{
  "license": "CC BY-NC 4.0",
  "license_url": "https://creativecommons.org/licenses/by-nc/4.0/",
  "attribution": "Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0. Link to the specific record page where possible.",
  "source": "https://datacenterrecord.org/states/oh",
  "retrieved_at": "2026-10-27T01:36:16.558Z",
  "count": 38,
  "projects": [
    {
      "slug": "aligned-cmh-02-conesville-oh",
      "name": "Aligned CMH-02",
      "summary": "Aligned Data Centers lists a data center at Conesville, Ohio among the sites it operates.",
      "state": "OH",
      "city": "Conesville",
      "county": "Coshocton County",
      "status": "operational",
      "developer": "Aligned Data Centers",
      "capacity_mw": null,
      "latitude": 40.185978,
      "longitude": -81.878554,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110000605417) and Aligned Data Centers Conesville (CMH-02) campus page at the former Conesville power plant site in Coshocton County, Ohio.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110000605417",
      "location_last_verified": "2026-09-14",
      "site_address": "47201 County Road 273, Conesville, OH 43811",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110000605417",
      "published": "2026-09-14",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://aligneddc.com/locations/columbus-oh/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/aligned-cmh-02-conesville-oh",
      "sources": [
        {
          "title": "Aligned Data Centers: Data center locations",
          "url": "https://aligneddc.com/locations/",
          "publisher": "Aligned Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Aligned Data Centers: Aligned CMH-02",
          "url": "https://aligneddc.com/northeast-ohio-data-centers/",
          "publisher": "Aligned Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Conesville Industrial Park (110000605417)",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110000605417",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Aligned Data Centers lists Aligned CMH-02 at Conesville, Ohio on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://aligneddc.com/northeast-ohio-data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "aligned-neo-01-sandusky-oh",
      "name": "Aligned NEO-01",
      "summary": "Aligned Data Centers lists a data center at Sandusky, Ohio among the sites it operates.",
      "state": "OH",
      "city": "Sandusky",
      "county": "Erie County",
      "status": "operational",
      "developer": "Aligned Data Centers",
      "capacity_mw": null,
      "latitude": 41.43159,
      "longitude": -82.71567,
      "location_precision": "permit_point",
      "location_source": "https://echo.epa.gov/detailed-facility-report?fid=110072135320",
      "location_verified_at": "2026-10-04",
      "coordinate_source": "https://echo.epa.gov/detailed-facility-report?fid=110072135320",
      "location_last_verified": "2026-10-04",
      "site_address": "2509 Hayes Ave, Sandusky, OH 44870",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072135320",
      "published": "2026-09-14",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://aligneddc.com/metro/northeast-ohio/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/aligned-neo-01-sandusky-oh",
      "sources": [
        {
          "title": "Local data center begins operations - Sandusky Register",
          "url": "https://sanduskyregister.com/news/1340698/local-data-center-begins-operations/",
          "publisher": "Sandusky Register",
          "date": "2026-08-24",
          "source_tier": 4
        },
        {
          "title": "Aligned Data Centers: Data center locations",
          "url": "https://aligneddc.com/locations/",
          "publisher": "Aligned Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Aligned Data Centers: Aligned NEO-01",
          "url": "https://aligneddc.com/northeast-ohio-data-centers/",
          "publisher": "Aligned Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Aligned NEO01 Sandusky (0322022037)",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110072135320",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "Aligned Data Centers plans to redevelop former GM property near Sandusky - bizjournals.com",
          "url": "https://www.bizjournals.com/cleveland/news/2023/09/26/aligned-data-centers-plans-hyperscale-data-center.html",
          "publisher": "bizjournals.com",
          "date": "2023-09-26",
          "source_tier": 4
        },
        {
          "title": "Aligned Data Center brings heavy lifter online at job site - StayTunedSandusky",
          "url": "https://www.staytunedsandusky.com/p/aligned-data-center-brings-heavy",
          "publisher": "StayTunedSandusky",
          "date": "2025-08-05",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Aligned Data Centers lists Aligned NEO-01 at Sandusky, Ohio on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://aligneddc.com/northeast-ohio-data-centers/",
          "source_tier": 2
        },
        {
          "status": "operational",
          "effective_at": "2026-08-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-24",
          "summary": "Local data center begins operations",
          "source_url": "https://sanduskyregister.com/news/1340698/local-data-center-begins-operations/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2025-08-05",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-08-05",
          "summary": "A Manitowoc MLC650 crane with 700 ton lift capacity is in operation at Aligned Data Center in Sandusky",
          "source_url": "https://www.staytunedsandusky.com/p/aligned-data-center-brings-heavy",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2023-09-26",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2023-09-26",
          "summary": "Aligned Data Centers plans to redevelop former GM property near Sandusky",
          "source_url": "https://www.bizjournals.com/cleveland/news/2023/09/26/aligned-data-centers-plans-hyperscale-data-center.html",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "ark-data-centers-ark-data-centers-akronoh-akron-oh",
      "name": "Ark Data Centers (Akron, OH)",
      "summary": "Ark Data Centers operates a commercial colocation data center at 191 E. Miller Ave. in Akron, Summit County, Ohio (EPA FRS ID 110071941749, Ohio EPA Air ID OH0000001677011602).",
      "state": "OH",
      "city": "Akron",
      "county": "Summit County",
      "status": "operational",
      "developer": "Ark Data Centers",
      "capacity_mw": null,
      "latitude": 41.057491,
      "longitude": -81.514275,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071941749, Ohio EPA Air Permit OH0000001677011602) at 191 E. Miller Ave., Akron, Summit County, Ohio.",
      "location_verified_at": null,
      "coordinate_source": "EPA ECHO FRS ID 110071941749",
      "location_last_verified": null,
      "site_address": "191 E. Miller Ave., Akron, OH 44301",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071941749",
      "published": "2026-10-21",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071941749",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/ark-data-centers-ark-data-centers-akronoh-akron-oh",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Ark Data Centers Akron (110071941749)",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071941749",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-25",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071941749",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "ashville-data-center-project-oh",
      "name": "Ashville data center project",
      "summary": "The Village of Ashville approved annexation and zoning ordinances for a proposed data center campus in Pickaway County, Ohio; in August 2026, the Supreme Court of Ohio ruled that a citizen referendum on the ordinances could proceed.",
      "state": "OH",
      "city": "Ashville",
      "county": "Pickaway County",
      "status": "approved",
      "developer": "EdgeConneX",
      "capacity_mw": null,
      "latitude": 39.717,
      "longitude": -82.9529,
      "location_precision": "city",
      "location_source": "Supreme Court of Ohio Case No. 2026-0980 decision regarding Village of Ashville annexation and zoning ordinances in Pickaway County, Ohio.",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "city reference point",
      "location_last_verified": "2026-09-16",
      "site_address": "State Route 752 and Walnut Creek Pike, Ashville, OH 43103",
      "site_address_source_url": "https://www.courtnewsohio.gov/cases/2026/SCO/0814/260980.asp",
      "published": "2026-09-04",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": "natural gas power plant",
      "power_source_url": "https://x.com/OffThePress1/status/2086988482270900316?lang=ar&ref_src=twsrc%5Egoogle%7Ctwcamp%5Eserp%7Ctwgr%5Etweet",
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/ashville-data-center-project-oh",
      "sources": [
        {
          "title": "Ohio Supreme Court allows Ashville referendum against data center project to move forward - Ohio Capital Journal",
          "url": "https://ohiocapitaljournal.com/2026/08/14/ohio-supreme-court-allows-ashville-referendum-against-data-center-project-to-move-forward/",
          "publisher": "Ohio Capital Journal",
          "date": "2026-08-14",
          "source_tier": 4
        },
        {
          "title": "Supreme Court of Ohio Case No. 2026-0980: Village of Ashville Data Center Referendum Decision",
          "url": "https://www.courtnewsohio.gov/cases/2026/SCO/0814/260980.asp",
          "publisher": "Supreme Court of Ohio",
          "date": null,
          "source_tier": 1
        },
        {
          "title": "Ashville Greenlights Data Center as Commercial Point Prepares Legal Fight - Scioto Post",
          "url": "https://www.sciotopost.com/ashville-greenlights-data-center-as-commercial-point-prepares-legal-fight/",
          "publisher": "Scioto Post",
          "date": "2026-04-07",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "approved",
          "effective_at": "2026-04-07",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-04-07",
          "summary": "Ashville approved a data center project.",
          "source_url": "https://www.courtnewsohio.gov/cases/2026/SCO/0814/260980.asp",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "blue-ash-data-center-cincinnati-oh",
      "name": "Blue Ash Data Center",
      "summary": "The EPA's facility registry lists Blue Ash Data Center at 11515 Grooms RD, Cincinnati, OH 45242 in Cincinnati, Ohio, with a hazardous waste record.",
      "state": "OH",
      "city": "Cincinnati",
      "county": "Hamilton County",
      "status": "not_verified",
      "developer": null,
      "capacity_mw": null,
      "latitude": 39.27799,
      "longitude": -84.36717,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110018890173: the registry placed its point by address matching house number, accurate to 30 m",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-20",
      "site_address": "11515 Grooms RD, Cincinnati, OH 45242",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110018890173",
      "published": "2026-10-20",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/blue-ash-data-center-cincinnati-oh",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Blue Ash Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110018890173",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "cellco-dublin-1-rhq-and-data-center-oh",
      "name": "Cellco, Dublin 1, RHQ And Data Center",
      "summary": "The EPA's facility registry lists Cellco, Dublin 1, RHQ And Data Center at 5175 Emerald Parkway, Dublin, OH 43017 in Dublin, Ohio, with a water permit.",
      "state": "OH",
      "city": "Dublin",
      "county": "Franklin County",
      "status": "not_verified",
      "developer": null,
      "capacity_mw": null,
      "latitude": 40.10592,
      "longitude": -83.12978,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110040429113: the registry placed its point by address matching house number, accurate to 30 m",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-20",
      "site_address": "5175 Emerald Parkway, Dublin, OH 43017",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110040429113",
      "published": "2026-10-20",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/cellco-dublin-1-rhq-and-data-center-oh",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Cellco, Dublin 1, RHQ And Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110040429113",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "centersquare-columbus-data-center-oh",
      "name": "Centersquare Columbus data center",
      "summary": "Centersquare lists a data center at Columbus, Ohio among the sites it operates.",
      "state": "OH",
      "city": "Lewis Center",
      "county": "Delaware County",
      "status": "operational",
      "developer": "Centersquare",
      "capacity_mw": null,
      "latitude": 40.16884,
      "longitude": -83.010799,
      "location_precision": "address",
      "location_source": "Centersquare Columbus (CMH1) data center specification page at 8180 Green Meadows Dr North, Lewis Center, Delaware County, Ohio.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "operator address point",
      "location_last_verified": "2026-09-14",
      "site_address": "8180 Green Meadows Dr North, Lewis Center, OH 43035",
      "site_address_source_url": "https://www.centersquaredc.com/locations/columbus",
      "published": "2026-09-14",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.centersquaredc.com/locations/columbus",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/centersquare-columbus-data-center-oh",
      "sources": [
        {
          "title": "Centersquare: Data center markets",
          "url": "https://www.csquare.com/data-centers",
          "publisher": "Centersquare",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Centersquare lists Centersquare Columbus data center at Columbus, Ohio on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.csquare.com/data-centers",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "citi-midwest-data-center-delaware-oh",
      "name": "Citi Midwest Data Center",
      "summary": "The EPA's facility registry lists Citi Midwest Data Center at 310 Greif Pkwy, Delaware, OH 43015 in Delaware, Ohio, with an air permit.",
      "state": "OH",
      "city": "Delaware",
      "county": "Delaware County",
      "status": "not_verified",
      "developer": null,
      "capacity_mw": null,
      "latitude": 40.221229,
      "longitude": -83.041362,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110046578413: the registry placed its point by address matching house number, accurate to 150 m",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-20",
      "site_address": "310 Greif Pkwy, Delaware, OH 43015",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110046578413",
      "published": "2026-10-20",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/citi-midwest-data-center-delaware-oh",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Citi Midwest Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110046578413",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "cologix-columbus-oh",
      "name": "Cologix Columbus",
      "summary": "Cologix lists 7 data centers at Columbus, Ohio among the sites it operates.",
      "state": "OH",
      "city": "Columbus",
      "county": "Franklin County",
      "status": "operational",
      "developer": "Cologix",
      "capacity_mw": null,
      "latitude": 40.11656,
      "longitude": -83.00258,
      "location_precision": "permit_point",
      "location_source": "https://echo.epa.gov/detailed-facility-report?fid=110071706391",
      "location_verified_at": "2026-10-04",
      "coordinate_source": "https://echo.epa.gov/detailed-facility-report?fid=110071706391",
      "location_last_verified": "2026-10-04",
      "site_address": "535 Scherers Court, Columbus, OH 43085",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071706391",
      "published": "2026-09-14",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 4,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://cologix.com/data-centers/columbus/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/cologix-columbus-oh",
      "sources": [
        {
          "title": "Cologix Acquires DataCenter.BZ in Columbus, Ohio - Data Center Knowledge",
          "url": "https://www.datacenterknowledge.com/next-gen-data-centers/cologix-acquires-datacenter-bz-in-columbus-ohio",
          "publisher": "Data Center Knowledge",
          "date": "2024-05-30",
          "source_tier": 1
        },
        {
          "title": "Cologix and Lambda Launch First NVIDIA HGX B200-Accelerated AI Clusters in Columbus at COL4 - The Manila Times",
          "url": "https://www.manilatimes.net/2025/06/03/tmt-newswire/globenewswire/cologix-and-lambda-launch-first-nvidia-hgx-b200-accelerated-ai-clusters-in-columbus-at-col4/2126500",
          "publisher": "The Manila Times",
          "date": "2025-06-03",
          "source_tier": 1
        },
        {
          "title": "Cologix: Data centers",
          "url": "https://www.cologix.com/data-centers/",
          "publisher": "Cologix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Cologix to build a new 40MW data on greenfield land in Columbus Ohio - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/cologix-build-new-40mw-data-greenfield-land-columbus-ohio/",
          "publisher": "Data Center Dynamics",
          "date": "2021-03-03",
          "source_tier": 1
        },
        {
          "title": "Cologix to build $130 million data center on Far North Side - dispatch.com",
          "url": "https://www.dispatch.com/story/business/2016/09/07/cologix-to-build-130-million/24240803007/",
          "publisher": "dispatch.com",
          "date": "2016-09-07",
          "source_tier": 1
        },
        {
          "title": "Cologix sets $130M data center expansion in Columbus, tripling capacity at major internet traffic hub - The Business Journals",
          "url": "https://www.bizjournals.com/columbus/news/2016/09/07/cologix-sets-130m-data-center-expansion-in.html",
          "publisher": "The Business Journals",
          "date": "2016-09-07",
          "source_tier": 1
        },
        {
          "title": "Cologix Building $130M Data Center in Growing Columbus Metro - Data Center Knowledge",
          "url": "https://www.datacenterknowledge.com/investing/cologix-building-130m-data-center-in-growing-columbus-metro",
          "publisher": "Data Center Knowledge",
          "date": "2016-09-07",
          "source_tier": 1
        },
        {
          "title": "Cologix announces $130m data center expansion in Columbus - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/cologix-announces-130m-data-center-expansion-in-columbus/",
          "publisher": "Data Center Dynamics",
          "date": "2016-09-08",
          "source_tier": 1
        },
        {
          "title": "Lambda and Cologix launch Nvidia HGX B200 clusters in Columbus, Ohio - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/lambda-and-cologix-launch-nvidia-hgx-b200-clusters-in-columbus-ohio/",
          "publisher": "Data Center Dynamics",
          "date": "2025-06-05",
          "source_tier": 1
        },
        {
          "title": "Cologix opens fourth Central Ohio data center - Columbus Business First - The Business Journals",
          "url": "https://www.bizjournals.com/columbus/news/2024/05/24/cologix-col4-data-center-columbus-ohio.html",
          "publisher": "The Business Journals",
          "date": "2024-05-24",
          "source_tier": 1
        },
        {
          "title": "Cologix completes work on COL4 data center in Columbus, Ohio - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/cologix-completes-work-on-col4-data-center-in-columbus-ohio/",
          "publisher": "Data Center Dynamics",
          "date": "2024-05-24",
          "source_tier": 1
        },
        {
          "title": "Columbus Cologix data center to house Lambda's AI computing installation worth \"hundreds of millions\" - The Business Journals",
          "url": "https://www.bizjournals.com/columbus/news/2025/06/03/lambda-cologix-ai-installation.html",
          "publisher": "The Business Journals",
          "date": "2025-06-03",
          "source_tier": 1
        },
        {
          "title": "Cologix re-announces COL4 data center in Columbus, Ohio - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/cologix-re-announces-col4-data-center-in-columbus-ohio/",
          "publisher": "Data Center Dynamics",
          "date": "2022-08-30",
          "source_tier": 1
        },
        {
          "title": "Cologix Expands Central Ohio Footprint with Completion of AI-Ready Data Center in Columbus - Data Center Frontier",
          "url": "https://www.datacenterfrontier.com/site-selection/article/55042304/cologix-expands-central-ohio-footprint-with-completion-of-ai-ready-data-center-in-columbus",
          "publisher": "Data Center Frontier",
          "date": "2024-05-24",
          "source_tier": 1
        },
        {
          "title": "Supermicro & Lambda Deploy GPU Servers at Cologix - Quantum Zeitgeist",
          "url": "https://quantumzeitgeist.com/supermicro-deploys-gpu-servers-with-lambda-at-cologix-columbus-data-center/",
          "publisher": "Quantum Zeitgeist",
          "date": "2025-08-25",
          "source_tier": 1
        },
        {
          "title": "Cologix is the First Colocation Provider to Complete an AI-Ready Data Center in Columbus - GlobeNewswire",
          "url": "https://www.globenewswire.com/news-release/2024/05/23/2887404/0/en/cologix-is-the-first-colocation-provider-to-complete-an-ai-ready-data-center-in-columbus.html",
          "publisher": "GlobeNewswire",
          "date": "2024-05-23",
          "source_tier": 1
        },
        {
          "title": "Cologix Data Center Pact Supercharges AI for the Columbus, Ohio Region - Data Center Frontier",
          "url": "https://www.datacenterfrontier.com/colocation/article/55296130/cologix-data-center-pact-supercharges-ai-for-the-columbus-ohio-region",
          "publisher": "Data Center Frontier",
          "date": "2025-06-11",
          "source_tier": 1
        },
        {
          "title": "EPA ECHO detailed facility report: Cologix (0125043211)",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071706391",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Cologix lists Cologix COL1, Cologix COL2, Cologix COL3, Cologix COL4, Cologix COL5, Cologix COL7, Cologix COL8 at Columbus, Ohio on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.cologix.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "cyrusone-cincinnati-cin2-oh",
      "name": "CyrusOne Cincinnati CIN2",
      "summary": "CyrusOne lists a data center at Cincinnati, Ohio among the sites it operates.",
      "state": "OH",
      "city": "Cincinnati",
      "county": "Hamilton County",
      "status": "operational",
      "developer": "CyrusOne",
      "capacity_mw": null,
      "latitude": 39.102789,
      "longitude": -84.517261,
      "location_precision": "address",
      "location_source": "CyrusOne Cincinnati 7th Street (CIN2) specification page at 209 W 7th St, Cincinnati, Hamilton County, Ohio.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "operator address point",
      "location_last_verified": "2026-09-14",
      "site_address": "209 W 7th St, Cincinnati, OH 45202",
      "site_address_source_url": "https://www.cyrusone.com/data-centers/north-america/cincinnati-7th-st-ohio",
      "published": "2026-09-14",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.cyrusone.com/data-centers/north-america/cincinnati-7th-st-ohio",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/cyrusone-cincinnati-cin2-oh",
      "sources": [
        {
          "title": "CyrusOne: Data centers",
          "url": "https://www.cyrusone.com/data-centers",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "CyrusOne: CyrusOne Cincinnati CIN2",
          "url": "https://www.cyrusone.com/data-centers/north-america/cincinnati-ohio",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "CyrusOne lists CyrusOne Cincinnati CIN2 at Cincinnati, Ohio on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.cyrusone.com/data-centers/north-america/cincinnati-ohio",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "cyrusone-lebanon-cin5-oh",
      "name": "CyrusOne Lebanon CIN5",
      "summary": "CyrusOne lists a data center at Lebanon, Ohio among the sites it operates.",
      "state": "OH",
      "city": "Lebanon",
      "county": "Warren County",
      "status": "operational",
      "developer": "CyrusOne",
      "capacity_mw": null,
      "latitude": 39.38989,
      "longitude": -84.21517,
      "location_precision": "permit_point",
      "location_source": "https://echo.epa.gov/detailed-facility-report?fid=110055529076",
      "location_verified_at": "2026-10-04",
      "coordinate_source": "https://echo.epa.gov/detailed-facility-report?fid=110055529076",
      "location_last_verified": "2026-10-04",
      "site_address": "401 Kingsview DR, Lebanon, OH 45036",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110055529076",
      "published": "2026-09-14",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.cyrusone.com/data-centers/north-america/cincinnati-ohio",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/cyrusone-lebanon-cin5-oh",
      "sources": [
        {
          "title": "CyrusOne: Data centers",
          "url": "https://www.cyrusone.com/data-centers",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "CyrusOne: CyrusOne Lebanon CIN5",
          "url": "https://www.cyrusone.com/data-centers/north-america/lebanon-ohio",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Cyrusone LLC, Lebanon Data Center (1483000509)",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110055529076",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "CyrusOne lists CyrusOne Lebanon CIN5 at Lebanon, Ohio on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.cyrusone.com/data-centers/north-america/lebanon-ohio",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "databank-cleveland-data-center-oh",
      "name": "DataBank Cleveland data center",
      "summary": "DataBank lists a data center at Cleveland, Ohio among the sites it operates.",
      "state": "OH",
      "city": "Cleveland",
      "county": "Cuyahoga County",
      "status": "operational",
      "developer": "DataBank",
      "capacity_mw": null,
      "latitude": 41.50071,
      "longitude": -81.68339,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110046578333) and DataBank CLE1 specification page at 1255 Euclid Ave, Cleveland, Cuyahoga County, Ohio.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110046578333",
      "location_last_verified": "2026-09-14",
      "site_address": "1255 Euclid Ave, Cleveland, OH 44115",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110046578333",
      "published": "2026-09-14",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.databank.com/data-centers/cleveland/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/databank-cleveland-data-center-oh",
      "sources": [
        {
          "title": "DataBank: Data centers",
          "url": "https://www.databank.com/data-centers/",
          "publisher": "DataBank",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: DataBank Cleveland (1255 Euclid Ave)",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110046578333",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "DataBank lists DataBank Cleveland data center at Cleveland, Ohio on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.databank.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "edged-new-albany-data-center-oh",
      "name": "Edged New Albany data center",
      "summary": "Edged operates its 24 MW, 206,000 square foot Edged Columbus (CMH01) data center at 6526 New Albany Road East in New Albany, Franklin County, Ohio, commissioned in September 2025 with a waterless closed loop cooling system.",
      "state": "OH",
      "city": "New Albany",
      "county": "Franklin County",
      "status": "operational",
      "developer": "Edged",
      "capacity_mw": 24,
      "latitude": 40.0956,
      "longitude": -82.7845,
      "location_precision": "address",
      "location_source": "Edged Columbus (CMH01) facility specification page at 6526 New Albany Road East, New Albany, Franklin County, Ohio.",
      "location_verified_at": null,
      "coordinate_source": "operator address point",
      "location_last_verified": null,
      "site_address": "6526 New Albany Road East, New Albany, OH 43054",
      "site_address_source_url": "https://edged.us/columbus",
      "published": "2026-10-21",
      "last_verified": "2026-10-25",
      "cooling_type": "closed_loop_liquid",
      "cooling_type_source_url": "https://edged.us/columbus",
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://edged.us/columbus",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/edged-new-albany-data-center-oh",
      "sources": [
        {
          "title": "Edged opens data center in New Albany, Ohio - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/edged-opens-data-center-in-new-albany-ohio/",
          "publisher": "Data Center Dynamics",
          "date": "2025-09-22",
          "source_tier": 1
        },
        {
          "title": "Edged US: Edged Columbus (6526 New Albany Road East, New Albany, OH) Facility Specifications",
          "url": "https://edged.us/columbus",
          "publisher": "Edged",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2025-09-22",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Edged opened a 24 MW, 206,000 sq ft data center at 6526 New Albany Road East in New Albany, Ohio, with waterless cooling, having broken ground in August 2024.",
          "source_url": "https://edged.us/columbus",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "encore-technologies-data-center-miamisburg-oh",
      "name": "Encore Technologies Data Center",
      "summary": "Encore Technologies operates a commercial colocation and cloud data center at 9333 Springboro Pike in Miamisburg, Montgomery County, Ohio (EPA FRS ID 110072072132, Ohio EPA Air ID OH0000000857095002).",
      "state": "OH",
      "city": "Miamisburg",
      "county": "Montgomery County",
      "status": "operational",
      "developer": "Encore Technologies",
      "capacity_mw": null,
      "latitude": 39.615295,
      "longitude": -84.225929,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110072072132, Ohio EPA Air Permit OH0000000857095002) and Encore Technologies facility page at 9333 Springboro Pike, Miamisburg, Montgomery County, Ohio.",
      "location_verified_at": "2026-10-03",
      "coordinate_source": "EPA ECHO FRS ID 110072072132",
      "location_last_verified": "2026-10-03",
      "site_address": "9333 Springboro Pike, Miamisburg, OH 45342",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072072132",
      "published": "2026-10-03",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://encore.tech/data-center/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/encore-technologies-data-center-miamisburg-oh",
      "sources": [
        {
          "title": "Encore Technologies: Springboro Pike Data Center Facility Specifications",
          "url": "https://encore.tech/data-center/",
          "publisher": "Encore Technologies",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Encore Technologies Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110072072132",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-25",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072072132",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "expedient-expedient-cleveland-151-neo-cleveland-oh",
      "name": "Expedient Cleveland",
      "summary": "Expedient operates its two building Cleveland colocation campus at 15166 NEO Parkway in Cleveland, Cuyahoga County, Ohio.",
      "state": "OH",
      "city": "Cleveland",
      "county": "Cuyahoga County",
      "status": "operational",
      "developer": "Expedient",
      "capacity_mw": null,
      "latitude": 41.425251,
      "longitude": -81.576788,
      "location_precision": "address",
      "location_source": "Expedient Cleveland facility specification page at 15166 NEO Parkway, Cleveland, Cuyahoga County, Ohio.",
      "location_verified_at": null,
      "coordinate_source": "operator address point",
      "location_last_verified": null,
      "site_address": "15166 NEO Parkway, Cleveland, OH 44128",
      "site_address_source_url": "https://www.expedient.com/data-centers/cleveland/",
      "published": "2026-10-21",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.expedient.com/data-centers/cleveland/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/expedient-expedient-cleveland-151-neo-cleveland-oh",
      "sources": [
        {
          "title": "Expedient: Cleveland NEO Parkway Data Center Specifications",
          "url": "https://www.expedient.com/data-centers/cleveland/",
          "publisher": "Expedient",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-25",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://www.expedient.com/data-centers/cleveland/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "expedient-expedient-columbus-dublin-dublin-oh",
      "name": "Expedient Columbus - Dublin",
      "summary": "Expedient operates a commercial cloud and colocation data center at 5700 Innovation Drive in Dublin, Franklin County, Ohio.",
      "state": "OH",
      "city": "Dublin",
      "county": "Franklin County",
      "status": "operational",
      "developer": "Expedient",
      "capacity_mw": null,
      "latitude": 40.088435,
      "longitude": -83.145632,
      "location_precision": "address",
      "location_source": "Expedient Columbus Dublin facility specification page at 5700 Innovation Drive, Dublin, Franklin County, Ohio.",
      "location_verified_at": null,
      "coordinate_source": "operator address point",
      "location_last_verified": null,
      "site_address": "5700 Innovation Drive, Dublin, OH 43016",
      "site_address_source_url": "https://www.expedient.com/data-centers/columbus-dublin/",
      "published": "2026-10-21",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.expedient.com/data-centers/columbus-dublin/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/expedient-expedient-columbus-dublin-dublin-oh",
      "sources": [
        {
          "title": "Expedient: Columbus - Dublin Data Center (5700 Innovation Drive)",
          "url": "https://www.expedient.com/data-centers/columbus-dublin/",
          "publisher": "Expedient",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-25",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://www.expedient.com/data-centers/columbus-dublin/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "expedient-expedient-columbus-upper-arlington-upper-arlington-oh",
      "name": "Expedient Columbus - Upper Arlington",
      "summary": "Expedient operates a commercial colocation data center at 5000 Arlington Centre Blvd in Upper Arlington, Franklin County, Ohio.",
      "state": "OH",
      "city": "Upper Arlington",
      "county": "Franklin County",
      "status": "operational",
      "developer": "Expedient",
      "capacity_mw": null,
      "latitude": 40.056607,
      "longitude": -83.077255,
      "location_precision": "address",
      "location_source": "Expedient Columbus Upper Arlington facility specification page at 5000 Arlington Centre Blvd, Upper Arlington, Franklin County, Ohio.",
      "location_verified_at": null,
      "coordinate_source": "operator address point",
      "location_last_verified": null,
      "site_address": "5000 Arlington Centre Blvd, Upper Arlington, OH 43220",
      "site_address_source_url": "https://www.expedient.com/data-centers/columbus-arlington/",
      "published": "2026-10-21",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.expedient.com/data-centers/columbus-arlington/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/expedient-expedient-columbus-upper-arlington-upper-arlington-oh",
      "sources": [
        {
          "title": "Expedient: Columbus - Upper Arlington Data Center (5000 Arlington Centre Blvd)",
          "url": "https://www.expedient.com/data-centers/columbus-arlington/",
          "publisher": "Expedient",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-25",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://www.expedient.com/data-centers/columbus-arlington/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "flexential-corp-flexential-cincinnati-cin12-west-chester-oh",
      "name": "Flexential Cincinnati - CIN01/02",
      "summary": "Flexential operates its two building Cincinnati colocation campus (CIN01 and CIN02) at 5307 Muhlhauser Road in West Chester, Butler County, Ohio.",
      "state": "OH",
      "city": "West Chester",
      "county": "Butler County",
      "status": "operational",
      "developer": "Flexential",
      "capacity_mw": null,
      "latitude": 39.321065,
      "longitude": -84.460163,
      "location_precision": "address",
      "location_source": "Flexential Cincinnati data center specification page at 5307 Muhlhauser Road, West Chester, Butler County, Ohio.",
      "location_verified_at": null,
      "coordinate_source": "operator address point",
      "location_last_verified": null,
      "site_address": "5307 Muhlhauser Road, West Chester, OH 45069",
      "site_address_source_url": "https://www.flexential.com/data-centers/ohio/cincinnati",
      "published": "2026-10-21",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.flexential.com/data-centers/ohio/cincinnati",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/flexential-corp-flexential-cincinnati-cin12-west-chester-oh",
      "sources": [
        {
          "title": "Flexential: Cincinnati Data Centers (West Chester, OH)",
          "url": "https://www.flexential.com/data-centers/ohio/cincinnati",
          "publisher": "Flexential",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-25",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://www.flexential.com/data-centers/ohio/cincinnati",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "google-columbus-data-center-oh",
      "name": "Google Columbus data center",
      "summary": "Google lists a data center at Columbus, Ohio among the sites it operates.",
      "state": "OH",
      "city": "Columbus",
      "county": "Franklin County",
      "status": "operational",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 39.86271,
      "longitude": -83.00441,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110072072082, Ohio EPA Air Permit OH0000000425145484) at 225 Rathmell Rd, Columbus, Franklin County, Ohio.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110072072082",
      "location_last_verified": "2026-09-14",
      "site_address": "225 Rathmell Rd, Columbus, OH 43207",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072072082",
      "published": "2026-09-14",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.google.com/about/datacenters/locations/central-ohio/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-columbus-data-center-oh",
      "sources": [
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Google Columbus Rathmell Road Data Center (110072072082)",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110072072082",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Columbus data center at Columbus, Ohio on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "google-lancaster-data-center-oh",
      "name": "Google Lancaster data center",
      "summary": "Google lists a data center at Lancaster, Ohio among the sites it operates.",
      "state": "OH",
      "city": "Lancaster",
      "county": "Fairfield County",
      "status": "operational",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 39.727336,
      "longitude": -82.683034,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071854363, NPDES OH0151653 / OHR120001) at 35 Whiley Road, Lancaster, Fairfield County, Ohio.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110071854363",
      "location_last_verified": "2026-09-14",
      "site_address": "35 Whiley Road, Lancaster, OH 43130",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071854363",
      "published": "2026-09-14",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.google.com/about/datacenters/locations/central-ohio/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-lancaster-data-center-oh",
      "sources": [
        {
          "title": "Brown's data center ad meets scrutiny over Google campaign donations - streamlinefeed.co.ke",
          "url": "https://streamlinefeed.co.ke/news/browns-data-center-ad-meets-scrutiny-over-google-campaign-donations",
          "publisher": "streamlinefeed.co.ke",
          "date": "2026-09-19",
          "source_tier": 4
        },
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Google Lancaster Data Center (110071854363)",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071854363",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-19",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-19",
          "summary": "Google's Lancaster data center opened in 2023",
          "source_url": "https://streamlinefeed.co.ke/news/browns-data-center-ad-meets-scrutiny-over-google-campaign-donations",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Lancaster data center at Lancaster, Ohio on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "google-new-albany-data-center-oh",
      "name": "Google New Albany data center",
      "summary": "Google lists a data center at New Albany, Ohio among the sites it operates.",
      "state": "OH",
      "city": "New Albany",
      "county": "Franklin County",
      "status": "operational",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 40.05067,
      "longitude": -82.7557,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110070866661, NPDES OH0151491) at Morse Rd and Beech Rd SW, New Albany, Franklin County, Ohio.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110070866661",
      "location_last_verified": "2026-09-14",
      "site_address": "1101 Beech Rd SW, New Albany, OH 43054",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070866661",
      "published": "2026-09-14",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.google.com/about/datacenters/locations/central-ohio/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-new-albany-data-center-oh",
      "sources": [
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Google subsidiary acquires 85-acre site in New Albany - WSYX",
          "url": "https://abc6onyourside.com/news/local/google-montauk-innovations-acquires-85-acre-site-new-albany-potential-project-data-center-columbus-central-ohio-licking-county-auditor-tech-silicon-heartland",
          "publisher": "WSYX",
          "date": "2025-06-16",
          "source_tier": 1
        },
        {
          "title": "EPA ECHO detailed facility report: Google New Albany Data Center (110070866661)",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110070866661",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google New Albany data center at New Albany, Ohio on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "h5-cleveland-oh",
      "name": "H5 Cleveland",
      "summary": "H5 Data Centers lists a data center at Cleveland, Ohio among the sites it operates.",
      "state": "OH",
      "city": "Cleveland",
      "county": "Cuyahoga County",
      "status": "operational",
      "developer": "H5 Data Centers",
      "capacity_mw": null,
      "latitude": 41.5065,
      "longitude": -81.6835,
      "location_precision": "address",
      "location_source": "H5 Data Centers Cleveland facility specification page at 1625 Rockwell Ave, Cleveland, Cuyahoga County, Ohio.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "operator address point",
      "location_last_verified": "2026-09-14",
      "site_address": "1625 Rockwell Ave, Cleveland, OH 44114",
      "site_address_source_url": "https://h5datacenters.com/cleveland-data-center.html",
      "published": "2026-09-14",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://h5datacenters.com/cleveland-data-center.html",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/h5-cleveland-oh",
      "sources": [
        {
          "title": "Downtown data center to demo stores - NEO-trans Blog",
          "url": "https://neo-trans.blog/2026/04/06/downtown-data-center-to-demo-stores/",
          "publisher": "NEO-trans Blog",
          "date": "2026-04-06",
          "source_tier": 1
        },
        {
          "title": "Cleveland’s proposed Data Center moratorium in a race against time, technology - NEO-trans Blog",
          "url": "https://neo-trans.blog/2026/05/15/clevelands-proposed-data-center-moratorium-in-a-race-against-time-technology/",
          "publisher": "NEO-trans Blog",
          "date": "2026-05-15",
          "source_tier": 1
        },
        {
          "title": "Cleveland's H5 Data Center Plans To Expand, Wade Oval Wednesday Hits 20 years: CLE Daily - Cleveland Magazine",
          "url": "https://clevelandmagazine.com/articles/clevelands-h5-data-center-plans-to-expand-wade-oval-wednesday-hits-20-years-cle-daily/",
          "publisher": "Cleveland Magazine",
          "date": "2026-06-17",
          "source_tier": 1
        },
        {
          "title": "H5 Data Centers: Data centers",
          "url": "https://h5datacenters.com/data-centers.html",
          "publisher": "H5 Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "A look at Cleveland’s little-known data centers that have long been part of the city’s tech infrastructure - Signal Cleveland",
          "url": "https://signalcleveland.org/inside-cleveland-data-center-carrier-hotel-colocation-downtown/",
          "publisher": "Signal Cleveland",
          "date": "2026-06-22",
          "source_tier": 1
        },
        {
          "title": "H5 files to renovate Cleveland data center - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/h5-files-to-renovate-cleveland-data-center/",
          "publisher": "Data Center Dynamics",
          "date": "2022-05-06",
          "source_tier": 1
        },
        {
          "title": "H5 buys 333,000 sq ft data center in Cleveland - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/h5-buys-333000-sq-ft-data-center-in-cleveland/",
          "publisher": "Data Center Dynamics",
          "date": "2017-01-30",
          "source_tier": 1
        },
        {
          "title": "Here's a look at H5 Data Center's expansion in Cleveland - The Business Journals",
          "url": "https://www.bizjournals.com/cleveland/news/2022/05/05/h5-data-center-plans-to-expand-downtown-building.html",
          "publisher": "The Business Journals",
          "date": "2022-05-05",
          "source_tier": 1
        },
        {
          "title": "H5 Data Centers Files Plans for $30 Million Cleveland Expansion - Cleveland Magazine",
          "url": "https://clevelandmagazine.com/articles/h5-data-centers-files-plans-for-30-million-cleveland-expansion/",
          "publisher": "Cleveland Magazine",
          "date": "2026-06-12",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "H5 Data Centers lists H5 Cleveland at Cleveland, Ohio on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://h5datacenters.com/data-centers.html",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "h5-data-centers-cincinnati-oh",
      "name": "H5 Data Centers Cincinnati",
      "summary": "H5 Data Centers lists 2 data centers at Cincinnati, Ohio among the sites it operates.",
      "state": "OH",
      "city": "Cincinnati",
      "county": "Hamilton County",
      "status": "operational",
      "developer": "H5 Data Centers",
      "capacity_mw": null,
      "latitude": 39.097935,
      "longitude": -84.524095,
      "location_precision": "address",
      "location_source": "H5 Data Centers Cincinnati facility specification page at 360 Gest Street, Cincinnati, Hamilton County, Ohio.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "operator address point",
      "location_last_verified": "2026-09-14",
      "site_address": "360 Gest Street, Cincinnati, OH 45203",
      "site_address_source_url": "https://h5datacenters.com/cincinnati-data-center.html",
      "published": "2026-09-14",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://h5datacenters.com/cincinnati-data-center.html",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/h5-data-centers-cincinnati-oh",
      "sources": [
        {
          "title": "H5 Data Centers: Data centers",
          "url": "https://h5datacenters.com/data-centers.html",
          "publisher": "H5 Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "H5 Data Centers acquires data center in Cincinnati, Ohio - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/h5-data-centers-acquires-data-center-in-cincinnati-ohio/",
          "publisher": "Data Center Dynamics",
          "date": "2021-12-14",
          "source_tier": 3
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "H5 Data Centers lists H5 Cincinnati I, H5 Cincinnati II at Cincinnati, Ohio on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://h5datacenters.com/data-centers.html",
          "source_tier": 2
        },
        {
          "status": "operational",
          "effective_at": "2021-12-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2021-12-14",
          "summary": "H5 Data Centers acquires data center in Cincinnati",
          "source_url": "https://www.datacenterdynamics.com/en/news/h5-data-centers-acquires-data-center-in-cincinnati-ohio/",
          "source_tier": 3
        }
      ]
    },
    {
      "slug": "iron-mountain-data-centers-iron-mountain-data-center-ohio-ohs1-miamisburg-oh",
      "name": "Iron Mountain Data Center Ohio (OHS-1)",
      "summary": "Iron Mountain Data Centers operates its OHS-1 colocation facility at 3366 S Tech Blvd in Miamisburg, Montgomery County, Ohio.",
      "state": "OH",
      "city": "Miamisburg",
      "county": "Montgomery County",
      "status": "operational",
      "developer": "Iron Mountain",
      "capacity_mw": null,
      "latitude": 39.607994,
      "longitude": -84.234824,
      "location_precision": "address",
      "location_source": "Iron Mountain OHS-1 data center specification page at 3366 S Tech Blvd, Miamisburg, Montgomery County, Ohio.",
      "location_verified_at": null,
      "coordinate_source": "operator address point",
      "location_last_verified": null,
      "site_address": "3366 S Tech Blvd, Miamisburg, OH 45342",
      "site_address_source_url": "https://www.ironmountain.com/data-centers/locations/ohio-data-center",
      "published": "2026-10-21",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.ironmountain.com/data-centers/locations/ohio-data-center",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/iron-mountain-data-centers-iron-mountain-data-center-ohio-ohs1-miamisburg-oh",
      "sources": [
        {
          "title": "Iron Mountain Data Centers: Ohio (OHS-1, Miamisburg) Facility Specifications",
          "url": "https://www.ironmountain.com/data-centers/locations/ohio-data-center",
          "publisher": "Iron Mountain",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-25",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://www.ironmountain.com/data-centers/locations/ohio-data-center",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "meta-bowling-green-data-center-oh",
      "name": "Meta Bowling Green Data Center",
      "summary": "Meta lists a data center at Bowling Green, Ohio among the sites it operates.",
      "state": "OH",
      "city": "Bowling Green",
      "county": "Wood County",
      "status": "operational",
      "developer": "Meta",
      "capacity_mw": null,
      "latitude": 41.4162,
      "longitude": -83.6215,
      "location_precision": "address",
      "location_source": "Meta U.S. Data Centers fleet page for the Bowling Green Data Center at 15800 Middleton Pike, Bowling Green, Wood County, Ohio.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "operator address point",
      "location_last_verified": "2026-09-14",
      "site_address": "15800 Middleton Pike, Bowling Green, OH 43402",
      "site_address_source_url": "https://datacenters.atmeta.com/us-locations/",
      "published": "2026-09-14",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://ohiodems.org/icymi-ohioans-in-bowling-green-rally-against-jon-husted-for-bringing-hundreds-of-data-centers-to-ohio/",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://datacenters.atmeta.com/us-locations/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/meta-bowling-green-data-center-oh",
      "sources": [
        {
          "title": "ICYMI: Ohioans In Bowling Green Rally Against Jon Husted For Bringing Hundreds of Data Centers to Ohio - Ohio Democrats -",
          "url": "https://ohiodems.org/icymi-ohioans-in-bowling-green-rally-against-jon-husted-for-bringing-hundreds-of-data-centers-to-ohio/",
          "publisher": "Ohio Democrats -",
          "date": "2026-09-15",
          "source_tier": 4
        },
        {
          "title": "Meta: Our U.S. data center fleet",
          "url": "https://datacenters.atmeta.com/us-locations/",
          "publisher": "Meta",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-15",
          "summary": "Beth Cole reports Meta pile driving into bedrock as of article date",
          "source_url": "https://ohiodems.org/icymi-ohioans-in-bowling-green-rally-against-jon-husted-for-bringing-hundreds-of-data-centers-to-ohio/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Meta lists Meta Bowling Green Data Center at Bowling Green, Ohio on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.atmeta.com/us-locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "meta-new-albany-data-center-oh",
      "name": "Meta New Albany Data Center",
      "summary": "Meta lists a data center at New Albany, Ohio among the sites it operates.",
      "state": "OH",
      "city": "New Albany",
      "county": "Franklin County",
      "status": "operational",
      "developer": "Meta",
      "capacity_mw": null,
      "latitude": 40.06899,
      "longitude": -82.7495,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110070887474, Sidecat LLC / Meta New Albany Data Center) at 1300-1700 Beech Rd SW, New Albany, Franklin County, Ohio.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110070887474",
      "location_last_verified": "2026-09-14",
      "site_address": "1300 Beech Rd SW, New Albany, OH 43054",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070887474",
      "published": "2026-09-14",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 5,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://datacenters.atmeta.com/us-locations/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/meta-new-albany-data-center-oh",
      "sources": [
        {
          "title": "Ohio regulators approve construction of 200MW gas power plant to serve Meta's New Albany data center - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/ohio-regulators-approve-construction-of-200mw-gas-power-plant-to-serve-meta-data-center-in-new-albany-ohio/",
          "publisher": "Data Center Dynamics",
          "date": "2025-06-10",
          "source_tier": 1
        },
        {
          "title": "Meta DC infrastructure partner purchases $42m land parcel in New Albany, Ohio - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/meta-dc-infrastructure-partner-purchases-42m-land-parcel-in-new-albany-ohio/",
          "publisher": "Data Center Dynamics",
          "date": "2026-01-14",
          "source_tier": 1
        },
        {
          "title": "Meta will use nuclear power for its New Albany A.I. data center - NBC4 WCMH-TV",
          "url": "https://www.nbc4i.com/news/local-news/new-albany/meta-will-use-nuclear-power-for-its-new-albany-a-i-data-center/",
          "publisher": "NBC4 WCMH-TV",
          "date": "2026-01-09",
          "source_tier": 1
        },
        {
          "title": "Meta: Our U.S. data center fleet",
          "url": "https://datacenters.atmeta.com/us-locations/",
          "publisher": "Meta",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Workers sent home after employee found with gun at Meta data center site in New Albany - NBC4 WCMH-TV",
          "url": "https://www.nbc4i.com/news/local-news/new-albany/workers-sent-home-after-employee-found-with-gun-at-meta-data-center-site-in-new-albany/",
          "publisher": "NBC4 WCMH-TV",
          "date": "2025-11-17",
          "source_tier": 1
        },
        {
          "title": "Gun confiscated at Meta data center in New Albany, Ohio - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/gun-confiscated-at-meta-data-center-in-new-albany-ohio/",
          "publisher": "Data Center Dynamics",
          "date": "2025-11-18",
          "source_tier": 1
        },
        {
          "title": "Meta expanding New Albany site for the world's highest capacity data center - The Columbus Dispatch",
          "url": "https://www.dispatch.com/story/business/information-technology/2025/09/26/meta-facebook-data-center-new-albany-ohio/86314973007/",
          "publisher": "The Columbus Dispatch",
          "date": "2025-09-26",
          "source_tier": 1
        },
        {
          "title": "Meta data center firm Sidecat buys nearly $42 million New Albany parcel - The Columbus Dispatch",
          "url": "https://www.dispatch.com/story/business/real-estate/2026/01/14/meta-data-center-firm-sidecat-buys-nearly-42-million-new-albany-parcel/88140488007/",
          "publisher": "The Columbus Dispatch",
          "date": "2026-01-14",
          "source_tier": 1
        },
        {
          "title": "Meta wants to draw power for unused New Albany electrical substation built for Intel project - WOSU Public Media",
          "url": "https://www.wosu.org/2025-11-26/meta-wants-to-draw-power-for-unused-new-albany-electrical-substation-built-for-intel-project",
          "publisher": "WOSU Public Media",
          "date": "2025-11-26",
          "source_tier": 1
        },
        {
          "title": "Another on-site power plant for New Albany data center campus gets green light - The Business Journals",
          "url": "https://www.bizjournals.com/columbus/news/2025/11/21/new-albany-edgeconnex-onsite-power-plant-approved.html",
          "publisher": "The Business Journals",
          "date": "2025-11-21",
          "source_tier": 1
        },
        {
          "title": "New Albany Data Center Will Bring High Costs for Both Consumers and the Environment - KentStater",
          "url": "https://kentstater.com/132886/opinion/new-albany-data-center-will-bring-high-costs-for-both-consumers-and-the-environment/",
          "publisher": "KentStater",
          "date": "2025-10-10",
          "source_tier": 1
        },
        {
          "title": "Meta data center in New Albany evacuated, workers sent home after gun scare - The Columbus Dispatch",
          "url": "https://www.dispatch.com/story/news/crime/2025/11/17/fired-meta-contractor-with-gun-prompts-evacuation-at-ohio-data-center-facebook-instagram/87320221007/",
          "publisher": "The Columbus Dispatch",
          "date": "2025-11-17",
          "source_tier": 1
        },
        {
          "title": "Hollow Promises in Ohio’s Silicon Heartland - The American Prospect",
          "url": "https://prospect.org/2026/03/05/ohio-tech-ai-data-centers-meta-amazon-google-energy/",
          "publisher": "The American Prospect",
          "date": "2026-03-05",
          "source_tier": 1
        },
        {
          "title": "Meta lines up supply of nuclear power to energize AI data centers, including New Albany - WSYX",
          "url": "https://abc6onyourside.com/news/local/meta-lines-up-supply-of-nuclear-power-to-energize-ai-data-centers-including-new-albany-prometheus-supercluster",
          "publisher": "WSYX",
          "date": "2026-01-09",
          "source_tier": 1
        },
        {
          "title": "Meta will use nuclear power for its New Albany A.I. data center - nbc4i.com",
          "url": "https://www.nbc4i.com/news/local-news/new-albany/meta-will-use-nuclear-power-for-its-new-albany-a-i-data-center/",
          "publisher": "nbc4i.com",
          "date": "2026-01-09",
          "source_tier": 1
        },
        {
          "title": "EPA ECHO detailed facility report: Sidecat LLC / Meta New Albany Data Center (110070887474)",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110070887474",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Meta lists Meta New Albany Data Center at New Albany, Ohio on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.atmeta.com/us-locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "microsoft-heath-datacenter-oh",
      "name": "Microsoft Heath datacenter",
      "summary": "Microsoft lists a data center at Heath, Ohio among the sites it operates.",
      "state": "OH",
      "city": "Heath",
      "county": "Licking County",
      "status": "operational",
      "developer": "Microsoft",
      "capacity_mw": null,
      "latitude": 40.0085,
      "longitude": -82.432,
      "location_precision": "address",
      "location_source": "Microsoft Ohio Datacenter Community hub for Heath (Dorsey Mill Rd), Licking County, Ohio.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "operator address point",
      "location_last_verified": "2026-09-14",
      "site_address": "1600 Dorsey Mill Rd, Heath, OH 43056",
      "site_address_source_url": "https://local.microsoft.com/ohio/",
      "published": "2026-09-14",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://local.microsoft.com/ohio/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/microsoft-heath-datacenter-oh",
      "sources": [
        {
          "title": "Microsoft: Microsoft datacenter communities",
          "url": "https://local.microsoft.com/communities/",
          "publisher": "Microsoft",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Microsoft: Microsoft Heath datacenter",
          "url": "https://local.microsoft.com/communities/americas/ohio",
          "publisher": "Microsoft",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Microsoft lists Microsoft Heath datacenter at Heath, Ohio on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://local.microsoft.com/communities/americas/ohio",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "microsoft-hebron-datacenter-oh",
      "name": "Microsoft Hebron datacenter",
      "summary": "Microsoft lists a data center at Hebron, Ohio among the sites it operates.",
      "state": "OH",
      "city": "Hebron",
      "county": "Licking County",
      "status": "operational",
      "developer": "Microsoft",
      "capacity_mw": null,
      "latitude": 39.969,
      "longitude": -82.495,
      "location_precision": "address",
      "location_source": "Microsoft Ohio Datacenter Community hub for Hebron (Enterprise Dr), Licking County, Ohio.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "operator address point",
      "location_last_verified": "2026-09-14",
      "site_address": "1100 Enterprise Dr, Hebron, OH 43025",
      "site_address_source_url": "https://local.microsoft.com/ohio/",
      "published": "2026-09-14",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://local.microsoft.com/ohio/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/microsoft-hebron-datacenter-oh",
      "sources": [
        {
          "title": "Microsoft: Microsoft datacenter communities",
          "url": "https://local.microsoft.com/communities/",
          "publisher": "Microsoft",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Microsoft: Microsoft Hebron datacenter",
          "url": "https://local.microsoft.com/communities/americas/ohio",
          "publisher": "Microsoft",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Microsoft lists Microsoft Hebron datacenter at Hebron, Ohio on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://local.microsoft.com/communities/americas/ohio",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "microsoft-new-albany-datacenter-oh",
      "name": "Microsoft New Albany datacenter",
      "summary": "Microsoft lists a data center at New Albany, Ohio among the sites it operates.",
      "state": "OH",
      "city": "New Albany",
      "county": "Franklin County",
      "status": "operational",
      "developer": "Microsoft",
      "capacity_mw": null,
      "latitude": 40.0885,
      "longitude": -82.755,
      "location_precision": "address",
      "location_source": "Microsoft Ohio Datacenter Community hub for New Albany (Beech Rd NW), Franklin County, Ohio.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "operator address point",
      "location_last_verified": "2026-09-14",
      "site_address": "2200 Beech Rd NW, New Albany, OH 43054",
      "site_address_source_url": "https://local.microsoft.com/ohio/",
      "published": "2026-09-14",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://local.microsoft.com/ohio/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/microsoft-new-albany-datacenter-oh",
      "sources": [
        {
          "title": "Microsoft to build $420m data center in New Albany, Ohio - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/microsoft-to-build-420m-data-center-in-new-albany-ohio/",
          "publisher": "Data Center Dynamics",
          "date": "2024-10-07",
          "source_tier": 1
        },
        {
          "title": "Microsoft and New Albany to build $420 million data center - WSYX",
          "url": "https://abc6onyourside.com/news/local/microsoft-and-new-albany-to-build-420-million-data-center-beech-road-tech-columbus-central-ohio-boom",
          "publisher": "WSYX",
          "date": "2024-10-02",
          "source_tier": 1
        },
        {
          "title": "Microsoft pushes back $1 billion plan for data centers in central Ohio - The Columbus Dispatch",
          "url": "https://www.dispatch.com/story/business/2025/04/07/microsoft-backs-out-of-plans-to-build-data-centers-in-licking-county/82973097007/",
          "publisher": "The Columbus Dispatch",
          "date": "2025-04-07",
          "source_tier": 4
        },
        {
          "title": "Microsoft to invest $420 million to build New Albany data center as suburb OKs incentive - The Columbus Dispatch",
          "url": "https://www.dispatch.com/story/business/information-technology/2024/10/02/microsoft-to-build-420-million-new-albany-data-center/75475442007/",
          "publisher": "The Columbus Dispatch",
          "date": "2024-10-02",
          "source_tier": 1
        },
        {
          "title": "Microsoft buys 200 acres in New Albany for data center development - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/microsoft-buys-200-acres-in-new-albany-for-data-center-development/",
          "publisher": "Data Center Dynamics",
          "date": "2023-06-29",
          "source_tier": 1
        },
        {
          "title": "Tech giant to build $420 million data center in New Albany - 10TV",
          "url": "https://www.10tv.com/article/news/local/microsoft-new-albany-data-center/530-218f7fac-a66c-435f-b8c5-02a03951acd9",
          "publisher": "10TV",
          "date": "2024-10-02",
          "source_tier": 1
        },
        {
          "title": "Neighbors of incoming data center in New Albany react to area growth - 10TV",
          "url": "https://www.10tv.com/article/news/local/boomtown-ohio/microsoft-data-center-new-albany-ohio-resident-react/530-b2bd6e00-3c3a-4b07-bb43-8020fb7d820e",
          "publisher": "10TV",
          "date": "2024-10-02",
          "source_tier": 1
        },
        {
          "title": "New Albany City Council approves 15-year tax break for $420 million Microsoft data center - WOSU Public Media",
          "url": "https://www.wosu.org/2024-10-02/new-albany-city-council-approves-15-year-tax-break-for-420-million-microsoft-data-center",
          "publisher": "WOSU Public Media",
          "date": "2024-10-02",
          "source_tier": 1
        },
        {
          "title": "Microsoft plans to build $420M data center in New Albany - The Business Journals",
          "url": "https://www.bizjournals.com/columbus/news/2024/10/01/microsoft-corp-data-center-new-albany-ohio.html",
          "publisher": "The Business Journals",
          "date": "2024-10-01",
          "source_tier": 1
        },
        {
          "title": "Microsoft: Microsoft datacenter communities",
          "url": "https://local.microsoft.com/communities/",
          "publisher": "Microsoft",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Microsoft: Microsoft New Albany datacenter",
          "url": "https://local.microsoft.com/communities/americas/ohio",
          "publisher": "Microsoft",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Meta seeks to use idle AEP Ohio substation slated to power delayed Intel fab for New Albany data center - report - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/meta-seeks-to-use-idle-aep-ohio-substation-slated-to-power-delayed-intel-fab-for-new-albany-data-center-report/",
          "publisher": "Data Center Dynamics",
          "date": "2025-12-04",
          "source_tier": 3
        },
        {
          "title": "Microsoft adds to Pataskala land holdings with $11.4M purchase - Columbus Business First - The Business Journals",
          "url": "https://www.bizjournals.com/columbus/news/2024/12/04/microsoft-land-purchase-pataskala-ohio.html",
          "publisher": "The Business Journals",
          "date": "2024-12-04",
          "source_tier": 4
        },
        {
          "title": "Microsoft expands in Ohio with $420 million New Albany Data Center - Ohio Tech News",
          "url": "https://www.ohiotechnews.com/microsoft-expands-in-ohio-with-420-million-new-albany-data-center/",
          "publisher": "Ohio Tech News",
          "date": "2024-10-02",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Microsoft lists Microsoft New Albany datacenter at New Albany, Ohio on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://local.microsoft.com/communities/americas/ohio",
          "source_tier": 2
        },
        {
          "status": "operational",
          "effective_at": "2025-12-04",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-12-04",
          "summary": "Meta seeks to use idle AEP Ohio substation for New Albany data center",
          "source_url": "https://www.datacenterdynamics.com/en/news/meta-seeks-to-use-idle-aep-ohio-substation-slated-to-power-delayed-intel-fab-for-new-albany-data-center-report/",
          "source_tier": 3
        },
        {
          "status": "operational",
          "effective_at": "2025-04-07",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-04-07",
          "summary": "Microsoft postpones one billion dollar data center plan in central Ohio",
          "source_url": "https://www.dispatch.com/story/business/2025/04/07/microsoft-backs-out-of-plans-to-build-data-centers-in-licking-county/82973097007/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2024-12-04",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2024-12-04",
          "summary": "Microsoft purchased $11.4 million in land in Pataskala, Ohio",
          "source_url": "https://www.bizjournals.com/columbus/news/2024/12/04/microsoft-land-purchase-pataskala-ohio.html",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "ports-pike-technology-campus-oh",
      "name": "PORTS-Pike Technology Campus",
      "summary": "SB Energy's PORTS Pike Technology Campus in Pike County is being built as an AI compute campus with NVIDIA guaranteeing exclusive hosting of NVIDIA AI compute, and OpenAI has joined the project, which is reported to require more power than all homes in Ohio.",
      "state": "OH",
      "city": "Piketon",
      "county": "Pike County",
      "status": "under_construction",
      "developer": "SB Energy",
      "capacity_mw": null,
      "latitude": 39.0135,
      "longitude": -83.0055,
      "location_precision": "address",
      "location_source": "U.S. Department of Energy Portsmouth Site (3930 US Highway 23 South, Piketon, Pike County, Ohio) reindustrialization lease record.",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "DOE Portsmouth Site address point",
      "location_last_verified": "2026-09-16",
      "site_address": "3930 US Highway 23 South, Piketon, OH 45661",
      "site_address_source_url": "https://www.energy.gov/em/articles/cleanup-reindustrialization-initiative-moving-ahead-portsmouth-site",
      "published": "2026-09-04",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 4,
      "buildings_basis": "site plan",
      "buildings_source_url": "https://www.energy.gov/em/articles/cleanup-reindustrialization-initiative-moving-ahead-portsmouth-site",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/ports-pike-technology-campus-oh",
      "sources": [
        {
          "title": "OpenAI joins PORTS-Pike project - OpenAI",
          "url": "https://openai.com/index/openai-joins-ports-pike-project/",
          "publisher": "OpenAI",
          "date": "2026-08-17",
          "source_tier": 4
        },
        {
          "title": "NVIDIA Partners With SB Energy on 10 GW AI Data Center Complex in Ohio - enr.com",
          "url": "https://www.enr.com/articles/63525-nvidia-partners-with-sb-energy-on-10-gw-ai-data-center-complex-in-ohio",
          "publisher": "enr.com",
          "date": "2026-08-19",
          "source_tier": 4
        },
        {
          "title": "Data center that could require more power than all of the homes in Ohio being built in Pike County - wlwt.com",
          "url": "https://www.wlwt.com/article/nvidia-data-center-pike-county-ohio/73501288",
          "publisher": "wlwt.com",
          "date": "2026-08-26",
          "source_tier": 4
        },
        {
          "title": "Developer details expansive Starpointe data center proposal - Observer Reporter",
          "url": "https://www.observer-reporter.com/news/local-news/2026/sep/02/developer-details-expansive-starpointe-data-center-proposal/",
          "publisher": "Observer-Reporter",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Nvidia Backs OpenAI’s Ohio Data Center Buildout With $105B Guarantee",
          "url": "https://www.datacenterknowledge.com/data-center-construction/nvidia-backs-openai-s-ohio-data-center-buildout-with-105b-guarantee",
          "publisher": "Data Center Knowledge",
          "date": "2026-08-19",
          "source_tier": 3
        },
        {
          "title": "Ohio, PJM to Use State Agreement Approach for 10 GW Data Center, Gas Plant - RTO Insider",
          "url": "https://www.rtoinsider.com/142390-ohio-pjm-state-agreement-approach-data-center-gas-generator/",
          "publisher": "RTO Insider",
          "date": "2026-09-07",
          "source_tier": 3
        },
        {
          "title": "OpenAI to build world's biggest AI data center in Ohio. What we know - Cincinnati Enquirer",
          "url": "https://www.cincinnati.com/story/news/politics/2026/08/24/openai-plans-ohio-data-center/91372218007/",
          "publisher": "Cincinnati Enquirer",
          "date": "2026-08-24",
          "source_tier": 4
        },
        {
          "title": "OpenAI joins world’s largest data center project, brings 35,000 construction jobs to Ohio - NBC4 WCMH-TV",
          "url": "https://www.nbc4i.com/news/local-news/central-ohio-news/datacenters/openai-joins-worlds-largest-data-center-project-brings-35000-construction-jobs-to-ohio/",
          "publisher": "NBC4 WCMH-TV",
          "date": "2026-08-19",
          "source_tier": 4
        },
        {
          "title": "AI’s natural gas addiction could be deadly for Ohio’s communities - Ohio Capital Journal",
          "url": "https://ohiocapitaljournal.com/2026/09/01/ais-natural-gas-addiction-could-be-deadly-for-ohios-communities/",
          "publisher": "Ohio Capital Journal",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "NVIDIA Guarantees SB Energy’s PORTS-Pike Technology Campus in Ohio to Exclusively Host NVIDIA AI Compute - NVIDIA Newsroom",
          "url": "https://nvidianews.nvidia.com/news/nvidia-guarantees-sb-energy-s-ports-pike-technology-campus-in-ohio-to-exclusively-host-nvidia-ai-compute",
          "publisher": "NVIDIA Newsroom",
          "date": "2026-08-17",
          "source_tier": 4
        },
        {
          "title": "OpenAI Locks In Lease for Huge Data Center in Ohio With Backing From Nvidia - WSJ",
          "url": "https://www.wsj.com/articles/openai-locks-in-lease-for-huge-data-center-in-ohio-with-backing-from-nvidia-7474bb9c",
          "publisher": "WSJ",
          "date": "2026-08-17",
          "source_tier": 4
        },
        {
          "title": "OpenAI announces massive data center in Ohio with Nvidia guarantee - Axios",
          "url": "https://www.axios.com/2026/08/17/openai-nvidia-ohio-data-center-sb-energy",
          "publisher": "Axios",
          "date": "2026-08-17",
          "source_tier": 4
        },
        {
          "title": "OpenAI and Nvidia join forces for new enormous Ohio data center - Washington Examiner",
          "url": "https://www.washingtonexaminer.com/policy/technology/4689837/openai-nvidia-new-ohio-data-center-largest-in-world-above-power-plant-history-ai-race/",
          "publisher": "Washington Examiner",
          "date": "2026-08-17",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "permitting",
          "effective_at": "2026-09-07",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-07",
          "summary": "PORTS-Pike Technology Campus is a 10 GW data center with co located gas generator",
          "source_url": "https://www.rtoinsider.com/142390-ohio-pjm-state-agreement-approach-data-center-gas-generator/",
          "source_tier": 3
        },
        {
          "status": "permitting",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "Prime Data Centers developer detailed Starpointe data center proposal on September 2, 2026",
          "source_url": "https://www.observer-reporter.com/news/local-news/2026/sep/02/developer-details-expansive-starpointe-data-center-proposal/",
          "source_tier": 4
        },
        {
          "status": "permitting",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "Construction on each building expected to take between 14 to 16 months",
          "source_url": "https://www.observer-reporter.com/news/local-news/2026/sep/02/developer-details-expansive-starpointe-data-center-proposal/",
          "source_tier": 4
        },
        {
          "status": "permitting",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "Prime hopes to begin work on the project sometime in early 2027",
          "source_url": "https://www.observer-reporter.com/news/local-news/2026/sep/02/developer-details-expansive-starpointe-data-center-proposal/",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2026-08-19",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-19",
          "summary": "PORTS Pike data center campus located on site of former Portsmouth Gaseous Diffusion Plant uranium enrichment facility near Columbus, Ohio",
          "source_url": "https://www.enr.com/articles/63525-nvidia-partners-with-sb-energy-on-10-gw-ai-data-center-complex-in-ohio",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2026-08-19",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-19",
          "summary": "SB Energy will develop, own and operate data center campus including power generation",
          "source_url": "https://www.enr.com/articles/63525-nvidia-partners-with-sb-energy-on-10-gw-ai-data-center-complex-in-ohio",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2026-08-19",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-19",
          "summary": "Bechtel and Kiewit Corp tapped to provide engineering, procurement, construction and other services for PORTS Pike",
          "source_url": "https://www.enr.com/articles/63525-nvidia-partners-with-sb-energy-on-10-gw-ai-data-center-complex-in-ohio",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-17",
          "summary": "Project is being built at the Portsmouth Gaseous Diffusion Plant, a former uranium enrichment facility",
          "source_url": "https://www.washingtonexaminer.com/policy/technology/4689837/openai-nvidia-new-ohio-data-center-largest-in-world-above-power-plant-history-ai-race/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-17",
          "summary": "By 2028 facility is set to generate 800 megawatts before construction is complete",
          "source_url": "https://www.washingtonexaminer.com/policy/technology/4689837/openai-nvidia-new-ohio-data-center-largest-in-world-above-power-plant-history-ai-race/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-17",
          "summary": "OpenAI entered into a 20 year lease agreement with SB Energy and SoftBank Group on Monday",
          "source_url": "https://www.washingtonexaminer.com/policy/technology/4689837/openai-nvidia-new-ohio-data-center-largest-in-world-above-power-plant-history-ai-race/",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "qts-data-centers-new-albany-oh",
      "name": "QTS Data Centers New Albany",
      "summary": "QTS Data Centers lists 2 data centers at New Albany, Ohio and says they are being built.",
      "state": "OH",
      "city": "New Albany",
      "county": "Franklin County",
      "status": "under_construction",
      "developer": "QTS Data Centers",
      "capacity_mw": null,
      "latitude": 40.070261,
      "longitude": -82.802113,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110072134779) and QTS New Albany campus page at 1225 Beech Rd SW, New Albany, Franklin County, Ohio.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110072134779",
      "location_last_verified": "2026-09-14",
      "site_address": "1225 Beech Rd SW, New Albany, OH 43054",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072134779",
      "published": "2026-09-14",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 4,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://qtsdatacenters.com/data-centers/new-albany/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/qts-data-centers-new-albany-oh",
      "sources": [
        {
          "title": "QTS plans four building data center campus in New Albany, Ohio - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/qts-plans-four-building-data-center-campus-in-new-albany-ohio/",
          "publisher": "Data Center Dynamics",
          "date": "2023-10-24",
          "source_tier": 3
        },
        {
          "title": "Data center company QTS investing $1.5B into New Albany - WSYX",
          "url": "https://abc6onyourside.com/news/local/data-center-company-investing-into-new-albany",
          "publisher": "WSYX",
          "date": "2023-10-23",
          "source_tier": 4
        },
        {
          "title": "QTS Data Centers: All locations",
          "url": "https://q.com/data-centers/",
          "publisher": "QTS Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: QTS New Albany (110072134779)",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110072134779",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [
          "co-location"
        ],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": "https://abc6onyourside.com/news/local/data-center-company-investing-into-new-albany"
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "QTS Data Centers lists QTS New Albany 1, QTS New Albany 2 at New Albany, Ohio on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://q.com/data-centers/",
          "source_tier": 2
        },
        {
          "status": "under_construction",
          "effective_at": "2023-10-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2023-10-24",
          "summary": "QTS plans a four building data center campus in New Albany, Ohio",
          "source_url": "https://www.datacenterdynamics.com/en/news/qts-plans-four-building-data-center-campus-in-new-albany-ohio/",
          "source_tier": 3
        }
      ]
    },
    {
      "slug": "qts-van-wert-oh",
      "name": "QTS Van Wert",
      "summary": "QTS Data Centers lists a data center at Van Wert, Ohio and says it is being built.",
      "state": "OH",
      "city": "Van Wert",
      "county": "Van Wert County",
      "status": "under_construction",
      "developer": "QTS Data Centers",
      "capacity_mw": null,
      "latitude": 40.8812,
      "longitude": -84.562,
      "location_precision": "address",
      "location_source": "QTS Van Wert data center campus specification at Vision Drive Mega Site, Van Wert, Van Wert County, Ohio.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "operator address point",
      "location_last_verified": "2026-09-14",
      "site_address": "11185 Vision Dr, Van Wert, OH 45891",
      "site_address_source_url": "https://qtsdatacenters.com/data-centers/van-wert/",
      "published": "2026-09-14",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://qtsdatacenters.com/data-centers/van-wert/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/qts-van-wert-oh",
      "sources": [
        {
          "title": "QTS Data Centers: All locations",
          "url": "https://q.com/data-centers/",
          "publisher": "QTS Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Van Wert data center end user named - thevwindependent.com",
          "url": "https://thevwindependent.com/news/2026/05/29/qts-data-centers-is-the-end-user-for-vw-data-center/",
          "publisher": "thevwindependent.com",
          "date": "2026-05-29",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "QTS Data Centers lists QTS Van Wert at Van Wert, Ohio on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://q.com/data-centers/",
          "source_tier": 2
        },
        {
          "status": "under_construction",
          "effective_at": "2026-05-29",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-29",
          "summary": "End user customer named for Van Wert data center",
          "source_url": "https://thevwindependent.com/news/2026/05/29/qts-data-centers-is-the-end-user-for-vw-data-center/",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "stack-nal01-new-albany-oh",
      "name": "STACK NAL01",
      "summary": "STACK Infrastructure lists a data center at New Albany, Ohio among the sites it operates.",
      "state": "OH",
      "city": "New Albany",
      "county": "Franklin County",
      "status": "operational",
      "developer": "STACK Infrastructure",
      "capacity_mw": null,
      "latitude": 40.0815,
      "longitude": -82.766,
      "location_precision": "address",
      "location_source": "STACK Infrastructure New Albany (NAL01) campus specification at 3330 Horizon Ct, New Albany, Franklin County, Ohio.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "operator address point",
      "location_last_verified": "2026-09-14",
      "site_address": "3330 Horizon Ct, New Albany, OH 43054",
      "site_address_source_url": "https://www.stackinfra.com/locations/americas/new-albany/",
      "published": "2026-09-14",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.stackinfra.com/locations/americas/new-albany/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/stack-nal01-new-albany-oh",
      "sources": [
        {
          "title": "STACK Infrastructure: Americas locations",
          "url": "https://www.stackinfra.com/locations/",
          "publisher": "STACK Infrastructure",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "STACK Infrastructure Acquires Data Center in Ohio Cloud Cluster - Data Center Frontier",
          "url": "https://www.datacenterfrontier.com/cloud/article/11429364/stack-infrastructure-acquires-data-center-in-ohio-cloud-cluster",
          "publisher": "Data Center Frontier",
          "date": "2019-10-16",
          "source_tier": 1
        },
        {
          "title": "STACK Infrastructure: STACK NAL01",
          "url": "https://www.stackinfra.com/locations/americas/new-albany/",
          "publisher": "STACK Infrastructure",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "STACK Infrastructure lists STACK NAL01 at New Albany, Ohio on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.stackinfra.com/locations/americas/new-albany/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "t5-data-centers-t5cleveland-cleveland-oh",
      "name": "T5@Cleveland",
      "summary": "T5 Data Centers operates the T5@Cleveland colocation data center at 4150 W 150th Street in Cleveland, Cuyahoga County, Ohio.",
      "state": "OH",
      "city": "Cleveland",
      "county": "Cuyahoga County",
      "status": "operational",
      "developer": "T5 Data Centers",
      "capacity_mw": null,
      "latitude": 41.442254,
      "longitude": -81.801725,
      "location_precision": "address",
      "location_source": "T5 Data Centers T5@Cleveland specification page at 4150 W 150th Street, Cleveland, Cuyahoga County, Ohio.",
      "location_verified_at": null,
      "coordinate_source": "operator address point",
      "location_last_verified": null,
      "site_address": "4150 W 150th Street, Cleveland, OH 44135",
      "site_address_source_url": "https://t5datacenters.com/locations/cleveland/",
      "published": "2026-10-21",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://t5datacenters.com/locations/cleveland/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/t5-data-centers-t5cleveland-cleveland-oh",
      "sources": [
        {
          "title": "T5 Data Centers: T5@Cleveland (4150 W 150th Street) Facility Specifications",
          "url": "https://t5datacenters.com/locations/cleveland/",
          "publisher": "T5 Data Centers",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-25",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://t5datacenters.com/locations/cleveland/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "trenton-data-center-oh",
      "name": "Trenton data center",
      "summary": "Prologis proposed a data center campus in Trenton, Butler County, Ohio; on September 1, 2026, the Supreme Court of Ohio ordered the Trenton City Council to place a charter amendment referendum on a special election ballot.",
      "state": "OH",
      "city": "Trenton",
      "county": "Butler County",
      "status": "proposed",
      "developer": "Prologis",
      "capacity_mw": null,
      "latitude": 39.4808,
      "longitude": -84.4578,
      "location_precision": "city",
      "location_source": "Supreme Court of Ohio Case No. 2026-1035 (State ex rel. Trenton Citizens v. Trenton City Council) decision on proposed Trenton data center site.",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "city reference point",
      "location_last_verified": "2026-09-16",
      "site_address": "Kennel Road and Wayne Madison Road, Trenton, OH 45067",
      "site_address_source_url": "https://www.courtnewsohio.gov/cases/2026/SCO/0901/261035.asp",
      "published": "2026-09-04",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/trenton-data-center-oh",
      "sources": [
        {
          "title": "Data center in Trenton spurs transparency concerns - 91.7 WVXU",
          "url": "https://www.wvxu.org/environment/2026-08-11/data-center-trenton-prologis-transparency-concerns",
          "publisher": "91.7 WVXU",
          "date": "2026-08-11",
          "source_tier": 4
        },
        {
          "title": "Ohio Supreme Court orders special election on data center ban after city blocked petition - The Cool Down",
          "url": "https://www.thecooldown.com/green-tech/trenton-vote-data-center-ban/",
          "publisher": "The Cool Down",
          "date": "2026-09-07",
          "source_tier": 4
        },
        {
          "title": "Ohio city illegally blocked a citizen effort to stop data center - Cincinnati Enquirer",
          "url": "https://www.cincinnati.com/story/news/politics/2026/09/01/trenton-data-center-ban-special-election-ohio-supreme-court/91563769007/",
          "publisher": "Cincinnati Enquirer",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Ohio Supreme Court rules Trenton must allow vote on data center ban - 91.7 WVXU",
          "url": "https://www.wvxu.org/environment/2026-09-01/ohio-supreme-court-trenton-vote-data-center-ban",
          "publisher": "91.7 WVXU",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Ohio Supreme Court orders Trenton vote on data center ban - Journal-News.com",
          "url": "https://www.journal-news.com/tncms/asset/editorial/599fafca-4b4c-51ba-b989-09ed4f20d43d",
          "publisher": "Journal-News.com",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Ohio Supreme Court orders Tri-State city to hold special election on data center ban - WKRC",
          "url": "https://local12.com/news/local/ohio-supreme-court-orders-trenton-city-council-hold-special-election-data-center-ban-construction-building-petition-ballot-vote-voters-cincinnati",
          "publisher": "WKRC",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Data center ban in southwest Ohio city must go before voters, says Ohio Supreme Court - The Statehouse News Bureau",
          "url": "https://www.statenews.org/government-politics/2026-09-01/data-center-ban-in-southwest-ohio-city-must-go-before-voters-says-ohio-supreme-court",
          "publisher": "The Statehouse News Bureau",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Trenton Must Place Data-Center-Ban Amendment on Special Election Ballot - Court News Ohio (.gov)",
          "url": "https://www.courtnewsohio.gov/cases/2026/SCO/0901/261035.asp",
          "publisher": "Supreme Court of Ohio",
          "date": "2026-09-01",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-08-11",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "A data center proposed in Trenton has spurred transparency concerns and citizen efforts to ban it, leading to Ohio Supreme Court intervention.",
          "source_url": "https://www.courtnewsohio.gov/cases/2026/SCO/0901/261035.asp",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "vantage-new-albany-oh",
      "name": "Vantage New Albany",
      "summary": "Vantage Data Centers lists a data center at New Albany, Ohio among the sites it operates.",
      "state": "OH",
      "city": "New Albany",
      "county": "Franklin County",
      "status": "operational",
      "developer": "Vantage Data Centers",
      "capacity_mw": null,
      "latitude": 40.0912,
      "longitude": -82.7548,
      "location_precision": "address",
      "location_source": "Vantage Data Centers Ohio (OH1) campus specification at 2500 Beech Rd NW, New Albany, Franklin County, Ohio.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "operator address point",
      "location_last_verified": "2026-09-14",
      "site_address": "2500 Beech Rd NW, New Albany, OH 43054",
      "site_address_source_url": "https://vantage-dc.com/data-center-locations/north-america/new-albany-ohio/",
      "published": "2026-09-14",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://vantage-dc.com/data-center-locations/north-america/new-albany-ohio/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/vantage-new-albany-oh",
      "sources": [
        {
          "title": "Data Center Investment Boom Rolls On: DigitalBridge, Yondr, Vantage, New Albany, AustralianSuper, DataBank - Data Center Frontier",
          "url": "https://www.datacenterfrontier.com/hyperscale/article/55240378/data-center-investment-boom-rolls-on-digitalbridge-yondr-vantage-new-albany-australiansuper-databank",
          "publisher": "Data Center Frontier",
          "date": "2024-11-06",
          "source_tier": 1
        },
        {
          "title": "Vorys Assists Vantage Data Centers in Hyperscale Data Center Development Project - Vorys | Law Firm",
          "url": "https://www.vorys.com/news-vorys-assists-vantage-data-centers-in-hyperscale-data-center-development-project",
          "publisher": "Vorys | Law Firm",
          "date": "2025-01-05",
          "source_tier": 1
        },
        {
          "title": "Vantage Data Centers: Data center locations",
          "url": "https://vantage-dc.com/data-center-locations/",
          "publisher": "Vantage Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Vantage Data Centers: Vantage New Albany",
          "url": "https://vantage-dc.com/data-center-locations/north-america/new-albany-ohio",
          "publisher": "Vantage Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Turner Selected for $2B Expansion Project for Vantage Data Centers - Associated Construction Publications",
          "url": "https://acppubs.com/CD/article/57832D95-turner-selected-for-2b-expansion-project-for-vantage-data-centers",
          "publisher": "Associated Construction Publications",
          "date": "2024-11-21",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Vantage Data Centers lists Vantage New Albany at New Albany, Ohio on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://vantage-dc.com/data-center-locations/north-america/new-albany-ohio",
          "source_tier": 2
        },
        {
          "status": "proposed",
          "effective_at": "2026-07-29",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Vantage Data Centers is building a $2 billion, 192 megawatt hyperscale campus in New Albany with Turner Construction as general contractor, targeting initial operations by late 2025 with completion by 2028.",
          "source_url": "https://constructionreviewonline.com/2b-central-ohio-data-center-campus-expected-to-cover-1-5-million-sq-ft/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "verizon-north-inc-norwalk-data-center-oh",
      "name": "Verizon North INC, Norwalk Data Center",
      "summary": "The EPA's facility registry lists Verizon North INC, Norwalk Data Center at 14 Gibbs RD, Norwalk, OH 44857 in Norwalk, Ohio, with no permit program listed.",
      "state": "OH",
      "city": "Norwalk",
      "county": "Huron County",
      "status": "not_verified",
      "developer": "Verizon North INC",
      "capacity_mw": null,
      "latitude": 41.252103,
      "longitude": -82.590651,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110046566872: the registry placed its point by address matching house number, accurate to 50 m",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-20",
      "site_address": "14 Gibbs RD, Norwalk, OH 44857",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110046566872",
      "published": "2026-10-20",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110046566872",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/verizon-north-inc-norwalk-data-center-oh",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Verizon North INC, Norwalk Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110046566872",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "verizon-wireless-data-center-dublin-ii-oh",
      "name": "Verizon Wireless, Data Center Dublin II",
      "summary": "The EPA's facility registry lists Verizon Wireless, Data Center Dublin II at 5165 Emerald Pkwy, Dublin, OH 43017 in Dublin, Ohio, with no permit program listed.",
      "state": "OH",
      "city": "Dublin",
      "county": "Franklin County",
      "status": "not_verified",
      "developer": null,
      "capacity_mw": null,
      "latitude": 40.10657,
      "longitude": -83.12863,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110046569708: the registry placed its point by address matching house number, accurate to 30 m",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-20",
      "site_address": "5165 Emerald Pkwy, Dublin, OH 43017",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110046569708",
      "published": "2026-10-20",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/verizon-wireless-data-center-dublin-ii-oh",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Verizon Wireless, Data Center Dublin II",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110046569708",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    }
  ]
}
