A. 9064: Prohibits electric corporations and gas corporations from passing along costs or increasing charges to ratepayers as a result of increased costs incurred due to the building or operation of a data center except to those ratepayers involved with or associated with the building or operation of such data center or semiconductor fabrication plant.
New York, 2025-2026 General Assembly. In committee, January 7, 2026.
Last verified
A. 9064 at a glance
Status In committee In committee, .
No official summary is on file yet. The full text is on the legislature's page, linked below.
Measure Bill.
Sponsors Jonathan Jacobson (D); Sarahana Shrestha (D); William Conrad (D)
Subjects None on file. The legislature's own list.
Official page www.nysenate.gov/legislation/bills/2025/A9064. Found through LegiScan (bill 2043431), whose data is CC BY 4.0; the citation is the legislature's own page.
What happened, and when
- January 7, 2026 In committee
A. 9064 went to committee in the Assembly. nysenate.gov primary source [1] The official action text: referred to energy.
- September 5, 2025 In committee
A. 9064 went to committee in the Assembly. nysenate.gov primary source [1] The official action text: referred to energy.
- September 5, 2025 Introduced
A. 9064 was introduced in the Assembly. nysenate.gov primary source [1] The official action text: referred to energy.
Newest first. A stage is never overwritten; each entry carries the source it rests on. The status at the top is derived from the newest entry. The action text in Researcher mode is the legislature's own wording.
Sources
Bill data from LegiScan, licensed CC BY 4.0. The record chooses the bills, writes each stage in its own words and cites the legislature's own page for every bill. Bills on this record are also found through the legislatures' own records; the citation is always the legislature's own page or the clerk's own file. This bill was found through LegiScan.
Report a correction to this bill: the row, the source that shows the correct information, and what is wrong. Every correction is logged in the open.
Cite this page
Data Center Record, "A. 9064: Prohibits electric corporations and gas corporations from passing along costs or increasing charges to ratepayers as a result of increased costs incurred due to the building or operation of a data center except to those ratepayers involved with or associated with the building or operation of such data center or semiconductor fabrication plant.", https://datacenterrecord.org/bills/ny-2025-a-9064. Data: Data Center Record, datacenterrecord.org, CC BY 4.0.
The structured rows are CC BY 4.0. Link to this page; that is what turns a reuse into a citation. Prose stays under copyright.