  "license": "CC BY-NC 4.0",
  "license_url": "https://creativecommons.org/licenses/by-nc/4.0/",
  "attribution": "Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0. Link to the specific record page where possible.",
  "source": "https://datacenterrecord.org/states/tx",
  "retrieved_at": "2026-10-27T01:36:16.558Z",
  "count": 67,
  "projects": [
    {
      "slug": "ntt-garland-tx1-water-tx",
      "name": "NTT Global Data Centers Garland (TX1)",
      "summary": "NTT Global Data Centers operates the Garland TX1 data center campus at 2001 Lookout Dr in Garland, Dallas County, Texas, registered in the EPA Facility Registry Service (FRS IDs 110070358446 and 110071952697).",
      "state": "TX",
      "city": "Garland",
      "county": "Dallas County",
      "status": "operational",
      "developer": "NTT Data",
      "capacity_mw": null,
      "latitude": 32.98268,
      "longitude": -96.667361,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Reports (FRS IDs 110070358446 and 110071952697) for NTT Global Data Centers Garland (TX1) at 2001 Lookout Dr, Garland, Dallas County, Texas.",
      "location_verified_at": null,
      "coordinate_source": "EPA ECHO FRS ID 110070358446",
      "location_last_verified": null,
      "site_address": "2001 Lookout Dr, Garland, TX 75044",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070358446",
      "published": "2026-09-28",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "air permit generator list",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071952697",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/ntt-garland-tx1-water-tx",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: NTT TX-4 Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071952697",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: RagingWire NTT Garland TX1",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110070358446",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070358446",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "aligned-data-centers-plano-tx",
      "name": "Aligned Data Centers Plano",
      "summary": "Aligned Data Centers lists 3 data centers at Plano, Texas among the sites it operates.",
      "state": "TX",
      "city": "Plano",
      "county": "Collin County",
      "status": "operational",
      "developer": "Aligned Data Centers",
      "capacity_mw": null,
      "latitude": 33.0094,
      "longitude": -96.6805,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071345231) for Aligned Data Center at 2800 Summit Ave, Plano, Collin County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110071345231",
      "location_last_verified": "2026-09-14",
      "site_address": "2800 Summit Ave, Plano, TX 75074",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071345231",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "closed_loop_liquid",
      "cooling_type_source_url": "https://aligneddc.com/dallas-data-centers/",
      "cooling_fluid": "water",
      "cooling_fluid_source_url": "https://aligneddc.com/dallas-data-centers/",
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://aligneddc.com/dallas-data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/aligned-data-centers-plano-tx",
      "sources": [
        {
          "title": "Aligned Data Centers: Data center locations",
          "url": "https://aligneddc.com/locations/",
          "publisher": "Aligned Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Aligned Data Centers: Aligned DFW-01",
          "url": "https://aligneddc.com/dallas-data-centers/",
          "publisher": "Aligned Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "BlackRock Reportedly In Talks To Buy Aligned Data Centers For $40B - Bisnow",
          "url": "https://www.bisnow.com/news/national/data-center-capital-markets/blackrock-in-advanced-talks-to-buy-aligned-data-centers-in-40b-deal-131227",
          "publisher": "Bisnow",
          "date": "2025-10-03",
          "source_tier": 1
        },
        {
          "title": "EPA ECHO detailed facility report: Aligned Data Center Plano",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071345231",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Aligned Data Centers lists Aligned DFW-01, Aligned DFW-02, Aligned DFW-04 at Plano, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://aligneddc.com/dallas-data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "aligned-lbb-01-abernathy-tx",
      "name": "Aligned LBB-01",
      "summary": "Aligned Data Centers lists a data center at Abernathy, Texas among the sites it operates.",
      "state": "TX",
      "city": "Abernathy",
      "county": "Hale County",
      "status": "operational",
      "developer": "Aligned Data Centers",
      "capacity_mw": null,
      "latitude": 33.8419249,
      "longitude": -101.8154033,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "closed_loop_liquid",
      "cooling_type_source_url": "https://aligneddc.com/abernathy-tx-data-center/",
      "cooling_fluid": "water",
      "cooling_fluid_source_url": "https://aligneddc.com/abernathy-tx-data-center/",
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://aligneddc.com/abernathy-tx-data-center/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/aligned-lbb-01-abernathy-tx",
      "sources": [
        {
          "title": "Aligned Data Centers: Data center locations",
          "url": "https://aligneddc.com/locations/",
          "publisher": "Aligned Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Aligned Data Centers: Aligned LBB-01",
          "url": "https://aligneddc.com/abernathy-tx-data-center/",
          "publisher": "Aligned Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Aligned Data Centers lists Aligned LBB-01 at Abernathy, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://aligneddc.com/abernathy-tx-data-center/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "centersquare-dallas-data-center-tx",
      "name": "Centersquare Dallas data center",
      "summary": "Centersquare lists a data center at Dallas, Texas among the sites it operates.",
      "state": "TX",
      "city": "Dallas",
      "county": "Dallas County",
      "status": "operational",
      "developer": "Centersquare",
      "capacity_mw": null,
      "latitude": 32.91054,
      "longitude": -96.87294,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110035069127) and Centersquare Dallas DFW3 specification at 11800 Webb Chapel Rd, Dallas, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110035069127",
      "location_last_verified": "2026-09-14",
      "site_address": "11800 Webb Chapel Rd, Dallas, TX 75234",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110035069127",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.csquare.com/data-centers",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/centersquare-dallas-data-center-tx",
      "sources": [
        {
          "title": "Centersquare: Data center markets",
          "url": "https://www.csquare.com/data-centers",
          "publisher": "Centersquare",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Webb Chapel Data Center Dallas",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110035069127",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Centersquare lists Centersquare Dallas data center at Dallas, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.csquare.com/data-centers",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "centersquare-fort-worth-data-center-tx",
      "name": "Centersquare Fort Worth data center",
      "summary": "Centersquare lists a data center at Fort Worth, Texas among the sites it operates.",
      "state": "TX",
      "city": "Fort Worth",
      "county": "Tarrant County",
      "status": "operational",
      "developer": "Centersquare",
      "capacity_mw": null,
      "latitude": 32.83094,
      "longitude": -97.04107,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071955710) for Centersquare DFW1 at 14901 FAA Blvd, Fort Worth, Tarrant County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110071955710",
      "location_last_verified": "2026-09-14",
      "site_address": "14901 FAA Blvd, Fort Worth, TX 76155",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071955710",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.csquare.com/data-centers",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/centersquare-fort-worth-data-center-tx",
      "sources": [
        {
          "title": "Centersquare: Data center markets",
          "url": "https://www.csquare.com/data-centers",
          "publisher": "Centersquare",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Centersquare DFW1 Fort Worth",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071955710",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Centersquare lists Centersquare Fort Worth data center at Fort Worth, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.csquare.com/data-centers",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "cologix-dallas-tx",
      "name": "Cologix Dallas",
      "summary": "Cologix lists 3 data centers at Dallas, Texas among the sites it operates.",
      "state": "TX",
      "city": "Dallas",
      "county": "Dallas County",
      "status": "operational",
      "developer": "Cologix",
      "capacity_mw": null,
      "latitude": 32.7935291,
      "longitude": -96.7666819,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.cologix.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/cologix-dallas-tx",
      "sources": [
        {
          "title": "Cologix to open third data center in Dallas - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/cologix-open-third-data-center-dallas/",
          "publisher": "Data Center Dynamics",
          "date": "2019-10-11",
          "source_tier": 1
        },
        {
          "title": "Cologix Opens Second Site at Dallas INFOMART - Data Center Knowledge",
          "url": "https://www.datacenterknowledge.com/next-gen-data-centers/cologix-opens-second-site-at-dallas-infomart",
          "publisher": "Data Center Knowledge",
          "date": "2024-05-31",
          "source_tier": 1
        },
        {
          "title": "Cologix: Data centers",
          "url": "https://www.cologix.com/data-centers/",
          "publisher": "Cologix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Cologix Now Even More Wired at the INFOMART - Data Center Knowledge",
          "url": "https://www.datacenterknowledge.com/next-gen-data-centers/cologix-now-even-more-wired-at-the-infomart",
          "publisher": "Data Center Knowledge",
          "date": "2024-05-31",
          "source_tier": 3
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Cologix lists Cologix DAL1, Cologix DAL2, Cologix DAL3 at Dallas, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.cologix.com/data-centers/",
          "source_tier": 2
        },
        {
          "status": "operational",
          "effective_at": "2024-05-31",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2024-05-31",
          "summary": "Cologix expanded through acquisitions in key network hubs in Minneapolis, Montreal, Toronto and Vancouver",
          "source_url": "https://www.datacenterknowledge.com/next-gen-data-centers/cologix-now-even-more-wired-at-the-infomart",
          "source_tier": 3
        }
      ]
    },
    {
      "slug": "cyrusone-allen-dfw3-dfw5-tx",
      "name": "CyrusOne Allen DFW3-DFW5",
      "summary": "CyrusOne lists a data center at Allen, Texas among the sites it operates.",
      "state": "TX",
      "city": "Allen",
      "county": "Collin County",
      "status": "operational",
      "developer": "CyrusOne",
      "capacity_mw": null,
      "latitude": 33.1165,
      "longitude": -96.6578,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110070366246) for CyrusOne Allen Data Center Phase 1 Building 1 in Allen, Collin County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110070366246",
      "location_last_verified": "2026-09-14",
      "site_address": "Northeast Of Chelsea Blvd. And Allen Commerce Pkwy, Allen, TX 75013",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070366246",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.cyrusone.com/data-centers/north-america/allen-texas",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/cyrusone-allen-dfw3-dfw5-tx",
      "sources": [
        {
          "title": "CyrusOne: Data centers",
          "url": "https://www.cyrusone.com/data-centers",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "CyrusOne: CyrusOne Allen DFW3-DFW5",
          "url": "https://www.cyrusone.com/data-centers/north-america/allen-texas",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: CyrusOne Allen Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110070366246",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070366246",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "cyrusone-austin-aus2-aus3-tx",
      "name": "CyrusOne Austin AUS2-AUS3",
      "summary": "CyrusOne lists a data center at Austin, Texas among the sites it operates.",
      "state": "TX",
      "city": "Austin",
      "county": "Travis County",
      "status": "operational",
      "developer": "CyrusOne",
      "capacity_mw": null,
      "latitude": 30.2052,
      "longitude": -97.7024,
      "location_precision": "permit_point",
      "location_source": "CyrusOne Austin AUS2 and AUS3 facility specification page at 7301 Metropolis Drive, Austin, Travis County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "operator address point",
      "location_last_verified": "2026-09-14",
      "site_address": "7301 Metropolis Drive, Austin, TX 78744",
      "site_address_source_url": "https://www.cyrusone.com/data-centers/north-america/austin-texas",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.cyrusone.com/data-centers/north-america/austin-texas",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/cyrusone-austin-aus2-aus3-tx",
      "sources": [
        {
          "title": "CyrusOne: Data centers",
          "url": "https://www.cyrusone.com/data-centers",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "CyrusOne: CyrusOne Austin AUS2-AUS3",
          "url": "https://www.cyrusone.com/data-centers/north-america/austin-texas",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://www.cyrusone.com/data-centers/north-america/austin-texas",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "cyrusone-carrollton-dfw1-tx",
      "name": "CyrusOne Carrollton DFW1",
      "summary": "CyrusOne lists a data center at Carrollton, Texas among the sites it operates.",
      "state": "TX",
      "city": "Carrollton",
      "county": "Denton County",
      "status": "operational",
      "developer": "CyrusOne",
      "capacity_mw": null,
      "latitude": 32.99449,
      "longitude": -96.93117,
      "location_precision": "permit_point",
      "location_source": "https://echo.epa.gov/detailed-facility-report?fid=110062195235",
      "location_verified_at": "2026-10-04",
      "coordinate_source": "https://echo.epa.gov/detailed-facility-report?fid=110062195235",
      "location_last_verified": "2026-10-04",
      "site_address": "1649 West Frankford Road, Carrollton, TX 75007",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110062195235",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.cyrusone.com/data-centers/north-america/carrollton-texas",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/cyrusone-carrollton-dfw1-tx",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Cyrusone, Carrollton Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110062195235",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "CyrusOne: Data centers",
          "url": "https://www.cyrusone.com/data-centers",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "CyrusOne: CyrusOne Carrollton DFW1",
          "url": "https://www.cyrusone.com/data-centers/north-america/carrollton-texas",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "CyrusOne lists CyrusOne Carrollton DFW1 at Carrollton, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.cyrusone.com/data-centers/north-america/carrollton-texas",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "cyrusone-freestone-campus-fairfield-tx",
      "name": "Cyrusone Freestone Campus",
      "summary": "The EPA's facility registry lists Cyrusone Freestone Campus at 1400 FM 488, Fairfield, TX 75840 in Fairfield, Texas, with a water permit.",
      "state": "TX",
      "city": "Fairfield",
      "county": "Freestone County",
      "status": "operational",
      "developer": "CyrusOne",
      "capacity_mw": null,
      "latitude": 31.907762,
      "longitude": -96.114437,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110072106677: the registry placed its point by address matching house number, accurate to 50 m",
      "location_verified_at": "2026-10-03",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-03",
      "site_address": "1400 FM 488, Fairfield, TX 75840",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072106677",
      "published": "2026-10-03",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072106677",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "air permit generator list",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072106677",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/cyrusone-freestone-campus-fairfield-tx",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Cyrusone Freestone Campus",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110072106677",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072106677",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "cyrusone-houston-hou3-hou4-tx",
      "name": "CyrusOne Houston HOU3-HOU4",
      "summary": "CyrusOne lists a data center at Houston, Texas among the sites it operates.",
      "state": "TX",
      "city": "Houston",
      "county": "Harris County",
      "status": "operational",
      "developer": "CyrusOne",
      "capacity_mw": null,
      "latitude": 29.72877,
      "longitude": -95.44477,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110034329803) and CyrusOne Houston HOU3 and HOU4 facility page in Houston, Harris County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110034329803",
      "location_last_verified": "2026-09-14",
      "site_address": "5150 Westway Park Blvd, Houston, TX 77041",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110034329803",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.cyrusone.com/data-centers/north-america/houston-tx",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/cyrusone-houston-hou3-hou4-tx",
      "sources": [
        {
          "title": "CyrusOne: Data centers",
          "url": "https://www.cyrusone.com/data-centers",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "CyrusOne: CyrusOne Houston HOU3-HOU4",
          "url": "https://www.cyrusone.com/data-centers/north-america/houston-tx",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: CyrusOne Houston",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110034329803",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110034329803",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "cyrusone-lewisville-dfw2-tx",
      "name": "CyrusOne Lewisville DFW2",
      "summary": "CyrusOne lists a data center at Lewisville, Texas among the sites it operates.",
      "state": "TX",
      "city": "Lewisville",
      "county": "Denton County",
      "status": "operational",
      "developer": "CyrusOne",
      "capacity_mw": null,
      "latitude": 33.007693,
      "longitude": -96.993172,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110038203734) for CyrusOne Lewisville DFW2 at 2501 S State Highway 121 Bus, Lewisville, Denton County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110038203734",
      "location_last_verified": "2026-09-14",
      "site_address": "2501 S State Highway 121 Bus, Lewisville, TX 75067",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110038203734",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.cyrusone.com/data-centers/north-america/lewisville-texas",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/cyrusone-lewisville-dfw2-tx",
      "sources": [
        {
          "title": "CyrusOne: Data centers",
          "url": "https://www.cyrusone.com/data-centers",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "CyrusOne: CyrusOne Lewisville DFW2",
          "url": "https://www.cyrusone.com/data-centers/north-america/lewisville-texas",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: CyrusOne Lewisville",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110038203734",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "CyrusOne lists CyrusOne Lewisville DFW2 at Lewisville, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.cyrusone.com/data-centers/north-america/lewisville-texas",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "cyrusone-san-antonio-tx",
      "name": "CyrusOne San Antonio",
      "summary": "CyrusOne lists 3 data centers at San Antonio, Texas among the sites it operates.",
      "state": "TX",
      "city": "San Antonio",
      "county": "Bexar County",
      "status": "operational",
      "developer": "CyrusOne",
      "capacity_mw": null,
      "latitude": 29.46572,
      "longitude": -98.68775,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110072102038) and CyrusOne San Antonio campus page at 9999 Westover Hills Blvd, San Antonio, Bexar County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110072102038",
      "location_last_verified": "2026-09-14",
      "site_address": "9999 Westover Hills Blvd, San Antonio, TX 78251",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072102038",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.cyrusone.com/data-centers",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/cyrusone-san-antonio-tx",
      "sources": [
        {
          "title": "CyrusOne: CyrusOne San Antonio SAT5-SAT6",
          "url": "https://www.cyrusone.com/data-centers/north-america/san-antonio-sat5-sat6",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "CyrusOne: Data centers",
          "url": "https://www.cyrusone.com/data-centers",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "CyrusOne: CyrusOne San Antonio SAT2-SAT4",
          "url": "https://www.cyrusone.com/data-centers/north-america/san-antonio-sat2-sat4",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "CyrusOne: CyrusOne San Antonio SAT1",
          "url": "https://www.cyrusone.com/data-centers/north-america/san-antonio-texas-sat1",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: CyrusOne San Antonio Westover Hills",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110072102038",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072102038",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "databank-austin-data-center-tx",
      "name": "DataBank Austin data center",
      "summary": "DataBank lists a data center at Austin, Texas among the sites it operates.",
      "state": "TX",
      "city": "Austin",
      "county": "Travis County",
      "status": "operational",
      "developer": "DataBank",
      "capacity_mw": null,
      "latitude": 30.2984886,
      "longitude": -97.7536575,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.databank.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/databank-austin-data-center-tx",
      "sources": [
        {
          "title": "DataBank: Data centers",
          "url": "https://www.databank.com/data-centers/",
          "publisher": "DataBank",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "DataBank lists DataBank Austin data center at Austin, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.databank.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "databank-dallas-data-center-tx",
      "name": "DataBank Dallas data center",
      "summary": "DataBank lists a data center at Dallas, Texas among the sites it operates.",
      "state": "TX",
      "city": "Dallas",
      "county": "Dallas County",
      "status": "operational",
      "developer": "DataBank",
      "capacity_mw": null,
      "latitude": 32.7935291,
      "longitude": -96.7666819,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 4,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.databank.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/databank-dallas-data-center-tx",
      "sources": [
        {
          "title": "DataBank Acquired by Avista Capital - Data Center Knowledge",
          "url": "https://www.datacenterknowledge.com/business/databank-acquired-by-avista-capital",
          "publisher": "Data Center Knowledge",
          "date": "2024-06-01",
          "source_tier": 1
        },
        {
          "title": "DataBank Grows Beyond its Dallas Digital Fortress - Data Center Knowledge",
          "url": "https://www.datacenterknowledge.com/business/databank-grows-beyond-its-dallas-digital-fortress",
          "publisher": "Data Center Knowledge",
          "date": "2013-04-18",
          "source_tier": 3
        },
        {
          "title": "Dallas-Based DataBank Gets $250M Equity Investment from TJC, Announces $600M Secondary Share Sale - Dallas Innovates",
          "url": "https://dallasinnovates.com/dallas-based-databank-gets-250m-equity-investment-from-tjc-announces-600m-secondary-share-sale/",
          "publisher": "Dallas Innovates",
          "date": "2025-01-30",
          "source_tier": 1
        },
        {
          "title": "AustralianSuper Takes $1.5B Equity Stakes in DataBank | Chief Investment Officer - ai-cio.com",
          "url": "https://www.ai-cio.com/news/australiansuper-takes-1-5b-equity-stakes-in-databank/",
          "publisher": "ai-cio.com",
          "date": "2024-10-17",
          "source_tier": 1
        },
        {
          "title": "DataBank: Data centers",
          "url": "https://www.databank.com/data-centers/",
          "publisher": "DataBank",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "DataBank Obtains $2B for Dallas Data Center Project - CommercialSearch",
          "url": "https://www.commercialsearch.com/news/databank-obtains-2b-for-dallas-data-center-project/",
          "publisher": "CommercialSearch",
          "date": "2026-04-22",
          "source_tier": 4
        },
        {
          "title": "News | DataBank lands its biggest construction loan yet for Dallas data centers - CoStar",
          "url": "https://www.costar.com/article/2064534335/databank-lands-its-biggest-construction-loan-yet-for-dallas-data-centers",
          "publisher": "CoStar",
          "date": "2026-04-22",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "DataBank lists DataBank Dallas data center at Dallas, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.databank.com/data-centers/",
          "source_tier": 2
        },
        {
          "status": "operational",
          "effective_at": "2026-04-22",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-04-22",
          "summary": "DataBank secured its largest construction loan for Dallas data centers",
          "source_url": "https://www.costar.com/article/2064534335/databank-lands-its-biggest-construction-loan-yet-for-dallas-data-centers",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-04-22",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-04-22",
          "summary": "DataBank obtained $2 billion in financing for Dallas data center project",
          "source_url": "https://www.commercialsearch.com/news/databank-obtains-2b-for-dallas-data-center-project/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2013-04-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2013-04-18",
          "summary": "DataBank filled 130,000 square feet of data center space in former Federal Reserve building in downtown Dallas",
          "source_url": "https://www.datacenterknowledge.com/business/databank-grows-beyond-its-dallas-digital-fortress",
          "source_tier": 3
        },
        {
          "status": "operational",
          "effective_at": "2013-04-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2013-04-18",
          "summary": "DataBank expanded into Richardson, Texas with new North Dallas data center",
          "source_url": "https://www.datacenterknowledge.com/business/databank-grows-beyond-its-dallas-digital-fortress",
          "source_tier": 3
        },
        {
          "status": "operational",
          "effective_at": "2013-04-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2013-04-18",
          "summary": "DataBank expanded to other second tier markets around the US with backing from Avista",
          "source_url": "https://www.datacenterknowledge.com/business/databank-grows-beyond-its-dallas-digital-fortress",
          "source_tier": 3
        }
      ]
    },
    {
      "slug": "databank-houston-data-center-tx",
      "name": "DataBank Houston data center",
      "summary": "DataBank lists a data center at Houston, Texas among the sites it operates.",
      "state": "TX",
      "city": "Houston",
      "county": "Harris County",
      "status": "operational",
      "developer": "DataBank",
      "capacity_mw": null,
      "latitude": 29.842923,
      "longitude": -95.559859,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110072135439) for DataBank HOU3 in Houston, Harris County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110072135439",
      "location_last_verified": "2026-09-14",
      "site_address": "11003 Corporate Centre Drive, Houston, TX 77041",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072135439",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 4,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.databank.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/databank-houston-data-center-tx",
      "sources": [
        {
          "title": "DataBank to boost HOU2 data center capacity in $20M expansion, filing shows - The Business Journals",
          "url": "https://www.bizjournals.com/houston/news/2026/06/18/databank-westway-park-hou2-data-center-expansion.html",
          "publisher": "The Business Journals",
          "date": "2026-06-18",
          "source_tier": 1
        },
        {
          "title": "DataBank: Data centers",
          "url": "https://www.databank.com/data-centers/",
          "publisher": "DataBank",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: DataBank HOU3 Houston",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110072135439",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "DataBank lists DataBank Houston data center at Houston, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.databank.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "databank-plano-dfw3-tx",
      "name": "DataBank Plano DFW3",
      "summary": "DataBank operates the DFW3 data center at 8375 Dominion Pkwy in Plano, Collin County, Texas, registered in the EPA Facility Registry Service (FRS ID 110071657222).",
      "state": "TX",
      "city": "Plano",
      "county": "Collin County",
      "status": "operational",
      "developer": "DataBank",
      "capacity_mw": 9,
      "latitude": 33.0768,
      "longitude": -96.8197,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071657222) for DataBank DFW3 at 8375 Dominion Pkwy, Plano, Collin County, Texas.",
      "location_verified_at": null,
      "coordinate_source": "EPA ECHO FRS ID 110071657222",
      "location_last_verified": null,
      "site_address": "8375 Dominion Pkwy, Plano, TX 75024",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071657222",
      "published": "2026-09-28",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.databank.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/databank-plano-dfw3-tx",
      "sources": [
        {
          "title": "DataBank: Data Center Locations",
          "url": "https://www.databank.com/data-centers/",
          "publisher": "DataBank",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: DataBank DFW3 Plano",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071657222",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071657222",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "databank-red-oak-campus-dfw9-dfw11-tx",
      "name": "DataBank Red Oak Campus",
      "summary": "DataBank operates the Red Oak data center campus at 1712 Stainback Rd in Red Oak, Ellis County, Texas, registered in the EPA Facility Registry Service (FRS ID 110071849539).",
      "state": "TX",
      "city": "Red Oak",
      "county": "Ellis County",
      "status": "operational",
      "developer": "DataBank",
      "capacity_mw": 480,
      "latitude": 32.5186,
      "longitude": -96.8142,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071849539) for DataBank Red Oak at 1712 Stainback Rd, Red Oak, Ellis County, Texas.",
      "location_verified_at": null,
      "coordinate_source": "EPA ECHO FRS ID 110071849539",
      "location_last_verified": null,
      "site_address": "1712 Stainback Rd, Red Oak, TX 75154",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071849539",
      "published": "2026-09-28",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.databank.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/databank-red-oak-campus-dfw9-dfw11-tx",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Databank, Red Oak",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071849539",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "DataBank: Data Center Locations",
          "url": "https://www.databank.com/data-centers/",
          "publisher": "DataBank",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071849539",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "databank-waco-data-center-tx",
      "name": "DataBank Waco data center",
      "summary": "DataBank lists a data center at Waco, Texas among the sites it operates.",
      "state": "TX",
      "city": "Waco",
      "county": "McLennan County",
      "status": "operational",
      "developer": "DataBank",
      "capacity_mw": null,
      "latitude": 31.5574945,
      "longitude": -97.19032,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.databank.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/databank-waco-data-center-tx",
      "sources": [
        {
          "title": "DataBank: Data centers",
          "url": "https://www.databank.com/data-centers/",
          "publisher": "DataBank",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Many Waco residents had no idea a data center was operating in the heart of downtown , until now - KXXV",
          "url": "https://www.kxxv.com/news/local-news/in-your-neighborhood/mclennan-county/waco/many-waco-residents-had-no-idea-a-data-center-was-operating-in-the-heart-of-downtown-until-now",
          "publisher": "KXXV",
          "date": "2026-05-06",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "DataBank lists DataBank Waco data center at Waco, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.databank.com/data-centers/",
          "source_tier": 2
        },
        {
          "status": "operational",
          "effective_at": "2026-05-06",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-06",
          "summary": "DataBank facility has operated in downtown Waco since 2009",
          "source_url": "https://www.kxxv.com/news/local-news/in-your-neighborhood/mclennan-county/waco/many-waco-residents-had-no-idea-a-data-center-was-operating-in-the-heart-of-downtown-until-now",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-05-06",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-06",
          "summary": "Originally owned by Clear view Information Technology Gateway",
          "source_url": "https://www.kxxv.com/news/local-news/in-your-neighborhood/mclennan-county/waco/many-waco-residents-had-no-idea-a-data-center-was-operating-in-the-heart-of-downtown-until-now",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-05-06",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-06",
          "summary": "DataBank acquired the facility for data center use in 2020",
          "source_url": "https://www.kxxv.com/news/local-news/in-your-neighborhood/mclennan-county/waco/many-waco-residents-had-no-idea-a-data-center-was-operating-in-the-heart-of-downtown-until-now",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-05-06",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-06",
          "summary": "Facility runs on 100 percent renewable energy using wind and solar power",
          "source_url": "https://www.kxxv.com/news/local-news/in-your-neighborhood/mclennan-county/waco/many-waco-residents-had-no-idea-a-data-center-was-operating-in-the-heart-of-downtown-until-now",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-05-06",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-06",
          "summary": "Facility serves as disaster recovery and backup hub for Austin, Dallas, Houston, and San Antonio",
          "source_url": "https://www.kxxv.com/news/local-news/in-your-neighborhood/mclennan-county/waco/many-waco-residents-had-no-idea-a-data-center-was-operating-in-the-heart-of-downtown-until-now",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "digital-realty-austin-tx",
      "name": "Digital Realty Austin",
      "summary": "Digital Realty lists 2 data centers at Austin, Texas among the sites it operates.",
      "state": "TX",
      "city": "Austin",
      "county": "Travis County",
      "status": "operational",
      "developer": "Digital Realty",
      "capacity_mw": null,
      "latitude": 30.21642,
      "longitude": -97.69563,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110033535057) for Digital Realty AUS11 at 7500 Metro Center Drive, Austin, Travis County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110033535057",
      "location_last_verified": "2026-09-14",
      "site_address": "7500 Metro Center Drive, Austin, TX 78744",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110033535057",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.digitalrealty.com/data-centers/americas/austin",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/digital-realty-austin-tx",
      "sources": [
        {
          "title": "Global data center company Digital Realty relocates HQ to Austin from San Francisco - The Business Journals",
          "url": "https://www.bizjournals.com/austin/news/2021/01/14/digital-realty-relocates-hq-to-austin.html",
          "publisher": "The Business Journals",
          "date": "2021-01-14",
          "source_tier": 1
        },
        {
          "title": "Digital Realty: Americas data centers",
          "url": "https://www.digitalrealty.com/data-centers/americas",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty AUS11",
          "url": "https://www.digitalrealty.com/data-centers/americas/austin/aus11",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty Austin",
          "url": "https://www.digitalrealty.com/data-centers/americas/austin",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Austin Data Center Metro Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110033535057",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Digital Realty lists Digital Realty AUS11, Digital Realty Austin at Austin, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.digitalrealty.com/data-centers/americas/austin/aus11",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "digital-realty-carrollton-tx",
      "name": "Digital Realty Carrollton",
      "summary": "Digital Realty lists 2 data centers at Carrollton, Texas among the sites it operates.",
      "state": "TX",
      "city": "Carrollton",
      "county": "Denton County",
      "status": "operational",
      "developer": "Digital Realty",
      "capacity_mw": null,
      "latitude": 32.9889447,
      "longitude": -96.8998281,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.digitalrealty.com/data-centers/americas/dallas",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/digital-realty-carrollton-tx",
      "sources": [
        {
          "title": "Digital Realty: Americas data centers",
          "url": "https://www.digitalrealty.com/data-centers/americas",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty DFW11",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw11",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty DFW12",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw12",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Digital Realty lists Digital Realty DFW11, Digital Realty DFW12 at Carrollton, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw11",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "digital-realty-dallas-tx",
      "name": "Digital Realty Dallas",
      "summary": "Digital Realty lists 3 data centers at Dallas, Texas among the sites it operates.",
      "state": "TX",
      "city": "Dallas",
      "county": "Dallas County",
      "status": "operational",
      "developer": "Digital Realty",
      "capacity_mw": null,
      "latitude": 32.7935291,
      "longitude": -96.7666819,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.digitalrealty.com/data-centers/americas/dallas",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/digital-realty-dallas-tx",
      "sources": [
        {
          "title": "Digital Realty: Americas data centers",
          "url": "https://www.digitalrealty.com/data-centers/americas",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty DFW10",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw10",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty DFW36",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw36",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty Dallas",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Digital Realty lists Digital Realty DFW10, Digital Realty DFW36, Digital Realty Dallas at Dallas, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw10",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "digital-realty-dfw26-lewisville-tx",
      "name": "Digital Realty DFW26",
      "summary": "Digital Realty lists a data center at Lewisville, Texas among the sites it operates.",
      "state": "TX",
      "city": "Lewisville",
      "county": "Denton County",
      "status": "operational",
      "developer": "Digital Realty",
      "capacity_mw": null,
      "latitude": 33.045295,
      "longitude": -96.9753595,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw26",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/digital-realty-dfw26-lewisville-tx",
      "sources": [
        {
          "title": "Digital Realty: Americas data centers",
          "url": "https://www.digitalrealty.com/data-centers/americas",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty DFW26",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw26",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Digital Realty lists Digital Realty DFW26 at Lewisville, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw26",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "digital-realty-houston-tx",
      "name": "Digital Realty Houston",
      "summary": "Digital Realty lists 2 data centers at Houston, Texas among the sites it operates.",
      "state": "TX",
      "city": "Houston",
      "county": "Harris County",
      "status": "operational",
      "developer": "Digital Realty",
      "capacity_mw": null,
      "latitude": 29.7859623,
      "longitude": -95.388661,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.digitalrealty.com/data-centers/americas/houston",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/digital-realty-houston-tx",
      "sources": [
        {
          "title": "Digital Realty: Americas data centers",
          "url": "https://www.digitalrealty.com/data-centers/americas",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty IAH10",
          "url": "https://www.digitalrealty.com/data-centers/americas/houston/iah10",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty Houston",
          "url": "https://www.digitalrealty.com/data-centers/americas/houston",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Digital Realty lists Digital Realty IAH10, Digital Realty Houston at Houston, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.digitalrealty.com/data-centers/americas/houston/iah10",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "digital-realty-richardson-tx",
      "name": "Digital Realty Richardson",
      "summary": "Digital Realty lists 7 data centers at Richardson, Texas among the sites it operates.",
      "state": "TX",
      "city": "Richardson",
      "county": "Dallas County",
      "status": "operational",
      "developer": "Digital Realty",
      "capacity_mw": null,
      "latitude": 32.96613,
      "longitude": -96.71706,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110040158735) for Digital Realty Datacenter Park at 1232 Alma Rd, Richardson, Dallas County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110040158735",
      "location_last_verified": "2026-09-14",
      "site_address": "1232 Alma Rd, Richardson, TX 75081",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110040158735",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 7,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.digitalrealty.com/data-centers/americas/dallas",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/digital-realty-richardson-tx",
      "sources": [
        {
          "title": "Digital Realty: Americas data centers",
          "url": "https://www.digitalrealty.com/data-centers/americas",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty DFW16",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw16",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty DFW17",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw17",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty DFW18",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw18",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty DFW25",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw25",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty DFW28",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw28",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty DFW29",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw29",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty DFW35",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw35",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Datacenter Park Richardson",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110040158735",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Digital Realty lists Digital Realty DFW16, Digital Realty DFW17, Digital Realty DFW18, Digital Realty DFW25, Digital Realty DFW28, Digital Realty DFW29, Digital Realty DFW35 at Richardson, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw16",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "edgeconnex-houston-holdings-llc-katy-tx",
      "name": "Edgeconnex Houston Holdings, LLC",
      "summary": "The EPA's facility registry lists Edgeconnex Houston Holdings, LLC at 1510 Primewest Parkway, Katy, TX 77449 in Katy, Texas, with a hazardous waste record.",
      "state": "TX",
      "city": "Katy",
      "county": "Harris County",
      "status": "operational",
      "developer": "EdgeConneX",
      "capacity_mw": null,
      "latitude": 29.79487,
      "longitude": -95.74599,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110070913234: the registry placed its point by address matching house number, accurate to 30 m",
      "location_verified_at": "2026-10-03",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-03",
      "site_address": "1510 Primewest Parkway, Katy, TX 77449",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070913234",
      "published": "2026-10-03",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070913234",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "air permit generator list",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070913234",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/edgeconnex-houston-holdings-llc-katy-tx",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Edgeconnex Houston Holdings, LLC",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110070913234",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070913234",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "edged-irving-data-center-tx",
      "name": "Edged Irving Data Center",
      "summary": "Edged operates the Edged Dallas data center at 4901 N O'Connor Rd in Irving, Dallas County, Texas, using a waterless closed loop cooling system.",
      "state": "TX",
      "city": "Irving",
      "county": "Dallas County",
      "status": "operational",
      "developer": "Edged",
      "capacity_mw": null,
      "latitude": 32.8741,
      "longitude": -96.9602,
      "location_precision": "permit_point",
      "location_source": "Edged US Dallas facility specification page (4901 N O'Connor Rd, Irving, TX 75062) and EPA ECHO Detailed Facility Report (FRS ID 110071953300).",
      "location_verified_at": null,
      "coordinate_source": "operator address point",
      "location_last_verified": null,
      "site_address": "4901 N O'Connor Rd, Irving, TX 75062",
      "site_address_source_url": "https://edged.us/dallas",
      "published": "2026-10-21",
      "last_verified": "2026-10-24",
      "cooling_type": "closed_loop_liquid",
      "cooling_type_source_url": "https://edged.us/dallas",
      "cooling_fluid": "water-glycol",
      "cooling_fluid_source_url": "https://edged.us/dallas",
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://edged.us/dallas",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/edged-irving-data-center-tx",
      "sources": [
        {
          "title": "Texas’ top construction permits for the week ending April 27, 2026 - The Real Deal",
          "url": "https://therealdeal.com/texas/2026/04/28/texas-top-construction-permits-april-27-2026/",
          "publisher": "The Real Deal",
          "date": "2026-04-28",
          "source_tier": 1
        },
        {
          "title": "Edged US: Edged Dallas (4901 N O'Connor Rd, Irving, TX) Facility Specifications",
          "url": "https://edged.us/dallas",
          "publisher": "Edged",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Edged Energy NFL Irving",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071953300",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://edged.us/dallas",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "element-critical-llc-element-critical-austin-aus1-austin-tx",
      "name": "Element Critical Austin (AUS1)",
      "summary": "Element Critical operates the AUS1 data center at 8025 N IH 35 in Austin, Travis County, Texas, registered in the EPA Facility Registry Service (FRS ID 110035038474).",
      "state": "TX",
      "city": "Austin",
      "county": "Travis County",
      "status": "operational",
      "developer": "Element Critical",
      "capacity_mw": null,
      "latitude": 30.176027,
      "longitude": -97.77968,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110035038474) for Austin Internet Data Center at 8025 N IH 35, Austin, Travis County, Texas.",
      "location_verified_at": null,
      "coordinate_source": "EPA ECHO FRS ID 110035038474",
      "location_last_verified": null,
      "site_address": "8025 N IH 35, Austin, TX 78753",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110035038474",
      "published": "2026-10-21",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "air permit generator list",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110035038474",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/element-critical-llc-element-critical-austin-aus1-austin-tx",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Austin Internet Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110035038474",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110035038474",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "energy-control-and-data-center-houston-tx",
      "name": "Energy Control And Data Center",
      "summary": "The EPA's facility registry lists Energy Control And Data Center at 16303 State Highway 249, Houston, TX 77064 in Houston, Texas, with no permit program listed.",
      "state": "TX",
      "city": "Houston",
      "county": "Harris County",
      "status": "not_verified",
      "developer": "CenterPoint Energy",
      "capacity_mw": null,
      "latitude": 29.945252,
      "longitude": -95.527699,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110034437125: the registry placed its point by address matching house number, accurate to 50 m",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-20",
      "site_address": "16303 State Highway 249, Houston, TX 77064",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110034437125",
      "published": "2026-10-20",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/energy-control-and-data-center-houston-tx",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Energy Control And Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110034437125",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Facility appears in the EPA Facility Registry Service (ECHO) under NAICS 518210 or SIC 7374; commercial data center operations have not yet been independently verified.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110034437125",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "equinix-da7-plano-tx",
      "name": "Equinix DA7",
      "summary": "Equinix lists a data center at Plano, Texas among the sites it operates.",
      "state": "TX",
      "city": "Plano",
      "county": "Collin County",
      "status": "operational",
      "developer": "Equinix",
      "capacity_mw": null,
      "latitude": 33.0502419,
      "longitude": -96.748682,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da7",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/equinix-da7-plano-tx",
      "sources": [
        {
          "title": "MEDIA ALERT: Equinix to Host Launch Event at New Dallas Metro Data Center - PR Newswire",
          "url": "https://www.prnewswire.com/news-releases/media-alert-equinix-to-host-launch-event-at-new-dallas-metro-data-center-300232284.html",
          "publisher": "PR Newswire",
          "date": "2016-03-08",
          "source_tier": 1
        },
        {
          "title": "Equinix to unveil new $20 M data center in Legacy Business Park - The Business Journals",
          "url": "https://www.bizjournals.com/dallas/news/2016/03/10/equinix-to-unveil-new-20m-data-center-inlegacy.html",
          "publisher": "The Business Journals",
          "date": "2016-03-10",
          "source_tier": 1
        },
        {
          "title": "Equinix: United States and Canada colocation data centers",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Equinix: Equinix DA7",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da7",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Equinix lists Equinix DA7 at Plano, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da7",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "equinix-da9-irving-tx",
      "name": "Equinix DA9",
      "summary": "Equinix lists a data center at Irving, Texas among the sites it operates.",
      "state": "TX",
      "city": "Irving",
      "county": "Dallas County",
      "status": "operational",
      "developer": "Equinix",
      "capacity_mw": null,
      "latitude": 32.8582366,
      "longitude": -96.9702114,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da9",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/equinix-da9-irving-tx",
      "sources": [
        {
          "title": "Equinix: United States and Canada colocation data centers",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Equinix: Equinix DA9",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da9",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Equinix lists Equinix DA9 at Irving, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da9",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "equinix-dallas-tx",
      "name": "Equinix Dallas",
      "summary": "Equinix lists 6 data centers at Dallas, Texas among the sites it operates.",
      "state": "TX",
      "city": "Dallas",
      "county": "Dallas County",
      "status": "operational",
      "developer": "Equinix",
      "capacity_mw": null,
      "latitude": 32.79974,
      "longitude": -96.82027,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071241271) for Equinix N Stemmons Freeway Dallas in Dallas County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110071241271",
      "location_last_verified": "2026-09-14",
      "site_address": "1950 N Stemmons Freeway, Dallas, TX 75207",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071241271",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 6,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/equinix-dallas-tx",
      "sources": [
        {
          "title": "Equinix: United States and Canada colocation data centers",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Equinix: Equinix DA1",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da1",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Equinix: Equinix DA2",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da2",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Equinix: Equinix DA3",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da3",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Equinix: Equinix DA4",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da4",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Equinix: Equinix DA6",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da6",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Equinix: Equinix DA11",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da11",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "News | Equinix gets ready to develop massive Dallas data center - CoStar",
          "url": "https://www.costar.com/article/932950618/equinix-gets-ready-to-develop-massive-dallas-data-center",
          "publisher": "CoStar",
          "date": "2025-11-25",
          "source_tier": 1
        },
        {
          "title": "EPA ECHO detailed facility report: Equinix N Stemmons Freeway Dallas",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071241271",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Equinix lists Equinix DA1, Equinix DA2, Equinix DA3, Equinix DA4, Equinix DA6, Equinix DA11 at Dallas, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da1",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "equinix-ho1-houston-tx",
      "name": "Equinix HO1",
      "summary": "Equinix lists a data center at Houston, Texas among the sites it operates.",
      "state": "TX",
      "city": "Houston",
      "county": "Harris County",
      "status": "operational",
      "developer": "Equinix",
      "capacity_mw": null,
      "latitude": 29.7859623,
      "longitude": -95.388661,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/houston-data-centers/ho1",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/equinix-ho1-houston-tx",
      "sources": [
        {
          "title": "Equinix: United States and Canada colocation data centers",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Equinix: Equinix HO1",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/houston-data-centers/ho1",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Equinix lists Equinix HO1 at Houston, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/houston-data-centers/ho1",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "experian-mckinney-data-center-tx",
      "name": "Experian Mckinney Data Center",
      "summary": "The EPA's facility registry lists Experian Mckinney Data Center at 3400 S Stonebridge DR, Mckinney, TX 75070 in Mckinney, Texas, with no permit program listed.",
      "state": "TX",
      "city": "McKinney",
      "county": "Collin County",
      "status": "not_verified",
      "developer": "Experian",
      "capacity_mw": null,
      "latitude": 33.17086,
      "longitude": -96.72481,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110034292129: the registry placed its point by address matching house number, accurate to 30 m",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-20",
      "site_address": "3400 S Stonebridge DR, Mckinney, TX 75070",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110034292129",
      "published": "2026-10-20",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/experian-mckinney-data-center-tx",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Experian Mckinney Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110034292129",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Facility appears in the EPA Facility Registry Service (ECHO) under NAICS 518210 or SIC 7374; commercial data center operations have not yet been independently verified.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110034292129",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "flexential-corp-flexential-dallasplano-dfw01-plano-tx",
      "name": "Flexential Dallas Plano (DFW01)",
      "summary": "Flexential operates the DFW01 data center at 3500 E Plano Pkwy in Plano, Collin County, Texas, registered in the EPA Facility Registry Service (FRS ID 110071155467).",
      "state": "TX",
      "city": "Plano",
      "county": "Collin County",
      "status": "operational",
      "developer": "Flexential",
      "capacity_mw": null,
      "latitude": 33.008872,
      "longitude": -96.666123,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071155467) for Flexential Data Center at 3500 E Plano Pkwy, Plano, Collin County, Texas.",
      "location_verified_at": null,
      "coordinate_source": "EPA ECHO FRS ID 110071155467",
      "location_last_verified": null,
      "site_address": "3500 E Plano Pkwy, Plano, TX 75074",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071155467",
      "published": "2026-10-21",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "air permit generator list",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071155467",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/flexential-corp-flexential-dallasplano-dfw01-plano-tx",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Flexential Data Center Plano",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071155467",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071155467",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "ge-capital-data-center-dallas-tx",
      "name": "Ge Capital Data Center",
      "summary": "The EPA's facility registry lists Ge Capital Data Center at 1100 Empire Central Place, Dallas, TX 75247 in Dallas, Texas, with a hazardous waste record.",
      "state": "TX",
      "city": "Dallas",
      "county": "Dallas County",
      "status": "not_verified",
      "developer": "GE Capital",
      "capacity_mw": null,
      "latitude": 32.82278,
      "longitude": -96.87359,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110005009506: the registry placed its point by address matching house number, accurate to 50 m",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-20",
      "site_address": "1100 Empire Central Place, Dallas, TX 75247",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110005009506",
      "published": "2026-10-20",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/ge-capital-data-center-dallas-tx",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Ge Capital Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110005009506",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Facility appears in the EPA Facility Registry Service (ECHO) under NAICS 518210 or SIC 7374; commercial data center operations have not yet been independently verified.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110005009506",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "google-armstrong-county-data-center-tx",
      "name": "Google Armstrong County data center",
      "summary": "Google lists a data center at Armstrong County, Texas and says it is being built.",
      "state": "TX",
      "city": "Claude",
      "county": "Armstrong County",
      "status": "under_construction",
      "developer": "Crusoe",
      "capacity_mw": null,
      "latitude": 35.016961,
      "longitude": -101.319614,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110072160729) for Goodnight Power Plant Project at 9921 Lima Road, Claude, Armstrong County, Texas.",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "EPA ECHO FRS ID 110072160729",
      "location_last_verified": "2026-09-16",
      "site_address": "9921 Lima Road, Claude, TX 79019",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072160729",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://www.crusoe.ai/resources/newsroom/crusoe-developing-data-center-campus-in-armstrong-county-texas",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": "Goodnight 1 (265.5 MW operational) and Goodnight 2 (265.5 MW under construction) wind farms",
      "power_source_url": "https://www.crusoe.ai/resources/newsroom/crusoe-developing-data-center-campus-in-armstrong-county-texas",
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-armstrong-county-data-center-tx",
      "sources": [
        {
          "title": "Google commits $40B to 3 new data centers, infrastructure in Texas through 2027 - Community Impact",
          "url": "https://communityimpact.com/mckinney/austin/google-commits-40b-to-3-new-data-centers-infrastructure-in-texas-through-2027/",
          "publisher": "Community Impact",
          "date": "2025-11-14",
          "source_tier": 4
        },
        {
          "title": "Construction underway on six building Claude data center - NewsChannel 10",
          "url": "https://www.newschannel10.com/2026/09/23/construction-underway-six-building-claude-data-center/",
          "publisher": "NewsChannel 10",
          "date": "2026-09-23",
          "source_tier": 4
        },
        {
          "title": "Crusoe, Google to host community open house about Claude data center project - KFDA | NewsChannel 10 | Amarillo Texas",
          "url": "https://www.newschannel10.com/2026/09/13/crusoe-google-host-community-open-house-about-claude-data-center-project/",
          "publisher": "KFDA | NewsChannel 10 | Amarillo Texas",
          "date": "2026-09-13",
          "source_tier": 4
        },
        {
          "title": "‘We've proudly called Texas home for 15 years’, says Google CEO Sundar Pichai announcing $40 billion inve - The Times of India",
          "url": "https://timesofindia.indiatimes.com/technology/tech-news/weve-proudly-called-texas-home-for-15-years-says-google-ceo-sundar-pichai-announcing-40-billion-investment-in-texas/articleshow/125340570.cms",
          "publisher": "The Times of India",
          "date": "2025-11-19",
          "source_tier": 1
        },
        {
          "title": "Google taps Texas for $40B AI investment to run through 2027 - dallasnews.com",
          "url": "https://www.dallasnews.com/business/technology/2025/11/14/google-taps-texas-for-40b-ai-investment-to-run-through-2027/",
          "publisher": "dallasnews.com",
          "date": "2025-11-14",
          "source_tier": 1
        },
        {
          "title": "Google to invest $40 billion in Texas through 2027 - cnbc.com",
          "url": "https://www.cnbc.com/2025/11/14/google-to-invest-40-billion-in-texas-through-2027.html",
          "publisher": "cnbc.com",
          "date": "2025-11-14",
          "source_tier": 1
        },
        {
          "title": "Google plans to invest $40 billion towards building data centers in Texas - Engadget",
          "url": "https://www.engadget.com/big-tech/google-plans-to-invest-40-billion-towards-building-data-centers-in-texas-183056066.html",
          "publisher": "Engadget",
          "date": "2025-11-16",
          "source_tier": 1
        },
        {
          "title": "Google unveils $40 billion investment in Texas, with expansion in Ellis County - WFAA",
          "url": "https://www.wfaa.com/article/money/business/google-40-billion-investment-in-texas-ellis-county/287-0bf6e355-b350-4c46-b706-6745e7cb7358",
          "publisher": "WFAA",
          "date": "2025-11-14",
          "source_tier": 1
        },
        {
          "title": "Google Announces $40 Billion Texas Data Center Investment to Expand Cloud and AI Infrastructure - MLQ.ai",
          "url": "https://mlq.ai/news/google-announces-40-billion-texas-data-center-investment-to-expand-cloud-and-ai-infrastructure/",
          "publisher": "MLQ.ai",
          "date": "2025-11-15",
          "source_tier": 1
        },
        {
          "title": "Google is spending $40 billion to build 3 new data centers in Texas - Fast Company",
          "url": "https://www.fastcompany.com/91446624/google-data-center-texas-greg-abbott-sundar-pichai",
          "publisher": "Fast Company",
          "date": "2025-11-21",
          "source_tier": 1
        },
        {
          "title": "Google Earmarks $40B for Texas Digital Development - CommercialSearch",
          "url": "https://www.commercialsearch.com/news/google-earmarks-40b-for-texas-digital-development/",
          "publisher": "CommercialSearch",
          "date": "2025-11-19",
          "source_tier": 1
        },
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Crusoe Develops Google AI Data Center Campus in Armstrong County, TX - Crusoe",
          "url": "https://www.crusoe.ai/resources/newsroom/crusoe-developing-data-center-campus-in-armstrong-county-texas",
          "publisher": "Crusoe",
          "date": "2026-09-28",
          "source_tier": 4
        },
        {
          "title": "Photos: Construction underway on six building Claude data center - NewsChannel 10",
          "url": "https://www.newschannel10.com/gallery/2026/09/23/photos-construction-underway-six-building-claude-data-center/",
          "publisher": "NewsChannel 10",
          "date": "2026-09-23",
          "source_tier": 4
        },
        {
          "title": "EPA ECHO detailed facility report: Goodnight Power Plant Project Claude TX",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110072160729",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [
          "Google"
        ],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": "https://www.crusoe.ai/resources/newsroom/crusoe-developing-data-center-campus-in-armstrong-county-texas"
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-23",
          "summary": "first buildings expected to be turned over to Google in early 2027",
          "source_url": "https://www.newschannel10.com/2026/09/23/construction-underway-six-building-claude-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-23",
          "summary": "Construction underway on six building Claude data center hosted by Google and Crusoe.",
          "source_url": "https://www.newschannel10.com/gallery/2026/09/23/photos-construction-underway-six-building-claude-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-23",
          "summary": "construction expected to wrap up by the end of 2027",
          "source_url": "https://www.newschannel10.com/2026/09/23/construction-underway-six-building-claude-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-23",
          "summary": "closed loop cooling system allowing water to continuously circulate",
          "source_url": "https://www.newschannel10.com/2026/09/23/construction-underway-six-building-claude-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-23",
          "summary": "water recirculates for a period of about 15 years",
          "source_url": "https://www.newschannel10.com/2026/09/23/construction-underway-six-building-claude-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-23",
          "summary": "primary power source will be the nearby Goodnight 1 and 2 wind farms, with ERCOT grid as backup",
          "source_url": "https://www.newschannel10.com/2026/09/23/construction-underway-six-building-claude-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-23",
          "summary": "Google committed to 50 permanent jobs once operational",
          "source_url": "https://www.newschannel10.com/2026/09/23/construction-underway-six-building-claude-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-23",
          "summary": "six building data center campus",
          "source_url": "https://www.newschannel10.com/2026/09/23/construction-underway-six-building-claude-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Armstrong County data center at Armstrong County, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-13",
          "summary": "Data center project under construction in Claude off Lima Road",
          "source_url": "https://www.newschannel10.com/2026/09/13/crusoe-google-host-community-open-house-about-claude-data-center-project/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2025-06-01",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-28",
          "summary": "Groundbreaking was in June 2025 with more than 5,500 skilled laborers on site daily",
          "source_url": "https://www.crusoe.ai/resources/newsroom/crusoe-developing-data-center-campus-in-armstrong-county-texas",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "google-haskell-county-data-center-tx",
      "name": "Google Haskell County data center",
      "summary": "Google lists a data center at Haskell County, Texas and says it is being built.",
      "state": "TX",
      "city": "Haskell",
      "county": "Haskell County",
      "status": "under_construction",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 33.1603,
      "longitude": -99.7344,
      "location_precision": "county",
      "location_source": "County seat (Haskell), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-haskell-county-data-center-tx",
      "sources": [
        {
          "title": "Google's parent buys data center energy specialist for $4.75B to help power AI - Post and Courier",
          "url": "https://www.postandcourier.com/ap/business/googles-parent-buys-data-center-energy-specialist-for-4-75b-to-help-power-ai/article_c7d79a0a-1151-4942-b026-570fed39f849.html",
          "publisher": "Post and Courier",
          "date": "2025-12-22",
          "source_tier": 1
        },
        {
          "title": "Google to invest $40 billion in Texas through 2027 - cnbc.com",
          "url": "https://www.cnbc.com/2025/11/14/google-to-invest-40-billion-in-texas-through-2027.html",
          "publisher": "cnbc.com",
          "date": "2025-11-14",
          "source_tier": 1
        },
        {
          "title": "‘We've proudly called Texas home for 15 years’, says Google CEO Sundar Pichai announcing $40 billion inve - The Times of India",
          "url": "https://timesofindia.indiatimes.com/technology/tech-news/weve-proudly-called-texas-home-for-15-years-says-google-ceo-sundar-pichai-announcing-40-billion-investment-in-texas/articleshow/125340570.cms",
          "publisher": "The Times of India",
          "date": "2025-11-19",
          "source_tier": 1
        },
        {
          "title": "Google taps Texas for $40B AI investment to run through 2027 - dallasnews.com",
          "url": "https://www.dallasnews.com/business/technology/2025/11/14/google-taps-texas-for-40b-ai-investment-to-run-through-2027/",
          "publisher": "dallasnews.com",
          "date": "2025-11-14",
          "source_tier": 1
        },
        {
          "title": "Google plans to invest $40 billion towards building data centers in Texas - Engadget",
          "url": "https://www.engadget.com/big-tech/google-plans-to-invest-40-billion-towards-building-data-centers-in-texas-183056066.html",
          "publisher": "Engadget",
          "date": "2025-11-16",
          "source_tier": 1
        },
        {
          "title": "Google Announces $40 Billion Texas Data Center Investment to Expand Cloud and AI Infrastructure - MLQ.ai",
          "url": "https://mlq.ai/news/google-announces-40-billion-texas-data-center-investment-to-expand-cloud-and-ai-infrastructure/",
          "publisher": "MLQ.ai",
          "date": "2025-11-15",
          "source_tier": 1
        },
        {
          "title": "Google is spending $40 billion to build 3 new data centers in Texas - Fast Company",
          "url": "https://www.fastcompany.com/91446624/google-data-center-texas-greg-abbott-sundar-pichai",
          "publisher": "Fast Company",
          "date": "2025-11-21",
          "source_tier": 1
        },
        {
          "title": "Google Earmarks $40B for Texas Digital Development - CommercialSearch",
          "url": "https://www.commercialsearch.com/news/google-earmarks-40b-for-texas-digital-development/",
          "publisher": "CommercialSearch",
          "date": "2025-11-19",
          "source_tier": 1
        },
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Haskell County data center at Haskell County, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "google-midlothian-data-center-tx",
      "name": "Google Midlothian data center",
      "summary": "Google lists a data center at Midlothian, Texas among the sites it operates.",
      "state": "TX",
      "city": "Midlothian",
      "county": "Ellis County",
      "status": "operational",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 32.447971,
      "longitude": -97.056184,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110070801654) for Google Sharka campus in Midlothian, Ellis County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110070801654",
      "location_last_verified": "2026-09-14",
      "site_address": "3200 V V Jones Road, Midlothian, TX 76065",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070801654",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": "withdrawal",
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://datacenters.google/locations/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-midlothian-data-center-tx",
      "sources": [
        {
          "title": "Google 2026 Environmental Report (Page 97: Water use by data center location, 2025)",
          "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
          "publisher": "Google",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Sharka Midlothian TX",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110070801654",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Midlothian data center at Midlothian, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "google-pampa-data-center-tx",
      "name": "Google Pampa data center",
      "summary": "Google lists a data center at Pampa, Texas and says it is being built.",
      "state": "TX",
      "city": "Pampa",
      "county": "Gray County",
      "status": "under_construction",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 35.5478529,
      "longitude": -100.9650303,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-pampa-data-center-tx",
      "sources": [
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Pampa data center at Pampa, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "google-pflugerville-data-center-tx",
      "name": "Google Pflugerville Data Center",
      "summary": "Google operates the Pflugerville data center in Pflugerville, Travis County, Texas, reported in the Google 2026 Environmental Report with 400,000 gallons of annual water withdrawal in 2025.",
      "state": "TX",
      "city": "Pflugerville",
      "county": "Travis County",
      "status": "operational",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 30.4478,
      "longitude": -97.6021,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071659424) and Google 2026 Environmental Report (Page 97) for Pflugerville, Travis County, Texas.",
      "location_verified_at": null,
      "coordinate_source": "EPA ECHO FRS ID 110071659424",
      "location_last_verified": null,
      "site_address": "2515 South Kenny Fort Boulevard, Pflugerville, TX 78660",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071659424",
      "published": "2026-10-21",
      "last_verified": "2026-10-24",
      "cooling_type": "air",
      "cooling_type_source_url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": "withdrawal",
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-pflugerville-data-center-tx",
      "sources": [
        {
          "title": "Google 2026 Environmental Report (Page 97: Water use by data center location, 2025)",
          "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
          "publisher": "Google 2026 Environmental Report",
          "date": "2026-06-01",
          "source_tier": 2
        },
        {
          "title": "Google 2026 Environmental Report (Page 97: Water use by data center location, 2025)",
          "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
          "publisher": "Google 2026 Environmental Report",
          "date": "2026-06-01",
          "source_tier": 2
        },
        {
          "title": "Google 2026 Environmental Report (Page 97 & Page 116, Endnote 229 / 226)",
          "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
          "publisher": "Google 2026 Environmental Report",
          "date": "2026-06-01",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Austin Data Center 2 Pflugerville",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071659424",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071659424",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "google-red-oak-data-center-tx",
      "name": "Google Red Oak data center",
      "summary": "Google lists a data center at Red Oak, Texas among the sites it operates.",
      "state": "TX",
      "city": "Red Oak",
      "county": "Ellis County",
      "status": "operational",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 32.5155346,
      "longitude": -96.7826267,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": "withdrawal",
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://datacenters.google/locations/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-red-oak-data-center-tx",
      "sources": [
        {
          "title": "Google 2026 Environmental Report (Page 97: Water use by data center location, 2025)",
          "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
          "publisher": "Google",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Red Oak data center at Red Oak, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "google-wilbarger-county-data-center-tx",
      "name": "Google Wilbarger County data center",
      "summary": "Google lists a data center at Wilbarger County, Texas and says it is being built.",
      "state": "TX",
      "city": "Vernon",
      "county": "Wilbarger County",
      "status": "under_construction",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 34.1511,
      "longitude": -99.2906,
      "location_precision": "county",
      "location_source": "County seat (Vernon), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-wilbarger-county-data-center-tx",
      "sources": [
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Google, AES plan new data center in Wilbarger Co. - texomashomepage.com",
          "url": "https://www.texomashomepage.com/news/local-news/google-plans-new-data-center-in-wilbarger-county-expected-to-bring-jobs-economic-growth/",
          "publisher": "texomashomepage.com",
          "date": "2026-02-25",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Wilbarger County data center at Wilbarger County, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "google-wilmer-data-center-tx",
      "name": "Google Wilmer Data Center",
      "summary": "Google operates the Wilmer data center in Wilmer, Dallas County, Texas, reported in the Google 2026 Environmental Report with 2.6 million gallons of annual water withdrawal in 2025.",
      "state": "TX",
      "city": "Wilmer",
      "county": "Dallas County",
      "status": "operational",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 32.6012,
      "longitude": -96.6784,
      "location_precision": "city",
      "location_source": "Google 2026 Environmental Report (Page 97) disclosing operational facility in Wilmer, Dallas County, Texas.",
      "location_verified_at": null,
      "coordinate_source": "census gazetteer place point",
      "location_last_verified": null,
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-10-21",
      "last_verified": "2026-10-24",
      "cooling_type": "air",
      "cooling_type_source_url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": "withdrawal",
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-wilmer-data-center-tx",
      "sources": [
        {
          "title": "Google 2026 Environmental Report (Page 97: Water use by data center location, 2025)",
          "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
          "publisher": "Google 2026 Environmental Report",
          "date": "2026-06-01",
          "source_tier": 2
        },
        {
          "title": "Google 2026 Environmental Report (Page 97 & Page 116, Endnote 235 / 226)",
          "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
          "publisher": "Google 2026 Environmental Report",
          "date": "2026-06-01",
          "source_tier": 2
        },
        {
          "title": "Google 2026 Environmental Report (Page 97: Water use by data center location, 2025)",
          "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
          "publisher": "Google 2026 Environmental Report",
          "date": "2026-06-01",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "h5-san-antonio-tx",
      "name": "H5 San Antonio",
      "summary": "H5 Data Centers lists a data center at San Antonio, Texas among the sites it operates.",
      "state": "TX",
      "city": "San Antonio",
      "county": "Bexar County",
      "status": "operational",
      "developer": "H5 Data Centers",
      "capacity_mw": null,
      "latitude": 29.4600337,
      "longitude": -98.5242037,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://h5datacenters.com/data-centers.html",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/h5-san-antonio-tx",
      "sources": [
        {
          "title": "H5 Data Centers' San Antonio facility gets fiber expansion by FiberLight - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/h5-data-centers-san-antonio-facility-gets-fiber-expansion-fiberlight/",
          "publisher": "Data Center Dynamics",
          "date": "2020-09-17",
          "source_tier": 1
        },
        {
          "title": "H5 buys San Antonio’s only carrier hotel - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/h5-buys-san-antonios-only-carrier-hotel/",
          "publisher": "Data Center Dynamics",
          "date": "2018-11-27",
          "source_tier": 1
        },
        {
          "title": "News | San Antonio’s H5 Edge Data Center and Colocation Facility Plans for Expansion - CoStar",
          "url": "https://www.costar.com/article/360460271/san-antonios-h5-edge-data-center-and-colocation-facility-plans-for-expansion",
          "publisher": "CoStar",
          "date": "2023-11-22",
          "source_tier": 4
        },
        {
          "title": "H5 Data Centers Announces Next Phase Expansion at its San Antonio Data Center - Business Wire",
          "url": "https://www.businesswire.com/news/home/20231120465034/en/H5-Data-Centers-Announces-Next-Phase-Expansion-at-its-San-Antonio-Data-Center",
          "publisher": "Business Wire",
          "date": "2023-11-20",
          "source_tier": 1
        },
        {
          "title": "H5 Data Centers Expands Edge Data Center in San Antonio - telecomtalk.info",
          "url": "https://telecomtalk.info/h5-datacenters-expands-edge-datacenter-san-antonio/898144/",
          "publisher": "telecomtalk.info",
          "date": "2023-11-20",
          "source_tier": 1
        },
        {
          "title": "H5 expands data center in San Antonio, Texas - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/h5-expands-data-center-in-san-antonio-texas/",
          "publisher": "Data Center Dynamics",
          "date": "2023-11-21",
          "source_tier": 1
        },
        {
          "title": "H5 Data Centers: Data centers",
          "url": "https://h5datacenters.com/data-centers.html",
          "publisher": "H5 Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "H5 Data Centers lists H5 San Antonio at San Antonio, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://h5datacenters.com/data-centers.html",
          "source_tier": 2
        },
        {
          "status": "operational",
          "effective_at": "2023-11-22",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2023-11-22",
          "summary": "H5 Edge data center in San Antonio plans expansion",
          "source_url": "https://www.costar.com/article/360460271/san-antonios-h5-edge-data-center-and-colocation-facility-plans-for-expansion",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "lincoln-rackhouse-lincoln-rackhouse-dallas-plano-tx",
      "name": "Lincoln Rackhouse Dallas Plano",
      "summary": "Lincoln Rackhouse operates the Plano data center campus at 1000 Coit Road in Plano, Collin County, Texas, registered in the EPA Facility Registry Service (FRS ID 110062491744).",
      "state": "TX",
      "city": "Plano",
      "county": "Collin County",
      "status": "operational",
      "developer": "Lincoln Rackhouse",
      "capacity_mw": null,
      "latitude": 33.0106,
      "longitude": -96.76667,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110062491744) for Coit Data Center at 1000 Coit Road, Plano, Collin County, Texas.",
      "location_verified_at": null,
      "coordinate_source": "EPA ECHO FRS ID 110062491744",
      "location_last_verified": null,
      "site_address": "1000 Coit Road, Plano, TX 75075",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110062491744",
      "published": "2026-10-21",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "air permit generator list",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110062491744",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/lincoln-rackhouse-lincoln-rackhouse-dallas-plano-tx",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Coit Data Center Plano",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110062491744",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110062491744",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "meta-el-paso-data-center-tx",
      "name": "Meta El Paso data center",
      "summary": "Meta's El Paso Data Center in El Paso, Texas, which broke ground in 2025.",
      "state": "TX",
      "city": "El Paso",
      "county": "El Paso County",
      "status": "under_construction",
      "developer": "Meta",
      "capacity_mw": null,
      "latitude": 31.75917,
      "longitude": -106.48861,
      "location_precision": "county",
      "location_source": "County seat (El Paso), Wikidata, placed at county level",
      "location_verified_at": "2026-09-23",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-23",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-08",
      "last_verified": "2026-10-24",
      "cooling_type": "closed_loop_liquid",
      "cooling_type_source_url": "https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/",
      "cooling_fluid": "water",
      "cooling_fluid_source_url": "https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/",
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://datacenters.atmeta.com/us-locations/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/meta-el-paso-data-center-tx",
      "sources": [
        {
          "title": "Meta Tables Plans for $437M Gas-fired Power Plant to Run its Data Center in El Paso, Texas - Construction Review",
          "url": "https://constructionreviewonline.com/meta-tables-plans-for-437m-gas-plant-to-power-its-data-center-in-el-paso-texas-despite-city-council-pushback/",
          "publisher": "Construction Review",
          "date": "2026-02-27",
          "source_tier": 1
        },
        {
          "title": "Meta: Our U.S. data center fleet",
          "url": "https://datacenters.atmeta.com/us-locations/",
          "publisher": "Meta",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Meta Wants Data Center in Sunny El Paso to Rely on Natural Gas - Inside Climate News",
          "url": "https://insideclimatenews.org/news/21012026/meta-data-center-in-sunny-el-paso-will-rely-on-natural-gas/",
          "publisher": "Inside Climate News",
          "date": "2026-01-21",
          "source_tier": 1
        },
        {
          "title": "Big things are happening, El Paso!",
          "url": "https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/",
          "publisher": "Meta Data Centers",
          "date": "2026-03-26",
          "source_tier": 4
        },
        {
          "title": "Meta to hold eight El Paso meetings this fall as data center agreement talks advance - KFOX",
          "url": "https://kfoxtv.com/news/local/meta-to-hold-eight-el-paso-meetings-this-fall-as-data-center-agreement-talks-advance",
          "publisher": "KFOX",
          "date": "2026-09-15",
          "source_tier": 4
        },
        {
          "title": "Meta breaks ground on 1GW data center campus in El Paso, Texas - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/meta-breaks-ground-on-1gw-data-center-campus-in-el-paso-texas/",
          "publisher": "Data Center Dynamics",
          "date": "2025-10-16",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-15",
          "summary": "Meta has agreed to hold eight community meetings this fall, one in each City Council district",
          "source_url": "https://kfoxtv.com/news/local/meta-to-hold-eight-el-paso-meetings-this-fall-as-data-center-agreement-talks-advance",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-15",
          "summary": "Meta El Paso Data Center occupies approximately 1,000 acres",
          "source_url": "https://kfoxtv.com/news/local/meta-to-hold-eight-el-paso-meetings-this-fall-as-data-center-agreement-talks-advance",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-15",
          "summary": "Meta El Paso Data Center expanded to 1 gigawatt of computing capacity",
          "source_url": "https://kfoxtv.com/news/local/meta-to-hold-eight-el-paso-meetings-this-fall-as-data-center-agreement-talks-advance",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-15",
          "summary": "Meta data center project cost over $10 billion",
          "source_url": "https://kfoxtv.com/news/local/meta-to-hold-eight-el-paso-meetings-this-fall-as-data-center-agreement-talks-advance",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-15",
          "summary": "Meta stated 300 permanent positions at El Paso facility",
          "source_url": "https://kfoxtv.com/news/local/meta-to-hold-eight-el-paso-meetings-this-fall-as-data-center-agreement-talks-advance",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-15",
          "summary": "Applications for Meta funding are open until October 6",
          "source_url": "https://kfoxtv.com/news/local/meta-to-hold-eight-el-paso-meetings-this-fall-as-data-center-agreement-talks-advance",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-03-26",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Meta plans to add enough clean and renewable energy to match 100 percent of the electricity use of El Paso data center",
          "source_url": "https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/",
          "source_tier": 2
        },
        {
          "status": "under_construction",
          "effective_at": "2026-03-26",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Meta announced a $500,000 grant to support workforce development in partnership with El Paso public schools",
          "source_url": "https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/",
          "source_tier": 2
        },
        {
          "status": "under_construction",
          "effective_at": "2026-03-26",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Meta broke ground on El Paso Data Center last year (2025)",
          "source_url": "https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/",
          "source_tier": 2
        },
        {
          "status": "under_construction",
          "effective_at": "2026-03-26",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Meta El Paso Data Center will grow to 1 gigawatt",
          "source_url": "https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "meta-fort-worth-data-center-tx",
      "name": "Meta Fort Worth Data Center",
      "summary": "Meta lists a data center at Fort Worth, Texas among the sites it operates.",
      "state": "TX",
      "city": "Fort Worth",
      "county": "Tarrant County",
      "status": "operational",
      "developer": "Meta",
      "capacity_mw": null,
      "latitude": 32.7819724,
      "longitude": -97.3490056,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 5,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://datacenters.atmeta.com/us-locations/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/meta-fort-worth-data-center-tx",
      "sources": [
        {
          "title": "Meta: Our U.S. data center fleet",
          "url": "https://datacenters.atmeta.com/us-locations/",
          "publisher": "Meta",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Meta 2025 Environmental Data Index (Page 9: Water Withdrawal by Facility)",
          "url": "https://sustainability.atmeta.com/wp-content/uploads/2025/10/Meta_2025-Environmental-Data-Index.pdf",
          "publisher": "Meta",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Meta lists Meta Fort Worth Data Center at Fort Worth, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.atmeta.com/us-locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "meta-temple-data-center-tx",
      "name": "Meta Temple Data Center",
      "summary": "Meta lists a data center at Temple, Texas among the sites it operates.",
      "state": "TX",
      "city": "Temple",
      "county": "Bell County",
      "status": "operational",
      "developer": "Meta",
      "capacity_mw": null,
      "latitude": 31.1051466,
      "longitude": -97.3882844,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "closed_loop_liquid",
      "cooling_type_source_url": "https://datacenters.atmeta.com/2026/07/temple-we-are-online/",
      "cooling_fluid": "water",
      "cooling_fluid_source_url": "https://datacenters.atmeta.com/2026/07/temple-we-are-online/",
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://datacenters.atmeta.com/us-locations/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/meta-temple-data-center-tx",
      "sources": [
        {
          "title": "Meta: Our U.S. data center fleet",
          "url": "https://datacenters.atmeta.com/us-locations/",
          "publisher": "Meta",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Meta Data Centers: Temple, we are online!",
          "url": "https://datacenters.atmeta.com/2026/07/temple-we-are-online/",
          "publisher": "Meta",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "Meta project expected to resume in late 2023 - Temple Daily Telegram",
          "url": "https://www.tdtnews.com/news/community_guide/article_c8df7ce2-0c6a-11ee-91d7-6b6c563032a0.html",
          "publisher": "Temple Daily Telegram",
          "date": "2023-06-24",
          "source_tier": 4
        },
        {
          "title": "Meta puts construction pause on $800M Temple data center - kcentv.com",
          "url": "https://www.kcentv.com/article/news/local/meta-halts-construction-800m-temple-data-center/500-a1fe94fe-ec85-472c-a18f-37cde0913e26",
          "publisher": "kcentv.com",
          "date": "2022-12-15",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Meta lists Meta Temple Data Center at Temple, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.atmeta.com/us-locations/",
          "source_tier": 2
        },
        {
          "status": "operational",
          "effective_at": "2022-12-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2022-12-15",
          "summary": "Meta put construction pause on $800 million Temple data center.",
          "source_url": "https://www.kcentv.com/article/news/local/meta-halts-construction-800m-temple-data-center/500-a1fe94fe-ec85-472c-a18f-37cde0913e26",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "qts-fort-worth-tx",
      "name": "QTS Fort Worth",
      "summary": "QTS Data Centers lists a data center at Fort Worth, Texas among the sites it operates.",
      "state": "TX",
      "city": "Fort Worth",
      "county": "Tarrant County",
      "status": "operational",
      "developer": "QTS Data Centers",
      "capacity_mw": null,
      "latitude": 32.98864,
      "longitude": -97.26263,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071669219) for QTS Fort Worth at 14100 Park Vista Blvd, Fort Worth, Tarrant County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110071669219",
      "location_last_verified": "2026-09-14",
      "site_address": "14100 Park Vista Blvd, Fort Worth, TX 76177",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071669219",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://q.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/qts-fort-worth-tx",
      "sources": [
        {
          "title": "QTS Data Centers: All locations",
          "url": "https://q.com/data-centers/",
          "publisher": "QTS Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: QTS Fort Worth Park Vista Blvd",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071669219",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "QTS Data Centers lists QTS Fort Worth at Fort Worth, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://q.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "qts-hall-county-tx",
      "name": "QTS Hall County",
      "summary": "QTS Data Centers lists a data center at Hall County, Texas and says it is being built.",
      "state": "TX",
      "city": "Turkey",
      "county": "Hall County",
      "status": "under_construction",
      "developer": "QTS Data Centers",
      "capacity_mw": null,
      "latitude": 34.72667,
      "longitude": -100.54139,
      "location_precision": "county",
      "location_source": "County seat (Memphis), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": "Southeast Corner Highway 70 & County Road CC, Turkey, TX 79261",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072157031",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/qts-hall-county-tx",
      "sources": [
        {
          "title": "QTS Data Centers: All locations",
          "url": "https://q.com/data-centers/",
          "publisher": "QTS Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: QTS WTX1 Turkey TX",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110072157031",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "QTS Data Centers lists QTS Hall County at Hall County, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://q.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "qts-howard-county-tx",
      "name": "QTS Howard County",
      "summary": "A QTS Data Centers site in Howard County, Texas, which QTS lists as in consideration.",
      "state": "TX",
      "city": "Big Spring",
      "county": "Howard County",
      "status": "proposed",
      "developer": "QTS Data Centers",
      "capacity_mw": null,
      "latitude": 32.2433,
      "longitude": -101.475,
      "location_precision": "county",
      "location_source": "County seat (Big Spring), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/qts-howard-county-tx",
      "sources": [
        {
          "title": "QTS Data Centers: All locations",
          "url": "https://q.com/data-centers/",
          "publisher": "QTS Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-10-13",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-10-13",
          "summary": "QTS Data Centers lists QTS Howard County at Howard County, Texas as in consideration on its own page of data center locations, read October 13, 2026.",
          "source_url": "https://q.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "qts-irving-tx",
      "name": "QTS Irving",
      "summary": "QTS Data Centers lists a data center at Irving, Texas among the sites it operates.",
      "state": "TX",
      "city": "Irving",
      "county": "Dallas County",
      "status": "operational",
      "developer": "QTS Data Centers",
      "capacity_mw": null,
      "latitude": 32.89607,
      "longitude": -96.98123,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071337750) for QTS DFW01 at 6351 Longhorn Dr, Irving, Dallas County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110071337750",
      "location_last_verified": "2026-09-14",
      "site_address": "6351 Longhorn Dr, Irving, TX 75063",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071337750",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 4,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://q.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/qts-irving-tx",
      "sources": [
        {
          "title": "QTS Eyeing $150M Irving Data Center Expansion - Connect CRE",
          "url": "https://www.connectcre.com/stories/qts-eyeing-150m-data-center-expansion-at-irving-site/",
          "publisher": "Connect CRE",
          "date": "2024-03-29",
          "source_tier": 1
        },
        {
          "title": "QTS Data Centers: All locations",
          "url": "https://q.com/data-centers/",
          "publisher": "QTS Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: QTS DFW01 Longhorn Dr Irving",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071337750",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "QTS Data Centers lists QTS Irving at Irving, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://q.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "qts-san-antonio-tx",
      "name": "QTS San Antonio",
      "summary": "QTS Data Centers lists a data center at San Antonio, Texas among the sites it operates.",
      "state": "TX",
      "city": "San Antonio",
      "county": "Bexar County",
      "status": "operational",
      "developer": "QTS Data Centers",
      "capacity_mw": null,
      "latitude": 29.4426,
      "longitude": -98.6852,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110070939377) for QTS SAT2 in San Antonio, Bexar County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110070939377",
      "location_last_verified": "2026-09-14",
      "site_address": "NWC Of Potranco Road And Ingram Road, San Antonio, TX 78251",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070939377",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://q.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/qts-san-antonio-tx",
      "sources": [
        {
          "title": "QTS Data Centers: All locations",
          "url": "https://q.com/data-centers/",
          "publisher": "QTS Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: QTS SAT2 San Antonio",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110070939377",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "QTS Data Centers lists QTS San Antonio at San Antonio, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://q.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "qts-south-dallas-wilmer-tx",
      "name": "QTS South Dallas",
      "summary": "QTS Data Centers lists a data center at Wilmer, Texas and says it is being built.",
      "state": "TX",
      "city": "Wilmer",
      "county": "Dallas County",
      "status": "under_construction",
      "developer": "QTS Data Centers",
      "capacity_mw": null,
      "latitude": 32.587472,
      "longitude": -96.699838,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071946009) for QTS DFW2 DC3 in Wilmer, Dallas County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110071946009",
      "location_last_verified": "2026-09-14",
      "site_address": "1501 N Sunrise Rd, Wilmer, TX 75172",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071946009",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "air permit generator list",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071946009",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/qts-south-dallas-wilmer-tx",
      "sources": [
        {
          "title": "QTS Data Centers: All locations",
          "url": "https://q.com/data-centers/",
          "publisher": "QTS Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: QTS DFW2 DC3 Wilmer TX",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071946009",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "QTS Data Centers lists QTS South Dallas at Wilmer, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://q.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "rackspace-us-inc-rackspace-dallas-grapevine-dfw1-grapevine-tx",
      "name": "Rackspace Dallas Grapevine (DFW1)",
      "summary": "Rackspace operates the DFW1 data center at 801 Industrial Blvd in Grapevine, Tarrant County, Texas, registered in the EPA Facility Registry Service (FRS ID 110035370504).",
      "state": "TX",
      "city": "Grapevine",
      "county": "Tarrant County",
      "status": "operational",
      "developer": "Rackspace",
      "capacity_mw": null,
      "latitude": 32.93054,
      "longitude": -97.10471,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110035370504) for Rackspace Hosting at 801 Industrial Blvd Ste 200, Grapevine, Tarrant County, Texas.",
      "location_verified_at": null,
      "coordinate_source": "EPA ECHO FRS ID 110035370504",
      "location_last_verified": null,
      "site_address": "801 Industrial Blvd Ste 200, Grapevine, TX 76051",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110035370504",
      "published": "2026-10-21",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "air permit generator list",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110035370504",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/rackspace-us-inc-rackspace-dallas-grapevine-dfw1-grapevine-tx",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Rackspace Hosting Grapevine",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110035370504",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110035370504",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "stack-dfw01-plano-tx",
      "name": "STACK DFW01",
      "summary": "STACK Infrastructure lists a data center at Plano, Texas among the sites it operates.",
      "state": "TX",
      "city": "Plano",
      "county": "Collin County",
      "status": "operational",
      "developer": "STACK Infrastructure",
      "capacity_mw": null,
      "latitude": 33.0502419,
      "longitude": -96.748682,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.stackinfra.com/locations/americas/dallas-fort-worth/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/stack-dfw01-plano-tx",
      "sources": [
        {
          "title": "STACK Infrastructure: Americas locations",
          "url": "https://www.stackinfra.com/locations/",
          "publisher": "STACK Infrastructure",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "STACK Infrastructure: STACK DFW01",
          "url": "https://www.stackinfra.com/locations/americas/dallas-fort-worth/",
          "publisher": "STACK Infrastructure",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "STACK Infrastructure lists STACK DFW01 at Plano, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.stackinfra.com/locations/americas/dallas-fort-worth/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "stack-dfw02-lancaster-tx",
      "name": "STACK DFW02",
      "summary": "STACK Infrastructure lists a data center at Lancaster, Texas among the sites it operates.",
      "state": "TX",
      "city": "Lancaster",
      "county": "Dallas County",
      "status": "operational",
      "developer": "STACK Infrastructure",
      "capacity_mw": null,
      "latitude": 32.561752,
      "longitude": -96.76881,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071943842) for Lancaster Data Center at 2401 S Dallas Ave, Lancaster, Dallas County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110071943842",
      "location_last_verified": "2026-09-14",
      "site_address": "2401 S Dallas Ave, Lancaster, TX 75146",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071943842",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.stackinfra.com/locations/americas/dallas-fort-worth/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/stack-dfw02-lancaster-tx",
      "sources": [
        {
          "title": "STACK Infrastructure: Americas locations",
          "url": "https://www.stackinfra.com/locations/",
          "publisher": "STACK Infrastructure",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "STACK Infrastructure: STACK DFW02",
          "url": "https://www.stackinfra.com/locations/americas/dallas-fort-worth/",
          "publisher": "STACK Infrastructure",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: LAN01 Lancaster Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071943842",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "STACK Infrastructure lists STACK DFW02 at Lancaster, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.stackinfra.com/locations/americas/dallas-fort-worth/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "stream-data-centers-stream-data-centers-dfw-vii-garland-tx",
      "name": "Stream Data Centers DFW VII Garland",
      "summary": "Stream Data Centers operates the DFW VII data center campus at 1717 Lookout Drive in Garland, Dallas County, Texas, registered in the EPA Facility Registry Service (FRS ID 110071854750).",
      "state": "TX",
      "city": "Garland",
      "county": "Dallas County",
      "status": "operational",
      "developer": "Stream Data Centers",
      "capacity_mw": null,
      "latitude": 32.982696,
      "longitude": -96.666884,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071854750) for SDC DFW VII Data Center at 1717 Lookout Drive, Garland, Dallas County, Texas.",
      "location_verified_at": null,
      "coordinate_source": "EPA ECHO FRS ID 110071854750",
      "location_last_verified": null,
      "site_address": "1717 Lookout Drive, Garland, TX 75044",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071854750",
      "published": "2026-10-21",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "air permit generator list",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071854750",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/stream-data-centers-stream-data-centers-dfw-vii-garland-tx",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: SDC DFW VII Data Center Phase 2",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071854750",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071854750",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "switch-austin-campus-tx",
      "name": "Switch Austin campus",
      "summary": "Switch lists a data center at Austin, Texas among the sites it operates.",
      "state": "TX",
      "city": "Austin",
      "county": "Travis County",
      "status": "operational",
      "developer": "Switch",
      "capacity_mw": null,
      "latitude": 30.2984886,
      "longitude": -97.7536575,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.switch.com/austin/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/switch-austin-campus-tx",
      "sources": [
        {
          "title": "Switch: Locations",
          "url": "https://www.switch.com/locations/",
          "publisher": "Switch",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Switch: Switch Austin campus",
          "url": "https://www.switch.com/austin/",
          "publisher": "Switch",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Switch lists Switch Austin campus at Austin, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.switch.com/austin/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "tierpoint-dallas-tx",
      "name": "TierPoint Dallas",
      "summary": "TierPoint lists 3 data centers at Dallas, Texas among the sites it operates.",
      "state": "TX",
      "city": "Dallas",
      "county": "Dallas County",
      "status": "operational",
      "developer": "TierPoint",
      "capacity_mw": null,
      "latitude": 32.7935291,
      "longitude": -96.7666819,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.tierpoint.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/tierpoint-dallas-tx",
      "sources": [
        {
          "title": "TierPoint: Browse our data centers",
          "url": "https://www.tierpoint.com/data-centers/",
          "publisher": "TierPoint",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "TierPoint lists TierPoint Dallas Data Center, TierPoint Dallas - Allen Data Center, TierPoint Dallas - Fort Worth Data Center at Dallas, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.tierpoint.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "tierpoint-llc-tierpoint-dallas-forth-worth-fort-worth-tx",
      "name": "TierPoint Fort Worth Data Center",
      "summary": "TierPoint operates the Dallas Fort Worth data center at 13701 Independence Pkwy in Fort Worth, Tarrant County, Texas, registered in the EPA Facility Registry Service (FRS ID 110033431935).",
      "state": "TX",
      "city": "Fort Worth",
      "county": "Tarrant County",
      "status": "operational",
      "developer": "TierPoint",
      "capacity_mw": null,
      "latitude": 32.97985,
      "longitude": -97.25112,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110033431935) and TierPoint data center directory at 13701 Independence Pkwy, Fort Worth, Tarrant County, Texas.",
      "location_verified_at": null,
      "coordinate_source": "EPA ECHO FRS ID 110033431935",
      "location_last_verified": null,
      "site_address": "13701 Independence Pkwy, Fort Worth, TX 76177",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110033431935",
      "published": "2026-10-21",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.tierpoint.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/tierpoint-llc-tierpoint-dallas-forth-worth-fort-worth-tx",
      "sources": [
        {
          "title": "TierPoint: Data Center Locations",
          "url": "https://www.tierpoint.com/data-centers/",
          "publisher": "TierPoint",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Independence Pkwy Data Center Fort Worth",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110033431935",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110033431935",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "tierpoint-llc-tierpoint-dallas2-allen-allen-tx",
      "name": "TierPoint Allen Data Center",
      "summary": "TierPoint operates the Dallas Allen data center at 820 Allen Commerce Parkway in Allen, Collin County, Texas.",
      "state": "TX",
      "city": "Allen",
      "county": "Collin County",
      "status": "operational",
      "developer": "TierPoint",
      "capacity_mw": null,
      "latitude": 33.0954,
      "longitude": -96.6792,
      "location_precision": "permit_point",
      "location_source": "TierPoint Dallas Allen data center specification at 820 Allen Commerce Parkway, Allen, Collin County, Texas.",
      "location_verified_at": null,
      "coordinate_source": "operator address point",
      "location_last_verified": null,
      "site_address": "820 Allen Commerce Parkway, Allen, TX 75013",
      "site_address_source_url": "https://www.tierpoint.com/data-centers/",
      "published": "2026-10-21",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.tierpoint.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/tierpoint-llc-tierpoint-dallas2-allen-allen-tx",
      "sources": [
        {
          "title": "TierPoint: Data Center Locations",
          "url": "https://www.tierpoint.com/data-centers/",
          "publisher": "TierPoint",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://www.tierpoint.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "turner-construction-wlo-sn1-data-center-project-san-antonio-tx",
      "name": "Turner Construction Wlo SN1 Data Center Project",
      "summary": "The EPA's facility registry lists Turner Construction Wlo SN1 Data Center Project at 5150 Rogers RD, San Antonio, TX 78251 in San Antonio, Texas, with no permit program listed.",
      "state": "TX",
      "city": "San Antonio",
      "county": "Bexar County",
      "status": "operational",
      "developer": "Microsoft",
      "capacity_mw": null,
      "latitude": 29.47897,
      "longitude": -98.69541,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110035156041: the registry placed its point by address matching house number, accurate to 30 m",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-20",
      "site_address": "5150 Rogers RD, San Antonio, TX 78251",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110035156041",
      "published": "2026-10-20",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "air permit generator list",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110035156041",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/turner-construction-wlo-sn1-data-center-project-san-antonio-tx",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Turner Construction Wlo SN1 Data Center Project",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110035156041",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110035156041",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "westlake-data-ctr-roanoke-tx",
      "name": "Westlake Data CTR",
      "summary": "The EPA's facility registry lists Westlake Data CTR at 8 Campus Cir, Roanoke, TX 76262 in Roanoke, Texas, with no permit program listed.",
      "state": "TX",
      "city": "Roanoke",
      "county": "Tarrant County",
      "status": "not_verified",
      "developer": "Fidelity Investments",
      "capacity_mw": null,
      "latitude": 32.980592,
      "longitude": -97.174381,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110034238064: the registry placed its point by address matching house number, accurate to 50 m",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-20",
      "site_address": "8 Campus Cir, Roanoke, TX 76262",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110034238064",
      "published": "2026-10-20",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/westlake-data-ctr-roanoke-tx",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Westlake Data CTR",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110034238064",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Facility appears in the EPA Facility Registry Service (ECHO) under NAICS 518210 or SIC 7374; commercial data center operations have not yet been independently verified.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110034238064",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "compass-red-oak-campus-tx",
      "name": "Compass Red Oak campus",
      "summary": "Compass Datacenters lists a data center at Red Oak, Texas and says it is being built.",
      "state": "TX",
      "city": "Red Oak",
      "county": "Ellis County",
      "status": "under_construction",
      "developer": "Compass Datacenters",
      "capacity_mw": null,
      "latitude": 32.5155346,
      "longitude": -96.7826267,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/compass-red-oak-campus-tx",
      "sources": [
        {
          "title": "Compass Datacenters: Data center markets",
          "url": "https://www.compassdatacenters.com/data-center-markets/",
          "publisher": "Compass Datacenters",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "A Texas developer got a $2 billion loan to build Oracle data centers in the 'burbs - Business Insider",
          "url": "https://www.businessinsider.com/databank-financing-dallas-data-center-inference-2026-4",
          "publisher": "Business Insider",
          "date": "2026-04-21",
          "source_tier": 4
        },
        {
          "title": "County Partners with Compass Datacenters for Phase 2 Construction of Red Oak Campus - Focus Daily News",
          "url": "https://www.focusdailynews.com/county-partners-with-compass-datacenters-for-phase-2-construction-of-red-oak-campus/",
          "publisher": "Focus Daily News",
          "date": "2023-11-05",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Compass Datacenters lists Compass Red Oak campus at Red Oak, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.compassdatacenters.com/data-center-markets/",
          "source_tier": 2
        },
        {
          "status": "under_construction",
          "effective_at": "2026-04-21",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-04-21",
          "summary": "A Texas developer obtained $2 billion in financing to build Oracle data centers near Dallas",
          "source_url": "https://www.businessinsider.com/databank-financing-dallas-data-center-inference-2026-4",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2023-11-05",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2023-11-05",
          "summary": "Compass Datacenters Red Oak Campus phase two construction partnership with county",
          "source_url": "https://www.focusdailynews.com/county-partners-with-compass-datacenters-for-phase-2-construction-of-red-oak-campus/",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "vantage-shackelford-county-tx",
      "name": "Vantage Shackelford County",
      "summary": "Vantage Data Centers lists a data center at Shackelford County, Texas among the sites it operates.",
      "state": "TX",
      "city": "Albany",
      "county": "Shackelford County",
      "status": "operational",
      "developer": "Vantage Data Centers",
      "capacity_mw": 1400,
      "latitude": 32.72694,
      "longitude": -99.29444,
      "location_precision": "county",
      "location_source": "County seat (Albany), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/vantage-shackelford-county-tx",
      "sources": [
        {
          "title": "1,200-acre data center in Shackelford County could boost local economy – KTAB - BigCountryHomepage.com",
          "url": "https://www.bigcountryhomepage.com/video/1200-acre-data-center-in-shackelford-county-could-boost-local-economy/10938702/",
          "publisher": "BigCountryHomepage.com",
          "date": "2025-07-30",
          "source_tier": 1
        },
        {
          "title": "Is gas really winning the AI race? - Latitude Media",
          "url": "https://www.latitudemedia.com/news/is-gas-really-winning-the-ai-race/",
          "publisher": "Latitude Media",
          "date": "2025-08-27",
          "source_tier": 1
        },
        {
          "title": "AI-fueled data centers' construction boom moves into West Texas - El Paso Times",
          "url": "https://www.elpasotimes.com/story/money/business/2025/11/10/artificial-intelligence-fueled-data-centers-construction-boom-moves-into-west-texas/87072278007/",
          "publisher": "El Paso Times",
          "date": "2025-11-10",
          "source_tier": 1
        },
        {
          "title": "Vantage Invests US$25bn in Mega-Campus for AI Data Centres - Construction Digital",
          "url": "https://constructiondigital.com/news/inside-vantages-us-25bn-ai-data-centre-mega-campus-in-texas",
          "publisher": "Construction Digital",
          "date": "2025-08-21",
          "source_tier": 1
        },
        {
          "title": "Big Country data centers: Where they are & what’s coming - BigCountryHomepage.com",
          "url": "https://www.bigcountryhomepage.com/news/big-country-data-centers-where-they-are-whats-coming/",
          "publisher": "BigCountryHomepage.com",
          "date": "2026-06-01",
          "source_tier": 1
        },
        {
          "title": "Inside Frontier: Vantage Data Centers’ $25B Hyperscale Campus in Texas - Construction Review",
          "url": "https://constructionreviewonline.com/vantage-data-centers-unveils-25b-1-4gw-frontier-campus-in-texas-its-largest-project-to-date/",
          "publisher": "Construction Review",
          "date": "2026-01-23",
          "source_tier": 1
        },
        {
          "title": "Vantage breaks ground on Texas gigawatt data center campus for OpenAI - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/vantage-breaks-ground-on-texas-gigawatt-data-center-campus-for-openai/",
          "publisher": "Data Center Dynamics",
          "date": "2025-12-15",
          "source_tier": 1
        },
        {
          "title": "Vantage Data Centers: Data center locations",
          "url": "https://vantage-dc.com/data-center-locations/",
          "publisher": "Vantage Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Vantage Data Centers: Vantage Shackelford County",
          "url": "https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx",
          "publisher": "Vantage Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Vantage files to build another data center in San Antonio, Texas - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/vantage-files-to-build-another-data-center-in-san-antonio-texas/",
          "publisher": "Data Center Dynamics",
          "date": "2025-10-15",
          "source_tier": 1
        },
        {
          "title": "Vantage plots 1.4GW data center campus in Texas - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/vantage-plots-14gw-data-center-campus-in-texas/",
          "publisher": "Data Center Dynamics",
          "date": "2025-08-19",
          "source_tier": 1
        },
        {
          "title": "Vantage Breaks Ground on 1.4GW Texas Data Center for OpenAI - constructionowners.com",
          "url": "https://www.constructionowners.com/news/vantage-breaks-ground-on-1-4gw-texas-data-center-campus",
          "publisher": "constructionowners.com",
          "date": "2025-12-16",
          "source_tier": 1
        },
        {
          "title": "OpenAI marks Texas Stargate site as shift toward physical AI infrastructure | ETIH EdTech News - EdTech Innovation Hub",
          "url": "https://www.edtechinnovationhub.com/news/openai-government-affairs-director-says-texas-data-center-marks-shift-to-physical-ai-infrastructure",
          "publisher": "EdTech Innovation Hub",
          "date": "2025-12-15",
          "source_tier": 1
        },
        {
          "title": "Oracle and OpenAI's second Stargate data center in Texas will be powered off the grid - Business Insider",
          "url": "https://www.businessinsider.com/openai-building-natural-gas-microgrid-at-new-texas-data-center-2025-10",
          "publisher": "Business Insider",
          "date": "2025-10-23",
          "source_tier": 1
        },
        {
          "title": "Vantage Data Centers breaks ground on data center campus in Texas - W.Media",
          "url": "https://w.media/vantage-data-centers-breaks-ground-on-data-center-campus-in-texas/",
          "publisher": "W.Media",
          "date": "2025-12-16",
          "source_tier": 1
        },
        {
          "title": "Vantage Data Centers unveils plans for a $25b mega-campus in Texas to meet AI demand - Institutional Real Estate, Inc.",
          "url": "https://irei.com/news/vantage-data-centers-unveils-plans-for-a-25b-mega-campus-in-texas-to-meet-ai-demand/",
          "publisher": "Institutional Real Estate, Inc.",
          "date": "2025-08-19",
          "source_tier": 1
        },
        {
          "title": "Oracle to back massive 1.4-gigawatt gas-powered data center in US - Interesting Engineering",
          "url": "https://interestingengineering.com/culture/oracle-to-back-gas-powered-data-center",
          "publisher": "Interesting Engineering",
          "date": "2025-08-21",
          "source_tier": 1
        },
        {
          "title": "Vantage Data Centers Unveils “Frontier,” a $25B Mega-campus in Texas - Inside Towers",
          "url": "https://insidetowers.com/vantage-data-centers-unveils-frontier-a-25b-mega-campus-in-texas/",
          "publisher": "Inside Towers",
          "date": "2025-08-20",
          "source_tier": 1
        },
        {
          "title": "DigitalBridge-Backed Portfolio Company Vantage Data Centers Launches $25 Billion Texas “Frontier” Mega-Campus - Business Wire",
          "url": "https://www.businesswire.com/news/home/20250818389101/en/DigitalBridge-Backed-Portfolio-Company-Vantage-Data-Centers-Launches-%2425-Billion-Texas-Frontier-Mega-Campus",
          "publisher": "Business Wire",
          "date": "2025-08-19",
          "source_tier": 1
        },
        {
          "title": "Vantage Develops $25B Data Center in Texas - CommercialSearch",
          "url": "https://www.commercialsearch.com/news/vantage-develops-25b-data-center-in-texas/",
          "publisher": "CommercialSearch",
          "date": "2025-08-20",
          "source_tier": 1
        },
        {
          "title": "Vantage’s $25 Billion Texas Data Center Plan Sparks Opportunities—and Water Concerns - CarbonCredits.com",
          "url": "https://carboncredits.com/vantages-25-billion-texas-data-center-plan-sparks-opportunities-and-water-concerns/",
          "publisher": "CarbonCredits.com",
          "date": "2025-08-21",
          "source_tier": 1
        },
        {
          "title": "Vantage Data Centers unveils plans for Frontier, a US$25B mega-campus in Texas - Intelligent CIO",
          "url": "https://www.intelligentcio.com/north-america/2025/08/29/vantage-data-centers-unveils-plans-for-frontier-a-us25b-mega-campus-in-texas/",
          "publisher": "Intelligent CIO",
          "date": "2025-08-29",
          "source_tier": 1
        },
        {
          "title": "Vantage Data Centers to build data center campus in Texas - Inspenet",
          "url": "https://inspenet.com/en/news/vantage-data-centers-to-build-data-center-campus-in-texas/",
          "publisher": "Inspenet",
          "date": "2025-08-21",
          "source_tier": 1
        },
        {
          "title": "Vantage Launching $25B Data Center Campus Near Abilene - Connect CRE",
          "url": "https://www.connectcre.com/stories/vantage-launching-25b-data-center-campus-near-abilene/",
          "publisher": "Connect CRE",
          "date": "2025-08-19",
          "source_tier": 1
        },
        {
          "title": "$25 billion data center campus slated for rural area near Abilene - The Business Journals",
          "url": "https://www.bizjournals.com/dallas/news/2025/08/20/vantage-data-centers-new-frontier-campus.html",
          "publisher": "The Business Journals",
          "date": "2025-08-20",
          "source_tier": 1
        },
        {
          "title": "JPMorgan and MUFG close to securing $22bn financing for Vantage's Texas data center project - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/jpmorgan-and-mufg-close-to-securing-22bn-financing-for-vantages-texas-data-center-project/",
          "publisher": "Data Center Dynamics",
          "date": "2025-08-20",
          "source_tier": 1
        },
        {
          "title": "New data center expected to create 250 full time jobs in Shackelford county - KTXS",
          "url": "https://ktxs.com/news/local/new-data-center-expected-to-create-250-full-time-jobs-in-shackelford-county",
          "publisher": "KTXS",
          "date": "2025-08-01",
          "source_tier": 1
        },
        {
          "title": "Inside Vantage's US$25bn AI Data Centre Mega-Campus in Texas - technologymagazine.com",
          "url": "https://technologymagazine.com/news/inside-vantages-us-25bn-ai-data-centre-mega-campus-in-texas",
          "publisher": "technologymagazine.com",
          "date": "2025-08-19",
          "source_tier": 1
        },
        {
          "title": "Vantage Data Centers to Invest $25B for Mega-Campus in Shackelford County, Texas - REBusinessOnline",
          "url": "https://rebusinessonline.com/vantage-data-centers-to-invest-25b-for-mega-campus-in-shackleford-county-texas/",
          "publisher": "REBusinessOnline",
          "date": "2025-08-19",
          "source_tier": 1
        },
        {
          "title": "Vantage Data Centers Unveils Plans for “Frontier,” a $25B Mega-campus in Texas to Meet Unprecedented AI Demand - Business Wire",
          "url": "https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/",
          "publisher": "Business Wire",
          "date": "2025-08-19",
          "source_tier": 1
        },
        {
          "title": "Explore Vantage’s New US$25bn AI Data Centre Campus in Texas - Data Centre Magazine",
          "url": "https://datacentremagazine.com/news/inside-vantages-us-25bn-ai-data-centre-mega-campus-in-texas",
          "publisher": "Data Centre Magazine",
          "date": "2025-08-20",
          "source_tier": 1
        },
        {
          "title": "Vantage Data Centers plans $25 billion AI campus in Texas - Reuters",
          "url": "https://www.reuters.com/business/vantage-data-centers-plans-25-billion-ai-campus-texas-2025-08-19/",
          "publisher": "Reuters",
          "date": "2025-08-19",
          "source_tier": 1
        },
        {
          "title": "OpenAI announces five more US Stargate data centers with Oracle and SoftBank - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/openai-announces-five-more-us-stargate-data-centers-with-oracle-and-softbank/",
          "publisher": "Data Center Dynamics",
          "date": "2025-09-24",
          "source_tier": 1
        },
        {
          "title": "Vantage plots 1,000-acre data center campus in Texas - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/vantage-plots-1000-acre-data-center-campus-in-texas/",
          "publisher": "Data Center Dynamics",
          "date": "2025-07-28",
          "source_tier": 1
        },
        {
          "title": "1,200-acre data center in Shackelford County could boost local economy - BigCountryHomepage.com",
          "url": "https://www.bigcountryhomepage.com/video/1200-acre-data-center-in-shackelford-county-could-boost-local-economy/10938702/",
          "publisher": "BigCountryHomepage.com",
          "date": "2025-07-30",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Vantage Data Centers lists Vantage Shackelford County at Shackelford County, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx",
          "source_tier": 2
        }
      ]
    }
  ]
}