  "projects": [
    {
      "slug": "jacobs-project-management-co-hut-8-dc-corp-saint-francisville-la",
      "name": "Jacobs Project Management Co, Hut 8 DC Corp-river Bend Data Center",
      "summary": "The EPA's facility registry lists Jacobs Project Management Co, Hut 8 DC Corp river Bend Data Center at 2545 La Hwy 964, Saint Francisville, LA 70000 in Saint Francisville, Louisiana, with a water permit.",
      "state": "LA",
      "city": "St. Francisville",
      "county": "West Feliciana Parish",
      "status": "not_verified",
      "developer": "Jacobs Project Management Co, Hut 8 DC Corp",
      "capacity_mw": null,
      "latitude": 30.7842,
      "longitude": -91.3764,
      "location_precision": "address",
      "location_source": "U.S. Census Bureau 2020 Gazetteer, the internal point of St. Francisville, public domain, placed at city level; the EPA facility record gives no site point (the registry placed its point by post office name centroid, which is not the site)",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "census gazetteer place point",
      "location_last_verified": "2026-10-20",
      "site_address": "2545 La Hwy 964, Saint Francisville, LA 70000",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072156341",
      "published": "2026-10-20",
      "last_verified": "2026-10-20",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072156341",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/jacobs-project-management-co-hut-8-dc-corp-saint-francisville-la",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Jacobs Project Management Co, Hut 8 DC Corp river Bend Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110072156341",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "delta-forge-1-boyce-la",
      "name": "Delta Forge 1",
      "summary": "Applied Digital is constructing a 300 acre, $3.6 billion data center campus called Delta Forge 1 in Boyce, Louisiana, with 300 MW in its first phase and initial operations expected as soon as mid 2027.",
      "state": "LA",
      "city": "Boyce",
      "county": "Rapides Parish",
      "status": "rumored",
      "developer": "Applied Digital",
      "capacity_mw": 300,
      "latitude": 31.31125,
      "longitude": -92.44519,
      "location_precision": "county",
      "location_source": "County seat (Alexandria), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": "5941 La Hwy 121, Boyce, LA 70000",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072183100",
      "published": "2026-09-05",
      "last_verified": "2026-10-06",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/delta-forge-1-boyce-la",
      "sources": [
        {
          "title": "Citizens 'have no seat at the table' on data centers, says organizer - thetowntalk.com",
          "url": "https://www.thetowntalk.com/story/news/2026/09/13/residents-support-ai-data-center-revolt-tour-stop-near-boyce-project/91747763007/",
          "publisher": "thetowntalk.com",
          "date": "2026-09-13",
          "source_tier": 4
        },
        {
          "title": "NDAs are hiding data center deals, drawing ire from locals — and attention from lawmakers - Oregon Public Broadcasting - OPB",
          "url": "https://www.opb.org/article/2026/08/27/ndas-are-hiding-data-center-deals-drawing-ire-from-locals-and-attention-from-lawmakers/",
          "publisher": "OPB (via Google News)",
          "date": "2026-08-27",
          "source_tier": 4
        },
        {
          "title": "Cleco to power planned Rapides Parish data center - Rapides Parish Journal",
          "url": "https://rapidesparishjournal.com/2026/05/27/cleco-to-power-planned-rapides-parish-data-center/",
          "publisher": "Rapides Parish Journal",
          "date": "2026-05-27",
          "source_tier": 1
        },
        {
          "title": "Applied Digital secures customer for new 210MW data center campus - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/applied-digital-secures-customer-for-new-210mw-data-center-campus/",
          "publisher": "Data Center Dynamics",
          "date": "2026-06-09",
          "source_tier": 1
        },
        {
          "title": "Cleco to power data center coming to Rapides Parish - KALB | News Channel 5",
          "url": "https://www.kalb.com/2026/05/27/cleco-power-data-center-coming-rapides-parish/",
          "publisher": "KALB | News Channel 5",
          "date": "2026-05-27",
          "source_tier": 1
        },
        {
          "title": "NDAs are hiding data center deals, drawing ire from locals — and attention from lawmakers - NPR",
          "url": "https://www.npr.org/2026/08/27/nx-s1-5879528/data-center-nda-disclosure-louisiana",
          "publisher": "NPR",
          "date": "2026-08-27",
          "source_tier": 4
        },
        {
          "title": "Developer of Delta data center announces ‘revolutionary’ tech to turn natural gas into water - News From The States",
          "url": "https://www.newsfromthestates.com/article/developer-delta-data-center-announces-revolutionary-tech-turn-natural-gas-water",
          "publisher": "News From The States",
          "date": "2026-09-09",
          "source_tier": 4
        },
        {
          "title": "EPA ECHO detailed facility report: Beard Construction Group LLC, Applied Digital",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110072183100",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-09-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-13",
          "summary": "Applied Digital building 3.6 billion dollar Data Forge 1 data center near Boyce",
          "source_url": "https://www.thetowntalk.com/story/news/2026/09/13/residents-support-ai-data-center-revolt-tour-stop-near-boyce-project/91747763007/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-13",
          "summary": "Meta building Hyperion data center approximately 30 miles east of Monroe in Richland Parish",
          "source_url": "https://www.thetowntalk.com/story/news/2026/09/13/residents-support-ai-data-center-revolt-tour-stop-near-boyce-project/91747763007/",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "edgeconnex-new-orleans-holdings-llc-slidell-la",
      "name": "Edgeconnex New Orleans Holdings LLC",
      "summary": "The EPA's facility registry lists Edgeconnex New Orleans Holdings LLC at 2070 Gause Boulevard East, Slidell, LA 70461 in Slidell, Louisiana, with a hazardous waste record.",
      "state": "LA",
      "city": "Slidell",
      "county": "St. Tammany Parish",
      "status": "not_verified",
      "developer": "EdgeConneX",
      "capacity_mw": null,
      "latitude": 30.28639,
      "longitude": -89.737523,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110070911179: the registry placed its point by address matching house number, accurate to 50 m",
      "location_verified_at": "2026-10-03",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-03",
      "site_address": "2070 Gause Boulevard East, Slidell, LA 70461",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070911179",
      "published": "2026-10-03",
      "last_verified": "2026-10-03",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070911179",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/edgeconnex-new-orleans-holdings-llc-slidell-la",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Edgeconnex New Orleans Holdings LLC",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110070911179",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "livingston-parish-data-center-la",
      "name": "Livingston Parish Data Center",
      "summary": "Rumors are circulating about a data center coming to Livingston Parish, with the parish president denying having signed an NDA related to the project.",
      "state": "LA",
      "city": null,
      "county": "Livingston Parish",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 30.4986,
      "longitude": -90.7483,
      "location_precision": "county",
      "location_source": "County seat (Livingston), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": 691,
      "site_acres_disclosed_as": "third_party_estimate",
      "site_acres_source_url": "https://www.livingstonparishnews.com/stories/delatte-addresses-data-center-speculation,229844",
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/livingston-parish-data-center-la",
      "sources": [
        {
          "title": "Delatte addresses data center speculation - Livingston Parish News",
          "url": "https://www.livingstonparishnews.com/stories/delatte-addresses-data-center-speculation,229844",
          "publisher": "Livingston Parish News",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Is a data center coming to Livingston Parish? As rumors swirl, here's what we know. - theadvocate.com",
          "url": "https://www.theadvocate.com/baton_rouge/news/communities/livingston_tangipahoa/is-data-center-coming-livingston/article_29570770-b1c6-4d05-952a-9002a69d2fa3.html",
          "publisher": "theadvocate.com",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Livingston Parish president denies signing NDA for data center - Louisiana First News",
          "url": "https://www.louisianafirstnews.com/video/livingston-parish-president-denies-signing-nda-for-data-center/12127978/",
          "publisher": "Louisiana First News",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "WBRZ Channel 2. . Livingston Parish President Randy Delatte announced on Tuesday that he has not signed an NDA regarding any business coming to Livingston Parish and as of now, there are no plans for a data center. Read the full story through the link i",
          "url": "https://www.facebook.com/WBRZNews2/videos/livingston-parish-president-randy-delatte-announced-on-tuesday-that-he-has-not-s/1075986291565820/",
          "publisher": "www.facebook.com",
          "date": "2026-09-03",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-09-01",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-01",
          "summary": "The land was originally planned for development as a 1700 family subdivision before rezoning for potential data center use",
          "source_url": "https://www.livingstonparishnews.com/stories/delatte-addresses-data-center-speculation,229844",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-01",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-01",
          "summary": "DEMCO requested expedited approval to generate an additional gigawatt of energy, cited as potential evidence of data center project",
          "source_url": "https://www.livingstonparishnews.com/stories/delatte-addresses-data-center-speculation,229844",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "meta-louisiana-data-center-richland-la",
      "name": "Meta Louisiana data center",
      "summary": "Meta expanded its data center investment in Richland Parish, Louisiana to $50 billion, with the project reported to be creating jobs and opportunity in the parish.",
      "state": "LA",
      "city": null,
      "county": "Richland Parish",
      "status": "under_construction",
      "developer": "Meta",
      "capacity_mw": 5000,
      "latitude": 32.47736,
      "longitude": -91.75485,
      "location_precision": "county",
      "location_source": "County seat (Rayville), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/meta-louisiana-data-center-richland-la",
      "sources": [
        {
          "title": "Zuckerberg’s $250 Billion Louisiana Data Center Will Create Just 1,000 Jobs. That’s $250 Million Spent Per Job - Yahoo Finance",
          "url": "https://247wallst.com/investing/2026/08/14/zuckerbergs-250-billion-louisiana-data-center-will-create-just-1000-jobs-thats-250-million-spent-per-job/",
          "publisher": "Yahoo Finance",
          "date": "2026-08-14",
          "source_tier": 4
        },
        {
          "title": "Letters: As data center discussed for Livingston Parish, questions remain - NOLA.com",
          "url": "https://www.nola.com/opinions/letters/letters-data-center-livingston-parish/article_05be4bde-50d0-4f7b-a862-ec8653cd1217.amp.html",
          "publisher": "NOLA.com",
          "date": "2026-09-10",
          "source_tier": 4
        },
        {
          "title": "Congresswoman Julia Letlow responds to Meta’s $50 billion Richland Parish expansion - KTVE – myarklamiss.com – Your ArkLaMiss News Source",
          "url": "https://www.myarklamiss.com/news/ouachita-parish/letlow-responds-to-metas-50-billion-richland-parish-expansion/",
          "publisher": "KTVE – myarklamiss.com – Your ArkLaMiss News Source",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "Meta's Louisiana Data Center Is Making Rural America Part of the AI Race - Memeburn",
          "url": "https://memeburn.com/metas-louisiana-data-center-is-making-rural-america-part-of-the-ai-race/",
          "publisher": "Memeburn",
          "date": "2026-07-16",
          "source_tier": 1
        },
        {
          "title": "Meta expands Richland Parish data center, now $50-billion project - hannapub.com",
          "url": "https://www.hannapub.com/ouachitacitizen/news/local_state_headlines/meta-expands-richland-parish-data-center-now-50-billion-project/article_4f99b31f-8edd-47b2-bba0-20617bc7352c.html",
          "publisher": "hannapub.com",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "Gov. Jeff Landry backs Meta's $50 billion data center expansion alongside Trump in D.C. - WDSU",
          "url": "https://www.wdsu.com/article/louisiana-data-center-growth-jeff-landry-washington/73250393",
          "publisher": "WDSU",
          "date": "2026-07-23",
          "source_tier": 1
        },
        {
          "title": "Concerns grow along with size of Meta data center - louisianaradionetwork.com",
          "url": "https://louisianaradionetwork.com/2026/07/16/concerns-grow-along-with-size-of-meta-data-center/",
          "publisher": "louisianaradionetwork.com",
          "date": "2026-07-16",
          "source_tier": 1
        },
        {
          "title": "Gov. Jeff Landry cheers Meta expansion as local leaders, residents react - nola.com",
          "url": "https://www.nola.com/news/business/gov-jeff-landry-cheers-meta-expansion-as-local-leaders-residents-react/article_fe98e646-1833-4645-bd91-6000051dabfe.html",
          "publisher": "nola.com",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "PSC votes against requiring Meta to reveal more about data center - WWLTV.com",
          "url": "https://www.wwltv.com/article/tech/psc-rejects-request-for-more-information-on-meta-data-center/289-7241512a-497f-4e01-9545-868b16da09cf",
          "publisher": "WWLTV.com",
          "date": "2026-08-12",
          "source_tier": 1
        },
        {
          "title": "I own a house rental business near a future Meta AI data center. Construction workers make up most of our tenants. - Business Insider",
          "url": "https://www.businessinsider.com/meta-ai-data-center-louisiana-housing-market-home-rentals-2026-9",
          "publisher": "Business Insider",
          "date": "2026-09-13",
          "source_tier": 4
        },
        {
          "title": "Meta expands controversial Louisiana AI data center investment to $50 billion - The Tulane Hullabaloo",
          "url": "https://tulanehullabaloo.com/75337/news/meta-expands-controversial-louisiana-ai-data-center-investment-to-50-billion/",
          "publisher": "The Tulane Hullabaloo",
          "date": "2026-08-24",
          "source_tier": 4
        },
        {
          "title": "Meta builds a $50 billion dollar data center in Richland Parish, Louisiana - loyolamaroon.com",
          "url": "https://loyolamaroon.com/10047124/news/local-news/meta-builds-a-50-billion-dollar-data-center-in-richland-parish-louisiana/",
          "publisher": "loyolamaroon.com",
          "date": "2026-08-22",
          "source_tier": 4
        },
        {
          "title": "From RV camps to packed hotels, Meta data center project has LA parish bursting at the seams - NOLA.com",
          "url": "https://www.nola.com/news/politics/meta-data-center-richland-parish-louisiana/article_1a044e8c-632c-474e-a899-d6a47c11ec78.html",
          "publisher": "NOLA.com",
          "date": "2026-08-21",
          "source_tier": 4
        },
        {
          "title": "$50,000 teacher checks have Louisiana parishes asking for data centers - The Center Square",
          "url": "https://www.thecentersquare.com/louisiana/article_44b57c7e-9c5f-4051-a8eb-8ecb51cf1c8a.html",
          "publisher": "The Center Square",
          "date": "2026-09-17",
          "source_tier": 4
        },
        {
          "title": "Meta data center in Richland Parish brings jobs, tax growth to northeast Louisiana - WAFB",
          "url": "https://www.wafb.com/2026/07/29/meta-data-center-richland-parish-brings-jobs-tax-growth-northeast-louisiana/",
          "publisher": "WAFB",
          "date": "2026-07-29",
          "source_tier": 4
        },
        {
          "title": "5 Things to Know About Meta’s Giant Data Center in Louisiana - The New York Times",
          "url": "https://www.nytimes.com/2026/07/27/business/meta-data-center-louisiana-takeaways.html",
          "publisher": "The New York Times",
          "date": "2026-07-28",
          "source_tier": 4
        },
        {
          "title": "How Meta Got Everything It Wanted in a Secret Louisiana Data Center Deal - The New York Times",
          "url": "https://www.nytimes.com/2026/07/27/technology/meta-data-center-louisiana.html",
          "publisher": "The New York Times",
          "date": "2026-07-27",
          "source_tier": 4
        },
        {
          "title": "Meta Data Center in Louisiana - LED - Louisiana Economic Development (.gov)",
          "url": "https://www.opportunitylouisiana.gov/data-center/meta",
          "publisher": "Louisiana Economic Development (.gov)",
          "date": "2026-07-13",
          "source_tier": 2
        },
        {
          "title": "Deepening our investment in Richland Parish, Louisiana - Meta Data Centers",
          "url": "https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/",
          "publisher": "Meta Data Centers",
          "date": "2026-07-13",
          "source_tier": 4
        },
        {
          "title": "Teachers and Local Businesses Win as Meta Expands Louisiana Data Center - Meta Store",
          "url": "https://about.fb.com/news/2026/07/teachers-local-businesses-win-as-meta-expands-louisiana-data-center/",
          "publisher": "Meta Store",
          "date": "2026-07-13",
          "source_tier": 4
        },
        {
          "title": "Meta's Louisiana data center investment to reach $50 billion, aided by generous tax incentives - CNBC",
          "url": "https://www.cnbc.com/2026/07/13/meta-louisiana-data-center-investment-reaches-50-billion-amid-ai-push.html",
          "publisher": "CNBC",
          "date": "2026-07-13",
          "source_tier": 4
        },
        {
          "title": "Meta more than doubles size of Louisiana AI data center in massive $50 billion expansion - WAFB",
          "url": "https://www.fox8live.com/2026/07/13/gov-landry-meta-formally-announce-louisiana-data-centers-historic-expansion/",
          "publisher": "WAFB",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "How big will the Richland Parish data center be? Meta will expand AI center - Shreveport Times",
          "url": "https://www.shreveporttimes.com/story/news/special-reports/datacenter/2026/07/13/is-meta-expanding-the-richland-parish-data-center-investment-costs-how-large-much-water-energy/90901504007/",
          "publisher": "Shreveport Times",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "Meta expands Louisiana Hyperion data center to 5 gigawatts - finance.yahoo.com",
          "url": "https://finance.yahoo.com/technology/articles/meta-expands-louisiana-hyperion-data-121522809.html",
          "publisher": "finance.yahoo.com",
          "date": "2026-07-27",
          "source_tier": 1
        },
        {
          "title": "Meta Will Invest Over $50B To Expand North Louisiana Data Center Campus - Business Facilities",
          "url": "https://businessfacilities.com/meta-will-invest-over-50b-to-expand-north-louisiana-data-center-campus/",
          "publisher": "Business Facilities",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "Meta plans $40 billion expansion of Louisiana AI data center, more than doubling its size - NOLA.com",
          "url": "https://www.nola.com/news/business/meta-louisiana-ai-data-center-richland-parish/article_d1308014-c718-4c34-a75f-476a151ef1a7.html",
          "publisher": "NOLA.com",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "Meta to spend an additional $40B to expand colossal Louisiana data center - businessreport.com",
          "url": "https://www.businessreport.com/article/meta-to-spend-an-additional-40b-to-expand-colossal-louisiana-data-center",
          "publisher": "businessreport.com",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "New York Times investigates Meta's data center deal in Louisiana - Axios",
          "url": "https://www.axios.com/local/new-orleans/2026/07/28/new-york-times-investigates-meta-s-data-center-deal-in-louisiana",
          "publisher": "Axios",
          "date": "2026-07-28",
          "source_tier": 1
        },
        {
          "title": "North Louisiana Meta data center to become largest center in history - WDSU",
          "url": "https://www.wdsu.com/article/north-louisiana-meta-data-center-largest-center/71920037",
          "publisher": "WDSU",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "Meta expands Louisiana data center to 5 gigawatts, investment crosses $50 billion - Reuters",
          "url": "https://www.reuters.com/business/meta-expands-louisiana-data-center-5-gigawatts-compute-capacity-2026-07-13/",
          "publisher": "Reuters",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "Meta expands plans for Richland Parish data center while investing in the local community - WBRZ",
          "url": "https://www.wbrz.com/news/meta-expands-plans-for-richland-parish-data-center-while-investing-in-the-local-community/",
          "publisher": "WBRZ",
          "date": "2026-07-12",
          "source_tier": 1
        },
        {
          "title": "Meta data center in Richland Parish brings jobs, tax growth to northeast Louisiana - KOLN | Nebraska Local News, Weather, Sports | Lincoln, NE",
          "url": "https://www.1011now.com/video/2026/07/29/meta-data-center-richland-parish-brings-jobs-tax-growth-northeast-louisiana/",
          "publisher": "KOLN | Nebraska Local News, Weather, Sports | Lincoln, NE",
          "date": "2026-07-29",
          "source_tier": 1
        },
        {
          "title": "Gov. Jeff Landry discusses Meta's investment into Louisiana through data center in Richland Parish - wbrz.com",
          "url": "https://www.wbrz.com/news/gov-jeff-landry-discusses-meta-s-investment-into-louisiana-through-data-center-in-richland-parish/",
          "publisher": "wbrz.com",
          "date": "2026-07-12",
          "source_tier": 1
        },
        {
          "title": "Meta expands Louisiana Hyperion data center to 5GW and $50 billion - Yahoo Finance",
          "url": "https://finance.yahoo.com/technology/ai/articles/meta-expands-louisiana-hyperion-data-120038782.html",
          "publisher": "Yahoo Finance",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "Meta Data Center in Louisiana - LED - Louisiana Economic Development - LED (.gov)",
          "url": "https://www.opportunitylouisiana.gov/data-center/meta",
          "publisher": "Louisiana Economic Development - LED (.gov)",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "The power play behind Hyperion, Mark Zuckerberg’s colossal data center being built in rural Louisiana - Sherwood News",
          "url": "https://sherwood.news/tech/hyperion/",
          "publisher": "Sherwood News",
          "date": "2025-12-15",
          "source_tier": 1
        },
        {
          "title": "Entergy keeps Meta data center load forecasts confidential - The Center Square",
          "url": "https://neworleanscitybusiness.com/blog/2026/07/01/louisiana-psc-data-center-confidentiality-rule/",
          "publisher": "The Center Square",
          "date": "2026-06-30",
          "source_tier": 1
        },
        {
          "title": "Entergy seeks more big projects in 2026 as Louisiana load surges - New Orleans CityBusiness",
          "url": "https://neworleanscitybusiness.com/blog/2026/01/05/entergy-louisiana-1b-transmission-project/",
          "publisher": "New Orleans CityBusiness",
          "date": "2026-01-05",
          "source_tier": 1
        },
        {
          "title": "Louisiana AI Project to Grow to 5 GW - rtoinsider.com",
          "url": "https://www.rtoinsider.com/136600-louisiana-ai-project-to-grow-to-5gw/",
          "publisher": "rtoinsider.com",
          "date": "2026-07-14",
          "source_tier": 1
        },
        {
          "title": "Williams expands northwest Louisiana Haynesville Shale as data centers drive demand - The Shreveport-Bossier City Advocate",
          "url": "https://www.shreveportbossieradvocate.com/business/williams-sees-opportunity-in-haynesville-shale-data-center-demand/article_63b24135-317a-4129-89ef-49ada8d999b9.html",
          "publisher": "The Shreveport-Bossier City Advocate",
          "date": "2026-08-07",
          "source_tier": 1
        },
        {
          "title": "Groups Warn that La. Ratepayers Could be Saddled with Buildout for Meta’s Hyperion - RTO Insider",
          "url": "https://www.rtoinsider.com/138696-nonprofits-denounce-louisiana-meta-buildout-warn-cost-spillover/",
          "publisher": "RTO Insider",
          "date": "2026-08-09",
          "source_tier": 1
        },
        {
          "title": "Entergy receives regulatory approval for investments to support Meta's Louisiana data center - Reuters",
          "url": "https://www.reuters.com/business/energy/entergy-receives-regulatory-approval-investments-support-metas-louisiana-data-2025-08-20/",
          "publisher": "Reuters",
          "date": "2025-08-20",
          "source_tier": 1
        },
        {
          "title": "Entergy Louisiana gains regulatory approval for massive Meta power project - Louisiana Illuminator",
          "url": "https://lailluminator.com/2025/08/20/entergy-meta/",
          "publisher": "Louisiana Illuminator",
          "date": "2025-08-20",
          "source_tier": 1
        },
        {
          "title": "Meta data center in northeast LA transforms local government: ‘Coming into the modern world’ - NOLA.com",
          "url": "https://www.nola.com/news/politics/elections/richland-parish-meta-data-centers-local-government/article_0b35c62f-6674-4ed5-86ef-88270f7191f9.html",
          "publisher": "NOLA.com",
          "date": "2026-08-31",
          "source_tier": 4
        },
        {
          "title": "How big will the Richland Parish data center be? Meta will expand AI center - Yahoo Finance",
          "url": "https://finance.yahoo.com/technology/ai/articles/big-richland-parish-data-center-171024537.html",
          "publisher": "Yahoo Finance",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "Gov. Jeff Landry hails expansion of Meta’s massive data center in Louisiana - NOLA.com",
          "url": "https://www.nola.com/news/politics/jeff-landry-meta-data-center-louisiana-press-conference/article_ea8647e9-9652-40aa-b4ad-77f9562aa31a.html",
          "publisher": "NOLA.com",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "Meta expanding Richland Parish data center to 5 gigawatts, one of the largest in history - WAFB",
          "url": "https://www.wafb.com/video/2026/07/14/meta-expanding-richland-parish-data-center-5-gigawatts-one-largest-history-2/",
          "publisher": "WAFB",
          "date": "2026-07-14",
          "source_tier": 1
        },
        {
          "title": "Meta: Our U.S. data center fleet",
          "url": "https://datacenters.atmeta.com/us-locations/",
          "publisher": "Meta",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "This community college is training Louisiana residents for jobs at Meta's data center - WWNO",
          "url": "https://www.wwno.org/education/2026-09-04/this-community-college-is-training-louisiana-residents-for-jobs-at-metas-data-center",
          "publisher": "WWNO",
          "date": "2026-09-04",
          "source_tier": 4
        },
        {
          "title": "Meta hides data center info as it pushes more risks to Entergy’s customers - thelensnola.org",
          "url": "https://thelensnola.org/2026/08/18/meta-louisiana-data-center-ratepayer-costs/",
          "publisher": "thelensnola.org",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "Louisiana regulators kill effort to subpoena details of Meta data center - E&E News by POLITICO",
          "url": "https://www.eenews.net/articles/louisiana-regulators-kill-effort-to-subpoena-details-of-meta-data-center/",
          "publisher": "E&E News by POLITICO",
          "date": "2026-08-13",
          "source_tier": 4
        },
        {
          "title": "Meta won’t have to turn over job, electric information after Louisiana regulators override judge - NOLA.com",
          "url": "https://www.nola.com/news/meta-won-t-have-to-turn-over-job-electric-information-after-louisiana-regulators-override-judge/article_69105eda-826d-476c-9b01-b911afcdbe64.html",
          "publisher": "NOLA.com",
          "date": "2026-08-12",
          "source_tier": 4
        },
        {
          "title": "Louisiana Democrats helped bring Meta to the state. Some regret their votes - thecentersquare.com",
          "url": "https://www.thecentersquare.com/louisiana/article_f5fe155f-eab3-46be-872a-17c18608f4d9.html",
          "publisher": "thecentersquare.com",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Meta’s data center will be the biggest in the U.S., but no one knows who they’re hiring - thelensnola.org",
          "url": "https://thelensnola.org/2026/08/31/metas-data-center-will-be-the-biggest-in-the-u-s-but-no-one-knows-who-theyre-hiring/",
          "publisher": "thelensnola.org",
          "date": "2026-08-31",
          "source_tier": 4
        },
        {
          "title": "Meta can keep its data center details private, PSC decides - Louisiana Illuminator",
          "url": "https://lailluminator.com/2026/08/13/meta-data-center-private/",
          "publisher": "Louisiana Illuminator",
          "date": "2026-08-13",
          "source_tier": 4
        },
        {
          "title": "Expanded Meta Data Center Creates More Jobs and Opportunity in Richland Parish, Louisiana - Associated Construction Publications",
          "url": "https://www.turnerconstruction.com/insights/expanded-meta-data-center-creates-more-jobs-and-opportunity-in-richland-parish-louisiana",
          "publisher": "Associated Construction Publications",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "Meta prevails as Louisiana regulators block disclosure of data center expansion records - Baton Rouge Business Report",
          "url": "https://www.businessreport.com/article/meta-prevails-as-louisiana-regulators-block-disclosure-of-data-center-expansion-records",
          "publisher": "Baton Rouge Business Report",
          "date": "2026-08-12",
          "source_tier": 4
        },
        {
          "title": "Is a data center coming to Moss Bluff? Here’s what we know. - theadvocate.com",
          "url": "https://www.theadvocate.com/lake_charles/is-a-data-center-coming-to-moss-bluff-here-s-what-we-know/article_ad6f97c0-ed97-4609-99a5-eac05731915e.html",
          "publisher": "theadvocate.com",
          "date": "2026-08-12",
          "source_tier": 4
        },
        {
          "title": "Regulators allow Meta to keep data center records secret - WAFB",
          "url": "https://www.wafb.com/2026/08/12/regulators-allow-meta-keep-data-center-records-secret/",
          "publisher": "WAFB",
          "date": "2026-08-12",
          "source_tier": 4
        },
        {
          "title": "Louisiana PSC kills ruling that would force Meta to turn over key data center information - WWNO",
          "url": "https://www.wwno.org/politics/2026-08-12/louisiana-psc-kills-ruling-that-would-force-meta-to-turn-over-key-data-center-information",
          "publisher": "WWNO",
          "date": "2026-08-12",
          "source_tier": 4
        },
        {
          "title": "Meta wants to keep Hyperion data center details protected - Louisiana Illuminator",
          "url": "https://lailluminator.com/2026/08/11/meta-wants-details-secret/",
          "publisher": "Louisiana Illuminator",
          "date": "2026-08-11",
          "source_tier": 4
        },
        {
          "title": "Public Service Commission can demand transparency for Meta’s data center expansion - Louisiana Illuminator",
          "url": "https://lailluminator.com/2026/08/11/meta-energy/",
          "publisher": "Louisiana Illuminator",
          "date": "2026-08-11",
          "source_tier": 4
        },
        {
          "title": "Meta Hides Data Center Info As it Pushes More Risks to Entergy’s Customers - The Equation - Union of Concerned Scientists",
          "url": "https://blog.ucs.org/paul-arbaje/meta-hides-data-center-info-as-it-pushes-more-risks-to-entergys-customers/",
          "publisher": "The Equation - Union of Concerned Scientists",
          "date": "2026-08-10",
          "source_tier": 4
        },
        {
          "title": "As Meta data center expands, advocates push harder for transparency - Louisiana Illuminator",
          "url": "https://lailluminator.com/2026/08/05/as-meta-data-center-expands-advocates-push-harder-for-transparency/",
          "publisher": "Louisiana Illuminator",
          "date": "2026-08-05",
          "source_tier": 4
        },
        {
          "title": "Meta’s $200 Billion Bet on a Remote Data Center",
          "url": "https://www.youtube.com/watch?v=VV9Y8IYS9W4",
          "publisher": "YouTube",
          "date": "2026-05-23",
          "source_tier": 5
        },
        {
          "title": "Expanded Meta Data Center Creates More Jobs and Opportunity in Richland Parish, Louisiana - Associated Construction Publications",
          "url": "https://www.turnerconstruction.com/insights/expanded-meta-data-center-creates-more-jobs-and-opportunity-in-richland-parish-louisiana",
          "publisher": "Associated Construction Publications",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "Meta hides data center info as it pushes more risks to Entergy’s customers - thelensnola.org",
          "url": "https://thelensnola.org/2026/08/18/meta-louisiana-data-center-ratepayer-costs/",
          "publisher": "thelensnola.org",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "Editorial: Meta changing life in Richland Parish",
          "url": "https://americanpress.com/2026/09/02/editorial-meta-changing-life-in-richland-parish/",
          "publisher": "americanpress.com",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Meta data center in Richland Parish brings jobs, tax growth to northeast Louisiana",
          "url": "https://www.wafb.com/2026/07/29/meta-data-center-richland-parish-brings-jobs-tax-growth-northeast-louisiana/",
          "publisher": "WAFB",
          "date": "2026-07-29",
          "source_tier": 4
        },
        {
          "title": "Meta expanding Richland Parish data center to 5 gigawatts, one of the largest in history",
          "url": "https://www.knoe.com/video/2026/07/14/meta-expanding-richland-parish-data-center-5-gigawatts-one-largest-history-2/",
          "publisher": "KNOE",
          "date": "2026-07-13",
          "source_tier": 4
        },
        {
          "title": "Louisiana Meta data center generates staggering sales tax growth",
          "url": "https://www.shreveporttimes.com/story/news/2026/07/21/louisiana-meta-data-center-generates-staggering-sales-tax-growth-as-trump-predicted/90986903007/",
          "publisher": "Shreveport Times",
          "date": "2026-07-21",
          "source_tier": 4
        },
        {
          "title": "Digital Infrastructure as the Backbone of the Future: How Meta's Louisiana Data Center Expansion is Delivering Life Changing Returns",
          "url": "https://netchoice.org/digital-infrastructure-as-the-backbone-of-the-future-how-metas-louisiana-data-center-expansion-is-delivering-life-changing-returns/",
          "publisher": "NetChoice",
          "date": "2026-07-20",
          "source_tier": 4
        },
        {
          "title": "Meta data center tax infusion means $50,000 bonus checks for these Louisiana teachers - The Shreveport Bossier City Advocate",
          "url": "https://www.shreveportbossieradvocate.com/news/meta-data-center-bonus-checks-taxes/article_a2f5fa71-e62d-4197-af35-fc31e201065d.html",
          "publisher": "shreveportbossieradvocate.com",
          "date": "2026-06-13",
          "source_tier": 4
        },
        {
          "title": "This community college is training Louisiana residents for jobs at Meta's data center - WWNO",
          "url": "https://www.wwno.org/education/2026-09-04/this-community-college-is-training-louisiana-residents-for-jobs-at-metas-data-center",
          "publisher": "WWNO",
          "date": "2026-09-04",
          "source_tier": 4
        },
        {
          "title": "From RV camps to packed hotels, Meta data center project has LA parish bursting at the seams - NOLA.com",
          "url": "https://www.nola.com/news/politics/meta-data-center-richland-parish-louisiana/article_1a044e8c-632c-474e-a899-d6a47c11ec78.html",
          "publisher": "NOLA.com",
          "date": "2026-08-21",
          "source_tier": 4
        },
        {
          "title": "Investing in Richland Parish",
          "url": "https://www.meta.com/actions/building-louisiana/",
          "publisher": "Meta Store",
          "date": "2026-07-13",
          "source_tier": 2
        },
        {
          "title": "Meta's Louisiana data center investment to reach $50 billion, aided by generous tax incentives",
          "url": "https://www.cnbc.com/2026/07/13/meta-louisiana-data-center-investment-reaches-50-billion-amid-ai-push.html",
          "publisher": "CNBC",
          "date": "2026-07-13",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "Meta construction at Richland Parish began increase in worker numbers in December 2024",
          "source_url": "https://www.thecentersquare.com/louisiana/article_44b57c7e-9c5f-4051-a8eb-8ecb51cf1c8a.html",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Meta lists Meta Richland Parish Data Center at Richland Parish, Louisiana on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.atmeta.com/us-locations/",
          "source_tier": 2
        },
        {
          "status": "operational",
          "effective_at": "2026-09-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-13",
          "summary": "Meta announced Hyperion AI data center in northeast Louisiana",
          "source_url": "https://www.businessinsider.com/meta-ai-data-center-louisiana-housing-market-home-rentals-2026-9",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-09-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-10",
          "summary": "Work continues on the Meta Richland Parish Data Center near Rayville as of August 3, 2026",
          "source_url": "https://www.nola.com/opinions/letters/letters-data-center-livingston-parish/article_05be4bde-50d0-4f7b-a862-ec8653cd1217.amp.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-04",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-04",
          "summary": "Louisiana Delta Community College created new four week data center technician program",
          "source_url": "https://www.wwno.org/education/2026-09-04/this-community-college-is-training-louisiana-residents-for-jobs-at-metas-data-center",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-04",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-04",
          "summary": "Meta is described as having its largest project at Richland Parish, and one of the biggest in the world",
          "source_url": "https://www.wwno.org/education/2026-09-04/this-community-college-is-training-louisiana-residents-for-jobs-at-metas-data-center",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-04",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-04",
          "summary": "The programs were created since late 2024, when Meta broke ground on the Richland Parish data center",
          "source_url": "https://www.wwno.org/education/2026-09-04/this-community-college-is-training-louisiana-residents-for-jobs-at-metas-data-center",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "Meta announced Richland Parish data center less than seven months after HB 827 passage in 2024",
          "source_url": "https://www.thecentersquare.com/louisiana/article_f5fe155f-eab3-46be-872a-17c18608f4d9.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "The data center is known as Hyperion",
          "source_url": "https://americanpress.com/2026/09/02/editorial-meta-changing-life-in-richland-parish/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-21",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-21",
          "summary": "Meta is expanding its investment at Hyperion to $50 billion from $10 billion, announced in July.",
          "source_url": "https://www.nola.com/news/politics/meta-data-center-richland-parish-louisiana/article_1a044e8c-632c-474e-a899-d6a47c11ec78.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-21",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-21",
          "summary": "The data center will occupy five square miles and is scheduled to be fully operational in 2036.",
          "source_url": "https://www.nola.com/news/politics/meta-data-center-richland-parish-louisiana/article_1a044e8c-632c-474e-a899-d6a47c11ec78.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-18",
          "summary": "Interior buildout already underway in first buildings",
          "source_url": "https://www.turnerconstruction.com/insights/expanded-meta-data-center-creates-more-jobs-and-opportunity-in-richland-parish-louisiana",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-18",
          "summary": "Entergy Louisiana filed an application in April 2026 for seven additional gas fired power plants to serve Meta's data center expansion",
          "source_url": "https://thelensnola.org/2026/08/18/meta-louisiana-data-center-ratepayer-costs/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-18",
          "summary": "Meta's data center in Richland Parish requires a total of 10 new gas plants, including three already approved last year",
          "source_url": "https://thelensnola.org/2026/08/18/meta-louisiana-data-center-ratepayer-costs/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-18",
          "summary": "The commission's final decision on the seven new gas plants is scheduled for December 16, 2026",
          "source_url": "https://thelensnola.org/2026/08/18/meta-louisiana-data-center-ratepayer-costs/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-18",
          "summary": "Meta expanded Richland Parish data center from originally announced 2 gigawatts to 5 gigawatts of IT capacity",
          "source_url": "https://www.turnerconstruction.com/insights/expanded-meta-data-center-creates-more-jobs-and-opportunity-in-richland-parish-louisiana",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-08-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-14",
          "summary": "Entergy Louisiana will build seven new gas fired power plants to support the data center",
          "source_url": "https://247wallst.com/investing/2026/08/14/zuckerbergs-250-billion-louisiana-data-center-will-create-just-1000-jobs-thats-250-million-spent-per-job/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-08-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-14",
          "summary": "Full buildout of both phases not expected until around 2036",
          "source_url": "https://247wallst.com/investing/2026/08/14/zuckerbergs-250-billion-louisiana-data-center-will-create-just-1000-jobs-thats-250-million-spent-per-job/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-08-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-14",
          "summary": "Permanent headcount of 1,000 jobs arrives after a decade of construction",
          "source_url": "https://247wallst.com/investing/2026/08/14/zuckerbergs-250-billion-louisiana-data-center-will-create-just-1000-jobs-thats-250-million-spent-per-job/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-08-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-13",
          "summary": "Meta announced plans to expand Hyperion with seven additional power generating units",
          "source_url": "https://lailluminator.com/2026/08/13/meta-data-center-private/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-08-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-13",
          "summary": "Meta has contracted with Entergy Louisiana to build three natural gas powered turbines initially",
          "source_url": "https://lailluminator.com/2026/08/13/meta-data-center-private/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-08-12",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-12",
          "summary": "Meta and Entergy plan to build 10 new gas power plants to power the data center facilities",
          "source_url": "https://www.wwno.org/politics/2026-08-12/louisiana-psc-kills-ruling-that-would-force-meta-to-turn-over-key-data-center-information",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-08-12",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-12",
          "summary": "Both Hyperion and newer Evest artificial intelligence data centers could be among the largest in the world",
          "source_url": "https://www.wwno.org/politics/2026-08-12/louisiana-psc-kills-ruling-that-would-force-meta-to-turn-over-key-data-center-information",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-08-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-11",
          "summary": "Three natural gas powered turbines are being built by Entergy to initially power the data center",
          "source_url": "https://lailluminator.com/2026/08/11/meta-wants-details-secret/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-08-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-11",
          "summary": "Meta announced it intends to expand Hyperion with seven power generating units",
          "source_url": "https://lailluminator.com/2026/08/11/meta-wants-details-secret/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-08-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-11",
          "summary": "Meta announced it will nearly double expected size of its Hyperion campus in Northeast Louisiana",
          "source_url": "https://lailluminator.com/2026/08/11/meta-energy/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-10",
          "summary": "Meta's data center expansion in Richland Parish, Louisiana requires seven additional gas plants, each rated at 754 megawatts, on top of three already approved.",
          "source_url": "https://thelensnola.org/2026/08/18/meta-louisiana-data-center-ratepayer-costs/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-08-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-10",
          "summary": "Entergy Louisiana filed application in April 2026 to build seven additional gas fired power plants for Meta data center expansion",
          "source_url": "https://blog.ucs.org/paul-arbaje/meta-hides-data-center-info-as-it-pushes-more-risks-to-entergys-customers/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-10",
          "summary": "Entergy Louisiana filed an application in April 2026 to build seven additional gas fired power plants for Meta's data center expansion.",
          "source_url": "https://thelensnola.org/2026/08/18/meta-louisiana-data-center-ratepayer-costs/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-10",
          "summary": "The Louisiana Public Service Commission's final decision on the new gas plants is scheduled for December 16, 2026.",
          "source_url": "https://thelensnola.org/2026/08/18/meta-louisiana-data-center-ratepayer-costs/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-29",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-29",
          "summary": "Meta announced the Richland Parish data center project in 2024",
          "source_url": "https://www.wafb.com/2026/07/29/meta-data-center-richland-parish-brings-jobs-tax-growth-northeast-louisiana/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-07-28",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-28",
          "summary": "Meta is building a large data center in Louisiana",
          "source_url": "https://www.nytimes.com/2026/07/27/business/meta-data-center-louisiana-takeaways.html",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-07-27",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-27",
          "summary": "Meta negotiated a secret Louisiana data center deal and got everything it wanted",
          "source_url": "https://www.nytimes.com/2026/07/27/technology/meta-data-center-louisiana.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-21",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-21",
          "summary": "Construction timeline extended by expansion to up to 10 years",
          "source_url": "https://www.shreveporttimes.com/story/news/2026/07/21/louisiana-meta-data-center-generates-staggering-sales-tax-growth-as-trump-predicted/90986903007/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-21",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-21",
          "summary": "Meta expanded data center investment from $10 billion to $50 billion",
          "source_url": "https://www.shreveporttimes.com/story/news/2026/07/21/louisiana-meta-data-center-generates-staggering-sales-tax-growth-as-trump-predicted/90986903007/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-20",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-20",
          "summary": "Meta announced this month that it is expanding its Richland Parish data center to 5 gigawatts of compute capacity",
          "source_url": "https://netchoice.org/digital-infrastructure-as-the-backbone-of-the-future-how-metas-louisiana-data-center-expansion-is-delivering-life-changing-returns/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-20",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-20",
          "summary": "The Richland Parish site broke ground in December 2024",
          "source_url": "https://netchoice.org/digital-infrastructure-as-the-backbone-of-the-future-how-metas-louisiana-data-center-expansion-is-delivering-life-changing-returns/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-13",
          "summary": "The data center is home to Hyperion, Meta's most powerful cluster for training AI",
          "source_url": "https://www.meta.com/actions/building-louisiana/",
          "source_tier": 2
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-13",
          "summary": "Meta Hyperion data center in Richland Parish planned as 5 GW facility",
          "source_url": "https://www.cnbc.com/2026/07/13/meta-louisiana-data-center-investment-reaches-50-billion-amid-ai-push.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-13",
          "summary": "Full 5 GW Hyperion project expected to be complete around 2032",
          "source_url": "https://www.cnbc.com/2026/07/13/meta-louisiana-data-center-investment-reaches-50-billion-amid-ai-push.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-13",
          "summary": "Hyperion project should reach 2 GW by 2030",
          "source_url": "https://www.cnbc.com/2026/07/13/meta-louisiana-data-center-investment-reaches-50-billion-amid-ai-push.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-13",
          "summary": "Meta expanding Richland Parish data center to 5 gigawatts of compute capacity",
          "source_url": "https://www.knoe.com/video/2026/07/14/meta-expanding-richland-parish-data-center-5-gigawatts-one-largest-history-2/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-06-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-06-13",
          "summary": "Hyperion construction expected to continue until 2030",
          "source_url": "https://www.shreveportbossieradvocate.com/news/meta-data-center-bonus-checks-taxes/article_a2f5fa71-e62d-4197-af35-fc31e201065d.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-05-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-23",
          "summary": "The data center will be fueled by 10 newly constructed natural gas plants",
          "source_url": "https://www.youtube.com/watch?v=VV9Y8IYS9W4",
          "source_tier": 5
        },
        {
          "status": "rumored",
          "effective_at": "2026-05-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-23",
          "summary": "Meta is building its largest AI data center in Richland Parish, Louisiana",
          "source_url": "https://www.youtube.com/watch?v=VV9Y8IYS9W4",
          "source_tier": 5
        }
      ]
    },
    {
      "slug": "amazon-web-services-louisiana-data-centers-shreveport-la",
      "name": "Amazon Web Services Louisiana data centers",
      "summary": "Amazon Web Services announced a third data center campus in Shreveport, raising its total Louisiana investment to $18 billion across three Northwest Louisiana campuses.",
      "state": "LA",
      "city": "Shreveport",
      "county": "Caddo Parish",
      "status": "rumored",
      "developer": "Amazon Web Services",
      "capacity_mw": null,
      "latitude": 32.50806,
      "longitude": -93.76278,
      "location_precision": "county",
      "location_source": "County seat (Shreveport), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/amazon-web-services-louisiana-data-centers-shreveport-la",
      "sources": [
        {
          "title": "Amazon raises Louisiana data-center investment to $18 billion, adds third Shreveport campus - BIC Magazine",
          "url": "https://www.bicmagazine.com/departments/AI-Infrastructure/amazon-raises-louisiana-data-center-investment/",
          "publisher": "BIC Magazine",
          "date": "2026-08-19",
          "source_tier": 4
        },
        {
          "title": "Amazon Web Services announces third data center in NW Louisiana, sets community meeting date - The Shreveport-Bossier City Advocate",
          "url": "https://www.shreveportbossieradvocate.com/business/amazon-web-services-third-data-center-in-northwest-louisiana-shreveport/article_2ee6697d-2d82-4814-98a8-903a488c3eb9.html",
          "publisher": "The Shreveport-Bossier City Advocate",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "AWS ‘Unable To Restore’ Data Centers Hit By Iran Strikes; Partner Hopes Amazon’s $220B Spending Plan Continues",
          "url": "https://www.crn.com/news/data-center/2026/aws-unable-to-restore-data-centers-hit-by-iran-strikes-partner-hopes-amazon-s-220b-spending-plan-continues",
          "publisher": "www.crn.com",
          "date": "2026-09-16",
          "source_tier": 4
        },
        {
          "title": "Shreveport Emerges as a Key Hub for SLB’s Data Center Infrastructure Business - SLB",
          "url": "https://www.slb.com/newsroom/features/2026/2026-0827-slb-shreveport-data-center",
          "publisher": "SLB",
          "date": "2026-08-27",
          "source_tier": 4
        },
        {
          "title": "Trump calls data center opponents backward as Louisiana projects roll on - Shreveport Times",
          "url": "https://www.shreveporttimes.com/story/news/2026/09/01/louisiana-welcome-data-centers-as-national-resistance-grows-despite-trump-calling-opponents-backward/91554990007/",
          "publisher": "Shreveport Times",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Amazon Web Services to build third data center in Louisiana - audacy.com",
          "url": "https://www.audacy.com/wwl/news/local/amazon-web-services-to-build-third-data-center-in-louisiana",
          "publisher": "audacy.com",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "Amazon plans 3rd data center in NW Louisiana, bringing investment to $18B - WWLTV.com",
          "url": "https://www.wwltv.com/article/tech/amazon-plans-3rd-data-center-in-nw-louisiana-bringing-investment-to-18b/289-769becae-0dea-4b16-baa9-50a34297086b",
          "publisher": "WWLTV.com",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "Amazon Web Services announces a third data center campus is coming to Shreveport - KSLA",
          "url": "https://www.ksla.com/2026/08/18/amazon-web-services-announces-third-data-center-campus-is-coming-shreveport/",
          "publisher": "KSLA",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "Amazon’s data center network in Northwest Louisiana is going to get bigger - Louisiana Illuminator",
          "url": "https://lailluminator.com/2026/08/18/amazons-data-center-network-in-northwest-louisiana-is-going-to-get-bigger/",
          "publisher": "Louisiana Illuminator",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "Amazon is upping its data center commitment in northwest Louisiana by $6B - Baton Rouge Business Report",
          "url": "https://www.businessreport.com/article/amazon-is-upping-its-data-center-commitment-in-northwest-louisiana-by-6b",
          "publisher": "Baton Rouge Business Report",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "AWS pledges $6bn investment in data center campus in Shreveport, Louisiana - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/aws-pledges-6bn-investment-in-data-center-campus-in-shreveport-louisiana/",
          "publisher": "Data Center Dynamics",
          "date": "2026-08-19",
          "source_tier": 3
        },
        {
          "title": "Amazon raises Louisiana data center investment to $18 billion, adds third Shreveport campus - BIC Magazine",
          "url": "https://www.bicmagazine.com/departments/AI-Infrastructure/amazon-raises-louisiana-data-center-investment/",
          "publisher": "BIC Magazine",
          "date": "2026-08-19",
          "source_tier": 4
        },
        {
          "title": "Amazon Web Services announces a third data center campus is coming to Shreveport - KSLA",
          "url": "https://www.ksla.com/2026/08/18/amazon-web-services-announces-third-data-center-campus-is-coming-shreveport/",
          "publisher": "KSLA",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "Third Amazon data center campus part of Amazon's $18 billion Louisiana investment - WBRZ",
          "url": "https://www.wbrz.com/news/third-amazon-data-center-campus-part-of-amazon-s-18-billion-louisiana-investment/",
          "publisher": "WBRZ",
          "date": "2026-08-19",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-08-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-18",
          "summary": "Amazon Web Services announced plans in February 2026 to build two data centers in northwest Louisiana",
          "source_url": "https://www.audacy.com/wwl/news/local/amazon-web-services-to-build-third-data-center-in-louisiana",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-08-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-18",
          "summary": "AWS is adding a third data center at Resilient Technology Park in west Shreveport",
          "source_url": "https://www.audacy.com/wwl/news/local/amazon-web-services-to-build-third-data-center-in-louisiana",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "caddo-parish-data-center-la",
      "name": "Caddo Parish Data Center",
      "summary": "A data center project in Caddo Parish is moving forward with construction after parish commissioners rejected a moratorium step.",
      "state": "LA",
      "city": null,
      "county": "Caddo Parish",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 32.50806,
      "longitude": -93.76278,
      "location_precision": "county",
      "location_source": "County seat (Shreveport), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/caddo-parish-data-center-la",
      "sources": [
        {
          "title": "Data center construction moves forward in Caddo Parish - KTVE – myarklamiss.com – Your ArkLaMiss News Source",
          "url": "https://www.ktalnews.com/news/local-news/shreveport-caddo-parish-rejects-data-center-moratorium-commission-votes-against-data-center-halt-construction-moves-forward/",
          "publisher": "KTVE – myarklamiss.com – Your ArkLaMiss News Source",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Caddo commissioners reject data center moratorium step - thecentersquare.com",
          "url": "https://www.thecentersquare.com/louisiana/article_3f44b5fa-479c-4ca5-9e9e-1e770fe099aa.html",
          "publisher": "thecentersquare.com",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Trump calls data center opponents backward as Louisiana projects roll on - Shreveport Times",
          "url": "https://www.shreveporttimes.com/story/news/2026/09/01/louisiana-welcome-data-centers-as-national-resistance-grows-despite-trump-calling-opponents-backward/91554990007/",
          "publisher": "Shreveport Times",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Louisiana governor to announce $12B Caddo-Bossier project today",
          "url": "https://www.shreveporttimes.com/story/news/2026/02/23/louisiana-governor-jeff-landry-to-announce-12-billion-data-center-project-today-in-shreveport/88821398007/",
          "publisher": "www.shreveporttimes.com",
          "date": "2026-02-23",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "meta-plus-moss-bluff-la",
      "name": "Meta plus Moss Bluff",
      "summary": "A headline raises the question of whether a data center is coming to Moss Bluff, Louisiana, with limited confirmed details.",
      "state": "LA",
      "city": "Moss Bluff",
      "county": "Calcasieu Parish",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 30.21472,
      "longitude": -93.20861,
      "location_precision": "county",
      "location_source": "County seat (Lake Charles), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/meta-plus-moss-bluff-la",
      "sources": [
        {
          "title": "Data center could be coming to Moss Bluff - American Press",
          "url": "https://americanpress.com/2026/09/11/data-center-could-be-coming-to-moss-bluff/",
          "publisher": "American Press",
          "date": "2026-09-11",
          "source_tier": 4
        },
        {
          "title": "Data center planned for north of Lake Charles, developer confirms. Here’s what we know. - The Advocate",
          "url": "https://www.theadvocate.com/lake_charles/moss-bluff-data-center-project-azimuth/article_d9fc7b69-c5ba-40a6-9cf9-facb2f6e3542.html",
          "publisher": "The Advocate",
          "date": "2026-09-10",
          "source_tier": 4
        },
        {
          "title": "Proposed data center north of Moss Bluff still in exploration stage, company says - KPLC 7 News",
          "url": "https://www.kplctv.com/2026/09/10/proposed-data-center-north-moss-bluff-still-exploration-stage-company-says/",
          "publisher": "KPLC 7 News",
          "date": "2026-09-10",
          "source_tier": 4
        },
        {
          "title": "Is a data center coming to Moss Bluff? Here’s what we know. - theadvocate.com",
          "url": "https://www.theadvocate.com/lake_charles/is-a-data-center-coming-to-moss-bluff-here-s-what-we-know/article_ad6f97c0-ed97-4609-99a5-eac05731915e.html",
          "publisher": "theadvocate.com",
          "date": "2026-08-12",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-09-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-11",
          "summary": "Azimuth Renewables considering building a data center on 1,100 acres near Coffey Road in Moss Bluff",
          "source_url": "https://americanpress.com/2026/09/11/data-center-could-be-coming-to-moss-bluff/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-11",
          "summary": "Company has option to purchase 1,100 acres",
          "source_url": "https://americanpress.com/2026/09/11/data-center-could-be-coming-to-moss-bluff/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-11",
          "summary": "Plans are still in early stages and nothing firm has been decided yet",
          "source_url": "https://americanpress.com/2026/09/11/data-center-could-be-coming-to-moss-bluff/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-10",
          "summary": "Azimuth Renewables signed option to purchase about 1,200 acres in Moss Bluff in April 2026",
          "source_url": "https://www.theadvocate.com/lake_charles/moss-bluff-data-center-project-azimuth/article_d9fc7b69-c5ba-40a6-9cf9-facb2f6e3542.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-10",
          "summary": "Azimuth Renewables has three years to purchase property with optional one year extension",
          "source_url": "https://www.theadvocate.com/lake_charles/moss-bluff-data-center-project-azimuth/article_d9fc7b69-c5ba-40a6-9cf9-facb2f6e3542.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-10",
          "summary": "Data center would occupy fraction of 1,168 acres in wooded rural portion of Moss Bluff",
          "source_url": "https://www.theadvocate.com/lake_charles/moss-bluff-data-center-project-azimuth/article_d9fc7b69-c5ba-40a6-9cf9-facb2f6e3542.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-08-12",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-12",
          "summary": "Discussions appear to be in early stages between landowner Kenny Nichols and a potential developer",
          "source_url": "https://www.theadvocate.com/lake_charles/is-a-data-center-coming-to-moss-bluff-here-s-what-we-know/article_ad6f97c0-ed97-4609-99a5-eac05731915e.html",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "one-nuclear-project-cayman-data-center-campus-vermilion-la",
      "name": "One Nuclear / Project Cayman Data Center Campus",
      "summary": "ONE Nuclear Energy executed a binding letter of intent to develop a 2.88 GW gas fired plant and large battery energy storage system to power a co located data center campus in Louisiana near SpaceX's Starbase project.",
      "state": "LA",
      "city": null,
      "county": "Vermilion Parish",
      "status": "rumored",
      "developer": "ONE Nuclear Energy",
      "capacity_mw": 2880,
      "latitude": 29.9725,
      "longitude": -92.12917,
      "location_precision": "county",
      "location_source": "County seat (Abbeville), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/one-nuclear-project-cayman-data-center-campus-vermilion-la",
      "sources": [
        {
          "title": "ONE Nuclear Executes Binding LOI for Project Cayman, a 2.88 GW Louisiana Energy Project with Co-Located Data Center Campus - Business Wire",
          "url": "https://www.businesswire.com/news/home/20260831090268/en/ONE-Nuclear-Executes-Binding-LOI-for-Project-Cayman-a-2.88-GW-Louisiana-Energy-Project-with-Co-Located-Data-Center-Campus",
          "publisher": "Business Wire",
          "date": "2026-08-31",
          "source_tier": 4
        },
        {
          "title": "ONE Nuclear Energy secures Louisiana site for power, data center project - Daily Energy Insider",
          "url": "https://dailyenergyinsider.com/news/53636-one-nuclear-energy-secures-louisiana-site-for-power-data-center-project/",
          "publisher": "Daily Energy Insider",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "One Nuclear inks binding LOI to develop 2.88GW gas plant and BESS to power data center in Louisiana - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/one-nuclear-inks-binding-loi-to-develop-288gw-gas-plant-and-bess-to-power-data-center-in-louisiana/",
          "publisher": "Data Center Dynamics",
          "date": "2026-09-01",
          "source_tier": 3
        },
        {
          "title": "One Nuclear inks binding LOI to develop 2.88GW gas plant and BESS to power data center in Louisiana",
          "url": "https://www.datacenterdynamics.com/en/news/one-nuclear-inks-binding-loi-to-develop-288gw-gas-plant-and-bess-to-power-data-center-in-louisiana/",
          "publisher": "Data Center Dynamics",
          "date": "2026-09-01",
          "source_tier": 3
        },
        {
          "title": "One Nuclear Signs Deal for 2.88-GW Gas-Fired Plant, Large BESS for Louisiana Data Center Campus - POWER Magazine",
          "url": "https://www.powermag.com/one-nuclear-signs-deal-for-2-88-gw-gas-fired-plant-large-bess-for-louisiana-data-center-campus/",
          "publisher": "POWER Magazine",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "One Nuclear plans gas-fired data center near Musk’s Starbase - thecentersquare.com",
          "url": "https://www.thecentersquare.com/louisiana/article_92d0738f-d1da-40d8-820e-26f824e4f8c1.html",
          "publisher": "thecentersquare.com",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "West Palm Beach energy developer plans data center campus near Louisiana SpaceX project - The Business Journals",
          "url": "https://www.bizjournals.com/southflorida/news/2026/08/31/energy-developer-plans-data-center-campus-spacex.html",
          "publisher": "The Business Journals",
          "date": "2026-08-31",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "spacex-starbase-louisiana-orbital-data-center-vermilion-la",
      "name": "SpaceX Starbase Louisiana / orbital data center",
      "summary": "SpaceX unveiled a Starbase launch site in coastal Vermilion Parish, Louisiana, and moved up its orbital data center launch timeline.",
      "state": "LA",
      "city": null,
      "county": "Vermilion Parish",
      "status": "rumored",
      "developer": "SpaceX",
      "capacity_mw": null,
      "latitude": 29.9725,
      "longitude": -92.12917,
      "location_precision": "county",
      "location_source": "County seat (Abbeville), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/spacex-starbase-louisiana-orbital-data-center-vermilion-la",
      "sources": [
        {
          "title": "Where is new SpaceX site in Louisiana? See coastal Vermilion Parish from above.",
          "url": "https://www.nola.com/news/spacex-site-louisiana-aerial-view/article_ae347f58-2727-4768-8b65-f9cca7fa29c9.html",
          "publisher": "The Times-Picayune and The New Orleans Advocate",
          "date": "2026-08-25",
          "source_tier": 4
        },
        {
          "title": "SpaceX unveils Starbase launch site in Louisiana, moves up orbital data center launch timeline - Yahoo Finance",
          "url": "https://finance.yahoo.com/markets/stocks/article/spacex-unveils-starbase-launch-site-in-louisiana-moves-up-orbital-data-center-launch-timeline-142539276.html",
          "publisher": "Yahoo Finance",
          "date": "2026-08-25",
          "source_tier": 4
        },
        {
          "title": "SpaceX unveils Starbase launch site in Louisiana, moves up orbital data center launch timeline - Yahoo Finance",
          "url": "https://finance.yahoo.com/markets/stocks/article/spacex-unveils-starbase-launch-site-in-louisiana-moves-up-orbital-data-center-launch-timeline-142539276.html",
          "publisher": "Yahoo Finance",
          "date": "2026-08-25",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    }
  ]
}