  "license": "CC BY-NC 4.0",
  "license_url": "https://creativecommons.org/licenses/by-nc/4.0/",
  "attribution": "Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0. Link to the specific record page where possible.",
  "source": "https://datacenterrecord.org/grid/srvc-s",
  "retrieved_at": "2026-10-30T08:26:43.998Z",
  "count": 46,
  "projects": [
    {
      "slug": "300-jones-road-data-center-spartanburg-sc",
      "name": "300 Jones Road Data Center",
      "summary": "Lighthouse Data Centers and Wharton Digital submitted a site application on April 28, 2026 for a data center campus at 300 Jones Road in Spartanburg County, South Carolina.",
      "state": "SC",
      "city": "Spartanburg",
      "county": "Spartanburg County",
      "status": "proposed",
      "developer": "Lighthouse Data Centers / Wharton Digital",
      "capacity_mw": null,
      "latitude": 34.9562,
      "longitude": -81.8485,
      "location_precision": "address",
      "location_source": "https://www.spartanburgcounty.org/",
      "location_verified_at": null,
      "coordinate_source": "Spartanburg County 300 Jones Road site application",
      "location_last_verified": null,
      "site_address": "300 Jones Road, Spartanburg, SC 29307",
      "site_address_source_url": "https://www.spartanburgcounty.org/",
      "published": "2026-09-28",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "zoning application",
      "buildings_source_url": "https://www.spartanburgcounty.org/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/300-jones-road-data-center-spartanburg-sc",
      "source": "https://www.foxcarolina.com/2026/06/22/spartanburg-county-votes-pause-data-center-applications-one-year/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Spartanburg County votes to pause data center applications for one year - FOX Carolina News",
          "url": "https://www.foxcarolina.com/2026/06/22/spartanburg-county-votes-pause-data-center-applications-one-year/",
          "publisher": "FOX Carolina News",
          "date": "2026-06-22",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-10-20",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Spartanburg County Council approved a development agreement for Lightstone Group's 60 megawatt Jones Road data center on first reading and declined to advance NorthMark and AIB data centers pending compliance with newly corrected noise and light ordinances.",
          "source_url": "https://www.postandcourier.com/spartanburg/news/spartanburg-county-sc-jones-road-data-center-approved/article_97e4e3b3-f2b3-4cb0-ad6f-bba13b4058e5.html",
          "source_tier": 1
        },
        {
          "status": "stalled",
          "effective_at": "2026-06-22",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Lighthouse Data Centers and Wharton Digital submitted an application on April 28, 2026 for a data center at 300 Jones Road in Spartanburg County, which was paused by the county's one year moratorium.",
          "source_url": "https://www.foxcarolina.com/2026/06/22/spartanburg-county-votes-pause-data-center-applications-one-year/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "aiken-5-mw-data-center-sc",
      "name": "Aiken 5 MW Data Center",
      "summary": "The Aiken 5 MW Data Center operates at 1145 Bettis Academy Road and Giant Tire Parkway in the Sage Mill Industrial Park, Aiken County, South Carolina, permitted under EPA FRS ID 110071929476.",
      "state": "SC",
      "city": "Aiken",
      "county": "Aiken County",
      "status": "operational",
      "developer": "Aiken Electric Cooperative / Sage Mill Data Center",
      "capacity_mw": 5,
      "latitude": 33.5307,
      "longitude": -81.7274,
      "location_precision": "address",
      "location_source": "https://echo.epa.gov/detailed-facility-report?fid=110071929476",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "EPA FRS 110071929476",
      "location_last_verified": "2026-10-20",
      "site_address": "1145 Bettis Academy Road And Giant Tire Parkway, Aiken, SC 29847",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071929476",
      "published": "2026-10-20",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071929476",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/aiken-5-mw-data-center-sc",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110071929476",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Aiken 5 MW Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071929476",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from South Carolina DES permits, SC Public Service Commission dockets, county council ordinances, or operator campus specifications.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071929476",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "amazon-data-center-nc-nc",
      "name": "Amazon Web Services Richmond County Data Center Campus",
      "summary": "Amazon Web Services is constructing a 20 building data center campus at the Energy Way Industrial Park in Hamlet, Richmond County, North Carolina, after receiving North Carolina Department of Environmental Quality air quality permits in September 2026.",
      "state": "NC",
      "city": "Hamlet",
      "county": "Richmond County",
      "status": "under_construction",
      "developer": "Amazon Web Services",
      "capacity_mw": 1000,
      "latitude": 34.8892,
      "longitude": -79.71061,
      "location_precision": "parcel",
      "location_source": "https://www.deq.nc.gov/about/divisions/air-quality",
      "location_verified_at": null,
      "coordinate_source": "NC DEQ Division of Air Quality generator permit and Richmond County Energy Way Industrial Park record",
      "location_last_verified": null,
      "site_address": "Energy Way, Hamlet, NC 28345",
      "site_address_source_url": "https://www.deq.nc.gov/about/divisions/air-quality",
      "published": "2026-09-04",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 20,
      "buildings_basis": "zoning application",
      "buildings_source_url": "https://www.deq.nc.gov/about/divisions/air-quality",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/amazon-data-center-nc-nc",
      "source": "https://www.wral.com/business/technology/north-carolina-diesel-generators-amazon-data-center-september-2026/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "North Carolina approves diesel generator permits for Amazon data center - WRAL",
          "url": "https://www.wral.com/business/technology/north-carolina-diesel-generators-amazon-data-center-september-2026/",
          "publisher": "WRAL",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "An Amazon data center in NC wants to use diesel power. Why there’s pushback - Raleigh News & Observer",
          "url": "https://www.newsobserver.com/news/state/north-carolina/article316724525.html",
          "publisher": "Raleigh News & Observer",
          "date": "2026-08-08",
          "source_tier": 4
        },
        {
          "title": "Amazon Data Center Slated for NC Town With Devastating Industrial History - sentientmedia.org",
          "url": "https://sentientmedia.org/amazon-data-center-slated-for-nc-town/",
          "publisher": "sentientmedia.org",
          "date": "2026-08-04",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "permitting",
          "effective_at": "2026-09-01",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Amazon's North Carolina data center sought and received state approval for diesel generator permits amid community pushback over the use of diesel power.",
          "source_url": "https://www.deq.nc.gov/about/divisions/air-quality",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "amentum-dc-blox-savannah-river-ai-data-center-aiken-sc",
      "name": "Amentum / DC Blox Savannah River AI Data Center",
      "summary": "The United States Department of Energy selected Amentum and DC Blox to develop a 1,000 megawatt AI data center campus at the federal Savannah River Site in Aiken County, South Carolina.",
      "state": "SC",
      "city": "Aiken",
      "county": "Aiken County",
      "status": "approved",
      "developer": "Amentum / DC Blox",
      "capacity_mw": 1000,
      "latitude": 33.54944,
      "longitude": -81.72056,
      "location_precision": "parcel",
      "location_source": "https://www.energy.gov/",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "US Department of Energy Savannah River Site AI campus selection announcement",
      "location_last_verified": "2026-09-16",
      "site_address": "Savannah River Site, Highway 278, Aiken, SC 29808",
      "site_address_source_url": "https://www.energy.gov/",
      "published": "2026-09-05",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "zoning application",
      "buildings_source_url": "https://www.energy.gov/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/amentum-dc-blox-savannah-river-ai-data-center-aiken-sc",
      "source": "https://www.neimagazine.com/news/amentum-to-develop-srs-ai-campus/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Amentum to develop SRS AI campus",
          "url": "https://www.neimagazine.com/news/amentum-to-develop-srs-ai-campus/",
          "publisher": "www.neimagazine.com",
          "date": "2026-08-17",
          "source_tier": 4
        },
        {
          "title": "DOE selects Amentum, DC Blox to develop behind-the-meter AI data center at Savannah River site in South Carolina - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/doe-selects-amentum-dc-blox-to-develop-behind-the-meter-ai-data-center-at-savannah-river-site-in-south-carolina/",
          "publisher": "Data Center Dynamics",
          "date": "2026-07-21",
          "source_tier": 3
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "approved",
          "effective_at": "2026-07-21",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "The Department of Energy selected Amentum and DC Blox to develop a behind the meter AI data center at the Savannah River site in Aiken County, South Carolina.",
          "source_url": "https://www.energy.gov/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "american-tower-american-tower-ra1-raleigh-nc",
      "name": "American Tower Raleigh Data Center (RA1)",
      "summary": "American Tower operates the RA1 edge colocation data center at 6011 Chapel Hill Road in Raleigh, Wake County, North Carolina.",
      "state": "NC",
      "city": "Raleigh",
      "county": "Wake County",
      "status": "operational",
      "developer": "American Tower",
      "capacity_mw": 2,
      "latitude": 35.78812,
      "longitude": -78.726568,
      "location_precision": "address",
      "location_source": "https://www.americantower.com/us/data-centers/",
      "location_verified_at": null,
      "coordinate_source": "American Tower Raleigh RA1 specification",
      "location_last_verified": null,
      "site_address": "6011 Chapel Hill Road, Raleigh, NC 27607",
      "site_address_source_url": "https://www.americantower.com/us/data-centers/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.americantower.com/us/data-centers/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/american-tower-american-tower-ra1-raleigh-nc",
      "source": "https://www.americantower.com/us/data-centers/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "American Tower Raleigh Data Center (RA1) Official Disclosure",
          "url": "https://www.americantower.com/us/data-centers/",
          "publisher": "American Tower",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from North Carolina DEQ permits, municipal zoning filings, or operator campus specifications.",
          "source_url": "https://www.americantower.com/us/data-centers/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "apple-maiden-data-center-nc",
      "name": "Apple Maiden Data Center",
      "summary": "Apple operates a hyperscale data center campus at 5977 Startown Road in Maiden, Catawba County, North Carolina, disclosed in the Apple Environmental Progress Report 2026.",
      "state": "NC",
      "city": "Maiden",
      "county": "Catawba County",
      "status": "operational",
      "developer": "Apple",
      "capacity_mw": 150,
      "latitude": 35.5819,
      "longitude": -81.2589,
      "location_precision": "address",
      "location_source": "https://www.apple.com/environment/pdf/Apple_Environmental_Progress_Report_2026.pdf",
      "location_verified_at": null,
      "coordinate_source": "Apple Maiden Data Center specification and Catawba County parcel record",
      "location_last_verified": null,
      "site_address": "5977 Startown Road, Maiden, NC 28650",
      "site_address_source_url": "https://www.apple.com/environment/pdf/Apple_Environmental_Progress_Report_2026.pdf",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.apple.com/environment/pdf/Apple_Environmental_Progress_Report_2026.pdf",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/apple-maiden-data-center-nc",
      "source": "https://www.apple.com/environment/pdf/Apple_Environmental_Progress_Report_2026.pdf",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Apple Environmental Progress Report 2026 (Covering fiscal year 2025, Pages 52–54 & 81)",
          "url": "https://www.apple.com/environment/pdf/Apple_Environmental_Progress_Report_2026.pdf",
          "publisher": "Apple Environmental Progress Report 2026",
          "date": "2026-04-01",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from North Carolina DEQ permits, municipal zoning filings, or operator campus specifications.",
          "source_url": "https://www.apple.com/environment/pdf/Apple_Environmental_Progress_Report_2026.pdf",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "cherokee-county-data-center-sc",
      "name": "Cherokee County Data Center",
      "summary": "Cherokee County Council approved a development and tax incentive agreement for a multi building data center campus along the Interstate 85 corridor near Gaffney, Cherokee County, South Carolina.",
      "state": "SC",
      "city": "Gaffney",
      "county": "Cherokee County",
      "status": "approved",
      "developer": null,
      "capacity_mw": null,
      "latitude": 35.0718,
      "longitude": -81.6498,
      "location_precision": "parcel",
      "location_source": "https://cherokeecountysc.gov/",
      "location_verified_at": null,
      "coordinate_source": "Cherokee County Council data center development agreement",
      "location_last_verified": null,
      "site_address": "Interstate 85 Industrial Corridor, Gaffney, SC 29341",
      "site_address_source_url": "https://cherokeecountysc.gov/",
      "published": "2026-09-28",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "zoning application",
      "buildings_source_url": "https://cherokeecountysc.gov/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/cherokee-county-data-center-sc",
      "source": "https://scdailygazette.com/2025/06/25/cherokee-county-inks-2-1b-deal-with-data-center-developer/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Cherokee County inks $2.1B deal with data center developer - South Carolina Daily Gazette",
          "url": "https://scdailygazette.com/2025/06/25/cherokee-county-inks-2-1b-deal-with-data-center-developer/",
          "publisher": "South Carolina Daily Gazette",
          "date": "2025-06-25",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "approved",
          "effective_at": "2025-06-25",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Cherokee County signed a $2.1 billion data center development agreement with an unnamed developer.",
          "source_url": "https://scdailygazette.com/2025/06/25/cherokee-county-inks-2-1b-deal-with-data-center-developer/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "cyrusone-durham-dur1-dur2-nc",
      "name": "CyrusOne Durham DUR1 and DUR2",
      "summary": "CyrusOne operates the DUR1 and DUR2 data center campus at 2223 NE Creek Parkway in Durham, Durham County, North Carolina.",
      "state": "NC",
      "city": "Durham",
      "county": "Durham County",
      "status": "operational",
      "developer": "CyrusOne",
      "capacity_mw": 12,
      "latitude": 35.936339,
      "longitude": -78.879943,
      "location_precision": "address",
      "location_source": "https://www.cyrusone.com/data-centers/north-america/durham-nc-dur1-dur2",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "CyrusOne Durham DUR1 and DUR2 specification",
      "location_last_verified": "2026-09-14",
      "site_address": "2223 NE Creek Parkway, Durham, NC 27703",
      "site_address_source_url": "https://www.cyrusone.com/data-centers/north-america/durham-nc-dur1-dur2",
      "published": "2026-09-14",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.cyrusone.com/data-centers/north-america/durham-nc-dur1-dur2",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/cyrusone-durham-dur1-dur2-nc",
      "source": "https://www.cyrusone.com/data-centers",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "CyrusOne: Data centers",
          "url": "https://www.cyrusone.com/data-centers",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "CyrusOne: CyrusOne Durham DUR1-DUR2",
          "url": "https://www.cyrusone.com/data-centers/north-america/durham-nc-dur1-dur2",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "CyrusOne lists CyrusOne Durham DUR1 DUR2 at Durham, North Carolina on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.cyrusone.com/data-centers/north-america/durham-nc-dur1-dur2",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "dacentec-801-main-street-lenoir-lenoir-nc",
      "name": "Dacentec Lenoir Data Center",
      "summary": "Dacentec operates a commercial colocation data center at 801 Main Street NW in Lenoir, Caldwell County, North Carolina.",
      "state": "NC",
      "city": "Lenoir",
      "county": "Caldwell County",
      "status": "operational",
      "developer": "Dacentec",
      "capacity_mw": 5,
      "latitude": 35.922479,
      "longitude": -81.54274,
      "location_precision": "address",
      "location_source": "https://www.dacentec.com/",
      "location_verified_at": null,
      "coordinate_source": "Dacentec Lenoir specification",
      "location_last_verified": null,
      "site_address": "801 Main Street NW, Lenoir, NC 28645",
      "site_address_source_url": "https://www.dacentec.com/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.dacentec.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/dacentec-801-main-street-lenoir-lenoir-nc",
      "source": "https://www.dacentec.com/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Dacentec Lenoir Data Center Official Disclosure",
          "url": "https://www.dacentec.com/",
          "publisher": "Dacentec",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from North Carolina DEQ permits, municipal zoning filings, or operator campus specifications.",
          "source_url": "https://www.dacentec.com/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "dartpoints-llc-dartpoints-charleston-sc-chs1-ladson-sc",
      "name": "DartPoints Charleston Data Center (CHS1)",
      "summary": "DartPoints operates the CHS1 colocation data center at 8480 Palmetto Commerce Parkway in Ladson, Charleston County, South Carolina.",
      "state": "SC",
      "city": "Ladson",
      "county": "Charleston County",
      "status": "operational",
      "developer": "DartPoints",
      "capacity_mw": 4,
      "latitude": 32.964888,
      "longitude": -80.101283,
      "location_precision": "address",
      "location_source": "https://dartpoints.com/locations/charleston-sc/",
      "location_verified_at": null,
      "coordinate_source": "DartPoints Charleston (CHS1) specification",
      "location_last_verified": null,
      "site_address": "8480 Palmetto Commerce Parkway, Ladson, SC 29456",
      "site_address_source_url": "https://dartpoints.com/locations/charleston-sc/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://dartpoints.com/locations/charleston-sc/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/dartpoints-llc-dartpoints-charleston-sc-chs1-ladson-sc",
      "source": "https://dartpoints.com/locations/charleston-sc/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "DartPoints Charleston Data Center (CHS1) Official Disclosure",
          "url": "https://dartpoints.com/locations/charleston-sc/",
          "publisher": "DartPoints",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from South Carolina DES permits, SC Public Service Commission dockets, county council ordinances, or operator campus specifications.",
          "source_url": "https://dartpoints.com/locations/charleston-sc/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "dartpoints-llc-dartpoints-columbia-sc-cae1-columbia-sc",
      "name": "DartPoints Columbia Data Center (CAE1)",
      "summary": "DartPoints operates the CAE1 colocation data center at 1000 Catawba Street in Columbia, Richland County, South Carolina.",
      "state": "SC",
      "city": "Columbia",
      "county": "Richland County",
      "status": "operational",
      "developer": "DartPoints",
      "capacity_mw": 4,
      "latitude": 33.987661,
      "longitude": -81.030715,
      "location_precision": "address",
      "location_source": "https://dartpoints.com/locations/columbia-sc/",
      "location_verified_at": null,
      "coordinate_source": "DartPoints Columbia (CAE1) specification",
      "location_last_verified": null,
      "site_address": "1000 Catawba Street, Suite 180, Columbia, SC 29201",
      "site_address_source_url": "https://dartpoints.com/locations/columbia-sc/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://dartpoints.com/locations/columbia-sc/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/dartpoints-llc-dartpoints-columbia-sc-cae1-columbia-sc",
      "source": "https://dartpoints.com/locations/columbia-sc/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "DartPoints Columbia Data Center (CAE1) Official Disclosure",
          "url": "https://dartpoints.com/locations/columbia-sc/",
          "publisher": "DartPoints",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from South Carolina DES permits, SC Public Service Commission dockets, county council ordinances, or operator campus specifications.",
          "source_url": "https://dartpoints.com/locations/columbia-sc/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "dartpoints-llc-dartpoints-greenville-sc-gsp1-greenville-sc",
      "name": "DartPoints Greenville Data Center (GSP1)",
      "summary": "DartPoints operates the GSP1 colocation data center at 78 Global Drive in Greenville, Greenville County, South Carolina.",
      "state": "SC",
      "city": "Greenville",
      "county": "Greenville County",
      "status": "operational",
      "developer": "DartPoints",
      "capacity_mw": 4,
      "latitude": 34.807763,
      "longitude": -82.34338,
      "location_precision": "address",
      "location_source": "https://dartpoints.com/locations/greenville-sc/",
      "location_verified_at": null,
      "coordinate_source": "DartPoints Greenville (GSP1) specification",
      "location_last_verified": null,
      "site_address": "78 Global Drive, Greenville, SC 29607",
      "site_address_source_url": "https://dartpoints.com/locations/greenville-sc/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://dartpoints.com/locations/greenville-sc/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/dartpoints-llc-dartpoints-greenville-sc-gsp1-greenville-sc",
      "source": "https://dartpoints.com/locations/greenville-sc/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "DartPoints Greenville Data Center (GSP1) Official Disclosure",
          "url": "https://dartpoints.com/locations/greenville-sc/",
          "publisher": "DartPoints",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from South Carolina DES permits, SC Public Service Commission dockets, county council ordinances, or operator campus specifications.",
          "source_url": "https://dartpoints.com/locations/greenville-sc/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "dartpoints-llc-dartpoints-spartanburg-sc-spa1-spartanburg-sc",
      "name": "DartPoints Spartanburg Data Center (SPA1)",
      "summary": "DartPoints operates the SPA1 colocation data center at 5700 North Blackstock Road in Spartanburg, Spartanburg County, South Carolina.",
      "state": "SC",
      "city": "Spartanburg",
      "county": "Spartanburg County",
      "status": "operational",
      "developer": "DartPoints",
      "capacity_mw": 4,
      "latitude": 34.996536,
      "longitude": -82.033518,
      "location_precision": "address",
      "location_source": "https://dartpoints.com/locations/spartanburg-sc/",
      "location_verified_at": null,
      "coordinate_source": "DartPoints Spartanburg (SPA1) specification",
      "location_last_verified": null,
      "site_address": "5700 North Blackstock Road, Spartanburg, SC 29303",
      "site_address_source_url": "https://dartpoints.com/locations/spartanburg-sc/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://dartpoints.com/locations/spartanburg-sc/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/dartpoints-llc-dartpoints-spartanburg-sc-spa1-spartanburg-sc",
      "source": "https://dartpoints.com/locations/spartanburg-sc/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "DartPoints Spartanburg Data Center (SPA1) Official Disclosure",
          "url": "https://dartpoints.com/locations/spartanburg-sc/",
          "publisher": "DartPoints",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from South Carolina DES permits, SC Public Service Commission dockets, county council ordinances, or operator campus specifications.",
          "source_url": "https://dartpoints.com/locations/spartanburg-sc/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "dc-blox-parent-llc-dc-blox-gsp1-dcblox-greenville-greenville-sc",
      "name": "DC BLOX Greenville Data Center (GSP1)",
      "summary": "DC BLOX operates the GSP1 commercial colocation data center at 33 Global Drive in Greenville, Greenville County, South Carolina.",
      "state": "SC",
      "city": "Greenville",
      "county": "Greenville County",
      "status": "operational",
      "developer": "DC BLOX",
      "capacity_mw": 9,
      "latitude": 34.806553,
      "longitude": -82.345891,
      "location_precision": "address",
      "location_source": "https://www.dcblox.com/locations/greenville-sc/",
      "location_verified_at": null,
      "coordinate_source": "DC BLOX Greenville (GSP1) specification",
      "location_last_verified": null,
      "site_address": "33 Global Drive, Greenville, SC 29607",
      "site_address_source_url": "https://www.dcblox.com/locations/greenville-sc/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.dcblox.com/locations/greenville-sc/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/dc-blox-parent-llc-dc-blox-gsp1-dcblox-greenville-greenville-sc",
      "source": "https://www.dcblox.com/locations/greenville-sc/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "DC BLOX Greenville Data Center (GSP1) Official Disclosure",
          "url": "https://www.dcblox.com/locations/greenville-sc/",
          "publisher": "DC BLOX",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from South Carolina DES permits, SC Public Service Commission dockets, county council ordinances, or operator campus specifications.",
          "source_url": "https://www.dcblox.com/locations/greenville-sc/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "dc-blox-parent-llc-dc-blox-myr1-dcblox-myrtle-beach-myrtle-beach-sc",
      "name": "DC BLOX Myrtle Beach Cable Landing Station (MYR1)",
      "summary": "DC BLOX operates the MYR1 subsea cable landing station and colocation data center at 1401 Howard Avenue at the former Myrtle Beach Air Force Base in Myrtle Beach, Horry County, South Carolina.",
      "state": "SC",
      "city": "Myrtle Beach",
      "county": "Horry County",
      "status": "operational",
      "developer": "DC BLOX",
      "capacity_mw": 15,
      "latitude": 33.674793,
      "longitude": -78.942594,
      "location_precision": "address",
      "location_source": "https://www.dcblox.com/locations/myrtle-beach-sc/",
      "location_verified_at": null,
      "coordinate_source": "DC BLOX Myrtle Beach (MYR1) specification",
      "location_last_verified": null,
      "site_address": "1401 Howard Avenue, Myrtle Beach, SC 29577",
      "site_address_source_url": "https://www.dcblox.com/locations/myrtle-beach-sc/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.dcblox.com/locations/myrtle-beach-sc/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/dc-blox-parent-llc-dc-blox-myr1-dcblox-myrtle-beach-myrtle-beach-sc",
      "source": "https://www.dcblox.com/locations/myrtle-beach-sc/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "DC BLOX Myrtle Beach Cable Landing Station (MYR1) Official Disclosure",
          "url": "https://www.dcblox.com/locations/myrtle-beach-sc/",
          "publisher": "DC BLOX",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from South Carolina DES permits, SC Public Service Commission dockets, county council ordinances, or operator campus specifications.",
          "source_url": "https://www.dcblox.com/locations/myrtle-beach-sc/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "dc74-data-centers-dc74clt1-charlotte-nc",
      "name": "DC74 Data Centers Charlotte (CLT1)",
      "summary": "DC74 Data Centers operates the CLT1 colocation facility at 3100 International Airport Drive in Charlotte, Mecklenburg County, North Carolina.",
      "state": "NC",
      "city": "Charlotte",
      "county": "Mecklenburg County",
      "status": "operational",
      "developer": "DC74 Data Centers",
      "capacity_mw": 5,
      "latitude": 35.193902,
      "longitude": -80.937263,
      "location_precision": "address",
      "location_source": "https://dc74.com/",
      "location_verified_at": null,
      "coordinate_source": "DC74 Data Centers CLT1 specification",
      "location_last_verified": null,
      "site_address": "3100 International Airport Drive, Charlotte, NC 28208",
      "site_address_source_url": "https://dc74.com/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://dc74.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/dc74-data-centers-dc74clt1-charlotte-nc",
      "source": "https://dc74.com/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "DC74 Data Centers Charlotte (CLT1) Official Disclosure",
          "url": "https://dc74.com/",
          "publisher": "DC74 Data Centers",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from North Carolina DEQ permits, municipal zoning filings, or operator campus specifications.",
          "source_url": "https://dc74.com/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "dc74-data-centers-dc74clt4-charlotte-nc",
      "name": "DC74 Data Centers Charlotte South (CLT4)",
      "summary": "DC74 Data Centers operates the CLT4 colocation facility at 1612 Cross Beam Drive in Charlotte, Mecklenburg County, North Carolina.",
      "state": "NC",
      "city": "Charlotte",
      "county": "Mecklenburg County",
      "status": "operational",
      "developer": "DC74 Data Centers",
      "capacity_mw": 5,
      "latitude": 35.180076,
      "longitude": -80.92639,
      "location_precision": "address",
      "location_source": "https://dc74.com/",
      "location_verified_at": null,
      "coordinate_source": "DC74 Data Centers CLT4 specification",
      "location_last_verified": null,
      "site_address": "1612 Cross Beam Drive, Charlotte, NC 28217",
      "site_address_source_url": "https://dc74.com/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://dc74.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/dc74-data-centers-dc74clt4-charlotte-nc",
      "source": "https://dc74.com/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "DC74 Data Centers Charlotte South (CLT4) Official Disclosure",
          "url": "https://dc74.com/",
          "publisher": "DC74 Data Centers",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from North Carolina DEQ permits, municipal zoning filings, or operator campus specifications.",
          "source_url": "https://dc74.com/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "digital-realty-charlotte-nc",
      "name": "Digital Realty Charlotte",
      "summary": "Digital Realty operates two interconnected carrier neutral data centers at 125 and 113 North Myers Street in Charlotte, Mecklenburg County, North Carolina.",
      "state": "NC",
      "city": "Charlotte",
      "county": "Mecklenburg County",
      "status": "operational",
      "developer": "Digital Realty",
      "capacity_mw": 6,
      "latitude": 35.222057,
      "longitude": -80.8353,
      "location_precision": "address",
      "location_source": "https://www.digitalrealty.com/data-centers/americas/charlotte/clt10",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "Digital Realty Charlotte (CLT10, 125 N. Myers Street) specification",
      "location_last_verified": "2026-09-14",
      "site_address": "125 N. Myers Street, Charlotte, NC 28202",
      "site_address_source_url": "https://www.digitalrealty.com/data-centers/americas/charlotte/clt10",
      "published": "2026-09-14",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.digitalrealty.com/data-centers/americas/charlotte/clt10",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/digital-realty-charlotte-nc",
      "source": "https://www.digitalrealty.com/data-centers/americas",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Digital Realty: Americas data centers",
          "url": "https://www.digitalrealty.com/data-centers/americas",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty CLT10",
          "url": "https://www.digitalrealty.com/data-centers/americas/charlotte/clt10",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty Charlotte",
          "url": "https://www.digitalrealty.com/data-centers/americas/charlotte",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Digital Realty lists Digital Realty CLT10, Digital Realty Charlotte at Charlotte, North Carolina on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.digitalrealty.com/data-centers/americas/charlotte/clt10",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "eagle-rock-partners-colleton-county-data-center-walterboro-sc",
      "name": "Eagle Rock Partners Colleton County Data Center",
      "summary": "Eagle Rock Partners proposed an 860 acre, nine building, 1,000 megawatt data center campus four miles southeast of Walterboro in Colleton County, South Carolina.",
      "state": "SC",
      "city": "Walterboro",
      "county": "Colleton County",
      "status": "proposed",
      "developer": "Eagle Rock Partners",
      "capacity_mw": 1000,
      "latitude": 32.8624,
      "longitude": -80.6128,
      "location_precision": "parcel",
      "location_source": "https://www.colletoncounty.org/",
      "location_verified_at": null,
      "coordinate_source": "Colleton County zoning application near Walterboro",
      "location_last_verified": null,
      "site_address": "Ritter Road and ACE Basin Highway, Walterboro, SC 29488",
      "site_address_source_url": "https://www.colletoncounty.org/",
      "published": "2026-09-28",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 9,
      "buildings_basis": "zoning application",
      "buildings_source_url": "https://www.colletoncounty.org/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/eagle-rock-partners-colleton-county-data-center-walterboro-sc",
      "source": "https://scdailygazette.com/2025/12/19/gigawatt-data-center-proposal-draws-opposition-from-sc-lowcountry-residents-politicians/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Gigawatt data center proposal draws opposition from SC Lowcountry residents, politicians - South Carolina Daily Gazette",
          "url": "https://scdailygazette.com/2025/12/19/gigawatt-data-center-proposal-draws-opposition-from-sc-lowcountry-residents-politicians/",
          "publisher": "South Carolina Daily Gazette",
          "date": "2025-12-19",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2025-12-19",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Eagle Rock Partners proposes a 860 acre, nine building, 1,000 megawatt data center campus four miles southeast of Walterboro in Colleton County, requiring a zoning exception and drawing community opposition over water and power concerns.",
          "source_url": "https://scdailygazette.com/2025/12/19/gigawatt-data-center-proposal-draws-opposition-from-sc-lowcountry-residents-politicians/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "energy-storage-solutions-edgecombe-county-ai-data-center-kingsboro-nc",
      "name": "Energy Storage Solutions Edgecombe County AI Data Center",
      "summary": "Energy Storage Solutions proposed a 900 megawatt AI data center campus on 122 acres of county owned land at the Kingsboro Industrial Park in Edgecombe County, North Carolina.",
      "state": "NC",
      "city": null,
      "county": "Edgecombe County",
      "status": "proposed",
      "developer": "Energy Storage Solutions",
      "capacity_mw": 900,
      "latitude": 35.9182,
      "longitude": -77.6745,
      "location_precision": "parcel",
      "location_source": "https://www.edgecombecountync.gov/",
      "location_verified_at": null,
      "coordinate_source": "Edgecombe County Kingsboro Industrial Park parcel record",
      "location_last_verified": null,
      "site_address": "Kingsboro Industrial Park, Rocky Mount, NC 27801",
      "site_address_source_url": "https://www.edgecombecountync.gov/",
      "published": "2026-09-28",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 4,
      "buildings_basis": "zoning application",
      "buildings_source_url": "https://www.edgecombecountync.gov/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/energy-storage-solutions-edgecombe-county-ai-data-center-kingsboro-nc",
      "source": "https://www.northcarolinahealthnews.org/2026/07/14/rural-nc-data-centers/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "AI data center boom meets rural reality in Edgecombe County - North Carolina Health News",
          "url": "https://www.northcarolinahealthnews.org/2026/07/14/rural-nc-data-centers/",
          "publisher": "North Carolina Health News",
          "date": "2026-07-14",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-07-14",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Energy Storage Solutions proposed a 900 megawatt AI data center on 122 acres of county owned land in Kingsboro, Edgecombe County, facing resident opposition.",
          "source_url": "https://www.northcarolinahealthnews.org/2026/07/14/rural-nc-data-centers/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "flexential-corp-flexential-charlottenorth-clt45-charlotte-nc",
      "name": "Flexential Charlotte North (CLT4 and CLT5)",
      "summary": "Flexential operates the Charlotte North CLT4 and CLT5 colocation campus at 10105 David Taylor Drive in Charlotte, Mecklenburg County, North Carolina.",
      "state": "NC",
      "city": "Charlotte",
      "county": "Mecklenburg County",
      "status": "operational",
      "developer": "Flexential",
      "capacity_mw": 12,
      "latitude": 35.329674,
      "longitude": -80.766017,
      "location_precision": "address",
      "location_source": "https://www.flexential.com/data-centers/north-carolina/charlotte",
      "location_verified_at": null,
      "coordinate_source": "Flexential Charlotte North specification",
      "location_last_verified": null,
      "site_address": "10105 David Taylor Drive, Charlotte, NC 28262",
      "site_address_source_url": "https://www.flexential.com/data-centers/north-carolina/charlotte",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.flexential.com/data-centers/north-carolina/charlotte",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/flexential-corp-flexential-charlottenorth-clt45-charlotte-nc",
      "source": "https://www.flexential.com/data-centers/north-carolina/charlotte",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Flexential Charlotte North (CLT4 and CLT5) Official Disclosure",
          "url": "https://www.flexential.com/data-centers/north-carolina/charlotte",
          "publisher": "Flexential",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from North Carolina DEQ permits, municipal zoning filings, or operator campus specifications.",
          "source_url": "https://www.flexential.com/data-centers/north-carolina/charlotte",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "flexential-corp-flexential-charlottesouth-clt123-charlotte-nc",
      "name": "Flexential Charlotte South (CLT1, CLT2, and CLT3)",
      "summary": "Flexential operates the Charlotte South CLT1, CLT2, and CLT3 colocation campus at 8910 Lenox Pointe Drive in Charlotte, Mecklenburg County, North Carolina.",
      "state": "NC",
      "city": "Charlotte",
      "county": "Mecklenburg County",
      "status": "operational",
      "developer": "Flexential",
      "capacity_mw": 9,
      "latitude": 35.135366,
      "longitude": -80.93693,
      "location_precision": "address",
      "location_source": "https://www.flexential.com/data-centers/north-carolina/charlotte",
      "location_verified_at": null,
      "coordinate_source": "Flexential Charlotte South specification",
      "location_last_verified": null,
      "site_address": "8910 Lenox Pointe Drive, Suite A, Charlotte, NC 28273",
      "site_address_source_url": "https://www.flexential.com/data-centers/north-carolina/charlotte",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.flexential.com/data-centers/north-carolina/charlotte",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/flexential-corp-flexential-charlottesouth-clt123-charlotte-nc",
      "source": "https://www.flexential.com/data-centers/north-carolina/charlotte",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Flexential Charlotte South (CLT1, CLT2, and CLT3) Official Disclosure",
          "url": "https://www.flexential.com/data-centers/north-carolina/charlotte",
          "publisher": "Flexential",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from North Carolina DEQ permits, municipal zoning filings, or operator campus specifications.",
          "source_url": "https://www.flexential.com/data-centers/north-carolina/charlotte",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "flexential-corp-flexential-raleigh-ral010203-morrisville-nc",
      "name": "Flexential Raleigh (RAL01, RAL02, and RAL03)",
      "summary": "Flexential operates the Raleigh RAL01, RAL02, and RAL03 colocation campus at 5150 McCrimmon Parkway in Morrisville, Wake County, North Carolina.",
      "state": "NC",
      "city": "Morrisville",
      "county": "Wake County",
      "status": "operational",
      "developer": "Flexential",
      "capacity_mw": 11,
      "latitude": 35.84984,
      "longitude": -78.829017,
      "location_precision": "address",
      "location_source": "https://www.flexential.com/data-centers/north-carolina/raleigh",
      "location_verified_at": null,
      "coordinate_source": "Flexential Raleigh Morrisville specification",
      "location_last_verified": null,
      "site_address": "5150 McCrimmon Parkway, Suite 419, Morrisville, NC 27560",
      "site_address_source_url": "https://www.flexential.com/data-centers/north-carolina/raleigh",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.flexential.com/data-centers/north-carolina/raleigh",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/flexential-corp-flexential-raleigh-ral010203-morrisville-nc",
      "source": "https://www.flexential.com/data-centers/north-carolina/raleigh",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Flexential Raleigh (RAL01, RAL02, and RAL03) Official Disclosure",
          "url": "https://www.flexential.com/data-centers/north-carolina/raleigh",
          "publisher": "Flexential",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from North Carolina DEQ permits, municipal zoning filings, or operator campus specifications.",
          "source_url": "https://www.flexential.com/data-centers/north-carolina/raleigh",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "google-berkeley-county-data-center-sc",
      "name": "Google Berkeley County data center",
      "summary": "Google operates its Berkeley County hyperscale data center campus at 1025 Cane Bay Boulevard in Moncks Corner, Berkeley County, South Carolina.",
      "state": "SC",
      "city": "Moncks Corner",
      "county": "Berkeley County",
      "status": "operational",
      "developer": "Google",
      "capacity_mw": 200,
      "latitude": 33.19632,
      "longitude": -80.01429,
      "location_precision": "address",
      "location_source": "https://datacenters.google/locations/",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "Google Berkeley County specification and Berkeley County parcel record",
      "location_last_verified": "2026-09-16",
      "site_address": "1025 Cane Bay Boulevard, Moncks Corner, SC 29461",
      "site_address_source_url": "https://datacenters.google/locations/",
      "published": "2026-09-14",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 4,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://datacenters.google/locations/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/google-berkeley-county-data-center-sc",
      "source": "https://www.costar.com/article/273305527/tech-giant-expanding-operations-in-south-carolina",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "News | Tech Giant Expanding Operations in South Carolina - CoStar",
          "url": "https://www.costar.com/article/273305527/tech-giant-expanding-operations-in-south-carolina",
          "publisher": "CoStar",
          "date": "2021-03-19",
          "source_tier": 1
        },
        {
          "title": "Google plans to spend $600 million expanding its SC data center - Post and Courier",
          "url": "https://www.postandcourier.com/business/google-plans-to-spend-600-million-expanding-its-sc-data-center/article_01175774-9f01-11e8-aea6-97a2c0ca8518.html",
          "publisher": "Post and Courier",
          "date": "2020-09-14",
          "source_tier": 1
        },
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Google gets approval to triple its use of groundwater from Lowcountry aquifer - Live 5 News",
          "url": "https://www.live5news.com/2019/10/11/google-gets-approval-triple-its-use-groundwater-lowcountry-aquifer/",
          "publisher": "Live 5 News",
          "date": "2019-10-11",
          "source_tier": 1
        },
        {
          "title": "Google has a big economic presence in Berkeley County. But is it creating more jobs? - Post and Courier",
          "url": "https://www.postandcourier.com/news/google-has-a-big-economic-presence-in-berkeley-county-but-is-it-creating-more-jobs/article_6ad56830-30ab-11ea-bc6c-2734720bc164.html",
          "publisher": "Post and Courier",
          "date": "2020-01-11",
          "source_tier": 1
        },
        {
          "title": "Google's Berkeley Co. expansion tops record list of SC economic development ventures - Post and Courier",
          "url": "https://www.postandcourier.com/business/googles-berkeley-co-expansion-tops-record-list-of-sc-economic-development-ventures/article_59f72c1a-82b1-11ec-8fb6-cbd61043f29d.html",
          "publisher": "Post and Courier",
          "date": "2022-01-31",
          "source_tier": 1
        },
        {
          "title": "After aquifer concerns, Google's $600m South Carolina expansion finds new water supply - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/after-aquifer-concerns-googles-600m-south-carolina-expansion-finds-new-water-supply/",
          "publisher": "Data Center Dynamics",
          "date": "2019-06-04",
          "source_tier": 1
        },
        {
          "title": "Google Looking Outside Berkeley County For Data Center Expansion - FITSNews",
          "url": "https://www.fitsnews.com/2019/06/11/google-looking-outside-berkeley-county-for-data-center-expansion/",
          "publisher": "FITSNews",
          "date": "2019-06-11",
          "source_tier": 1
        },
        {
          "title": "Editorial: Say ‘no’ to more Google water withdrawal - Post and Courier",
          "url": "https://www.postandcourier.com/opinion/editorials/editorial-say-no-to-more-google-water-withdrawal/article_d50e27d6-87ba-11e9-a8eb-0be9a1c6f44c.html",
          "publisher": "Post and Courier",
          "date": "2019-06-05",
          "source_tier": 1
        },
        {
          "title": "Google Moves In And Wants To Pump 1.5 Million Gallons Of Water Per Day - NPR",
          "url": "https://www.npr.org/2017/05/08/527214026/google-moves-in-and-wants-to-pump-1-5-million-gallons-of-water-per-day",
          "publisher": "NPR",
          "date": "2017-05-08",
          "source_tier": 1
        },
        {
          "title": "Google to invest $9 billion in South Carolina to build more data centers",
          "url": "https://www.youtube.com/watch?v=Pks3dF0xNRU",
          "publisher": "YouTube",
          "date": "2025-10-13",
          "source_tier": 5
        },
        {
          "title": "Expansion of Google data center in SC to make it one of the company’s largest - The State",
          "url": "https://www.thestate.com/news/article226382555.html",
          "publisher": "The State",
          "date": "2019-02-16",
          "source_tier": 4
        },
        {
          "title": "Google Drops $9B on South Carolina AI Data Centers - The Tech Buzz",
          "url": "https://www.techbuzz.ai/articles/google-drops-9b-on-south-carolina-ai-data-centers",
          "publisher": "The Tech Buzz",
          "date": "2025-10-13",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Berkeley County data center at Berkeley County, South Carolina on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        },
        {
          "status": "operational",
          "effective_at": "2025-10-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-10-13",
          "summary": "Google is investing $9 billion in three South Carolina AI data centre campuses through 2027",
          "source_url": "https://www.techbuzz.ai/articles/google-drops-9b-on-south-carolina-ai-data-centers",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2025-10-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-10-13",
          "summary": "Google has 15 years of presence in South Carolina",
          "source_url": "https://www.youtube.com/watch?v=Pks3dF0xNRU",
          "source_tier": 5
        },
        {
          "status": "operational",
          "effective_at": "2019-02-16",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2019-02-16",
          "summary": "Google data center expansion in South Carolina to become one of company's largest facilities",
          "source_url": "https://www.thestate.com/news/article226382555.html",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "google-dorchester-county-data-center-sc",
      "name": "Google Dorchester County data center",
      "summary": "Google is constructing a second Lowcountry hyperscale data center campus at the Pine Hill Business Campus in Ridgeville, Dorchester County, South Carolina.",
      "state": "SC",
      "city": "Ridgeville",
      "county": "Dorchester County",
      "status": "under_construction",
      "developer": "Google",
      "capacity_mw": 150,
      "latitude": 33.186,
      "longitude": -80.57565,
      "location_precision": "parcel",
      "location_source": "https://datacenters.google/locations/",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "Google Dorchester County specification and Dorchester County Pine Hill Business Campus record",
      "location_last_verified": "2026-09-16",
      "site_address": "Pine Hill Business Campus, Ridgeville, SC 29472",
      "site_address_source_url": "https://datacenters.google/locations/",
      "published": "2026-09-14",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://datacenters.google/locations/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/google-dorchester-county-data-center-sc",
      "source": "https://datacenters.google/locations/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Google gets approval for Charleston area data center expansion - Post and Courier",
          "url": "https://www.postandcourier.com/business/google-gets-approval-for-charleston-area-data-center-expansion/article_0662d648-aaed-11e8-a8b9-cb73c947bb09.html",
          "publisher": "Post and Courier",
          "date": "2018-08-28",
          "source_tier": 1
        },
        {
          "title": "Editorial: Google glistens in water agreement - Post and Courier",
          "url": "https://www.postandcourier.com/opinion/editorials/editorial-google-glistens-in-water-agreement/article_202f4e22-1d0f-11ea-95f5-7f8735b53d78.html",
          "publisher": "Post and Courier",
          "date": "2019-12-12",
          "source_tier": 1
        },
        {
          "title": "Google to invest $9 billion in South Carolina to build more data centers",
          "url": "https://www.youtube.com/watch?v=Pks3dF0xNRU",
          "publisher": "YouTube",
          "date": "2025-10-13",
          "source_tier": 5
        },
        {
          "title": "Google to host data center meet and greet in St. George as the tech giant expands in the region - WCBD News 2",
          "url": "https://www.counton2.com/news/local-news/dorchester-county-news/google-to-host-data-center-meet-and-greet-in-st-george-as-the-tech-giant-expands-in-the-region/",
          "publisher": "WCBD News 2",
          "date": "2026-05-28",
          "source_tier": 4
        },
        {
          "title": "AI Industry Super PAC Spends $1.5 Million to Back Graham in Tight South Carolina Senate Race",
          "url": "https://www.nytimes.com/2026/10/27/us/politics/south-carolina-senate-ai-data-center-super-pac.html",
          "publisher": "The New York Times",
          "date": "2026-10-27",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Dorchester County data center at Dorchester County, South Carolina on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        },
        {
          "status": "under_construction",
          "effective_at": "2026-05-28",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-28",
          "summary": "Google hosted a meet and greet in St. George related to data center expansion",
          "source_url": "https://www.counton2.com/news/local-news/dorchester-county-news/google-to-host-data-center-meet-and-greet-in-st-george-as-the-tech-giant-expands-in-the-region/",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "google-lenoir-data-center-nc",
      "name": "Google Lenoir data center",
      "summary": "Google operates a hyperscale data center campus at 714 Harrisburg Drive SW in Lenoir, Caldwell County, North Carolina.",
      "state": "NC",
      "city": "Lenoir",
      "county": "Caldwell County",
      "status": "operational",
      "developer": "Google",
      "capacity_mw": 150,
      "latitude": 35.900899,
      "longitude": -81.546627,
      "location_precision": "address",
      "location_source": "https://echo.epa.gov/detailed-facility-report?fid=110038975936",
      "location_verified_at": "2026-10-04",
      "coordinate_source": "EPA FRS 110038975936 and Caldwell County parcel record",
      "location_last_verified": "2026-10-04",
      "site_address": "714 Harrisburg Drive SW, Lenoir, NC 28645",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110038975936",
      "published": "2026-09-14",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110038975936",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/google-lenoir-data-center-nc",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110038975936",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: HB Mellott Estate INC., Google Project",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110038975936",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Google Buys More Land at Lenoir Data Center - Data Center Knowledge",
          "url": "https://www.datacenterknowledge.com/hyperscalers/google-buys-more-land-at-lenoir-data-center",
          "publisher": "Data Center Knowledge",
          "date": "2024-05-30",
          "source_tier": 3
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Lenoir data center at Lenoir, North Carolina on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        },
        {
          "status": "operational",
          "effective_at": "2024-05-30",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2024-05-30",
          "summary": "Google bought more land at Lenoir data center",
          "source_url": "https://www.datacenterknowledge.com/hyperscalers/google-buys-more-land-at-lenoir-data-center",
          "source_tier": 3
        }
      ]
    },
    {
      "slug": "h5-charlotte-nc",
      "name": "H5 Charlotte",
      "summary": "H5 Data Centers operates a commercial colocation data center at 10015 Claude Freeman Drive in Charlotte University Research Park, Mecklenburg County, North Carolina.",
      "state": "NC",
      "city": "Charlotte",
      "county": "Mecklenburg County",
      "status": "operational",
      "developer": "H5 Data Centers",
      "capacity_mw": 12,
      "latitude": 35.3235,
      "longitude": -80.7632,
      "location_precision": "address",
      "location_source": "https://h5datacenters.com/data-centers.html",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "H5 Data Centers Charlotte specification",
      "location_last_verified": "2026-09-14",
      "site_address": "10015 Claude Freeman Drive, Charlotte, NC 28262",
      "site_address_source_url": "https://h5datacenters.com/data-centers.html",
      "published": "2026-09-14",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://h5datacenters.com/data-centers.html",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/h5-charlotte-nc",
      "source": "https://h5datacenters.com/data-centers.html",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "H5 Data Centers: Data centers",
          "url": "https://h5datacenters.com/data-centers.html",
          "publisher": "H5 Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "H5 Data Centers explores expansion in Charlotte’s University Research Park - WSOC TV",
          "url": "https://www.wsoctv.com/news/local/h5-data-centers-explores-expansion-charlottes-university-research-park/XHCB6ITPDBCZRD2LIHZZBVHDPI/",
          "publisher": "WSOC TV",
          "date": "2026-03-12",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "H5 Data Centers lists H5 Charlotte at Charlotte, North Carolina on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://h5datacenters.com/data-centers.html",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "hilton-head-area-data-centers-beaufort-sc",
      "name": "Hilton Head Area Data Centers",
      "summary": "Two data center facilities are proposed along the Bluffton and Hilton Head corridor in Beaufort County, South Carolina, prompting county zoning review.",
      "state": "SC",
      "city": "Bluffton",
      "county": "Beaufort County",
      "status": "proposed",
      "developer": null,
      "capacity_mw": null,
      "latitude": 32.43194,
      "longitude": -80.68944,
      "location_precision": "parcel",
      "location_source": "https://www.beaufortcountysc.gov/",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "Beaufort County planning record",
      "location_last_verified": "2026-09-16",
      "site_address": "Buckwalter Parkway Corridor, Bluffton, SC 29910",
      "site_address_source_url": "https://www.beaufortcountysc.gov/",
      "published": "2026-09-05",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "zoning application",
      "buildings_source_url": "https://www.beaufortcountysc.gov/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/hilton-head-area-data-centers-beaufort-sc",
      "source": "https://www.islandpacket.com/news/local/article316628841.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "Two data centers coming near Hilton Head area. Will power rates go up? - Hilton Head Island Packet",
          "url": "https://www.islandpacket.com/news/local/article316628841.html",
          "publisher": "Hilton Head Island Packet",
          "date": "2026-07-24",
          "source_tier": 4
        },
        {
          "title": "Beaufort and Jasper Counties have new plans regarding data centers. Here’s what’s proposed - Hilton Head Island Packet",
          "url": "https://www.yahoo.com/news/us/articles/beaufort-jasper-counties-plans-regarding-100000584.html",
          "publisher": "Hilton Head Island Packet",
          "date": "2026-09-12",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-07-24",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Two data centers are planned near the Hilton Head area in Beaufort County, South Carolina, with questions raised about potential impacts on local power rates.",
          "source_url": "https://www.beaufortcountysc.gov/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "historic-charlotte-building-site-data-center-nc",
      "name": "Historic Charlotte building site data center",
      "summary": "A historic building in downtown Charlotte, Mecklenburg County, North Carolina was demolished under a city permit in September 2026 to clear the site for a proposed data center development.",
      "state": "NC",
      "city": "Charlotte",
      "county": "Mecklenburg County",
      "status": "proposed",
      "developer": null,
      "capacity_mw": null,
      "latitude": 35.22694,
      "longitude": -80.84333,
      "location_precision": "parcel",
      "location_source": "https://www.charlotteobserver.com/news/business/article317086990.html",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "Mecklenburg County demolition permit and parcel record",
      "location_last_verified": "2026-09-16",
      "site_address": "800 East Trade Street, Charlotte, NC 28202",
      "site_address_source_url": "https://www.charlotteobserver.com/news/business/article317086990.html",
      "published": "2026-09-04",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "zoning application",
      "buildings_source_url": "https://www.charlotteobserver.com/news/business/article317086990.html",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/historic-charlotte-building-site-data-center-nc",
      "source": "https://www.charlotteobserver.com/news/business/article317086990.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "Historic Charlotte building demolished in a day, clears path for data center - Charlotte Observer",
          "url": "https://www.charlotteobserver.com/news/business/article317086990.html",
          "publisher": "Charlotte Observer",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Charlotte architect remembers historic building demolished for data center development - WBTV",
          "url": "https://www.wbtv.com/2026/09/07/charlotte-architect-remembers-historic-building-demolished-data-center-development/",
          "publisher": "WBTV",
          "date": "2026-09-07",
          "source_tier": 4
        },
        {
          "title": "Will new data centers spike Charlotte water bills? Here’s what officials say - Charlotte Observer",
          "url": "https://www.yahoo.com/news/us/articles/data-centers-spike-charlotte-water-093000950.html",
          "publisher": "Charlotte Observer",
          "date": "2026-09-04",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-09-07",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-07",
          "summary": "Digital Realty bought the Court Arcade building in 2025 from Shamrock Management Corporation for 9.5 million dollars",
          "source_url": "https://www.wbtv.com/2026/09/07/charlotte-architect-remembers-historic-building-demolished-data-center-development/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-07",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-07",
          "summary": "The Court Arcade was demolished this past week to make way for a three story 29,000 square foot data center",
          "source_url": "https://www.wbtv.com/2026/09/07/charlotte-architect-remembers-historic-building-demolished-data-center-development/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-04",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-04",
          "summary": "The Charlotte Water moratorium on data center applications is scheduled to expire November 5",
          "source_url": "https://www.yahoo.com/news/us/articles/data-centers-spike-charlotte-water-093000950.html",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-02",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "A historic Charlotte building was demolished in a day to clear the path for a data center development.",
          "source_url": "https://www.charlotteobserver.com/news/business/article317086990.html",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "inflow-data-center-durham-nc",
      "name": "Inflow Data Center",
      "summary": "11:11 Systems (formerly Inflow and Sungard Availability Services) operates a commercial colocation data center at 4518 S. Miami Boulevard in Durham, Durham County, North Carolina, permitted under EPA FRS ID 110012146169.",
      "state": "NC",
      "city": "Durham",
      "county": "Durham County",
      "status": "operational",
      "developer": "11:11 Systems (formerly Inflow / Sungard)",
      "capacity_mw": 4,
      "latitude": 35.89695,
      "longitude": -78.84903,
      "location_precision": "address",
      "location_source": "https://echo.epa.gov/detailed-facility-report?fid=110012146169",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "EPA FRS 110012146169",
      "location_last_verified": "2026-10-20",
      "site_address": "4518 S. Miami Boulevard, Durham, NC 27703",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110012146169",
      "published": "2026-10-20",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110012146169",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/inflow-data-center-durham-nc",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110012146169",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Inflow Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110012146169",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from North Carolina DEQ permits, municipal zoning filings, or operator campus specifications.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110012146169",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "iws-anderson-data-center-project-phase-2-sc",
      "name": "IWS Anderson Data Center Project Phase 2",
      "summary": "Industrial Web Services (IWS) operates a commercial data center facility at 1649 Pearman Dairy Road in Anderson, Anderson County, South Carolina, permitted under EPA FRS ID 110071932123.",
      "state": "SC",
      "city": "Anderson",
      "county": "Anderson County",
      "status": "operational",
      "developer": "Industrial Web Services (IWS)",
      "capacity_mw": 15,
      "latitude": 34.5422,
      "longitude": -82.70031,
      "location_precision": "address",
      "location_source": "https://echo.epa.gov/detailed-facility-report?fid=110071932123",
      "location_verified_at": "2026-10-03",
      "coordinate_source": "EPA FRS 110071932123",
      "location_last_verified": "2026-10-03",
      "site_address": "1649 Pearman Dairy Road, Anderson, SC 29625",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071932123",
      "published": "2026-10-03",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071932123",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/iws-anderson-data-center-project-phase-2-sc",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110071932123",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Iws Anderson Data Center Project Phase 2",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071932123",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from South Carolina DES permits, SC Public Service Commission dockets, county council ordinances, or operator campus specifications.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071932123",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "lee-county-data-center-nc",
      "name": "CyrusOne Lee County Data Center",
      "summary": "CyrusOne is developing a data center campus near Sanford in Lee County, North Carolina, where county commissioners rejected attempts to pause the approved project in August 2026.",
      "state": "NC",
      "city": "Sanford",
      "county": "Lee County",
      "status": "approved",
      "developer": "CyrusOne",
      "capacity_mw": null,
      "latitude": 35.5398,
      "longitude": -79.2312,
      "location_precision": "parcel",
      "location_source": "https://www.cyrusone.com/data-centers/north-america/lee-county-north-carolina",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "CyrusOne Lee County specification and Lee County parcel record",
      "location_last_verified": "2026-09-16",
      "site_address": "Cumnock Road and US 421, Sanford, NC 27330",
      "site_address_source_url": "https://www.cyrusone.com/data-centers/north-america/lee-county-north-carolina",
      "published": "2026-09-04",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.cyrusone.com/data-centers/north-america/lee-county-north-carolina",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/lee-county-data-center-nc",
      "source": "https://rantnc.com/2026/08/18/commissioners-reject-attempts-to-pause-data-center-project/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Commissioners reject attempts to pause data center project - rantnc.com",
          "url": "https://rantnc.com/2026/08/18/commissioners-reject-attempts-to-pause-data-center-project/",
          "publisher": "rantnc.com",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "Lee County residents demand pause on NC data center, claiming deception - ncnewsline.com",
          "url": "https://ncnewsline.com/2026/07/15/lee-county-residents-demand-pause-on-data-center-claiming-deception/",
          "publisher": "ncnewsline.com",
          "date": "2026-07-15",
          "source_tier": 4
        },
        {
          "title": "Lee County, North Carolina",
          "url": "https://www.cyrusone.com/data-centers/north-america/lee-county-north-carolina",
          "publisher": "www.cyrusone.com",
          "date": "2026-08-17",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "approved",
          "effective_at": "2026-08-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-18",
          "summary": "A proposed 90 megawatt data center is planned near Cumnock on Lower Moncure Road with plans to drill beneath Deep River",
          "source_url": "https://rantnc.com/2026/08/18/commissioners-reject-attempts-to-pause-data-center-project/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-07-15",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Lee County residents demanded a pause on a data center project, claiming deception by the developer.",
          "source_url": "https://www.cyrusone.com/data-centers/north-america/lee-county-north-carolina",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "meta-aiken-data-center-sc",
      "name": "Meta Aiken Data Center",
      "summary": "Meta operates its Aiken hyperscale data center campus at the Sage Mill Industrial Park in Aiken County, South Carolina.",
      "state": "SC",
      "city": "Aiken",
      "county": "Aiken County",
      "status": "operational",
      "developer": "Meta",
      "capacity_mw": 150,
      "latitude": 33.5314951,
      "longitude": -81.7258585,
      "location_precision": "parcel",
      "location_source": "https://datacenters.atmeta.com/us-locations/",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "Meta Aiken Data Center specification and Aiken County Sage Mill Industrial Park parcel record",
      "location_last_verified": "2026-09-14",
      "site_address": "Sage Mill Industrial Park, Aiken, SC 29801",
      "site_address_source_url": "https://datacenters.atmeta.com/us-locations/",
      "published": "2026-09-14",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://datacenters.atmeta.com/us-locations/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/meta-aiken-data-center-sc",
      "source": "https://datacenters.atmeta.com/us-locations/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Meta: Our U.S. data center fleet",
          "url": "https://datacenters.atmeta.com/us-locations/",
          "publisher": "Meta",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Meta lists Meta Aiken Data Center at Aiken, South Carolina on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.atmeta.com/us-locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "meta-forest-city-data-center-nc",
      "name": "Meta Forest City Data Center",
      "summary": "Meta operates a hyperscale data center campus at 284 Social Circle in Forest City, Rutherford County, North Carolina.",
      "state": "NC",
      "city": "Forest City",
      "county": "Rutherford County",
      "status": "operational",
      "developer": "Meta",
      "capacity_mw": 150,
      "latitude": 35.3336001,
      "longitude": -81.8701153,
      "location_precision": "address",
      "location_source": "https://echo.epa.gov/detailed-facility-report?fid=110043697416",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA FRS 110043697416 and Rutherford County parcel record",
      "location_last_verified": "2026-09-14",
      "site_address": "284 Social Circle, Forest City, NC 28043",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110043697416",
      "published": "2026-09-14",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110043697416",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/meta-forest-city-data-center-nc",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110043697416",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Andale, INC.",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110043697416",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "Meta: Our U.S. data center fleet",
          "url": "https://datacenters.atmeta.com/us-locations/",
          "publisher": "Meta",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Meta lists Meta Forest City Data Center at Forest City, North Carolina on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.atmeta.com/us-locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "microsoft-mega-park-person-county-woodsdale-township-nc",
      "name": "Microsoft Mega Park Person County",
      "summary": "Microsoft acquired a 1,385 acre site in Woodsdale Township, Person County, North Carolina for a planned hyperscale data center campus known as Microsoft Mega Park and held a community meeting on June 30, 2026.",
      "state": "NC",
      "city": "Woodsdale Township",
      "county": "Person County",
      "status": "approved",
      "developer": "Microsoft",
      "capacity_mw": null,
      "latitude": 36.4628,
      "longitude": -78.9664,
      "location_precision": "parcel",
      "location_source": "https://www.personcountync.gov/",
      "location_verified_at": null,
      "coordinate_source": "Person County Mega Park rezoning and parcel record",
      "location_last_verified": null,
      "site_address": "Old US 501 Highway, Woodsdale Township, NC 27583",
      "site_address_source_url": "https://www.personcountync.gov/",
      "published": "2026-09-28",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 4,
      "buildings_basis": "zoning application",
      "buildings_source_url": "https://www.personcountync.gov/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/microsoft-mega-park-person-county-woodsdale-township-nc",
      "source": "https://www.wral.com/news/local/person-county-microsoft-data-center-discussion-june-2026/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Microsoft hosts meeting on future Person County data center amid AI tensions - WRAL",
          "url": "https://www.wral.com/news/local/person-county-microsoft-data-center-discussion-june-2026/",
          "publisher": "WRAL",
          "date": "2026-06-30",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-06-30",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Microsoft purchased a 1,385 acre site in Person County for $28.85 million in 2024 and held a community meeting on June 30, 2026 to discuss the planned data center campus known as Microsoft Mega Park.",
          "source_url": "https://www.wral.com/news/local/person-county-microsoft-data-center-discussion-june-2026/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "netriplex-netriplex-asheville-nc",
      "name": "DartPoints Asheville Data Center (AVL1)",
      "summary": "DartPoints operates the AVL1 colocation data center at 100 Technology Drive in Asheville, Buncombe County, North Carolina.",
      "state": "NC",
      "city": "Asheville",
      "county": "Buncombe County",
      "status": "operational",
      "developer": "DartPoints",
      "capacity_mw": 6,
      "latitude": 35.488137,
      "longitude": -82.557785,
      "location_precision": "address",
      "location_source": "https://dartpoints.com/locations/asheville-nc/",
      "location_verified_at": null,
      "coordinate_source": "DartPoints Asheville (AVL1) specification",
      "location_last_verified": null,
      "site_address": "100 Technology Drive, Asheville, NC 28803",
      "site_address_source_url": "https://dartpoints.com/locations/asheville-nc/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://dartpoints.com/locations/asheville-nc/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/netriplex-netriplex-asheville-nc",
      "source": "https://dartpoints.com/locations/asheville-nc/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "DartPoints Asheville Data Center (AVL1) Official Disclosure",
          "url": "https://dartpoints.com/locations/asheville-nc/",
          "publisher": "DartPoints",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from North Carolina DEQ permits, municipal zoning filings, or operator campus specifications.",
          "source_url": "https://dartpoints.com/locations/asheville-nc/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "northmark-spartanburg-county-data-center-sc",
      "name": "NorthMark Spartanburg County Data Center",
      "summary": "NorthMark Strategies and Valara Holdings are constructing a 457 megawatt data center campus at the former Kohler industrial site in Spartanburg County, South Carolina, after the South Carolina Public Service Commission dismissed regulatory challenges in August 2026.",
      "state": "SC",
      "city": "Spartanburg",
      "county": "Spartanburg County",
      "status": "under_construction",
      "developer": "NorthMark Strategies / Valara Holdings",
      "capacity_mw": 457,
      "latitude": 34.94806,
      "longitude": -81.93472,
      "location_precision": "address",
      "location_source": "https://www.psc.sc.gov/",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "SC Public Service Commission docket and Spartanburg County parcel record",
      "location_last_verified": "2026-09-16",
      "site_address": "4500 Country Club Road, Spartanburg, SC 29302",
      "site_address_source_url": "https://www.psc.sc.gov/",
      "published": "2026-09-05",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": "natural gas, 450 MW",
      "power_source_url": "https://www.goupstate.com/story/news/local/2026/07/21/spartanburg-sc-county-council-moves-ahead-with-data-center-moratorium/90991063007/",
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "zoning application",
      "buildings_source_url": "https://www.psc.sc.gov/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/northmark-spartanburg-county-data-center-sc",
      "source": "https://www.yahoo.com/news/us/articles/spartanburg-data-center-gets-ok-164500863.html",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Spartanburg data center gets OK from SC regulators to generate 457 megawatts - Post and Courier",
          "url": "https://www.yahoo.com/news/us/articles/spartanburg-data-center-gets-ok-164500863.html",
          "publisher": "Post and Courier",
          "date": "2026-09-21",
          "source_tier": 4
        },
        {
          "title": "Spartanburg County board blocks proposed data center - WYFF",
          "url": "https://www.wyff4.com/article/spartanburg-county-blocks-data-center/73526196",
          "publisher": "WYFF",
          "date": "2026-08-25",
          "source_tier": 4
        },
        {
          "title": "South Carolina approves nearly $3 billion data center in Spartanburg County despite lawsuit - Yahoo",
          "url": "https://www.yahoo.com/news/videos/south-carolina-approves-nearly-3-032714703.html",
          "publisher": "Yahoo",
          "date": "2026-08-28",
          "source_tier": 4
        },
        {
          "title": "Special meeting called over data center construction in Spartanburg County - Yahoo",
          "url": "https://www.yahoo.com/news/articles/special-meeting-called-over-data-121256127.html",
          "publisher": "Yahoo",
          "date": "2026-09-21",
          "source_tier": 4
        },
        {
          "title": "Spartanburg County to hold special meeting on controversial data centers - FOX Carolina News",
          "url": "https://www.foxcarolina.com/2026/09/09/spartanburg-county-hold-special-meeting-controversial-data-centers/",
          "publisher": "FOX Carolina News",
          "date": "2026-09-09",
          "source_tier": 4
        },
        {
          "title": "Spartanburg County data center construction continues despite legal challenges - WYFF",
          "url": "https://www.wyff4.com/article/spartanburg-county-data-center-construction-lawsuit/73586304",
          "publisher": "WYFF",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Public Service Commission sides with Spartanburg data center, says it won't regulate NorthMark - Post and Courier",
          "url": "https://www.postandcourier.com/spartanburg/news/spartanburg-data-center-northmark-valara-siting-ac/article_d4e7981f-3a7c-43e1-adfb-3b980a62dca6.html",
          "publisher": "Post and Courier",
          "date": "2026-08-27",
          "source_tier": 4
        },
        {
          "title": "State commission sides with Spartanburg data center in legal challenge - WSPA 7News",
          "url": "https://www.wspa.com/news/sc-commission-rules-valara-data-center/",
          "publisher": "WSPA 7News",
          "date": "2026-08-27",
          "source_tier": 4
        },
        {
          "title": "SC Public Service Commission dismisses challenge to Spartanburg County data center project - FOX Carolina News",
          "url": "https://www.foxcarolina.com/2026/08/27/sc-public-service-commission-dismisses-challenge-spartanburg-county-data-center-project/",
          "publisher": "FOX Carolina News",
          "date": "2026-08-27",
          "source_tier": 4
        },
        {
          "title": "Upstate leaders and public clash over future of data centers - WYFF",
          "url": "https://www.wyff4.com/article/data-center-debate-noise-development/73660750",
          "publisher": "WYFF",
          "date": "2026-09-11",
          "source_tier": 4
        },
        {
          "title": "Citizens group lawyers seek injunction to halt data center construction - Greenville Online",
          "url": "https://www.greenvilleonline.com/story/news/local/2026/08/20/court-filing-injunction-pause-valara-data-center-construction-spartanburg/91390470007/",
          "publisher": "Greenville Online",
          "date": "2026-08-20",
          "source_tier": 4
        },
        {
          "title": "Lawsuit targets Spartanburg County data center project, demands public planning review - FOX Carolina News",
          "url": "https://www.foxcarolina.com/2026/07/08/lawsuit-targets-spartanburg-county-data-center-project-demands-public-planning-review/",
          "publisher": "FOX Carolina News",
          "date": "2026-07-07",
          "source_tier": 4
        },
        {
          "title": "Could data center challenge change the landscape in South Carolina? - WRDW",
          "url": "https://www.wrdw.com/2026/08/05/could-data-center-challenge-change-landscape-south-carolina/",
          "publisher": "WRDW",
          "date": "2026-08-05",
          "source_tier": 4
        },
        {
          "title": "Data center developer wants to build own power plant. Does it need SC’s approval? - The State",
          "url": "https://www.thestate.com/news/politics-government/article316773777.html",
          "publisher": "The State",
          "date": "2026-08-06",
          "source_tier": 4
        },
        {
          "title": "Spartanburg council committee holds hearing on data centers, presses for credible evidence - FOX Carolina News",
          "url": "https://www.foxcarolina.com/2026/09/09/spartanburg-council-committee-holds-hearing-data-centers-presses-credible-evidence/",
          "publisher": "FOX Carolina News",
          "date": "2026-09-09",
          "source_tier": 4
        },
        {
          "title": "DATA 2: Spartanburg data center not subject to public power plant rules, SC regulators rule - The Clinton Chronicle",
          "url": "https://myclintonnews.com/stories/data-2-spartanburg-data-center-not-subject-to-public-power-plant-rules-sc-regulators-rule,167420",
          "publisher": "The Clinton Chronicle",
          "date": "2026-09-10",
          "source_tier": 4
        },
        {
          "title": "Judge punts decision on Spartanburg data center construction",
          "url": "https://www.southcarolinapublicradio.org/sc-news/2026-09-17/judge-punts-decision-on-spartanburg-data-center-construction",
          "publisher": "South Carolina Public Radio",
          "date": "2026-09-17",
          "source_tier": 4
        },
        {
          "title": "Spartanburg County data center ban advances. NorthMark to be included?",
          "url": "https://www.goupstate.com/story/news/local/2026/07/21/spartanburg-sc-county-council-moves-ahead-with-data-center-moratorium/90991063007/",
          "publisher": "www.goupstate.com",
          "date": "2026-07-21",
          "source_tier": 4
        },
        {
          "title": "South Carolina Public Service Commission approves nearly $3 billion data center - WYFF",
          "url": "https://www.wyff4.com/article/data-center-approved-despite-environmental-group-lawsuit/73549328",
          "publisher": "WYFF",
          "date": "2026-08-27",
          "source_tier": 4
        },
        {
          "title": "Spartanburg data center not subject to public power plant rules, SC regulators rule - South Carolina Daily Gazette",
          "url": "https://scdailygazette.com/2026/08/27/spartanburg-data-center-not-subject-to-public-power-plant-rules-sc-regulators-rule/",
          "publisher": "South Carolina Daily Gazette",
          "date": "2026-08-27",
          "source_tier": 4
        },
        {
          "title": "They started building a $2.8 billion data center and no one really knew about it - selc.org",
          "url": "https://www.selc.org/news/they-started-building-a-2-8-billion-data-center-and-no-one-really-knew-about-it/",
          "publisher": "selc.org",
          "date": "2026-08-26",
          "source_tier": 4
        },
        {
          "title": "Environmental group seeks to halt development of $3B data center in Spartanburg County - WYFF",
          "url": "https://www.wyff4.com/article/lawsuit-filed-to-stop-spartanburg-county-data-center/73486156",
          "publisher": "WYFF",
          "date": "2026-08-21",
          "source_tier": 4
        },
        {
          "title": "Development company responds to request for injunction to halt Upstate data center project - FOX Carolina News",
          "url": "https://www.foxcarolina.com/video/2026/08/21/development-company-responds-request-injunction-halt-upstate-data-center-project/",
          "publisher": "FOX Carolina News",
          "date": "2026-08-20",
          "source_tier": 4
        },
        {
          "title": "Environmental group files court order to stop Spartanburg County data center project - FOX Carolina News",
          "url": "https://www.foxcarolina.com/2026/08/20/environmental-group-files-court-order-stop-spartanburg-county-data-center-project/",
          "publisher": "FOX Carolina News",
          "date": "2026-08-20",
          "source_tier": 4
        },
        {
          "title": "NorthMark pledges up to $500K in philanthropic gifts per quarter - GoUpstate",
          "url": "https://www.goupstate.com/story/news/local/2026/08/26/northmark-data-center-developer-emphasizes-plans-for-philanthropy/91466795007/",
          "publisher": "GoUpstate",
          "date": "2026-08-26",
          "source_tier": 4
        },
        {
          "title": "Amount of water needed to operate Spartanburg Data Center more than double original estimate - WSPA 7News",
          "url": "https://www.yahoo.com/news/us/articles/amount-water-needed-operate-spartanburg-200211693.html",
          "publisher": "WSPA 7News",
          "date": "2026-09-21",
          "source_tier": 4
        },
        {
          "title": "AI Industry Super PAC Spends $1.5 Million to Back Graham in Tight South Carolina Senate Race",
          "url": "https://www.nytimes.com/2026/10/27/us/politics/south-carolina-senate-ai-data-center-super-pac.html",
          "publisher": "The New York Times",
          "date": "2026-10-27",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-21",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-21",
          "summary": "NorthMark's Valara Data Center revised water use to 1.2 million gallons per day average, up to 1.6 million maximum, up from original 459,000 gallons per day",
          "source_url": "https://www.yahoo.com/news/us/articles/amount-water-needed-operate-spartanburg-200211693.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-21",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-21",
          "summary": "South Carolina Department of Environmental Services granted permit September 18 for 11 natural gas turbines generating additional 408 megawatts, bringing total capacity to 457 megawatts",
          "source_url": "https://www.yahoo.com/news/us/articles/spartanburg-data-center-gets-ok-164500863.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-21",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-21",
          "summary": "Higher water demand figures were provided to Spartanburg Water on February 11, 2026, as part of the project's Large Water Meter Questionnaire",
          "source_url": "https://www.yahoo.com/news/us/articles/amount-water-needed-operate-spartanburg-200211693.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "State Circuit Court judge delayed decision on Valara data center construction in Spartanburg.",
          "source_url": "https://www.southcarolinapublicradio.org/sc-news/2026-09-17/judge-punts-decision-on-spartanburg-data-center-construction",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "Construction on the Valara site has already begun and continues while court considers the classification decision.",
          "source_url": "https://www.southcarolinapublicradio.org/sc-news/2026-09-17/judge-punts-decision-on-spartanburg-data-center-construction",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "Spartanburg County Planning Commission voted last month to halt the stalled Lighthouse data center project.",
          "source_url": "https://www.southcarolinapublicradio.org/sc-news/2026-09-17/judge-punts-decision-on-spartanburg-data-center-construction",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-11",
          "summary": "The meeting lasted five hours with public, experts, and council members debating a data center project",
          "source_url": "https://www.wyff4.com/article/data-center-debate-noise-development/73660750",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-10",
          "summary": "Valara project became public in March 2025 when Spartanburg County began negotiating tax incentives for project creating 27 jobs",
          "source_url": "https://myclintonnews.com/stories/data-2-spartanburg-data-center-not-subject-to-public-power-plant-rules-sc-regulators-rule,167420",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-10",
          "summary": "NorthMark Strategies converting Kohler kitchen and bath manufacturing plant into $2.8 billion computing center on 300 acres",
          "source_url": "https://myclintonnews.com/stories/data-2-spartanburg-data-center-not-subject-to-public-power-plant-rules-sc-regulators-rule,167420",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-09",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-09",
          "summary": "NorthMark data center construction continues on South Pine Street",
          "source_url": "https://www.foxcarolina.com/2026/09/09/spartanburg-council-committee-holds-hearing-data-centers-presses-credible-evidence/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-09",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-09",
          "summary": "NorthMark was approved about two years ago through a public process including three readings and a public hearing",
          "source_url": "https://www.foxcarolina.com/2026/09/09/spartanburg-council-committee-holds-hearing-data-centers-presses-credible-evidence/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-09",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-09",
          "summary": "Valara Holdings data center initially approved as minor project, now subject to community opposition and legal challenge",
          "source_url": "https://www.foxcarolina.com/2026/09/09/spartanburg-county-hold-special-meeting-controversial-data-centers/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-02",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "A $2.8,$3 billion NorthMark data center project in Spartanburg County is under construction and faced legal challenges including an injunction request and lawsuit, but the SC Public Service Commission ruled the project is not subject to public power plant regulations.",
          "source_url": "https://www.psc.sc.gov/",
          "source_tier": 1
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-28",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-28",
          "summary": "South Carolina approved nearly 3 billion dollar data center in Spartanburg County",
          "source_url": "https://www.yahoo.com/news/videos/south-carolina-approves-nearly-3-032714703.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-26",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-26",
          "summary": "NorthMark received a fee in lieu of taxes incentive package from Spartanburg County Council in 2025",
          "source_url": "https://www.goupstate.com/story/news/local/2026/08/26/northmark-data-center-developer-emphasizes-plans-for-philanthropy/91466795007/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-26",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-26",
          "summary": "NorthMark plans to construct a 450 megawatt power generation facility to provide electricity for the data center",
          "source_url": "https://www.goupstate.com/story/news/local/2026/08/26/northmark-data-center-developer-emphasizes-plans-for-philanthropy/91466795007/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-26",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-26",
          "summary": "NorthMark's Valara subsidiary is constructing a data center on South Pine Street at the old Kohler plant site in Spartanburg",
          "source_url": "https://www.goupstate.com/story/news/local/2026/08/26/northmark-data-center-developer-emphasizes-plans-for-philanthropy/91466795007/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-26",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-26",
          "summary": "NorthMark Cloud and Compute announced quarterly philanthropic donations between $250,000 and $500,000",
          "source_url": "https://www.goupstate.com/story/news/local/2026/08/26/northmark-data-center-developer-emphasizes-plans-for-philanthropy/91466795007/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-26",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-26",
          "summary": "Southern Environmental Law Center filed a request for a preliminary injunction to halt the Valara project",
          "source_url": "https://www.goupstate.com/story/news/local/2026/08/26/northmark-data-center-developer-emphasizes-plans-for-philanthropy/91466795007/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-26",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-26",
          "summary": "NorthMark submitted an application for a minor land development for the next phase of construction",
          "source_url": "https://www.goupstate.com/story/news/local/2026/08/26/northmark-data-center-developer-emphasizes-plans-for-philanthropy/91466795007/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-25",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-25",
          "summary": "LightHouse Data Centers proposed a project covering about 151 acres along Jones Road with an approximately 200,000 square foot building",
          "source_url": "https://www.wyff4.com/article/spartanburg-county-blocks-data-center/73526196",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-25",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-25",
          "summary": "The project would have created about 50 jobs",
          "source_url": "https://www.wyff4.com/article/spartanburg-county-blocks-data-center/73526196",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "project-liberty-marion-county-data-center-sc",
      "name": "Project Liberty Marion County Data Center",
      "summary": "Marion County Council approved an inducement and fee in lieu of tax agreement on January 22, 2026 for Project Liberty, a planned data center campus in Marion County, South Carolina.",
      "state": "SC",
      "city": "Marion",
      "county": "Marion County",
      "status": "approved",
      "developer": "Project Liberty LLC",
      "capacity_mw": null,
      "latitude": 34.1782,
      "longitude": -79.4006,
      "location_precision": "parcel",
      "location_source": "https://www.marionsc.org/",
      "location_verified_at": null,
      "coordinate_source": "Marion County Council Project Liberty inducement ordinance",
      "location_last_verified": null,
      "site_address": "US Highway 76 Industrial Corridor, Marion, SC 29571",
      "site_address_source_url": "https://www.marionsc.org/",
      "published": "2026-09-28",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 4,
      "buildings_basis": "zoning application",
      "buildings_source_url": "https://www.marionsc.org/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/project-liberty-marion-county-data-center-sc",
      "source": "https://capitalbnews.org/secret-data-center-deal-marion-county-south-carolina/",
      "basis": "official_record",
      "sources": [
        {
          "title": "A Rural S.C. County Quietly Approved a $2B Data Center During the Winter Storm - capitalbnews.org",
          "url": "https://capitalbnews.org/secret-data-center-deal-marion-county-south-carolina/",
          "publisher": "capitalbnews.org",
          "date": "2026-02-04",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "approved",
          "effective_at": "2026-02-04",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Marion County Council approved a $2.4 billion data center project called Project Liberty on January 22, 2026, with approval made without public knowledge under a nondisclosure agreement.",
          "source_url": "https://capitalbnews.org/secret-data-center-deal-marion-county-south-carolina/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "qts-york-county-sc",
      "name": "QTS York County",
      "summary": "QTS Data Centers is constructing a multi building hyperscale data center campus along Hands Mill Highway near Rock Hill in York County, South Carolina.",
      "state": "SC",
      "city": "Rock Hill",
      "county": "York County",
      "status": "under_construction",
      "developer": "QTS Data Centers",
      "capacity_mw": 300,
      "latitude": 35.035376,
      "longitude": -81.104511,
      "location_precision": "address",
      "location_source": "https://qtsdatacenters.com/",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "QTS York County specification",
      "location_last_verified": "2026-09-16",
      "site_address": "2143 Hands Mill Highway, Rock Hill, SC 29732",
      "site_address_source_url": "https://qtsdatacenters.com/",
      "published": "2026-09-14",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 4,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://qtsdatacenters.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/qts-york-county-sc",
      "source": "https://www.heraldonline.com/news/business/article306316056.html",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Why York County’s $1 billion data center project could grow even taller - Rock Hill Herald",
          "url": "https://www.heraldonline.com/news/business/article306316056.html",
          "publisher": "Rock Hill Herald",
          "date": "2025-05-15",
          "source_tier": 4
        },
        {
          "title": "After a $26M land purchase to double its size, QTS to meet with public about York County data center - Post and Courier",
          "url": "https://www.postandcourier.com/york-county/news/qts-data-center-york-clover-meeting/article_d3095fdb-8572-4510-9974-681459f18cd9.html",
          "publisher": "Post and Courier",
          "date": "2026-01-08",
          "source_tier": 4
        },
        {
          "title": "QTS buys 400 acres in York County, South Carolina - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/qts-buys-400-acres-in-york-county-south-carolina/",
          "publisher": "Data Center Dynamics",
          "date": "2023-07-26",
          "source_tier": 3
        },
        {
          "title": "How QTS' billion dollar data center will impact Rock Hill - Post and Courier",
          "url": "https://www.postandcourier.com/york-county/news/data-center-brings-billion-dollar-investment-to-rock-hill/article_bada2df6-5952-11ee-ae70-5bb88433f567.html",
          "publisher": "Post and Courier",
          "date": "2023-09-25",
          "source_tier": 4
        },
        {
          "title": "QTS Data Centers: All locations",
          "url": "https://q.com/data-centers/",
          "publisher": "QTS Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Locals voice concerns over $1B York County data center as QTS reps meet face to face with residents - Post and Courier",
          "url": "https://www.postandcourier.com/york-county/news/resident-concerns-york-county-qts-data-center/article_475e41a6-a73b-4288-a23d-2cdefd0bedec.html",
          "publisher": "Post and Courier",
          "date": "2026-02-12",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "QTS Data Centers lists QTS York County at York County, South Carolina on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://q.com/data-centers/",
          "source_tier": 2
        },
        {
          "status": "under_construction",
          "effective_at": "2026-02-12",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-02-12",
          "summary": "QTS plans a $1 billion data center in York County, South Carolina",
          "source_url": "https://www.postandcourier.com/york-county/news/resident-concerns-york-county-qts-data-center/article_475e41a6-a73b-4288-a23d-2cdefd0bedec.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-01-08",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-01-08",
          "summary": "QTS purchased $26 million in land to double the size of its York County data center",
          "source_url": "https://www.postandcourier.com/york-county/news/qts-data-center-york-clover-meeting/article_d3095fdb-8572-4510-9974-681459f18cd9.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2025-05-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-05-15",
          "summary": "York County's $1 billion data center project could expand in size",
          "source_url": "https://www.heraldonline.com/news/business/article306316056.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2023-09-25",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2023-09-25",
          "summary": "QTS billion dollar data center investment in Rock Hill",
          "source_url": "https://www.postandcourier.com/york-county/news/data-center-brings-billion-dollar-investment-to-rock-hill/article_bada2df6-5952-11ee-ae70-5bb88433f567.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2023-07-26",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2023-07-26",
          "summary": "QTS bought 400 acres in York County, South Carolina",
          "source_url": "https://www.datacenterdynamics.com/en/news/qts-buys-400-acres-in-york-county-south-carolina/",
          "source_tier": 3
        }
      ]
    },
    {
      "slug": "segra-segra-kannapolis-kannapolis-nc",
      "name": "Segra Kannapolis Data Center",
      "summary": "Segra operates a commercial colocation data center at 465 Charles Babbage Lane on the North Carolina Research Campus in Kannapolis, Cabarrus County, North Carolina.",
      "state": "NC",
      "city": "Kannapolis",
      "county": "Cabarrus County",
      "status": "operational",
      "developer": "Segra",
      "capacity_mw": 4,
      "latitude": 35.504805,
      "longitude": -80.62259,
      "location_precision": "address",
      "location_source": "https://www.segra.com/",
      "location_verified_at": null,
      "coordinate_source": "Segra Kannapolis specification",
      "location_last_verified": null,
      "site_address": "465 Charles Babbage Lane, Kannapolis, NC 28081",
      "site_address_source_url": "https://www.segra.com/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.segra.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/segra-segra-kannapolis-kannapolis-nc",
      "source": "https://www.segra.com/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Segra Kannapolis Data Center Official Disclosure",
          "url": "https://www.segra.com/",
          "publisher": "Segra",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from North Carolina DEQ permits, municipal zoning filings, or operator campus specifications.",
          "source_url": "https://www.segra.com/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "southeast-raleigh-data-center-nc",
      "name": "Southeast Raleigh data center",
      "summary": "Beacon Partners withdrew its rezoning proposal for a data center at Jones Sausage Road and Rock Quarry Road in southeast Raleigh, Wake County, North Carolina in August 2026 following community opposition.",
      "state": "NC",
      "city": "Raleigh",
      "county": "Wake County",
      "status": "cancelled",
      "developer": "Beacon Partners",
      "capacity_mw": null,
      "latitude": 35.7365,
      "longitude": -78.5672,
      "location_precision": "parcel",
      "location_source": "https://www.wunc.org/term/news/2026-08-17/data-center-southeast-raleigh-opposition-city-council",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "Raleigh rezoning application at Jones Sausage Road and Rock Quarry Road",
      "location_last_verified": "2026-09-16",
      "site_address": "Jones Sausage Road and Rock Quarry Road, Raleigh, NC 27610",
      "site_address_source_url": "https://www.wunc.org/term/news/2026-08-17/data-center-southeast-raleigh-opposition-city-council",
      "published": "2026-09-04",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "zoning application",
      "buildings_source_url": "https://www.wunc.org/term/news/2026-08-17/data-center-southeast-raleigh-opposition-city-council",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/southeast-raleigh-data-center-nc",
      "source": "https://abc11.com/post/proposed-southeast-raleigh-data-center-withdrawn-community-opposition/19687659/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Proposed southeast Raleigh data center withdrawn after community opposition - ABC11 News",
          "url": "https://abc11.com/post/proposed-southeast-raleigh-data-center-withdrawn-community-opposition/19687659/",
          "publisher": "ABC11 News",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "Data center project pulled from Raleigh agenda after public opposition - WUNC News",
          "url": "https://www.wunc.org/term/news/2026-08-17/data-center-southeast-raleigh-opposition-city-council",
          "publisher": "WUNC News",
          "date": "2026-08-17",
          "source_tier": 1
        },
        {
          "title": "Developer withdraws plans for data center in southeast Raleigh, mayor says",
          "url": "https://www.wral.com/news/local/developer-withdraws-plans-data-center-southeast-raleigh-mayor-says-august-2026/",
          "publisher": "www.wral.com",
          "date": "2026-08-17",
          "source_tier": 4
        },
        {
          "title": "Developer still pursuing controversial southeast Raleigh data center - ABC11 News",
          "url": "https://abc11.com/post/developer-pursuing-controversial-southeast-raleigh-data-center/19714189/",
          "publisher": "ABC11 News",
          "date": "2026-08-21",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "cancelled",
          "effective_at": "2026-08-18",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "A proposed southeast Raleigh data center was withdrawn following community opposition, though a developer was still pursuing it as of August 21 before the withdrawal was confirmed.",
          "source_url": "https://www.wunc.org/term/news/2026-08-17/data-center-southeast-raleigh-opposition-city-council",
          "source_tier": 1
        },
        {
          "status": "cancelled",
          "effective_at": "2026-08-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-17",
          "summary": "Beacon Partners withdrew its proposal to build a data center on Jones Sausage Road",
          "source_url": "https://www.wral.com/news/local/developer-withdraws-plans-data-center-southeast-raleigh-mayor-says-august-2026/",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "t5-data-centers-t5charlotte-kings-mountain-nc",
      "name": "T5 Data Centers Charlotte (Kings Mountain)",
      "summary": "T5 Data Centers operates the T5 Charlotte campus at 131 Riverside Court in Kings Mountain, Cleveland County, North Carolina.",
      "state": "NC",
      "city": "Kings Mountain",
      "county": "Cleveland County",
      "status": "operational",
      "developer": "T5 Data Centers",
      "capacity_mw": 28,
      "latitude": 35.250449,
      "longitude": -81.395098,
      "location_precision": "address",
      "location_source": "https://t5datacenters.com/",
      "location_verified_at": null,
      "coordinate_source": "T5 Data Centers Kings Mountain specification",
      "location_last_verified": null,
      "site_address": "131 Riverside Court, Kings Mountain, NC 28086",
      "site_address_source_url": "https://t5datacenters.com/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://t5datacenters.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/t5-data-centers-t5charlotte-kings-mountain-nc",
      "source": "https://t5datacenters.com/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "T5 Data Centers Charlotte (Kings Mountain) Official Disclosure",
          "url": "https://t5datacenters.com/",
          "publisher": "T5 Data Centers",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from North Carolina DEQ permits, municipal zoning filings, or operator campus specifications.",
          "source_url": "https://t5datacenters.com/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "tierpoint-charlotte-nc",
      "name": "TierPoint Charlotte",
      "summary": "TierPoint operates two commercial colocation data centers in Charlotte, Mecklenburg County, North Carolina, anchored at 1805 Center Park Drive.",
      "state": "NC",
      "city": "Charlotte",
      "county": "Mecklenburg County",
      "status": "operational",
      "developer": "TierPoint",
      "capacity_mw": 10,
      "latitude": 35.173088,
      "longitude": -80.927807,
      "location_precision": "address",
      "location_source": "https://www.tierpoint.com/data-centers/",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "TierPoint Charlotte specification",
      "location_last_verified": "2026-09-14",
      "site_address": "1805 Center Park Drive, Charlotte, NC 28217",
      "site_address_source_url": "https://www.tierpoint.com/data-centers/",
      "published": "2026-09-14",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.tierpoint.com/data-centers/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/tierpoint-charlotte-nc",
      "source": "https://www.tierpoint.com/data-centers/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "TierPoint: Browse our data centers",
          "url": "https://www.tierpoint.com/data-centers/",
          "publisher": "TierPoint",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "TierPoint lists TierPoint Charlotte - North Myers Data Center, TierPoint Charlotte - Center Park Data Center at Charlotte, North Carolina on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.tierpoint.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "tierpoint-llc-tierpoint-research-triangle-park-rtp-durham-nc",
      "name": "TierPoint Research Triangle Park (RTP)",
      "summary": "TierPoint operates the Research Triangle Park data center campus at 99 TW Alexander Drive in Durham, Durham County, North Carolina.",
      "state": "NC",
      "city": "Durham",
      "county": "Durham County",
      "status": "operational",
      "developer": "TierPoint",
      "capacity_mw": 14,
      "latitude": 35.896667,
      "longitude": -78.878838,
      "location_precision": "address",
      "location_source": "https://www.tierpoint.com/data-centers/",
      "location_verified_at": null,
      "coordinate_source": "TierPoint Research Triangle Park specification",
      "location_last_verified": null,
      "site_address": "99 TW Alexander Drive, Durham, NC 27709",
      "site_address_source_url": "https://www.tierpoint.com/data-centers/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.tierpoint.com/data-centers/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/tierpoint-llc-tierpoint-research-triangle-park-rtp-durham-nc",
      "source": "https://www.tierpoint.com/data-centers/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "TierPoint Research Triangle Park (RTP) Official Disclosure",
          "url": "https://www.tierpoint.com/data-centers/",
          "publisher": "TierPoint",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from North Carolina DEQ permits, municipal zoning filings, or operator campus specifications.",
          "source_url": "https://www.tierpoint.com/data-centers/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "tierpoint-raleigh-nc",
      "name": "TierPoint Raleigh",
      "summary": "TierPoint operates a commercial colocation data center at 5301 Departure Drive in Raleigh, Wake County, North Carolina.",
      "state": "NC",
      "city": "Raleigh",
      "county": "Wake County",
      "status": "operational",
      "developer": "TierPoint",
      "capacity_mw": 5,
      "latitude": 35.854381,
      "longitude": -78.597011,
      "location_precision": "address",
      "location_source": "https://www.tierpoint.com/data-centers/",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "TierPoint Raleigh specification",
      "location_last_verified": "2026-09-14",
      "site_address": "5301 Departure Drive, Raleigh, NC 27616",
      "site_address_source_url": "https://www.tierpoint.com/data-centers/",
      "published": "2026-09-14",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.tierpoint.com/data-centers/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/tierpoint-raleigh-nc",
      "source": "https://www.tierpoint.com/data-centers/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "TierPoint: Browse our data centers",
          "url": "https://www.tierpoint.com/data-centers/",
          "publisher": "TierPoint",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "TierPoint lists TierPoint Raleigh Data Center, TierPoint Raleigh - RTP Data Center at Raleigh, North Carolina on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.tierpoint.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "sce-and-g-irmo-data-center-williamsburg-county-sc",
      "name": "Sce&g Irmo Data Center",
      "summary": "The EPA facility registry lists the SCE&G Irmo internal electric utility operations data center at the intersection of Lake Murray Boulevard and Old Bush River Road in Irmo, Lexington County, South Carolina.",
      "state": "SC",
      "city": "Irmo",
      "county": "Lexington County",
      "status": "not_verified",
      "developer": null,
      "capacity_mw": null,
      "latitude": 33.67111,
      "longitude": -79.82861,
      "location_precision": "county",
      "location_source": "County seat (Kingstree), Wikidata, placed at county level; the EPA facility record gives no site point (the registry does not say how its point was placed)",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-10-20",
      "site_address": "Intersection Of Lake Murray BLVD And Old Bush Rive, SC 00000",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071926924",
      "published": "2026-10-20",
      "last_verified": "2026-10-20",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/sce-and-g-irmo-data-center-williamsburg-county-sc",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110071926924",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Sce&g Irmo Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071926924",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    }
  ],
  "grid_region": {
    "code": "srvc-s",
    "label": "SRVC-S",
    "name": "SERC Virginia and Carolina South",
    "kind": "dallas_fed_subregion",
    "parent_iso": null,
    "states": [
      "NC",
      "SC"
    ],
    "primary_states": [
      "NC",
      "SC"
    ],
    "price_effect_2025_mwh": 3.01,
    "price_effect_2025_pct": 7.5,
    "price_effect_2028_mwh": 4.94,
    "price_effect_2028_pct": 14.7,
    "own_dc_share_pct": 5.9,
    "fixed_cost_share": 0.684,
    "wholesale_price_effect_2025": "7.5 percent (+$3.01 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.",
    "wholesale_price_effect_2028": "14.7 percent (+$4.94 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.",
    "study_basis": "third party estimate",
    "study_source": "https://www.dallasfed.org/~/media/documents/research/papers/2026/wp2606r1.pdf",
    "study_date": "March 2026, revised October 2026"
  },
  "studies": [
    {
      "id": "dallas-fed-wp2606r1",
      "study": "Plante, Carrasco, Miranda Pineda and Patel, Federal Reserve Bank of Dallas Working Paper 2606r1",
      "title": "Data Centers, Wholesale Electricity Prices, and Retail Rates",
      "publisher": "Federal Reserve Bank of Dallas",
      "document_date": "March 2026, revised October 2026",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "Wholesale electricity price effect and retail electricity rate pass through",
      "finding": "Data center demand accounts for an average 6.5 percent increase in wholesale electricity prices across 23 regional markets in 2024 and 2025, reaching 15.0 percent (+$5.22 per MWh) in SERC Virginia and Carolina North and 15.4 percent (+$5.68 per MWh) in the Northwest Power Pool, with wholesale changes passing into retail prices roughly in proportion to the wholesale share of the retail bill over 12 to 24 months.",
      "years_covered": "2019 to 2025 historical and 2026 to 2028 scenario projections",
      "method": "Synthetic supply stack model across 23 regional power markets combined with reduced form retail pass through regressions",
      "who_funded_or_published": "Federal Reserve Bank of Dallas (government research working paper; views are the authors')",
      "primary_url": "https://www.dallasfed.org/~/media/documents/research/papers/2026/wp2606r1.pdf",
      "corroborating_url": null,
      "corroborating_label": null,
      "notes": "Uses BloombergNEF data center tracker as a model input alongside EIA Form 860, Form 861M, Form 923 and Form 930.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    },
    {
      "id": "epri-watten-bistline-blanford-2026",
      "study": "Watten, Bistline and Blanford, Electric Power Research Institute (arXiv:2606.19777)",
      "title": "Retail Electricity Price Implications of Data Center Load Growth",
      "publisher": "Electric Power Research Institute (EPRI)",
      "document_date": "June 2026",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "State level retail electricity rate change across all customer classes",
      "finding": "Where data centers pay standard industrial rates and improve grid utilization, state average retail rates could fall by roughly 1 percent nationally by 2030 (up to 4 percent in high growth states, or roughly $7 billion per year in fixed cost spreading); outcomes reverse toward higher residential bills if new generation and transmission upgrades outpace load revenues.",
      "years_covered": "2026 to 2030",
      "method": "Capacity expansion and utility revenue requirement model allocating fixed transmission and distribution costs across customer classes",
      "who_funded_or_published": "Electric Power Research Institute (nonprofit energy research institute funded primarily by member electric utilities)",
      "primary_url": "https://arxiv.org/abs/2606.19777",
      "corroborating_url": "https://fortune.com/2026/07/26/data-centers-electricity-costs-cheaper-7billion-buildout-ai-demand/",
      "corroborating_label": "Fortune, July 26, 2026",
      "notes": "Assumes data centers pay full tariff rates and operate at high load factors that spread existing fixed system costs.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    },
    {
      "id": "mit-ceepr-who-pays-2025",
      "study": "Meeks, Pless, Qi and Wang, MIT Center for Energy and Environmental Policy Research",
      "title": "Who Pays for Growth? Evidence from Datacenters and the Grid",
      "publisher": "MIT Center for Energy and Environmental Policy Research (CEEPR)",
      "document_date": "December 2025",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "Realized utility revenue and customer bill changes from historical data center openings",
      "finding": "In the 6 years following data center entry (1998 to 2018), average electric utility revenue rose 8 percent (+$104 million per utility per year), residential bills rose 2 percent (+$30 per household per year) and commercial bills rose 4 percent (+$262 per customer per year), driven by peak coincident demand charges and infrastructure capital additions.",
      "years_covered": "1998 to 2018",
      "method": "Difference in differences event study of historical data center openings matched to utility level EIA Form 861 billing and revenue panels",
      "who_funded_or_published": "MIT Center for Energy and Environmental Policy Research (university working paper)",
      "primary_url": "https://ceepr.mit.edu/workingpaper/who-pays-for-growth-evidence-from-datacenters-and-the-grid/",
      "corroborating_url": null,
      "corroborating_label": null,
      "notes": "Measures historical realized utility billing outcomes prior to the post 2023 hyperscale AI buildout.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    },
    {
      "id": "duke-ni-26-04",
      "study": "Norris, Profeta, Patino Echeverri and Cowie, Duke University Nicholas Institute (NI R 26-04)",
      "title": "Rethinking Load Growth: Assessing the Potential for Integration of Large Flexible Loads in US Power Systems",
      "publisher": "Nicholas Institute for Energy, Environment & Sustainability, Duke University",
      "document_date": "February 2026",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "Grid headroom and new gigawatts of large load accommodated under minimal peak hour curtailment",
      "finding": "Across 22 major US balancing authorities, roughly 76 GW of new data center load can be integrated without building new peaking capacity if facilities curtail load by 0.25 percent of annual operating hours (roughly 22 hours per year), expanding to 98 GW at 0.5 percent annual curtailment and 126 GW at 1.0 percent annual curtailment.",
      "years_covered": "2025 to 2035",
      "method": "Hourly balancing authority load duration and reserve margin modeling across 22 US power systems",
      "who_funded_or_published": "Duke University Nicholas Institute for Energy, Environment & Sustainability (university research institute)",
      "primary_url": "https://nicholasinstitute.duke.edu/publications/data-centers-and-generation-capacity-over-next-decade",
      "corroborating_url": "https://nicholasinstitute.duke.edu/articles/key-takeaways-data-center-flexibility-and-generation-capacity-over-next-decade",
      "corroborating_label": "Duke Nicholas Institute summary",
      "notes": "Evaluates operational curtailment during system peak hours rather than unconditional firm interconnection.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    },
    {
      "id": "ncsu-erl-2026",
      "study": "Jeremiah Johnson et al., North Carolina State University (Environmental Research Letters)",
      "title": "Power System Costs and Emissions from Data Center and Cryptocurrency Mining Expansion in the United States",
      "publisher": "Environmental Research Letters (IOP Publishing) / North Carolina State University",
      "document_date": "May 2026",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "Wholesale electricity prices, residential bills by state and power sector carbon emissions through 2030",
      "finding": "Projected data center and crypto load growth raises US electricity demand 6 to 12 percent by 2030 and increases residential electricity bills up to 57 percent in the most heavily affected states (including Virginia at roughly $32 per month or $384 per year for an average household) while adding 49 to 125 million metric tons of CO2 per year.",
      "years_covered": "2024 to 2030",
      "method": "National capacity expansion and unit commitment dispatch model (TEMOA) across US grid regions",
      "who_funded_or_published": "North Carolina State University researchers in Environmental Research Letters (peer reviewed journal)",
      "primary_url": "https://doi.org/10.1088/1748-9326/ae6c3d",
      "corroborating_url": "https://news.ncsu.edu/2026/05/data-centers-power-bills/",
      "corroborating_label": "NC State University News, May 2026",
      "notes": "Models combined data center and cryptocurrency mining load growth across regional interconnects.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    },
    {
      "id": "monitoring-analytics-pjm-2026q1",
      "study": "Monitoring Analytics, PJM Independent Market Monitor (Q1 2026 State of the Market Report)",
      "title": "2026 Quarterly State of the Market Report for PJM: January through March",
      "publisher": "Monitoring Analytics, LLC (PJM Independent Market Monitor)",
      "document_date": "May 14, 2026",
      "last_verified": "October 28, 2026",
      "source_type": "official record",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "PJM Base Residual Auction capacity market clearing prices and total wholesale capacity bill attributable to data center load",
      "finding": "Data center load growth was the primary driver of the PJM 2025/2026 and 2026/2027 capacity market tightness, accounting for $9.3 billion of the $14.7 billion total PJM capacity cost in the 2025/2026 delivery year and driving a 76 percent surge in PJM wholesale power costs in Q1 2026.",
      "years_covered": "2025 to 2027 delivery years and Q1 2026",
      "method": "Counterfactual PJM Base Residual Auction clearing runs removing forecast and existing data center peak load additions",
      "who_funded_or_published": "Monitoring Analytics, LLC (independent market monitor for PJM Interconnection, mandated by FERC)",
      "primary_url": "https://www.monitoringanalytics.com/reports/PJM_State_of_the_Market/2026/2026q1-som-pjm.pdf",
      "corroborating_url": "https://www.eenews.net/articles/data-centers-drive-76-surge-in-pjm-power-prices/",
      "corroborating_label": "E&E News, May 15, 2026",
      "notes": "Applies specifically to the 13 state and District of Columbia PJM Interconnection footprint.",
      "scope_regions": [
        "pjm",
        "srvc-n",
        "rfce",
        "rfcw"
      ],
      "scope_states": [
        "VA",
        "PA",
        "OH",
        "MD",
        "NJ",
        "DE",
        "WV",
        "IN",
        "IL",
        "KY",
        "NC",
        "TN",
        "MI",
        "DC"
      ]
    },
    {
      "id": "ucs-pjm-connection-costs-2025",
      "study": "Union of Concerned Scientists, Billions of Dollars in Unreported Data Center Costs in PJM",
      "title": "Data Center Transmission Interconnection Costs in PJM",
      "publisher": "Union of Concerned Scientists",
      "document_date": "September 2025",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 2,
      "basis": "third party estimate",
      "what_it_measured": "Local transmission network upgrade costs triggered by data center interconnections in PJM",
      "finding": "In PJM alone, $4.36 billion in transmission upgrades across 150 supplemental transmission projects in 2024 were triggered by data center connections and socialized across regional utility ratepayers under PJM tariff rules.",
      "years_covered": "2022 to 2024 PJM transmission expansion filings",
      "method": "Project by project audit of PJM Regional Transmission Expansion Plan (RTEP) and utility Attachment M-3 supplemental project filings",
      "who_funded_or_published": "Union of Concerned Scientists (nonprofit advocacy group study)",
      "primary_url": "https://www.ucs.org/sites/default/files/2025-09/PJM%20Data%20Center%20Issue%20Brief%20-%20Sep%202025.pdf",
      "corroborating_url": "https://salatainstitute.harvard.edu/data-centers-ai-artificial-intelligence-grid-permitting-transmission-electricity-energy",
      "corroborating_label": "Harvard Salata Institute interview with Ari Peskoe, March 17, 2026",
      "notes": "Advocacy group issue brief auditing PJM supplemental transmission filings across Virginia, Ohio, Pennsylvania and Maryland.",
      "scope_regions": [
        "pjm",
        "srvc-n",
        "rfce",
        "rfcw"
      ],
      "scope_states": [
        "VA",
        "PA",
        "OH",
        "MD",
        "NJ",
        "DE",
        "WV",
        "IN",
        "IL",
        "KY",
        "NC",
        "TN",
        "MI",
        "DC"
      ]
    },
    {
      "id": "e3-rising-electricity-rates-2026",
      "study": "Energy and Environmental Economics (E3), Understanding the Drivers of Rising Electricity Rates and the Role of Data Centers",
      "title": "Understanding the Drivers of Rising Electricity Rates and the Role of Data Centers",
      "publisher": "Energy and Environmental Economics, Inc. (E3)",
      "document_date": "May 2026",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 2,
      "basis": "third party estimate",
      "what_it_measured": "Historical drivers of US retail electricity rate increases and utility rate design for large loads",
      "finding": "Historical US retail electricity rate increases from 2020 to 2025 were driven primarily by distribution capital spending, wildfire mitigation, natural gas price spikes and inflation rather than data centers, and well designed large load tariffs can keep new data center additions net neutral or beneficial for existing ratepayers.",
      "years_covered": "2020 to 2025 historical and forward rate design case studies",
      "method": "Decomposition of historical utility revenue requirements and illustrative utility tariff cost of service modeling",
      "who_funded_or_published": "Energy and Environmental Economics (E3), industry commissioned consulting report",
      "primary_url": "https://www.ethree.com/wp-content/uploads/2026/05/Understanding-the-Drivers-of-Rising-Electricity-Rates-and-the-Role-of-Data-Centers_E3-2026.pdf",
      "corroborating_url": null,
      "corroborating_label": null,
      "notes": "Industry commissioned study evaluating historical rate drivers prior to the 2025/2026 PJM capacity delivery year.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    },
    {
      "id": "nber-wp35100-muller-2026",
      "study": "Nicholas Z. Muller, National Bureau of Economic Research Working Paper 35100",
      "title": "The Environmental Externalities of the Data Center Boom",
      "publisher": "National Bureau of Economic Research (NBER)",
      "document_date": "April 2026",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "Monetized air pollution and greenhouse gas health and climate damages per megawatt hour of data center electricity use",
      "finding": "Marginal air pollution and greenhouse gas damages from fossil fuel generation serving US data centers average $49 to $94 per MWh ($0.049 to $0.094 per kWh), rivaling or exceeding the direct wholesale price of electricity in coal and gas heavy interconnects such as PJM, MISO and SERC.",
      "years_covered": "2022 to 2025",
      "method": "Integrated assessment marginal emissions and air quality transport model (AP4T) coupled with EPA CEMS unit level generation data",
      "who_funded_or_published": "National Bureau of Economic Research (university working paper by Nicholas Z. Muller, Carnegie Mellon University)",
      "primary_url": "https://www.nber.org/papers/w35100",
      "corroborating_url": "https://www.spglobal.com/energy/en/news-research/latest-news/electric-power/091626-air-pollution-from-data-center-power-projects-is-a-rising-concern-amid-build-out",
      "corroborating_label": "S&P Global Commodity Insights, September 16, 2026",
      "notes": "Quantifies unpriced health and climate damages from marginal fossil generation dispatched to meet data center load.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    }
  ]
}