Data Center Record.

Leaders · Connecticut

Ned Lamont and Susan Bysiewicz

Candidate for Governor · Connecticut

Democratic, working families party candidate for Governor, Connecticut

On your ballot Governor, Connecticut (certified list (opens in a new tab), verified October 9, 2026)

Connecticut's leaders

Checked · How the record reads leaders · Report a change · Corrections

Of 8 statements on the record, 3 raised concerns about data centers, 1 was mixed and 4 carry no label.

What they said

0 3 1

What they did

No vote on a data center measure on the record.

Labels are applied by the record's published rules: two readings of each statement, and a third that reads its source where the two differ. Every label sits beside its statement and its source, and any label can be challenged through Report a change, with the correction logged on the corrections page.

Position History: Chronological record of positions across sourced statements.

  1. · Mixed · WSHU
  2. · Raises concern · WSHU
  3. · Raises concern · ctmirror.org
  4. · Raises concern · Hartford Business Journal

What they said

  1. Lamont says he is against bigger hyperscale AI data centers and is concerned they will stress local energy grids and lead to higher electricity costs.

    Context & source notes

    Format & Provenance: Paraphrased from source.

    Where & When: October 15, 2026.

    Primary Sources:

    Archived copy: Wayback Machine (opens in a new tab).

  2. Governor Ned Lamont said data centers will not be built in Connecticut and locals can say no to them

    Context & source notes

    Format & Provenance: Paraphrased from source.

    Where & When: October 15, 2026.

    Primary Sources:

    Archived copy: Wayback Machine (opens in a new tab).

  3. Gov. Lamont said Connecticut should slow down new data centers unless they bring new power generation with them.

    ctmirror.org (opens in a new tab)
    Context & source notes

    Format & Provenance: Paraphrased from source.

    Where & When: September 21, 2026.

    Primary Sources:

    Label rationale: Both readings of the statement agreed. The words that set it: "Connecticut should slow down new data centers unless they bring new power generation with them".

  4. Governor Ned Lamont said he does not want hyperscale data centers in Connecticut unless developers add enough electricity generation to serve them

    Hartford Business Journal (opens in a new tab)
    Context & source notes

    Format & Provenance: Paraphrased from source.

    Where & When: September 21, 2026.

    Primary Sources:

    Label rationale: Both readings of the statement agreed. The words that set it: "does not want hyperscale data centers in Connecticut unless developers add enough electricity generation to serve them".

  5. Connecticut already has smaller data centers located throughout the state

    WSHU (opens in a new tab)
    Context & source notes

    Format & Provenance: Paraphrased from source. Label set by a tiebreak.

    Where & When: September 7, 2026.

    Primary Sources:

    Label rationale: No label: the words are not clearly the speaker's own. The two first readings differed, and a third reading of the statement and its source held it.

  6. Lamont said proposals in which a developer offers to supply its own water and electrical power can be reviewed on a case by case basis

    WSHU (opens in a new tab)
    Context & source notes

    Format & Provenance: Paraphrased from source.

    Where & When: September 7, 2026.

    Primary Sources:

    Label rationale: No label: the words support none. Both readings of the statement held it.

  7. Governor Ned Lamont said he is open to building IT infrastructure in Connecticut, but there is no place for massive data centers in the state

    WSHU (opens in a new tab)
    Context & source notes

    Format & Provenance: Paraphrased from source.

    Where & When: September 7, 2026.

    Primary Sources:

    Label rationale: Both readings of the statement agreed. The words that set it: "open to building IT infrastructure in Connecticut, but there is no place for massive data centers in the state".

  8. Lamont stated a major data center would demand a large amount of electricity, which could raise electric rates for residents

    WSHU (opens in a new tab)
    Context & source notes

    Format & Provenance: Paraphrased from source.

    Where & When: September 7, 2026.

    Primary Sources:

    Label rationale: Both readings of the statement agreed. The words that set it: "a major data center would demand a large amount of electricity, which could raise electric rates for residents".

Where we looked

The record last searched for Ned Lamont and Susan Bysiewicz's words on October 20, 2026.

How they voted

No vote on a data center measure on the record.

Others in this race

Something missing?

Know a sourced statement by Ned Lamont and Susan Bysiewicz on data centers that is not here? Send the link. It goes to the record's inbox as a card routed to this person and publishes only after it is read against its source.

Send a sourced statement

Are you Ned Lamont and Susan Bysiewicz or on the campaign? Ask for a correction or send a statement, or email corrections@datacenterrecord.org.

Cite as

Data Center Record, "Public statements by Ned Lamont and Susan Bysiewicz", https://datacenterrecord.org/speakers/ned-lamont-and-susan-bysiewicz, last verified October 22, 2026.

This page as data CSV
Reusing this page

The structured rows are CC BY-NC 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change

Last verified: October 12, 2026.

Every race in Connecticut, and where each candidate stands

Researcher view · basis and source tier on every row · docket and Census GEOIDs · citation and export tools

Commercial and bulk data