Sault Ste. Marie Data Centre

A plan for a 400 MW AI data centre in Sault Ste. Marie, Ontario was proposed and met with community opposition. It is reported, as reported August 27, 2026.

How much water it would use and who would use it have not been disclosed.

Last verified · 2 sources, 0 primary · Built from one source, not yet reviewed in depth by a person. · How to read this page

How to read this page. Every fact links to the source it rests on; a number in brackets is its place in the source list. A figure no source gives reads Not disclosed, and nothing is estimated. Where sources give different figures, each is shown with who gave it, and another source's figure never stands in for the record's own. Entries are added and never overwritten; corrections are listed under What happened.

What is known

Each figure as its source gave it. The number in brackets is its place in the source list.

Land
Not disclosed
Power it would draw
400 MW
not disclosed
Water
Not disclosed
Who leads it
Not disclosed
Who would use it
Not disclosed
Jobs once it runs
Not disclosed
Tax each year
Not disclosed
Every field, with who said it and when (Researcher view)

Impact figures

FieldValueWho says soSourceLast verified
How much power it needs 400 MW not disclosed October 7, 2026
How much water it would use Not disclosed
How loud it would be Not disclosed
Jobs once it runs Not disclosed
Tax it would pay each year Not disclosed

The record's fields

FieldValueWho says soSourceLast verified
Who is building it Not disclosed
Who is constructing it Not disclosed
How much land Not disclosed
Where its power comes from Not disclosed
Grid connection Not disclosed
How it is cooled Not disclosed

The developer's figure is what the company said; what a permit allows is the ceiling a permit sets; measured means observed. Water is in gallons a day or a year, whichever the source stated; a tax claim given as a range shows both ends, each linked to the source that gave it.

Still not public, and where it would show up

The record adds each the day a source gives it. Why these documents.

  • Water useA state water right filing or a water supply agreement.
  • Who would use itA lease announcement or a tenant named in a filing.
  • Who is behind itA land record, a zoning application or a company's own announcement.
  • Jobs and taxAn incentive agreement, a county's economic development filing or a fiscal note.

What happened

  1. (source date; the content gives no date of its own)

    The project is in very early stages and must clear several regulatory hurdles [2]

  2. · Status: rumored (source date; the content gives no date of its own)

    A 400 megawatt data centre is proposed for Sault Ste. Marie [2]

The full Sault Ste. Marie Data Centre timeline, in order

The site

Where in Sault Ste. Marie is not in the public record. The pin marks the center of Sault Ste. Marie, not a building, and the outline is Algoma County.

  • This record: Proposed, ringed
  • data center
  • Dashed edge: the exact site is not in the public record
Details
  • this record's location, ringed
  • parcel outline, from the county parcel record
  • city limits, U.S. Census Bureau, on a town level record
  • county boundary

The other pins are the published projects in the same state, each in its stage color. The imagery beneath is the USGS national orthoimagery, public domain, shown so the land around the site can be read.

Where
Sault Ste. Marie, Algoma County, Ontario
How exactly it is located
Town level, the center of the city
The parcel
No parcel outline in the public record
Nearest homes
Not computed for a record placed at a place center
Nearest records
Nearest records are not computed for a record placed at the center of its town.

Questions about this project

5 questions answered from the record

Answered from the rows on this page.

How big is Sault Ste. Marie Data Centre?

The record has one measure of its size: 400 MW (not disclosed). Its acreage is not disclosed.

Who is building Sault Ste. Marie Data Centre?

Not disclosed. No source on file names the developer. The sources read for this record are listed under Sources.

How much power and water does Sault Ste. Marie Data Centre say it needs?

Power: 400 MW (not disclosed). Water: not disclosed by any source on file.

Where does Sault Ste. Marie Data Centre stand today?

It is reported, as reported August 27, 2026. The newest entry, reported August 27, 2026: The project is in very early stages and must clear several regulatory hurdles [2].

What has Sault Ste. Marie or Algoma County decided about it?

No decision by Sault Ste. Marie or Algoma County about data centers is on the record. The Ontario scorecard lists every rated row the day a person publishes one.

Sources

Primary documents first: filings, minutes, dockets and official pages. Then reporting. The numbers are the ones the entries above cite.

Reporting

  1. Data centre proposal in Sault Ste. Marie, Ont. met with opposition - CBC, CBC, July 31, 2026, local outlet
  2. Plan would see 400MW AI data centre built in the Sault - CTV News, CTV News, August 27, 2026, local outlet

2 sources on file.

Cite this record

Data Center Record, "Sault Ste. Marie Data Centre", https://datacenterrecord.org/projects/sault-ste-marie-data-centre-on, last verified October 7, 2026.

Last verified , first recorded . Every correction is logged on the corrections page.

Cite this page

Data Center Record, "Sault Ste. Marie Data Centre", https://datacenterrecord.org/projects/sault-ste-marie-data-centre-on. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.

The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.

Report a change
For researchers
Slug
sault-ste-marie-data-centre-on
Status value
rumored
Stage
Proposed
Tier
skeleton
Tags
skeleton
Place id
ca/on/algoma-county/sault-ste-marie
Coordinates
46.53893, -84.39943
Location precision
city
Location source
Place center (Sault Ste. Marie), placed at city level: centroid of the city's boundary in the Canadian Geographical Names Database (Natural Resources Canada, Open Government Licence)
Coordinate source
cgndb centroid
Location source number
Not disclosed
Location last verified
October 7, 2026
EPA registry id
Not disclosed
Use type values
not_disclosed
Tenancy value
not_disclosed
Cooling type value
not_disclosed
Capacity basis
not_disclosed
Water basis
not_disclosed, gallons_per_day
Acreage basis
Not disclosed
Interconnection value
not_disclosed
Capacity, if disclosed
400 MW, not disclosed
Rating of the county's rows
Not disclosed
Published
2026-09-05
Last verified
2026-10-07