{
  "license": "CC BY-NC 4.0",
  "license_url": "https://creativecommons.org/licenses/by-nc/4.0/",
  "attribution": "Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0. Link to the specific record page where possible.",
  "source": "https://datacenterrecord.org/projects/switch-bartow-county-data-center-ga",
  "retrieved_at": "2026-10-27T01:02:13.075Z",
  "count": 1,
  "projects": [
    {
      "slug": "switch-bartow-county-data-center-ga",
      "name": "Switch Bartow County data center",
      "summary": "Switch plans a $772 million data center in Bartow County, Georgia.",
      "state": "GA",
      "city": null,
      "county": "Bartow",
      "status": "rumored",
      "developer": "Switch",
      "capacity_mw": null,
      "latitude": null,
      "longitude": null,
      "location_precision": null,
      "location_source": null,
      "location_verified_at": null,
      "coordinate_source": null,
      "location_last_verified": null,
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-10-21",
      "last_verified": "2026-10-21",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/switch-bartow-county-data-center-ga",
      "sources": [
        {
          "title": "Switch plans to expand metro Atlanta footprint with $772M data center - The Atlanta Journal-Constitution",
          "url": "https://www.ajc.com/news/switch-plans-to-expand-metro-atlanta-footprint-with-772m-data-center/NOOEVEXIHBHMXMVC44T4XTZZUI/",
          "publisher": "The Atlanta Journal-Constitution",
          "date": "2023-09-01",
          "source_tier": 1
        },
        {
          "title": "Switch’s plan for new $772 million data center will boost investment in Bartow - northwestgeorgianews.com",
          "url": "https://www.northwestgeorgianews.com/switch-s-plan-for-new-772-million-data-center-will-boost-investment-in-bartow/article_7b9fda42-4a74-11ee-be15-7726888b6906.html",
          "publisher": "northwestgeorgianews.com",
          "date": "2023-08-31",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    }
  ]
}
