  "license": "CC BY-NC 4.0",
  "license_url": "https://creativecommons.org/licenses/by-nc/4.0/",
  "attribution": "Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0. Link to the specific record page where possible.",
  "source": "https://datacenterrecord.org/projects/microsoft-van-meter-data-center-campus-ia",
  "retrieved_at": "2026-10-28T05:26:09.750Z",
  "count": 1,
  "projects": [
    {
      "slug": "microsoft-van-meter-data-center-campus-ia",
      "name": "Microsoft Van Meter Data Center Campus",
      "summary": "Microsoft is constructing a 4 building hyperscale data center campus in Van Meter, Dallas County, Iowa, approved by the Iowa Economic Development Authority.",
      "state": "IA",
      "city": "Van Meter",
      "county": "Dallas County",
      "status": "under_construction",
      "developer": "Microsoft",
      "capacity_mw": 200,
      "latitude": 41.5285,
      "longitude": -93.9245,
      "location_precision": "address",
      "location_source": "https://www.iowaeda.com/",
      "location_verified_at": null,
      "coordinate_source": "IEDA Board approval and Dallas County site plan",
      "location_last_verified": null,
      "site_address": "360th Street and Grand Avenue, Van Meter, IA 50261",
      "site_address_source_url": "https://www.iowaeda.com/",
      "published": "2026-09-27",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 4,
      "buildings_basis": "agency filing",
      "buildings_source_url": "https://www.iowaeda.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/microsoft-van-meter-data-center-campus-ia",
      "sources": [
        {
          "title": "Microsoft buys land in Van Meter for another data center campus - Business Record",
          "url": "https://www.businessrecord.com/microsoft-buys-land-in-van-meter-for-another-data-center-campus/",
          "publisher": "Business Record",
          "date": "2024-01-31",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-10-20",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Microsoft closed on six hundred acres in Woodward for a data center campus, announcing the project at a community meeting restricted to local residents and prompting criticism from a freedom of information advocate.",
          "source_url": "https://www.mississippivalleypublishing.com/the_hawk_eye/data-center-discussion-deserves-a-bigger-room/article_3a7186d7-0387-4519-a9bc-7848bc9c718b.html",
          "source_tier": 1
        },
        {
          "status": "proposed",
          "effective_at": "2024-01-31",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Microsoft acquired 377 acres near Vision Park in Van Meter, Iowa for approximately $40 million to build a data center campus.",
          "source_url": "https://www.businessrecord.com/microsoft-buys-land-in-van-meter-for-another-data-center-campus/",
          "source_tier": 1
        }
      ]
    }
  ]
}