  "projects": [
    {
      "slug": "cube-na-data-center-company-llc-kansas-city-mo",
      "name": "Cube Na Data Center Company LLC",
      "summary": "The EPA's facility registry lists Cube Na Data Center Company LLC at 101 Holmes, Kansas City, MO 64108 in Kansas City, Missouri, with an air permit and a hazardous waste record.",
      "state": "MO",
      "city": "Kansas City",
      "county": "Jackson County",
      "status": "not_verified",
      "developer": "Cube Na Data Center Company",
      "capacity_mw": null,
      "latitude": 39.11287,
      "longitude": -94.57684,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110015866892: the registry placed its point by address matching house number, accurate to 50 m",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-20",
      "site_address": "101 Holmes, Kansas City, MO 64108",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110015866892",
      "published": "2026-10-20",
      "last_verified": "2026-10-20",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110015866892",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/cube-na-data-center-company-llc-kansas-city-mo",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Cube Na Data Center Company LLC",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110015866892",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "digital-realty-trust-st-louis-mo",
      "name": "Digital Realty Trust",
      "summary": "The EPA's facility registry lists Digital Realty Trust at 210 N Tucker BLVD, ST Louis, MO 63101 in ST Louis, Missouri, with a hazardous waste record.",
      "state": "MO",
      "city": "ST Louis",
      "county": "ST. Louis city",
      "status": "not_verified",
      "developer": "Digital Realty",
      "capacity_mw": null,
      "latitude": 38.629046,
      "longitude": -90.197681,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110038878818: the registry placed its point by address matching house number, accurate to 50 m",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-20",
      "site_address": "210 N Tucker BLVD, ST Louis, MO 63101",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110038878818",
      "published": "2026-10-20",
      "last_verified": "2026-10-20",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110038878818",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/digital-realty-trust-st-louis-mo",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Digital Realty Trust",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110038878818",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "oppidan-data-center-berkeley-mo",
      "name": "Oppidan Data Center",
      "summary": "The EPA's facility registry lists Oppidan Data Center at 5341 N. Hanley Road, Berkeley, MO 63134 in Berkeley, Missouri, with a water permit.",
      "state": "MO",
      "city": "Berkeley",
      "county": "ST. Louis County",
      "status": "not_verified",
      "developer": null,
      "capacity_mw": null,
      "latitude": 38.729662,
      "longitude": -90.324647,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110071668019: the registry placed its point by interpolation map, accurate to 50 m",
      "location_verified_at": "2026-10-03",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-03",
      "site_address": "5341 N. Hanley Road, Berkeley, MO 63134",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071668019",
      "published": "2026-10-03",
      "last_verified": "2026-10-03",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/oppidan-data-center-berkeley-mo",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Oppidan Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071668019",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "amazon-montgomery-county-data-center-mo",
      "name": "Amazon Montgomery County data center",
      "summary": "A data center campus Amazon announced for Montgomery County, Missouri, in June 2026.",
      "state": "MO",
      "city": null,
      "county": "Montgomery County",
      "status": "rumored",
      "developer": "Amazon",
      "capacity_mw": null,
      "latitude": 38.9769,
      "longitude": -91.505,
      "location_precision": "county",
      "location_source": "County seat (Montgomery City), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-08",
      "last_verified": "2026-09-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/amazon-montgomery-county-data-center-mo",
      "sources": [
        {
          "title": "Hundreds of Missourians rally for pause of data center development, man arrested - ABC17NEWS",
          "url": "https://abc17news.com/news/top-stories/2026/09/16/missouri-protesters-seek-to-suspend-ai-data-center-growth/",
          "publisher": "ABC17NEWS",
          "date": "2026-09-17",
          "source_tier": 4
        },
        {
          "title": "Amazon Unveils Multibillion-Dollar Missouri Data Center Investment - Yahoo Finance",
          "url": "https://finance.yahoo.com/technology/articles/amazon-unveils-multibillion-dollar-missouri-084211587.html",
          "publisher": "Yahoo Finance",
          "date": "2026-06-16",
          "source_tier": 1
        },
        {
          "title": "Amazon to Invest $10 Billion in Montgomery County Data Center Campus - The Missouri Times -",
          "url": "https://themissouritimes.com/amazon-to-invest-10-billion-in-montgomery-county-data-center-campus/",
          "publisher": "The Missouri Times -",
          "date": "2026-06-16",
          "source_tier": 1
        },
        {
          "title": "Amazon holds Q&A in Montgomery County about incoming data center - KOMU 8",
          "url": "https://www.komu.com/news/midmissourinews/amazon-holds-q-a-in-montgomery-county-about-incoming-data-center/article_7e78f36b-e820-4d0b-9d49-3c400e249529.html",
          "publisher": "KOMU 8",
          "date": "2026-06-23",
          "source_tier": 4
        },
        {
          "title": "Amazon Selects Missouri for $10 Billion Data Center Campus - PR Newswire",
          "url": "https://www.prnewswire.com/news-releases/amazon-selects-missouri-for-10-billion-data-center-campus-302800859.html",
          "publisher": "PR Newswire",
          "date": "2026-06-15",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "Amazon data center in Montgomery County broke ground in June",
          "source_url": "https://abc17news.com/news/top-stories/2026/09/16/missouri-protesters-seek-to-suspend-ai-data-center-growth/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-06-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-06-23",
          "summary": "Amazon held a question and answer session about a data center campus in Montgomery County",
          "source_url": "https://www.komu.com/news/midmissourinews/amazon-holds-q-a-in-montgomery-county-about-incoming-data-center/article_7e78f36b-e820-4d0b-9d49-3c400e249529.html",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "st-louis-midtown-data-center-mo",
      "name": "St. Louis Midtown Data Center",
      "summary": "A proposed Midtown data center in St. Louis prompted residents and organizations to file a lawsuit against the project.",
      "state": "MO",
      "city": "St. Louis",
      "county": "St. Louis city",
      "status": "rumored",
      "developer": null,
      "capacity_mw": 300,
      "latitude": 38.6357896,
      "longitude": -90.2451124,
      "location_precision": "city",
      "location_source": "City centroid (St. Louis), U.S. Census Bureau TIGERweb, public domain, placed at city level",
      "location_verified_at": "2026-09-17",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-17",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": 11,
      "site_acres_disclosed_as": "third_party_estimate",
      "site_acres_source_url": "https://www.independent.co.uk/news/world/americas/st-louis-data-center-lawsuit-b3052142.html",
      "power_source": "50% renewable energy within 5 years",
      "power_source_url": "https://www.independent.co.uk/news/world/americas/st-louis-data-center-lawsuit-b3052142.html",
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/st-louis-midtown-data-center-mo",
      "sources": [
        {
          "title": "Developer behind controversial data center near Armory sues St. Louis",
          "url": "https://www.stlpr.org/news-briefs/2026-09-17/developer-st-louis-data-center-armory-files-lawsuit-against-city",
          "publisher": "St Louis Public Radio",
          "date": "2026-09-17",
          "source_tier": 4
        },
        {
          "title": "Data center developer sues city after requiring company to supply renewable energy on site - The Independent",
          "url": "https://www.independent.co.uk/news/world/americas/st-louis-data-center-lawsuit-b3052142.html",
          "publisher": "The Independent",
          "date": "2026-09-17",
          "source_tier": 4
        },
        {
          "title": "'Pay to play'? Donation adds new controversy to Ferguson data center vote",
          "url": "https://www.stltoday.com/news/local/government-politics/article_dce0004e-2762-47ef-af46-82451138d189.html",
          "publisher": "St Louis Post-Dispatch",
          "date": "2026-09-22",
          "source_tier": 4
        },
        {
          "title": "How data center noise is different from regular noise pollution, according to a St. Louis scientist",
          "url": "https://www.stlpr.org/health-science-environment/2026-09-24/st-louis-scientist-data-center-noise-pollution",
          "publisher": "St Louis Public Radio",
          "date": "2026-09-24",
          "source_tier": 4
        },
        {
          "title": "St. Louis OKs plan for Midtown data center estimated to generate $445M in tax revenue over 10 years",
          "url": "https://www.stlpr.org/government-politics-issues/2026-09-15/st-louis-okays-midtown-data-center-445m-tax-revenue",
          "publisher": "St Louis Public Radio",
          "date": "2026-09-15",
          "source_tier": 4
        },
        {
          "title": "Data centers across the region move forward",
          "url": "https://www.stltoday.com/news/article_5215f107-af9d-43b7-84f8-a35599e59f28.html",
          "publisher": "St Louis Post-Dispatch",
          "date": "2026-09-16",
          "source_tier": 4
        },
        {
          "title": "Midtown data center wins key approval from St. Louis Board of Public Service",
          "url": "https://www.stlmag.com/news/midtown-data-center-armory-board-of-public-service/",
          "publisher": "www.stlmag.com",
          "date": "2026-04-21",
          "source_tier": 4
        },
        {
          "title": "Residents, organizations file lawsuit against proposed Midtown data center - KMOV",
          "url": "https://www.firstalert4.com/2026/08/29/residents-organizations-file-lawsuit-against-proposed-midtown-data-center/",
          "publisher": "KMOV",
          "date": "2026-08-29",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "Armory data center in Midtown is approved before new St. Louis regulations and is regulated by conditional use permit with different sound policies",
          "source_url": "https://www.stlpr.org/health-science-environment/2026-09-24/st-louis-scientist-data-center-noise-pollution",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "Permit upheld by Board of Adjustment in July",
          "source_url": "https://www.independent.co.uk/news/world/americas/st-louis-data-center-lawsuit-b3052142.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "Developer David Lambiaso filed suit against the city's Board of Adjustment challenging two conditions imposed on the data center construction",
          "source_url": "https://www.stlpr.org/news-briefs/2026-09-17/developer-st-louis-data-center-armory-files-lawsuit-against-city",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2026-09-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-15",
          "summary": "Land Clearance for Redevelopment Authority approved community benefit plan for TerraWatt data center at 3728 Market Street",
          "source_url": "https://www.stlpr.org/government-politics-issues/2026-09-15/st-louis-okays-midtown-data-center-445m-tax-revenue",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2026-09-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-15",
          "summary": "Construction expected to begin August 2027 and be completed by late 2029",
          "source_url": "https://www.stlpr.org/government-politics-issues/2026-09-15/st-louis-okays-midtown-data-center-445m-tax-revenue",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2026-09-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-15",
          "summary": "Renewable energy must power 50% of facility in first five years, 100% within 10 years",
          "source_url": "https://www.stlpr.org/government-politics-issues/2026-09-15/st-louis-okays-midtown-data-center-445m-tax-revenue",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "benton-county-data-center-mo",
      "name": "Benton County Data Center",
      "summary": "A data center has been proposed in Benton County, Missouri, facing community opposition and a moratorium dispute being litigated in a Benton County courtroom.",
      "state": "MO",
      "city": null,
      "county": "Benton",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 38.24528,
      "longitude": -93.37722,
      "location_precision": "county",
      "location_source": "County seat (Warsaw), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/benton-county-data-center-mo",
      "sources": [
        {
          "title": "Data center moratorium fight plays out in Benton County courtroom - KY3",
          "url": "https://www.ky3.com/2026/09/02/data-center-moratorium-fight-plays-out-benton-county-courtroom/",
          "publisher": "KY3",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Benton County. Mo., residents fight a proposed data center - KY3",
          "url": "https://www.ky3.com/video/2026/09/02/benton-county-mo-residents-fight-proposed-data-center/",
          "publisher": "KY3",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Benton County Data Center Moratorium: data center in Missouri",
          "url": "https://morethanjustparks.com/data-center-tracker/benton-county-data-center-moratorium-mo--48ab8af7-2b0f-47fb-9f14-26bfa51fbce5",
          "publisher": "morethanjustparks.com",
          "date": "2026-09-13",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "callaway-county-data-center-mo",
      "name": "Callaway County Data Center",
      "summary": "A proposed data center in Callaway County hosted an open house to inform the public about the development.",
      "state": "MO",
      "city": null,
      "county": "Callaway",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 38.85083,
      "longitude": -91.94806,
      "location_precision": "county",
      "location_source": "County seat (Fulton), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/callaway-county-data-center-mo",
      "sources": [
        {
          "title": "AI infrastructure company unveils plans for Callaway County data center",
          "url": "https://abc17news.com/news/top-stories/2026/07/14/ai-infrastructure-company-unveils-plans-for-callaway-county-data-center/",
          "publisher": "abc17news.com",
          "date": "2026-07-14",
          "source_tier": 4
        },
        {
          "title": "Callaway County hosts open house for proposed data center - KOMU 8",
          "url": "https://www.komu.com/news/midmissourinews/callaway-county-hosts-open-house-for-proposed-data-center/article_906df960-8402-48dc-96b4-c23d4cf1750c.html",
          "publisher": "KOMU 8",
          "date": "2026-07-14",
          "source_tier": 4
        },
        {
          "title": "Open house set next week with company that could bring data center to Callaway County - KOMU 8",
          "url": "https://www.komu.com/news/midmissourinews/open-house-set-next-week-with-company-that-could-bring-data-center-to-callaway-county/article_a451ff98-3f65-4f63-bd12-9a4f6a66a049.html",
          "publisher": "KOMU 8",
          "date": "2026-07-07",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-07-07",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-07",
          "summary": "A data center in Callaway County is in initial planning stages",
          "source_url": "https://www.komu.com/news/midmissourinews/open-house-set-next-week-with-company-that-could-bring-data-center-to-callaway-county/article_a451ff98-3f65-4f63-bd12-9a4f6a66a049.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-07-07",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-07",
          "summary": "Chamber of Commerce will share details at a meeting next week",
          "source_url": "https://www.komu.com/news/midmissourinews/open-house-set-next-week-with-company-that-could-bring-data-center-to-callaway-county/article_a451ff98-3f65-4f63-bd12-9a4f6a66a049.html",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "databank-kansas-city-data-center-mo",
      "name": "DataBank Kansas City data center",
      "summary": "DataBank lists a data center at Kansas City, Missouri among the sites it operates.",
      "state": "MO",
      "city": "Kansas City",
      "county": "Jackson County",
      "status": "operational",
      "developer": "DataBank",
      "capacity_mw": null,
      "latitude": 39.1237467,
      "longitude": -94.5539473,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/databank-kansas-city-data-center-mo",
      "sources": [
        {
          "title": "DataBank: Data centers",
          "url": "https://www.databank.com/data-centers/",
          "publisher": "DataBank",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "DataBank lists DataBank Kansas City data center at Kansas City, Missouri on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.databank.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "downtown-kansas-city-data-center-mo",
      "name": "Downtown Kansas City Data Center",
      "summary": "A downtown Kansas City, Missouri data center proposal sparked concern from neighborhood residents in July 2026.",
      "state": "MO",
      "city": "Kansas City",
      "county": "Jackson County",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 39.0925,
      "longitude": -94.41389,
      "location_precision": "county",
      "location_source": "County seat (Independence), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/downtown-kansas-city-data-center-mo",
      "sources": [
        {
          "title": "SOM designs \"vertical data center\" for Downtown Kansas City - Dezeen",
          "url": "https://www.dezeen.com/2026/08/05/data-center-skyscraper-kansas-city-som/",
          "publisher": "Dezeen",
          "date": "2026-08-05",
          "source_tier": 4
        },
        {
          "title": "The ‘developer’ of a Kansas data center swore under oath he wasn’t involved. My town is bamboozled. - Kansas Reflector",
          "url": "https://kansasreflector.com/2026/07/19/the-developer-of-a-kansas-data-center-swore-under-oath-he-wasnt-involved-my-town-is-bamboozled/",
          "publisher": "Kansas Reflector",
          "date": "2026-07-19",
          "source_tier": 4
        },
        {
          "title": "Kansas City officials denied a plan for downtown data center. Some residents vow to keep fighting - kcur.org",
          "url": "https://www.kcur.org/housing-development-section/2026-08-10/kansas-city-officials-denied-a-plan-for-downtown-data-center-some-residents-vow-to-keep-fighting",
          "publisher": "kcur.org",
          "date": "2026-08-10",
          "source_tier": 4
        },
        {
          "title": "Proposed Kansas data center near psychiatric hospital raises safety concerns - KSHB 41 Kansas City",
          "url": "https://ca.news.yahoo.com/proposed-kansas-data-center-near-024946521.html",
          "publisher": "KSHB 41 Kansas City",
          "date": "2026-09-07",
          "source_tier": 4
        },
        {
          "title": "KCMO City Plan Commission votes to deny application for proposed downtown data center - KSHB 41 Kansas City",
          "url": "https://www.yahoo.com/news/videos/kcmo-city-plan-commission-votes-032018933.html",
          "publisher": "KSHB 41 Kansas City",
          "date": "2026-08-05",
          "source_tier": 1
        },
        {
          "title": "A 20-story data center tower could be built in downtown Kansas City. See where - Kansas City Star",
          "url": "https://www.kansascity.com/news/local/article316177408.html",
          "publisher": "Kansas City Star",
          "date": "2026-06-22",
          "source_tier": 1
        },
        {
          "title": "The downtown Kansas City data center tower project is even worse than you think | Hudnall - Kansas City Star",
          "url": "https://www.kansascity.com/opinion/article316594639.html",
          "publisher": "Kansas City Star",
          "date": "2026-07-22",
          "source_tier": 1
        },
        {
          "title": "Historic building in downtown Kansas City may be replaced by 20-story data center - FOX4KC.com",
          "url": "https://fox4kc.com/news/historic-building-in-downtown-kansas-city-may-be-replaced-by-20-story-data-center/",
          "publisher": "FOX4KC.com",
          "date": "2026-07-21",
          "source_tier": 1
        },
        {
          "title": "Kansas City leaders rightly rejected data center plan that nobody wanted | Hudnall - Kansas City Star",
          "url": "https://www.kansascity.com/opinion/opn-columns-blogs/david-hudnall/article316791324.html",
          "publisher": "Kansas City Star",
          "date": "2026-08-07",
          "source_tier": 1
        },
        {
          "title": "Kansas City could get a 20-story data center in the heart of downtown. Here's what we know - KCUR",
          "url": "https://www.kcur.org/politics-elections-and-government/2026-07-22/kansas-city-downtown-data-center-western-newspaper-union-quality-hill-20-story",
          "publisher": "KCUR",
          "date": "2026-07-22",
          "source_tier": 4
        },
        {
          "title": "Downtown Kansas City, Missouri, data center proposal sparks concern from neighbors - KSHB 41 Kansas City",
          "url": "https://www.kshb.com/news/local-news/kansas/johnson-county/downtown-kansas-city-missouri-data-center-proposal-sparks-concern-from-neighbors",
          "publisher": "KSHB 41 Kansas City",
          "date": "2026-07-21",
          "source_tier": 4
        },
        {
          "title": "Kansas City residents question whether a 20-story data center is a developer's Trojan Horse - kcur.org",
          "url": "https://www.kcur.org/housing-development-section/2026-07-29/kansas-city-downtown-data-center-revitalization-unlimited-historic-building",
          "publisher": "kcur.org",
          "date": "2026-07-29",
          "source_tier": 4
        },
        {
          "title": "Highrise data center proposal stirs opposition in Kansas City - The Architect’s Newspaper",
          "url": "https://www.archpaper.com/2026/08/highrise-data-center-kansas-city/",
          "publisher": "The Architect’s Newspaper",
          "date": "2026-08-17",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "google-kansas-city-data-center-mo",
      "name": "Google Kansas City data center",
      "summary": "Google lists a data center at Kansas City, Missouri and says it is being built.",
      "state": "MO",
      "city": "Kansas City",
      "county": "Jackson County",
      "status": "not_verified",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 39.1237467,
      "longitude": -94.5539473,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-kansas-city-data-center-mo",
      "sources": [
        {
          "title": "Google reveals plans for a new $1 billion data center in Kansas City - fox4kc.com",
          "url": "https://fox4kc.com/business/google-reveals-plans-for-a-new-1-billion-data-center-in-kansas-city/",
          "publisher": "fox4kc.com",
          "date": "2024-03-20",
          "source_tier": 1
        },
        {
          "title": "Exclusive: Google buys nearly 500 acres at a second, larger Northland data center site - The Business Journals",
          "url": "https://www.bizjournals.com/kansascity/news/2024/01/09/google-data-center-northland-rocky-branch-creek.html",
          "publisher": "The Business Journals",
          "date": "2024-01-09",
          "source_tier": 1
        },
        {
          "title": "Google confirms plans for $1B data center in Hunt Midwest Business Park - The Business Journals",
          "url": "https://www.bizjournals.com/kansascity/news/2024/03/20/google-hunt-midwest-data-center-confirmation.html",
          "publisher": "The Business Journals",
          "date": "2024-03-20",
          "source_tier": 1
        },
        {
          "title": "Google selects Kansas City for new data center - KOMU 8",
          "url": "https://www.komu.com/news/state/google-selects-kansas-city-for-new-data-center/article_02b26810-e6ce-11ee-a45a-9f0c6b298125.html",
          "publisher": "KOMU 8",
          "date": "2024-03-20",
          "source_tier": 1
        },
        {
          "title": "Google to Build $1B Data Center in Kansas City - Connect CRE",
          "url": "https://www.connectcre.com/stories/google-to-build-1b-data-center-in-kansas-city/",
          "publisher": "Connect CRE",
          "date": "2024-03-21",
          "source_tier": 1
        },
        {
          "title": "'We need jobs, not promises': Community members push back against data center tax breaks - KSHB 41 Kansas City",
          "url": "https://www.kshb.com/news/local-news/we-need-jobs-not-promises-community-members-push-back-against-data-center-tax-breaks",
          "publisher": "KSHB 41 Kansas City",
          "date": "2025-04-29",
          "source_tier": 1
        },
        {
          "title": "News | Google’s Pick of Kansas City for Data Center Shows Midwest’s Growing Digital Allure - CoStar",
          "url": "https://www.costar.com/article/454201643/googles-pick-of-kansas-city-for-data-center-shows-midwests-growing-digital-allure",
          "publisher": "CoStar",
          "date": "2024-03-28",
          "source_tier": 1
        },
        {
          "title": "Google applies to develop Kansas City data center - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/google-applies-to-develop-kansas-city-data-center/",
          "publisher": "Data Center Dynamics",
          "date": "2023-09-11",
          "source_tier": 1
        },
        {
          "title": "Google files first project plan for large data center campus in KC's Northland - The Business Journals",
          "url": "https://www.bizjournals.com/kansascity/news/2023/10/24/google-shalerock-data-center-northland-port-kc.html",
          "publisher": "The Business Journals",
          "date": "2023-10-24",
          "source_tier": 1
        },
        {
          "title": "Tax breaks for Google data center spark protest at Port KC meeting - The Business Journals",
          "url": "https://www.bizjournals.com/kansascity/news/2025/04/29/google-data-center-project-mica-port-kc-northland.html",
          "publisher": "The Business Journals",
          "date": "2025-04-29",
          "source_tier": 1
        },
        {
          "title": "Major tech company to build new $10 billion 500-acre campus in Northland - fox4kc.com",
          "url": "https://fox4kc.com/news/major-tech-company-to-build-new-10-billion-500-acre-campus-in-northland/",
          "publisher": "fox4kc.com",
          "date": "2025-07-28",
          "source_tier": 1
        },
        {
          "title": "Google buys more land at another Northland data center site - fox4kc.com",
          "url": "https://fox4kc.com/business/google-buys-more-land-at-another-northland-data-center-site/",
          "publisher": "fox4kc.com",
          "date": "2024-01-10",
          "source_tier": 1
        },
        {
          "title": "Google to build $1 billion data center in Kansas City - KCTV",
          "url": "https://www.kctv5.com/2024/03/20/google-build-1-billion-data-center-kansas-city/",
          "publisher": "KCTV",
          "date": "2024-03-20",
          "source_tier": 1
        },
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Kansas City data center at Kansas City, Missouri on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "google-new-florence-data-center-mo",
      "name": "Google New Florence data center",
      "summary": "Google lists a data center at New Florence, Missouri and says it is being built.",
      "state": "MO",
      "city": "New Florence",
      "county": "Montgomery County",
      "status": "under_construction",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 38.9093325,
      "longitude": -91.4529412,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-new-florence-data-center-mo",
      "sources": [
        {
          "title": "Missouri governor and Google announce $15 billion data center in Montgomery County",
          "url": "https://www.komu.com/news/midmissourinews/missouri-governor-and-google-announce-15-billion-data-center-in-montgomery-county/article_a4c5a7f4-de3f-4510-8060-f41fad7433fd.html",
          "publisher": "KOMU 8",
          "date": "2026-05-20",
          "source_tier": 4
        },
        {
          "title": "Montgomery County approves a tax incentive package for Google data center",
          "url": "https://www.komu.com/news/midmissourinews/montgomery-county-approves-a-tax-incentive-package-for-google-data-center/article_95e79aa5-418a-44fc-98d2-6e36b9dab865.html",
          "publisher": "KOMU 8",
          "date": "2026-06-11",
          "source_tier": 4
        },
        {
          "title": "North America Data Center Construction Market Report 2026-2031 Now Available — Published as Google Commits $15B to New Missouri AI Hyperscale Campus - Yahoo Finance",
          "url": "https://finance.yahoo.com/technology/ai/articles/north-america-data-center-construction-082800691.html",
          "publisher": "Yahoo Finance",
          "date": "2026-08-28",
          "source_tier": 4
        },
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Missouri Data Center to Receive $15 Billion from Google, Largest Single Investment in State History - Construction Review",
          "url": "https://constructionreviewonline.com/missouri-data-center-to-receive-15-billion-from-google-largest-single-investment-in-state-history/",
          "publisher": "Construction Review",
          "date": "2026-05-21",
          "source_tier": 1
        },
        {
          "title": "Google data center in rural Missouri plan raises tax and transparency questions - KCUR",
          "url": "https://www.kcur.org/housing-development-section/2026-05-23/google-data-center-in-rural-missouri-plan-raises-tax-and-transparency-questions",
          "publisher": "KCUR",
          "date": "2026-05-23",
          "source_tier": 1
        },
        {
          "title": "Google Announces $15B Data Center Investment in Missouri - tedmag.com",
          "url": "https://tedmag.com/google-announces-15b-data-center-investment-in-missouri/",
          "publisher": "tedmag.com",
          "date": "2026-05-21",
          "source_tier": 1
        },
        {
          "title": "Timeline: Montgomery County considers data center proposals - KOMU 8",
          "url": "https://www.komu.com/montgomery-county-considers-data-center-proposals/collection_dff90985-4dd2-4d0f-8b4d-93fbb9cf0945.html",
          "publisher": "KOMU 8",
          "date": "2026-01-22",
          "source_tier": 1
        },
        {
          "title": "Google Invests Billions in New Missouri Data Center - Readers.id",
          "url": "https://www.readers.id/en/google-missouri-data-center-investment",
          "publisher": "Readers.id",
          "date": "2026-05-24",
          "source_tier": 1
        },
        {
          "title": "'Our fields are becoming buildings': $15B data center begins to reshape rural life in Missouri - kvue.com",
          "url": "https://www.kvue.com/article/news/nation-world/google-tech-data-center-rural-america-landscape-small-town-residents-construction/507-59f548a7-6299-44b0-a72d-7d6ff514e913",
          "publisher": "kvue.com",
          "date": "2026-05-24",
          "source_tier": 1
        },
        {
          "title": "Google Commits $15 Billion to Build Beside Amazon in Rural Missouri - globaldatacenterhub.com",
          "url": "https://www.globaldatacenterhub.com/p/google-commits-15-billion-to-build",
          "publisher": "globaldatacenterhub.com",
          "date": "2026-05-31",
          "source_tier": 1
        },
        {
          "title": "Google plans huge Missouri data center amid AI boom - Latest news from Azerbaijan",
          "url": "https://news.az/news/google-plans-huge-missouri-data-center-amid-ai-boom",
          "publisher": "Latest news from Azerbaijan",
          "date": "2026-05-21",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google New Florence data center at New Florence, Missouri on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-28",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-28",
          "summary": "Google announced 15 billion USD investment in May 2026 for hyperscale data center campus in New Florence, Missouri including 500 MW additional power capacity.",
          "source_url": "https://finance.yahoo.com/technology/ai/articles/north-america-data-center-construction-082800691.html",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2026-06-11",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Montgomery County Commission unanimously approved tax incentive package for Google data center",
          "source_url": "https://www.komu.com/news/midmissourinews/montgomery-county-approves-a-tax-incentive-package-for-google-data-center/article_95e79aa5-418a-44fc-98d2-6e36b9dab865.html",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2026-05-20",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Google announced $15 billion investment in data center in New Florence, Montgomery County, Missouri",
          "source_url": "https://www.komu.com/news/midmissourinews/missouri-governor-and-google-announce-15-billion-data-center-in-montgomery-county/article_a4c5a7f4-de3f-4510-8060-f41fad7433fd.html",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "h5-st-louis-mo",
      "name": "H5 St. Louis",
      "summary": "H5 Data Centers lists a data center at St. Louis, Missouri among the sites it operates.",
      "state": "MO",
      "city": "St. Louis",
      "county": "St. Louis city",
      "status": "operational",
      "developer": "H5 Data Centers",
      "capacity_mw": null,
      "latitude": 38.6357896,
      "longitude": -90.2451124,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/h5-st-louis-mo",
      "sources": [
        {
          "title": "H5 Data Centers: Data centers",
          "url": "https://h5datacenters.com/data-centers.html",
          "publisher": "H5 Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "H5 Data Centers lists H5 St. Louis at St. Louis, Missouri on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://h5datacenters.com/data-centers.html",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "joplin-data-center-mo",
      "name": "Joplin Data Center",
      "summary": "A data center project near Joplin, Missouri prompted opponents to meet with an attorney to discuss available options for opposing the development.",
      "state": "MO",
      "city": "Joplin",
      "county": "Jasper",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 37.16778,
      "longitude": -94.315,
      "location_precision": "county",
      "location_source": "County seat (Carthage), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/joplin-data-center-mo",
      "sources": [
        {
          "title": "Attorney meets with data center opponents to offer options - The Joplin Globe",
          "url": "https://www.joplinglobe.com/news/attorney-meets-with-data-center-opponents-to-offer-options/article_b70ebb0b-e091-4a95-9390-36ef254bd3a3.html",
          "publisher": "The Joplin Globe",
          "date": "2026-08-30",
          "source_tier": 4
        },
        {
          "title": "Officials in Joplin, Missouri, greenlight rezoning request for potential data center",
          "url": "https://www.datacenterdynamics.com/en/news/officials-in-joplin-missouri-greenlight-rezoning-request-for-potential-data-center/",
          "publisher": "www.datacenterdynamics.com",
          "date": "2026-01-23",
          "source_tier": 3
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "meta-kansas-city-data-center-mo",
      "name": "Meta Kansas City Data Center",
      "summary": "Meta lists a data center at Kansas City, Missouri among the sites it operates.",
      "state": "MO",
      "city": "Kansas City",
      "county": "Jackson County",
      "status": "operational",
      "developer": "Meta",
      "capacity_mw": null,
      "latitude": 39.1237467,
      "longitude": -94.5539473,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/meta-kansas-city-data-center-mo",
      "sources": [
        {
          "title": "'Historic' $800 million Meta (Facebook) facility coming to Platte/Clay county line - The Platte County Citizen",
          "url": "http://www.plattecountycitizen.com/theplattecountycitizen/historic-800-million-meta-facebook-facility-coming-to-platteclay-county-line3132022",
          "publisher": "The Platte County Citizen",
          "date": "2022-03-31",
          "source_tier": 1
        },
        {
          "title": "Meta Announces $800M Data Center in Kansas City - CommercialSearch",
          "url": "https://www.commercialsearch.com/news/meta-announces-800m-data-center-in-kansas-city/",
          "publisher": "CommercialSearch",
          "date": "2022-03-25",
          "source_tier": 1
        },
        {
          "title": "Social media giant plans to occupy big Northland data center - The Business Journals",
          "url": "https://www.bizjournals.com/kansascity/news/2022/03/10/facebook-project-velvet-data-center-golden-plains.html",
          "publisher": "The Business Journals",
          "date": "2022-03-10",
          "source_tier": 1
        },
        {
          "title": "Meta acquires 500 more acres in Diode’s Golden Plains park in Kansas City, Missouri - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/meta-acquires-500-more-acres-in-diodes-golden-plains-park-in-kansas-city-missouri/",
          "publisher": "Data Center Dynamics",
          "date": "2023-01-12",
          "source_tier": 1
        },
        {
          "title": "Exclusive: School district's tax windfall delayed from KC Meta data center - The Business Journals",
          "url": "https://www.bizjournals.com/kansascity/news/2025/03/03/meta-data-center-taxes-smithville-school-district.html",
          "publisher": "The Business Journals",
          "date": "2025-03-03",
          "source_tier": 1
        },
        {
          "title": "Meta Data Center In Kansas City Officially Operates, Ready To Serve Data Traffic - VOI.ID",
          "url": "https://voi.id/en/technology/507547",
          "publisher": "VOI.ID",
          "date": "2025-08-22",
          "source_tier": 1
        },
        {
          "title": "Meta chooses Kansas City for construction of $800M data center - KSHB 41 Kansas City",
          "url": "https://www.kshb.com/news/local-news/meta-chooses-kansas-city-for-construction-of-800m-data-center",
          "publisher": "KSHB 41 Kansas City",
          "date": "2022-03-24",
          "source_tier": 1
        },
        {
          "title": "Facebook parent Meta announces new $800M data center in Missouri - KSDK",
          "url": "https://www.ksdk.com/article/tech/facebook-parent-meta-announces-new-data-center-kansas-city/63-ec7e7659-25a4-48fe-ab44-bf878cf3d4f6",
          "publisher": "KSDK",
          "date": "2022-03-24",
          "source_tier": 1
        },
        {
          "title": "Meta: Our U.S. data center fleet",
          "url": "https://datacenters.atmeta.com/us-locations/",
          "publisher": "Meta",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Meta confirms data center development plans for Kansas City, Missouri - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/meta-confirms-data-center-development-plans-for-kansas-city-missouri/",
          "publisher": "Data Center Dynamics",
          "date": "2022-03-24",
          "source_tier": 1
        },
        {
          "title": "Meta's Northland data center leads to legal battle between father and son - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/metas-northland-data-center-leads-to-legal-battle-between-father-and-son/",
          "publisher": "Data Center Dynamics",
          "date": "2024-07-10",
          "source_tier": 1
        },
        {
          "title": "Building's completion is a big step for KC area contractor and Meta project - The Business Journals",
          "url": "https://www.bizjournals.com/kansascity/news/2023/09/28/lm2-contracting-takes-lead-meta-building-kc.html",
          "publisher": "The Business Journals",
          "date": "2023-09-28",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Meta lists Meta Kansas City Data Center at Kansas City, Missouri on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.atmeta.com/us-locations/",
          "source_tier": 2
        },
        {
          "status": "operational",
          "effective_at": "2023-09-28",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2023-09-28",
          "summary": "Building completion is a major step for KC area contractor and Meta data center project",
          "source_url": "https://www.bizjournals.com/kansascity/news/2023/09/28/lm2-contracting-takes-lead-meta-building-kc.html",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "nebius-ai-data-center-independence-mo",
      "name": "Nebius AI Data Center Independence",
      "summary": "A multibillion dollar Nebius AI data center was proposed in Independence, Missouri, prompting a tax break vote and subsequent recall of Councilman John Perkins, as well as a lawsuit filed to stop the project.",
      "state": "MO",
      "city": "Independence",
      "county": "Jackson",
      "status": "rumored",
      "developer": "Nebius",
      "capacity_mw": null,
      "latitude": 39.0925,
      "longitude": -94.41389,
      "location_precision": "county",
      "location_source": "County seat (Independence), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/nebius-ai-data-center-independence-mo",
      "sources": [
        {
          "title": "Almost 70% of voters in Missouri city vote to recall council member who said yes to AI data center tax breaks — councilor said disagreement over an issue shouldn’t be enough to unseat him - Tom's Hardware",
          "url": "https://www.tomshardware.com/tech-industry/data-centers/almost-70-percent-of-voters-in-missouri-city-recall-council-member-who-said-yes-to-ai-data-center-tax-breaks-councilor-said-disagreement-over-an-issue-shouldnt-be-enough-to-unseat-him",
          "publisher": "Tom's Hardware",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Missouri voters recall councilman over Nebius data-center tax break - Blockspace Media",
          "url": "https://www.yahoo.com/news/politics/articles/missouri-voters-recall-councilman-over-135947263.html",
          "publisher": "Blockspace Media",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "The Growing Opposition to AI Data Centers — Independence, MO Recall Vote - Daily Kos",
          "url": "https://www.dailykos.com/stories/2026/9/2/800093275/community/t/",
          "publisher": "Daily Kos",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "He Voted for a Massive AI Data Center, Got Recalled by 68% of Voters - Gadget Review",
          "url": "https://www.gadgetreview.com/he-voted-for-a-massive-ai-data-center-got-recalled-by-68-of-voters",
          "publisher": "Gadget Review",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "After voting for Independence data center, council member faces recall election next week - KSHB 41 Kansas City",
          "url": "https://www.kshb.com/news/local-news/missouri/jackson-county/after-voting-for-independence-data-center-council-member-faces-recall-election-next-week",
          "publisher": "KSHB 41 Kansas City",
          "date": "2026-08-25",
          "source_tier": 4
        },
        {
          "title": "Independence hits pause on data centers as Nebius construction moves forward",
          "url": "https://www.kctv5.com/2026/07/08/independence-hits-pause-data-centers-nebius-construction-moves-forward/",
          "publisher": "www.kctv5.com",
          "date": "2026-07-08",
          "source_tier": 4
        },
        {
          "title": "Voters in Missouri City Overwhelmingly Vote to Recall Councilman Who Approved Data Center - commondreams.org",
          "url": "https://www.commondreams.org/news/data-center-supporter-recalled",
          "publisher": "commondreams.org",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Independence Councilman John Perkins recalled after voting to approve multibillion-dollar data center - KMBC",
          "url": "https://www.kmbc.com/article/independence-john-perkins-recall-data-center-election/73586616",
          "publisher": "KMBC",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Independence voters recall councilman tied to data center tax vote - kctv5.com",
          "url": "https://www.kctv5.com/2026/09/02/independence-voters-recall-councilman-tied-data-center-tax-vote/",
          "publisher": "kctv5.com",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Independence voters decide recall of councilman tied to data center tax vote - kctv5.com",
          "url": "https://www.kctv5.com/2026/09/01/independence-voters-decide-recall-councilman-tied-data-center-tax-vote/",
          "publisher": "kctv5.com",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Anger over planned AI data center drives Missouri city’s voters to recall council member - NBC News",
          "url": "https://www.nbcnews.com/politics/elections/recall-vote-missouri-ai-data-center-rcna595690",
          "publisher": "NBC News",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Missouri Officials Ousted For Approving Massive Data Center - Newsweek",
          "url": "https://www.newsweek.com/missouri-officials-ousted-for-approving-massive-data-center-12394384",
          "publisher": "Newsweek",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Independence councilman faces recall over data center vote - kctv5.com",
          "url": "https://www.kctv5.com/2026/08/26/independence-councilman-faces-recall-over-data-center-vote/",
          "publisher": "kctv5.com",
          "date": "2026-08-26",
          "source_tier": 4
        },
        {
          "title": "New lawsuit attempting to stop multi-billion data center project in Independence - KMBC",
          "url": "https://www.kmbc.com/article/independence-missouri-data-center-lawsuit-nebius-residents/73428982",
          "publisher": "KMBC",
          "date": "2026-08-13",
          "source_tier": 4
        },
        {
          "title": "Independence neighbors sue to stop construction of $150 billion AI data center - kansascity.com",
          "url": "https://www.kansascity.com/news/local/article316845573.html",
          "publisher": "kansascity.com",
          "date": "2026-08-15",
          "source_tier": 4
        },
        {
          "title": "In­de­pen­dence group files lawsuit to block Nebius' AI data center - Spectrum News",
          "url": "https://spectrumlocalnews.com/mo/kansas-city/news/2026/08/13/ai-data-center-independence-lawsuit",
          "publisher": "Spectrum News",
          "date": "2026-08-13",
          "source_tier": 4
        },
        {
          "title": "Bly Road residents file 52-page lawsuit to stop Independence AI data center project - KSHB 41 Kansas City",
          "url": "https://www.kshb.com/news/local-news/missouri/jackson-county/independence-guard-alliance-files-lawsuit-to-halt-construction-of-independence-data-center",
          "publisher": "KSHB 41 Kansas City",
          "date": "2026-08-13",
          "source_tier": 4
        },
        {
          "title": "Independence’s AI data center deal cost another council member his seat. What happens next? - kcur.org",
          "url": "https://www.kcur.org/politics-elections-and-government/2026-09-03/independences-ai-data-center-decision-cost-another-council-member-his-seat-what-happens-next",
          "publisher": "kcur.org",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Independence looks to add more regulations, guidelines for future data center development - KSHB 41 Kansas City",
          "url": "https://www.kshb.com/news/local-news/kansas/johnson-county/independence-looks-to-add-more-regulations-guidelines-for-future-data-center-development",
          "publisher": "KSHB 41 Kansas City",
          "date": "2026-08-17",
          "source_tier": 4
        },
        {
          "title": "Independence councilman recalled by voters in his district after his vote for data center tax incentives - KSHB 41 Kansas City",
          "url": "https://www.kshb.com/news/local-news/independence-mo-councilman-recalled-by-voters-in-his-district-after-his-vote-for-data-center-tax-incentives",
          "publisher": "KSHB 41 Kansas City",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Independence Councilman John Perkins to learn recall vote fate after data center support - KSHB 41 Kansas City",
          "url": "https://www.kshb.com/news/local-news/missouri/jackson-county/independence-councilman-john-perkins-to-learn-recall-vote-fate-after-data-center-support",
          "publisher": "KSHB 41 Kansas City",
          "date": "2026-09-01",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "nodaway-county-data-centers-mo",
      "name": "Nodaway County Data Centers",
      "summary": "Two companies expressed interest in Nodaway County land for data center development, prompting reactions from local residents.",
      "state": "MO",
      "city": null,
      "county": "Nodaway",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 40.34528,
      "longitude": -94.87111,
      "location_precision": "county",
      "location_source": "County seat (Maryville), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/nodaway-county-data-centers-mo",
      "sources": [
        {
          "title": "Nodaway County Commissioners hold meeting with Scale Microgrids about proposed data center",
          "url": "https://www.kq2.com/news/2026/06/03/nodaway-county-commissioners-to-hold-meeting-with-scale-microgrids-about-proposed-data-center/",
          "publisher": "www.kq2.com",
          "date": "2026-06-03",
          "source_tier": 4
        },
        {
          "title": "2 more companies eye Nodaway County land for data center development, residents react - Northwest Missourian",
          "url": "https://www.nwmissourinews.com/news/article_aec4c9b0-401c-4edb-9ddd-c72e3af27207.html",
          "publisher": "Northwest Missourian",
          "date": "2026-08-12",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "springfield-data-center-mo",
      "name": "Springfield Data Center",
      "summary": "A developer expressed interest in building a data center in Springfield, Missouri, and the city subsequently hosted community meetings about the proposed development.",
      "state": "MO",
      "city": "Springfield",
      "county": "Greene County",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 37.195,
      "longitude": -93.28611,
      "location_precision": "county",
      "location_source": "County seat (Springfield), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/springfield-data-center-mo",
      "sources": [
        {
          "title": "Developer expresses interest in building data center in Springfield - OzarksFirst.com",
          "url": "https://www.yahoo.com/news/articles/developer-expresses-interest-building-data-033502229.html",
          "publisher": "OzarksFirst.com",
          "date": "2026-08-24",
          "source_tier": 4
        },
        {
          "title": "City of Springfield hosts community meetings about data center development - KY3",
          "url": "https://www.ky3.com/2026/08/27/city-springfield-hosts-community-meetings-about-data-center-development/",
          "publisher": "KY3",
          "date": "2026-08-27",
          "source_tier": 4
        },
        {
          "title": "Springfield residents pack data center public engagement session - KY3",
          "url": "https://www.ky3.com/2026/08/28/springfield-residents-pack-data-center-public-engagement-session/",
          "publisher": "KY3",
          "date": "2026-08-27",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "st-louis-armory-data-center-mo",
      "name": "St. Louis Armory Data Center",
      "summary": "A data center near the Armory in St. Louis was allowed to move forward by the St. Louis board under new rules in July 2026.",
      "state": "MO",
      "city": "St. Louis",
      "county": "St. Louis city",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 38.6357896,
      "longitude": -90.2451124,
      "location_precision": "city",
      "location_source": "City centroid (St. Louis), U.S. Census Bureau TIGERweb, public domain, placed at city level",
      "location_verified_at": "2026-09-17",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-17",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/st-louis-armory-data-center-mo",
      "sources": [
        {
          "title": "Developer behind controversial data center near Armory sues St. Louis - STLPR",
          "url": "https://www.stlpr.org/news-briefs/2026-09-17/developer-st-louis-data-center-armory-files-lawsuit-against-city",
          "publisher": "STLPR",
          "date": "2026-09-17",
          "source_tier": 4
        },
        {
          "title": "Armory Data Center Deal Advances in St. Louis - stl.news",
          "url": "https://www.stl.news/armory-data-center-deal-advances-in-st-louis/",
          "publisher": "stl.news",
          "date": "2026-09-15",
          "source_tier": 4
        },
        {
          "title": "St. Louis board allows data center near Armory to move forward with new rules - STLPR",
          "url": "https://www.stlpr.org/health-science-environment/2026-07-30/st-louis-board-allows-data-center-near-armory-to-move-forward-with-new-rules",
          "publisher": "STLPR",
          "date": "2026-07-30",
          "source_tier": 4
        },
        {
          "title": "St. Louis could get $8.3 million from Armory data center by spring - STLtoday.com",
          "url": "https://www.stltoday.com/news/local/government-politics/article_6c6bf848-cf26-4282-935e-ac830e881009.html",
          "publisher": "STLtoday.com",
          "date": "2026-09-14",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "TerraWatt plans to build a 120 megawatt data center in the old Famous Barr warehouse on Market Street as part of a planned technology district.",
          "source_url": "https://www.stlpr.org/news-briefs/2026-09-17/developer-st-louis-data-center-armory-files-lawsuit-against-city",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "The developer filed suit against the city this week; the company plans to build a data center as part of a planned technology district.",
          "source_url": "https://www.stlpr.org/news-briefs/2026-09-17/developer-st-louis-data-center-armory-files-lawsuit-against-city",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "The city's renewable energy requirements require the data center to use 2.4 megawatts of renewable energy.",
          "source_url": "https://www.stlpr.org/news-briefs/2026-09-17/developer-st-louis-data-center-armory-files-lawsuit-against-city",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "The project is planned at an 11 acre site in the old Famous Barr warehouse.",
          "source_url": "https://www.stlpr.org/news-briefs/2026-09-17/developer-st-louis-data-center-armory-files-lawsuit-against-city",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "st-louis-data-center-controversy-mo",
      "name": "St. Louis data center (controversy)",
      "summary": "St. Louis is debating data center regulations, with the Planning Commission having held a meeting on loosening rules and Mayor Cara Spencer reportedly intervening to oppose relaxed regulations.",
      "state": "MO",
      "city": "St. Louis",
      "county": "St. Louis city",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 38.6357896,
      "longitude": -90.2451124,
      "location_precision": "city",
      "location_source": "City centroid (St. Louis), U.S. Census Bureau TIGERweb, public domain, placed at city level",
      "location_verified_at": "2026-09-17",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-17",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/st-louis-data-center-controversy-mo",
      "sources": [
        {
          "title": "Editorial: On city’s data center controversy, the buck stops … where?",
          "url": "https://www.stltoday.com/opinion/editorial/article_91abf8c9-117a-41dd-9db2-f18d3ba62635.html",
          "publisher": "St Louis Post-Dispatch",
          "date": "2026-09-04",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "tierpoint-st-louis-mo",
      "name": "TierPoint St. Louis",
      "summary": "TierPoint lists 2 data centers at St. Louis, Missouri among the sites it operates.",
      "state": "MO",
      "city": "St. Louis",
      "county": "St. Louis city",
      "status": "operational",
      "developer": "TierPoint",
      "capacity_mw": null,
      "latitude": 38.6357896,
      "longitude": -90.2451124,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/tierpoint-st-louis-mo",
      "sources": [
        {
          "title": "World-Class Data Center coming to the City of St. Louis - stlpartnership.com",
          "url": "https://stlpartnership.com/world-class-data-center-coming-to-the-city-of-st-louis/",
          "publisher": "stlpartnership.com",
          "date": "2024-08-14",
          "source_tier": 1
        },
        {
          "title": "TierPoint Acquires Downtown St. Louis Building for Newest Data Center In Missouri - PR Newswire",
          "url": "https://www.prnewswire.com/news-releases/tierpoint-acquires-downtown-st-louis-building-for-newest-data-center-in-missouri-302221624.html",
          "publisher": "PR Newswire",
          "date": "2024-08-13",
          "source_tier": 1
        },
        {
          "title": "TierPoint plans for $150M data center in Downtown St. Louis - FOX 2",
          "url": "https://fox2now.com/news/missouri/tierpoint-plans-for-150m-data-center-in-downtown-st-louis/",
          "publisher": "FOX 2",
          "date": "2024-08-14",
          "source_tier": 1
        },
        {
          "title": "TierPoint to convert office into data center in St. Louis, Missouri - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/tierpoint-to-convert-office-into-data-center-in-st-louis-missouri/",
          "publisher": "Data Center Dynamics",
          "date": "2024-08-14",
          "source_tier": 1
        },
        {
          "title": "TierPoint to build data center in St. Louis, Missouri - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/tierpoint-to-build-data-centre-in-stlouis-missouri/",
          "publisher": "Data Center Dynamics",
          "date": "2021-09-10",
          "source_tier": 1
        },
        {
          "title": "TierPoint: Browse our data centers",
          "url": "https://www.tierpoint.com/data-centers/",
          "publisher": "TierPoint",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "TierPoint completes new data center in St. Louis, Missouri - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/tierpoint-completes-new-data-center-in-st-louis-missouri/",
          "publisher": "Data Center Dynamics",
          "date": "2022-08-05",
          "source_tier": 3
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "TierPoint lists TierPoint St. Louis - Olive Data Center, TierPoint St. Louis - Locust Data Center at St. Louis, Missouri on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.tierpoint.com/data-centers/",
          "source_tier": 2
        },
        {
          "status": "operational",
          "effective_at": "2022-08-05",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2022-08-05",
          "summary": "TierPoint completed a new data center in St. Louis, Missouri",
          "source_url": "https://www.datacenterdynamics.com/en/news/tierpoint-completes-new-data-center-in-st-louis-missouri/",
          "source_tier": 3
        }
      ]
    }
  ]
}