  "license": "CC BY-NC 4.0",
  "license_url": "https://creativecommons.org/licenses/by-nc/4.0/",
  "attribution": "Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0. Link to the specific record page where possible.",
  "source": "https://datacenterrecord.org/states/ut/utah-county",
  "retrieved_at": "2026-10-27T01:47:33.873Z",
  "count": 6,
  "projects": [
    {
      "slug": "meta-eagle-mountain-data-center-ut",
      "name": "Meta Eagle Mountain Data Center",
      "summary": "Meta operates and expands a 5 building, 2.4 million square foot hyperscale data center campus through subsidiary Stadler Pahvant LLC at 2000 N. Pony Express Parkway in Eagle Mountain, Utah County, Utah.",
      "state": "UT",
      "city": "Eagle Mountain",
      "county": "Utah County",
      "status": "operational",
      "developer": "Meta",
      "capacity_mw": null,
      "latitude": 40.28914,
      "longitude": -112.01246,
      "location_precision": "address",
      "location_source": "EPA ECHO Detailed Facility Report 110071310579 (1499 North Pioneer Parkway, Eagle Mountain, UT 84005) and Meta Eagle Mountain Data Center fact sheet.",
      "location_verified_at": "2026-10-23",
      "coordinate_source": "Utah County Assessor parcel at 2000 N. Pony Express Parkway, Eagle Mountain",
      "location_last_verified": "2026-10-23",
      "site_address": "2000 N. Pony Express Parkway, Eagle Mountain, UT 84005",
      "site_address_source_url": "https://datacenters.atmeta.com/utah-data-center/",
      "published": "2026-09-14",
      "last_verified": "2026-10-26",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://datacenters.atmeta.com/utah-data-center/",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": 900,
      "site_acres_disclosed_as": "developer_estimate",
      "site_acres_source_url": "https://datacenters.atmeta.com/utah-data-center/",
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 5,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://datacenters.atmeta.com/utah-data-center/",
      "buildings_verified_at": "2026-10-23",
      "record_url": "https://datacenterrecord.org/projects/meta-eagle-mountain-data-center-ut",
      "sources": [
        {
          "title": "Mortenson fires worker for noose at Facebook data center site - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/mortenson-fires-worker-for-noose-at-facebook-data-center-site/",
          "publisher": "Data Center Dynamics",
          "date": "2022-03-23",
          "source_tier": 3
        },
        {
          "title": "Meta: Our U.S. data center fleet",
          "url": "https://datacenters.atmeta.com/us-locations/",
          "publisher": "Meta",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Google Buys Land in Growing Cloud Cluster in Utah - Data Center Frontier",
          "url": "https://www.datacenterfrontier.com/cloud/article/11427905/google-buys-land-in-growing-cloud-cluster-in-utah",
          "publisher": "Data Center Frontier",
          "date": "2021-10-05",
          "source_tier": 3
        },
        {
          "title": "Meta lists Eagle Mountain Data Center at Eagle Mountain, Utah",
          "url": "https://datacenters.atmeta.com/us-locations/#meta-eagle-mountain-data-center-ut",
          "publisher": "Meta",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "Facebook to invest in 120MW solar farm in Utah to power Eagle Mountain data center - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/facebook-to-invest-in-120mw-solar-farm-in-utah-to-power-eagle-mountain-data-center/",
          "publisher": "Data Center Dynamics",
          "date": "2021-06-30",
          "source_tier": 3
        },
        {
          "title": "Police investigating noose like rope found at Facebook data center construction site - KUTV",
          "url": "https://kutv.com/news/local/noose-like-rope-found-at-facebook-data-center-construction-site",
          "publisher": "KUTV",
          "date": "2022-03-21",
          "source_tier": 4
        },
        {
          "title": "Contractor Mortenson shuts down Meta/Facebook data center construction site in Utah due to racist graffiti - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/contractor-mortenson-shuts-down-metafacebook-data-center-construction-site-in-utah-due-to-racist-graffiti/",
          "publisher": "Data Center Dynamics",
          "date": "2021-11-22",
          "source_tier": 3
        },
        {
          "title": "Construction halted at Facebook data center site after additional 'hateful' messages found - KUTV",
          "url": "https://kutv.com/news/local/construction-halted-at-facebook-data-center-site-after-additional-hateful-messages-found",
          "publisher": "KUTV",
          "date": "2021-11-16",
          "source_tier": 4
        },
        {
          "title": "Meta to Expand Eagle Mountain Data Center Project - W.Media",
          "url": "https://w.media/meta-to-expand-eagle-mountain-data-center-project/",
          "publisher": "W.Media",
          "date": "2022-10-03",
          "source_tier": 4
        },
        {
          "title": "Noose found at Facebook Utah data center construction site, in another racist incident - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/noose-found-at-facebook-utah-data-center-construction-site-in-another-racist-incident/",
          "publisher": "Data Center Dynamics",
          "date": "2022-03-22",
          "source_tier": 3
        },
        {
          "title": "Turner halts work at $1.5B Meta site for recurring racist graffiti - Construction Dive",
          "url": "https://www.constructiondive.com/news/turner-halts-work-meta-data-center-recurring-racist-graffiti/632395/",
          "publisher": "Construction Dive",
          "date": "2022-09-22",
          "source_tier": 4
        },
        {
          "title": "Growing outward: Meta announces expansion of Eagle Mountain data center facility, contributions to community - heraldextra.com",
          "url": "https://www.heraldextra.com/news/2026/sep/14/growing-outward-meta-announces-expansion-of-eagle-mountain-data-center-facility-contributions-to-community/",
          "publisher": "heraldextra.com",
          "date": "2026-09-14",
          "source_tier": 1
        },
        {
          "title": "Meta got a 40-year tax break for its $1.5 billion data center. Now neighbors face a 183% property tax hike - moneywise.com",
          "url": "https://moneywise.com/news/real-estate-news/meta-data-center-eagle-mountain-property-tax-hike",
          "publisher": "moneywise.com",
          "date": "2026-08-19",
          "source_tier": 1
        },
        {
          "title": "Meta to expand Eagle Mountain data center campus in Utah",
          "url": "https://www.datacenterdynamics.com/en/news/meta-to-expand-eagle-mountain-data-center-campus-in-utah/",
          "publisher": "Data Center Dynamics",
          "date": "2026-09-15",
          "source_tier": 3
        },
        {
          "title": "Meta announces data center expansion, new community investments in Eagle Mountain",
          "url": "https://www.ksl.com/article/51624008/meta-announces-data-center-expansion-new-community-investments-in-eagle-mountain",
          "publisher": "KSL",
          "date": "2026-09-15",
          "source_tier": 4
        },
        {
          "title": "Meta plans Eagle Mountain data center expansion, $2.5M community investment - KUTV",
          "url": "https://kutv.com/news/local/meta-plans-eagle-mountain-data-center-expansion-25m-community-investment",
          "publisher": "KUTV",
          "date": "2026-09-14",
          "source_tier": 4
        },
        {
          "title": "Meta to expand Eagle Mountain data center campus in Utah - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/meta-to-expand-eagle-mountain-data-center-campus-in-utah/",
          "publisher": "Data Center Dynamics",
          "date": "2026-09-15",
          "source_tier": 3
        },
        {
          "title": "Meta Provides Crucial Investment Insights into its $3bn+ Eagle Mountain Data Center in Utah - Construction Review",
          "url": "https://constructionreviewonline.com/meta-provides-crucial-investment-insights-into-its-3bn-eagle-mountain-data-center-in-utah/",
          "publisher": "Construction Review",
          "date": "2026-09-15",
          "source_tier": 4
        },
        {
          "title": "Meta announces data center expansion, new community investments in Eagle Mountain - ksl.com",
          "url": "https://www.ksl.com/article/51624008/meta-announces-data-center-expansion-new-community-investments-in-eagle-mountain",
          "publisher": "ksl.com",
          "date": "2026-09-15",
          "source_tier": 4
        },
        {
          "title": "Deepening Our Investment in Eagle Mountain, Utah - Meta Data Centers",
          "url": "https://datacenters.atmeta.com/2026/09/deepening-our-investment-in-eagle-mountain-utah/",
          "publisher": "Meta Data Centers",
          "date": "2026-09-15",
          "source_tier": 4
        },
        {
          "title": "Can a data center company actually be a good neighbor? - Utah Business",
          "url": "https://www.utahbusiness.com/industry/2026/09/14/meta-boosts-eagle-mountain-investment-3-billion-utah-data-center/",
          "publisher": "Utah Business",
          "date": "2026-09-15",
          "source_tier": 4
        },
        {
          "title": "Meta to expand Eagle Mountain Data Center, announces more than $1 million in community investments - ABC4 Utah",
          "url": "https://www.abc4.com/news/wasatch-front/meta-expand-eagle-mountain-data-center/",
          "publisher": "ABC4 Utah",
          "date": "2026-09-14",
          "source_tier": 4
        },
        {
          "title": "Meta Eagle Mountain Data Center Campus Fact Sheet (Stadler Pahvant LLC)",
          "url": "https://datacenters.atmeta.com/utah-data-center/",
          "publisher": "Meta",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO Detailed Facility Report: 1499 Pioneer Parkway, Eagle Mountain, UT 84005 (FRS 110071310579, CWA UTRC04407 / UTRC09924)",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071310579",
          "publisher": "U.S. Environmental Protection Agency / Utah Department of Environmental Quality",
          "date": "2026-10-23",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Meta operates its Eagle Mountain Data Center campus at 1275 North Community Circle, which opened in 2021 and is expanding across five buildings.",
          "source_url": "https://kutv.com/news/local/meta-plans-eagle-mountain-data-center-expansion-25m-community-investment",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Meta expands Eagle Mountain data center with $2.5 million community investment",
          "source_url": "https://kutv.com/news/local/meta-plans-eagle-mountain-data-center-expansion-25m-community-investment",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Meta first broke ground in 2018",
          "source_url": "https://kutv.com/news/local/meta-plans-eagle-mountain-data-center-expansion-25m-community-investment",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Campus opened in 2021 at 1275 N. Community Circle",
          "source_url": "https://kutv.com/news/local/meta-plans-eagle-mountain-data-center-expansion-25m-community-investment",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Meta lists Meta Eagle Mountain Data Center at Eagle Mountain, Utah on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.atmeta.com/us-locations/#meta-eagle-mountain-data-center-ut",
          "source_tier": 2
        },
        {
          "status": "under_construction",
          "effective_at": "2022-10-03",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2022-10-03",
          "summary": "Meta announced Phase 3 expansion of Eagle Mountain data center project",
          "source_url": "https://w.media/meta-to-expand-eagle-mountain-data-center-project/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2022-09-22",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2022-09-22",
          "summary": "Turner halted work at the Meta data center site",
          "source_url": "https://www.constructiondive.com/news/turner-halts-work-meta-data-center-recurring-racist-graffiti/632395/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2022-03-23",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2022-03-23",
          "summary": "Mortenson Construction fired a worker who left a yellow noose at Meta Eagle Mountain data center construction site",
          "source_url": "https://www.datacenterdynamics.com/en/news/mortenson-fires-worker-for-noose-at-facebook-data-center-site/",
          "source_tier": 3
        },
        {
          "status": "under_construction",
          "effective_at": "2022-03-22",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2022-03-22",
          "summary": "Mortenson Construction offered $100,000 reward for information identifying person responsible",
          "source_url": "https://www.datacenterdynamics.com/en/news/noose-found-at-facebook-utah-data-center-construction-site-in-another-racist-incident/",
          "source_tier": 3
        },
        {
          "status": "under_construction",
          "effective_at": "2022-03-22",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2022-03-22",
          "summary": "Worker responsible for noose incident was fired",
          "source_url": "https://www.datacenterdynamics.com/en/news/noose-found-at-facebook-utah-data-center-construction-site-in-another-racist-incident/",
          "source_tier": 3
        },
        {
          "status": "under_construction",
          "effective_at": "2022-03-22",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2022-03-22",
          "summary": "Construction suspended for one day following noose incident",
          "source_url": "https://www.datacenterdynamics.com/en/news/noose-found-at-facebook-utah-data-center-construction-site-in-another-racist-incident/",
          "source_tier": 3
        },
        {
          "status": "under_construction",
          "effective_at": "2022-03-22",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2022-03-22",
          "summary": "Noose found at Meta Eagle Mountain data center construction site",
          "source_url": "https://www.datacenterdynamics.com/en/news/noose-found-at-facebook-utah-data-center-construction-site-in-another-racist-incident/",
          "source_tier": 3
        },
        {
          "status": "under_construction",
          "effective_at": "2022-03-21",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2022-03-21",
          "summary": "Noose like rope found at Meta data center construction site in Eagle Mountain",
          "source_url": "https://kutv.com/news/local/noose-like-rope-found-at-facebook-data-center-construction-site",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2022-03-21",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2022-03-21",
          "summary": "Mortenson offered $100,000 reward for information leading to identification of person(s) responsible",
          "source_url": "https://kutv.com/news/local/noose-like-rope-found-at-facebook-data-center-construction-site",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2021-11-29",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2022-03-23",
          "summary": "Racist graffiti was found at Eagle Mountain construction site in November, with Mortenson offering $50,000 reward",
          "source_url": "https://www.datacenterdynamics.com/en/news/mortenson-fires-worker-for-noose-at-facebook-data-center-site/",
          "source_tier": 3
        },
        {
          "status": "under_construction",
          "effective_at": "2021-11-16",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2021-11-16",
          "summary": "Work halted until Friday for additional safety protocols and training",
          "source_url": "https://kutv.com/news/local/construction-halted-at-facebook-data-center-site-after-additional-hateful-messages-found",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2021-11-16",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2021-11-16",
          "summary": "Mortenson offered $50,000 reward for information identifying person responsible for vandalism",
          "source_url": "https://kutv.com/news/local/construction-halted-at-facebook-data-center-site-after-additional-hateful-messages-found",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2021-11-16",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2021-11-16",
          "summary": "Construction halted after additional instances of racist or hateful graffiti found at Eagle Mountain site",
          "source_url": "https://kutv.com/news/local/construction-halted-at-facebook-data-center-site-after-additional-hateful-messages-found",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2021-11-08",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2021-11-22",
          "summary": "Site wide stand down ordered by Mortenson following racist graffiti incident",
          "source_url": "https://www.datacenterdynamics.com/en/news/contractor-mortenson-shuts-down-metafacebook-data-center-construction-site-in-utah-due-to-racist-graffiti/",
          "source_tier": 3
        },
        {
          "status": "under_construction",
          "effective_at": "2021-11-08",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2022-03-21",
          "summary": "Mortenson offered $50,000 reward for information on November incident",
          "source_url": "https://kutv.com/news/local/noose-like-rope-found-at-facebook-data-center-construction-site",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2021-11-08",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2022-03-21",
          "summary": "Racist message found in portable bathroom in November 2021",
          "source_url": "https://kutv.com/news/local/noose-like-rope-found-at-facebook-data-center-construction-site",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2021-11-08",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2021-11-22",
          "summary": "Mortenson and Meta offered $50,000 reward for information on perpetrator",
          "source_url": "https://www.datacenterdynamics.com/en/news/contractor-mortenson-shuts-down-metafacebook-data-center-construction-site-in-utah-due-to-racist-graffiti/",
          "source_tier": 3
        },
        {
          "status": "under_construction",
          "effective_at": "2021-11-08",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2021-11-22",
          "summary": "Racist graffiti found at Meta data center construction site in Eagle Mountain on November 8, 2021",
          "source_url": "https://www.datacenterdynamics.com/en/news/contractor-mortenson-shuts-down-metafacebook-data-center-construction-site-in-utah-due-to-racist-graffiti/",
          "source_tier": 3
        },
        {
          "status": "under_construction",
          "effective_at": "2021-11-01",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2021-11-16",
          "summary": "First instance of racist slur and threat found in portable bathroom earlier in month",
          "source_url": "https://kutv.com/news/local/construction-halted-at-facebook-data-center-site-after-additional-hateful-messages-found",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2021-11-01",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2022-03-22",
          "summary": "In November 2021, employees found racist graffiti including Kill a n word day 11/29 on construction toilets at the same site",
          "source_url": "https://www.datacenterdynamics.com/en/news/noose-found-at-facebook-utah-data-center-construction-site-in-another-racist-incident/",
          "source_tier": 3
        },
        {
          "status": "under_construction",
          "effective_at": "2021-10-05",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2021-10-05",
          "summary": "Facebook plans to expand Eagle Mountain campus by more than 900,000 square feet with two new data centers in February, boosting planned development to five data center buildings",
          "source_url": "https://www.datacenterfrontier.com/cloud/article/11427905/google-buys-land-in-growing-cloud-cluster-in-utah",
          "source_tier": 3
        },
        {
          "status": "under_construction",
          "effective_at": "2021-10-05",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2021-10-05",
          "summary": "Google opened a Google Cloud Platform region in Salt Lake City last year, leasing space from a data center provider",
          "source_url": "https://www.datacenterfrontier.com/cloud/article/11427905/google-buys-land-in-growing-cloud-cluster-in-utah",
          "source_tier": 3
        },
        {
          "status": "under_construction",
          "effective_at": "2021-06-30",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2021-06-30",
          "summary": "Second expansion of 900,000 square feet was announced in February 2021",
          "source_url": "https://www.datacenterdynamics.com/en/news/facebook-to-invest-in-120mw-solar-farm-in-utah-to-power-eagle-mountain-data-center/",
          "source_tier": 3
        },
        {
          "status": "under_construction",
          "effective_at": "2021-06-30",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2021-06-30",
          "summary": "First expansion of 500,000 square feet was announced in 2019",
          "source_url": "https://www.datacenterdynamics.com/en/news/facebook-to-invest-in-120mw-solar-farm-in-utah-to-power-eagle-mountain-data-center/",
          "source_tier": 3
        },
        {
          "status": "under_construction",
          "effective_at": "2021-06-30",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2021-06-30",
          "summary": "Solar farm is scheduled to be in service at the end of 2023",
          "source_url": "https://www.datacenterdynamics.com/en/news/facebook-to-invest-in-120mw-solar-farm-in-utah-to-power-eagle-mountain-data-center/",
          "source_tier": 3
        }
      ]
    },
    {
      "slug": "ace-data-center-provo-ut",
      "name": "Ace Data Center",
      "summary": "Ace Data Center operates a single building colocation data center at 1950 South 950 East in Provo, Utah County, Utah under Utah Division of Air Quality permit 4904900259.",
      "state": "UT",
      "city": "Provo",
      "county": "Utah County",
      "status": "operational",
      "developer": "Ace Data Center",
      "capacity_mw": null,
      "latitude": 40.207474,
      "longitude": -111.642409,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110043217079: the registry placed its point by address matching house number, accurate to 50 m",
      "location_verified_at": "2026-10-23",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-23",
      "site_address": "1950 South 950 East, Provo, UT 84606",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110043217079",
      "published": "2026-10-20",
      "last_verified": "2026-10-23",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://acedatacenter.com/",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://acedatacenter.com/",
      "buildings_verified_at": "2026-10-23",
      "record_url": "https://datacenterrecord.org/projects/ace-data-center-provo-ut",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Ace Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110043217079",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "Ace Data Center Provo Facility Specification",
          "url": "https://acedatacenter.com/",
          "publisher": "Ace Data Center",
          "date": "2026-01-15",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-01-15",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Ace Data Center operates its colocation data center at 1950 South 950 East in Provo under Utah Division of Air Quality permit 4904900259.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110043217079",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "flexential-corp-flexential-salt-lake-citylindon-slc03-lindon-ut",
      "name": "Flexential Salt Lake City Lindon (SLC03)",
      "summary": "Flexential operates its single building SLC03 Lindon colocation data center at 333 S. 520 West in Lindon, Utah County, Utah.",
      "state": "UT",
      "city": "Lindon",
      "county": "Utah County",
      "status": "operational",
      "developer": "Flexential",
      "capacity_mw": null,
      "latitude": 40.332493,
      "longitude": -111.728052,
      "location_precision": "address",
      "location_source": "Flexential SLC03 facility specification and Utah County Assessor parcel at 333 S. 520 West, Lindon.",
      "location_verified_at": "2026-10-23",
      "coordinate_source": "Utah County Assessor parcel at 333 S. 520 West, Lindon",
      "location_last_verified": "2026-10-23",
      "site_address": "333 S. 520 West, Lindon, UT 84042",
      "site_address_source_url": "https://www.flexential.com/data-centers/utah/salt-lake-city",
      "published": "2026-10-21",
      "last_verified": "2026-10-23",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://www.flexential.com/data-centers/utah/salt-lake-city",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.flexential.com/data-centers/utah/salt-lake-city",
      "buildings_verified_at": "2026-10-23",
      "record_url": "https://datacenterrecord.org/projects/flexential-corp-flexential-salt-lake-citylindon-slc03-lindon-ut",
      "sources": [
        {
          "title": "Flexential Salt Lake City Lindon (SLC03) Facility Specification",
          "url": "https://www.flexential.com/data-centers/utah/salt-lake-city",
          "publisher": "Flexential",
          "date": "2026-01-15",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-01-15",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Flexential operates the single building SLC03 data center at 333 S. 520 West in Lindon, Utah County.",
          "source_url": "https://www.flexential.com/data-centers/utah/salt-lake-city",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "qts-eagle-mountain-ut",
      "name": "QTS Eagle Mountain",
      "summary": "QTS Data Centers is constructing its QTS SLC DC1 hyperscale data center campus in Eagle Mountain, Utah County, Utah under stormwater permits UTRC08700 and UTRC11607.",
      "state": "UT",
      "city": "Eagle Mountain",
      "county": "Utah County",
      "status": "under_construction",
      "developer": "QTS Data Centers",
      "capacity_mw": null,
      "latitude": 40.30421,
      "longitude": -112.02581,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility report 110071707118 (NPDES permits UTRC08700 and UTRC11607) for QTS SLC DC1 in Eagle Mountain, UT 84005.",
      "location_verified_at": "2026-10-23",
      "coordinate_source": "EPA ECHO permit point 110071707118 for QTS SLC DC1 in Eagle Mountain",
      "location_last_verified": "2026-10-23",
      "site_address": "Virtual Drive and Sweetwater Road, Eagle Mountain, UT 84005",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071707118",
      "published": "2026-09-14",
      "last_verified": "2026-10-23",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071707118",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/qts-eagle-mountain-ut",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: QTS SLC DC1",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071707118",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "QTS Data Centers: All locations",
          "url": "https://q.com/data-centers/",
          "publisher": "QTS Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "QTS Data Centers lists QTS Eagle Mountain at Eagle Mountain, Utah",
          "url": "https://q.com/data-centers/#qts-eagle-mountain-ut",
          "publisher": "QTS Data Centers",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "QTS Data Centers lists QTS Eagle Mountain at Eagle Mountain, Utah on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://q.com/data-centers/#qts-eagle-mountain-ut",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "volition-spanish-fork-ut",
      "name": "Volition Industries Spanish Fork",
      "summary": "Spanish Fork City Council approved a Title 15 zoning amendment creating a Data Center Overlay District on September 21, 2026, while the developer proposed moving the 250 MW project to an unincorporated Utah County site in the Stockman Flats area south of the city.",
      "state": "UT",
      "city": "Spanish Fork",
      "county": "Utah County",
      "status": "proposed",
      "developer": "Volition",
      "capacity_mw": 250,
      "latitude": 40.077375,
      "longitude": -111.589416,
      "location_precision": "parcel",
      "location_source": "Utah County parcel 672280003 (322.29 acres, owner JPC UT LLC, S 1/2 Sec 34 T8S R3E SLB&M), where Spanish Fork City Press Release (Jan 16, 2026) places the project in its site map, queried from Utah AGRC Parcels_Utah FeatureServer (https://services1.arcgis.com/99lidPhWCzftIe9K/arcgis/rest/services/Parcels_Utah/FeatureServer/0/query?where=PARCEL_ID%3D%27672280003%27&outFields=*&returnCentroid=true&outSR=4326&f=json).",
      "location_verified_at": "2026-10-23",
      "coordinate_source": "utah agrc parcels_utah parcel centroid (parcel 672280003)",
      "location_last_verified": "2026-10-23",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-04",
      "last_verified": "2026-10-23",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://www.spanishfork.gov/news_detail_T9_R391.php",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/volition-spanish-fork-ut",
      "sources": [
        {
          "title": "Adopted minutes, City Council meeting, April 21, 2026",
          "url": "https://www.utah.gov/pmn/files/1430163.pdf",
          "publisher": "Spanish Fork City via Utah Public Notice Website",
          "date": "2026-04-21",
          "source_tier": 2
        },
        {
          "title": "Spanish Fork residents weigh in on proposed Volition AI data center",
          "url": "https://thecougarchronicle.com/spanish-fork-volition-ai-data-center",
          "publisher": "The Cougar Chronicle",
          "date": "2026-08-17",
          "source_tier": 4
        },
        {
          "title": "Residents voice concerns over proposed data center regulations in Spanish Fork",
          "url": "https://www.ksl.com/article/51611520/residents-voice-concerns-over-proposed-data-center-regulations-in-spanish-fork",
          "publisher": "KSL",
          "date": "2026-08-19",
          "source_tier": 4
        },
        {
          "title": "Spanish Fork City Council delays vote for amendments that could pave way for data center",
          "url": "https://www.heraldextra.com/news/2026/aug/20/data-center-discussion-spanish-fork-city-council-delays-vote-for-amendments-that-could-pave-way-for-data-center/",
          "publisher": "Daily Herald",
          "date": "2026-08-20",
          "source_tier": 4
        },
        {
          "title": "Spanish Fork leaders consider data center proposal amid community concerns",
          "url": "https://www.fox13now.com/news/politics/spanish-fork-leaders-consider-data-center-proposal-amid-community-concerns",
          "publisher": "Fox 13",
          "date": "2026-08-19",
          "source_tier": 4
        },
        {
          "title": "Spanish Fork residents frustrated after mayor voices approval of data center proposal",
          "url": "https://www.ksl.com/article/51618421/spanish-fork-residents-frustrated-after-mayor-voices-approval-of-data-center-proposal",
          "publisher": "KSL",
          "date": "2026-08-31",
          "source_tier": 4
        },
        {
          "title": "Data center company ponders moving on after Spanish Fork leaders delay Title 15 vote",
          "url": "https://www.fox13now.com/news/local-news/central-utah/data-center-company-ponders-moving-on-after-spanish-fork-leaders-delay-title-15-vote",
          "publisher": "Fox 13",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Will a data center join the wind turbines at Spanish Fork Canyon? The city just cleared a path. - The Salt Lake Tribune",
          "url": "https://www.sltrib.com/news/2026/09/24/spanish-fork-changes-zoning-allow/",
          "publisher": "The Salt Lake Tribune",
          "date": "2026-09-24",
          "source_tier": 4
        },
        {
          "title": "Utah County zoning map",
          "url": "https://maps.utahcounty.gov/CommDev/Zoning/Zoning.html",
          "publisher": "Utah County Community Development",
          "date": "2026-09-05",
          "source_tier": 2
        },
        {
          "title": "Proposed Spanish Fork data center draws concerns from residents",
          "url": "https://www.youtube.com/watch?v=64tmSZX1Gxg",
          "publisher": "YouTube",
          "date": null,
          "source_tier": 5
        },
        {
          "title": "The size of 20 Costcos: Can Utah residents drive a data center out of their backyard?",
          "url": "https://www.ksl.com/article/news/utah/the-size-of-20-costcos-can-utah-residents-drive-a-data-center-out-of-their-backyard/51621687",
          "publisher": "KSL",
          "date": "2026-09-13",
          "source_tier": 4
        },
        {
          "title": "As other local governments pass data center bans, this Utah city is considering changing code to bring one in - The Salt Lake Tribune",
          "url": "https://www.sltrib.com/news/2026/08/21/spanish-fork-data-center-what-know/",
          "publisher": "The Salt Lake Tribune",
          "date": "2026-08-21",
          "source_tier": 4
        },
        {
          "title": "Volition Title 15 Amendment - Planning Commission | August 5, 2026",
          "url": "https://www.youtube.com/watch?v=m9biQV4k2ig",
          "publisher": "YouTube",
          "date": null,
          "source_tier": 5
        },
        {
          "title": "Spanish Fork leaders consider data center proposal amid community concerns",
          "url": "https://www.youtube.com/watch?v=WX2HBPtAvvA",
          "publisher": "YouTube",
          "date": null,
          "source_tier": 5
        },
        {
          "title": "Is Iron County ready for massive AI data center? Residents don't think so",
          "url": "https://www.youtube.com/watch?v=tEitXWunm7M",
          "publisher": "YouTube",
          "date": null,
          "source_tier": 5
        },
        {
          "title": "Spanish Fork Mayor Backs $1B Data Center, Residents Cry Foul",
          "url": "https://hoodline.com/2026/09/spanish-fork-mayor-backs-1b-data-center-residents-cry-foul/",
          "publisher": "Hoodline",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "In this Utah neighborhood, residents say a nearby data center is making a constant humming noise",
          "url": "https://www.sltrib.com/news/2026/10/21/this-utah-neighborhood-residents/",
          "publisher": "The Salt Lake Tribune",
          "date": "2026-10-21",
          "source_tier": 4
        },
        {
          "title": "‘Not interested in being a test site’: Residents oppose potential data center in Spanish Fork - ABC4 Utah",
          "url": "https://www.abc4.com/news/wasatch-front/not-interested-in-being-a-test-site-residents-oppose-potential-data-center-in-spanish-fork/",
          "publisher": "ABC4 Utah",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "Utah AGRC Parcels_Utah FeatureServer: Utah County Parcel 672280003 (322.29 acres, owner JPC UT LLC, S 1/2 Sec 34 T8S R3E SLB&M)",
          "url": "https://services1.arcgis.com/99lidPhWCzftIe9K/arcgis/rest/services/Parcels_Utah/FeatureServer/0/query?where=PARCEL_ID%3D%27672280003%27&outFields=*&returnCentroid=true&outSR=4326&f=json",
          "publisher": "Utah Automated Geographic Reference Center (AGRC) / Utah County Recorder",
          "date": "2026-10-16",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "ai_unspecified",
          "share_percent": null,
          "source_url": "https://www.ksl.com/article/51611520/residents-voice-concerns-over-proposed-data-center-regulations-in-spanish-fork"
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "The proposed Volition data center would be a billion dollar, self powered facility generating between 250 and 400 megawatts of its own power using natural gas",
          "source_url": "https://www.fox13now.com/news/local-news/central-utah/data-center-company-ponders-moving-on-after-spanish-fork-leaders-delay-title-15-vote",
          "source_tier": 4
        },
        {
          "status": "permitting",
          "effective_at": "2026-09-01",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Spanish Fork City Council delayed the Title 15 vote a second time, for two more weeks, and Volition Industries said it may take the project to another community.",
          "source_url": "https://www.fox13now.com/news/local-news/central-utah/data-center-company-ponders-moving-on-after-spanish-fork-leaders-delay-title-15-vote",
          "source_tier": 4
        },
        {
          "status": "permitting",
          "effective_at": "2026-09-01",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-01",
          "summary": "Volition plans to partner with Bloom Energy to power the facility using natural gas fueled solid oxide fuel cells with closed loop cooling",
          "source_url": "https://hoodline.com/2026/09/spanish-fork-mayor-backs-1b-data-center-residents-cry-foul/",
          "source_tier": 4
        },
        {
          "status": "permitting",
          "effective_at": "2026-09-01",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-01",
          "summary": "The Fingerhut warehouse site is located at 4000 E. U.S. Highway 6 and is approximately 1.1 million square feet",
          "source_url": "https://hoodline.com/2026/09/spanish-fork-mayor-backs-1b-data-center-residents-cry-foul/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-01",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-01",
          "summary": "Volition, a Provo based AI data center company, hopes to redevelop the former Fingerhut warehouse site at 4000 E. U.S. 6 in Spanish Fork",
          "source_url": "https://www.ksl.com/article/51618421/spanish-fork-residents-frustrated-after-mayor-voices-approval-of-data-center-proposal",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-01",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Spanish Fork City Council delayed the Title 15 vote a second time, for two more weeks, and Volition Industries said it may take the project to another community",
          "source_url": "https://www.fox13now.com/news/local-news/central-utah/data-center-company-ponders-moving-on-after-spanish-fork-leaders-delay-title-15-vote",
          "source_tier": 4
        },
        {
          "status": "permitting",
          "effective_at": "2026-08-25",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Mayor Mike Mendenhall posted on Facebook that he supports the proposal, citing the tax revenue and jobs the company has described.",
          "source_url": "https://www.ksl.com/article/51618421/spanish-fork-residents-frustrated-after-mayor-voices-approval-of-data-center-proposal",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-21",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-21",
          "summary": "Volition proposes a data center at the former Fingerhut warehouse at the mouth of Spanish Fork Canyon",
          "source_url": "https://www.sltrib.com/news/2026/08/21/spanish-fork-data-center-what-know/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-21",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-21",
          "summary": "Volition, a Provo based company, proposes to build a data center at the former Fingerhut warehouse, a million square foot facility currently operating as a distribution center",
          "source_url": "https://www.sltrib.com/news/2026/08/21/spanish-fork-data-center-what-know/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-20",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-20",
          "summary": "The motion to vote on revisions to the Title 15 municipal amendments was tabled until Sept. 1",
          "source_url": "https://www.heraldextra.com/news/2026/aug/20/data-center-discussion-spanish-fork-city-council-delays-vote-for-amendments-that-could-pave-way-for-data-center/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-20",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-20",
          "summary": "Volition proposes a 250 MW data center using onsite power generation in an existing warehouse at Spanish Fork Canyon mouth",
          "source_url": "https://www.heraldextra.com/news/2026/aug/20/data-center-discussion-spanish-fork-city-council-delays-vote-for-amendments-that-could-pave-way-for-data-center/",
          "source_tier": 4
        },
        {
          "status": "permitting",
          "effective_at": "2026-08-19",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-19",
          "summary": "Volition is proposing a development agreement holding the company accountable to all statements made about the project",
          "source_url": "https://www.ksl.com/article/51611520/residents-voice-concerns-over-proposed-data-center-regulations-in-spanish-fork",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-19",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-19",
          "summary": "Council meeting to revisit data center resolution at September 1 meeting",
          "source_url": "https://www.fox13now.com/news/politics/spanish-fork-leaders-consider-data-center-proposal-amid-community-concerns",
          "source_tier": 4
        },
        {
          "status": "permitting",
          "effective_at": "2026-08-19",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-19",
          "summary": "Volition aims to redevelop the former Fingerhut warehouse site at 4000 E. U.S. 6 into a self powered AI data center",
          "source_url": "https://www.ksl.com/article/51611520/residents-voice-concerns-over-proposed-data-center-regulations-in-spanish-fork",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-19",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-19",
          "summary": "Jeff Chavez, Volition CEO, said project would generate about 250 megawatts of power",
          "source_url": "https://www.fox13now.com/news/politics/spanish-fork-leaders-consider-data-center-proposal-amid-community-concerns",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-19",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-19",
          "summary": "Volition proposed redevelopment of former Fingerhut warehouse site at 4000 E. U.S. 6 in Spanish Fork for self powered AI data center",
          "source_url": "https://www.ksl.com/article/51611520/residents-voice-concerns-over-proposed-data-center-regulations-in-spanish-fork",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-19",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-19",
          "summary": "Volition project would utilize an existing distribution center about 28 acres in size",
          "source_url": "https://www.fox13now.com/news/politics/spanish-fork-leaders-consider-data-center-proposal-amid-community-concerns",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-19",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-19",
          "summary": "Volition's closed loop cooling system would need about two Utah households' worth of water to fill",
          "source_url": "https://www.fox13now.com/news/politics/spanish-fork-leaders-consider-data-center-proposal-amid-community-concerns",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-18",
          "summary": "Volition proposes converting an existing 28 acre distribution center into a data center",
          "source_url": "https://www.youtube.com/watch?v=WX2HBPtAvvA",
          "source_tier": 5
        },
        {
          "status": "permitting",
          "effective_at": "2026-08-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-18",
          "summary": "The city's Development Review Committee recommended the ordinance amendment be approved",
          "source_url": "https://www.abc4.com/news/wasatch-front/not-interested-in-being-a-test-site-residents-oppose-potential-data-center-in-spanish-fork/",
          "source_tier": 4
        },
        {
          "status": "permitting",
          "effective_at": "2026-08-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-18",
          "summary": "Volition, a Provo based company, applied for an ordinance amendment to change Title 15 of the Spanish Fork Municipal Code to allow Data Centers and Onsite Power Generation Facilities in light industrial zones",
          "source_url": "https://www.abc4.com/news/wasatch-front/not-interested-in-being-a-test-site-residents-oppose-potential-data-center-in-spanish-fork/",
          "source_tier": 4
        },
        {
          "status": "permitting",
          "effective_at": "2026-08-18",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "After a public hearing of more than six hours, Spanish Fork City Council tabled the Title 15 amendments the project depends on until September 1.",
          "source_url": "https://www.heraldextra.com/news/2026/aug/20/data-center-discussion-spanish-fork-city-council-delays-vote-for-amendments-that-could-pave-way-for-data-center/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-18",
          "summary": "Volition proposes generating its own power using natural gas rather than connecting to Spanish Fork's electrical grid",
          "source_url": "https://www.youtube.com/watch?v=64tmSZX1Gxg",
          "source_tier": 5
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-18",
          "summary": "The proposed data center would be located at the old Fingerhut warehouse at the mouth of Spanish Fork Canyon",
          "source_url": "https://www.youtube.com/watch?v=64tmSZX1Gxg",
          "source_tier": 5
        },
        {
          "status": "permitting",
          "effective_at": "2026-08-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-18",
          "summary": "The Planning Commission recommended the ordinance be modified to limit the amount of power generated and the number of data centers allowed",
          "source_url": "https://www.abc4.com/news/wasatch-front/not-interested-in-being-a-test-site-residents-oppose-potential-data-center-in-spanish-fork/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-17",
          "summary": "Volition proposes repurposing the Western Distribution Center, a 1.05 million square foot facility on about 70 acres",
          "source_url": "https://thecougarchronicle.com/spanish-fork-volition-ai-data-center",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-17",
          "summary": "Volition will use localized solid oxide fuel cells generating power from natural gas without connecting to the grid",
          "source_url": "https://thecougarchronicle.com/spanish-fork-volition-ai-data-center",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-14",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Volition Industries held a public open house on the proposal at the Spanish Fork Library.",
          "source_url": "https://thecougarchronicle.com/spanish-fork-volition-ai-data-center",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-05",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-06",
          "summary": "Non ultra low emission technologies such as diesel generators are explicitly excluded under the proposed definition",
          "source_url": "https://www.youtube.com/watch?v=m9biQV4k2ig",
          "source_tier": 5
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-05",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-06",
          "summary": "Data centers without their own on site power generation facilities will not be allowed inside Spanish Fork City under this proposal",
          "source_url": "https://www.youtube.com/watch?v=m9biQV4k2ig",
          "source_tier": 5
        },
        {
          "status": "proposed",
          "effective_at": "2026-04-21",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Volition Industries presented a self powered data center at the former Fingerhut warehouse to the Spanish Fork City Council in a work session.",
          "source_url": "https://www.utah.gov/pmn/files/1430163.pdf",
          "source_tier": 2
        },
        {
          "status": "proposed",
          "effective_at": "2026-03-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-03-11",
          "summary": "A dedicated natural gas power plant will power the facility without connecting to the public power grid",
          "source_url": "https://www.youtube.com/watch?v=tEitXWunm7M",
          "source_tier": 5
        }
      ]
    },
    {
      "slug": "voonami-inc-voonami-slc1-orem-ut",
      "name": "Voonami Orem Data Center (SLC1)",
      "summary": "Voonami Inc. operates a single building colocation data center at 510 East Technology Avenue in Orem, Utah County, Utah.",
      "state": "UT",
      "city": "Orem",
      "county": "Utah County",
      "status": "operational",
      "developer": "Voonami Inc.",
      "capacity_mw": null,
      "latitude": 40.326235,
      "longitude": -111.681642,
      "location_precision": "address",
      "location_source": "Voonami SLC1 specification and Utah County Assessor parcel at 510 East Technology Avenue, Orem.",
      "location_verified_at": "2026-10-23",
      "coordinate_source": "Utah County Assessor parcel at 510 East Technology Avenue, Orem",
      "location_last_verified": "2026-10-23",
      "site_address": "510 East Technology Avenue, Orem, UT 84097",
      "site_address_source_url": "https://www.voonami.com/",
      "published": "2026-10-21",
      "last_verified": "2026-10-23",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://www.voonami.com/",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.voonami.com/",
      "buildings_verified_at": "2026-10-23",
      "record_url": "https://datacenterrecord.org/projects/voonami-inc-voonami-slc1-orem-ut",
      "sources": [
        {
          "title": "Voonami Orem Data Center (SLC1) Specification",
          "url": "https://www.voonami.com/",
          "publisher": "Voonami Inc.",
          "date": "2026-01-15",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-01-15",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Voonami operates its single building colocation data center at 510 East Technology Avenue in Orem.",
          "source_url": "https://www.voonami.com/",
          "source_tier": 2
        }
      ]
    }
  ]
}