      "slug": "georgia-dri-4727-bridgeport-ga",
      "name": "Bridgeport Technology Park Data Center Campus (Coweta County, DRI #4727)",
      "summary": "Georgia DCA DRI #4727 (Bridgeport Revised) was filed on April 28, 2026 for an 8,250,000 square foot data center campus requesting up to 1,500 MW along Bridgeport Parkway in Coweta County.",
      "state": "GA",
      "city": null,
      "county": "Coweta County",
      "status": "permitting",
      "developer": "Bridgeport Revised Development Applicant",
      "capacity_mw": 1500,
      "latitude": 33.318054,
      "longitude": -84.779471,
      "location_precision": "parcel",
      "location_source": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4727",
      "location_verified_at": "2026-11-11",
      "coordinate_source": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4727",
      "location_last_verified": "2026-11-11",
      "site_address": "0 Bridgeport Pkwy, Newnan, Coweta County, GA 30265",
      "site_address_source_url": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4727",
      "published": "2026-10-21",
      "last_verified": "2026-04-28",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4727",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": "withdrawal",
      "state_permit_status": "Georgia DCA DRI #4727 regional review filing",
      "state_permit_status_source_url": "https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4727",
      "state_permit_status_disclosed_as": "permitted",
      "state_permit_status_as_of": "2026-04-28",
      "state_permit_status_last_verified": "2026-11-11",
      "buildings": 10,
      "buildings_basis": "Georgia DCA DRI Initial Form",
      "buildings_source_url": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4727",
      "buildings_verified_at": "2026-11-11",
      "record_url": "https://datacenterrecord.org/projects/georgia-dri-4727-bridgeport-ga",
      "source": "https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4727",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Georgia DCA DRI #4727 Application Summary (Bridgeport Technology Park Data Center Campus (Coweta County, DRI #4727))",
          "url": "https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4727",
          "publisher": "Georgia Department of Community Affairs",
          "date": "2026-04-28",
          "source_tier": 1
        },
        {
          "title": "Georgia DCA DRI #4727 Initial Form (Bridgeport Technology Park Data Center Campus (Coweta County, DRI #4727))",
          "url": "https://apps.dca.ga.gov/DRI/InitialForm.aspx?driid=4727",
          "publisher": "Georgia Department of Community Affairs",
          "date": "2026-04-28",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "permitting",
          "effective_at": "2026-04-28",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Georgia DCA DRI #4727 (Bridgeport Revised) was filed on April 28, 2026 for an 8,250,000 square foot data center campus requesting up to 1,500 MW along Bridgeport Parkway in Coweta County.",
          "source_url": "https://apps.dca.ga.gov/DRI/AppSummary.aspx?driid=4727",
          "source_tier": 1
        }
      ]
    }
  ]
}