  "license": "CC BY-NC 4.0",
  "license_url": "https://creativecommons.org/licenses/by-nc/4.0/",
  "attribution": "Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0. Link to the specific record page where possible.",
  "source": "https://datacenterrecord.org/states/tn",
  "retrieved_at": "2026-10-27T01:36:16.558Z",
  "count": 8,
  "projects": [
    {
      "slug": "5c-data-centers-mem01-memphis-tn",
      "name": "5C Data Centers Memphis (MEM01)",
      "summary": "5C Data Centers is expanding its MEM01 facility at 4300 Getwell Road in the former Fred's corporate headquarters and distribution complex (1.1 million square foot site) from 20 MW to 84 MW using on site Bloom Energy solid oxide fuel cells and liquid cooled NVIDIA GB200 and GB300 NVL72 infrastructure under a $575 million Phase 4 alteration permit.",
      "state": "TN",
      "city": "Memphis",
      "county": "Shelby County",
      "status": "under_construction",
      "developer": "5C Data Centers",
      "capacity_mw": 84,
      "latitude": 35.0392,
      "longitude": -89.9284,
      "location_precision": "address",
      "location_source": "developer filing and commercial building permit",
      "location_verified_at": "2026-10-20",
      "coordinate_source": null,
      "location_last_verified": "2026-10-20",
      "site_address": "4300 Getwell Rd, Memphis, TN 38118",
      "site_address_source_url": "https://www.datacenterfrontier.com/hyperscale/article/55411657/beyond-colossus-5c-advances-575m-memphis-ai-factory-expansion",
      "published": "2026-10-19",
      "last_verified": "2026-10-20",
      "cooling_type": "closed_loop_liquid",
      "cooling_type_source_url": "https://www.datacenterfrontier.com/hyperscale/article/55411657/beyond-colossus-5c-advances-575m-memphis-ai-factory-expansion",
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://www.datacenterfrontier.com/hyperscale/article/55411657/beyond-colossus-5c-advances-575m-memphis-ai-factory-expansion",
      "contractor": "Walker General Contractors",
      "contractor_source_url": "https://www.datacenterfrontier.com/hyperscale/article/55411657/beyond-colossus-5c-advances-575m-memphis-ai-factory-expansion",
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": "Bloom Energy solid oxide fuel cells",
      "power_source_url": "https://www.datacenterfrontier.com/hyperscale/article/55411657/beyond-colossus-5c-advances-575m-memphis-ai-factory-expansion",
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/5c-data-centers-mem01-memphis-tn",
      "sources": [
        {
          "title": "Beyond Colossus: 5C Advances  Memphis AI Factory Expansion",
          "url": "https://www.datacenterfrontier.com/hyperscale/article/55411657/beyond-colossus-5c-advances-575m-memphis-ai-factory-expansion",
          "publisher": "Data Center Frontier",
          "date": "2026-10-19",
          "source_tier": 3
        }
      ],
      "use_types": [
        {
          "use_type": "ai_unspecified",
          "share_percent": null,
          "source_url": "https://www.datacenterfrontier.com/hyperscale/article/55411657/beyond-colossus-5c-advances-575m-memphis-ai-factory-expansion"
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "tierpoint-nashville-data-center-tn",
      "name": "TierPoint Nashville Data Center",
      "summary": "TierPoint lists a data center at Nashville, Tennessee among the sites it operates.",
      "state": "TN",
      "city": "Nashville",
      "county": "Davidson County",
      "status": "operational",
      "developer": "TierPoint",
      "capacity_mw": null,
      "latitude": 36.1718,
      "longitude": -86.785,
      "location_precision": "city",
      "location_source": "Place center (Nashville), placed at city level: Census 2020 internal point of Nashville-Davidson (data/gazetteer/place-points-2020.json)",
      "location_verified_at": "2026-10-07",
      "coordinate_source": "census centroid",
      "location_last_verified": "2026-10-07",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-07",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/tierpoint-nashville-data-center-tn",
      "sources": [
        {
          "title": "Tierpoint Nashville Data Center , Davidson, Tennessee",
          "url": "https://cleanview.co/data-centers/tennessee/1220/tierpoint-nashville-data-center",
          "publisher": "cleanview.co",
          "date": "2026-05-15",
          "source_tier": 4
        },
        {
          "title": "TierPoint: Browse our data centers",
          "url": "https://www.tierpoint.com/data-centers/",
          "publisher": "TierPoint",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "HyscaleIX Nashville Carrier Hotel — Davidson, Tennessee",
          "url": "https://cleanview.co/data-centers/tennessee/2204/hyscaleix-nashville-carrier-hotel",
          "publisher": "cleanview.co",
          "date": "2026-05-15",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-05-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-15",
          "summary": "HyscaleIX Nashville Carrier Hotel is an operating data center",
          "source_url": "https://cleanview.co/data-centers/tennessee/2204/hyscaleix-nashville-carrier-hotel",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-05-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-15",
          "summary": "Tierpoint Nashville Data Center is an operating data center",
          "source_url": "https://cleanview.co/data-centers/tennessee/1220/tierpoint-nashville-data-center",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "meta-gallatin-data-center-tn",
      "name": "Meta Gallatin Data Center",
      "summary": "Meta lists a data center at Gallatin, Tennessee among the sites it operates.",
      "state": "TN",
      "city": "Gallatin",
      "county": "Sumner County",
      "status": "operational",
      "developer": "Meta",
      "capacity_mw": 300,
      "latitude": 36.3801445,
      "longitude": -86.4669573,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/meta-gallatin-data-center-tn",
      "sources": [
        {
          "title": "Meta: Our U.S. data center fleet",
          "url": "https://datacenters.atmeta.com/us-locations/",
          "publisher": "Meta",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Gallatin, home to Meta campus, weighs new data center moratorium - The Tennessean",
          "url": "https://www.yahoo.com/news/us/articles/gallatin-home-meta-campus-weighs-142756673.html",
          "publisher": "The Tennessean",
          "date": "2026-09-16",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-16",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-16",
          "summary": "Meta broke ground on Gallatin campus in 2020 and pledged more than $1.5 billion investment",
          "source_url": "https://www.yahoo.com/news/us/articles/gallatin-home-meta-campus-weighs-142756673.html",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-09-16",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-16",
          "summary": "Meta Gallatin data center began serving global internet traffic in November 2024",
          "source_url": "https://www.yahoo.com/news/us/articles/gallatin-home-meta-campus-weighs-142756673.html",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Meta lists Meta Gallatin Data Center at Gallatin, Tennessee on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.atmeta.com/us-locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "spacexai-memphis-data-centers-tn",
      "name": "SpaceXAI Memphis data centers",
      "summary": "SpaceXAI is expanding data center operations in Memphis, with Elon Musk confirming a fourth facility and the company adding another center in Whitehaven while removing gas turbines deemed illegal.",
      "state": "TN",
      "city": "Memphis",
      "county": "Shelby",
      "status": "rumored",
      "developer": "SpaceXAI",
      "capacity_mw": null,
      "latitude": 35.14611,
      "longitude": -90.05194,
      "location_precision": "county",
      "location_source": "County seat (Memphis), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": "gas turbines",
      "power_source_url": "https://www.independent.co.uk/news/world/americas/elon-musk-colossus-data-center-alexis-vicent-b3052634.html",
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/spacexai-memphis-data-centers-tn",
      "sources": [
        {
          "title": "NAACP, Stand Up Nashville hold data center town hall with experts from across the country - WSMV",
          "url": "https://www.wsmv.com/2026/09/11/naacp-stand-up-nashville-hold-data-center-town-hall-with-experts-across-country/",
          "publisher": "WSMV",
          "date": "2026-09-11",
          "source_tier": 4
        },
        {
          "title": "Elon Musk's Memphis AI empire is the epicenter of the data center backlash - CNBC",
          "url": "https://www.cnbc.com/2026/07/16/elon-musk-memphis-ai-colossus-data-center.html",
          "publisher": "CNBC",
          "date": "2026-07-16",
          "source_tier": 4
        },
        {
          "title": "Memphis AI data center fuels pollution fight in Black neighborhood - France 24",
          "url": "https://www.france24.com/en/live-news/20260811-memphis-ai-data-center-fuels-pollution-fight-in-black-neighborhood",
          "publisher": "France 24",
          "date": "2026-08-11",
          "source_tier": 4
        },
        {
          "title": "Memphis weighs data center moratorium in city Musk’s xAI calls ‘home’ - eenews.net",
          "url": "https://www.eenews.net/articles/memphis-weighs-data-center-moratorium-in-city-musks-xai-calls-home-2/",
          "publisher": "eenews.net",
          "date": "2026-08-20",
          "source_tier": 4
        },
        {
          "title": "Elon Musk’s data center sued for $30 million by family of worker killed at site - The Independent",
          "url": "https://www.independent.co.uk/news/world/americas/elon-musk-colossus-data-center-alexis-vicent-b3052634.html",
          "publisher": "The Independent",
          "date": "2026-09-18",
          "source_tier": 4
        },
        {
          "title": "TVA vote impacts data centers as Memphis residents raise environmental concerns - localmemphis.com",
          "url": "https://www.yahoo.com/news/us/articles/tva-vote-impacts-data-centers-012915878.html",
          "publisher": "localmemphis.com",
          "date": "2026-08-20",
          "source_tier": 4
        },
        {
          "title": "Congressional Candidate Molder Supports Memphis Data Center Moratorium - Radio NWTN",
          "url": "https://www.radionwtn.com/2026/08/18/congressional-candidate-molder-supports-memphis-data-center-moratorium/",
          "publisher": "Radio NWTN",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "Residents file lawsuit challenging noise pollution from Elon Musk's data center",
          "url": "https://www.ctpublic.org/2026-09-17/residents-file-lawsuit-challenging-noise-pollution-from-elon-musks-data-center",
          "publisher": "Connecticut Public",
          "date": "2026-09-17",
          "source_tier": 4
        },
        {
          "title": "SpaceXAI adds another data center in Memphis; Whitehaven residents react - WREG.com",
          "url": "https://wreg.com/news/local/xai-memphis/spacexai-adds-another-data-center-whitehaven-residents-react/",
          "publisher": "WREG.com",
          "date": "2026-07-31",
          "source_tier": 4
        },
        {
          "title": "Musk confirms fourth SpaceXAI data center in Memphis, company starts removing 'illegal' gas turbines - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/musk-confirms-fourth-spacexai-data-center-in-memphis-company-starts-removing-illegal-gas-turbines/",
          "publisher": "Data Center Dynamics",
          "date": "2026-07-31",
          "source_tier": 3
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-09-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-18",
          "summary": "Operations at Colossus II came online in January 2026.",
          "source_url": "https://www.independent.co.uk/news/world/americas/elon-musk-colossus-data-center-alexis-vicent-b3052634.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-18",
          "summary": "SpaceXAI agreed to timeline for removal of turbines with Mississippi Department of Environmental Quality, all turbines to be removed by July 2027.",
          "source_url": "https://www.independent.co.uk/news/world/americas/elon-musk-colossus-data-center-alexis-vicent-b3052634.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-18",
          "summary": "Worker Alexis Vicent fell from a mezzanine at Colossus II in August 2025.",
          "source_url": "https://www.independent.co.uk/news/world/americas/elon-musk-colossus-data-center-alexis-vicent-b3052634.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-18",
          "summary": "Vicent died in Florida in February, months after the fall.",
          "source_url": "https://www.independent.co.uk/news/world/americas/elon-musk-colossus-data-center-alexis-vicent-b3052634.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-18",
          "summary": "Lawsuit filed in August 2026 seeks $30 million in damages, $20 million of which is punitive.",
          "source_url": "https://www.independent.co.uk/news/world/americas/elon-musk-colossus-data-center-alexis-vicent-b3052634.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-18",
          "summary": "Colossus I opened in 2024.",
          "source_url": "https://www.independent.co.uk/news/world/americas/elon-musk-colossus-data-center-alexis-vicent-b3052634.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "Elon Musk announced the xAI campus could expand to 10 times its current capacity",
          "source_url": "https://www.ctpublic.org/2026-09-17/residents-file-lawsuit-challenging-noise-pollution-from-elon-musks-data-center",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "Residents filed a lawsuit challenging the noise pollution from the data center",
          "source_url": "https://www.ctpublic.org/2026-09-17/residents-file-lawsuit-challenging-noise-pollution-from-elon-musks-data-center",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "xAI promised to replace the gas turbines in one year with quieter permanent ones as of July 2026",
          "source_url": "https://www.ctpublic.org/2026-09-17/residents-file-lawsuit-challenging-noise-pollution-from-elon-musks-data-center",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-11",
          "summary": "xAI's hyperscale data center in Memphis opened in 2024",
          "source_url": "https://www.wsmv.com/2026/09/11/naacp-stand-up-nashville-hold-data-center-town-hall-with-experts-across-country/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-08-20",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-20",
          "summary": "TVA Board approved over 100 megawatts of firm power for SpaceXAI Memphis operations.",
          "source_url": "https://www.yahoo.com/news/us/articles/tva-vote-impacts-data-centers-012915878.html",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "project-river-bradley-tn",
      "name": "Project River",
      "summary": "Project River proposes a $7.3 billion data center investment in Bradley County, Tennessee, projected to create 2,600 jobs.",
      "state": "TN",
      "city": null,
      "county": "Bradley",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 35.1714,
      "longitude": -84.8711,
      "location_precision": "county",
      "location_source": "County seat (Cleveland), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-18",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/project-river-bradley-tn",
      "sources": [
        {
          "title": "Family slows proposed Tennessee data center project - The Black Chronicle",
          "url": "https://blackchronicle.com/energy/family-slows-proposed-tennessee-data-center-project/",
          "publisher": "The Black Chronicle",
          "date": "2026-09-18",
          "source_tier": 4
        },
        {
          "title": "City still drafting Project River zoning specifications",
          "url": "https://www.clevelandbanner.com/news/city-still-drafting-project-river-zoning-specifications/article_0d733a62-1b2b-5d30-938e-85214c55d189.html",
          "publisher": "www.clevelandbanner.com",
          "date": "2026-09-17",
          "source_tier": 4
        },
        {
          "title": "Data center developer hammering out binding agreement with city - The Center Square",
          "url": "https://www.thecentersquare.com/tennessee/article_68cd8a85-a29a-457c-be42-1556512aac8d.html",
          "publisher": "The Center Square",
          "date": "2026-09-15",
          "source_tier": 4
        },
        {
          "title": "‘Project River’ to bring $7.3 billion data center, 2600 jobs to Bradley County - WDEF",
          "url": "https://www.wdef.com/project-river-to-bring-7-3-billion-data-center-2600-jobs-to-bradley-county/",
          "publisher": "WDEF",
          "date": "2026-08-26",
          "source_tier": 4
        },
        {
          "title": "Data center fears spur crowd as Cleveland reviews 400-acre annexation request from builder - WTVC",
          "url": "https://newschannel9.com/news/local/data-center-fears-spur-crowd-as-cleveland-reviews-400-acre-annexation-request-from-builder",
          "publisher": "WTVC",
          "date": "2026-08-18",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-09-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-18",
          "summary": "An east Tennessee family asked Cleveland officials to delay action on Project River data center",
          "source_url": "https://blackchronicle.com/energy/family-slows-proposed-tennessee-data-center-project/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "Project River proposal includes construction of two biomass plants to power a possible data center, robotics or semiconductor manufacturing facility",
          "source_url": "https://www.clevelandbanner.com/news/city-still-drafting-project-river-zoning-specifications/article_0d733a62-1b2b-5d30-938e-85214c55d189.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "Project River site is 850 acres with plans for biomass plants, fire station, EMS facility, and police precinct",
          "source_url": "https://www.clevelandbanner.com/news/city-still-drafting-project-river-zoning-specifications/article_0d733a62-1b2b-5d30-938e-85214c55d189.html",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "databank-memphis-data-center-tn",
      "name": "DataBank Memphis data center",
      "summary": "DataBank lists a data center at Memphis, Tennessee among the sites it operates.",
      "state": "TN",
      "city": "Memphis",
      "county": "Shelby County",
      "status": "operational",
      "developer": "DataBank",
      "capacity_mw": null,
      "latitude": 35.1081407,
      "longitude": -89.9687628,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/databank-memphis-data-center-tn",
      "sources": [
        {
          "title": "DataBank: Data centers",
          "url": "https://www.databank.com/data-centers/",
          "publisher": "DataBank",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "DataBank lists DataBank Memphis data center at Memphis, Tennessee on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.databank.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "dc-blox-nashville-zoo-data-center-tn",
      "name": "DC BLOX Nashville Zoo data center",
      "summary": "DC BLOX purchased land next to the Nashville Zoo for a data center, faced a metro permit freeze, sued Metro Nashville, and Metro Council approved eminent domain to acquire the site.",
      "state": "TN",
      "city": "Nashville",
      "county": "Davidson",
      "status": "rumored",
      "developer": "DC BLOX",
      "capacity_mw": null,
      "latitude": 36.16222,
      "longitude": -86.77444,
      "location_precision": "county",
      "location_source": "County seat (Nashville), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/dc-blox-nashville-zoo-data-center-tn",
      "sources": [
        {
          "title": "Nashville Has Begun Regulating Data Centers. Now the Energy Conversation Must Catch Up. - Southern Alliance for Clean Energy",
          "url": "https://cleanenergy.org/news/nashville-has-begun-regulating-data-centers-now-the-energy-conversation-must-catch-up/",
          "publisher": "Southern Alliance for Clean Energy",
          "date": "2026-08-03",
          "source_tier": 4
        },
        {
          "title": "DC Blox purchases land next to Nashville Zoo for data center - WKRN News 2",
          "url": "https://www.wkrn.com/news/local-news/nashville/dc-blox-purchases-land-next-to-nashville-zoo-for-data-center/",
          "publisher": "WKRN News 2",
          "date": "2026-07-20",
          "source_tier": 4
        },
        {
          "title": "DC BLOX sues Metro Nashville over proposed data center near Nashville Zoo - WZTV",
          "url": "https://fox17.com/news/local/dc-blox-lawsuit-metro-nashville-data-center-proposed-near-nashville-zoo-vested-property-rights-moratorium-zoning-restrictions-permits-eminent-domain",
          "publisher": "WZTV",
          "date": "2026-08-12",
          "source_tier": 4
        },
        {
          "title": "Company behind data center near Nashville Zoo sues Metro Nashville - WKRN News 2",
          "url": "https://www.wkrn.com/news/local-news/nashville/dc-blox-sues-metro-nashville/",
          "publisher": "WKRN News 2",
          "date": "2026-08-12",
          "source_tier": 4
        },
        {
          "title": "Data center developer sues metro government over Tennessee zoo-area permit freeze - Yahoo",
          "url": "https://www.yahoo.com/news/us/articles/data-center-developer-sues-metro-154800085.html",
          "publisher": "Yahoo",
          "date": "2026-08-17",
          "source_tier": 4
        },
        {
          "title": "Metro Council approves eminent domain to buy proposed data center land near Nashville Zoo - WKRN News 2",
          "url": "https://www.wkrn.com/news/local-news/nashville/zoo-council-vote-eminent-domain-data-center/",
          "publisher": "WKRN News 2",
          "date": "2026-08-05",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "google-montgomery-county-data-center-tn",
      "name": "Google Montgomery County data center",
      "summary": "Google lists a data center at Montgomery County, Tennessee among the sites it operates.",
      "state": "TN",
      "city": null,
      "county": "Montgomery County",
      "status": "operational",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 36.52972,
      "longitude": -87.35944,
      "location_precision": "county",
      "location_source": "County seat (Clarksville), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-montgomery-county-data-center-tn",
      "sources": [
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Montgomery County data center at Montgomery County, Tennessee on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        }
      ]
    }
  ]
}