  "license": "CC BY 4.0",
  "license_url": "https://creativecommons.org/licenses/by/4.0/",
  "attribution": "Data: Data Center Record, datacenterrecord.org, CC BY 4.0. Link to the specific record page where possible.",
  "source": "https://datacenterrecord.org/states/ut/utah-county/eagle-mountain",
  "retrieved_at": "2026-10-07T17:49:59.207Z",
  "count": 2,
  "projects": [
    {
      "slug": "qts-eagle-mountain-ut",
      "name": "QTS Eagle Mountain",
      "summary": "QTS Data Centers lists a data center at Eagle Mountain, Utah and says it is being built.",
      "state": "UT",
      "city": "Eagle Mountain",
      "county": "Utah County",
      "status": "under_construction",
      "developer": "QTS Data Centers",
      "capacity_mw": null,
      "latitude": 40.3142721,
      "longitude": -112.0119828,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": "Virtual Drive, Eagle Mountain, UT 84005",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071707118",
      "published": "2026-09-14",
      "last_verified": "2026-10-04",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "record_url": "https://datacenterrecord.org/projects/qts-eagle-mountain-ut",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: QTS SLC DC1",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071707118",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "QTS Data Centers: All locations",
          "url": "https://q.com/data-centers/",
          "publisher": "QTS Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "QTS Data Centers lists QTS Eagle Mountain at Eagle Mountain, Utah",
          "url": "https://q.com/data-centers/#qts-eagle-mountain-ut",
          "publisher": "QTS Data Centers",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "QTS Data Centers lists QTS Eagle Mountain at Eagle Mountain, Utah on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://q.com/data-centers/#qts-eagle-mountain-ut",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "meta-eagle-mountain-data-center-ut",
      "name": "Meta Eagle Mountain Data Center",
      "summary": "Meta lists a data center at Eagle Mountain, Utah among the sites it operates.",
      "state": "UT",
      "city": "Eagle Mountain",
      "county": "Utah County",
      "status": "under_construction",
      "developer": "Meta",
      "capacity_mw": null,
      "latitude": 40.3142721,
      "longitude": -112.0119828,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-03",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": 300,
      "site_acres_disclosed_as": "third_party_estimate",
      "site_acres_source_url": "https://www.datacenterfrontier.com/cloud/article/11427905/google-buys-land-in-growing-cloud-cluster-in-utah",
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "record_url": "https://datacenterrecord.org/projects/meta-eagle-mountain-data-center-ut",
      "sources": [
        {
          "title": "Mortenson fires worker for noose at Facebook data center site - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/mortenson-fires-worker-for-noose-at-facebook-data-center-site/",
          "publisher": "Data Center Dynamics",
          "date": "2022-03-23",
          "source_tier": 3
        },
        {
          "title": "Meta: Our U.S. data center fleet",
          "url": "https://datacenters.atmeta.com/us-locations/",
          "publisher": "Meta",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Google Buys Land in Growing Cloud Cluster in Utah - Data Center Frontier",
          "url": "https://www.datacenterfrontier.com/cloud/article/11427905/google-buys-land-in-growing-cloud-cluster-in-utah",
          "publisher": "Data Center Frontier",
          "date": "2021-10-05",
          "source_tier": 3
        },
        {
          "title": "Meta lists Eagle Mountain Data Center at Eagle Mountain, Utah",
          "url": "https://datacenters.atmeta.com/us-locations/#meta-eagle-mountain-data-center-ut",
          "publisher": "Meta",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "Facebook to invest in 120MW solar farm in Utah to power Eagle Mountain data center - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/facebook-to-invest-in-120mw-solar-farm-in-utah-to-power-eagle-mountain-data-center/",
          "publisher": "Data Center Dynamics",
          "date": "2021-06-30",
          "source_tier": 3
        },
        {
          "title": "Police investigating noose like rope found at Facebook data center construction site - KUTV",
          "url": "https://kutv.com/news/local/noose-like-rope-found-at-facebook-data-center-construction-site",
          "publisher": "KUTV",
          "date": "2022-03-21",
          "source_tier": 4
        },
        {
          "title": "Contractor Mortenson shuts down Meta/Facebook data center construction site in Utah due to racist graffiti - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/contractor-mortenson-shuts-down-metafacebook-data-center-construction-site-in-utah-due-to-racist-graffiti/",
          "publisher": "Data Center Dynamics",
          "date": "2021-11-22",
          "source_tier": 3
        },
        {
          "title": "Construction halted at Facebook data center site after additional 'hateful' messages found - KUTV",
          "url": "https://kutv.com/news/local/construction-halted-at-facebook-data-center-site-after-additional-hateful-messages-found",
          "publisher": "KUTV",
          "date": "2021-11-16",
          "source_tier": 4
        },
        {
          "title": "Meta to Expand Eagle Mountain Data Center Project - W.Media",
          "url": "https://w.media/meta-to-expand-eagle-mountain-data-center-project/",
          "publisher": "W.Media",
          "date": "2022-10-03",
          "source_tier": 4
        },
        {
          "title": "Noose found at Facebook Utah data center construction site, in another racist incident - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/noose-found-at-facebook-utah-data-center-construction-site-in-another-racist-incident/",
          "publisher": "Data Center Dynamics",
          "date": "2022-03-22",
          "source_tier": 3
        },
        {
          "title": "Turner halts work at $1.5B Meta site for recurring racist graffiti - Construction Dive",
          "url": "https://www.constructiondive.com/news/turner-halts-work-meta-data-center-recurring-racist-graffiti/632395/",
          "publisher": "Construction Dive",
          "date": "2022-09-22",
          "source_tier": 4
        },
        {
          "title": "Growing outward: Meta announces expansion of Eagle Mountain data center facility, contributions to community - heraldextra.com",
          "url": "https://www.heraldextra.com/news/2026/sep/14/growing-outward-meta-announces-expansion-of-eagle-mountain-data-center-facility-contributions-to-community/",
          "publisher": "heraldextra.com",
          "date": "2026-09-14",
          "source_tier": 1
        },
        {
          "title": "Meta got a 40-year tax break for its $1.5 billion data center. Now neighbors face a 183% property tax hike - moneywise.com",
          "url": "https://moneywise.com/news/real-estate-news/meta-data-center-eagle-mountain-property-tax-hike",
          "publisher": "moneywise.com",
          "date": "2026-08-19",
          "source_tier": 1
        },
        {
          "title": "Meta to expand Eagle Mountain data center campus in Utah",
          "url": "https://www.datacenterdynamics.com/en/news/meta-to-expand-eagle-mountain-data-center-campus-in-utah/",
          "publisher": "Data Center Dynamics",
          "date": "2026-09-15",
          "source_tier": 3
        },
        {
          "title": "Meta announces data center expansion, new community investments in Eagle Mountain",
          "url": "https://www.ksl.com/article/51624008/meta-announces-data-center-expansion-new-community-investments-in-eagle-mountain",
          "publisher": "KSL",
          "date": "2026-09-15",
          "source_tier": 4
        },
        {
          "title": "Meta plans Eagle Mountain data center expansion, $2.5M community investment - KUTV",
          "url": "https://kutv.com/news/local/meta-plans-eagle-mountain-data-center-expansion-25m-community-investment",
          "publisher": "KUTV",
          "date": "2026-09-14",
          "source_tier": 4
        },
        {
          "title": "Meta to expand Eagle Mountain data center campus in Utah - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/meta-to-expand-eagle-mountain-data-center-campus-in-utah/",
          "publisher": "Data Center Dynamics",
          "date": "2026-09-15",
          "source_tier": 3
        },
        {
          "title": "Meta Provides Crucial Investment Insights into its $3bn+ Eagle Mountain Data Center in Utah - Construction Review",
          "url": "https://constructionreviewonline.com/meta-provides-crucial-investment-insights-into-its-3bn-eagle-mountain-data-center-in-utah/",
          "publisher": "Construction Review",
          "date": "2026-09-15",
          "source_tier": 4
        },
        {
          "title": "Meta announces data center expansion, new community investments in Eagle Mountain - ksl.com",
          "url": "https://www.ksl.com/article/51624008/meta-announces-data-center-expansion-new-community-investments-in-eagle-mountain",
          "publisher": "ksl.com",
          "date": "2026-09-15",
          "source_tier": 4
        },
        {
          "title": "Deepening Our Investment in Eagle Mountain, Utah - Meta Data Centers",
          "url": "https://datacenters.atmeta.com/2026/09/deepening-our-investment-in-eagle-mountain-utah/",
          "publisher": "Meta Data Centers",
          "date": "2026-09-15",
          "source_tier": 4
        },
        {
          "title": "Can a data center company actually be a good neighbor? - Utah Business",
          "url": "https://www.utahbusiness.com/industry/2026/09/14/meta-boosts-eagle-mountain-investment-3-billion-utah-data-center/",
          "publisher": "Utah Business",
          "date": "2026-09-15",
          "source_tier": 4
        },
        {
          "title": "Meta to expand Eagle Mountain Data Center, announces more than $1 million in community investments - ABC4 Utah",
          "url": "https://www.abc4.com/news/wasatch-front/meta-expand-eagle-mountain-data-center/",
          "publisher": "ABC4 Utah",
          "date": "2026-09-14",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Meta lists Meta Eagle Mountain Data Center at Eagle Mountain, Utah on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.atmeta.com/us-locations/#meta-eagle-mountain-data-center-ut",
          "source_tier": 2
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Meta first broke ground in 2018",
          "source_url": "https://kutv.com/news/local/meta-plans-eagle-mountain-data-center-expansion-25m-community-investment",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Campus opened in 2021 at 1275 N. Community Circle",
          "source_url": "https://kutv.com/news/local/meta-plans-eagle-mountain-data-center-expansion-25m-community-investment",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Meta expands Eagle Mountain data center with $2.5 million community investment",
          "source_url": "https://kutv.com/news/local/meta-plans-eagle-mountain-data-center-expansion-25m-community-investment",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2022-10-03",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2022-10-03",
          "summary": "Meta announced Phase 3 expansion of Eagle Mountain data center project",
          "source_url": "https://w.media/meta-to-expand-eagle-mountain-data-center-project/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2022-09-22",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2022-09-22",
          "summary": "Turner halted work at the Meta data center site",
          "source_url": "https://www.constructiondive.com/news/turner-halts-work-meta-data-center-recurring-racist-graffiti/632395/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2022-03-23",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2022-03-23",
          "summary": "Mortenson Construction fired a worker who left a yellow noose at Meta Eagle Mountain data center construction site",
          "source_url": "https://www.datacenterdynamics.com/en/news/mortenson-fires-worker-for-noose-at-facebook-data-center-site/",
          "source_tier": 3
        },
        {
          "status": "under_construction",
          "effective_at": "2022-03-22",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2022-03-22",
          "summary": "Worker responsible for noose incident was fired",
          "source_url": "https://www.datacenterdynamics.com/en/news/noose-found-at-facebook-utah-data-center-construction-site-in-another-racist-incident/",
          "source_tier": 3
        },
        {
          "status": "under_construction",
          "effective_at": "2022-03-22",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2022-03-22",
          "summary": "Turner Construction shut down a Facebook data center project in Ohio due to racist graffiti",
          "source_url": "https://www.datacenterdynamics.com/en/news/noose-found-at-facebook-utah-data-center-construction-site-in-another-racist-incident/",
          "source_tier": 3
        },
        {
          "status": "under_construction",
          "effective_at": "2022-03-22",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2022-03-22",
          "summary": "Turner Construction shut down a Facebook data center site in Iowa due to noose being discovered on anniversary of end of slavery",
          "source_url": "https://www.datacenterdynamics.com/en/news/noose-found-at-facebook-utah-data-center-construction-site-in-another-racist-incident/",
          "source_tier": 3
        },
        {
          "status": "under_construction",
          "effective_at": "2022-03-22",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2022-03-22",
          "summary": "Construction suspended for one day following noose incident",
          "source_url": "https://www.datacenterdynamics.com/en/news/noose-found-at-facebook-utah-data-center-construction-site-in-another-racist-incident/",
          "source_tier": 3
        },
        {
          "status": "under_construction",
          "effective_at": "2022-03-22",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2022-03-22",
          "summary": "Noose found at Meta Eagle Mountain data center construction site",
          "source_url": "https://www.datacenterdynamics.com/en/news/noose-found-at-facebook-utah-data-center-construction-site-in-another-racist-incident/",
          "source_tier": 3
        },
        {
          "status": "under_construction",
          "effective_at": "2022-03-22",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2022-03-22",
          "summary": "Mortenson Construction offered $100,000 reward for information identifying person responsible",
          "source_url": "https://www.datacenterdynamics.com/en/news/noose-found-at-facebook-utah-data-center-construction-site-in-another-racist-incident/",
          "source_tier": 3
        },
        {
          "status": "under_construction",
          "effective_at": "2022-03-21",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2022-03-21",
          "summary": "Mortenson offered $100,000 reward for information leading to identification of person(s) responsible",
          "source_url": "https://kutv.com/news/local/noose-like-rope-found-at-facebook-data-center-construction-site",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2022-03-21",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2022-03-21",
          "summary": "Noose like rope found at Meta data center construction site in Eagle Mountain",
          "source_url": "https://kutv.com/news/local/noose-like-rope-found-at-facebook-data-center-construction-site",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2021-11-29",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2022-03-23",
          "summary": "Racist graffiti was found at Eagle Mountain construction site in November, with Mortenson offering $50,000 reward",
          "source_url": "https://www.datacenterdynamics.com/en/news/mortenson-fires-worker-for-noose-at-facebook-data-center-site/",
          "source_tier": 3
        },
        {
          "status": "under_construction",
          "effective_at": "2021-11-16",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2021-11-16",
          "summary": "Mortenson offered $50,000 reward for information identifying person responsible for vandalism",
          "source_url": "https://kutv.com/news/local/construction-halted-at-facebook-data-center-site-after-additional-hateful-messages-found",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2021-11-16",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2021-11-16",
          "summary": "Work halted until Friday for additional safety protocols and training",
          "source_url": "https://kutv.com/news/local/construction-halted-at-facebook-data-center-site-after-additional-hateful-messages-found",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2021-11-16",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2021-11-16",
          "summary": "Construction halted after additional instances of racist or hateful graffiti found at Eagle Mountain site",
          "source_url": "https://kutv.com/news/local/construction-halted-at-facebook-data-center-site-after-additional-hateful-messages-found",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2021-11-08",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2021-11-22",
          "summary": "Site wide stand down ordered by Mortenson following racist graffiti incident",
          "source_url": "https://www.datacenterdynamics.com/en/news/contractor-mortenson-shuts-down-metafacebook-data-center-construction-site-in-utah-due-to-racist-graffiti/",
          "source_tier": 3
        },
        {
          "status": "under_construction",
          "effective_at": "2021-11-08",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2022-03-21",
          "summary": "Racist message found in portable bathroom in November 2021",
          "source_url": "https://kutv.com/news/local/noose-like-rope-found-at-facebook-data-center-construction-site",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2021-11-08",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2022-03-21",
          "summary": "Mortenson offered $50,000 reward for information on November incident",
          "source_url": "https://kutv.com/news/local/noose-like-rope-found-at-facebook-data-center-construction-site",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2021-11-08",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2021-11-22",
          "summary": "Mortenson and Meta offered $50,000 reward for information on perpetrator",
          "source_url": "https://www.datacenterdynamics.com/en/news/contractor-mortenson-shuts-down-metafacebook-data-center-construction-site-in-utah-due-to-racist-graffiti/",
          "source_tier": 3
        },
        {
          "status": "under_construction",
          "effective_at": "2021-11-08",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2021-11-22",
          "summary": "Racist graffiti found at Meta data center construction site in Eagle Mountain on November 8, 2021",
          "source_url": "https://www.datacenterdynamics.com/en/news/contractor-mortenson-shuts-down-metafacebook-data-center-construction-site-in-utah-due-to-racist-graffiti/",
          "source_tier": 3
        },
        {
          "status": "under_construction",
          "effective_at": "2021-11-01",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2022-03-22",
          "summary": "In November 2021, employees found racist graffiti including Kill a n word day 11/29 on construction toilets at the same site",
          "source_url": "https://www.datacenterdynamics.com/en/news/noose-found-at-facebook-utah-data-center-construction-site-in-another-racist-incident/",
          "source_tier": 3
        },
        {
          "status": "under_construction",
          "effective_at": "2021-11-01",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2021-11-16",
          "summary": "First instance of racist slur and threat found in portable bathroom earlier in month",
          "source_url": "https://kutv.com/news/local/construction-halted-at-facebook-data-center-site-after-additional-hateful-messages-found",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2021-10-05",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2021-10-05",
          "summary": "Facebook plans to expand Eagle Mountain campus by more than 900,000 square feet with two new data centers in February, boosting planned development to five data center buildings",
          "source_url": "https://www.datacenterfrontier.com/cloud/article/11427905/google-buys-land-in-growing-cloud-cluster-in-utah",
          "source_tier": 3
        },
        {
          "status": "under_construction",
          "effective_at": "2021-10-05",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2021-10-05",
          "summary": "Google opened a Google Cloud Platform region in Salt Lake City last year, leasing space from a data center provider",
          "source_url": "https://www.datacenterfrontier.com/cloud/article/11427905/google-buys-land-in-growing-cloud-cluster-in-utah",
          "source_tier": 3
        },
        {
          "status": "under_construction",
          "effective_at": "2021-06-30",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2021-06-30",
          "summary": "Second expansion of 900,000 square feet was announced in February 2021",
          "source_url": "https://www.datacenterdynamics.com/en/news/facebook-to-invest-in-120mw-solar-farm-in-utah-to-power-eagle-mountain-data-center/",
          "source_tier": 3
        },
        {
          "status": "under_construction",
          "effective_at": "2021-06-30",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2021-06-30",
          "summary": "Solar farm is scheduled to be in service at the end of 2023",
          "source_url": "https://www.datacenterdynamics.com/en/news/facebook-to-invest-in-120mw-solar-farm-in-utah-to-power-eagle-mountain-data-center/",
          "source_tier": 3
        },
        {
          "status": "under_construction",
          "effective_at": "2021-06-30",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2021-06-30",
          "summary": "First expansion of 500,000 square feet was announced in 2019",
          "source_url": "https://www.datacenterdynamics.com/en/news/facebook-to-invest-in-120mw-solar-farm-in-utah-to-power-eagle-mountain-data-center/",
          "source_tier": 3
        }
      ]
    }
  ]
}