  "license": "CC BY 4.0",
  "license_url": "https://creativecommons.org/licenses/by/4.0/",
  "attribution": "Data: Data Center Record, datacenterrecord.org, CC BY 4.0. Link to the specific record page where possible.",
  "source": "https://datacenterrecord.org/states/nh/merrimack-county/bow",
  "retrieved_at": "2026-10-07T17:49:59.207Z",
  "count": 2,
  "projects": [
    {
      "slug": "bow-data-center-350-mw-nh",
      "name": "Bow Data Center (350 MW)",
      "summary": "An unnamed company asked Eversource to assess a potential 350 MW data center facility in Bow, and Bow is reported to be in talks to become the site of a new hyperscale data center.",
      "state": "NH",
      "city": "Bow",
      "county": "Merrimack",
      "status": "rumored",
      "developer": null,
      "capacity_mw": 350,
      "latitude": 43.20667,
      "longitude": -71.53806,
      "location_precision": "county",
      "location_source": "County seat (Concord), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": 343,
      "site_acres_disclosed_as": "third_party_estimate",
      "site_acres_source_url": "https://www.concordmonitor.com/2026/09/23/bow-residents-oppose-data-center/",
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "record_url": "https://datacenterrecord.org/projects/bow-data-center-350-mw-nh",
      "sources": [
        {
          "title": "Possible hyperscale data center eyed for Bow - New Hampshire Bulletin",
          "url": "https://newhampshirebulletin.com/2026/09/01/possible-hyperscale-data-center-eyed-for-bow/",
          "publisher": "New Hampshire Bulletin",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Bow in talks to become site of new data center - concordmonitor.com",
          "url": "https://www.nhpr.org/nh-news/2026-09-01/bow-in-talks-to-become-site-of-new-data-center",
          "publisher": "concordmonitor.com",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "‘Please, do not allow this to happen’: Residents call for proactive steps to prevent data center in Bow",
          "url": "https://www.concordmonitor.com/2026/09/23/bow-residents-oppose-data-center/",
          "publisher": "Concord Monitor",
          "date": "2026-09-23",
          "source_tier": 4
        },
        {
          "title": "Tax relief or environmental threat? Bow residents divided over possible data center - concordmonitor.com",
          "url": "https://www.concordmonitor.com/2026/09/04/tax-relief-or-environmental-threat-bow-residents-divided-over-possible-data-center/",
          "publisher": "concordmonitor.com",
          "date": "2026-09-04",
          "source_tier": 4
        },
        {
          "title": "Company asks Eversource to assess potential 350 MW facility in Bow - WMUR",
          "url": "https://www.wmur.com/article/eversource-assess-350-mw-facility-bow-9226/73594468",
          "publisher": "WMUR",
          "date": "2026-09-02",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-09-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-23",
          "summary": "Granite Shore Power filed a request with the Federal Energy Regulatory Commission to discuss connecting a 350 megawatt project to the regional power grid.",
          "source_url": "https://www.concordmonitor.com/2026/09/23/bow-residents-oppose-data-center/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "Public Service of New Hampshire, subsidiary of Eversource Energy, filed viability assessment with Granite Shore Power LLC in April 2026",
          "source_url": "https://www.wmur.com/article/eversource-assess-350-mw-facility-bow-9226/73594468",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "Granite Shore Power filed request for 350 megawatt facility interconnection to power grid",
          "source_url": "https://www.wmur.com/article/eversource-assess-350-mw-facility-bow-9226/73594468",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "Merrimack Station coal fired power plant in Bow set to cease operations in 2028",
          "source_url": "https://www.wmur.com/article/eversource-assess-350-mw-facility-bow-9226/73594468",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-01",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-01",
          "summary": "Data center would use Merrimack River for cooling water source",
          "source_url": "https://www.nhpr.org/nh-news/2026-09-01/bow-in-talks-to-become-site-of-new-data-center",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-01",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-01",
          "summary": "FERC filing shows Granite Shore Power requested viability study for data center project at Merrimack Station site in Bow, filed in April 2026",
          "source_url": "https://newhampshirebulletin.com/2026/09/01/possible-hyperscale-data-center-eyed-for-bow/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-01",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-01",
          "summary": "Merrimack Station is former coal fired power plant that closed in September 2025",
          "source_url": "https://www.nhpr.org/nh-news/2026-09-01/bow-in-talks-to-become-site-of-new-data-center",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-01",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-01",
          "summary": "Granite Shore Power filed request with Federal Energy Regulatory Commission in April 2026 to enter discussions with Eversource about connecting 350 megawatt project to power grid",
          "source_url": "https://www.nhpr.org/nh-news/2026-09-01/bow-in-talks-to-become-site-of-new-data-center",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-01",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-01",
          "summary": "Town official confirmed high level discussions between company and Bow about bringing data center to town",
          "source_url": "https://www.nhpr.org/nh-news/2026-09-01/bow-in-talks-to-become-site-of-new-data-center",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "bow-data-center-nh",
      "name": "Bow Data Center",
      "summary": "Bow residents are divided over a possible data center, with debate centering on tax relief benefits versus environmental concerns.",
      "state": "NH",
      "city": "Bow",
      "county": "Merrimack County",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 43.20667,
      "longitude": -71.53806,
      "location_precision": "county",
      "location_source": "County seat (Concord), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "record_url": "https://datacenterrecord.org/projects/bow-data-center-nh",
      "sources": [
        {
          "title": "Politicians Pile On Calls for Moratorium as Data Centers Talks In Bow Confirmed - InDepthNH.org",
          "url": "https://indepthnh.org/2026/09/02/politicians-pile-on-calls-for-moratorium-as-data-centers-talks-in-bow-confirmed/",
          "publisher": "InDepthNH.org",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "September 5, 2026 New England News Roundup - WKXL",
          "url": "https://www.nhtalkradio.com/?p=27098",
          "publisher": "WKXL",
          "date": "2026-09-05",
          "source_tier": 4
        },
        {
          "title": "Rates and Rights: Don’t panic about that data center in Bow",
          "url": "https://www.concordmonitor.com/2026/09/10/my-turn-eversource-data-center-bow/",
          "publisher": "Concord Monitor",
          "date": "2026-09-10",
          "source_tier": 4
        },
        {
          "title": "Michael Vose & Glen Lyons: We have a better alternative to a data center moratorium - UnionLeader.com",
          "url": "https://www.unionleader.com/opinion/op-eds/michael-vose-glen-lyons-we-have-a-better-alternative-to-a-data-center-moratorium/article_c2641d8e-2a65-4a14-9a50-baef686bef7d.html",
          "publisher": "UnionLeader.com",
          "date": "2026-09-16",
          "source_tier": 4
        },
        {
          "title": "Letter: Voice your opposition to Bow data center",
          "url": "https://www.concordmonitor.com/2026/09/24/letter-voice-your-opposition-to-bow-data-center/",
          "publisher": "Concord Monitor",
          "date": "2026-09-24",
          "source_tier": 4
        },
        {
          "title": "In New Hampshire, Democrats and Re­pub­licans fight over who is more anti-data center - Spectrum News",
          "url": "https://spectrumnews1.com/ma/worcester/news/2026/09/08/new-hampshire-data-centers-shaheen-pappas-ayotte",
          "publisher": "Spectrum News",
          "date": "2026-09-08",
          "source_tier": 4
        },
        {
          "title": "Tax relief or environmental threat? Bow residents divided over possible data center - concordmonitor.com",
          "url": "https://www.concordmonitor.com/2026/09/04/tax-relief-or-environmental-threat-bow-residents-divided-over-possible-data-center/",
          "publisher": "concordmonitor.com",
          "date": "2026-09-04",
          "source_tier": 4
        },
        {
          "title": "Ayotte opposes potential Bow data center, plans to propose statewide moratorium - mainepublic.org",
          "url": "https://www.mainepublic.org/2026-09-02/ayotte-opposes-potential-bow-data-center-plans-to-propose-moratorium-on-data-centers-in-state",
          "publisher": "mainepublic.org",
          "date": "2026-09-02",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "Granite Shore Power, owners of closed Merrimack Station in Bow, filed request with Federal Energy Regulatory Commission to enter discussions with Eversource about making a connection to the power grid for a 350 megawatt project",
          "source_url": "https://www.concordmonitor.com/2026/09/24/letter-voice-your-opposition-to-bow-data-center/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-16",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-16",
          "summary": "A preliminary study will examine the viability of a potential 350 megawatt interconnection associated with Granite Shore Power related to the rumored Bow data center.",
          "source_url": "https://www.unionleader.com/opinion/op-eds/michael-vose-glen-lyons-we-have-a-better-alternative-to-a-data-center-moratorium/article_c2641d8e-2a65-4a14-9a50-baef686bef7d.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-10",
          "summary": "Eversource has been in communication with a developer interested in building a data center in Bow",
          "source_url": "https://www.concordmonitor.com/2026/09/10/my-turn-eversource-data-center-bow/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-10",
          "summary": "Data center would be located next to Merrimack Station power plant",
          "source_url": "https://www.concordmonitor.com/2026/09/10/my-turn-eversource-data-center-bow/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-05",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-05",
          "summary": "The project is proposed at the Merrimack Station, a coal fired power plant that ceased operations in September 2025",
          "source_url": "https://www.nhtalkradio.com/?p=27098",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-05",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-05",
          "summary": "Granite Shore Power is exploring a 350 megawatt data center project in Bow",
          "source_url": "https://www.nhtalkradio.com/?p=27098",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "Merrimack Station, a coal fired power plant, ceased operations in September 2025 and was due for retirement in 2028",
          "source_url": "https://indepthnh.org/2026/09/02/politicians-pile-on-calls-for-moratorium-as-data-centers-talks-in-bow-confirmed/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "Granite Shore Power owns the 345 acre Merrimack Plant site",
          "source_url": "https://indepthnh.org/2026/09/02/politicians-pile-on-calls-for-moratorium-as-data-centers-talks-in-bow-confirmed/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "An unnamed town official in Bow confirmed there were high level discussions with a company about bringing a 350 megawatt data center to the town",
          "source_url": "https://indepthnh.org/2026/09/02/politicians-pile-on-calls-for-moratorium-as-data-centers-talks-in-bow-confirmed/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "Eversource and Granite Shore Power filed an application to the Federal Energy Regulatory Committee for a viability study for an up to 350 megawatt interconnection at the Merrimack Station coal plant",
          "source_url": "https://indepthnh.org/2026/09/02/politicians-pile-on-calls-for-moratorium-as-data-centers-talks-in-bow-confirmed/",
          "source_tier": 4
        }
      ]
    }
  ]
}