do better.
I think this is step one. We have to keep going because we are failing right now. We are failing to meet the obligations we have.
Whitehouse rejected Gore's criticism, said he is working on amendments to shore up the bill and said a Democratic Congress will have bigger climate issues to take up beyond this bill.
Bill data from LegiScan (opens in a new tab), licensed CC BY 4.0 (opens in a new tab). The record chooses the bills, writes each stage in its own words and cites the legislature's own page for every bill. Bills on this record are also found through the legislatures' own records; the citation is always the legislature's own page or the clerk's own file. This bill was found through the Senate's roll call file.
Report a correction to this bill: the row, the source that shows the correct information, and what is wrong. Every correction is logged in the open.
This page as dataCSVUsing this data in a report? Support the record. Commercial use needs a license.Cite this page
Data Center Record, "S. 5653, Congress 119th Congress: tariffs", https://datacenterrecord.org/bills/us-2026-s-5653. Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0.
The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Commercial use needs a license. Prose stays under copyright.