{
  "license": "CC BY-NC 4.0",
  "license_url": "https://creativecommons.org/licenses/by-nc/4.0/",
  "attribution": "Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0. Link to the specific record page where possible.",
  "source": "https://datacenterrecord.org/projects/radiusdc-nashville-i-tn",
  "retrieved_at": "2026-10-28T05:26:09.750Z",
  "count": 1,
  "projects": [
    {
      "slug": "radiusdc-nashville-i-tn",
      "name": "RadiusDC Nashville I Data Center",
      "summary": "RadiusDC is constructing Nashville I, a 102,500 square foot, 12 MW interconnection and colocation data center at 2902 and 2906 Brick Church Pike in Nashville, Davidson County, Tennessee.",
      "state": "TN",
      "city": "Nashville",
      "county": "Davidson County",
      "status": "under_construction",
      "developer": "RadiusDC",
      "capacity_mw": 12,
      "latitude": 36.2285,
      "longitude": -86.7842,
      "location_precision": "address",
      "location_source": "https://www.radiusdc.com/",
      "location_verified_at": null,
      "coordinate_source": "Davidson County Assessor / RadiusDC",
      "location_last_verified": null,
      "site_address": "2902 Brick Church Pike, Nashville, TN 37207",
      "site_address_source_url": "https://www.radiusdc.com/",
      "published": "2026-09-28",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.radiusdc.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/radiusdc-nashville-i-tn",
      "sources": [
        {
          "title": "RadiusDC breaks ground on 12MW Nashville data center, Tennessee - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/radiusdc-breaks-ground-on-12mw-nashville-data-center-tennessee/",
          "publisher": "Data Center Dynamics",
          "date": "2025-09-05",
          "source_tier": 1
        },
        {
          "title": "Your guide to data centers in Tennessee and how they could affect you - The Tennessean",
          "url": "https://www.tennessean.com/story/news/local/2026/07/07/nashville-data-center-ai-electricity-water-noise/90752061007/",
          "publisher": "The Tennessean",
          "date": "2026-07-07",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2025-09-05",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "RadiusDC broke ground on Nashville I, a 12 MW, 102,500 square foot colocation facility at 2902 and 2906 Brick Church Pike, expected to open in 2026.",
          "source_url": "https://www.datacenterdynamics.com/en/news/radiusdc-breaks-ground-on-12mw-nashville-data-center-tennessee/",
          "source_tier": 1
        }
      ]
    }
  ]
}
