{
  "license": "CC BY-NC 4.0",
  "license_url": "https://creativecommons.org/licenses/by-nc/4.0/",
  "attribution": "Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0. Link to the specific record page where possible.",
  "source": "https://datacenterrecord.org/projects/goodman-lax01-vernon-ca",
  "retrieved_at": "2026-10-28T05:26:09.750Z",
  "count": 1,
  "projects": [
    {
      "slug": "goodman-lax01-vernon-ca",
      "name": "Goodman Group Los Angeles Vernon Data Center (LAX01)",
      "summary": "Goodman Group is constructing its 32 MW LAX01 hyperscale data center at 2727 East Vernon Avenue in Vernon, Los Angeles County, California, served by Vernon Public Utilities.",
      "state": "CA",
      "city": "Vernon",
      "county": "Los Angeles County",
      "status": "under_construction",
      "developer": "Goodman Group",
      "capacity_mw": 32,
      "latitude": 34.0042,
      "longitude": -118.2215,
      "location_precision": "address",
      "location_source": "https://us.goodman.com/",
      "location_verified_at": null,
      "coordinate_source": "Los Angeles County Assessor / Goodman LAX01 Vernon specification",
      "location_last_verified": null,
      "site_address": "2727 East Vernon Avenue, Vernon, CA 90058",
      "site_address_source_url": "https://us.goodman.com/",
      "published": "2026-10-02",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://us.goodman.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/goodman-lax01-vernon-ca",
      "sources": [
        {
          "title": "Goodman Group breaks ground on Los Angeles facility - BeBeez International",
          "url": "https://www.datacenterdynamics.com/en/news/goodman-group-breaks-ground-on-los-angeles-facility/",
          "publisher": "BeBeez International",
          "date": "2025-03-20",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2025-03-20",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Goodman Group broke ground on LAX01, a 32 MW data center on a 5.6 acre site in Vernon, California, formerly home to the Farmer John meat packing plant, targeting a powered shell by mid-2026.",
          "source_url": "https://www.datacenterdynamics.com/en/news/goodman-group-breaks-ground-on-los-angeles-facility/",
          "source_tier": 1
        }
      ]
    }
  ]
}
