{
  "license": "CC BY-NC 4.0",
  "license_url": "https://creativecommons.org/licenses/by-nc/4.0/",
  "attribution": "Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0. Link to the specific record page where possible.",
  "source": "https://datacenterrecord.org/projects/cleanspark-rapid-city-data-center-sd",
  "retrieved_at": "2026-10-30T09:26:00.793Z",
  "count": 1,
  "projects": [
    {
      "slug": "cleanspark-rapid-city-data-center-sd",
      "name": "CleanSpark Rapid City Data Center Proposal",
      "summary": "CleanSpark subsidiary CSRE Properties South Dakota LLC executed an electric service agreement with Black Hills Power filed at the South Dakota Public Utilities Commission in April 2026 for a proposed data center in Rapid City, Pennington County, South Dakota.",
      "state": "SD",
      "city": "Rapid City",
      "county": "Pennington County",
      "status": "proposed",
      "developer": "CleanSpark Inc.",
      "capacity_mw": null,
      "latitude": 44.0805,
      "longitude": -103.231,
      "location_precision": "city",
      "location_source": "South Dakota Public Utilities Commission docket EL26-011 and Rapid City Gazetteer point",
      "location_verified_at": null,
      "coordinate_source": null,
      "location_last_verified": null,
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-10-02",
      "last_verified": "2026-10-28",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://www.cleanspark.com/",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "agreement_signed",
      "interconnection_source_url": "https://puc.sd.gov/Dockets/Electric/2026/EL26-011.aspx",
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/cleanspark-rapid-city-data-center-sd",
      "source": "https://rapidcitypost.com/confidential-energy-deal-proposed-for-rapid-city-data-center/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Confidential Energy Deal Proposed For Rapid City Data Center - The Rapid City Post",
          "url": "https://rapidcitypost.com/confidential-energy-deal-proposed-for-rapid-city-data-center/",
          "publisher": "The Rapid City Post",
          "date": "2026-04-13",
          "source_tier": 1
        },
        {
          "title": "South Dakota Public Utilities Commission Docket EL26-011 (Black Hills Power / CleanSpark ESA)",
          "url": "https://puc.sd.gov/Dockets/Electric/2026/EL26-011.aspx",
          "publisher": "South Dakota Public Utilities Commission",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-04-13",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Black Hills Power filed an electric service agreement with CleanSpark subsidiary CSRE Properties South Dakota LLC at the South Dakota Public Utilities Commission in Docket EL26-011 for a proposed data center in Rapid City.",
          "source_url": "https://puc.sd.gov/Dockets/Electric/2026/EL26-011.aspx",
          "source_tier": 2
        }
      ]
    }
  ]
}
