{
  "license": "CC BY-NC 4.0",
  "license_url": "https://creativecommons.org/licenses/by-nc/4.0/",
  "attribution": "Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0. Link to the specific record page where possible.",
  "source": "https://datacenterrecord.org/projects/burr-computer-environments-atl11-union-city-campus-ga",
  "retrieved_at": "2026-10-27T01:47:33.873Z",
  "count": 1,
  "projects": [
    {
      "slug": "burr-computer-environments-atl11-union-city-campus-ga",
      "name": "ATL03 Red Oak Data Center Campus (Union City)",
      "summary": "Burr Computer Environments filed a Developments of Regional Impact application for a 2.1 million square foot data center campus designated ATL11 in Union City, Fulton County, with construction set to start in 2026.",
      "state": "GA",
      "city": "Union City",
      "county": "Fulton County",
      "status": "permitting",
      "developer": "TA Realty / Burr Computer Environments",
      "capacity_mw": null,
      "latitude": 33.5842,
      "longitude": -84.5318,
      "location_precision": "parcel",
      "location_source": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4315",
      "location_verified_at": null,
      "coordinate_source": "Georgia DCA DRI Filing #4315 (ATL03 / Red Oak, Union City, Fulton County)",
      "location_last_verified": null,
      "site_address": "5200 Flat Shoals Rd, Union City, GA 30291",
      "site_address_source_url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4315",
      "published": "2026-10-21",
      "last_verified": "2026-10-26",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 6,
      "buildings_basis": "permit",
      "buildings_source_url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4315",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/burr-computer-environments-atl11-union-city-campus-ga",
      "sources": [
        {
          "title": "2.1 million sq ft data center campus proposed outside Atlanta, Georgia - datacenterdynamics.com",
          "url": "https://www.datacenterdynamics.com/en/news/21-million-sq-ft-data-center-campus-proposed-outside-atlanta-georgia/",
          "publisher": "datacenterdynamics.com",
          "date": "2024-07-16",
          "source_tier": 1
        },
        {
          "title": "Georgia Department of Community Affairs: DRI Filing #4315 (ATL03 / Red Oak, Union City, Fulton County)",
          "url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4315",
          "publisher": "Georgia Department of Community Affairs",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2024-07-16",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Burr Computer Environments filed a Developments of Regional Impact application for a 2.1 million square foot data center campus designated ATL11 in Union City, Fulton County, with construction set to start in 2026.",
          "source_url": "https://www.datacenterdynamics.com/en/news/21-million-sq-ft-data-center-campus-proposed-outside-atlanta-georgia/",
          "source_tier": 1
        }
      ]
    }
  ]
}
