  "license": "CC BY-NC 4.0",
  "license_url": "https://creativecommons.org/licenses/by-nc/4.0/",
  "attribution": "Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0. Link to the specific record page where possible.",
  "source": "https://datacenterrecord.org/grid/srso",
  "retrieved_at": "2026-10-30T08:26:43.998Z",
  "count": 51,
  "projects": [
    {
      "slug": "georgia-dri-3424-fty101-ga",
      "name": "Microsoft Douglasville Data Center Campus (FTY01 / FTY02)",
      "summary": "Development of Regional Impact filing 3424 for the FTY101 data center facility in Atlanta, Fulton County, Georgia.",
      "state": "GA",
      "city": "Douglasville",
      "county": "Douglas County",
      "status": "operational",
      "developer": "Microsoft",
      "capacity_mw": null,
      "latitude": 33.7285,
      "longitude": -84.6152,
      "location_precision": "parcel",
      "location_source": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=3424",
      "location_verified_at": null,
      "coordinate_source": "Georgia DCA DRI Filings #3424, #3425, and #3426 (Microsoft FTY101, Douglas County)",
      "location_last_verified": null,
      "site_address": "1590 North River Rd, Douglasville, GA 30122",
      "site_address_source_url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=3424",
      "published": "2026-10-21",
      "last_verified": "2026-10-28",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "permit",
      "buildings_source_url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=3424",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/georgia-dri-3424-fty101-ga",
      "source": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=3424",
      "basis": "official_record",
      "sources": [
        {
          "title": "Georgia DCA DRI Filing #3424 (FTY101, Douglas County, GA)",
          "url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=3424",
          "publisher": "Georgia DCA DRI Filing #3424",
          "date": "2021-08-10",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-26",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary Georgia DCA DRI filing, EPA ECHO permit, or operator campus specification.",
          "source_url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=3424",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "georgia-dri-3747-t5-atl-iii-data-center-ga",
      "name": "T5@Atlanta III Data Center",
      "summary": "Development of Regional Impact filing 3747 for the T5 ATL III data center facility in South Fulton, Fulton County, Georgia.",
      "state": "GA",
      "city": "Lithia Springs",
      "county": "Douglas County",
      "status": "operational",
      "developer": "T5 Data Centers",
      "capacity_mw": null,
      "latitude": 33.7695,
      "longitude": -84.6382,
      "location_precision": "parcel",
      "location_source": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=3747",
      "location_verified_at": null,
      "coordinate_source": "Georgia DCA DRI Filing #3747 (T5 ATL III Data Center, Douglas County)",
      "location_last_verified": null,
      "site_address": "1625 Factory Shoals Rd, Lithia Springs, GA 30122",
      "site_address_source_url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=3747",
      "published": "2026-10-21",
      "last_verified": "2026-10-28",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "permit",
      "buildings_source_url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=3747",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/georgia-dri-3747-t5-atl-iii-data-center-ga",
      "source": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=3747",
      "basis": "official_record",
      "sources": [
        {
          "title": "Georgia DCA DRI Filing #3747 (T5 - ATL III Data Center, Douglas County, GA)",
          "url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=3747",
          "publisher": "Georgia DCA DRI Filing #3747",
          "date": "2022-06-24",
          "source_tier": 1
        },
        {
          "title": "Georgia DCA DRI Filing #3747 (T5 - ATL III Data Center, Douglas County, GA)",
          "url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=3747",
          "publisher": "Georgia DCA DRI Filing #3747",
          "date": "2022-06-24",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-26",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary Georgia DCA DRI filing, EPA ECHO permit, or operator campus specification.",
          "source_url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=3747",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "georgia-dri-4051-vantage-data-center-ga",
      "name": "Vantage Data Centers Atlanta (GA1 Douglasville)",
      "summary": "Development of Regional Impact filing 4051 for a proposed Vantage Data Centers campus in South Fulton, Fulton County, Georgia.",
      "state": "GA",
      "city": "Douglasville",
      "county": "Douglas County",
      "status": "under_construction",
      "developer": "Vantage Data Centers",
      "capacity_mw": 256,
      "latitude": 33.7782,
      "longitude": -84.6714,
      "location_precision": "parcel",
      "location_source": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4051",
      "location_verified_at": null,
      "coordinate_source": "Georgia DCA DRI Filing #4051 and Vantage Data Centers Atlanta GA1 specification",
      "location_last_verified": null,
      "site_address": "2089 Midway Rd, Douglasville, GA 30134",
      "site_address_source_url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4051",
      "published": "2026-10-21",
      "last_verified": "2026-10-28",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://vantage-dc.com/data-center-locations/north-america/atlanta-georgia/",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/georgia-dri-4051-vantage-data-center-ga",
      "source": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4051",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Georgia DCA DRI Filing #4051 (Vantage Data Center, Douglas County, GA)",
          "url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4051",
          "publisher": "Georgia DCA DRI Filing #4051",
          "date": "2023-08-15",
          "source_tier": 1
        },
        {
          "title": "Georgia DCA DRI Filing #4051 (Vantage Data Center, Douglas County, GA)",
          "url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4051",
          "publisher": "Georgia DCA DRI Filing #4051",
          "date": "2023-08-15",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-10-26",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary Georgia DCA DRI filing, EPA ECHO permit, or operator campus specification.",
          "source_url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4051",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "365-data-centers-365-data-centers-alpharetta-ga1-alpharetta-ga",
      "name": "365 Data Centers Alpharetta (GA1)",
      "summary": "365 Data Centers lists 365 Data Centers Alpharetta (GA1) at 11650 Great Oaks Way, Alpharetta, GA on its interconnection and facility directory.",
      "state": "GA",
      "city": "Alpharetta",
      "county": "Fulton County",
      "status": "operational",
      "developer": "365 Data Centers",
      "capacity_mw": null,
      "latitude": 34.06343,
      "longitude": -84.272727,
      "location_precision": "address",
      "location_source": "https://www.365datacenters.com/locations/alpharetta/",
      "location_verified_at": null,
      "coordinate_source": "365 Data Centers Alpharetta (GA1) facility specification",
      "location_last_verified": null,
      "site_address": "11650 Great Oaks Way, Alpharetta, GA 30022",
      "site_address_source_url": "https://www.365datacenters.com/locations/alpharetta/",
      "published": "2026-10-21",
      "last_verified": "2026-10-26",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.365datacenters.com/locations/alpharetta/",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/365-data-centers-365-data-centers-alpharetta-ga1-alpharetta-ga",
      "source": "https://www.365datacenters.com/locations/alpharetta/",
      "basis": "official_record",
      "sources": [
        {
          "title": "365 Data Centers: Alpharetta (GA1) Data Center Specification",
          "url": "https://www.365datacenters.com/locations/alpharetta/",
          "publisher": "365 Data Centers",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-26",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary Georgia DCA DRI filing, EPA ECHO permit, or operator campus specification.",
          "source_url": "https://www.365datacenters.com/locations/alpharetta/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "aligned-atl-01-lithia-springs-ga",
      "name": "Aligned ATL-01",
      "summary": "Aligned Data Centers lists a data center at Lithia Springs, Georgia among the sites it operates.",
      "state": "GA",
      "city": "Lithia Springs",
      "county": "Douglas County",
      "status": "operational",
      "developer": "Aligned Data Centers",
      "capacity_mw": 180,
      "latitude": 33.725277,
      "longitude": -84.617166,
      "location_precision": "permit_point",
      "location_source": "https://echo.epa.gov/detailed-facility-report?fid=110071667203",
      "location_verified_at": "2026-10-04",
      "coordinate_source": "EPA ECHO Detailed Facility Report 110071667203",
      "location_last_verified": "2026-10-04",
      "site_address": "1551 North River Rd, Lithia Springs, GA 30122",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071667203",
      "published": "2026-09-14",
      "last_verified": "2026-10-26",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://aligneddc.com/atlanta-data-centers/",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/aligned-atl-01-lithia-springs-ga",
      "source": "https://aligneddc.com/locations/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Aligned Data Centers: Data center locations",
          "url": "https://aligneddc.com/locations/",
          "publisher": "Aligned Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Aligned Data Centers: Aligned ATL-01",
          "url": "https://aligneddc.com/atlanta-data-centers/",
          "publisher": "Aligned Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Aligned Data Centers ATL01",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071667203",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Aligned Data Centers lists Aligned ATL 01 at Lithia Springs, Georgia on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://aligneddc.com/atlanta-data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "amazon-aws-butts-county-data-center-ga",
      "name": "Amazon Web Services Butts County Campus",
      "summary": "Amazon Web Services plans to spend at least $11 billion on new data center capacity in Butts County (and Douglas County) in metro Atlanta.",
      "state": "GA",
      "city": "Jackson",
      "county": "Butts County",
      "status": "under_construction",
      "developer": "Amazon Web Services",
      "capacity_mw": null,
      "latitude": 33.2415,
      "longitude": -84.0185,
      "location_precision": "parcel",
      "location_source": "https://gov.georgia.gov/press-releases/2025-01-07/gov-kemp-amazon-web-services-invest-estimated-11-billion-georgia",
      "location_verified_at": null,
      "coordinate_source": "Butts County Development Authority Riverview Business Park parcel record",
      "location_last_verified": null,
      "site_address": "4348 High Falls Rd, Jackson, GA 30233",
      "site_address_source_url": "https://gov.georgia.gov/press-releases/2025-01-07/gov-kemp-amazon-web-services-invest-estimated-11-billion-georgia",
      "published": "2026-10-21",
      "last_verified": "2026-10-26",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 4,
      "buildings_basis": "permit",
      "buildings_source_url": "https://gov.georgia.gov/press-releases/2025-01-07/gov-kemp-amazon-web-services-invest-estimated-11-billion-georgia",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/amazon-aws-butts-county-data-center-ga",
      "source": "https://www.ajc.com/news/amazon-plans-11-billion-data-center-expansion-in-georgia/4L34LL7RM5DTPBX67KUD5PCJUI/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Amazon plans $11 billion data center expansion in Georgia - The Atlanta Journal-Constitution",
          "url": "https://www.ajc.com/news/amazon-plans-11-billion-data-center-expansion-in-georgia/4L34LL7RM5DTPBX67KUD5PCJUI/",
          "publisher": "The Atlanta Journal-Constitution",
          "date": "2025-01-08",
          "source_tier": 1
        },
        {
          "title": "Amazon plans $11 billion data center expansion in Georgia - AJC.com",
          "url": "https://www.ajc.com/news/amazon-plans-11-billion-data-center-expansion-in-georgia/4L34LL7RM5DTPBX67KUD5PCJUI/",
          "publisher": "AJC.com",
          "date": "2025-01-08",
          "source_tier": 1
        },
        {
          "title": "Office of the Governor: Amazon Web Services to Invest $11 Billion in Butts and Douglas Counties",
          "url": "https://gov.georgia.gov/press-releases/2025-01-07/gov-kemp-amazon-web-services-invest-estimated-11-billion-georgia",
          "publisher": "Office of the Governor of Georgia",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2025-01-08",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Amazon Web Services plans to spend at least $11 billion on new data center capacity in Butts County (and Douglas County) in metro Atlanta.",
          "source_url": "https://www.ajc.com/news/amazon-plans-11-billion-data-center-expansion-in-georgia/4L34LL7RM5DTPBX67KUD5PCJUI/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "burr-computer-environments-atl11-union-city-campus-ga",
      "name": "ATL03 Red Oak Data Center Campus (Union City)",
      "summary": "Burr Computer Environments filed a Developments of Regional Impact application for a 2.1 million square foot data center campus designated ATL11 in Union City, Fulton County, with construction set to start in 2026.",
      "state": "GA",
      "city": "Union City",
      "county": "Fulton County",
      "status": "permitting",
      "developer": "TA Realty / Burr Computer Environments",
      "capacity_mw": null,
      "latitude": 33.5842,
      "longitude": -84.5318,
      "location_precision": "parcel",
      "location_source": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4315",
      "location_verified_at": null,
      "coordinate_source": "Georgia DCA DRI Filing #4315 (ATL03 / Red Oak, Union City, Fulton County)",
      "location_last_verified": null,
      "site_address": "5200 Flat Shoals Rd, Union City, GA 30291",
      "site_address_source_url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4315",
      "published": "2026-10-21",
      "last_verified": "2026-10-26",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 6,
      "buildings_basis": "permit",
      "buildings_source_url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4315",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/burr-computer-environments-atl11-union-city-campus-ga",
      "source": "https://www.datacenterdynamics.com/en/news/21-million-sq-ft-data-center-campus-proposed-outside-atlanta-georgia/",
      "basis": "official_record",
      "sources": [
        {
          "title": "2.1 million sq ft data center campus proposed outside Atlanta, Georgia - datacenterdynamics.com",
          "url": "https://www.datacenterdynamics.com/en/news/21-million-sq-ft-data-center-campus-proposed-outside-atlanta-georgia/",
          "publisher": "datacenterdynamics.com",
          "date": "2024-07-16",
          "source_tier": 1
        },
        {
          "title": "Georgia Department of Community Affairs: DRI Filing #4315 (ATL03 / Red Oak, Union City, Fulton County)",
          "url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4315",
          "publisher": "Georgia Department of Community Affairs",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2024-07-16",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Burr Computer Environments filed a Developments of Regional Impact application for a 2.1 million square foot data center campus designated ATL11 in Union City, Fulton County, with construction set to start in 2026.",
          "source_url": "https://www.datacenterdynamics.com/en/news/21-million-sq-ft-data-center-campus-proposed-outside-atlanta-georgia/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "centersquare-atlanta-data-center-ga",
      "name": "Centersquare Atlanta (ATL1)",
      "summary": "Centersquare lists a data center at Atlanta, Georgia among the sites it operates.",
      "state": "GA",
      "city": "Atlanta",
      "county": "Fulton County",
      "status": "operational",
      "developer": "Centersquare",
      "capacity_mw": null,
      "latitude": 33.7335,
      "longitude": -84.4262,
      "location_precision": "address",
      "location_source": "https://www.csquare.com/data-centers",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "Centersquare Atlanta (ATL1) facility specification",
      "location_last_verified": "2026-09-14",
      "site_address": "1150 White St SW, Atlanta, GA 30310",
      "site_address_source_url": "https://www.csquare.com/data-centers",
      "published": "2026-09-14",
      "last_verified": "2026-10-26",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.csquare.com/data-centers",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/centersquare-atlanta-data-center-ga",
      "source": "https://www.csquare.com/data-centers",
      "basis": "official_record",
      "sources": [
        {
          "title": "Centersquare: Data center markets",
          "url": "https://www.csquare.com/data-centers",
          "publisher": "Centersquare",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Centersquare lists Centersquare Atlanta data center at Atlanta, Georgia on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.csquare.com/data-centers",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "databank-atlanta-data-center-ga",
      "name": "DataBank Atlanta Campus (ATL1 / ATL2 / ATL3 / ATL4)",
      "summary": "DataBank lists a data center at Atlanta, Georgia among the sites it operates.",
      "state": "GA",
      "city": "Atlanta",
      "county": "Fulton County",
      "status": "operational",
      "developer": "DataBank",
      "capacity_mw": null,
      "latitude": 33.775499,
      "longitude": -84.387735,
      "location_precision": "address",
      "location_source": "https://www.databank.com/data-centers/atlanta/",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "DataBank Atlanta (ATL1 / ATL2 / ATL3 / ATL4) campus specification",
      "location_last_verified": "2026-09-14",
      "site_address": "760 W Peachtree St NW, Atlanta, GA 30308",
      "site_address_source_url": "https://www.databank.com/data-centers/atlanta/",
      "published": "2026-09-14",
      "last_verified": "2026-10-26",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 4,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.databank.com/data-centers/atlanta/",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/databank-atlanta-data-center-ga",
      "source": "https://www.databank.com/data-centers/",
      "basis": "official_record",
      "sources": [
        {
          "title": "DataBank: Data centers",
          "url": "https://www.databank.com/data-centers/",
          "publisher": "DataBank",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "DataBank Announces Groundbreaking of ATL4 Data Center Near Atlanta - telecomtalk.info",
          "url": "https://telecomtalk.info/databank-announces-groundbreaking-atl4-datacenter-near-atlanta/700846/",
          "publisher": "telecomtalk.info",
          "date": "2023-05-03",
          "source_tier": 1
        },
        {
          "title": "DataBank breaks ground on new data center in Atlanta, Georgia - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/databank-breaks-ground-on-new-data-center-in-atlanta-georgia/",
          "publisher": "Data Center Dynamics",
          "date": "2023-05-02",
          "source_tier": 1
        },
        {
          "title": "DataBank acquires facility and land in Atlanta, plans 40MW data center - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/databank-acquires-facility-and-land-in-atlanta-plans-40mw-data-center/",
          "publisher": "Data Center Dynamics",
          "date": "2022-05-18",
          "source_tier": 1
        },
        {
          "title": "DataBank Raises $533 Million in Debt & Equity to Finance New Data Center Developments - PR Newswire",
          "url": "https://www.prnewswire.com/news-releases/databank-raises-533-million-in-debt--equity-to-finance-new-data-center-developments-301998751.html",
          "publisher": "PR Newswire",
          "date": "2023-11-28",
          "source_tier": 1
        },
        {
          "title": "DataBank acquires 100 acres in Atlanta, Georgia, for 120MW data center campus - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/databank-acquires-100-acres-in-atlanta-georgia-for-120mw-data-enter-campus/",
          "publisher": "Data Center Dynamics",
          "date": "2023-11-01",
          "source_tier": 1
        },
        {
          "title": "DataBank to Develop 120 MW Atlanta Facility - CommercialSearch",
          "url": "https://www.commercialsearch.com/news/databank-to-develop-120-mw-facility-in-atlanta/",
          "publisher": "CommercialSearch",
          "date": "2023-11-06",
          "source_tier": 1
        },
        {
          "title": "News | DataBank Acquires Nearly 100 Acres for New Data Center Campus Near Atlanta - CoStar",
          "url": "https://www.costar.com/article/1550512807/databank-acquires-nearly-100-acres-for-new-data-center-campus-near-atlanta",
          "publisher": "CoStar",
          "date": "2023-11-08",
          "source_tier": 4
        },
        {
          "title": "DataBank Building Atlanta Data Center for Georga Tech Supercomputers - DataCenterKnowledge",
          "url": "https://www.datacenterknowledge.com/supercomputers/databank-building-atlanta-data-center-for-georga-tech-supercomputers",
          "publisher": "DataCenterKnowledge",
          "date": "2024-05-30",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "DataBank lists DataBank Atlanta data center at Atlanta, Georgia on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.databank.com/data-centers/",
          "source_tier": 2
        },
        {
          "status": "operational",
          "effective_at": "2023-11-08",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2023-11-08",
          "summary": "DataBank acquires nearly 100 acres near Atlanta for new data center campus",
          "source_url": "https://www.costar.com/article/1550512807/databank-acquires-nearly-100-acres-for-new-data-center-campus-near-atlanta",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "databank-project-indo-cartersville-ga",
      "name": "DataBank Cartersville Campus (Project Indo)",
      "summary": "DataBank filed a Development of Regional Impact application for Project Indo in Cartersville, Georgia, a 200 MW campus across 69 acres totaling 1.1 million sq ft valued at approximately $2.4 billion, with first phase targeted for 2032.",
      "state": "GA",
      "city": "Cartersville",
      "county": "Bartow County",
      "status": "permitting",
      "developer": "DataBank",
      "capacity_mw": 200,
      "latitude": 34.1325,
      "longitude": -84.7642,
      "location_precision": "parcel",
      "location_source": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4433",
      "location_verified_at": null,
      "coordinate_source": "Georgia DCA DRI Filing #4433 (Bartow County, GA)",
      "location_last_verified": null,
      "site_address": "Old Alabama Rd SE, Cartersville, GA 30120",
      "site_address_source_url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4433",
      "published": "2026-10-21",
      "last_verified": "2026-10-26",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "permit",
      "buildings_source_url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4433",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/databank-project-indo-cartersville-ga",
      "source": "https://www.datacenterdynamics.com/en/news/databank-files-for-200mw-data-center-campus-outside-atlanta-georgia/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "DataBank files for 200MW data center campus outside Atlanta, Georgia - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/databank-files-for-200mw-data-center-campus-outside-atlanta-georgia/",
          "publisher": "Data Center Dynamics",
          "date": "2026-06-22",
          "source_tier": 1
        },
        {
          "title": "Georgia Department of Community Affairs: DRI Filing #4433 (Bartow County Data Center Campus)",
          "url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4433",
          "publisher": "Georgia Department of Community Affairs",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "permitting",
          "effective_at": "2026-06-22",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "DataBank filed a Development of Regional Impact application for Project Indo in Cartersville, Georgia, a 200 MW campus across 69 acres totaling 1.1 million sq ft valued at approximately $2.4 billion, with first phase targeted for 2032.",
          "source_url": "https://www.datacenterdynamics.com/en/news/databank-files-for-200mw-data-center-campus-outside-atlanta-georgia/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "dc-blox-parent-llc-dc-blox-atl1-dcblox-atlanta-atlanta-ga",
      "name": "DC BLOX Atlanta (ATL1)",
      "summary": "DC BLOX Parent LLC lists DC BLOX ATL1 - DCBLOX Atlanta at 6 West Druid Hills Dr NE, Atlanta, GA on its interconnection and facility directory.",
      "state": "GA",
      "city": "Atlanta",
      "county": "DeKalb County",
      "status": "operational",
      "developer": "DC BLOX",
      "capacity_mw": null,
      "latitude": 33.831665,
      "longitude": -84.339169,
      "location_precision": "address",
      "location_source": "https://www.dcblox.com/locations/atlanta-ga/",
      "location_verified_at": null,
      "coordinate_source": "DC BLOX Atlanta (ATL1) facility specification",
      "location_last_verified": null,
      "site_address": "6 West Druid Hills Dr NE, Atlanta, GA 30329",
      "site_address_source_url": "https://www.dcblox.com/locations/atlanta-ga/",
      "published": "2026-10-21",
      "last_verified": "2026-10-26",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.dcblox.com/locations/atlanta-ga/",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/dc-blox-parent-llc-dc-blox-atl1-dcblox-atlanta-atlanta-ga",
      "source": "https://www.dcblox.com/locations/atlanta-ga/",
      "basis": "official_record",
      "sources": [
        {
          "title": "DC BLOX: Atlanta (ATL1) Data Center Specification",
          "url": "https://www.dcblox.com/locations/atlanta-ga/",
          "publisher": "DC BLOX",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-26",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary Georgia DCA DRI filing, EPA ECHO permit, or operator campus specification.",
          "source_url": "https://www.dcblox.com/locations/atlanta-ga/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "digital-realty-atlanta-ga",
      "name": "Digital Realty Downtown Atlanta (ATL13 / ATL14)",
      "summary": "Digital Realty lists 3 data centers at Atlanta, Georgia among the sites it operates.",
      "state": "GA",
      "city": "Atlanta",
      "county": "Fulton County",
      "status": "operational",
      "developer": "Digital Realty",
      "capacity_mw": null,
      "latitude": 33.7568,
      "longitude": -84.3917,
      "location_precision": "address",
      "location_source": "https://www.digitalrealty.com/data-centers/americas/atlanta/atl13",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "Digital Realty ATL13 (56 Marietta St NW) and ATL14 (250 Williams St NW) specification",
      "location_last_verified": "2026-09-14",
      "site_address": "56 Marietta St NW, Atlanta, GA 30303",
      "site_address_source_url": "https://www.digitalrealty.com/data-centers/americas/atlanta/atl13",
      "published": "2026-09-14",
      "last_verified": "2026-10-26",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.digitalrealty.com/data-centers/americas/atlanta",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/digital-realty-atlanta-ga",
      "source": "https://www.digitalrealty.com/data-centers/americas",
      "basis": "official_record",
      "sources": [
        {
          "title": "Digital Realty: Americas data centers",
          "url": "https://www.digitalrealty.com/data-centers/americas",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty ATL13",
          "url": "https://www.digitalrealty.com/data-centers/americas/atlanta/atl13",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty ATL14",
          "url": "https://www.digitalrealty.com/data-centers/americas/atlanta/atl14",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Advocates claim proposed Adair Park data center plans mirror historical redlining - Rough Draft Atlanta",
          "url": "https://roughdraftatlanta.com/2026/08/05/atlanta-residents-protest-digital-realty/",
          "publisher": "Rough Draft Atlanta",
          "date": "2026-08-05",
          "source_tier": 1
        },
        {
          "title": "Digital Realty: Digital Realty Atlanta",
          "url": "https://www.digitalrealty.com/data-centers/americas/atlanta",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Digital Realty lists Digital Realty ATL13, Digital Realty ATL14, Digital Realty Atlanta at Atlanta, Georgia on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.digitalrealty.com/data-centers/americas/atlanta/atl13",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "edgeconnex-inc-edgeconnex-atlanta-edcatl01-atlanta-ga",
      "name": "EdgeConneX Atlanta Campus (ATL01 / ATL02 / ATL03)",
      "summary": "EdgeConneX Inc. lists EdgeConneX Atlanta (EDCATL01) at 1003 Donnelly Ave SW, Atlanta, GA on its interconnection and facility directory.",
      "state": "GA",
      "city": "Atlanta",
      "county": "Fulton County",
      "status": "operational",
      "developer": "EdgeConneX",
      "capacity_mw": null,
      "latitude": 33.729369,
      "longitude": -84.420099,
      "location_precision": "address",
      "location_source": "https://www.edgeconnex.com/locations/americas/atlanta-ga-data-center/",
      "location_verified_at": null,
      "coordinate_source": "EdgeConneX Atlanta (1003 Donnelly Ave SW) campus specification",
      "location_last_verified": null,
      "site_address": "1003 Donnelly Ave SW, Atlanta, GA 30310",
      "site_address_source_url": "https://www.edgeconnex.com/locations/americas/atlanta-ga-data-center/",
      "published": "2026-10-21",
      "last_verified": "2026-10-26",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.edgeconnex.com/locations/americas/atlanta-ga-data-center/",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/edgeconnex-inc-edgeconnex-atlanta-edcatl01-atlanta-ga",
      "source": "https://www.edgeconnex.com/locations/americas/atlanta-ga-data-center/",
      "basis": "official_record",
      "sources": [
        {
          "title": "EdgeConneX: Atlanta (ATL01 / ATL02 / ATL03) Data Center Campus Specification",
          "url": "https://www.edgeconnex.com/locations/americas/atlanta-ga-data-center/",
          "publisher": "EdgeConneX",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-26",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary Georgia DCA DRI filing, EPA ECHO permit, or operator campus specification.",
          "source_url": "https://www.edgeconnex.com/locations/americas/atlanta-ga-data-center/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "edged-atlanta-data-center-campus-ga",
      "name": "Edged Atlanta Data Center Campus (ATL01)",
      "summary": "Edged operates a 3 building, 180 megawatt hyperscale data center campus at 1800 Thomas Street NW on the former Tilford Yard site in Atlanta, Fulton County, Georgia.",
      "state": "GA",
      "city": "Atlanta",
      "county": "Fulton County",
      "status": "operational",
      "developer": "Edged",
      "capacity_mw": 180,
      "latitude": 33.8042,
      "longitude": -84.4398,
      "location_precision": "address",
      "location_source": "https://edged.us/atlanta",
      "location_verified_at": null,
      "coordinate_source": "Edged Atlanta (1800 Thomas St NW) campus specification",
      "location_last_verified": null,
      "site_address": "1800 Thomas St NW, Atlanta, GA 30318",
      "site_address_source_url": "https://edged.us/atlanta",
      "published": "2026-10-21",
      "last_verified": "2026-10-26",
      "cooling_type": "closed_loop_liquid",
      "cooling_type_source_url": "https://edged.us/atlanta",
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://edged.us/atlanta",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/edged-atlanta-data-center-campus-ga",
      "source": "https://edged.us/atlanta",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Edged US: Edged Atlanta (1800 Thomas Street NW, Atlanta, GA) Facility Specifications",
          "url": "https://edged.us/atlanta",
          "publisher": "Edged US",
          "date": "2026-01-01",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-26",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary Georgia DCA DRI filing, EPA ECHO permit, or operator campus specification.",
          "source_url": "https://edged.us/atlanta",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "equinix-atlanta-ga",
      "name": "Equinix Atlanta Campus (AT1 / AT2 / AT3 / AT4 / AT5)",
      "summary": "Equinix lists 2 data centers at Atlanta, Georgia among the sites it operates.",
      "state": "GA",
      "city": "Atlanta",
      "county": "Fulton County",
      "status": "operational",
      "developer": "Equinix",
      "capacity_mw": null,
      "latitude": 33.75935,
      "longitude": -84.38759,
      "location_precision": "permit_point",
      "location_source": "https://echo.epa.gov/detailed-facility-report?fid=110040755849",
      "location_verified_at": "2026-10-04",
      "coordinate_source": "EPA ECHO Detailed Facility Report 110040755849",
      "location_last_verified": "2026-10-04",
      "site_address": "180 Peachtree St NW, Atlanta, GA 30303",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110040755849",
      "published": "2026-09-14",
      "last_verified": "2026-10-26",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 5,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/atlanta-data-centers/at1",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/equinix-atlanta-ga",
      "source": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation",
      "basis": "official_record",
      "sources": [
        {
          "title": "Equinix: United States and Canada colocation data centers",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Equinix: Equinix AT1",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/atlanta-data-centers/at1",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Equinix: Equinix AT4",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/atlanta-data-centers/at4",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Equinix",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110040755849",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Equinix lists Equinix AT1, Equinix AT4 at Atlanta, Georgia on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/atlanta-data-centers/at1",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "flexential-atl-4-data-center-alpharetta-ga",
      "name": "Flexential Alpharetta (ATL4)",
      "summary": "The EPA's facility registry lists Flexential Atl 4 Data Center at 12655 Edison Drive, Alpharetta, GA 30022 in Alpharetta, Georgia, with a water permit.",
      "state": "GA",
      "city": "Alpharetta",
      "county": "Fulton County",
      "status": "operational",
      "developer": "Flexential",
      "capacity_mw": null,
      "latitude": 34.0709,
      "longitude": -84.2726,
      "location_precision": "address",
      "location_source": "https://echo.epa.gov/detailed-facility-report?fid=110071727007",
      "location_verified_at": "2026-10-03",
      "coordinate_source": "EPA ECHO Detailed Facility Report 110071727007",
      "location_last_verified": "2026-10-03",
      "site_address": "12655 Edison Dr, Alpharetta, GA 30005",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071727007",
      "published": "2026-10-03",
      "last_verified": "2026-10-26",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071727007",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.flexential.com/data-centers/georgia/atlanta",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/flexential-atl-4-data-center-alpharetta-ga",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110071727007",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Flexential Atl 4 Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071727007",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "Flexential: Atlanta - Alpharetta (ATL4) Data Center Specification",
          "url": "https://www.flexential.com/data-centers/georgia/atlanta",
          "publisher": "Flexential",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-26",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary Georgia DCA DRI filing, EPA ECHO permit, or operator campus specification.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071727007",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "flexential-corp-flexential-atlantadouglasville-atl5-douglasville-ga",
      "name": "Flexential Atlanta Douglasville (ATL5)",
      "summary": "Flexential Corp. lists Flexential - Atlanta/Douglasville (ATL5) at 1700 N. River Road, Douglasville, GA on its interconnection and facility directory.",
      "state": "GA",
      "city": "Douglasville",
      "county": "Douglas County",
      "status": "operational",
      "developer": "Flexential",
      "capacity_mw": 22.5,
      "latitude": 33.731164,
      "longitude": -84.615714,
      "location_precision": "address",
      "location_source": "https://www.flexential.com/data-centers/georgia/atlanta",
      "location_verified_at": null,
      "coordinate_source": "Flexential Atlanta Douglasville (ATL5) specification",
      "location_last_verified": null,
      "site_address": "1700 North River Rd, Douglasville, GA 30122",
      "site_address_source_url": "https://www.flexential.com/data-centers/georgia/atlanta",
      "published": "2026-10-21",
      "last_verified": "2026-10-26",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.flexential.com/data-centers/georgia/atlanta",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/flexential-corp-flexential-atlantadouglasville-atl5-douglasville-ga",
      "source": "https://www.flexential.com/data-centers/georgia/atlanta",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Flexential: Atlanta - Douglasville (ATL5) Data Center Specification",
          "url": "https://www.flexential.com/data-centers/georgia/atlanta",
          "publisher": "Flexential",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-26",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary Georgia DCA DRI filing, EPA ECHO permit, or operator campus specification.",
          "source_url": "https://www.flexential.com/data-centers/georgia/atlanta",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "flexential-corp-flexential-atlantanorcross-atl12-norcross-ga",
      "name": "Flexential Atlanta Norcross (ATL1 / ATL2)",
      "summary": "Flexential Corp. lists Flexential - Atlanta/Norcross (ATL1/2) at 2775 Northwoods Parkway NW, Norcross, GA on its interconnection and facility directory.",
      "state": "GA",
      "city": "Norcross",
      "county": "Gwinnett County",
      "status": "operational",
      "developer": "Flexential",
      "capacity_mw": 3.6,
      "latitude": 33.954763,
      "longitude": -84.198645,
      "location_precision": "address",
      "location_source": "https://www.flexential.com/data-centers/georgia/atlanta",
      "location_verified_at": null,
      "coordinate_source": "Flexential Atlanta Norcross (ATL1 / ATL2) specification",
      "location_last_verified": null,
      "site_address": "2775 Northwoods Pkwy NW, Norcross, GA 30071",
      "site_address_source_url": "https://www.flexential.com/data-centers/georgia/atlanta",
      "published": "2026-10-21",
      "last_verified": "2026-10-26",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.flexential.com/data-centers/georgia/atlanta",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/flexential-corp-flexential-atlantanorcross-atl12-norcross-ga",
      "source": "https://www.flexential.com/data-centers/georgia/atlanta",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Flexential: Atlanta - Norcross (ATL1 / ATL2) Data Center Specification",
          "url": "https://www.flexential.com/data-centers/georgia/atlanta",
          "publisher": "Flexential",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-26",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary Georgia DCA DRI filing, EPA ECHO permit, or operator campus specification.",
          "source_url": "https://www.flexential.com/data-centers/georgia/atlanta",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "google-columbia-county-data-center-ga",
      "name": "Google Columbia County Data Center (White Oak Technology Park)",
      "summary": "Google lists a data center at Columbia County, Georgia and says it is being built.",
      "state": "GA",
      "city": "Appling",
      "county": "Columbia County",
      "status": "under_construction",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 33.5042,
      "longitude": -82.3215,
      "location_precision": "parcel",
      "location_source": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4443",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "Georgia DCA DRI Filing #4443 (White Oak Technology Park, Columbia County) and Google Locations",
      "location_last_verified": "2026-09-16",
      "site_address": "1955 Appling Harlem Rd, Appling, GA 30802",
      "site_address_source_url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4443",
      "published": "2026-09-14",
      "last_verified": "2026-10-26",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://www.wfxg.com/community/what-google-s-data-center-could-mean-for-columbia-county-s-economy/article_e5f3d51c-d19a-4551-b917-75f393dee753.html",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": "96 MW from nuclear uprates",
      "power_source_url": "https://www.augustachronicle.com/story/business/2026/09/22/google-to-help-upgrade-georgia-powers-plant-vogtle-piece-what-we-know/91885209007/",
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 12,
      "buildings_basis": "permit",
      "buildings_source_url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4443",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/google-columbia-county-data-center-ga",
      "source": "https://www.augustachronicle.com/story/business/2026/09/22/google-to-help-upgrade-georgia-powers-plant-vogtle-piece-what-we-know/91885209007/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Georgia Power, Google to upgrade Plant Vogtle? What's happening - The Augusta Chronicle",
          "url": "https://www.augustachronicle.com/story/business/2026/09/22/google-to-help-upgrade-georgia-powers-plant-vogtle-piece-what-we-know/91885209007/",
          "publisher": "The Augusta Chronicle",
          "date": "2026-09-22",
          "source_tier": 4
        },
        {
          "title": "Georgia Power nuclear reactors to get huge face lift, paid partly by Google - ajc.com",
          "url": "https://www.ajc.com/business/2026/09/georgia-power-is-upgrading-its-nuclear-reactors-and-google-is-buying-the-electricity/",
          "publisher": "ajc.com",
          "date": "2026-09-22",
          "source_tier": 4
        },
        {
          "title": "Google data center could generate billions, add jobs, and new households - WRDW",
          "url": "https://www.wrdw.com/2026/09/23/google-data-center-could-generate-billions-add-jobs-new-households/",
          "publisher": "WRDW",
          "date": "2026-09-23",
          "source_tier": 4
        },
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "$17bn Google Data Center in Columbia County Advances as Firm Finalizes Agreement with Officials - Construction Review",
          "url": "https://constructionreviewonline.com/17bn-google-data-center-in-columbia-county-advances-as-firm-finalizes-agreement-with-officials/",
          "publisher": "Construction Review",
          "date": "2026-08-31",
          "source_tier": 4
        },
        {
          "title": "Columbia County pitches Google project as path to property tax relief - The Augusta Chronicle",
          "url": "https://www.augustachronicle.com/story/news/technology/2026/08/28/columbia-county-georgia-touts-revenue-windfall-as-data-center-talks-with-google-advance/91496314007/",
          "publisher": "The Augusta Chronicle",
          "date": "2026-08-28",
          "source_tier": 1
        },
        {
          "title": "Columbia County Observer: Google finally joins the conversation - The Augusta Press",
          "url": "https://theaugustapress.com/columbia-county-observer-google-finally-joins-the-conversation/",
          "publisher": "The Augusta Press",
          "date": "2026-09-14",
          "source_tier": 1
        },
        {
          "title": "What Google’s Data Center could mean for Columbia County’s Economy - WFXG FOX54",
          "url": "https://www.wfxg.com/community/what-google-s-data-center-could-mean-for-columbia-county-s-economy/article_e5f3d51c-d19a-4551-b917-75f393dee753.html",
          "publisher": "WFXG FOX54",
          "date": "2026-09-23",
          "source_tier": 4
        },
        {
          "title": "Georgia Department of Community Affairs: DRI Filing #4443 (White Oak Technology Park, Columbia County)",
          "url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4443",
          "publisher": "Georgia Department of Community Affairs",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-22",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-22",
          "summary": "Georgia Power wants to upgrade two reactors at Plant Vogtle near Augusta and two at Plant Hatch west of Savannah to put roughly 100 megawatts total of emission free electricity on the power grid.",
          "source_url": "https://www.ajc.com/business/2026/09/georgia-power-is-upgrading-its-nuclear-reactors-and-google-is-buying-the-electricity/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Columbia County data center at Columbia County, Georgia on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-31",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-31",
          "summary": "Two major sites: White Oak and Pumpkin Center area in Columbia County.",
          "source_url": "https://constructionreviewonline.com/17bn-google-data-center-in-columbia-county-advances-as-firm-finalizes-agreement-with-officials/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-31",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-31",
          "summary": "First payments expected late 2026 or early 2027 depending on construction milestones.",
          "source_url": "https://constructionreviewonline.com/17bn-google-data-center-in-columbia-county-advances-as-firm-finalizes-agreement-with-officials/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-31",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-31",
          "summary": "Agreement mandates 65 decibel noise ceiling and 500 foot buffer zone from residential areas.",
          "source_url": "https://constructionreviewonline.com/17bn-google-data-center-in-columbia-county-advances-as-firm-finalizes-agreement-with-officials/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-31",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-31",
          "summary": "Economic Development Authority approved memorandum of understanding for Google Data Center in Columbia County, Georgia.",
          "source_url": "https://constructionreviewonline.com/17bn-google-data-center-in-columbia-county-advances-as-firm-finalizes-agreement-with-officials/",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "google-douglas-county-data-center-ga",
      "name": "Google Douglas County Data Center",
      "summary": "Google lists a data center at Douglas County, Georgia among the sites it operates.",
      "state": "GA",
      "city": "Lithia Springs",
      "county": "Douglas County",
      "status": "operational",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 33.7368,
      "longitude": -84.6194,
      "location_precision": "address",
      "location_source": "https://datacenters.google/locations/douglas-county/",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "Google Douglas County data center specification",
      "location_last_verified": "2026-09-16",
      "site_address": "300 Riverside Pkwy, Lithia Springs, GA 30122",
      "site_address_source_url": "https://datacenters.google/locations/douglas-county/",
      "published": "2026-09-14",
      "last_verified": "2026-10-26",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://datacenters.google/locations/douglas-county/",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/google-douglas-county-data-center-ga",
      "source": "https://datacenters.google/locations/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Douglas County data center at Douglas County, Georgia on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "google-lagrange-data-center-ga",
      "name": "Google LaGrange Data Center Campus",
      "summary": "Google lists a data center at LaGrange, Georgia and says it is being built.",
      "state": "GA",
      "city": "LaGrange",
      "county": "Troup County",
      "status": "under_construction",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 32.9892,
      "longitude": -85.0518,
      "location_precision": "parcel",
      "location_source": "https://datacenters.google/locations/",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "Google Locations and Callaway South Industrial Park parcel record",
      "location_last_verified": "2026-09-14",
      "site_address": "200 Pegasus Pkwy, LaGrange, GA 30240",
      "site_address_source_url": "https://datacenters.google/locations/",
      "published": "2026-09-14",
      "last_verified": "2026-10-26",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 4,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://datacenters.google/locations/",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/google-lagrange-data-center-ga",
      "source": "https://datacenters.google/locations/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Google announces new data center coming to LaGrange - WSAV TV",
          "url": "https://www.wsav.com/news/local-news/georgia-news/google-announces-new-data-center-coming-to-lagrange/",
          "publisher": "WSAV-TV",
          "date": "2026-04-21",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google LaGrange data center at LaGrange, Georgia on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        },
        {
          "status": "under_construction",
          "effective_at": "2026-04-21",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-04-21",
          "summary": "Google announces new data center coming to LaGrange, Georgia.",
          "source_url": "https://www.wsav.com/news/local-news/georgia-news/google-announces-new-data-center-coming-to-lagrange/",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "h5-atlanta-ga",
      "name": "H5 Data Centers Atlanta",
      "summary": "H5 Data Centers lists a data center at Atlanta, Georgia among the sites it operates.",
      "state": "GA",
      "city": "Atlanta",
      "county": "Fulton County",
      "status": "operational",
      "developer": "H5 Data Centers",
      "capacity_mw": null,
      "latitude": 33.765138,
      "longitude": -84.383731,
      "location_precision": "address",
      "location_source": "https://h5datacenters.com/atlanta-data-center.html",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "H5 Data Centers Atlanta (345 Courtland St NE) specification",
      "location_last_verified": "2026-09-14",
      "site_address": "345 Courtland St NE, Atlanta, GA 30308",
      "site_address_source_url": "https://h5datacenters.com/atlanta-data-center.html",
      "published": "2026-09-14",
      "last_verified": "2026-10-26",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://h5datacenters.com/atlanta-data-center.html",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/h5-atlanta-ga",
      "source": "https://h5datacenters.com/data-centers.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "H5 Data Centers: Data centers",
          "url": "https://h5datacenters.com/data-centers.html",
          "publisher": "H5 Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "H5 Data Centers lists H5 Atlanta at Atlanta, Georgia on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://h5datacenters.com/data-centers.html",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "marietta-data-center-ga",
      "name": "Marietta Cobb Parkway Data Center",
      "summary": "The Marietta city council voted 5 2 to approve a new data center.",
      "state": "GA",
      "city": "Marietta",
      "county": "Cobb County",
      "status": "approved",
      "developer": "echosuite / Cobb Parkway Developer LLC",
      "capacity_mw": 18,
      "latitude": 33.9724,
      "longitude": -84.5342,
      "location_precision": "parcel",
      "location_source": "https://www.mariettaga.gov/AgendaCenter",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "City of Marietta City Council rezoning approval (August 12, 2026)",
      "location_last_verified": "2026-09-16",
      "site_address": "1295 Cobb Pkwy N, Marietta, GA 30062",
      "site_address_source_url": "https://www.mariettaga.gov/AgendaCenter",
      "published": "2026-09-04",
      "last_verified": "2026-10-26",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "zoning application",
      "buildings_source_url": "https://www.mariettaga.gov/AgendaCenter",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/marietta-data-center-ga",
      "source": "https://www.datacenterdynamics.com/en/news/self-storage-facility-in-marietta-georgia-targeted-for-18mw-data-center/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Self storage facility in Marietta, Georgia, targeted for 18MW data center",
          "url": "https://www.datacenterdynamics.com/en/news/self-storage-facility-in-marietta-georgia-targeted-for-18mw-data-center/",
          "publisher": "Data Center Dynamics",
          "date": "2026-07-07",
          "source_tier": 3
        },
        {
          "title": "Marietta, GA approves 11 acre data center",
          "url": "https://www.youtube.com/watch?v=x1nRzbFIpmo",
          "publisher": "YouTube",
          "date": "2026-08-21",
          "source_tier": 5
        },
        {
          "title": "Marietta data center project approved after hours of heated debate - WSB-TV",
          "url": "https://www.wsbtv.com/news/local/marietta-data-center-project-approved-after-hours-heated-debate/JNLAEDRF2NFQ3BKOAXYA2GWV5A/",
          "publisher": "wsbtv.com",
          "date": "2026-08-13",
          "source_tier": 4
        },
        {
          "title": "Marietta council votes 5-2 for new data center - FOX 5 Atlanta",
          "url": "https://www.fox5atlanta.com/news/marietta-council-approves-data-center-despite-six-month-moratorium",
          "publisher": "FOX 5 Atlanta",
          "date": "2026-08-12",
          "source_tier": 4
        },
        {
          "title": "City of Marietta City Council: Rezoning Approval for 1295 Cobb Pkwy N Data Center (August 12, 2026)",
          "url": "https://www.mariettaga.gov/AgendaCenter",
          "publisher": "City of Marietta",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "approved",
          "effective_at": "2026-08-21",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-21",
          "summary": "The data center utilizes a closed loop cooling system.",
          "source_url": "https://www.youtube.com/watch?v=x1nRzbFIpmo",
          "source_tier": 5
        },
        {
          "status": "approved",
          "effective_at": "2026-08-12",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "The Marietta city council voted 5 2 to approve a new data center.",
          "source_url": "https://www.mariettaga.gov/AgendaCenter",
          "source_tier": 1
        },
        {
          "status": "approved",
          "effective_at": "2026-07-07",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-07",
          "summary": "Self storage facility targeted for 18 MW data center in Marietta",
          "source_url": "https://www.datacenterdynamics.com/en/news/self-storage-facility-in-marietta-georgia-targeted-for-18mw-data-center/",
          "source_tier": 3
        }
      ]
    },
    {
      "slug": "meta-stanton-springs-data-center-ga",
      "name": "Meta Stanton Springs Data Center Campus",
      "summary": "Meta lists a data center at Stanton Springs, Georgia among the sites it operates.",
      "state": "GA",
      "city": "Social Circle",
      "county": "Newton County",
      "status": "operational",
      "developer": "Meta",
      "capacity_mw": null,
      "latitude": 33.6285,
      "longitude": -83.7438,
      "location_precision": "address",
      "location_source": "https://datacenters.atmeta.com/us-locations/",
      "location_verified_at": null,
      "coordinate_source": "Meta Stanton Springs Data Center campus specification",
      "location_last_verified": null,
      "site_address": "300 Shire Pkwy, Social Circle, GA 30025",
      "site_address_source_url": "https://datacenters.atmeta.com/us-locations/",
      "published": "2026-10-21",
      "last_verified": "2026-10-26",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 9,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://datacenters.atmeta.com/us-locations/",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/meta-stanton-springs-data-center-ga",
      "source": "https://www.covnews.com/news/eight-sue-meta-over-contaminated-well-water/article_593b4710-71f0-4f9d-8c38-b348faa7e702.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "Eight sue Meta over contaminated well water - The Covington News",
          "url": "https://www.covnews.com/news/eight-sue-meta-over-contaminated-well-water/article_593b4710-71f0-4f9d-8c38-b348faa7e702.html",
          "publisher": "The Covington News",
          "date": "2026-09-14",
          "source_tier": 4
        },
        {
          "title": "Meta: Our U.S. data center fleet",
          "url": "https://datacenters.atmeta.com/us-locations/",
          "publisher": "Meta",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Meta lists Meta Stanton Springs Data Center at Stanton Springs, Georgia on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.atmeta.com/us-locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "microsoft-palmetto-data-center-ga",
      "name": "Microsoft Palmetto Data Center (CCO06)",
      "summary": "Microsoft acquired nearly 21 acres adjacent to its existing Palmetto data center campus in south Fulton County for $6 million to support ongoing data center construction, and later purchased additional land near Atlanta.",
      "state": "GA",
      "city": "Palmetto",
      "county": "Fulton County",
      "status": "operational",
      "developer": "Microsoft",
      "capacity_mw": null,
      "latitude": 33.522969,
      "longitude": -84.631305,
      "location_precision": "permit_point",
      "location_source": "https://echo.epa.gov/detailed-facility-report?fid=110071963150",
      "location_verified_at": "2026-10-06",
      "coordinate_source": "EPA ECHO Detailed Facility Report 110071963150 and Georgia DCA DRI #3463",
      "location_last_verified": "2026-10-06",
      "site_address": "NW Corner of Johnson and Williams Rd, Palmetto, GA 30268",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071963150",
      "published": "2026-10-21",
      "last_verified": "2026-10-26",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "permit",
      "buildings_source_url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=3463",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/microsoft-palmetto-data-center-ga",
      "source": "https://www.ajc.com/news/business/microsoft-buys-land-for-expansion-of-fulton-county-data-center/WMEP3QOMDVDCXNLE3XM7MYMEBM/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Microsoft pays $6M for land to expand data center south of Atlanta - AJC.com",
          "url": "https://www.ajc.com/news/business/microsoft-buys-land-for-expansion-of-fulton-county-data-center/WMEP3QOMDVDCXNLE3XM7MYMEBM/",
          "publisher": "AJC.com",
          "date": "2024-03-04",
          "source_tier": 1
        },
        {
          "title": "EPA ECHO detailed facility report: Microsoft Data Center (CCO06)",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071963150",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "News | Microsoft Buys More Land Near Atlanta As It Expands National Data Center Footprint - CoStar",
          "url": "https://www.costar.com/article/1621439095?utm_source=newsletter%2CActiveCampaign&utm_medium=email%2Cemail&utm_campaign=personalized%2CJKAM+Newsletter+May+22%2C+2024&utm_content=p10%2CYour+Invitation+to+Invest+in+Atlanta+s+Most+Promising+Real+Estate%F0%9F%8F%A1&t=eyJhbGciOiJIUzI1NiIsInR5cCI6IkpXVCJ9.eyJjb250YWN0SWQiOiIxODcwNTQ2NTEiLCJjdWx0dXJlQ29kZSI6ImVuLVVTIiwiaWF0IjoxNzE2MjE4OTExfQ.DqVPhQUJSZIP7zo_IRFIKJau6CElYeraDY5Gx-KiZ6s",
          "publisher": "CoStar",
          "date": "2024-05-17",
          "source_tier": 1
        },
        {
          "title": "Georgia Department of Community Affairs: DRI Filing #3463 (Microsoft CCO06 Data Center, Palmetto, Fulton County)",
          "url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=3463",
          "publisher": "Georgia Department of Community Affairs",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2024-03-04",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Microsoft acquired nearly 21 acres adjacent to its existing Palmetto data center campus in south Fulton County for $6 million to support ongoing data center construction, and later purchased additional land near Atlanta.",
          "source_url": "https://www.ajc.com/news/business/microsoft-buys-land-for-expansion-of-fulton-county-data-center/WMEP3QOMDVDCXNLE3XM7MYMEBM/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "openai-effingham-county-data-center-ga",
      "name": "OpenAI Effingham County Data Center Campus (Project Camellia)",
      "summary": "OpenAI is planning a large data center in Effingham County, Georgia, for which Georgia Power received approval for a 3.2 GW power deal, and which faces a citizen led zoning lawsuit and questions about water and electric bill impacts.",
      "state": "GA",
      "city": "Rincon",
      "county": "Effingham County",
      "status": "permitting",
      "developer": "OpenAI",
      "capacity_mw": 3200,
      "latitude": 32.2642,
      "longitude": -81.2248,
      "location_precision": "parcel",
      "location_source": "https://psc.ga.gov/",
      "location_verified_at": "2026-09-23",
      "coordinate_source": "Effingham County Industrial Development Authority Savannah Gateway Industrial Hub parcel record",
      "location_last_verified": "2026-09-23",
      "site_address": "1002 Hwy 21 S (Savannah Gateway Industrial Hub), Rincon, GA 31326",
      "site_address_source_url": "https://psc.ga.gov/",
      "published": "2026-09-04",
      "last_verified": "2026-10-26",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 6,
      "buildings_basis": "permit",
      "buildings_source_url": "https://psc.ga.gov/",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/openai-effingham-county-data-center-ga",
      "source": "https://www.foxbusiness.com/video/6404586738112",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Congressman Buddy Carter on OpenAI's massive data center in Georgia, GOP midterms - Fox Business",
          "url": "https://www.foxbusiness.com/video/6404586738112",
          "publisher": "Fox Business",
          "date": "2026-09-04",
          "source_tier": 4
        },
        {
          "title": "Why southeast Georgia is becoming a data center hotspot - WTOC",
          "url": "https://www.wtoc.com/2026/09/04/why-southeast-georgia-is-becoming-data-center-hotspot/",
          "publisher": "WTOC",
          "date": "2026-09-04",
          "source_tier": 4
        },
        {
          "title": "Week In Review: Georgia Power cuts data center deal and courts review ‘shaken baby’ case - WABE",
          "url": "https://www.wabe.org/wabes-week-in-review-georgia-power-cuts-data-center-deal-and-courts-review-another-shaken-baby-case/",
          "publisher": "WABE",
          "date": "2026-08-28",
          "source_tier": 4
        },
        {
          "title": "Georgia Power to serve OpenAI project in Effingham County",
          "url": "https://www.prnewswire.com/news-releases/georgia-power-to-serve-openai-project-in-effingham-county-302832224.html",
          "publisher": "PR Newswire",
          "date": "2026-07-22",
          "source_tier": 4
        },
        {
          "title": "OpenAI plans $20 billion data center in Effingham County",
          "url": "https://www.wjcl.com/article/openai-data-center-effingham-county/73229017",
          "publisher": "WJCL",
          "date": "2026-07-22",
          "source_tier": 4
        },
        {
          "title": "OpenAI chooses Georgia for its largest-ever data center. $20B project touts efficiency - Columbus Ledger-Enquirer",
          "url": "https://www.ledger-enquirer.com/news/environment/article316612282.html",
          "publisher": "ledger-enquirer.com",
          "date": "2026-07-23",
          "source_tier": 4
        },
        {
          "title": "OpenAI Plans $30 Billion AI Data Center in Georgia",
          "url": "https://www.heygotrade.com/en/news/openai-georgia-data-center-ai-infrastructure-buildout/",
          "publisher": "www.heygotrade.com",
          "date": "2026-07-23",
          "source_tier": 4
        },
        {
          "title": "OpenAI data center in Effingham County clears major hurdle - WJCL",
          "url": "https://www.wjcl.com/article/georgia-power-openai-contract-psc-staff-review/73536639",
          "publisher": "WJCL",
          "date": "2026-08-26",
          "source_tier": 4
        },
        {
          "title": "How much water will Effingham’s OpenAI data center need? A lot – but not on site. - thecurrentga.org",
          "url": "https://thecurrentga.org/2026/09/01/how-much-water-will-effinghams-openai-data-center-need-a-lot-but-not-on-site/",
          "publisher": "thecurrentga.org",
          "date": "2026-09-01",
          "source_tier": 1
        },
        {
          "title": "OpenAI forced to delay plans for $20B data center in Georgia - E&E News by POLITICO",
          "url": "https://www.eenews.net/articles/openai-forced-to-delay-plans-for-20b-data-center-in-georgia/",
          "publisher": "E&E News by POLITICO",
          "date": "2026-08-14",
          "source_tier": 1
        },
        {
          "title": "OpenAI Plans $20 Billion Georgia Data Center with 3.2 GW of Power - ConstructConnect News",
          "url": "https://news.constructconnect.com/openai-plans-20-billion-georgia-data-center-with-3.2-gw-of-power",
          "publisher": "ConstructConnect News",
          "date": "2026-07-23",
          "source_tier": 1
        },
        {
          "title": "OpenAI announces $20 billion Georgia data center project - Axios",
          "url": "https://finance.yahoo.com/technology/ai/articles/openai-announces-20-billion-georgia-130004205.html",
          "publisher": "Axios",
          "date": "2026-07-22",
          "source_tier": 1
        },
        {
          "title": "OpenAI plans $30B Georgia data center mega-project - Yahoo Finance",
          "url": "https://finance.yahoo.com/technology/ai/articles/openai-plans-30b-georgia-data-135020996.html",
          "publisher": "Yahoo Finance",
          "date": "2026-07-22",
          "source_tier": 1
        },
        {
          "title": "Georgia Today: Another Flock arrest; Affordable groceries; Complaint of illegal data center zoning - gpb.org",
          "url": "https://www.gpb.org/news/2026/09/03/georgia-today-another-flock-arrest-affordable-groceries-complaint-of-illegal-data",
          "publisher": "gpb.org",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Citizen-led lawsuit challenges zoning for OpenAI Georgia data center - thecurrentga.org",
          "url": "https://thecurrentga.org/2026/09/03/citizen-led-lawsuit-challenges-zoning-for-openai-georgia-data-center/",
          "publisher": "thecurrentga.org",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Effingham County Residents Sue Over Zoning Ordinance That Paved Way for Data Center - The Georgia Virtue",
          "url": "https://www.thegeorgiavirtue.com/local-government-south-georgia/effingham-county-residents-sue-over-zoning-ordinance-that-paved-way-for-data-center/",
          "publisher": "The Georgia Virtue",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "OpenAI’s data center will need unprecedented power. What it means for Effingham County electric bills - WJCL",
          "url": "https://www.wjcl.com/article/openais-data-center-power-bills-effingham-county/73599707",
          "publisher": "WJCL",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "‘We’re in the fourth revolution’: GSU professor explains SE Georgia’s new role in the global AI race - WTOC",
          "url": "https://www.wtoc.com/2026/09/03/were-fourth-revolution-gsu-professor-explains-se-georgias-new-role-global-ai-race/",
          "publisher": "WTOC",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "‘Strictest contract in data center history’ reached between Georgia Power and OpenAI - WTOC",
          "url": "https://www.wtoc.com/2026/08/30/strictest-contract-data-center-history-reached-between-georgia-power-openai/",
          "publisher": "WTOC",
          "date": "2026-08-30",
          "source_tier": 4
        },
        {
          "title": "Georgia Power deal to power OpenAI data center is approved, with some fine print - AJC.com",
          "url": "https://www.ajc.com/business/2026/08/georgia-power-deal-to-power-openai-data-center-near-savannah-is-approved/",
          "publisher": "AJC.com",
          "date": "2026-08-27",
          "source_tier": 4
        },
        {
          "title": "OpenAI plans $20 billion data center campus in Effingham County's Savannah Gateway Industrial Hub",
          "url": "https://www.youtube.com/watch?v=tVlBHpf4E5Q",
          "publisher": "YouTube",
          "date": "2026-07-22",
          "source_tier": 5
        },
        {
          "title": "$20 billion OpenAI data center to open in Effingham County",
          "url": "https://thecurrentga.org/2026/07/22/20-billion-openai-data-center-to-open-in-effingham-county/",
          "publisher": "thecurrentga.org",
          "date": "2026-07-22",
          "source_tier": 4
        },
        {
          "title": "Effingham County residents push back on $20 billion OpenAI data center",
          "url": "https://www.youtube.com/watch?v=xM10dB0V53s",
          "publisher": "YouTube",
          "date": "2026-07-23",
          "source_tier": 5
        },
        {
          "title": "Effingham County residents are coming to grips with their neighbor-to-be: OpenAI",
          "url": "https://www.gpb.org/news/2026/08/06/effingham-county-residents-are-coming-grips-their-neighbor-be-openai",
          "publisher": "Georgia Public Broadcasting",
          "date": "2026-08-06",
          "source_tier": 4
        },
        {
          "title": "Next steps for Effingham County’s OpenAI data center",
          "url": "https://www.wtoc.com/2026/08/08/next-steps-effingham-co-openai-data-center/",
          "publisher": "WTOC",
          "date": "2026-08-07",
          "source_tier": 4
        },
        {
          "title": "New data center may use more electricity than anything else in Georgia - wsbtv.com",
          "url": "https://www.wsbtv.com/news/local/new-data-center-may-use-more-electricity-than-anything-else-georgia/YT6RVDQWNNFMPDRGPTVJRZZ4SU/",
          "publisher": "wsbtv.com",
          "date": "2026-08-27",
          "source_tier": 4
        },
        {
          "title": "Georgia Power extends deadline for PSC to consider its contract with data center operator OpenAI - WABE",
          "url": "https://www.wabe.org/georgia-power-extends-deadline-for-psc-to-consider-its-contract-with-data-center-operator-openai/",
          "publisher": "WABE",
          "date": "2026-08-14",
          "source_tier": 1
        },
        {
          "title": "Pro-data center group launches in Georgia to try to win over critics - Georgia Recorder",
          "url": "https://georgiarecorder.com/2026/07/27/pro-data-center-group-launches-in-georgia-to-try-to-win-over-critics/",
          "publisher": "Georgia Recorder",
          "date": "2026-07-27",
          "source_tier": 1
        },
        {
          "title": "OpenAI Moves Energy Planning Inside Data Center Organization",
          "url": "https://www.datacenterknowledge.com/data-center-construction/openai-moves-energy-planning-inside-data-center-organization",
          "publisher": "Data Center Knowledge",
          "date": "2026-08-26",
          "source_tier": 3
        },
        {
          "title": "OpenAI gets green light for 3.2GW power deal to supply planned data center in Effingham County, Georgia - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/openai-gets-green-light-for-32gw-power-deal-to-supply-planned-data-center-in-effingham-county-georgia/",
          "publisher": "Data Center Dynamics",
          "date": "2026-08-27",
          "source_tier": 3
        },
        {
          "title": "Georgia Power agrees to new protections against data center costs - WABE",
          "url": "https://www.wabe.org/georgia-power-agrees-to-new-protections-against-data-center-costs/",
          "publisher": "WABE",
          "date": "2026-08-27",
          "source_tier": 4
        },
        {
          "title": "Georgia Power gets clearance to serve OpenAI's massive AI data center in Effingham County​ - CBS News",
          "url": "https://www.cbsnews.com/atlanta/news/georgia-power-gets-clearance-to-serve-openais-massive-ai-data-center-in-effingham-county/",
          "publisher": "CBS News",
          "date": "2026-08-27",
          "source_tier": 4
        },
        {
          "title": "OpenAI data center project sparks outrage among Effingham County residents",
          "url": "https://thecurrentga.org/2026/07/23/openai-data-center-project-sparks-outrage-among-effingham-county-residents/",
          "publisher": "thecurrentga.org",
          "date": "2026-07-23",
          "source_tier": 4
        },
        {
          "title": "As Effingham County data center plan advances, next step is state evaluation process",
          "url": "https://thecurrentga.org/2026/07/25/as-effingham-county-data-center-plan-advances-next-step-is-state-evaluation-process/",
          "publisher": "thecurrentga.org",
          "date": "2026-07-25",
          "source_tier": 4
        },
        {
          "title": "How OpenAI's Effingham Data Center Moved Forward Without Public Input",
          "url": "https://www.effinghamherald.net/data-centers/how-openais-effingham-data-center-moved-forward-without-public-input-rincon/",
          "publisher": "Effingham Herald",
          "date": "2026-07-28",
          "source_tier": 4
        },
        {
          "title": "OpenAI plans to build an AI data center in Effingham County",
          "url": "https://spectrumlocalnews.com/ga/georgia/news/2026/07/24/openai-building-effingham-county-data-center",
          "publisher": "spectrumlocalnews.com",
          "date": "2026-07-26",
          "source_tier": 4
        },
        {
          "title": "Records show Effingham County leaders finalized massive tax break for $20B OpenAI data center day before public announcement",
          "url": "https://www.wtoc.com/2026/07/30/records-show-effingham-county-leaders-finalized-massive-tax-break-20b-openai-data-center-day-before-public-announcement/",
          "publisher": "WTOC",
          "date": "2026-07-29",
          "source_tier": 4
        },
        {
          "title": "OpenAI in Georgia: How $20B data center plan secretly took root in Effingham",
          "url": "https://www.ajc.com/news/2026/08/openai-in-georgia-how-20b-data-center-plan-secretly-took-root-in-effingham/",
          "publisher": "AJC.com",
          "date": "2026-08-02",
          "source_tier": 4
        },
        {
          "title": "OpenAI, Effingham IDA talk revenue, jobs for data center | Exclusive",
          "url": "https://www.savannahnow.com/story/news/2026/08/03/local-officials-explain-abatement-agreement-for-new-data-center/91087706007/",
          "publisher": "Savannah Morning News",
          "date": "2026-08-03",
          "source_tier": 4
        },
        {
          "title": "Hundreds Pack OpenAI Data Center Meeting in Effingham",
          "url": "https://www.effinghamherald.net/data-centers/hundreds-pack-openai-data-center-meeting-in-effingham-rincon-project-camellia/",
          "publisher": "Effingham Herald",
          "date": "2026-07-23",
          "source_tier": 4
        },
        {
          "title": "‘Water done right’ for Effingham County OpenAI data center",
          "url": "https://www.wtoc.com/2026/08/12/water-done-right-effingham-county-openai-data-center/",
          "publisher": "WTOC",
          "date": "2026-08-11",
          "source_tier": 4
        },
        {
          "title": "Project Camellia Raises Environmental Concerns in Effingham County",
          "url": "https://www.effinghamherald.net/opinion/project-camellia-raises-environmental-concerns-in-effingham-county-open-ai-dat-center/",
          "publisher": "Effingham Herald",
          "date": "2026-08-12",
          "source_tier": 4
        },
        {
          "title": "Effingham County Property Taxes Could See One of Largest Cuts",
          "url": "https://www.effinghamherald.net/data-centers/effingham-county-property-taxes-could-see-one-of-largest-cuts-openai-data-center-project-camellia-ida-school-district-millage-rate-6-mills/",
          "publisher": "Effingham Herald",
          "date": "2026-08-24",
          "source_tier": 4
        },
        {
          "title": "Warnock blasts OpenAI, Effingham for doing data center deal ‘in the dark’",
          "url": "https://www.ajc.com/business/2026/08/georgia-senator-blasts-openai-county-for-doing-data-center-deal-in-the-dark/",
          "publisher": "AJC.com",
          "date": "2026-08-29",
          "source_tier": 4
        },
        {
          "title": "Commissioner apologies to residents over OpenAI data center campus",
          "url": "https://www.youtube.com/watch?v=NGv4th3QYPs",
          "publisher": "YouTube",
          "date": "2026-09-02",
          "source_tier": 5
        },
        {
          "title": "OpenAI to cover Effingham County student school meal costs with $4.8M grant",
          "url": "https://www.wtoc.com/2026/09/02/openai-cover-effingham-county-student-school-meal-costs-with-48m-grant/",
          "publisher": "WTOC",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Packed meeting, protests erupt as OpenAI data center proposal divides Effingham County",
          "url": "https://www.youtube.com/watch?v=jOjLhgCHp8s",
          "publisher": "YouTube",
          "date": null,
          "source_tier": 5
        },
        {
          "title": "OpenAI announces plans for a new data center in Effingham County",
          "url": "https://www.youtube.com/watch?v=FirnUFepq1M",
          "publisher": "YouTube",
          "date": null,
          "source_tier": 5
        },
        {
          "title": "Residents Say OpenAI’s $20B Data Center Blindsided Effingham County, Georgia",
          "url": "https://www.youtube.com/watch?v=RgfN0NltS3M",
          "publisher": "YouTube",
          "date": null,
          "source_tier": 5
        },
        {
          "title": "Effingham County residents protest at OpenAI's data center open house",
          "url": "https://www.youtube.com/watch?v=GD-bYNSaY9Q",
          "publisher": "YouTube",
          "date": null,
          "source_tier": 5
        },
        {
          "title": "OpenAI to cover Effingham County students’ school meal costs for 2026-27 Year",
          "url": "https://www.wjcl.com/article/openai-effingham-county-school-meals/73596042",
          "publisher": "WJCL",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Effingham County Commissioners confront the public for the first time. One apologizes",
          "url": "https://www.gpb.org/news/2026/09/02/effingham-county-commissioners-confront-the-public-for-the-first-time-one",
          "publisher": "Georgia Public Broadcasting",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "OpenAI data center sparks intense debate at Effingham County meeting",
          "url": "https://thecurrentga.org/2026/08/29/openai-data-center-sparks-intense-debate-at-effingham-county-meeting/",
          "publisher": "thecurrentga.org",
          "date": "2026-08-29",
          "source_tier": 4
        },
        {
          "title": "Effingham promises homeowner tax breaks from part of OpenAI windfall, but there’s millions left",
          "url": "https://thecurrentga.org/2026/08/28/effingham-promises-homeowner-tax-breaks-from-part-of-openai-windfall-but-theres-millions-left/",
          "publisher": "thecurrentga.org",
          "date": "2026-08-28",
          "source_tier": 4
        },
        {
          "title": "Effingham County officials say OpenAI will bring property tax relief. Residents are unsatisfied",
          "url": "https://www.gpb.org/news/2026/08/27/effingham-county-officials-say-openai-will-bring-property-tax-relief-residents-are",
          "publisher": "Georgia Public Broadcasting",
          "date": "2026-08-27",
          "source_tier": 4
        },
        {
          "title": "OpenAI to cover school meal costs for all Effingham County students",
          "url": "https://www.yahoo.com/news/videos/openai-cover-school-meal-costs-221249857.html",
          "publisher": "Yahoo",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Warnock calls for data center moratorium during Effingham County visit",
          "url": "https://www.wtoc.com/2026/08/28/warnock-calls-data-center-moratorium-during-effingham-county-visit/",
          "publisher": "WTOC",
          "date": "2026-08-28",
          "source_tier": 4
        },
        {
          "title": "Warnock Criticizes Lack of Transparency on Effingham Data Center",
          "url": "https://www.effinghamherald.net/data-centers/warnock-criticizes-lack-of-transparency-on-effingham-data-center-moratorium-openai-georgia/",
          "publisher": "Effingham Herald",
          "date": "2026-08-28",
          "source_tier": 4
        },
        {
          "title": "OpenAI announces plans for a new data center campus in Effingham County",
          "url": "https://www.wtoc.com/2026/07/22/openai-announces-plans-new-data-center-effingham-county/",
          "publisher": "WTOC",
          "date": "2026-07-22",
          "source_tier": 4
        },
        {
          "title": "OpenAI holds public open house in Effingham County after announcing $20B data center campus",
          "url": "https://www.wtoc.com/2026/07/23/openai-holds-public-open-house-effingham-county-after-announcing-20b-data-center-campus/",
          "publisher": "WTOC",
          "date": "2026-07-23",
          "source_tier": 4
        },
        {
          "title": "OpenAI Plans $20B Data Center in Effingham County",
          "url": "https://www.effinghamherald.net/local/openai-plans-20b-data-center-in-effingham-county-rincon-georgia/",
          "publisher": "Effingham Herald",
          "date": "2026-07-22",
          "source_tier": 4
        },
        {
          "title": "Community pushes back on Effingham County OpenAI data center",
          "url": "https://www.wtoc.com/2026/07/24/community-pushes-back-effingham-county-openai-data-center/",
          "publisher": "WTOC",
          "date": "2026-07-23",
          "source_tier": 4
        },
        {
          "title": "OpenAI chooses Effingham County for massive project",
          "url": "https://www.savannahnow.com/story/news/2026/07/22/openai-data-center-project-announced-in-effingham/91006985007/",
          "publisher": "Savannah Morning News",
          "date": "2026-07-22",
          "source_tier": 4
        },
        {
          "title": "OpenAI Effingham Data Center Open House: What to Expect",
          "url": "https://www.effinghamherald.net/data-centers/openai-effingham-data-center-open-house-what-to-expect-public-meeting-rincon/",
          "publisher": "Effingham Herald",
          "date": "2026-07-22",
          "source_tier": 4
        },
        {
          "title": "Warnock calls for a moratorium on Effingham County data centers",
          "url": "https://ground.news/article/warnock-calls-for-a-moratorium-on-effingham-county-data-centers_0030d4",
          "publisher": "WJCL",
          "date": "2026-08-28",
          "source_tier": 4
        },
        {
          "title": "Senator criticizes lack of transparency on Effingham data center",
          "url": "https://www.bryancountynews.com/news/senator-criticizes-lack-of-transparency-on-effingham-data-center/",
          "publisher": "Bryan County News",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "2 Effingham voters quiz their commissioner: Why a data center? Why so secret?",
          "url": "https://thecurrentga.org/2026/07/24/2-effingham-voters-quiz-their-commissioner-why-a-data-center-why-so-secret/",
          "publisher": "thecurrentga.org",
          "date": "2026-07-24",
          "source_tier": 4
        },
        {
          "title": "OpenAI plans to build a $20B data center campus in Effingham County. It could be Georgia's largest yet",
          "url": "https://www.gpb.org/news/2026/07/22/openai-plans-build-20b-data-center-campus-in-effingham-county-it-could-be-georgias",
          "publisher": "Georgia Public Broadcasting",
          "date": "2026-07-22",
          "source_tier": 4
        },
        {
          "title": "OpenAI announces plans to open a data center in Effingham County - WSAV-TV",
          "url": "https://www.wsav.com/news/local-news/georgia-power-working-with-openai-on-new-effingham-county-project/",
          "publisher": "wsav.com",
          "date": "2026-07-22",
          "source_tier": 4
        },
        {
          "title": "$20B OpenAI data center project sparks outrage among Coastal Georgia residents",
          "url": "https://www.wabe.org/20b-openai-data-center-project-sparks-outrage-among-coastal-georgia-residents/",
          "publisher": "WABE",
          "date": "2026-07-24",
          "source_tier": 4
        },
        {
          "title": "OpenAI plans 3.2GW data center campus in Effingham County, Georgia",
          "url": "https://www.datacenterdynamics.com/en/news/openai-reveals-32gw-data-center-project-in-effingham-county-georgia/",
          "publisher": "Data Center Dynamics",
          "date": "2026-07-22",
          "source_tier": 3
        },
        {
          "title": "$20B OpenAI data center wins Georgia approval with ratepayer protections - State Affairs Pro",
          "url": "https://news.google.com/rss/articles/CBMikAFBVV95cUxQN29GclVXenpNNEFXM3dkSV9zVy1vUFF0NWRpcWctd1BrNDJmTE92VndQZ3dDZ19YWG9qSDBDUGQ3WnlIXzVycEFROXF2SnFNSDdLdW1Ia21UcW9Vb3A1WFp1RGFfdWpjN2hqblRRd0ptQVBlVUllZVhoS1Zab2prTVRCWFNBYWZvY2RvQmZlWEw?oc=5",
          "publisher": "State Affairs Pro",
          "date": "2026-08-27",
          "source_tier": 1
        },
        {
          "title": "Georgia Public Service Commission: Georgia Power Large Load Customer Contract Approval (Effingham County)",
          "url": "https://psc.ga.gov/",
          "publisher": "Georgia Public Service Commission",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-09-04",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "OpenAI is planning a large data center in Effingham County, Georgia, for which Georgia Power received approval for a 3.2 GW power deal, and which faces a citizen led zoning lawsuit and questions about water and electric bill impacts.",
          "source_url": "https://psc.ga.gov/",
          "source_tier": 1
        },
        {
          "status": "permitting",
          "effective_at": "2026-09-02",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "The Development Authority and OpenAI began their conversations in October",
          "source_url": "https://www.youtube.com/watch?v=NGv4th3QYPs",
          "source_tier": 5
        },
        {
          "status": "permitting",
          "effective_at": "2026-09-02",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "The free meal program is scheduled to begin on Tuesday, September 8, 2026",
          "source_url": "https://www.wtoc.com/2026/09/02/openai-cover-effingham-county-student-school-meal-costs-with-48m-grant/",
          "source_tier": 4
        },
        {
          "status": "permitting",
          "effective_at": "2026-09-02",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Campus is 1,400 acres",
          "source_url": "https://www.youtube.com/watch?v=NGv4th3QYPs",
          "source_tier": 5
        },
        {
          "status": "permitting",
          "effective_at": "2026-08-29",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "OpenAI announced a $20 billion data center in Effingham County",
          "source_url": "https://www.ajc.com/business/2026/08/georgia-senator-blasts-openai-county-for-doing-data-center-deal-in-the-dark/",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2026-08-27",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-27",
          "summary": "OpenAI Project Camellia data center agreement includes providing up to 1,000 megawatts of flexible demand response",
          "source_url": "https://www.wsbtv.com/news/local/new-data-center-may-use-more-electricity-than-anything-else-georgia/YT6RVDQWNNFMPDRGPTVJRZZ4SU/",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2026-08-27",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-27",
          "summary": "An annual publicly available audit conducted by an independent firm will monitor OpenAI's adherence to community and operational commitments for Project Camellia as development progresses",
          "source_url": "https://www.wsbtv.com/news/local/new-data-center-may-use-more-electricity-than-anything-else-georgia/YT6RVDQWNNFMPDRGPTVJRZZ4SU/",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2026-08-27",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-27",
          "summary": "Georgia Public Service Commission approved power contract between Georgia Power and OpenAI for Project Camellia data center in Effingham County",
          "source_url": "https://www.wsbtv.com/news/local/new-data-center-may-use-more-electricity-than-anything-else-georgia/YT6RVDQWNNFMPDRGPTVJRZZ4SU/",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2026-08-27",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-27",
          "summary": "OpenAI Project Camellia data center facility will use a closed loop water system that recirculates water to minimize ongoing water consumption",
          "source_url": "https://www.wsbtv.com/news/local/new-data-center-may-use-more-electricity-than-anything-else-georgia/YT6RVDQWNNFMPDRGPTVJRZZ4SU/",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2026-08-27",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-27",
          "summary": "OpenAI pledged 80 million dollars in local community benefits over the lifespan of the project to support schools, public safety, health care and infrastructure",
          "source_url": "https://www.wsbtv.com/news/local/new-data-center-may-use-more-electricity-than-anything-else-georgia/YT6RVDQWNNFMPDRGPTVJRZZ4SU/",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2026-08-27",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-27",
          "summary": "OpenAI Project Camellia data center will be built in phases from 2028 to 2032 and is expected to need approximately 3,200 megawatts of power once completed",
          "source_url": "https://www.wsbtv.com/news/local/new-data-center-may-use-more-electricity-than-anything-else-georgia/YT6RVDQWNNFMPDRGPTVJRZZ4SU/",
          "source_tier": 4
        },
        {
          "status": "permitting",
          "effective_at": "2026-08-26",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-26",
          "summary": "Georgia Power agreed to provide public information on data center portfolio performance twice yearly and issue summary within 10 days of contract filing.",
          "source_url": "https://www.wjcl.com/article/georgia-power-openai-contract-psc-staff-review/73536639",
          "source_tier": 4
        },
        {
          "status": "permitting",
          "effective_at": "2026-08-26",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-26",
          "summary": "Contract was filed on July 27, 2026.",
          "source_url": "https://www.wjcl.com/article/georgia-power-openai-contract-psc-staff-review/73536639",
          "source_tier": 4
        },
        {
          "status": "permitting",
          "effective_at": "2026-08-26",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-26",
          "summary": "Georgia PSC staff declined to object to Georgia Power electricity contract for OpenAI data center in Effingham County.",
          "source_url": "https://www.wjcl.com/article/georgia-power-openai-contract-psc-staff-review/73536639",
          "source_tier": 4
        },
        {
          "status": "permitting",
          "effective_at": "2026-08-24",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Project Camellia covers approximately 1,400 acres and could require up to 3.2 gigawatts of power",
          "source_url": "https://www.effinghamherald.net/data-centers/effingham-county-property-taxes-could-see-one-of-largest-cuts-openai-data-center-project-camellia-ida-school-district-millage-rate-6-mills/",
          "source_tier": 4
        },
        {
          "status": "permitting",
          "effective_at": "2026-08-24",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "OpenAI announced the project in July with a proposed $20 billion data center campus",
          "source_url": "https://www.effinghamherald.net/data-centers/effingham-county-property-taxes-could-see-one-of-largest-cuts-openai-data-center-project-camellia-ida-school-district-millage-rate-6-mills/",
          "source_tier": 4
        },
        {
          "status": "stalled",
          "effective_at": "2026-08-14",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "OpenAI's $20B data center project in Georgia has been delayed, with Georgia Power extending the deadline for the PSC to consider its contract with OpenAI.",
          "source_url": "https://psc.ga.gov/",
          "source_tier": 1
        },
        {
          "status": "permitting",
          "effective_at": "2026-08-12",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Georgia Power entered into a 25 year agreement with OpenAI to provide 3.2 gigawatts of electricity",
          "source_url": "https://www.effinghamherald.net/opinion/project-camellia-raises-environmental-concerns-in-effingham-county-open-ai-dat-center/",
          "source_tier": 4
        },
        {
          "status": "permitting",
          "effective_at": "2026-08-11",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Site will operate a closed loop cooling system to continuously recycle the same water instead of relying on evaporative methods",
          "source_url": "https://www.wtoc.com/2026/08/12/water-done-right-effingham-county-openai-data-center/",
          "source_tier": 4
        },
        {
          "status": "permitting",
          "effective_at": "2026-08-11",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Agreement mandates that developers draw only from treated surface rivers rather than underground groundwater",
          "source_url": "https://www.wtoc.com/2026/08/12/water-done-right-effingham-county-openai-data-center/",
          "source_tier": 4
        },
        {
          "status": "permitting",
          "effective_at": "2026-08-07",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Project Camellia has cleared initial hurdles through the county's development authority",
          "source_url": "https://www.wtoc.com/2026/08/08/next-steps-effingham-co-openai-data-center/",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2026-08-06",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "OpenAI data center planned for Effingham County",
          "source_url": "https://www.gpb.org/news/2026/08/06/effingham-county-residents-are-coming-grips-their-neighbor-be-openai",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2026-08-03",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Effingham County Industrial Development Authority approved incentive package for OpenAI data center on July 21, 2026",
          "source_url": "https://www.savannahnow.com/story/news/2026/08/03/local-officials-explain-abatement-agreement-for-new-data-center/91087706007/",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2026-08-03",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Project planned for phased development between 2028 and 2032",
          "source_url": "https://www.savannahnow.com/story/news/2026/08/03/local-officials-explain-abatement-agreement-for-new-data-center/91087706007/",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2026-08-03",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "1,440 acre data center campus with four buildings and combined footprint of 720,000 square feet",
          "source_url": "https://www.savannahnow.com/story/news/2026/08/03/local-officials-explain-abatement-agreement-for-new-data-center/91087706007/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-02",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "OpenAI planned $20 billion data center campus with 4.4 million square feet in Effingham County",
          "source_url": "https://www.ajc.com/news/2026/08/openai-in-georgia-how-20b-data-center-plan-secretly-took-root-in-effingham/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-07-29",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "County records show the Special Payment in Lieu of Taxes agreement gives OpenAI a 37.5 percent annual property tax reduction, assessing the property at 25 percent of fair market value instead of the standard 40 percent, locked at the 2026 millage rate for 15 years",
          "source_url": "https://www.wtoc.com/2026/07/30/records-show-effingham-county-leaders-finalized-massive-tax-break-20b-openai-data-center-day-before-public-announcement/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-07-29",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Project has multi year five phase timeline with first phase targeted to begin construction by late 2028 and entire project completed by end of 2034",
          "source_url": "https://www.wtoc.com/2026/07/30/records-show-effingham-county-leaders-finalized-massive-tax-break-20b-openai-data-center-day-before-public-announcement/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-07-28",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "In February 2016, ECIDA board voted 7 1 to partner with OmniTRAX in collaboration with Broe Real Estate Group as master developer",
          "source_url": "https://www.effinghamherald.net/data-centers/how-openais-effingham-data-center-moved-forward-without-public-input-rincon/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-07-28",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Savannah Gateway property has been zoned industrial since 2006",
          "source_url": "https://www.effinghamherald.net/data-centers/how-openais-effingham-data-center-moved-forward-without-public-input-rincon/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-07-28",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Agreement gave Broe and OmniTRAX authority as sole and exclusive agent, attorney in fact and master developer of nearly 2,600 acres of ECIDA owned land",
          "source_url": "https://www.effinghamherald.net/data-centers/how-openais-effingham-data-center-moved-forward-without-public-input-rincon/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-07-28",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "ECIDA purchased the property near Rincon in 2006 from International Paper for about $31 million",
          "source_url": "https://www.effinghamherald.net/data-centers/how-openais-effingham-data-center-moved-forward-without-public-input-rincon/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-07-28",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Project announced July 22 followed by public information open house July 23",
          "source_url": "https://www.effinghamherald.net/data-centers/how-openais-effingham-data-center-moved-forward-without-public-input-rincon/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-07-28",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Project Camellia is a planned 1,400 acre data center campus at the Savannah Gateway Industrial Hub",
          "source_url": "https://www.effinghamherald.net/data-centers/how-openais-effingham-data-center-moved-forward-without-public-input-rincon/",
          "source_tier": 4
        },
        {
          "status": "permitting",
          "effective_at": "2026-07-25",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "DRI form submitted July 23, 2026 by Effingham County Senior Planner Kimberly Barlett with blank spaces for water usage, energy supply, and environmental impacts",
          "source_url": "https://thecurrentga.org/2026/07/25/as-effingham-county-data-center-plan-advances-next-step-is-state-evaluation-process/",
          "source_tier": 4
        },
        {
          "status": "permitting",
          "effective_at": "2026-07-25",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Project Camellia must undergo Georgia Developments of Regional Impact process before construction can begin",
          "source_url": "https://thecurrentga.org/2026/07/25/as-effingham-county-data-center-plan-advances-next-step-is-state-evaluation-process/",
          "source_tier": 4
        },
        {
          "status": "permitting",
          "effective_at": "2026-07-25",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Georgia Coastal Regional Commission must evaluate project in no more than 30 days",
          "source_url": "https://thecurrentga.org/2026/07/25/as-effingham-county-data-center-plan-advances-next-step-is-state-evaluation-process/",
          "source_tier": 4
        },
        {
          "status": "permitting",
          "effective_at": "2026-07-25",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "County must wait until DRI process complete before initiating engineering reviews, fire and stormwater plans, or noise level evaluations",
          "source_url": "https://thecurrentga.org/2026/07/25/as-effingham-county-data-center-plan-advances-next-step-is-state-evaluation-process/",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2026-07-23",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "OpenAI will receive short term tax abatements during construction and become the county's largest taxpayer after opening in 2028",
          "source_url": "https://thecurrentga.org/2026/07/23/openai-data-center-project-sparks-outrage-among-effingham-county-residents/",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2026-07-23",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "OpenAI data center project covers 2,600 acres at Savannah Gateway Industrial Hub",
          "source_url": "https://thecurrentga.org/2026/07/23/openai-data-center-project-sparks-outrage-among-effingham-county-residents/",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2026-07-23",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "OpenAI data center project in Effingham County announced without any public comment or vote",
          "source_url": "https://thecurrentga.org/2026/07/23/openai-data-center-project-sparks-outrage-among-effingham-county-residents/",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2026-07-23",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Nearly 1,000 people attended an open house on July 23, 2026 about the $20 billion OpenAI data center project in Effingham County",
          "source_url": "https://thecurrentga.org/2026/07/23/openai-data-center-project-sparks-outrage-among-effingham-county-residents/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-07-23",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Site is next to a high school and less than a mile from a park",
          "source_url": "https://www.youtube.com/watch?v=xM10dB0V53s",
          "source_tier": 5
        },
        {
          "status": "proposed",
          "effective_at": "2026-07-23",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Under a 25 year agreement, OpenAI agreed to cut up to 1,000 megawatts during peak demand to help grid reliability",
          "source_url": "https://www.youtube.com/watch?v=xM10dB0V53s",
          "source_tier": 5
        },
        {
          "status": "proposed",
          "effective_at": "2026-07-23",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Project Camellia covers about 1,400 acres inside Savannah Gateway Industrial Hub with four buildings and $20 billion price tag",
          "source_url": "https://www.youtube.com/watch?v=xM10dB0V53s",
          "source_tier": 5
        },
        {
          "status": "approved",
          "effective_at": "2026-07-23",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Effingham County Industrial Development Authority was initially approached about the data center around fall 2025",
          "source_url": "https://thecurrentga.org/2026/07/23/openai-data-center-project-sparks-outrage-among-effingham-county-residents/",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2026-07-23",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "OpenAI promises $80 million in community benefits including sports fields and free training for school students",
          "source_url": "https://thecurrentga.org/2026/07/23/openai-data-center-project-sparks-outrage-among-effingham-county-residents/",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2026-07-22",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "The site is located just outside of Rincon in Effingham County",
          "source_url": "https://thecurrentga.org/2026/07/22/20-billion-openai-data-center-to-open-in-effingham-county/",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2026-07-22",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Data center is scheduled to open in phases starting in 2028",
          "source_url": "https://thecurrentga.org/2026/07/22/20-billion-openai-data-center-to-open-in-effingham-county/",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2026-07-22",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "OpenAI data center will comprise four buildings at Savannah Gateway Industrial Hub",
          "source_url": "https://thecurrentga.org/2026/07/22/20-billion-openai-data-center-to-open-in-effingham-county/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-07-22",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Site is located at Savannah Gateway Industrial Hub, approximately 12 miles northwest of the Port of Savannah",
          "source_url": "https://www.youtube.com/watch?v=tVlBHpf4E5Q",
          "source_tier": 5
        },
        {
          "status": "proposed",
          "effective_at": "2026-07-22",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Construction is expected to begin in 2028 and finish by 2032, with operations planned from 2028; project discussions began in November 2023, dates also on WTOC and the county video",
          "source_url": "https://www.youtube.com/watch?v=tVlBHpf4E5Q",
          "source_tier": 5
        },
        {
          "status": "proposed",
          "effective_at": "2026-07-22",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Campus will cover more than 1,400 acres on McCall Road in Effingham County",
          "source_url": "https://www.youtube.com/watch?v=tVlBHpf4E5Q",
          "source_tier": 5
        },
        {
          "status": "proposed",
          "effective_at": "2026-07-22",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "OpenAI proposes a $20 billion data center campus in Effingham County",
          "source_url": "https://www.youtube.com/watch?v=tVlBHpf4E5Q",
          "source_tier": 5
        },
        {
          "status": "proposed",
          "effective_at": "2026-07-22",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "25 year agreement with Georgia Power",
          "source_url": "https://www.prnewswire.com/news-releases/georgia-power-to-serve-openai-project-in-effingham-county-302832224.html",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-07-22",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "OpenAI announced plans for a new project in Effingham County, Georgia, about 45 minutes outside of Savannah",
          "source_url": "https://www.prnewswire.com/news-releases/georgia-power-to-serve-openai-project-in-effingham-county-302832224.html",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "phoenixnap-phoenixnap-atlanta-marietta-ga",
      "name": "phoenixNAP Atlanta",
      "summary": "PhoenixNAP lists PhoenixNAP ATLANTA at 1130 Powers Ferry Place, Marietta, GA on its interconnection and facility directory.",
      "state": "GA",
      "city": "Marietta",
      "county": "Cobb County",
      "status": "operational",
      "developer": "phoenixNAP",
      "capacity_mw": null,
      "latitude": 33.927915,
      "longitude": -84.481824,
      "location_precision": "address",
      "location_source": "https://phoenixnap.com/data-centers/atlanta",
      "location_verified_at": null,
      "coordinate_source": "phoenixNAP Atlanta facility specification",
      "location_last_verified": null,
      "site_address": "1130 Powers Ferry Pl SE, Marietta, GA 30067",
      "site_address_source_url": "https://phoenixnap.com/data-centers/atlanta",
      "published": "2026-10-21",
      "last_verified": "2026-10-26",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://phoenixnap.com/data-centers/atlanta",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/phoenixnap-phoenixnap-atlanta-marietta-ga",
      "source": "https://phoenixnap.com/data-centers/atlanta",
      "basis": "official_record",
      "sources": [
        {
          "title": "phoenixNAP: Atlanta (Marietta) Data Center Specification",
          "url": "https://phoenixnap.com/data-centers/atlanta",
          "publisher": "phoenixNAP",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-26",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary Georgia DCA DRI filing, EPA ECHO permit, or operator campus specification.",
          "source_url": "https://phoenixnap.com/data-centers/atlanta",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "qts-atlanta-1-ga",
      "name": "QTS Atlanta Metro (ATL1)",
      "summary": "QTS Data Centers lists a data center at Atlanta, Georgia among the sites it operates.",
      "state": "GA",
      "city": "Atlanta",
      "county": "Fulton County",
      "status": "operational",
      "developer": "QTS Data Centers",
      "capacity_mw": null,
      "latitude": 33.777526,
      "longitude": -84.421036,
      "location_precision": "address",
      "location_source": "https://www.qtsdatacenters.com/data-centers/atlanta-metro",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "QTS Atlanta Metro (ATL1) campus specification",
      "location_last_verified": "2026-09-14",
      "site_address": "1033 Jefferson St NW, Atlanta, GA 30318",
      "site_address_source_url": "https://www.qtsdatacenters.com/data-centers/atlanta-metro",
      "published": "2026-09-14",
      "last_verified": "2026-10-26",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.qtsdatacenters.com/data-centers/atlanta-metro",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/qts-atlanta-1-ga",
      "source": "https://q.com/data-centers/",
      "basis": "official_record",
      "sources": [
        {
          "title": "QTS Data Centers: All locations",
          "url": "https://q.com/data-centers/",
          "publisher": "QTS Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "QTS Data Centers lists QTS Atlanta 1 at Atlanta, Georgia on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://q.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "qts-augusta-ga",
      "name": "QTS Augusta Data Center Campus",
      "summary": "QTS Data Centers lists a data center at Augusta, Georgia and says it is being built.",
      "state": "GA",
      "city": "Augusta",
      "county": "Richmond County",
      "status": "under_construction",
      "developer": "QTS Data Centers",
      "capacity_mw": null,
      "latitude": 33.3685,
      "longitude": -81.9742,
      "location_precision": "parcel",
      "location_source": "https://www.qtsdatacenters.com/data-centers/augusta",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "QTS Augusta campus specification and Augusta Economic Development Authority parcel record",
      "location_last_verified": "2026-09-14",
      "site_address": "1568 Doug Barnard Pkwy, Augusta, GA 30906",
      "site_address_source_url": "https://www.qtsdatacenters.com/data-centers/augusta",
      "published": "2026-09-14",
      "last_verified": "2026-10-26",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 8,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.qtsdatacenters.com/data-centers/augusta",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/qts-augusta-ga",
      "source": "https://q.com/data-centers/",
      "basis": "official_record",
      "sources": [
        {
          "title": "QTS Data Centers: All locations",
          "url": "https://q.com/data-centers/",
          "publisher": "QTS Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "QTS Data Centers lists QTS Augusta at Augusta, Georgia on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://q.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "qts-blakely-ga",
      "name": "QTS Blakely Data Center Campus",
      "summary": "QTS Data Centers lists a data center at Blakely, Georgia and says it is being built.",
      "state": "GA",
      "city": "Blakely",
      "county": "Early County",
      "status": "under_construction",
      "developer": "QTS Data Centers",
      "capacity_mw": null,
      "latitude": 31.3654,
      "longitude": -84.9182,
      "location_precision": "parcel",
      "location_source": "https://q.com/data-centers/",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "QTS Blakely campus specification and Early County Development Authority parcel record",
      "location_last_verified": "2026-09-14",
      "site_address": "US Hwy 27 and Haleys Trail, Blakely, GA 39823",
      "site_address_source_url": "https://q.com/data-centers/",
      "published": "2026-09-14",
      "last_verified": "2026-10-26",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 6,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://q.com/data-centers/",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/qts-blakely-ga",
      "source": "https://www.aol.com/articles/early-county-schools-sees-early-172830000.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "Early County Schools sees early investment from data center project - AOL.com",
          "url": "https://www.aol.com/articles/early-county-schools-sees-early-172830000.html",
          "publisher": "AOL.com",
          "date": "2026-09-28",
          "source_tier": 4
        },
        {
          "title": "QTS Data Centers: All locations",
          "url": "https://q.com/data-centers/",
          "publisher": "QTS Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "QTS Announces $28.75M Community Investment in Georgia - Construction Owners",
          "url": "https://www.constructionowners.com/news/qts-announces-28-75m-community-investment-for-georgia-data-center-development",
          "publisher": "Construction Owners",
          "date": "2026-08-22",
          "source_tier": 4
        },
        {
          "title": "QTS announces community investment in Blakely and Early County - Yahoo",
          "url": "https://www.yahoo.com/news/us/articles/qts-announces-community-investment-blakely-225902933.html",
          "publisher": "Yahoo",
          "date": "2026-08-14",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "QTS Data Centers lists QTS Blakely at Blakely, Georgia on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://q.com/data-centers/",
          "source_tier": 2
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-22",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-22",
          "summary": "QTS will make $7.5 million annual payments for three years beginning in December 2026 before construction starts",
          "source_url": "https://www.constructionowners.com/news/qts-announces-28-75m-community-investment-for-georgia-data-center-development",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-22",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-22",
          "summary": "Data center campus will use closed loop cooling system that consumes no water for cooling once operational",
          "source_url": "https://www.constructionowners.com/news/qts-announces-28-75m-community-investment-for-georgia-data-center-development",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-22",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-22",
          "summary": "QTS Data Centers will invest at least $28.75 million in community betterment fund for Blakely and Early County Georgia data center development",
          "source_url": "https://www.constructionowners.com/news/qts-announces-28-75m-community-investment-for-georgia-data-center-development",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-14",
          "summary": "QTS announces community investment in Blakely and Early County",
          "source_url": "https://www.yahoo.com/news/us/articles/qts-announces-community-investment-blakely-225902933.html",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "qts-fayetteville-ga",
      "name": "QTS Atlanta Metro Fayetteville (ATL2)",
      "summary": "QTS Data Centers lists a data center at Fayetteville, Georgia and says it is being built.",
      "state": "GA",
      "city": "Fayetteville",
      "county": "Fayette County",
      "status": "operational",
      "developer": "QTS Data Centers",
      "capacity_mw": null,
      "latitude": 33.448789,
      "longitude": -84.522289,
      "location_precision": "address",
      "location_source": "https://www.qtsdatacenters.com/data-centers/fayetteville",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "QTS Atlanta Metro Fayetteville (ATL2) campus specification",
      "location_last_verified": "2026-09-14",
      "site_address": "1435 Hwy 54 W, Fayetteville, GA 30214",
      "site_address_source_url": "https://www.qtsdatacenters.com/data-centers/fayetteville",
      "published": "2026-09-14",
      "last_verified": "2026-10-26",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 16,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.qtsdatacenters.com/data-centers/fayetteville",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/qts-fayetteville-ga",
      "source": "https://q.com/data-centers/",
      "basis": "official_record",
      "sources": [
        {
          "title": "QTS Data Centers: All locations",
          "url": "https://q.com/data-centers/",
          "publisher": "QTS Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "QTS Data Centers lists QTS Fayetteville at Fayetteville, Georgia on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://q.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "qts-suwanee-1-ga",
      "name": "QTS Suwanee (SUW1)",
      "summary": "QTS Data Centers lists a data center at Suwanee, Georgia among the sites it operates.",
      "state": "GA",
      "city": "Suwanee",
      "county": "Gwinnett County",
      "status": "operational",
      "developer": "QTS Data Centers",
      "capacity_mw": null,
      "latitude": 34.038936,
      "longitude": -84.042965,
      "location_precision": "permit_point",
      "location_source": "https://echo.epa.gov/detailed-facility-report?fid=110038104217",
      "location_verified_at": "2026-10-04",
      "coordinate_source": "EPA ECHO Detailed Facility Report 110038104217",
      "location_last_verified": "2026-10-04",
      "site_address": "300 Satellite Blvd NW, Suwanee, GA 30024",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110038104217",
      "published": "2026-09-14",
      "last_verified": "2026-10-26",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.qtsdatacenters.com/data-centers/suwanee",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/qts-suwanee-1-ga",
      "source": "https://q.com/data-centers/",
      "basis": "official_record",
      "sources": [
        {
          "title": "QTS Data Centers: All locations",
          "url": "https://q.com/data-centers/",
          "publisher": "QTS Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Quality Technology Services, Suwanee",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110038104217",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "QTS Data Centers lists QTS Suwanee 1 at Suwanee, Georgia on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://q.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "serverfarm-serverfarm-atl1-atlanta-suwanee-ga",
      "name": "Serverfarm Atlanta (ATL1 Suwanee)",
      "summary": "Serverfarm lists Serverfarm ATL1 Atlanta at 305 Satellite Blvd, Suwanee, GA on its interconnection and facility directory.",
      "state": "GA",
      "city": "Suwanee",
      "county": "Gwinnett County",
      "status": "operational",
      "developer": "Serverfarm",
      "capacity_mw": 14,
      "latitude": 34.036063,
      "longitude": -84.063817,
      "location_precision": "address",
      "location_source": "https://www.serverfarmllc.com/locations/atlanta-atl1/",
      "location_verified_at": null,
      "coordinate_source": "Serverfarm ATL1 Suwanee facility specification",
      "location_last_verified": null,
      "site_address": "305 Satellite Blvd NW, Suwanee, GA 30024",
      "site_address_source_url": "https://www.serverfarmllc.com/locations/atlanta-atl1/",
      "published": "2026-10-21",
      "last_verified": "2026-10-26",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.serverfarmllc.com/locations/atlanta-atl1/",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/serverfarm-serverfarm-atl1-atlanta-suwanee-ga",
      "source": "https://www.serverfarmllc.com/locations/atlanta-atl1/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Serverfarm: Atlanta (ATL1 Suwanee) Data Center Specification",
          "url": "https://www.serverfarmllc.com/locations/atlanta-atl1/",
          "publisher": "Serverfarm",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-26",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary Georgia DCA DRI filing, EPA ECHO permit, or operator campus specification.",
          "source_url": "https://www.serverfarmllc.com/locations/atlanta-atl1/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "stack-atl01-alpharetta-ga",
      "name": "STACK Infrastructure ATL01 Alpharetta",
      "summary": "STACK Infrastructure lists a data center at Alpharetta, Georgia among the sites it operates.",
      "state": "GA",
      "city": "Alpharetta",
      "county": "Fulton County",
      "status": "operational",
      "developer": "STACK Infrastructure",
      "capacity_mw": null,
      "latitude": 34.0912,
      "longitude": -84.2548,
      "location_precision": "address",
      "location_source": "https://www.stackinfra.com/locations/americas/atlanta/",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "STACK Infrastructure ATL01 Alpharetta specification",
      "location_last_verified": "2026-09-14",
      "site_address": "5855 Windward Pkwy, Alpharetta, GA 30005",
      "site_address_source_url": "https://www.stackinfra.com/locations/americas/atlanta/",
      "published": "2026-09-14",
      "last_verified": "2026-10-26",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.stackinfra.com/locations/americas/atlanta/",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/stack-atl01-alpharetta-ga",
      "source": "https://www.stackinfra.com/locations/",
      "basis": "official_record",
      "sources": [
        {
          "title": "STACK Infrastructure: Americas locations",
          "url": "https://www.stackinfra.com/locations/",
          "publisher": "STACK Infrastructure",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "STACK Infrastructure: STACK ATL01",
          "url": "https://www.stackinfra.com/locations/americas/atlanta/",
          "publisher": "STACK Infrastructure",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "STACK Infrastructure lists STACK ATL01 at Alpharetta, Georgia on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.stackinfra.com/locations/americas/atlanta/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "stack-atl02-lithia-springs-ga",
      "name": "STACK Infrastructure ATL02 Lithia Springs",
      "summary": "STACK Infrastructure lists a data center at Lithia Springs, Georgia among the sites it operates.",
      "state": "GA",
      "city": "Lithia Springs",
      "county": "Douglas County",
      "status": "operational",
      "developer": "STACK Infrastructure",
      "capacity_mw": null,
      "latitude": 33.781114,
      "longitude": -84.6488295,
      "location_precision": "address",
      "location_source": "https://echo.epa.gov/detailed-facility-report?fid=110071525391",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO Detailed Facility Report 110071525391",
      "location_last_verified": "2026-09-14",
      "site_address": "808 Factory Shoals Rd, Lithia Springs, GA 30122",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071525391",
      "published": "2026-09-14",
      "last_verified": "2026-10-26",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.stackinfra.com/locations/americas/atlanta/",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/stack-atl02-lithia-springs-ga",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110071525391",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Stack, Lithia Springs",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071525391",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "STACK Infrastructure: Americas locations",
          "url": "https://www.stackinfra.com/locations/",
          "publisher": "STACK Infrastructure",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "STACK Infrastructure: STACK ATL02",
          "url": "https://www.stackinfra.com/locations/americas/atlanta/",
          "publisher": "STACK Infrastructure",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "STACK Infrastructure lists STACK ATL02 at Lithia Springs, Georgia on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.stackinfra.com/locations/americas/atlanta/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "strategic-real-estate-partners-rockdale-county-data-center-campus-conyers-ga",
      "name": "DC BLOX Conyers Data Center Campus (ATL East)",
      "summary": "Strategic Real Estate Partners filed state paperwork for a three warehouse, 837,500 square foot data center campus on 53 acres near Conyers in Rockdale County, east of Atlanta.",
      "state": "GA",
      "city": "Conyers",
      "county": "Rockdale County",
      "status": "under_construction",
      "developer": "DC BLOX / Strategic Real Estate Partners",
      "capacity_mw": null,
      "latitude": 33.6615,
      "longitude": -84.0324,
      "location_precision": "parcel",
      "location_source": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4120",
      "location_verified_at": null,
      "coordinate_source": "Georgia DCA DRI Filing #4120 (DC BLOX ATL East, Rockdale County)",
      "location_last_verified": null,
      "site_address": "2020 Old Covington Hwy SW, Conyers, GA 30012",
      "site_address_source_url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4120",
      "published": "2026-10-21",
      "last_verified": "2026-10-26",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "permit",
      "buildings_source_url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4120",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/strategic-real-estate-partners-rockdale-county-data-center-campus-conyers-ga",
      "source": "https://www.ajc.com/news/atlanta-news/large-data-center-planned-near-conyers-east-of-atlanta/WNCHKV23WZBNFIYAGIFOYZE6LY/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Large data center campus proposed for 53-acre site east of Atlanta - The Atlanta Journal-Constitution",
          "url": "https://www.ajc.com/news/atlanta-news/large-data-center-planned-near-conyers-east-of-atlanta/WNCHKV23WZBNFIYAGIFOYZE6LY/",
          "publisher": "The Atlanta Journal-Constitution",
          "date": "2024-02-16",
          "source_tier": 1
        },
        {
          "title": "Georgia Department of Community Affairs: DRI Filing #4120 (DC BLOX ATL East, Conyers, Rockdale County)",
          "url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4120",
          "publisher": "Georgia Department of Community Affairs",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "permitting",
          "effective_at": "2024-02-16",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Strategic Real Estate Partners filed state paperwork for a three warehouse, 837,500 square foot data center campus on 53 acres near Conyers in Rockdale County, east of Atlanta.",
          "source_url": "https://www.ajc.com/news/atlanta-news/large-data-center-planned-near-conyers-east-of-atlanta/WNCHKV23WZBNFIYAGIFOYZE6LY/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "switch-atlanta-campus-ga",
      "name": "Switch The Keep Campus (Atlanta)",
      "summary": "Switch lists a data center at Atlanta, Georgia among the sites it operates.",
      "state": "GA",
      "city": "Lithia Springs",
      "county": "Douglas County",
      "status": "operational",
      "developer": "Switch",
      "capacity_mw": null,
      "latitude": 33.7324,
      "longitude": -84.6345,
      "location_precision": "address",
      "location_source": "https://www.switch.com/atlanta/",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "Switch The Keep Campus specification (Lithia Springs, Douglas County)",
      "location_last_verified": "2026-09-14",
      "site_address": "2500 Riverside Pkwy, Lithia Springs, GA 30122",
      "site_address_source_url": "https://www.switch.com/atlanta/",
      "published": "2026-09-14",
      "last_verified": "2026-10-26",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "energized",
      "interconnection_source_url": "https://psc.ga.gov/",
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 4,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.switch.com/atlanta/",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/switch-atlanta-campus-ga",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110070892412",
      "basis": "official_record",
      "sources": [
        {
          "title": "US EPA ECHO Detailed Facility Report: Switch The Keep Campus Lithia Springs (FRS 110070892412)",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110070892412",
          "publisher": "US Environmental Protection Agency",
          "date": null,
          "source_tier": 1
        },
        {
          "title": "Switch: Locations",
          "url": "https://www.switch.com/locations/",
          "publisher": "Switch",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Switch: Switch Atlanta campus",
          "url": "https://www.switch.com/atlanta/",
          "publisher": "Switch",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "US EPA ECHO Detailed Facility Report: Switch Keep Campus Lithia Springs (FRS 110070841920, Georgia EPD Air Quality Permit)",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110070841920",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "Georgia Public Service Commission Docket 55378: Georgia Power Large Load Integrated Resource Plan Update",
          "url": "https://psc.ga.gov/",
          "publisher": "Georgia Public Service Commission",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Switch lists Switch Atlanta campus at Atlanta, Georgia on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.switch.com/atlanta/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "t5-data-centers-fairburn-campus-ga",
      "name": "T5 Data Centers Fairburn Campus",
      "summary": "T5 Data Centers is planning a data center campus in Fairburn, Georgia.",
      "state": "GA",
      "city": "Fairburn",
      "county": "Fulton County",
      "status": "approved",
      "developer": "T5 Data Centers",
      "capacity_mw": null,
      "latitude": 33.5684,
      "longitude": -84.5982,
      "location_precision": "parcel",
      "location_source": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4222",
      "location_verified_at": null,
      "coordinate_source": "Georgia DCA DRI Filing #4222 (T5 Data Center Fairburn, Fulton County)",
      "location_last_verified": null,
      "site_address": "7635 Bohannon Rd, Fairburn, GA 30213",
      "site_address_source_url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4222",
      "published": "2026-10-21",
      "last_verified": "2026-10-26",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "permit",
      "buildings_source_url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4222",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/t5-data-centers-fairburn-campus-ga",
      "source": "https://www.bisnow.com/news/atlanta/data-center/t5-plotting-data-center-campus-in-fairburn-124663",
      "basis": "official_record",
      "sources": [
        {
          "title": "T5 Plotting Data Center Campus In Fairburn - Bisnow",
          "url": "https://www.bisnow.com/news/atlanta/data-center/t5-plotting-data-center-campus-in-fairburn-124663",
          "publisher": "Bisnow",
          "date": "2024-06-12",
          "source_tier": 1
        },
        {
          "title": "Georgia Department of Community Affairs: DRI Filing #4222 (T5 Data Center Fairburn, Fulton County)",
          "url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4222",
          "publisher": "Georgia Department of Community Affairs",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2024-06-12",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "T5 Data Centers is planning a data center campus in Fairburn, Georgia.",
          "source_url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4222",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "trammell-crow-forsyth-data-center-campus-ga",
      "name": "Bolingbroke Technology Campus (Forsyth)",
      "summary": "Trammell Crow Company proposes a $21 billion, 1,632 acre data center campus along I 75 in Forsyth, Georgia, comprising up to 12 million square feet across 21 data center warehouses.",
      "state": "GA",
      "city": "Forsyth",
      "county": "Monroe County",
      "status": "permitting",
      "developer": "Trammell Crow Company",
      "capacity_mw": null,
      "latitude": 32.9612,
      "longitude": -83.8295,
      "location_precision": "parcel",
      "location_source": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4446",
      "location_verified_at": null,
      "coordinate_source": "Georgia DCA DRI Filing #4446 (Bolingbroke Technology Campus, Monroe County)",
      "location_last_verified": null,
      "site_address": "US Hwy 41 S (Bolingbroke), Forsyth, GA 31029",
      "site_address_source_url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4446",
      "published": "2026-10-21",
      "last_verified": "2026-10-26",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 12,
      "buildings_basis": "permit",
      "buildings_source_url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4446",
      "buildings_verified_at": "2026-10-26",
      "record_url": "https://datacenterrecord.org/projects/trammell-crow-forsyth-data-center-campus-ga",
      "source": "https://www.ajc.com/business/2025/11/21b-data-center-proposal-aims-to-become-one-of-georgias-largest/",
      "basis": "official_record",
      "sources": [
        {
          "title": "$21B data center proposal aims to become one of Georgia’s largest - The Atlanta Journal-Constitution",
          "url": "https://www.ajc.com/business/2025/11/21b-data-center-proposal-aims-to-become-one-of-georgias-largest/",
          "publisher": "The Atlanta Journal-Constitution",
          "date": "2025-11-28",
          "source_tier": 1
        },
        {
          "title": "Georgia Department of Community Affairs: DRI Filing #4446 (Bolingbroke Technology Campus, Monroe County)",
          "url": "https://apps.dca.ga.gov/DRI/AdditionalForm.aspx?driid=4446",
          "publisher": "Georgia Department of Community Affairs",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2025-11-28",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Trammell Crow Company proposes a $21 billion, 1,632 acre data center campus along I 75 in Forsyth, Georgia, comprising up to 12 million square feet across 21 data center warehouses.",
          "source_url": "https://www.ajc.com/business/2025/11/21b-data-center-proposal-aims-to-become-one-of-georgias-largest/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "edged-energy-prichard-data-center-al",
      "name": "Edged Energy Prichard Data Center",
      "summary": "Edged Energy proposed a $93 million data center on Telegraph Road in Prichard, prompting the city council to weigh a 480 day moratorium on new data center permits.",
      "state": "AL",
      "city": "Prichard",
      "county": "Mobile County",
      "status": "rumored",
      "developer": "Edged Energy",
      "capacity_mw": null,
      "latitude": 30.77334,
      "longitude": -88.13142,
      "location_precision": "city",
      "location_source": null,
      "location_verified_at": null,
      "coordinate_source": null,
      "location_last_verified": null,
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-10-21",
      "last_verified": "2026-10-21",
      "cooling_type": "closed_loop_liquid",
      "cooling_type_source_url": "https://yellowhammernews.com/questions-over-foreign-influence-in-data-center-opposition-reach-alabama/",
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/edged-energy-prichard-data-center-al",
      "source": "https://yellowhammernews.com/questions-over-foreign-influence-in-data-center-opposition-reach-alabama/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Alabamians target of foreign influence campaign stoking opposition to data centers - Yellowhammer News",
          "url": "https://yellowhammernews.com/questions-over-foreign-influence-in-data-center-opposition-reach-alabama/",
          "publisher": "Yellowhammer News",
          "date": "2026-07-30",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "oppidan-data-center-mgm-montgomery-al",
      "name": "Oppidan Data Center, MGM",
      "summary": "The EPA's facility registry lists Oppidan Data Center, MGM at 6220 Perimeter Parkway, Montgomery, AL 36116 in Montgomery, Alabama, with a water permit.",
      "state": "AL",
      "city": "Montgomery",
      "county": "Montgomery County",
      "status": "not_verified",
      "developer": null,
      "capacity_mw": null,
      "latitude": 32.30009,
      "longitude": -86.20931,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110072085633: the registry placed its point by address matching house number, accurate to 50 m",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-20",
      "site_address": "6220 Perimeter Parkway, Montgomery, AL 36116",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072085633",
      "published": "2026-10-20",
      "last_verified": "2026-10-20",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/oppidan-data-center-mgm-montgomery-al",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110072085633",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Oppidan Data Center, MGM",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110072085633",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "brookwood-proposed-data-center-al",
      "name": "Brookwood Proposed Data Center",
      "summary": "Brookwood residents voiced concerns over a potential data center project in their area, and a town hall on the topic was held.",
      "state": "AL",
      "city": "Brookwood",
      "county": "Tuscaloosa County",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 33.20667,
      "longitude": -87.53472,
      "location_precision": "county",
      "location_source": "County seat (Tuscaloosa), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-10-06",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/brookwood-proposed-data-center-al",
      "source": "https://www.tuscaloosanews.com/story/news/local/2026/08/25/data-center-and-surveillance-forum-planned-by-indivisible-west-alabama/91446557007/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Tuscaloosa group plans public forum on data centers, surveillance tech - The Tuscaloosa News",
          "url": "https://www.tuscaloosanews.com/story/news/local/2026/08/25/data-center-and-surveillance-forum-planned-by-indivisible-west-alabama/91446557007/",
          "publisher": "The Tuscaloosa News",
          "date": "2026-08-25",
          "source_tier": 4
        },
        {
          "title": "Tuberville Gets $25,000 from Data Center Developer With Land in Brookwood - Tuscaloosa Thread",
          "url": "https://tuscaloosathread.com/tuberville-gets-25k-contribution-applied-digital/",
          "publisher": "Tuscaloosa Thread",
          "date": "2026-08-28",
          "source_tier": 4
        },
        {
          "title": "Brookwood residents continue to voice concerns over potential data center - cbs42.com",
          "url": "https://www.yahoo.com/news/articles/brookwood-residents-continue-voice-concerns-021054028.html",
          "publisher": "cbs42.com",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "Trump Pushes Data Centers Amid National Debate, Brookwood Town Hall Tonight - tuscaloosathread.com",
          "url": "https://tuscaloosathread.com/trump-backs-data-centers-brookwood-meets/",
          "publisher": "tuscaloosathread.com",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "From land purchase to power: How data center projects move forward in central Alabama - WBMA",
          "url": "https://abc3340.com/news/local/from-land-purchase-to-power-how-data-center-projects-move-forward-in-central-alabama",
          "publisher": "WBMA",
          "date": "2026-09-08",
          "source_tier": 4
        },
        {
          "title": "Tuscaloosa County approves controversial $3 billion AI hub - tuscaloosanews.com",
          "url": "https://www.tuscaloosanews.com/story/news/local/2026/09/25/data-center-brookwood-approved/91929416007/",
          "publisher": "tuscaloosanews.com",
          "date": "2026-09-25",
          "source_tier": 4
        },
        {
          "title": "TCEDA: $3.2B Brookwood Data Center To Generate $131.5M For Area Schools - Patch",
          "url": "https://patch.com/alabama/tuscaloosa/tceda-3-2b-brookwood-data-center-generate-131-5m-area-schools",
          "publisher": "Patch",
          "date": "2026-09-24",
          "source_tier": 1
        },
        {
          "title": "Applied Digital confirms $3.2 billion data center campus in Brookwood - WBRC",
          "url": "https://www.wbrc.com/2026/09/24/applied-digital-confirms-32-billion-data-center-campus-brookwood/",
          "publisher": "WBRC",
          "date": "2026-09-24",
          "source_tier": 1
        },
        {
          "title": "Tuscaloosa County lands $3.2 billion data center , first in Alabama to pay 'community benefits,' $270 million over 20 years - Yellowhammer News",
          "url": "https://yellowhammernews.com/tuscaloosa-county-lands-3-2-billion-data-center-first-in-alabama-to-pay-community-benefits-270-million-over-20-years/",
          "publisher": "Yellowhammer News",
          "date": "2026-09-24",
          "source_tier": 1
        },
        {
          "title": "Applied Digital holds town hall on AI data center campus in Brookwood - WBRC 6 News",
          "url": "https://www.wbrc.com/2026/10/02/applied-digital-holds-town-hall-ai-data-center-campus-brookwood/",
          "publisher": "WBRC 6 News",
          "date": "2026-10-02",
          "source_tier": 1
        },
        {
          "title": "Brookwood Council Vote Clears Last Zoning Hurdle for One of Major 3 Data Center Projects - Tuscaloosa Thread",
          "url": "https://tuscaloosathread.com/brookwood-rezoning-vote-youngwoo-data-center/",
          "publisher": "Tuscaloosa Thread",
          "date": "2026-09-16",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [
          "Kayvens LLC (affiliated with Meta)"
        ],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": "https://www.tuscaloosanews.com/story/news/local/2026/09/25/data-center-brookwood-approved/91929416007/"
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-09-08",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-08",
          "summary": "Brookwood has a possible data center project near Brookwood Middle School",
          "source_url": "https://abc3340.com/news/local/from-land-purchase-to-power-how-data-center-projects-move-forward-in-central-alabama",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-08-28",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-28",
          "summary": "Applied Digital owns 1,300 acres in Brookwood",
          "source_url": "https://tuscaloosathread.com/tuberville-gets-25k-contribution-applied-digital/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-08-25",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-25",
          "summary": "Brookwood data center proposal is 2 million square foot facility on Brookwood Parkway near Brookwood Middle School",
          "source_url": "https://www.tuscaloosanews.com/story/news/local/2026/08/25/data-center-and-surveillance-forum-planned-by-indivisible-west-alabama/91446557007/",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "google-bridgeport-data-center-al",
      "name": "Google Bridgeport data center",
      "summary": "Google's data center campus in Bridgeport, Jackson County, Alabama, operating since 2019 on a site of more than 600 acres.",
      "state": "AL",
      "city": "Bridgeport",
      "county": "Jackson County",
      "status": "rumored",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 34.930645,
      "longitude": -85.731149,
      "location_precision": "permit_point",
      "location_source": "https://echo.epa.gov/detailed-facility-report?fid=110070571480",
      "location_verified_at": "2026-10-04",
      "coordinate_source": "https://echo.epa.gov/detailed-facility-report?fid=110070571480",
      "location_last_verified": "2026-10-04",
      "site_address": "48809 Alabama Hwy 277, Bridgeport, AL 35740",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070571480",
      "published": "2026-09-08",
      "last_verified": "2026-10-04",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-bridgeport-data-center-al",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110070571480",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Google LLC",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110070571480",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Inside Google's AI data centers",
          "url": "https://www.youtube.com/watch?v=TfW5pWpsHAo",
          "publisher": "YouTube",
          "date": "2026-06-19",
          "source_tier": 5
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-06-19",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-06-19",
          "summary": "The data center began operating in 2019",
          "source_url": "https://www.youtube.com/watch?v=TfW5pWpsHAo",
          "source_tier": 5
        },
        {
          "status": "rumored",
          "effective_at": "2026-06-19",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-06-19",
          "summary": "Less than a quarter of the campus property has been developed so far",
          "source_url": "https://www.youtube.com/watch?v=TfW5pWpsHAo",
          "source_tier": 5
        },
        {
          "status": "rumored",
          "effective_at": "2019-01-01",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-06-19",
          "summary": "Google's Bridgeport, Alabama data center began operating in 2019 (the video names the year only); corrects the entry dated June 19, 2026, which carried the video's upload date",
          "source_url": "https://www.youtube.com/watch?v=TfW5pWpsHAo",
          "source_tier": 5
        }
      ]
    },
    {
      "slug": "meta-huntsville-data-center-al",
      "name": "Meta Huntsville Data Center",
      "summary": "Meta lists a data center at Huntsville, Alabama among the sites it operates.",
      "state": "AL",
      "city": "Huntsville",
      "county": "Madison County",
      "status": "operational",
      "developer": "Meta",
      "capacity_mw": null,
      "latitude": 34.84103,
      "longitude": -86.63394,
      "location_precision": "permit_point",
      "location_source": "https://echo.epa.gov/detailed-facility-report?fid=110070255546",
      "location_verified_at": "2026-10-04",
      "coordinate_source": "https://echo.epa.gov/detailed-facility-report?fid=110070255546",
      "location_last_verified": "2026-10-04",
      "site_address": "5400 Prosperity DR NW, Huntsville, AL 35810",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070255546",
      "published": "2026-09-14",
      "last_verified": "2026-10-04",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/meta-huntsville-data-center-al",
      "source": "https://huntsvillebusinessjournal.com/news/2026/09/23/are-more-data-centers-coming-to-north-alabama-what-local-leaders-are-saying/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Are More Data Centers Coming To North Alabama? What Local Leaders Are Saying - Huntsville Business Journal",
          "url": "https://huntsvillebusinessjournal.com/news/2026/09/23/are-more-data-centers-coming-to-north-alabama-what-local-leaders-are-saying/",
          "publisher": "Huntsville Business Journal",
          "date": "2026-09-23",
          "source_tier": 4
        },
        {
          "title": "Meta: Our U.S. data center fleet",
          "url": "https://datacenters.atmeta.com/us-locations/",
          "publisher": "Meta",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Starbelt, North Huntsville",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110070255546",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Meta lists Meta Huntsville Data Center at Huntsville, Alabama on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.atmeta.com/us-locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "westover-proposed-data-center-al",
      "name": "Westover Proposed Data Center",
      "summary": "A proposed data center in Westover prompted a town hall and a 6 month moratorium approved by the city.",
      "state": "AL",
      "city": "Westover",
      "county": "Shelby County",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 33.18355,
      "longitude": -86.60936,
      "location_precision": "county",
      "location_source": "County seat (Columbiana), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": 448,
      "site_acres_disclosed_as": "third_party_estimate",
      "site_acres_source_url": "https://www.yahoo.com/news/us/articles/alabama-westover-delays-data-center-103500955.html",
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/westover-proposed-data-center-al",
      "source": "https://www.yahoo.com/news/us/articles/alabama-westover-delays-data-center-103500955.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "In Alabama, Westover delays data center moratorium vote, calls for town hall",
          "url": "https://www.yahoo.com/news/us/articles/alabama-westover-delays-data-center-103500955.html",
          "publisher": "www.yahoo.com",
          "date": "2026-08-17",
          "source_tier": 4
        },
        {
          "title": "City of Westover hosting town hall on proposed data center Thursday night - WBRC 6 News",
          "url": "https://www.wbrc.com/2026/08/20/city-westover-hosting-town-hall-proposed-data-center-thursday-night/",
          "publisher": "WBRC 6 News",
          "date": "2026-08-20",
          "source_tier": 4
        },
        {
          "title": "Westover approves 6-month moratorium on data centers - WBRC 6 News",
          "url": "https://www.wbrc.com/2026/08/19/westover-approves-6-month-moratorium-data-centers/",
          "publisher": "WBRC 6 News",
          "date": "2026-08-18",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-08-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-17",
          "summary": "The proposed data center project is awaiting engineering confirmation from Alabama Power regarding sufficient incremental electricity capacity and from Shelby County water authority regarding water capacity.",
          "source_url": "https://www.yahoo.com/news/us/articles/alabama-westover-delays-data-center-103500955.html",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "data-center-near-tuscaloosa-al",
      "name": "Data Center near Tuscaloosa",
      "summary": "A data center proposed near Tuscaloosa drew organized resident opposition according to AL.com.",
      "state": "AL",
      "city": "Tuscaloosa",
      "county": "Tuscaloosa County",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 33.20667,
      "longitude": -87.53472,
      "location_precision": "county",
      "location_source": "County seat (Tuscaloosa), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/data-center-near-tuscaloosa-al",
      "source": "https://dothaneagle.com/news/state-regional/alabama/article_03784bfe-a5fc-56bb-a4e5-b8aafc061db1.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "Tuberville's plan on data centers has good ideas, flaws | BRIAN LYMAN - The Tuscaloosa News",
          "url": "https://dothaneagle.com/news/state-regional/alabama/article_03784bfe-a5fc-56bb-a4e5-b8aafc061db1.html",
          "publisher": "The Tuscaloosa News",
          "date": "2026-09-14",
          "source_tier": 4
        },
        {
          "title": "‘They don’t care’: Residents fight back against data center proposed near Tuscaloosa - AL.com",
          "url": "https://www.al.com/business/2026/08/they-dont-care-residents-fight-back-against-data-center-proposed-near-tuscaloosa.html",
          "publisher": "AL.com",
          "date": "2026-08-22",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "dc-blox-montgomery-data-center-al",
      "name": "DC Blox Montgomery data center",
      "summary": "A DC Blox data center planned at Interstate Industrial Park in Montgomery, Alabama.",
      "state": "AL",
      "city": "Montgomery",
      "county": "Montgomery County",
      "status": "rumored",
      "developer": "DC Blox",
      "capacity_mw": null,
      "latitude": 32.3675,
      "longitude": -86.3,
      "location_precision": "county",
      "location_source": "County seat (Montgomery), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-08",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/dc-blox-montgomery-data-center-al",
      "source": "https://www.madeinalabama.com/2024/11/dc-blox-plans-new-advanced-data-centers-in-montgomery-and-huntsville/",
      "basis": "official_record",
      "sources": [
        {
          "title": "DC BLOX plans new advanced data centers in Montgomery and Huntsville",
          "url": "https://www.madeinalabama.com/2024/11/dc-blox-plans-new-advanced-data-centers-in-montgomery-and-huntsville/",
          "publisher": "www.madeinalabama.com",
          "date": "2024-11-22",
          "source_tier": 4
        },
        {
          "title": "New data center coming to Montgomery",
          "url": "https://www.youtube.com/watch?v=6lAVbIon5FE",
          "publisher": "YouTube",
          "date": "2024-11-27",
          "source_tier": 5
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "lowndes-county-hyperscale-data-center-al",
      "name": "Lowndes County Hyperscale Data Center",
      "summary": "Lowndes County residents demanded transparency regarding a proposed hyperscale data center development.",
      "state": "AL",
      "city": null,
      "county": "Lowndes",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 32.18236,
      "longitude": -86.58047,
      "location_precision": "county",
      "location_source": "County seat (Hayneville), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/lowndes-county-hyperscale-data-center-al",
      "source": "https://www.blackbeltnewsnetwork.com/news/lowndes-county-residents-demand-transparency-in-hyperscale-data-center-development/article_79e738d2-be19-4e7f-9420-e8a10fe87059.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "Lowndes County residents demand transparency in hyperscale data center development - Alabama Reflector",
          "url": "https://www.blackbeltnewsnetwork.com/news/lowndes-county-residents-demand-transparency-in-hyperscale-data-center-development/article_79e738d2-be19-4e7f-9420-e8a10fe87059.html",
          "publisher": "Alabama Reflector",
          "date": "2026-08-25",
          "source_tier": 4
        },
        {
          "title": "More than 1,000 sign petition opposing proposed Lowndes County data center as debate intensifies",
          "url": "https://www.wsfa.com/2026/05/27/more-than-1000-sign-petition-opposing-proposed-lowndes-county-data-center-debate-intensifies/",
          "publisher": "www.wsfa.com",
          "date": "2026-05-26",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "patmos-fairfield-data-center-al",
      "name": "Patmos Fairfield Data Center",
      "summary": "Patmos announced plans for a $150 million data center in Fairfield, Alabama, inside a former Walmart, with residents raising questions and hundreds attending a town hall.",
      "state": "AL",
      "city": "Fairfield",
      "county": "Jefferson",
      "status": "rumored",
      "developer": "Patmos",
      "capacity_mw": null,
      "latitude": 33.5175,
      "longitude": -86.80944,
      "location_precision": "county",
      "location_source": "County seat (Birmingham), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/patmos-fairfield-data-center-al",
      "source": "https://www.wbrc.com/2026/09/11/fairfield-mayor-visits-patmos-campus-kansas-city-company-eyes-city-possible-data-center-development/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Fairfield mayor visits Patmos campus in Kansas City as company eyes city for possible data center development - WBRC",
          "url": "https://www.wbrc.com/2026/09/11/fairfield-mayor-visits-patmos-campus-kansas-city-company-eyes-city-possible-data-center-development/",
          "publisher": "WBRC",
          "date": "2026-09-11",
          "source_tier": 4
        },
        {
          "title": "Patmos executives detail plans for $150 million Fairfield data center - AL.com",
          "url": "https://www.al.com/business/2026/08/patmos-executives-detail-plans-for-150-million-fairfield-data-center.html",
          "publisher": "AL.com",
          "date": "2026-08-13",
          "source_tier": 4
        },
        {
          "title": "New data center plans to move quickly in Fairfield. Residents have questions - wbhm.org",
          "url": "https://www.wbhm.org/local-news/2026-08-14/new-data-center-plans-to-move-quickly-in-fairfield-residents-have-questions",
          "publisher": "wbhm.org",
          "date": "2026-08-14",
          "source_tier": 4
        },
        {
          "title": "Hundreds pack Fairfield town hall over proposed data center inside former Walmart - WBRC 6 News",
          "url": "https://www.wbrc.com/2026/08/13/hundreds-pack-fairfield-town-hall-over-proposed-data-center-inside-former-walmart/",
          "publisher": "WBRC 6 News",
          "date": "2026-08-12",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "qts-bessemer-al",
      "name": "QTS Bessemer",
      "summary": "QTS Data Centers lists a data center at Bessemer, Alabama and says it is being built.",
      "state": "AL",
      "city": "Bessemer",
      "county": "Jefferson County",
      "status": "under_construction",
      "developer": "QTS Data Centers",
      "capacity_mw": null,
      "latitude": 33.3710498,
      "longitude": -86.9725452,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/qts-bessemer-al",
      "source": "https://www.alreporter.com/2026/09/15/conservative-anti-data-center-group-brings-bus-tour-to-bessemer/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Conservative anti data center group brings bus tour to Bessemer - Alabama Political Reporter",
          "url": "https://www.alreporter.com/2026/09/15/conservative-anti-data-center-group-brings-bus-tour-to-bessemer/",
          "publisher": "Alabama Political Reporter",
          "date": "2026-09-15",
          "source_tier": 4
        },
        {
          "title": "QTS Data Centers: All locations",
          "url": "https://q.com/data-centers/",
          "publisher": "QTS Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-15",
          "summary": "Project Marvel data center campus planned to cover roughly 1,600 acres in Bessemer area",
          "source_url": "https://www.alreporter.com/2026/09/15/conservative-anti-data-center-group-brings-bus-tour-to-bessemer/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-15",
          "summary": "Nebius AI data center project planned in Oxmoor Valley near Birmingham",
          "source_url": "https://www.alreporter.com/2026/09/15/conservative-anti-data-center-group-brings-bus-tour-to-bessemer/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "QTS Data Centers lists QTS Bessemer at Bessemer, Alabama on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://q.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "montgomery-meta-investment-al",
      "name": "Montgomery Meta Investment",
      "summary": "Meta published content about investing in Montgomery, Alabama.",
      "state": "AL",
      "city": "Montgomery",
      "county": "Montgomery County",
      "status": "under_construction",
      "developer": "Meta",
      "capacity_mw": null,
      "latitude": 32.3675,
      "longitude": -86.3,
      "location_precision": "county",
      "location_source": "County seat (Montgomery), Wikidata, placed at county level",
      "location_verified_at": "2026-09-23",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-23",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-08",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/montgomery-meta-investment-al",
      "source": "https://www.yahoo.com/news/articles/north-alabama-resident-expresses-concerns-005357449.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "North Alabama resident expresses concerns on rural community impacts from data centers - rocketcitynow.com",
          "url": "https://www.yahoo.com/news/articles/north-alabama-resident-expresses-concerns-005357449.html",
          "publisher": "rocketcitynow.com",
          "date": "2026-08-23",
          "source_tier": 4
        },
        {
          "title": "Solar farm approved for north Baldwin County to power Meta data center",
          "url": "https://www.fox10tv.com/2026/02/05/solar-farm-approved-north-baldwin-county-power-meta-data-center/",
          "publisher": "fox10tv.com",
          "date": "2026-02-05",
          "source_tier": 4
        },
        {
          "title": "Meta to expand data center in Montgomery, increasing total investment to $1.5 billion",
          "url": "https://www.waka.com/2025/09/23/meta-to-expand-data-center-in-montgomery-increasing-total-investment-to-1-5-billion/",
          "publisher": "WAKA 8",
          "date": "2025-09-23",
          "source_tier": 4
        },
        {
          "title": "Meta: Our U.S. data center fleet",
          "url": "https://datacenters.atmeta.com/us-locations/",
          "publisher": "Meta",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Investing in Montgomery, Alabama - Meta Store",
          "url": "https://www.meta.com/actions/building-montgomery-alabama/",
          "publisher": "Meta Store",
          "date": "2026-09-01",
          "source_tier": 2
        },
        {
          "title": "Baldwin County residents fight proposed solar farm that will power Meta data center",
          "url": "https://mynbc15.com/news/local/metas-solar-farm-plans-face-opposition-in-baldwin-county",
          "publisher": "mynbc15.com",
          "date": "2026-02-04",
          "source_tier": 4
        },
        {
          "title": "Meta plans to build $800M data center in Montgomery",
          "url": "https://www.youtube.com/watch?v=ttAdBuGsi1I",
          "publisher": "YouTube",
          "date": "2024-04-01",
          "source_tier": 5
        },
        {
          "title": "Meta turning to mass timber to build more sustainable data centers",
          "url": "https://www.esgdive.com/news/meta-piloting-mass-timber-for-sustainable-data-center-construction-clt-green-building/756843/",
          "publisher": "esgdive.com",
          "date": "2025-08-05",
          "source_tier": 4
        },
        {
          "title": "Hensel Phelps Builds With Mass Timber at Meta Data Center - Dixie Contractor",
          "url": "https://acppubs.com/DXC/article/1FB9B438-hensel-phelps-builds-with-mass-timber-at-meta-data-center",
          "publisher": "Associated Construction Publications",
          "date": "2025-09-12",
          "source_tier": 4
        },
        {
          "title": "Montgomery, we’re growing!",
          "url": "https://datacenters.atmeta.com/2025/09/montgomery-were-growing/",
          "publisher": "Meta Data Centers",
          "date": "2025-09-23",
          "source_tier": 4
        },
        {
          "title": "Meta to significantly expand Montgomery data center",
          "url": "https://www.wsfa.com/2025/09/23/meta-significantly-expand-montgomery-data-center/",
          "publisher": "WSFA",
          "date": "2025-09-23",
          "source_tier": 4
        },
        {
          "title": "Meta to expand Montgomery data center, upping local investments to $1.5 billion",
          "url": "https://www.alreporter.com/2025/09/24/meta-to-expand-montgomery-data-center-upping-local-investments-to-1-5-billion/",
          "publisher": "alreporter.com",
          "date": "2025-09-24",
          "source_tier": 4
        },
        {
          "title": "Meta launches $1B fund to support data center communities including Montgomery",
          "url": "https://yellowhammernews.com/meta-launches-1b-fund-to-support-data-center-communities-including-montgomery/",
          "publisher": "Yellowhammer News",
          "date": "2026-08-11",
          "source_tier": 4
        },
        {
          "title": "$1.5B boost: Montgomery set to become tech hub",
          "url": "https://www.youtube.com/watch?v=7WaZIjzkKOw",
          "publisher": "YouTube",
          "date": null,
          "source_tier": 5
        },
        {
          "title": "Meta to add two more buildings to Alabama campus in Montgomery",
          "url": "https://www.datacenterdynamics.com/en/news/meta-to-add-two-more-buildings-to-alabama-campus-in-montgomery/",
          "publisher": "Data Center Dynamics",
          "date": "2025-09-23",
          "source_tier": 3
        },
        {
          "title": "Meta to expand Montgomery data hub, pushing total investment to $1.5 billion",
          "url": "https://www.madeinalabama.com/2025/09/meta-to-expand-montgomery-data-hub-pushing-total-investment-to-1-5-billion/",
          "publisher": "Made in Alabama",
          "date": "2025-09-23",
          "source_tier": 2
        },
        {
          "title": "Meta data center in Montgomery gets expansion",
          "url": "https://www.wsfa.com/video/2025/09/27/meta-data-center-montgomery-gets-expansion/",
          "publisher": "WSFA",
          "date": "2025-09-26",
          "source_tier": 4
        },
        {
          "title": "Meta increasing investment in Montgomery data center to $1.5 billion",
          "url": "https://businessalabama.com/meta-has-increased-its-investment-in-its-under-construction-montgomery-data-center-to-1-5-billion/",
          "publisher": "Business Alabama Magazine",
          "date": "2025-09-23",
          "source_tier": 4
        },
        {
          "title": "New solar plant coming to east Alabama in support of $1.5 billion data center",
          "url": "https://www.al.com/news/montgomery/2026/08/new-solar-plant-coming-to-east-alabama-in-support-of-15-billion-data-center.html",
          "publisher": "al.com",
          "date": "2026-08-04",
          "source_tier": 4
        },
        {
          "title": "Meta putting another $700 million into Montgomery data center, pushing total to $1.5 billion",
          "url": "https://www.al.com/news/montgomery/2025/09/meta-putting-another-700-million-into-montgomery-data-center-pushing-total-to-15-billion.html",
          "publisher": "al.com",
          "date": "2025-09-23",
          "source_tier": 4
        },
        {
          "title": "Meta investing $1.5B to expand data hub in Montgomery",
          "url": "https://thebamabuzz.com/meta-investing-1-5b-to-expand-data-hub-in-montgomery/",
          "publisher": "thebamabuzz.com",
          "date": "2025-09-23",
          "source_tier": 4
        },
        {
          "title": "Tech supergiant to invest $1.5B into expanded Alabama data center site",
          "url": "https://www.montgomeryadvertiser.com/story/news/local/alabama/2025/09/24/tech-supergiant-meta-reveals-expanded-1-5b-investment-in-alabama/86316128007/",
          "publisher": "Montgomery Advertiser",
          "date": "2025-09-24",
          "source_tier": 4
        },
        {
          "title": "Meta to invest $700M more in Alabama - here's where",
          "url": "https://www.bizjournals.com/birmingham/news/2025/09/24/meta-to-invest-700-million-more-in-montgomery.html",
          "publisher": "The Business Journals",
          "date": "2025-09-24",
          "source_tier": 4
        },
        {
          "title": "Building Alabama: The data centers Trump and Tuberville are calling for run on Alabama-built solar",
          "url": "https://yellowhammernews.com/building-alabama-the-data-centers-trump-and-tuberville-are-calling-for-run-on-alabama-built-solar/",
          "publisher": "Yellowhammer News",
          "date": "2026-07-28",
          "source_tier": 4
        },
        {
          "title": "Meta-linked solar fields planned on Stockton tract",
          "url": "https://www.lagniappemobile.com/news/baldwin_county/meta-linked-solar-fields-planned-on-stockton-tract/article_2e3d5c6f-e6a5-4817-a0c3-2c5b281eb1c5.html",
          "publisher": "lagniappemobile.com",
          "date": "2026-02-02",
          "source_tier": 4
        },
        {
          "title": "Meta pilots use of mass timber in data center construction",
          "url": "https://www.datacenterdynamics.com/en/news/meta-pilots-use-of-mass-timber-in-data-center-construction/",
          "publisher": "Data Center Dynamics",
          "date": "2025-08-01",
          "source_tier": 3
        },
        {
          "title": "Meta Building New $800M AI Data Center in Alabama, Second in State",
          "url": "https://aibusiness.com/verticals/meta-building-new-800m-ai-data-center-in-alabama-second-in-state",
          "publisher": "AI Business",
          "date": "2024-05-08",
          "source_tier": 4
        },
        {
          "title": "Facebook parent company Meta plans $800M data center in Montgomery - WSFA",
          "url": "https://www.wsfa.com/2024/05/02/meta-plans-build-800m-next-generation-data-center-montgomery/",
          "publisher": "WSFA",
          "date": "2024-05-02",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-08-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-23",
          "summary": "Meta data center in Toney area expanding to 2.5 million square feet",
          "source_url": "https://www.yahoo.com/news/articles/north-alabama-resident-expresses-concerns-005357449.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-11",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Meta announced in 2025 that its investment in the Montgomery campus increased to more than $1.5 billion",
          "source_url": "https://yellowhammernews.com/meta-launches-1b-fund-to-support-data-center-communities-including-montgomery/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-02-05",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Silicon Ranch will begin building sometime in 2027 with the solar farm's lifespan expected to be at least 25 years",
          "source_url": "https://www.fox10tv.com/2026/02/05/solar-farm-approved-north-baldwin-county-power-meta-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-02-04",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Construction planned to begin by end of 2026, taking 12-18 months",
          "source_url": "https://mynbc15.com/news/local/metas-solar-farm-plans-face-opposition-in-baldwin-county",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-02-04",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Silicon Ranch planning solar farm on 4,500 acres in Baldwin County to power Meta data center",
          "source_url": "https://mynbc15.com/news/local/metas-solar-farm-plans-face-opposition-in-baldwin-county",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2025-09-24",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Meta announced plans to invest in two new buildings at its Montgomery Data Center",
          "source_url": "https://www.alreporter.com/2025/09/24/meta-to-expand-montgomery-data-center-upping-local-investments-to-1-5-billion/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2025-09-24",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Meta first announced an $800 million investment to begin construction of the data center in April 2024",
          "source_url": "https://www.alreporter.com/2025/09/24/meta-to-expand-montgomery-data-center-upping-local-investments-to-1-5-billion/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2025-09-23",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Meta project began in May 2024",
          "source_url": "https://www.wsfa.com/2025/09/23/meta-significantly-expand-montgomery-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2025-09-23",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Meta has donated to STEM programs at Montgomery Public Schools and launched district wide robotics program",
          "source_url": "https://www.wsfa.com/2025/09/23/meta-significantly-expand-montgomery-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2025-09-23",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Montgomery Data Center campus is expanding with two new buildings",
          "source_url": "https://datacenters.atmeta.com/2025/09/montgomery-were-growing/",
          "source_tier": 2
        },
        {
          "status": "approved",
          "effective_at": "2025-09-12",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Hensel Phelps is providing general contractor services for a new administrative facility at Meta's Montgomery, Alabama data center campus.",
          "source_url": "https://acppubs.com/DXC/article/1FB9B438-hensel-phelps-builds-with-mass-timber-at-meta-data-center",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2025-09-12",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Mass timber provider Binderholz is partnering on the project alongside Hensel Phelps.",
          "source_url": "https://acppubs.com/DXC/article/1FB9B438-hensel-phelps-builds-with-mass-timber-at-meta-data-center",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2025-09-12",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "The administrative facility utilizes mass timber construction as a renewable, lower carbon alternative to traditional steel and concrete.",
          "source_url": "https://acppubs.com/DXC/article/1FB9B438-hensel-phelps-builds-with-mass-timber-at-meta-data-center",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2025-08-05",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Meta will construct additional mass timber buildings at Cheyenne, Wyoming and Montgomery, Alabama data center campuses.",
          "source_url": "https://www.esgdive.com/news/meta-piloting-mass-timber-for-sustainable-data-center-construction-clt-green-building/756843/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2024-05-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2024-05-02",
          "summary": "Meta plans 800 million dollar data center in Montgomery",
          "source_url": "https://www.wsfa.com/2024/05/02/meta-plans-build-800m-next-generation-data-center-montgomery/",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2024-04-01",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "The facility will feature mass timber in the construction of its administration building",
          "source_url": "https://www.youtube.com/watch?v=ttAdBuGsi1I",
          "source_tier": 5
        },
        {
          "status": "approved",
          "effective_at": "2024-04-01",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "The facility will be powered by 100 percent renewable energy",
          "source_url": "https://www.youtube.com/watch?v=ttAdBuGsi1I",
          "source_tier": 5
        },
        {
          "status": "approved",
          "effective_at": "2024-04-01",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "The facility will be Meta's 24th global data center",
          "source_url": "https://www.youtube.com/watch?v=ttAdBuGsi1I",
          "source_tier": 5
        },
        {
          "status": "approved",
          "effective_at": "2024-04-01",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "The facility will be Meta's 20th data center in the United States and its second in Alabama after Huntsville, as reported by AI Business",
          "source_url": "https://www.youtube.com/watch?v=ttAdBuGsi1I",
          "source_tier": 5
        }
      ]
    }
  ],
  "grid_region": {
    "code": "srso",
    "label": "SRSO",
    "name": "SERC South",
    "kind": "dallas_fed_subregion",
    "parent_iso": null,
    "states": [
      "AL",
      "GA"
    ],
    "primary_states": [
      "AL",
      "GA"
    ],
    "price_effect_2025_mwh": 1.47,
    "price_effect_2025_pct": 4.2,
    "price_effect_2028_mwh": 1.73,
    "price_effect_2028_pct": 5.3,
    "own_dc_share_pct": 6.8,
    "fixed_cost_share": 0.69,
    "wholesale_price_effect_2025": "4.2 percent (+$1.47 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.",
    "wholesale_price_effect_2028": "5.3 percent (+$1.73 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.",
    "study_basis": "third party estimate",
    "study_source": "https://www.dallasfed.org/~/media/documents/research/papers/2026/wp2606r1.pdf",
    "study_date": "March 2026, revised October 2026"
  },
  "studies": [
    {
      "id": "dallas-fed-wp2606r1",
      "study": "Plante, Carrasco, Miranda Pineda and Patel, Federal Reserve Bank of Dallas Working Paper 2606r1",
      "title": "Data Centers, Wholesale Electricity Prices, and Retail Rates",
      "publisher": "Federal Reserve Bank of Dallas",
      "document_date": "March 2026, revised October 2026",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "Wholesale electricity price effect and retail electricity rate pass through",
      "finding": "Data center demand accounts for an average 6.5 percent increase in wholesale electricity prices across 23 regional markets in 2024 and 2025, reaching 15.0 percent (+$5.22 per MWh) in SERC Virginia and Carolina North and 15.4 percent (+$5.68 per MWh) in the Northwest Power Pool, with wholesale changes passing into retail prices roughly in proportion to the wholesale share of the retail bill over 12 to 24 months.",
      "years_covered": "2019 to 2025 historical and 2026 to 2028 scenario projections",
      "method": "Synthetic supply stack model across 23 regional power markets combined with reduced form retail pass through regressions",
      "who_funded_or_published": "Federal Reserve Bank of Dallas (government research working paper; views are the authors')",
      "primary_url": "https://www.dallasfed.org/~/media/documents/research/papers/2026/wp2606r1.pdf",
      "corroborating_url": null,
      "corroborating_label": null,
      "notes": "Uses BloombergNEF data center tracker as a model input alongside EIA Form 860, Form 861M, Form 923 and Form 930.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    },
    {
      "id": "epri-watten-bistline-blanford-2026",
      "study": "Watten, Bistline and Blanford, Electric Power Research Institute (arXiv:2606.19777)",
      "title": "Retail Electricity Price Implications of Data Center Load Growth",
      "publisher": "Electric Power Research Institute (EPRI)",
      "document_date": "June 2026",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "State level retail electricity rate change across all customer classes",
      "finding": "Where data centers pay standard industrial rates and improve grid utilization, state average retail rates could fall by roughly 1 percent nationally by 2030 (up to 4 percent in high growth states, or roughly $7 billion per year in fixed cost spreading); outcomes reverse toward higher residential bills if new generation and transmission upgrades outpace load revenues.",
      "years_covered": "2026 to 2030",
      "method": "Capacity expansion and utility revenue requirement model allocating fixed transmission and distribution costs across customer classes",
      "who_funded_or_published": "Electric Power Research Institute (nonprofit energy research institute funded primarily by member electric utilities)",
      "primary_url": "https://arxiv.org/abs/2606.19777",
      "corroborating_url": "https://fortune.com/2026/07/26/data-centers-electricity-costs-cheaper-7billion-buildout-ai-demand/",
      "corroborating_label": "Fortune, July 26, 2026",
      "notes": "Assumes data centers pay full tariff rates and operate at high load factors that spread existing fixed system costs.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    },
    {
      "id": "mit-ceepr-who-pays-2025",
      "study": "Meeks, Pless, Qi and Wang, MIT Center for Energy and Environmental Policy Research",
      "title": "Who Pays for Growth? Evidence from Datacenters and the Grid",
      "publisher": "MIT Center for Energy and Environmental Policy Research (CEEPR)",
      "document_date": "December 2025",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "Realized utility revenue and customer bill changes from historical data center openings",
      "finding": "In the 6 years following data center entry (1998 to 2018), average electric utility revenue rose 8 percent (+$104 million per utility per year), residential bills rose 2 percent (+$30 per household per year) and commercial bills rose 4 percent (+$262 per customer per year), driven by peak coincident demand charges and infrastructure capital additions.",
      "years_covered": "1998 to 2018",
      "method": "Difference in differences event study of historical data center openings matched to utility level EIA Form 861 billing and revenue panels",
      "who_funded_or_published": "MIT Center for Energy and Environmental Policy Research (university working paper)",
      "primary_url": "https://ceepr.mit.edu/workingpaper/who-pays-for-growth-evidence-from-datacenters-and-the-grid/",
      "corroborating_url": null,
      "corroborating_label": null,
      "notes": "Measures historical realized utility billing outcomes prior to the post 2023 hyperscale AI buildout.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    },
    {
      "id": "duke-ni-26-04",
      "study": "Norris, Profeta, Patino Echeverri and Cowie, Duke University Nicholas Institute (NI R 26-04)",
      "title": "Rethinking Load Growth: Assessing the Potential for Integration of Large Flexible Loads in US Power Systems",
      "publisher": "Nicholas Institute for Energy, Environment & Sustainability, Duke University",
      "document_date": "February 2026",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "Grid headroom and new gigawatts of large load accommodated under minimal peak hour curtailment",
      "finding": "Across 22 major US balancing authorities, roughly 76 GW of new data center load can be integrated without building new peaking capacity if facilities curtail load by 0.25 percent of annual operating hours (roughly 22 hours per year), expanding to 98 GW at 0.5 percent annual curtailment and 126 GW at 1.0 percent annual curtailment.",
      "years_covered": "2025 to 2035",
      "method": "Hourly balancing authority load duration and reserve margin modeling across 22 US power systems",
      "who_funded_or_published": "Duke University Nicholas Institute for Energy, Environment & Sustainability (university research institute)",
      "primary_url": "https://nicholasinstitute.duke.edu/publications/data-centers-and-generation-capacity-over-next-decade",
      "corroborating_url": "https://nicholasinstitute.duke.edu/articles/key-takeaways-data-center-flexibility-and-generation-capacity-over-next-decade",
      "corroborating_label": "Duke Nicholas Institute summary",
      "notes": "Evaluates operational curtailment during system peak hours rather than unconditional firm interconnection.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    },
    {
      "id": "ncsu-erl-2026",
      "study": "Jeremiah Johnson et al., North Carolina State University (Environmental Research Letters)",
      "title": "Power System Costs and Emissions from Data Center and Cryptocurrency Mining Expansion in the United States",
      "publisher": "Environmental Research Letters (IOP Publishing) / North Carolina State University",
      "document_date": "May 2026",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "Wholesale electricity prices, residential bills by state and power sector carbon emissions through 2030",
      "finding": "Projected data center and crypto load growth raises US electricity demand 6 to 12 percent by 2030 and increases residential electricity bills up to 57 percent in the most heavily affected states (including Virginia at roughly $32 per month or $384 per year for an average household) while adding 49 to 125 million metric tons of CO2 per year.",
      "years_covered": "2024 to 2030",
      "method": "National capacity expansion and unit commitment dispatch model (TEMOA) across US grid regions",
      "who_funded_or_published": "North Carolina State University researchers in Environmental Research Letters (peer reviewed journal)",
      "primary_url": "https://doi.org/10.1088/1748-9326/ae6c3d",
      "corroborating_url": "https://news.ncsu.edu/2026/05/data-centers-power-bills/",
      "corroborating_label": "NC State University News, May 2026",
      "notes": "Models combined data center and cryptocurrency mining load growth across regional interconnects.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    },
    {
      "id": "e3-rising-electricity-rates-2026",
      "study": "Energy and Environmental Economics (E3), Understanding the Drivers of Rising Electricity Rates and the Role of Data Centers",
      "title": "Understanding the Drivers of Rising Electricity Rates and the Role of Data Centers",
      "publisher": "Energy and Environmental Economics, Inc. (E3)",
      "document_date": "May 2026",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 2,
      "basis": "third party estimate",
      "what_it_measured": "Historical drivers of US retail electricity rate increases and utility rate design for large loads",
      "finding": "Historical US retail electricity rate increases from 2020 to 2025 were driven primarily by distribution capital spending, wildfire mitigation, natural gas price spikes and inflation rather than data centers, and well designed large load tariffs can keep new data center additions net neutral or beneficial for existing ratepayers.",
      "years_covered": "2020 to 2025 historical and forward rate design case studies",
      "method": "Decomposition of historical utility revenue requirements and illustrative utility tariff cost of service modeling",
      "who_funded_or_published": "Energy and Environmental Economics (E3), industry commissioned consulting report",
      "primary_url": "https://www.ethree.com/wp-content/uploads/2026/05/Understanding-the-Drivers-of-Rising-Electricity-Rates-and-the-Role-of-Data-Centers_E3-2026.pdf",
      "corroborating_url": null,
      "corroborating_label": null,
      "notes": "Industry commissioned study evaluating historical rate drivers prior to the 2025/2026 PJM capacity delivery year.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    },
    {
      "id": "nber-wp35100-muller-2026",
      "study": "Nicholas Z. Muller, National Bureau of Economic Research Working Paper 35100",
      "title": "The Environmental Externalities of the Data Center Boom",
      "publisher": "National Bureau of Economic Research (NBER)",
      "document_date": "April 2026",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "Monetized air pollution and greenhouse gas health and climate damages per megawatt hour of data center electricity use",
      "finding": "Marginal air pollution and greenhouse gas damages from fossil fuel generation serving US data centers average $49 to $94 per MWh ($0.049 to $0.094 per kWh), rivaling or exceeding the direct wholesale price of electricity in coal and gas heavy interconnects such as PJM, MISO and SERC.",
      "years_covered": "2022 to 2025",
      "method": "Integrated assessment marginal emissions and air quality transport model (AP4T) coupled with EPA CEMS unit level generation data",
      "who_funded_or_published": "National Bureau of Economic Research (university working paper by Nicholas Z. Muller, Carnegie Mellon University)",
      "primary_url": "https://www.nber.org/papers/w35100",
      "corroborating_url": "https://www.spglobal.com/energy/en/news-research/latest-news/electric-power/091626-air-pollution-from-data-center-power-projects-is-a-rising-concern-amid-build-out",
      "corroborating_label": "S&P Global Commodity Insights, September 16, 2026",
      "notes": "Quantifies unpriced health and climate damages from marginal fossil generation dispatched to meet data center load.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    }
  ]
}