{
  "license": "CC BY 4.0",
  "license_url": "https://creativecommons.org/licenses/by/4.0/",
  "attribution": "Data: Data Center Record, datacenterrecord.org, CC BY 4.0. Link to the specific record page where possible.",
  "source": "https://datacenterrecord.org/states/mi/wayne-county",
  "retrieved_at": "2026-10-07T17:49:59.207Z",
  "count": 3,
  "projects": [
    {
      "slug": "google-van-buren-township-data-center-mi",
      "name": "Google Van Buren Township data center",
      "summary": "Google lists a data center at Van Buren, Michigan and says it is being built.",
      "state": "MI",
      "city": "Van Buren",
      "county": "Wayne County",
      "status": "under_construction",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 42.2202069,
      "longitude": -83.4839342,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-14",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "record_url": "https://datacenterrecord.org/projects/google-van-buren-township-data-center-mi",
      "sources": [
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Wayne County commissioners override veto to approve Google data center tax incentives in Van Buren Township - WXYZ 7 News Detroit",
          "url": "https://www.wxyz.com/news/wayne-county-commissioners-override-veto-to-approve-google-data-center-tax-incentives-in-van-buren-township",
          "publisher": "WXYZ 7 News Detroit",
          "date": "2026-10-02",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-10-14",
          "date_basis": "content",
          "date_precision": "day",
          "planned": true,
          "source_date": "2026-10-02",
          "summary": "The Van Buren Township Planning Commission is expected to review the final site plan at its meeting on October 14",
          "source_url": "https://www.wxyz.com/news/wayne-county-commissioners-override-veto-to-approve-google-data-center-tax-incentives-in-van-buren-township",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Van Buren Township data center at Van Buren, Michigan on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "raeden-gibraltar-data-center-mi",
      "name": "Raeden Gibraltar Data Center",
      "summary": "Raeden's data center development in Gibraltar, Michigan was halted by a municipal moratorium, which the developer claims unlawfully stopped the project and has challenged in court.",
      "state": "MI",
      "city": "Gibraltar",
      "county": "Wayne County",
      "status": "rumored",
      "developer": "Raeden",
      "capacity_mw": null,
      "latitude": 42.33167,
      "longitude": -83.0475,
      "location_precision": "county",
      "location_source": "County seat (Detroit), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "record_url": "https://datacenterrecord.org/projects/raeden-gibraltar-data-center-mi",
      "sources": [
        {
          "title": "Raeden claims Michigan moratorium unlawfully stopped its Gibraltar data center development - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/raeden-claims-michigan-moratorium-unlawfully-stopped-its-gibraltar-data-center-development/",
          "publisher": "Data Center Dynamics",
          "date": "2026-08-24",
          "source_tier": 3
        },
        {
          "title": "Raeden Gibraltar Data Center: 100 MW data center in Michigan",
          "url": "https://morethanjustparks.com/data-center-tracker/raeden-gibraltar-data-center-mi--0bcf958a-7788-4863-baae-45bc30b6299b",
          "publisher": "morethanjustparks.com",
          "date": "2026-07-13",
          "source_tier": 4
        },
        {
          "title": "Developers challenge Gibraltar's data center moratorium in court - Detroit Free Press",
          "url": "https://www.freep.com/story/news/politics/2026/08/20/data-center-moratorium-gibraltar-raeden-lawsuit/91367873007/",
          "publisher": "Detroit Free Press",
          "date": "2026-08-20",
          "source_tier": 4
        },
        {
          "title": "Data center developer sues Michigan city, challenging one-year pause on projects - MLive.com",
          "url": "https://www.mlive.com/news/detroit/2026/08/data-center-developer-sues-michigan-city-challenging-one-year-pause-on-projects.html",
          "publisher": "MLive.com",
          "date": "2026-08-20",
          "source_tier": 4
        },
        {
          "title": "Raeden claims Michigan moratorium unlawfully stopped its Gibraltar data center development - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/raeden-claims-michigan-moratorium-unlawfully-stopped-its-gibraltar-data-center-development/",
          "publisher": "Data Center Dynamics",
          "date": "2026-08-24",
          "source_tier": 3
        },
        {
          "title": "Data center developer accuses Gibraltar city officials of unlawfully imposing 1 year moratorium - cbsnews.com",
          "url": "https://www.cbsnews.com/detroit/news/raedan-acquisition-sues-gibraltar-data-center-moratorium/",
          "publisher": "cbsnews.com",
          "date": "2026-08-21",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-08-20",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-20",
          "summary": "Raeden proposed to repurpose McLouth Steel industrial site into 100 megawatt inference data center",
          "source_url": "https://www.freep.com/story/news/politics/2026/08/20/data-center-moratorium-gibraltar-raeden-lawsuit/91367873007/",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "u-m-los-alamos-data-center-van-buren-township-wayne-mi",
      "name": "U-M / Los Alamos Data Center (Van Buren Township)",
      "summary": "A proposed data center linked to the University of Michigan and Los Alamos National Laboratory near Ypsilanti and Van Buren Township has been stalled by a 6 month power moratorium imposed by the township, with protesters planning a gathering at the Ypsilanti and Van Buren Township line.",
      "state": "MI",
      "city": null,
      "county": "Wayne",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 42.33167,
      "longitude": -83.0475,
      "location_precision": "county",
      "location_source": "County seat (Detroit), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "record_url": "https://datacenterrecord.org/projects/u-m-los-alamos-data-center-van-buren-township-wayne-mi",
      "sources": [
        {
          "title": "‘We don’t matter to them’: Ypsilanti Township pushed back on University of Michigan, Los Alamos data center - clickondetroit.com",
          "url": "https://www.clickondetroit.com/all-about-ann-arbor/2026/08/12/we-dont-matter-to-them-ypsilanti-township-pushed-back-on-university-of-michigan-los-alamos-data-center/",
          "publisher": "clickondetroit.com",
          "date": "2026-08-12",
          "source_tier": 4
        },
        {
          "title": "Resistance Grows Against MI Data Center That Would Fuel Nuclear Weapons Research - Truthout",
          "url": "https://truthout.org/articles/resistance-grows-against-mi-data-center-that-would-fuel-nuclear-weapons-research/",
          "publisher": "Truthout",
          "date": "2026-09-04",
          "source_tier": 4
        },
        {
          "title": "‘We don’t deserve this’: UMich town hall over data center draws severe backlash from community members - michigandaily.com",
          "url": "https://www.michigandaily.com/news/administration/we-dont-deserve-this-umich-town-hall-over-data-center-draws-severe-backlash-from-community-members/",
          "publisher": "michigandaily.com",
          "date": "2026-09-11",
          "source_tier": 4
        },
        {
          "title": "U M to hold town hall Wednesday over planned data center - ClickOnDetroit | WDIV Local 4",
          "url": "https://www.clickondetroit.com/video/news/2026/09/09/u-m-to-hold-town-hall-wednesday-over-planned-data-center/",
          "publisher": "ClickOnDetroit | WDIV Local 4",
          "date": "2026-09-09",
          "source_tier": 4
        },
        {
          "title": "Ypsilanti Township residents oppose University of Michigan data center plan - cbsnews.com",
          "url": "https://www.cbsnews.com/detroit/news/ypsilanti-township-residents-speak-university-of-michigan-data-center/",
          "publisher": "cbsnews.com",
          "date": "2026-09-10",
          "source_tier": 4
        },
        {
          "title": "'We will fight to our very last breath': Michigan township uses 6-month power moratorium to stall U-M, Los Alamos data center - The Cool Down",
          "url": "https://www.thecooldown.com/green-tech/michigan-ypsilanti-township-power-moratorium-data-center/",
          "publisher": "The Cool Down",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Data center protesters to gather Saturday at Ypsilanti, Van Buren Township line - MLive.com",
          "url": "https://www.mlive.com/news/ann-arbor/2026/09/data-center-protesters-to-gather-saturday-at-ypsilanti-van-buren-township-line.html",
          "publisher": "MLive.com",
          "date": "2026-09-04",
          "source_tier": 4
        },
        {
          "title": "U-M’s proposed computing center draws concerns over role in nuclear weapons modernization - Michigan Advance",
          "url": "https://michiganadvance.com/2026/09/04/u-ms-proposed-computing-center-draws-concerns-over-role-in-nuclear-weapons-modernization/",
          "publisher": "Michigan Advance",
          "date": "2026-09-04",
          "source_tier": 4
        },
        {
          "title": "UMich’s data center has a similar playbook as OpenAI’s - The Michigan Daily",
          "url": "https://www.michigandaily.com/opinion/columns/umichs-playbook-in-ypsilanti-township-isnt-that-different-than-openais-in-saline/",
          "publisher": "The Michigan Daily",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Dingell opposes U-M Los Alamos data center project, urges greater community transparency - The Michigan Daily",
          "url": "https://www.michigandaily.com/news/government/dingell-opposes-u-m-los-alamos-data-center-project-and-urges-greater-community-transparency/",
          "publisher": "The Michigan Daily",
          "date": "2026-09-16",
          "source_tier": 4
        },
        {
          "title": "U M affirms Ypsilanti $1.2B computing center site; township officials vow fight - Bridge Michigan",
          "url": "https://bridgemi.com/business-watch/u-m-affirms-ypsilanti-1-2b-computing-center-site-township-officials-vow-fight/",
          "publisher": "Bridge Michigan",
          "date": "2026-08-12",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-09-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-11",
          "summary": "University of Michigan announced a partnership with Los Alamos National Laboratory to build a data center in Ypsilanti Township nearly two years ago",
          "source_url": "https://www.michigandaily.com/news/administration/we-dont-deserve-this-umich-town-hall-over-data-center-draws-severe-backlash-from-community-members/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-10",
          "summary": "The facility is proposed to be built on a 144 acre site",
          "source_url": "https://www.cbsnews.com/detroit/news/ypsilanti-township-residents-speak-university-of-michigan-data-center/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-10",
          "summary": "The facility is proposed to be built along the Huron River",
          "source_url": "https://www.cbsnews.com/detroit/news/ypsilanti-township-residents-speak-university-of-michigan-data-center/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-10",
          "summary": "A next town hall is scheduled for October 1",
          "source_url": "https://www.cbsnews.com/detroit/news/ypsilanti-township-residents-speak-university-of-michigan-data-center/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-09",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-09",
          "summary": "University of Michigan hosting town hall on September 9 for Ypsilanti Township residents about data center planned with Los Alamos National Laboratory",
          "source_url": "https://www.clickondetroit.com/video/news/2026/09/09/u-m-to-hold-town-hall-wednesday-over-planned-data-center/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-04",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-04",
          "summary": "The University of Michigan proposed computing facility in Ypsilanti Township would cost $1.2 billion and be almost 300,000 square feet",
          "source_url": "https://truthout.org/articles/resistance-grows-against-mi-data-center-that-would-fuel-nuclear-weapons-research/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-04",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-04",
          "summary": "The project was first announced in 2024",
          "source_url": "https://truthout.org/articles/resistance-grows-against-mi-data-center-that-would-fuel-nuclear-weapons-research/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-04",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-04",
          "summary": "The facility would be almost 300,000 square feet with roughly 250,000 going to Los Alamos and about 50,000 square feet going to the university for nonclassified research",
          "source_url": "https://truthout.org/articles/resistance-grows-against-mi-data-center-that-would-fuel-nuclear-weapons-research/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-08-12",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-12",
          "summary": "University of Michigan announced a site along Textile Road near the Huron River in Ypsilanti Township as the preferred location for a proposed data and research center with Los Alamos National Laboratory",
          "source_url": "https://www.clickondetroit.com/all-about-ann-arbor/2026/08/12/we-dont-matter-to-them-ypsilanti-township-pushed-back-on-university-of-michigan-los-alamos-data-center/",
          "source_tier": 4
        }
      ]
    }
  ]
}
