{
  "license": "CC BY-NC 4.0",
  "license_url": "https://creativecommons.org/licenses/by-nc/4.0/",
  "attribution": "Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0. Link to the specific record page where possible.",
  "source": "https://datacenterrecord.org/states/tx/shackelford-county/albany",
  "retrieved_at": "2026-10-27T03:16:24.099Z",
  "count": 1,
  "projects": [
    {
      "slug": "vantage-shackelford-county-tx",
      "name": "Vantage Shackelford County",
      "summary": "Vantage Data Centers lists a data center at Shackelford County, Texas among the sites it operates.",
      "state": "TX",
      "city": "Albany",
      "county": "Shackelford County",
      "status": "operational",
      "developer": "Vantage Data Centers",
      "capacity_mw": 1400,
      "latitude": 32.72694,
      "longitude": -99.29444,
      "location_precision": "county",
      "location_source": "County seat (Albany), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/vantage-shackelford-county-tx",
      "sources": [
        {
          "title": "1,200-acre data center in Shackelford County could boost local economy – KTAB - BigCountryHomepage.com",
          "url": "https://www.bigcountryhomepage.com/video/1200-acre-data-center-in-shackelford-county-could-boost-local-economy/10938702/",
          "publisher": "BigCountryHomepage.com",
          "date": "2025-07-30",
          "source_tier": 1
        },
        {
          "title": "Is gas really winning the AI race? - Latitude Media",
          "url": "https://www.latitudemedia.com/news/is-gas-really-winning-the-ai-race/",
          "publisher": "Latitude Media",
          "date": "2025-08-27",
          "source_tier": 1
        },
        {
          "title": "AI-fueled data centers' construction boom moves into West Texas - El Paso Times",
          "url": "https://www.elpasotimes.com/story/money/business/2025/11/10/artificial-intelligence-fueled-data-centers-construction-boom-moves-into-west-texas/87072278007/",
          "publisher": "El Paso Times",
          "date": "2025-11-10",
          "source_tier": 1
        },
        {
          "title": "Vantage Invests US$25bn in Mega-Campus for AI Data Centres - Construction Digital",
          "url": "https://constructiondigital.com/news/inside-vantages-us-25bn-ai-data-centre-mega-campus-in-texas",
          "publisher": "Construction Digital",
          "date": "2025-08-21",
          "source_tier": 1
        },
        {
          "title": "Big Country data centers: Where they are & what’s coming - BigCountryHomepage.com",
          "url": "https://www.bigcountryhomepage.com/news/big-country-data-centers-where-they-are-whats-coming/",
          "publisher": "BigCountryHomepage.com",
          "date": "2026-06-01",
          "source_tier": 1
        },
        {
          "title": "Inside Frontier: Vantage Data Centers’ $25B Hyperscale Campus in Texas - Construction Review",
          "url": "https://constructionreviewonline.com/vantage-data-centers-unveils-25b-1-4gw-frontier-campus-in-texas-its-largest-project-to-date/",
          "publisher": "Construction Review",
          "date": "2026-01-23",
          "source_tier": 1
        },
        {
          "title": "Vantage breaks ground on Texas gigawatt data center campus for OpenAI - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/vantage-breaks-ground-on-texas-gigawatt-data-center-campus-for-openai/",
          "publisher": "Data Center Dynamics",
          "date": "2025-12-15",
          "source_tier": 1
        },
        {
          "title": "Vantage Data Centers: Data center locations",
          "url": "https://vantage-dc.com/data-center-locations/",
          "publisher": "Vantage Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Vantage Data Centers: Vantage Shackelford County",
          "url": "https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx",
          "publisher": "Vantage Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Vantage files to build another data center in San Antonio, Texas - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/vantage-files-to-build-another-data-center-in-san-antonio-texas/",
          "publisher": "Data Center Dynamics",
          "date": "2025-10-15",
          "source_tier": 1
        },
        {
          "title": "Vantage plots 1.4GW data center campus in Texas - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/vantage-plots-14gw-data-center-campus-in-texas/",
          "publisher": "Data Center Dynamics",
          "date": "2025-08-19",
          "source_tier": 1
        },
        {
          "title": "Vantage Breaks Ground on 1.4GW Texas Data Center for OpenAI - constructionowners.com",
          "url": "https://www.constructionowners.com/news/vantage-breaks-ground-on-1-4gw-texas-data-center-campus",
          "publisher": "constructionowners.com",
          "date": "2025-12-16",
          "source_tier": 1
        },
        {
          "title": "OpenAI marks Texas Stargate site as shift toward physical AI infrastructure | ETIH EdTech News - EdTech Innovation Hub",
          "url": "https://www.edtechinnovationhub.com/news/openai-government-affairs-director-says-texas-data-center-marks-shift-to-physical-ai-infrastructure",
          "publisher": "EdTech Innovation Hub",
          "date": "2025-12-15",
          "source_tier": 1
        },
        {
          "title": "Oracle and OpenAI's second Stargate data center in Texas will be powered off the grid - Business Insider",
          "url": "https://www.businessinsider.com/openai-building-natural-gas-microgrid-at-new-texas-data-center-2025-10",
          "publisher": "Business Insider",
          "date": "2025-10-23",
          "source_tier": 1
        },
        {
          "title": "Vantage Data Centers breaks ground on data center campus in Texas - W.Media",
          "url": "https://w.media/vantage-data-centers-breaks-ground-on-data-center-campus-in-texas/",
          "publisher": "W.Media",
          "date": "2025-12-16",
          "source_tier": 1
        },
        {
          "title": "Vantage Data Centers unveils plans for a $25b mega-campus in Texas to meet AI demand - Institutional Real Estate, Inc.",
          "url": "https://irei.com/news/vantage-data-centers-unveils-plans-for-a-25b-mega-campus-in-texas-to-meet-ai-demand/",
          "publisher": "Institutional Real Estate, Inc.",
          "date": "2025-08-19",
          "source_tier": 1
        },
        {
          "title": "Oracle to back massive 1.4-gigawatt gas-powered data center in US - Interesting Engineering",
          "url": "https://interestingengineering.com/culture/oracle-to-back-gas-powered-data-center",
          "publisher": "Interesting Engineering",
          "date": "2025-08-21",
          "source_tier": 1
        },
        {
          "title": "Vantage Data Centers Unveils “Frontier,” a $25B Mega-campus in Texas - Inside Towers",
          "url": "https://insidetowers.com/vantage-data-centers-unveils-frontier-a-25b-mega-campus-in-texas/",
          "publisher": "Inside Towers",
          "date": "2025-08-20",
          "source_tier": 1
        },
        {
          "title": "DigitalBridge-Backed Portfolio Company Vantage Data Centers Launches $25 Billion Texas “Frontier” Mega-Campus - Business Wire",
          "url": "https://www.businesswire.com/news/home/20250818389101/en/DigitalBridge-Backed-Portfolio-Company-Vantage-Data-Centers-Launches-%2425-Billion-Texas-Frontier-Mega-Campus",
          "publisher": "Business Wire",
          "date": "2025-08-19",
          "source_tier": 1
        },
        {
          "title": "Vantage Develops $25B Data Center in Texas - CommercialSearch",
          "url": "https://www.commercialsearch.com/news/vantage-develops-25b-data-center-in-texas/",
          "publisher": "CommercialSearch",
          "date": "2025-08-20",
          "source_tier": 1
        },
        {
          "title": "Vantage’s $25 Billion Texas Data Center Plan Sparks Opportunities—and Water Concerns - CarbonCredits.com",
          "url": "https://carboncredits.com/vantages-25-billion-texas-data-center-plan-sparks-opportunities-and-water-concerns/",
          "publisher": "CarbonCredits.com",
          "date": "2025-08-21",
          "source_tier": 1
        },
        {
          "title": "Vantage Data Centers unveils plans for Frontier, a US$25B mega-campus in Texas - Intelligent CIO",
          "url": "https://www.intelligentcio.com/north-america/2025/08/29/vantage-data-centers-unveils-plans-for-frontier-a-us25b-mega-campus-in-texas/",
          "publisher": "Intelligent CIO",
          "date": "2025-08-29",
          "source_tier": 1
        },
        {
          "title": "Vantage Data Centers to build data center campus in Texas - Inspenet",
          "url": "https://inspenet.com/en/news/vantage-data-centers-to-build-data-center-campus-in-texas/",
          "publisher": "Inspenet",
          "date": "2025-08-21",
          "source_tier": 1
        },
        {
          "title": "Vantage Launching $25B Data Center Campus Near Abilene - Connect CRE",
          "url": "https://www.connectcre.com/stories/vantage-launching-25b-data-center-campus-near-abilene/",
          "publisher": "Connect CRE",
          "date": "2025-08-19",
          "source_tier": 1
        },
        {
          "title": "$25 billion data center campus slated for rural area near Abilene - The Business Journals",
          "url": "https://www.bizjournals.com/dallas/news/2025/08/20/vantage-data-centers-new-frontier-campus.html",
          "publisher": "The Business Journals",
          "date": "2025-08-20",
          "source_tier": 1
        },
        {
          "title": "JPMorgan and MUFG close to securing $22bn financing for Vantage's Texas data center project - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/jpmorgan-and-mufg-close-to-securing-22bn-financing-for-vantages-texas-data-center-project/",
          "publisher": "Data Center Dynamics",
          "date": "2025-08-20",
          "source_tier": 1
        },
        {
          "title": "New data center expected to create 250 full time jobs in Shackelford county - KTXS",
          "url": "https://ktxs.com/news/local/new-data-center-expected-to-create-250-full-time-jobs-in-shackelford-county",
          "publisher": "KTXS",
          "date": "2025-08-01",
          "source_tier": 1
        },
        {
          "title": "Inside Vantage's US$25bn AI Data Centre Mega-Campus in Texas - technologymagazine.com",
          "url": "https://technologymagazine.com/news/inside-vantages-us-25bn-ai-data-centre-mega-campus-in-texas",
          "publisher": "technologymagazine.com",
          "date": "2025-08-19",
          "source_tier": 1
        },
        {
          "title": "Vantage Data Centers to Invest $25B for Mega-Campus in Shackelford County, Texas - REBusinessOnline",
          "url": "https://rebusinessonline.com/vantage-data-centers-to-invest-25b-for-mega-campus-in-shackleford-county-texas/",
          "publisher": "REBusinessOnline",
          "date": "2025-08-19",
          "source_tier": 1
        },
        {
          "title": "Vantage Data Centers Unveils Plans for “Frontier,” a $25B Mega-campus in Texas to Meet Unprecedented AI Demand - Business Wire",
          "url": "https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/",
          "publisher": "Business Wire",
          "date": "2025-08-19",
          "source_tier": 1
        },
        {
          "title": "Explore Vantage’s New US$25bn AI Data Centre Campus in Texas - Data Centre Magazine",
          "url": "https://datacentremagazine.com/news/inside-vantages-us-25bn-ai-data-centre-mega-campus-in-texas",
          "publisher": "Data Centre Magazine",
          "date": "2025-08-20",
          "source_tier": 1
        },
        {
          "title": "Vantage Data Centers plans $25 billion AI campus in Texas - Reuters",
          "url": "https://www.reuters.com/business/vantage-data-centers-plans-25-billion-ai-campus-texas-2025-08-19/",
          "publisher": "Reuters",
          "date": "2025-08-19",
          "source_tier": 1
        },
        {
          "title": "OpenAI announces five more US Stargate data centers with Oracle and SoftBank - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/openai-announces-five-more-us-stargate-data-centers-with-oracle-and-softbank/",
          "publisher": "Data Center Dynamics",
          "date": "2025-09-24",
          "source_tier": 1
        },
        {
          "title": "Vantage plots 1,000-acre data center campus in Texas - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/vantage-plots-1000-acre-data-center-campus-in-texas/",
          "publisher": "Data Center Dynamics",
          "date": "2025-07-28",
          "source_tier": 1
        },
        {
          "title": "1,200-acre data center in Shackelford County could boost local economy - BigCountryHomepage.com",
          "url": "https://www.bigcountryhomepage.com/video/1200-acre-data-center-in-shackelford-county-could-boost-local-economy/10938702/",
          "publisher": "BigCountryHomepage.com",
          "date": "2025-07-30",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Vantage Data Centers lists Vantage Shackelford County at Shackelford County, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx",
          "source_tier": 2
        }
      ]
    }
  ]
}
