{
  "license": "CC BY 4.0",
  "license_url": "https://creativecommons.org/licenses/by/4.0/",
  "attribution": "Data: Data Center Record, datacenterrecord.org, CC BY 4.0. Link to the specific record page where possible.",
  "source": "https://datacenterrecord.org/projects/wonder-valley-data-centre-ab",
  "retrieved_at": "2026-10-09T03:24:56.789Z",
  "count": 1,
  "projects": [
    {
      "slug": "wonder-valley-data-centre-ab",
      "name": "Wonder Valley Data Centre",
      "summary": "A proposed data centre site in Wonder Valley, northern Alberta received a special industrial zone designation.",
      "state": "AB",
      "city": "Wonder Valley",
      "county": "Greenview No. 16",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 55.6666667,
      "longitude": -118,
      "location_precision": "county",
      "location_source": "County center (the Municipal District of Greenview No. 16), placed at county level: the municipality's point in the Canadian Geographical Names Database (Natural Resources Canada, Open Government Licence); Wonder Valley is no gazetteer name, and the MD of Greenview is the body that gave the site its designation (CBC)",
      "location_verified_at": "2026-10-07",
      "coordinate_source": "cgndb centroid",
      "location_last_verified": "2026-10-07",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-10-07",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "record_url": "https://datacenterrecord.org/projects/wonder-valley-data-centre-ab",
      "sources": [
        {
          "title": "Alberta First Nation marks legal ‘win’ against celebrity backed data centre - CTV News",
          "url": "https://guelph.ctvnews.ca/edmonton/article/alberta-first-nation-marks-legal-win-against-celebrity-backed-data-centre/",
          "publisher": "CTV News",
          "date": "2026-08-14",
          "source_tier": 4
        },
        {
          "title": "Majority of Planned Alberta Data Centre Projects Could be Under Foreign Control - DeSmog",
          "url": "https://www.desmog.com/2026/09/14/majority-of-planned-alberta-data-centre-projects-could-be-under-foreign-control/",
          "publisher": "DeSmog",
          "date": "2026-09-14",
          "source_tier": 4
        },
        {
          "title": "Site of proposed Wonder Valley data centre in northern Alberta gets special industrial zone designation - CBC",
          "url": "https://www.cbc.ca/news/canada/edmonton/industrial-designation-wonder-valley-greenview-9.7331708",
          "publisher": "CBC",
          "date": "2026-09-04",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-09-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Wonder Valley AI Data Centre Park proposed at $70 billion investment",
          "source_url": "https://www.desmog.com/2026/09/14/majority-of-planned-alberta-data-centre-projects-could-be-under-foreign-control/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "O'Leary Digital Limited incorporated in Alberta with directors based in U.S., company based in Miami",
          "source_url": "https://www.desmog.com/2026/09/14/majority-of-planned-alberta-data-centre-projects-could-be-under-foreign-control/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Black Bear Power Project is 466 megawatt gas powered data centre proposed by Teton Digital",
          "source_url": "https://www.desmog.com/2026/09/14/majority-of-planned-alberta-data-centre-projects-could-be-under-foreign-control/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-08-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-14",
          "summary": "Sturgeon Lake Cree Nation won a court ruling against the Wonder Valley data centre",
          "source_url": "https://guelph.ctvnews.ca/edmonton/article/alberta-first-nation-marks-legal-win-against-celebrity-backed-data-centre/",
          "source_tier": 4
        }
      ]
    }
  ]
}
