{
  "license": "CC BY-NC 4.0",
  "license_url": "https://creativecommons.org/licenses/by-nc/4.0/",
  "attribution": "Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0. Link to the specific record page where possible.",
  "source": "https://datacenterrecord.org/projects/hurricane-electric-hurricane-electric-fremont-2-fremont-ca",
  "retrieved_at": "2026-10-28T05:26:09.750Z",
  "count": 1,
  "projects": [
    {
      "slug": "hurricane-electric-hurricane-electric-fremont-2-fremont-ca",
      "name": "Hurricane Electric Fremont Carrier Hotel Campus (FMT1 and FMT2)",
      "summary": "Hurricane Electric operates its 2 building global IP backbone and colocation campus (FMT1 and FMT2) at 760 Mission Court and 48233 Warm Springs Boulevard in Fremont, Alameda County, California, with 24 MW of capacity.",
      "state": "CA",
      "city": "Fremont",
      "county": "Alameda County",
      "status": "operational",
      "developer": "Hurricane Electric",
      "capacity_mw": 24,
      "latitude": 37.4795,
      "longitude": -121.9285,
      "location_precision": "address",
      "location_source": "https://he.net/colocation.html",
      "location_verified_at": null,
      "coordinate_source": "Alameda County Assessor / Hurricane Electric FMT1 and FMT2 specifications",
      "location_last_verified": null,
      "site_address": "760 Mission Court and 48233 Warm Springs Boulevard, Fremont, CA 94539",
      "site_address_source_url": "https://he.net/colocation.html",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://he.net/colocation.html",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/hurricane-electric-hurricane-electric-fremont-2-fremont-ca",
      "sources": [
        {
          "title": "Hurricane Electric Fremont Carrier Hotel Campus (FMT1 and FMT2) Official Disclosure",
          "url": "https://he.net/colocation.html",
          "publisher": "Hurricane Electric",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from California state agency permits, utility dockets, municipal planning filings, or operator campus specifications.",
          "source_url": "https://he.net/colocation.html",
          "source_tier": 1
        }
      ]
    }
  ]
}
