{
  "license": "CC BY 4.0",
  "license_url": "https://creativecommons.org/licenses/by/4.0/",
  "attribution": "Data: Data Center Record, datacenterrecord.org, CC BY 4.0. Link to the specific record page where possible.",
  "source": "https://datacenterrecord.org/projects/university-of-michigan-los-alamos-national-laboratory-hyperscale-data-center-mi",
  "retrieved_at": "2026-10-09T03:24:56.789Z",
  "count": 1,
  "projects": [
    {
      "slug": "university-of-michigan-los-alamos-national-laboratory-hyperscale-data-center-mi",
      "name": "University of Michigan / Los Alamos National Laboratory Hyperscale Data Center",
      "summary": "A 220,000 square foot hyperscale data center backed by the University of Michigan and Los Alamos National Laboratory was proposed in an Ypsilanti Township location, drawing opposition from the township which passed a ban on new electrical infrastructure.",
      "state": "MI",
      "city": "Ypsilanti Township",
      "county": null,
      "status": "rumored",
      "developer": "University of Michigan / Los Alamos National Laboratory",
      "capacity_mw": null,
      "latitude": 42.2136782,
      "longitude": -83.5991838,
      "location_precision": "city",
      "location_source": "Place center (Ypsilanti Township), placed at city level: Census internal point of Ypsilanti charter township (TIGERweb county subdivisions, read 2026-10-07)",
      "location_verified_at": "2026-10-07",
      "coordinate_source": "census centroid",
      "location_last_verified": "2026-10-07",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-10-07",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "record_url": "https://datacenterrecord.org/projects/university-of-michigan-los-alamos-national-laboratory-hyperscale-data-center-mi",
      "sources": [
        {
          "title": "‘We don’t matter to them’: Ypsilanti Township pushed back on University of Michigan, Los Alamos data center - ClickOnDetroit | WDIV Local 4",
          "url": "https://www.clickondetroit.com/all-about-ann-arbor/2026/08/12/we-dont-matter-to-them-ypsilanti-township-pushed-back-on-university-of-michigan-los-alamos-data-center/",
          "publisher": "ClickOnDetroit | WDIV Local 4",
          "date": "2026-08-12",
          "source_tier": 4
        },
        {
          "title": "Michigan Data Centers: The Weekly Download - Michigan Advance",
          "url": "https://michiganadvance.com/2026/08/17/michigan-data-centers-the-weekly-download-3-2-2-2-2-2-2-2-2/",
          "publisher": "Michigan Advance",
          "date": "2026-08-31",
          "source_tier": 4
        },
        {
          "title": "Ypsilanti Township eyes moratorium on power transmission to slow U-M data center - Bridge Michigan",
          "url": "https://bridgemi.com/business-watch/ypsilanti-township-eyes-moratorium-on-power-transmission-to-slow-u-m-data-center/",
          "publisher": "Bridge Michigan",
          "date": "2026-08-17",
          "source_tier": 4
        },
        {
          "title": "Michigan township combats nuclear weapons data center by passing ban on new electrical infrastructure — 220,000-square-foot hyperscale project is backed by University of Michigan and the Los Alamos National Laboratory - Tom's Hardware",
          "url": "https://www.tomshardware.com/tech-industry/data-centers/michigan-township-combats-nuclear-weapons-data-center-by-passing-ban-on-new-electrical-infrastructure-220-000-square-foot-hyperscale-project-is-backed-by-university-of-michigan-and-the-los-alamos-national-laboratory",
          "publisher": "Tom's Hardware",
          "date": "2026-08-20",
          "source_tier": 4
        },
        {
          "title": "'We will fight to our very last breath': Michigan township uses 6 month power moratorium to stall U M, Los Alamos data center - The Cool Down",
          "url": "https://www.thecooldown.com/green-tech/michigan-ypsilanti-township-power-moratorium-data-center/",
          "publisher": "The Cool Down",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Township pushes back against data center proposal - ClickOnDetroit | WDIV Local 4",
          "url": "https://www.clickondetroit.com/video/news/2026/08/13/township-pushes-back-against-data-center-proposal/",
          "publisher": "ClickOnDetroit | WDIV Local 4",
          "date": "2026-08-13",
          "source_tier": 4
        },
        {
          "title": "U M selects site for joint data center with Los Alamos Laboratory - Detroit Free Press - Breaking news, sports, business, entertainment",
          "url": "https://www.freep.com/story/news/environment/2026/08/12/university-michigan-los-alamos-national-laboratory-data-center-ypsilanti/91276431007/",
          "publisher": "Detroit Free Press - Breaking news, sports, business, entertainment",
          "date": "2026-08-12",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-08-31",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-31",
          "summary": "University of Michigan selected a 144 acre site in Ypsilanti Township for a research computing center with Los Alamos National Laboratory",
          "source_url": "https://michiganadvance.com/2026/08/17/michigan-data-centers-the-weekly-download-3-2-2-2-2-2-2-2-2/",
          "source_tier": 4
        }
      ]
    }
  ]
}
