H.R. 10579: Energy Cost Fairness and Reliability Act of 2026

Congress, 119th Congress. In committee, September 24, 2026.

Last verified

H.R. 10579 at a glance

Status In committee In committee, .

Official summary

No official summary is on file yet. The full text is on the legislature's page, linked below.

Description

To amend the Federal Power Act to require the Federal Energy Regulatory Commission to issue a final rule relating to the interconnection of large load facilities with the transmission system, and for other purposes.

As published by the legislature, found through LegiScan, source 1. It is the legislature's own line about the measure, not a summary of it.

Measure Bill.

Sponsors Dave Min (D); Daniel Goldman (D)

Subjects None on file. The legislature's own list.

Official page www.congress.gov/bill/119th-congress/house-bill/10579/all-info. Found through LegiScan (bill 2159136), whose data is CC BY 4.0; the citation is the legislature's own page.

What happened, and when

  1. September 24, 2026 In committee

    H.R. 10579 went to committee in the House. congress.gov primary source [1] The official action text: Referred to the Committee on Energy and Commerce, and in addition to the Committee on Science, Space, and Technology, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned..

  2. September 24, 2026 Introduced

    H.R. 10579 was introduced in the House. congress.gov primary source [1] The official action text: Referred to the Committee on Energy and Commerce, and in addition to the Committee on Science, Space, and Technology, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned..

Newest first. A stage is never overwritten; each entry carries the source it rests on. The status at the top is derived from the newest entry. The action text in Researcher mode is the legislature's own wording.

Sources

  1. H.R. 10579 on the legislature's site www.congress.gov

Bill data from LegiScan, licensed CC BY 4.0. The record chooses the bills, writes each stage in its own words and cites the legislature's own page for every bill. Bills on this record are also found through the legislatures' own records; the citation is always the legislature's own page or the clerk's own file. This bill was found through LegiScan.

Report a correction to this bill: the row, the source that shows the correct information, and what is wrong. Every correction is logged in the open.

This page as data CSV
Cite this page

Data Center Record, "H.R. 10579: Energy Cost Fairness and Reliability Act of 2026", https://datacenterrecord.org/bills/us-2025-hr-10579. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.

The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change