{
  "license": "CC BY-NC 4.0",
  "license_url": "https://creativecommons.org/licenses/by-nc/4.0/",
  "attribution": "Data: Data Center Record, datacenterrecord.org, CC BY-NC 4.0. Link to the specific record page where possible.",
  "source": "https://datacenterrecord.org/grid/spso",
  "retrieved_at": "2026-10-30T08:26:43.998Z",
  "count": 101,
  "projects": [
    {
      "slug": "ntt-garland-tx1-water-tx",
      "name": "NTT Global Data Centers Garland (TX1)",
      "summary": "NTT Global Data Centers operates the Garland TX1 data center campus at 2001 Lookout Dr in Garland, Dallas County, Texas, registered in the EPA Facility Registry Service (FRS IDs 110070358446 and 110071952697).",
      "state": "TX",
      "city": "Garland",
      "county": "Dallas County",
      "status": "operational",
      "developer": "NTT Data",
      "capacity_mw": null,
      "latitude": 32.98268,
      "longitude": -96.667361,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Reports (FRS IDs 110070358446 and 110071952697) for NTT Global Data Centers Garland (TX1) at 2001 Lookout Dr, Garland, Dallas County, Texas.",
      "location_verified_at": null,
      "coordinate_source": "EPA ECHO FRS ID 110070358446",
      "location_last_verified": null,
      "site_address": "2001 Lookout Dr, Garland, TX 75044",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070358446",
      "published": "2026-09-28",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "air permit generator list",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071952697",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/ntt-garland-tx1-water-tx",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110071952697",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: NTT TX-4 Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071952697",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: RagingWire NTT Garland TX1",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110070358446",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070358446",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "aligned-data-centers-plano-tx",
      "name": "Aligned Data Centers Plano",
      "summary": "Aligned Data Centers lists 3 data centers at Plano, Texas among the sites it operates.",
      "state": "TX",
      "city": "Plano",
      "county": "Collin County",
      "status": "operational",
      "developer": "Aligned Data Centers",
      "capacity_mw": null,
      "latitude": 33.0094,
      "longitude": -96.6805,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071345231) for Aligned Data Center at 2800 Summit Ave, Plano, Collin County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110071345231",
      "location_last_verified": "2026-09-14",
      "site_address": "2800 Summit Ave, Plano, TX 75074",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071345231",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "closed_loop_liquid",
      "cooling_type_source_url": "https://aligneddc.com/dallas-data-centers/",
      "cooling_fluid": "water",
      "cooling_fluid_source_url": "https://aligneddc.com/dallas-data-centers/",
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://aligneddc.com/dallas-data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/aligned-data-centers-plano-tx",
      "source": "https://aligneddc.com/locations/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Aligned Data Centers: Data center locations",
          "url": "https://aligneddc.com/locations/",
          "publisher": "Aligned Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Aligned Data Centers: Aligned DFW-01",
          "url": "https://aligneddc.com/dallas-data-centers/",
          "publisher": "Aligned Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "BlackRock Reportedly In Talks To Buy Aligned Data Centers For $40B - Bisnow",
          "url": "https://www.bisnow.com/news/national/data-center-capital-markets/blackrock-in-advanced-talks-to-buy-aligned-data-centers-in-40b-deal-131227",
          "publisher": "Bisnow",
          "date": "2025-10-03",
          "source_tier": 1
        },
        {
          "title": "EPA ECHO detailed facility report: Aligned Data Center Plano",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071345231",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Aligned Data Centers lists Aligned DFW-01, Aligned DFW-02, Aligned DFW-04 at Plano, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://aligneddc.com/dallas-data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "aligned-lbb-01-abernathy-tx",
      "name": "Aligned LBB-01",
      "summary": "Aligned Data Centers lists a data center at Abernathy, Texas among the sites it operates.",
      "state": "TX",
      "city": "Abernathy",
      "county": "Hale County",
      "status": "operational",
      "developer": "Aligned Data Centers",
      "capacity_mw": null,
      "latitude": 33.8419249,
      "longitude": -101.8154033,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "closed_loop_liquid",
      "cooling_type_source_url": "https://aligneddc.com/abernathy-tx-data-center/",
      "cooling_fluid": "water",
      "cooling_fluid_source_url": "https://aligneddc.com/abernathy-tx-data-center/",
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://aligneddc.com/abernathy-tx-data-center/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/aligned-lbb-01-abernathy-tx",
      "source": "https://aligneddc.com/locations/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Aligned Data Centers: Data center locations",
          "url": "https://aligneddc.com/locations/",
          "publisher": "Aligned Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Aligned Data Centers: Aligned LBB-01",
          "url": "https://aligneddc.com/abernathy-tx-data-center/",
          "publisher": "Aligned Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Aligned Data Centers lists Aligned LBB-01 at Abernathy, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://aligneddc.com/abernathy-tx-data-center/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "centersquare-dallas-data-center-tx",
      "name": "Centersquare Dallas data center",
      "summary": "Centersquare lists a data center at Dallas, Texas among the sites it operates.",
      "state": "TX",
      "city": "Dallas",
      "county": "Dallas County",
      "status": "operational",
      "developer": "Centersquare",
      "capacity_mw": null,
      "latitude": 32.91054,
      "longitude": -96.87294,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110035069127) and Centersquare Dallas DFW3 specification at 11800 Webb Chapel Rd, Dallas, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110035069127",
      "location_last_verified": "2026-09-14",
      "site_address": "11800 Webb Chapel Rd, Dallas, TX 75234",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110035069127",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.csquare.com/data-centers",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/centersquare-dallas-data-center-tx",
      "source": "https://www.csquare.com/data-centers",
      "basis": "official_record",
      "sources": [
        {
          "title": "Centersquare: Data center markets",
          "url": "https://www.csquare.com/data-centers",
          "publisher": "Centersquare",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Webb Chapel Data Center Dallas",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110035069127",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Centersquare lists Centersquare Dallas data center at Dallas, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.csquare.com/data-centers",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "centersquare-fort-worth-data-center-tx",
      "name": "Centersquare Fort Worth data center",
      "summary": "Centersquare lists a data center at Fort Worth, Texas among the sites it operates.",
      "state": "TX",
      "city": "Fort Worth",
      "county": "Tarrant County",
      "status": "operational",
      "developer": "Centersquare",
      "capacity_mw": null,
      "latitude": 32.83094,
      "longitude": -97.04107,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071955710) for Centersquare DFW1 at 14901 FAA Blvd, Fort Worth, Tarrant County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110071955710",
      "location_last_verified": "2026-09-14",
      "site_address": "14901 FAA Blvd, Fort Worth, TX 76155",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071955710",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.csquare.com/data-centers",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/centersquare-fort-worth-data-center-tx",
      "source": "https://www.csquare.com/data-centers",
      "basis": "official_record",
      "sources": [
        {
          "title": "Centersquare: Data center markets",
          "url": "https://www.csquare.com/data-centers",
          "publisher": "Centersquare",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Centersquare DFW1 Fort Worth",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071955710",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Centersquare lists Centersquare Fort Worth data center at Fort Worth, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.csquare.com/data-centers",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "cologix-dallas-tx",
      "name": "Cologix Dallas",
      "summary": "Cologix lists 3 data centers at Dallas, Texas among the sites it operates.",
      "state": "TX",
      "city": "Dallas",
      "county": "Dallas County",
      "status": "operational",
      "developer": "Cologix",
      "capacity_mw": null,
      "latitude": 32.7935291,
      "longitude": -96.7666819,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.cologix.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/cologix-dallas-tx",
      "source": "https://www.datacenterdynamics.com/en/news/cologix-open-third-data-center-dallas/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Cologix to open third data center in Dallas - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/cologix-open-third-data-center-dallas/",
          "publisher": "Data Center Dynamics",
          "date": "2019-10-11",
          "source_tier": 1
        },
        {
          "title": "Cologix Opens Second Site at Dallas INFOMART - Data Center Knowledge",
          "url": "https://www.datacenterknowledge.com/next-gen-data-centers/cologix-opens-second-site-at-dallas-infomart",
          "publisher": "Data Center Knowledge",
          "date": "2024-05-31",
          "source_tier": 1
        },
        {
          "title": "Cologix: Data centers",
          "url": "https://www.cologix.com/data-centers/",
          "publisher": "Cologix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Cologix Now Even More Wired at the INFOMART - Data Center Knowledge",
          "url": "https://www.datacenterknowledge.com/next-gen-data-centers/cologix-now-even-more-wired-at-the-infomart",
          "publisher": "Data Center Knowledge",
          "date": "2024-05-31",
          "source_tier": 3
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Cologix lists Cologix DAL1, Cologix DAL2, Cologix DAL3 at Dallas, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.cologix.com/data-centers/",
          "source_tier": 2
        },
        {
          "status": "operational",
          "effective_at": "2024-05-31",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2024-05-31",
          "summary": "Cologix expanded through acquisitions in key network hubs in Minneapolis, Montreal, Toronto and Vancouver",
          "source_url": "https://www.datacenterknowledge.com/next-gen-data-centers/cologix-now-even-more-wired-at-the-infomart",
          "source_tier": 3
        }
      ]
    },
    {
      "slug": "cyrusone-allen-dfw3-dfw5-tx",
      "name": "CyrusOne Allen DFW3-DFW5",
      "summary": "CyrusOne lists a data center at Allen, Texas among the sites it operates.",
      "state": "TX",
      "city": "Allen",
      "county": "Collin County",
      "status": "operational",
      "developer": "CyrusOne",
      "capacity_mw": null,
      "latitude": 33.1165,
      "longitude": -96.6578,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110070366246) for CyrusOne Allen Data Center Phase 1 Building 1 in Allen, Collin County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110070366246",
      "location_last_verified": "2026-09-14",
      "site_address": "Northeast Of Chelsea Blvd. And Allen Commerce Pkwy, Allen, TX 75013",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070366246",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.cyrusone.com/data-centers/north-america/allen-texas",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/cyrusone-allen-dfw3-dfw5-tx",
      "source": "https://www.cyrusone.com/data-centers",
      "basis": "official_record",
      "sources": [
        {
          "title": "CyrusOne: Data centers",
          "url": "https://www.cyrusone.com/data-centers",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "CyrusOne: CyrusOne Allen DFW3-DFW5",
          "url": "https://www.cyrusone.com/data-centers/north-america/allen-texas",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: CyrusOne Allen Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110070366246",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070366246",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "cyrusone-austin-aus2-aus3-tx",
      "name": "CyrusOne Austin AUS2-AUS3",
      "summary": "CyrusOne lists a data center at Austin, Texas among the sites it operates.",
      "state": "TX",
      "city": "Austin",
      "county": "Travis County",
      "status": "operational",
      "developer": "CyrusOne",
      "capacity_mw": null,
      "latitude": 30.2052,
      "longitude": -97.7024,
      "location_precision": "permit_point",
      "location_source": "CyrusOne Austin AUS2 and AUS3 facility specification page at 7301 Metropolis Drive, Austin, Travis County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "operator address point",
      "location_last_verified": "2026-09-14",
      "site_address": "7301 Metropolis Drive, Austin, TX 78744",
      "site_address_source_url": "https://www.cyrusone.com/data-centers/north-america/austin-texas",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.cyrusone.com/data-centers/north-america/austin-texas",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/cyrusone-austin-aus2-aus3-tx",
      "source": "https://www.cyrusone.com/data-centers",
      "basis": "official_record",
      "sources": [
        {
          "title": "CyrusOne: Data centers",
          "url": "https://www.cyrusone.com/data-centers",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "CyrusOne: CyrusOne Austin AUS2-AUS3",
          "url": "https://www.cyrusone.com/data-centers/north-america/austin-texas",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://www.cyrusone.com/data-centers/north-america/austin-texas",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "cyrusone-carrollton-dfw1-tx",
      "name": "CyrusOne Carrollton DFW1",
      "summary": "CyrusOne lists a data center at Carrollton, Texas among the sites it operates.",
      "state": "TX",
      "city": "Carrollton",
      "county": "Denton County",
      "status": "operational",
      "developer": "CyrusOne",
      "capacity_mw": null,
      "latitude": 32.99449,
      "longitude": -96.93117,
      "location_precision": "permit_point",
      "location_source": "https://echo.epa.gov/detailed-facility-report?fid=110062195235",
      "location_verified_at": "2026-10-04",
      "coordinate_source": "https://echo.epa.gov/detailed-facility-report?fid=110062195235",
      "location_last_verified": "2026-10-04",
      "site_address": "1649 West Frankford Road, Carrollton, TX 75007",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110062195235",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.cyrusone.com/data-centers/north-america/carrollton-texas",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/cyrusone-carrollton-dfw1-tx",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110062195235",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Cyrusone, Carrollton Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110062195235",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "CyrusOne: Data centers",
          "url": "https://www.cyrusone.com/data-centers",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "CyrusOne: CyrusOne Carrollton DFW1",
          "url": "https://www.cyrusone.com/data-centers/north-america/carrollton-texas",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "CyrusOne lists CyrusOne Carrollton DFW1 at Carrollton, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.cyrusone.com/data-centers/north-america/carrollton-texas",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "cyrusone-freestone-campus-fairfield-tx",
      "name": "Cyrusone Freestone Campus",
      "summary": "The EPA's facility registry lists Cyrusone Freestone Campus at 1400 FM 488, Fairfield, TX 75840 in Fairfield, Texas, with a water permit.",
      "state": "TX",
      "city": "Fairfield",
      "county": "Freestone County",
      "status": "operational",
      "developer": "CyrusOne",
      "capacity_mw": null,
      "latitude": 31.907762,
      "longitude": -96.114437,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110072106677: the registry placed its point by address matching house number, accurate to 50 m",
      "location_verified_at": "2026-10-03",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-03",
      "site_address": "1400 FM 488, Fairfield, TX 75840",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072106677",
      "published": "2026-10-03",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072106677",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "air permit generator list",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072106677",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/cyrusone-freestone-campus-fairfield-tx",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110072106677",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Cyrusone Freestone Campus",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110072106677",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072106677",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "cyrusone-houston-hou3-hou4-tx",
      "name": "CyrusOne Houston HOU3-HOU4",
      "summary": "CyrusOne lists a data center at Houston, Texas among the sites it operates.",
      "state": "TX",
      "city": "Houston",
      "county": "Harris County",
      "status": "operational",
      "developer": "CyrusOne",
      "capacity_mw": null,
      "latitude": 29.72877,
      "longitude": -95.44477,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110034329803) and CyrusOne Houston HOU3 and HOU4 facility page in Houston, Harris County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110034329803",
      "location_last_verified": "2026-09-14",
      "site_address": "5150 Westway Park Blvd, Houston, TX 77041",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110034329803",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.cyrusone.com/data-centers/north-america/houston-tx",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/cyrusone-houston-hou3-hou4-tx",
      "source": "https://www.cyrusone.com/data-centers",
      "basis": "official_record",
      "sources": [
        {
          "title": "CyrusOne: Data centers",
          "url": "https://www.cyrusone.com/data-centers",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "CyrusOne: CyrusOne Houston HOU3-HOU4",
          "url": "https://www.cyrusone.com/data-centers/north-america/houston-tx",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: CyrusOne Houston",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110034329803",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110034329803",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "cyrusone-lewisville-dfw2-tx",
      "name": "CyrusOne Lewisville DFW2",
      "summary": "CyrusOne lists a data center at Lewisville, Texas among the sites it operates.",
      "state": "TX",
      "city": "Lewisville",
      "county": "Denton County",
      "status": "operational",
      "developer": "CyrusOne",
      "capacity_mw": null,
      "latitude": 33.007693,
      "longitude": -96.993172,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110038203734) for CyrusOne Lewisville DFW2 at 2501 S State Highway 121 Bus, Lewisville, Denton County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110038203734",
      "location_last_verified": "2026-09-14",
      "site_address": "2501 S State Highway 121 Bus, Lewisville, TX 75067",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110038203734",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.cyrusone.com/data-centers/north-america/lewisville-texas",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/cyrusone-lewisville-dfw2-tx",
      "source": "https://www.cyrusone.com/data-centers",
      "basis": "official_record",
      "sources": [
        {
          "title": "CyrusOne: Data centers",
          "url": "https://www.cyrusone.com/data-centers",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "CyrusOne: CyrusOne Lewisville DFW2",
          "url": "https://www.cyrusone.com/data-centers/north-america/lewisville-texas",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: CyrusOne Lewisville",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110038203734",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "CyrusOne lists CyrusOne Lewisville DFW2 at Lewisville, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.cyrusone.com/data-centers/north-america/lewisville-texas",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "cyrusone-san-antonio-tx",
      "name": "CyrusOne San Antonio",
      "summary": "CyrusOne lists 3 data centers at San Antonio, Texas among the sites it operates.",
      "state": "TX",
      "city": "San Antonio",
      "county": "Bexar County",
      "status": "operational",
      "developer": "CyrusOne",
      "capacity_mw": null,
      "latitude": 29.46572,
      "longitude": -98.68775,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110072102038) and CyrusOne San Antonio campus page at 9999 Westover Hills Blvd, San Antonio, Bexar County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110072102038",
      "location_last_verified": "2026-09-14",
      "site_address": "9999 Westover Hills Blvd, San Antonio, TX 78251",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072102038",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.cyrusone.com/data-centers",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/cyrusone-san-antonio-tx",
      "source": "https://www.cyrusone.com/data-centers/north-america/san-antonio-sat5-sat6",
      "basis": "official_record",
      "sources": [
        {
          "title": "CyrusOne: CyrusOne San Antonio SAT5-SAT6",
          "url": "https://www.cyrusone.com/data-centers/north-america/san-antonio-sat5-sat6",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "CyrusOne: Data centers",
          "url": "https://www.cyrusone.com/data-centers",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "CyrusOne: CyrusOne San Antonio SAT2-SAT4",
          "url": "https://www.cyrusone.com/data-centers/north-america/san-antonio-sat2-sat4",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "CyrusOne: CyrusOne San Antonio SAT1",
          "url": "https://www.cyrusone.com/data-centers/north-america/san-antonio-texas-sat1",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: CyrusOne San Antonio Westover Hills",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110072102038",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072102038",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "databank-austin-data-center-tx",
      "name": "DataBank Austin data center",
      "summary": "DataBank lists a data center at Austin, Texas among the sites it operates.",
      "state": "TX",
      "city": "Austin",
      "county": "Travis County",
      "status": "operational",
      "developer": "DataBank",
      "capacity_mw": null,
      "latitude": 30.2984886,
      "longitude": -97.7536575,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.databank.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/databank-austin-data-center-tx",
      "source": "https://www.databank.com/data-centers/",
      "basis": "official_record",
      "sources": [
        {
          "title": "DataBank: Data centers",
          "url": "https://www.databank.com/data-centers/",
          "publisher": "DataBank",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "DataBank lists DataBank Austin data center at Austin, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.databank.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "databank-dallas-data-center-tx",
      "name": "DataBank Dallas data center",
      "summary": "DataBank lists a data center at Dallas, Texas among the sites it operates.",
      "state": "TX",
      "city": "Dallas",
      "county": "Dallas County",
      "status": "operational",
      "developer": "DataBank",
      "capacity_mw": null,
      "latitude": 32.7935291,
      "longitude": -96.7666819,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 4,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.databank.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/databank-dallas-data-center-tx",
      "source": "https://www.datacenterknowledge.com/business/databank-acquired-by-avista-capital",
      "basis": "official_record",
      "sources": [
        {
          "title": "DataBank Acquired by Avista Capital - Data Center Knowledge",
          "url": "https://www.datacenterknowledge.com/business/databank-acquired-by-avista-capital",
          "publisher": "Data Center Knowledge",
          "date": "2024-06-01",
          "source_tier": 1
        },
        {
          "title": "DataBank Grows Beyond its Dallas Digital Fortress - Data Center Knowledge",
          "url": "https://www.datacenterknowledge.com/business/databank-grows-beyond-its-dallas-digital-fortress",
          "publisher": "Data Center Knowledge",
          "date": "2013-04-18",
          "source_tier": 3
        },
        {
          "title": "Dallas-Based DataBank Gets $250M Equity Investment from TJC, Announces $600M Secondary Share Sale - Dallas Innovates",
          "url": "https://dallasinnovates.com/dallas-based-databank-gets-250m-equity-investment-from-tjc-announces-600m-secondary-share-sale/",
          "publisher": "Dallas Innovates",
          "date": "2025-01-30",
          "source_tier": 1
        },
        {
          "title": "AustralianSuper Takes $1.5B Equity Stakes in DataBank | Chief Investment Officer - ai-cio.com",
          "url": "https://www.ai-cio.com/news/australiansuper-takes-1-5b-equity-stakes-in-databank/",
          "publisher": "ai-cio.com",
          "date": "2024-10-17",
          "source_tier": 1
        },
        {
          "title": "DataBank: Data centers",
          "url": "https://www.databank.com/data-centers/",
          "publisher": "DataBank",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "DataBank Obtains $2B for Dallas Data Center Project - CommercialSearch",
          "url": "https://www.commercialsearch.com/news/databank-obtains-2b-for-dallas-data-center-project/",
          "publisher": "CommercialSearch",
          "date": "2026-04-22",
          "source_tier": 4
        },
        {
          "title": "News | DataBank lands its biggest construction loan yet for Dallas data centers - CoStar",
          "url": "https://www.costar.com/article/2064534335/databank-lands-its-biggest-construction-loan-yet-for-dallas-data-centers",
          "publisher": "CoStar",
          "date": "2026-04-22",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "DataBank lists DataBank Dallas data center at Dallas, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.databank.com/data-centers/",
          "source_tier": 2
        },
        {
          "status": "operational",
          "effective_at": "2026-04-22",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-04-22",
          "summary": "DataBank secured its largest construction loan for Dallas data centers",
          "source_url": "https://www.costar.com/article/2064534335/databank-lands-its-biggest-construction-loan-yet-for-dallas-data-centers",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-04-22",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-04-22",
          "summary": "DataBank obtained $2 billion in financing for Dallas data center project",
          "source_url": "https://www.commercialsearch.com/news/databank-obtains-2b-for-dallas-data-center-project/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2013-04-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2013-04-18",
          "summary": "DataBank filled 130,000 square feet of data center space in former Federal Reserve building in downtown Dallas",
          "source_url": "https://www.datacenterknowledge.com/business/databank-grows-beyond-its-dallas-digital-fortress",
          "source_tier": 3
        },
        {
          "status": "operational",
          "effective_at": "2013-04-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2013-04-18",
          "summary": "DataBank expanded into Richardson, Texas with new North Dallas data center",
          "source_url": "https://www.datacenterknowledge.com/business/databank-grows-beyond-its-dallas-digital-fortress",
          "source_tier": 3
        },
        {
          "status": "operational",
          "effective_at": "2013-04-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2013-04-18",
          "summary": "DataBank expanded to other second tier markets around the US with backing from Avista",
          "source_url": "https://www.datacenterknowledge.com/business/databank-grows-beyond-its-dallas-digital-fortress",
          "source_tier": 3
        }
      ]
    },
    {
      "slug": "databank-houston-data-center-tx",
      "name": "DataBank Houston data center",
      "summary": "DataBank lists a data center at Houston, Texas among the sites it operates.",
      "state": "TX",
      "city": "Houston",
      "county": "Harris County",
      "status": "operational",
      "developer": "DataBank",
      "capacity_mw": null,
      "latitude": 29.842923,
      "longitude": -95.559859,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110072135439) for DataBank HOU3 in Houston, Harris County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110072135439",
      "location_last_verified": "2026-09-14",
      "site_address": "11003 Corporate Centre Drive, Houston, TX 77041",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072135439",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 4,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.databank.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/databank-houston-data-center-tx",
      "source": "https://www.bizjournals.com/houston/news/2026/06/18/databank-westway-park-hou2-data-center-expansion.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "DataBank to boost HOU2 data center capacity in $20M expansion, filing shows - The Business Journals",
          "url": "https://www.bizjournals.com/houston/news/2026/06/18/databank-westway-park-hou2-data-center-expansion.html",
          "publisher": "The Business Journals",
          "date": "2026-06-18",
          "source_tier": 1
        },
        {
          "title": "DataBank: Data centers",
          "url": "https://www.databank.com/data-centers/",
          "publisher": "DataBank",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: DataBank HOU3 Houston",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110072135439",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "DataBank lists DataBank Houston data center at Houston, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.databank.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "databank-plano-dfw3-tx",
      "name": "DataBank Plano DFW3",
      "summary": "DataBank operates the DFW3 data center at 8375 Dominion Pkwy in Plano, Collin County, Texas, registered in the EPA Facility Registry Service (FRS ID 110071657222).",
      "state": "TX",
      "city": "Plano",
      "county": "Collin County",
      "status": "operational",
      "developer": "DataBank",
      "capacity_mw": 9,
      "latitude": 33.0768,
      "longitude": -96.8197,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071657222) for DataBank DFW3 at 8375 Dominion Pkwy, Plano, Collin County, Texas.",
      "location_verified_at": null,
      "coordinate_source": "EPA ECHO FRS ID 110071657222",
      "location_last_verified": null,
      "site_address": "8375 Dominion Pkwy, Plano, TX 75024",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071657222",
      "published": "2026-09-28",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.databank.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/databank-plano-dfw3-tx",
      "source": "https://www.databank.com/data-centers/",
      "basis": "official_record",
      "sources": [
        {
          "title": "DataBank: Data Center Locations",
          "url": "https://www.databank.com/data-centers/",
          "publisher": "DataBank",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: DataBank DFW3 Plano",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071657222",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071657222",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "databank-red-oak-campus-dfw9-dfw11-tx",
      "name": "DataBank Red Oak Campus",
      "summary": "DataBank operates the Red Oak data center campus at 1712 Stainback Rd in Red Oak, Ellis County, Texas, registered in the EPA Facility Registry Service (FRS ID 110071849539).",
      "state": "TX",
      "city": "Red Oak",
      "county": "Ellis County",
      "status": "operational",
      "developer": "DataBank",
      "capacity_mw": 480,
      "latitude": 32.5186,
      "longitude": -96.8142,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071849539) for DataBank Red Oak at 1712 Stainback Rd, Red Oak, Ellis County, Texas.",
      "location_verified_at": null,
      "coordinate_source": "EPA ECHO FRS ID 110071849539",
      "location_last_verified": null,
      "site_address": "1712 Stainback Rd, Red Oak, TX 75154",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071849539",
      "published": "2026-09-28",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.databank.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/databank-red-oak-campus-dfw9-dfw11-tx",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110071849539",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Databank, Red Oak",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071849539",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "DataBank: Data Center Locations",
          "url": "https://www.databank.com/data-centers/",
          "publisher": "DataBank",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071849539",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "databank-waco-data-center-tx",
      "name": "DataBank Waco data center",
      "summary": "DataBank lists a data center at Waco, Texas among the sites it operates.",
      "state": "TX",
      "city": "Waco",
      "county": "McLennan County",
      "status": "operational",
      "developer": "DataBank",
      "capacity_mw": null,
      "latitude": 31.5574945,
      "longitude": -97.19032,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.databank.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/databank-waco-data-center-tx",
      "source": "https://www.databank.com/data-centers/",
      "basis": "official_record",
      "sources": [
        {
          "title": "DataBank: Data centers",
          "url": "https://www.databank.com/data-centers/",
          "publisher": "DataBank",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Many Waco residents had no idea a data center was operating in the heart of downtown , until now - KXXV",
          "url": "https://www.kxxv.com/news/local-news/in-your-neighborhood/mclennan-county/waco/many-waco-residents-had-no-idea-a-data-center-was-operating-in-the-heart-of-downtown-until-now",
          "publisher": "KXXV",
          "date": "2026-05-06",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "DataBank lists DataBank Waco data center at Waco, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.databank.com/data-centers/",
          "source_tier": 2
        },
        {
          "status": "operational",
          "effective_at": "2026-05-06",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-06",
          "summary": "DataBank facility has operated in downtown Waco since 2009",
          "source_url": "https://www.kxxv.com/news/local-news/in-your-neighborhood/mclennan-county/waco/many-waco-residents-had-no-idea-a-data-center-was-operating-in-the-heart-of-downtown-until-now",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-05-06",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-06",
          "summary": "Originally owned by Clear view Information Technology Gateway",
          "source_url": "https://www.kxxv.com/news/local-news/in-your-neighborhood/mclennan-county/waco/many-waco-residents-had-no-idea-a-data-center-was-operating-in-the-heart-of-downtown-until-now",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-05-06",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-06",
          "summary": "DataBank acquired the facility for data center use in 2020",
          "source_url": "https://www.kxxv.com/news/local-news/in-your-neighborhood/mclennan-county/waco/many-waco-residents-had-no-idea-a-data-center-was-operating-in-the-heart-of-downtown-until-now",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-05-06",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-06",
          "summary": "Facility runs on 100 percent renewable energy using wind and solar power",
          "source_url": "https://www.kxxv.com/news/local-news/in-your-neighborhood/mclennan-county/waco/many-waco-residents-had-no-idea-a-data-center-was-operating-in-the-heart-of-downtown-until-now",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-05-06",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-06",
          "summary": "Facility serves as disaster recovery and backup hub for Austin, Dallas, Houston, and San Antonio",
          "source_url": "https://www.kxxv.com/news/local-news/in-your-neighborhood/mclennan-county/waco/many-waco-residents-had-no-idea-a-data-center-was-operating-in-the-heart-of-downtown-until-now",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "digital-realty-austin-tx",
      "name": "Digital Realty Austin",
      "summary": "Digital Realty lists 2 data centers at Austin, Texas among the sites it operates.",
      "state": "TX",
      "city": "Austin",
      "county": "Travis County",
      "status": "operational",
      "developer": "Digital Realty",
      "capacity_mw": null,
      "latitude": 30.21642,
      "longitude": -97.69563,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110033535057) for Digital Realty AUS11 at 7500 Metro Center Drive, Austin, Travis County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110033535057",
      "location_last_verified": "2026-09-14",
      "site_address": "7500 Metro Center Drive, Austin, TX 78744",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110033535057",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.digitalrealty.com/data-centers/americas/austin",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/digital-realty-austin-tx",
      "source": "https://www.bizjournals.com/austin/news/2021/01/14/digital-realty-relocates-hq-to-austin.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "Global data center company Digital Realty relocates HQ to Austin from San Francisco - The Business Journals",
          "url": "https://www.bizjournals.com/austin/news/2021/01/14/digital-realty-relocates-hq-to-austin.html",
          "publisher": "The Business Journals",
          "date": "2021-01-14",
          "source_tier": 1
        },
        {
          "title": "Digital Realty: Americas data centers",
          "url": "https://www.digitalrealty.com/data-centers/americas",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty AUS11",
          "url": "https://www.digitalrealty.com/data-centers/americas/austin/aus11",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty Austin",
          "url": "https://www.digitalrealty.com/data-centers/americas/austin",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Austin Data Center Metro Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110033535057",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Digital Realty lists Digital Realty AUS11, Digital Realty Austin at Austin, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.digitalrealty.com/data-centers/americas/austin/aus11",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "digital-realty-carrollton-tx",
      "name": "Digital Realty Carrollton",
      "summary": "Digital Realty lists 2 data centers at Carrollton, Texas among the sites it operates.",
      "state": "TX",
      "city": "Carrollton",
      "county": "Denton County",
      "status": "operational",
      "developer": "Digital Realty",
      "capacity_mw": null,
      "latitude": 32.9889447,
      "longitude": -96.8998281,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.digitalrealty.com/data-centers/americas/dallas",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/digital-realty-carrollton-tx",
      "source": "https://www.digitalrealty.com/data-centers/americas",
      "basis": "official_record",
      "sources": [
        {
          "title": "Digital Realty: Americas data centers",
          "url": "https://www.digitalrealty.com/data-centers/americas",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty DFW11",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw11",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty DFW12",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw12",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Digital Realty lists Digital Realty DFW11, Digital Realty DFW12 at Carrollton, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw11",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "digital-realty-dallas-tx",
      "name": "Digital Realty Dallas",
      "summary": "Digital Realty lists 3 data centers at Dallas, Texas among the sites it operates.",
      "state": "TX",
      "city": "Dallas",
      "county": "Dallas County",
      "status": "operational",
      "developer": "Digital Realty",
      "capacity_mw": null,
      "latitude": 32.7935291,
      "longitude": -96.7666819,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.digitalrealty.com/data-centers/americas/dallas",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/digital-realty-dallas-tx",
      "source": "https://www.digitalrealty.com/data-centers/americas",
      "basis": "official_record",
      "sources": [
        {
          "title": "Digital Realty: Americas data centers",
          "url": "https://www.digitalrealty.com/data-centers/americas",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty DFW10",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw10",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty DFW36",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw36",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty Dallas",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Digital Realty lists Digital Realty DFW10, Digital Realty DFW36, Digital Realty Dallas at Dallas, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw10",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "digital-realty-dfw26-lewisville-tx",
      "name": "Digital Realty DFW26",
      "summary": "Digital Realty lists a data center at Lewisville, Texas among the sites it operates.",
      "state": "TX",
      "city": "Lewisville",
      "county": "Denton County",
      "status": "operational",
      "developer": "Digital Realty",
      "capacity_mw": null,
      "latitude": 33.045295,
      "longitude": -96.9753595,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw26",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/digital-realty-dfw26-lewisville-tx",
      "source": "https://www.digitalrealty.com/data-centers/americas",
      "basis": "official_record",
      "sources": [
        {
          "title": "Digital Realty: Americas data centers",
          "url": "https://www.digitalrealty.com/data-centers/americas",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty DFW26",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw26",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Digital Realty lists Digital Realty DFW26 at Lewisville, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw26",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "digital-realty-houston-tx",
      "name": "Digital Realty Houston",
      "summary": "Digital Realty lists 2 data centers at Houston, Texas among the sites it operates.",
      "state": "TX",
      "city": "Houston",
      "county": "Harris County",
      "status": "operational",
      "developer": "Digital Realty",
      "capacity_mw": null,
      "latitude": 29.7859623,
      "longitude": -95.388661,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.digitalrealty.com/data-centers/americas/houston",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/digital-realty-houston-tx",
      "source": "https://www.digitalrealty.com/data-centers/americas",
      "basis": "official_record",
      "sources": [
        {
          "title": "Digital Realty: Americas data centers",
          "url": "https://www.digitalrealty.com/data-centers/americas",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty IAH10",
          "url": "https://www.digitalrealty.com/data-centers/americas/houston/iah10",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty Houston",
          "url": "https://www.digitalrealty.com/data-centers/americas/houston",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Digital Realty lists Digital Realty IAH10, Digital Realty Houston at Houston, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.digitalrealty.com/data-centers/americas/houston/iah10",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "digital-realty-richardson-tx",
      "name": "Digital Realty Richardson",
      "summary": "Digital Realty lists 7 data centers at Richardson, Texas among the sites it operates.",
      "state": "TX",
      "city": "Richardson",
      "county": "Dallas County",
      "status": "operational",
      "developer": "Digital Realty",
      "capacity_mw": null,
      "latitude": 32.96613,
      "longitude": -96.71706,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110040158735) for Digital Realty Datacenter Park at 1232 Alma Rd, Richardson, Dallas County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110040158735",
      "location_last_verified": "2026-09-14",
      "site_address": "1232 Alma Rd, Richardson, TX 75081",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110040158735",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 7,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.digitalrealty.com/data-centers/americas/dallas",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/digital-realty-richardson-tx",
      "source": "https://www.digitalrealty.com/data-centers/americas",
      "basis": "official_record",
      "sources": [
        {
          "title": "Digital Realty: Americas data centers",
          "url": "https://www.digitalrealty.com/data-centers/americas",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty DFW16",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw16",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty DFW17",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw17",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty DFW18",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw18",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty DFW25",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw25",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty DFW28",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw28",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty DFW29",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw29",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty DFW35",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw35",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Datacenter Park Richardson",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110040158735",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Digital Realty lists Digital Realty DFW16, Digital Realty DFW17, Digital Realty DFW18, Digital Realty DFW25, Digital Realty DFW28, Digital Realty DFW29, Digital Realty DFW35 at Richardson, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw16",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "edgeconnex-houston-holdings-llc-katy-tx",
      "name": "Edgeconnex Houston Holdings, LLC",
      "summary": "The EPA's facility registry lists Edgeconnex Houston Holdings, LLC at 1510 Primewest Parkway, Katy, TX 77449 in Katy, Texas, with a hazardous waste record.",
      "state": "TX",
      "city": "Katy",
      "county": "Harris County",
      "status": "operational",
      "developer": "EdgeConneX",
      "capacity_mw": null,
      "latitude": 29.79487,
      "longitude": -95.74599,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110070913234: the registry placed its point by address matching house number, accurate to 30 m",
      "location_verified_at": "2026-10-03",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-03",
      "site_address": "1510 Primewest Parkway, Katy, TX 77449",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070913234",
      "published": "2026-10-03",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070913234",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "air permit generator list",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070913234",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/edgeconnex-houston-holdings-llc-katy-tx",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110070913234",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Edgeconnex Houston Holdings, LLC",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110070913234",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070913234",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "edged-irving-data-center-tx",
      "name": "Edged Irving Data Center",
      "summary": "Edged operates the Edged Dallas data center at 4901 N O'Connor Rd in Irving, Dallas County, Texas, using a waterless closed loop cooling system.",
      "state": "TX",
      "city": "Irving",
      "county": "Dallas County",
      "status": "operational",
      "developer": "Edged",
      "capacity_mw": null,
      "latitude": 32.8741,
      "longitude": -96.9602,
      "location_precision": "permit_point",
      "location_source": "Edged US Dallas facility specification page (4901 N O'Connor Rd, Irving, TX 75062) and EPA ECHO Detailed Facility Report (FRS ID 110071953300).",
      "location_verified_at": null,
      "coordinate_source": "operator address point",
      "location_last_verified": null,
      "site_address": "4901 N O'Connor Rd, Irving, TX 75062",
      "site_address_source_url": "https://edged.us/dallas",
      "published": "2026-10-21",
      "last_verified": "2026-10-24",
      "cooling_type": "closed_loop_liquid",
      "cooling_type_source_url": "https://edged.us/dallas",
      "cooling_fluid": "water-glycol",
      "cooling_fluid_source_url": "https://edged.us/dallas",
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://edged.us/dallas",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/edged-irving-data-center-tx",
      "source": "https://therealdeal.com/texas/2026/04/28/texas-top-construction-permits-april-27-2026/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Texas’ top construction permits for the week ending April 27, 2026 - The Real Deal",
          "url": "https://therealdeal.com/texas/2026/04/28/texas-top-construction-permits-april-27-2026/",
          "publisher": "The Real Deal",
          "date": "2026-04-28",
          "source_tier": 1
        },
        {
          "title": "Edged US: Edged Dallas (4901 N O'Connor Rd, Irving, TX) Facility Specifications",
          "url": "https://edged.us/dallas",
          "publisher": "Edged",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Edged Energy NFL Irving",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071953300",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://edged.us/dallas",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "element-critical-llc-element-critical-austin-aus1-austin-tx",
      "name": "Element Critical Austin (AUS1)",
      "summary": "Element Critical operates the AUS1 data center at 8025 N IH 35 in Austin, Travis County, Texas, registered in the EPA Facility Registry Service (FRS ID 110035038474).",
      "state": "TX",
      "city": "Austin",
      "county": "Travis County",
      "status": "operational",
      "developer": "Element Critical",
      "capacity_mw": null,
      "latitude": 30.176027,
      "longitude": -97.77968,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110035038474) for Austin Internet Data Center at 8025 N IH 35, Austin, Travis County, Texas.",
      "location_verified_at": null,
      "coordinate_source": "EPA ECHO FRS ID 110035038474",
      "location_last_verified": null,
      "site_address": "8025 N IH 35, Austin, TX 78753",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110035038474",
      "published": "2026-10-21",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "air permit generator list",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110035038474",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/element-critical-llc-element-critical-austin-aus1-austin-tx",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110035038474",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Austin Internet Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110035038474",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110035038474",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "energy-control-and-data-center-houston-tx",
      "name": "Energy Control And Data Center",
      "summary": "The EPA's facility registry lists Energy Control And Data Center at 16303 State Highway 249, Houston, TX 77064 in Houston, Texas, with no permit program listed.",
      "state": "TX",
      "city": "Houston",
      "county": "Harris County",
      "status": "not_verified",
      "developer": "CenterPoint Energy",
      "capacity_mw": null,
      "latitude": 29.945252,
      "longitude": -95.527699,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110034437125: the registry placed its point by address matching house number, accurate to 50 m",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-20",
      "site_address": "16303 State Highway 249, Houston, TX 77064",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110034437125",
      "published": "2026-10-20",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/energy-control-and-data-center-houston-tx",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110034437125",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Energy Control And Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110034437125",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Facility appears in the EPA Facility Registry Service (ECHO) under NAICS 518210 or SIC 7374; commercial data center operations have not yet been independently verified.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110034437125",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "equinix-da7-plano-tx",
      "name": "Equinix DA7",
      "summary": "Equinix lists a data center at Plano, Texas among the sites it operates.",
      "state": "TX",
      "city": "Plano",
      "county": "Collin County",
      "status": "operational",
      "developer": "Equinix",
      "capacity_mw": null,
      "latitude": 33.0502419,
      "longitude": -96.748682,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da7",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/equinix-da7-plano-tx",
      "source": "https://www.prnewswire.com/news-releases/media-alert-equinix-to-host-launch-event-at-new-dallas-metro-data-center-300232284.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "MEDIA ALERT: Equinix to Host Launch Event at New Dallas Metro Data Center - PR Newswire",
          "url": "https://www.prnewswire.com/news-releases/media-alert-equinix-to-host-launch-event-at-new-dallas-metro-data-center-300232284.html",
          "publisher": "PR Newswire",
          "date": "2016-03-08",
          "source_tier": 1
        },
        {
          "title": "Equinix to unveil new $20 M data center in Legacy Business Park - The Business Journals",
          "url": "https://www.bizjournals.com/dallas/news/2016/03/10/equinix-to-unveil-new-20m-data-center-inlegacy.html",
          "publisher": "The Business Journals",
          "date": "2016-03-10",
          "source_tier": 1
        },
        {
          "title": "Equinix: United States and Canada colocation data centers",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Equinix: Equinix DA7",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da7",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Equinix lists Equinix DA7 at Plano, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da7",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "equinix-da9-irving-tx",
      "name": "Equinix DA9",
      "summary": "Equinix lists a data center at Irving, Texas among the sites it operates.",
      "state": "TX",
      "city": "Irving",
      "county": "Dallas County",
      "status": "operational",
      "developer": "Equinix",
      "capacity_mw": null,
      "latitude": 32.8582366,
      "longitude": -96.9702114,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da9",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/equinix-da9-irving-tx",
      "source": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation",
      "basis": "official_record",
      "sources": [
        {
          "title": "Equinix: United States and Canada colocation data centers",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Equinix: Equinix DA9",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da9",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Equinix lists Equinix DA9 at Irving, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da9",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "equinix-dallas-tx",
      "name": "Equinix Dallas",
      "summary": "Equinix lists 6 data centers at Dallas, Texas among the sites it operates.",
      "state": "TX",
      "city": "Dallas",
      "county": "Dallas County",
      "status": "operational",
      "developer": "Equinix",
      "capacity_mw": null,
      "latitude": 32.79974,
      "longitude": -96.82027,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071241271) for Equinix N Stemmons Freeway Dallas in Dallas County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110071241271",
      "location_last_verified": "2026-09-14",
      "site_address": "1950 N Stemmons Freeway, Dallas, TX 75207",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071241271",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 6,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/equinix-dallas-tx",
      "source": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation",
      "basis": "official_record",
      "sources": [
        {
          "title": "Equinix: United States and Canada colocation data centers",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Equinix: Equinix DA1",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da1",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Equinix: Equinix DA2",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da2",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Equinix: Equinix DA3",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da3",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Equinix: Equinix DA4",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da4",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Equinix: Equinix DA6",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da6",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Equinix: Equinix DA11",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da11",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "News | Equinix gets ready to develop massive Dallas data center - CoStar",
          "url": "https://www.costar.com/article/932950618/equinix-gets-ready-to-develop-massive-dallas-data-center",
          "publisher": "CoStar",
          "date": "2025-11-25",
          "source_tier": 1
        },
        {
          "title": "EPA ECHO detailed facility report: Equinix N Stemmons Freeway Dallas",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071241271",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Equinix lists Equinix DA1, Equinix DA2, Equinix DA3, Equinix DA4, Equinix DA6, Equinix DA11 at Dallas, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da1",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "equinix-ho1-houston-tx",
      "name": "Equinix HO1",
      "summary": "Equinix lists a data center at Houston, Texas among the sites it operates.",
      "state": "TX",
      "city": "Houston",
      "county": "Harris County",
      "status": "operational",
      "developer": "Equinix",
      "capacity_mw": null,
      "latitude": 29.7859623,
      "longitude": -95.388661,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/houston-data-centers/ho1",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/equinix-ho1-houston-tx",
      "source": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation",
      "basis": "official_record",
      "sources": [
        {
          "title": "Equinix: United States and Canada colocation data centers",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Equinix: Equinix HO1",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/houston-data-centers/ho1",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Equinix lists Equinix HO1 at Houston, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/houston-data-centers/ho1",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "experian-mckinney-data-center-tx",
      "name": "Experian Mckinney Data Center",
      "summary": "The EPA's facility registry lists Experian Mckinney Data Center at 3400 S Stonebridge DR, Mckinney, TX 75070 in Mckinney, Texas, with no permit program listed.",
      "state": "TX",
      "city": "McKinney",
      "county": "Collin County",
      "status": "not_verified",
      "developer": "Experian",
      "capacity_mw": null,
      "latitude": 33.17086,
      "longitude": -96.72481,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110034292129: the registry placed its point by address matching house number, accurate to 30 m",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-20",
      "site_address": "3400 S Stonebridge DR, Mckinney, TX 75070",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110034292129",
      "published": "2026-10-20",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/experian-mckinney-data-center-tx",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110034292129",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Experian Mckinney Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110034292129",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Facility appears in the EPA Facility Registry Service (ECHO) under NAICS 518210 or SIC 7374; commercial data center operations have not yet been independently verified.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110034292129",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "flexential-corp-flexential-dallasplano-dfw01-plano-tx",
      "name": "Flexential Dallas Plano (DFW01)",
      "summary": "Flexential operates the DFW01 data center at 3500 E Plano Pkwy in Plano, Collin County, Texas, registered in the EPA Facility Registry Service (FRS ID 110071155467).",
      "state": "TX",
      "city": "Plano",
      "county": "Collin County",
      "status": "operational",
      "developer": "Flexential",
      "capacity_mw": null,
      "latitude": 33.008872,
      "longitude": -96.666123,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071155467) for Flexential Data Center at 3500 E Plano Pkwy, Plano, Collin County, Texas.",
      "location_verified_at": null,
      "coordinate_source": "EPA ECHO FRS ID 110071155467",
      "location_last_verified": null,
      "site_address": "3500 E Plano Pkwy, Plano, TX 75074",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071155467",
      "published": "2026-10-21",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "air permit generator list",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071155467",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/flexential-corp-flexential-dallasplano-dfw01-plano-tx",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110071155467",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Flexential Data Center Plano",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071155467",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071155467",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "ge-capital-data-center-dallas-tx",
      "name": "Ge Capital Data Center",
      "summary": "The EPA's facility registry lists Ge Capital Data Center at 1100 Empire Central Place, Dallas, TX 75247 in Dallas, Texas, with a hazardous waste record.",
      "state": "TX",
      "city": "Dallas",
      "county": "Dallas County",
      "status": "not_verified",
      "developer": "GE Capital",
      "capacity_mw": null,
      "latitude": 32.82278,
      "longitude": -96.87359,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110005009506: the registry placed its point by address matching house number, accurate to 50 m",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-20",
      "site_address": "1100 Empire Central Place, Dallas, TX 75247",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110005009506",
      "published": "2026-10-20",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/ge-capital-data-center-dallas-tx",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110005009506",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Ge Capital Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110005009506",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Facility appears in the EPA Facility Registry Service (ECHO) under NAICS 518210 or SIC 7374; commercial data center operations have not yet been independently verified.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110005009506",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "google-armstrong-county-data-center-tx",
      "name": "Google Armstrong County data center",
      "summary": "Google lists a data center at Armstrong County, Texas and says it is being built.",
      "state": "TX",
      "city": "Claude",
      "county": "Armstrong County",
      "status": "under_construction",
      "developer": "Crusoe",
      "capacity_mw": null,
      "latitude": 35.016961,
      "longitude": -101.319614,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110072160729) for Goodnight Power Plant Project at 9921 Lima Road, Claude, Armstrong County, Texas.",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "EPA ECHO FRS ID 110072160729",
      "location_last_verified": "2026-09-16",
      "site_address": "9921 Lima Road, Claude, TX 79019",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072160729",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://www.crusoe.ai/resources/newsroom/crusoe-developing-data-center-campus-in-armstrong-county-texas",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": "Goodnight 1 (265.5 MW operational) and Goodnight 2 (265.5 MW under construction) wind farms",
      "power_source_url": "https://www.crusoe.ai/resources/newsroom/crusoe-developing-data-center-campus-in-armstrong-county-texas",
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-armstrong-county-data-center-tx",
      "source": "https://communityimpact.com/mckinney/austin/google-commits-40b-to-3-new-data-centers-infrastructure-in-texas-through-2027/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Google commits $40B to 3 new data centers, infrastructure in Texas through 2027 - Community Impact",
          "url": "https://communityimpact.com/mckinney/austin/google-commits-40b-to-3-new-data-centers-infrastructure-in-texas-through-2027/",
          "publisher": "Community Impact",
          "date": "2025-11-14",
          "source_tier": 4
        },
        {
          "title": "Construction underway on six building Claude data center - NewsChannel 10",
          "url": "https://www.newschannel10.com/2026/09/23/construction-underway-six-building-claude-data-center/",
          "publisher": "NewsChannel 10",
          "date": "2026-09-23",
          "source_tier": 4
        },
        {
          "title": "Crusoe, Google to host community open house about Claude data center project - KFDA | NewsChannel 10 | Amarillo Texas",
          "url": "https://www.newschannel10.com/2026/09/13/crusoe-google-host-community-open-house-about-claude-data-center-project/",
          "publisher": "KFDA | NewsChannel 10 | Amarillo Texas",
          "date": "2026-09-13",
          "source_tier": 4
        },
        {
          "title": "‘We've proudly called Texas home for 15 years’, says Google CEO Sundar Pichai announcing $40 billion inve - The Times of India",
          "url": "https://timesofindia.indiatimes.com/technology/tech-news/weve-proudly-called-texas-home-for-15-years-says-google-ceo-sundar-pichai-announcing-40-billion-investment-in-texas/articleshow/125340570.cms",
          "publisher": "The Times of India",
          "date": "2025-11-19",
          "source_tier": 1
        },
        {
          "title": "Google taps Texas for $40B AI investment to run through 2027 - dallasnews.com",
          "url": "https://www.dallasnews.com/business/technology/2025/11/14/google-taps-texas-for-40b-ai-investment-to-run-through-2027/",
          "publisher": "dallasnews.com",
          "date": "2025-11-14",
          "source_tier": 1
        },
        {
          "title": "Google to invest $40 billion in Texas through 2027 - cnbc.com",
          "url": "https://www.cnbc.com/2025/11/14/google-to-invest-40-billion-in-texas-through-2027.html",
          "publisher": "cnbc.com",
          "date": "2025-11-14",
          "source_tier": 1
        },
        {
          "title": "Google plans to invest $40 billion towards building data centers in Texas - Engadget",
          "url": "https://www.engadget.com/big-tech/google-plans-to-invest-40-billion-towards-building-data-centers-in-texas-183056066.html",
          "publisher": "Engadget",
          "date": "2025-11-16",
          "source_tier": 1
        },
        {
          "title": "Google unveils $40 billion investment in Texas, with expansion in Ellis County - WFAA",
          "url": "https://www.wfaa.com/article/money/business/google-40-billion-investment-in-texas-ellis-county/287-0bf6e355-b350-4c46-b706-6745e7cb7358",
          "publisher": "WFAA",
          "date": "2025-11-14",
          "source_tier": 1
        },
        {
          "title": "Google Announces $40 Billion Texas Data Center Investment to Expand Cloud and AI Infrastructure - MLQ.ai",
          "url": "https://mlq.ai/news/google-announces-40-billion-texas-data-center-investment-to-expand-cloud-and-ai-infrastructure/",
          "publisher": "MLQ.ai",
          "date": "2025-11-15",
          "source_tier": 1
        },
        {
          "title": "Google is spending $40 billion to build 3 new data centers in Texas - Fast Company",
          "url": "https://www.fastcompany.com/91446624/google-data-center-texas-greg-abbott-sundar-pichai",
          "publisher": "Fast Company",
          "date": "2025-11-21",
          "source_tier": 1
        },
        {
          "title": "Google Earmarks $40B for Texas Digital Development - CommercialSearch",
          "url": "https://www.commercialsearch.com/news/google-earmarks-40b-for-texas-digital-development/",
          "publisher": "CommercialSearch",
          "date": "2025-11-19",
          "source_tier": 1
        },
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Crusoe Develops Google AI Data Center Campus in Armstrong County, TX - Crusoe",
          "url": "https://www.crusoe.ai/resources/newsroom/crusoe-developing-data-center-campus-in-armstrong-county-texas",
          "publisher": "Crusoe",
          "date": "2026-09-28",
          "source_tier": 4
        },
        {
          "title": "Photos: Construction underway on six building Claude data center - NewsChannel 10",
          "url": "https://www.newschannel10.com/gallery/2026/09/23/photos-construction-underway-six-building-claude-data-center/",
          "publisher": "NewsChannel 10",
          "date": "2026-09-23",
          "source_tier": 4
        },
        {
          "title": "EPA ECHO detailed facility report: Goodnight Power Plant Project Claude TX",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110072160729",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [
          "Google"
        ],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": "https://www.crusoe.ai/resources/newsroom/crusoe-developing-data-center-campus-in-armstrong-county-texas"
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-23",
          "summary": "first buildings expected to be turned over to Google in early 2027",
          "source_url": "https://www.newschannel10.com/2026/09/23/construction-underway-six-building-claude-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-23",
          "summary": "Construction underway on six building Claude data center hosted by Google and Crusoe.",
          "source_url": "https://www.newschannel10.com/gallery/2026/09/23/photos-construction-underway-six-building-claude-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-23",
          "summary": "construction expected to wrap up by the end of 2027",
          "source_url": "https://www.newschannel10.com/2026/09/23/construction-underway-six-building-claude-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-23",
          "summary": "closed loop cooling system allowing water to continuously circulate",
          "source_url": "https://www.newschannel10.com/2026/09/23/construction-underway-six-building-claude-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-23",
          "summary": "water recirculates for a period of about 15 years",
          "source_url": "https://www.newschannel10.com/2026/09/23/construction-underway-six-building-claude-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-23",
          "summary": "primary power source will be the nearby Goodnight 1 and 2 wind farms, with ERCOT grid as backup",
          "source_url": "https://www.newschannel10.com/2026/09/23/construction-underway-six-building-claude-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-23",
          "summary": "Google committed to 50 permanent jobs once operational",
          "source_url": "https://www.newschannel10.com/2026/09/23/construction-underway-six-building-claude-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-23",
          "summary": "six building data center campus",
          "source_url": "https://www.newschannel10.com/2026/09/23/construction-underway-six-building-claude-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Armstrong County data center at Armstrong County, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-13",
          "summary": "Data center project under construction in Claude off Lima Road",
          "source_url": "https://www.newschannel10.com/2026/09/13/crusoe-google-host-community-open-house-about-claude-data-center-project/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2025-06-01",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-28",
          "summary": "Groundbreaking was in June 2025 with more than 5,500 skilled laborers on site daily",
          "source_url": "https://www.crusoe.ai/resources/newsroom/crusoe-developing-data-center-campus-in-armstrong-county-texas",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "google-haskell-county-data-center-tx",
      "name": "Google Haskell County data center",
      "summary": "Google lists a data center at Haskell County, Texas and says it is being built.",
      "state": "TX",
      "city": "Haskell",
      "county": "Haskell County",
      "status": "under_construction",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 33.1603,
      "longitude": -99.7344,
      "location_precision": "county",
      "location_source": "County seat (Haskell), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-haskell-county-data-center-tx",
      "source": "https://www.postandcourier.com/ap/business/googles-parent-buys-data-center-energy-specialist-for-4-75b-to-help-power-ai/article_c7d79a0a-1151-4942-b026-570fed39f849.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "Google's parent buys data center energy specialist for $4.75B to help power AI - Post and Courier",
          "url": "https://www.postandcourier.com/ap/business/googles-parent-buys-data-center-energy-specialist-for-4-75b-to-help-power-ai/article_c7d79a0a-1151-4942-b026-570fed39f849.html",
          "publisher": "Post and Courier",
          "date": "2025-12-22",
          "source_tier": 1
        },
        {
          "title": "Google to invest $40 billion in Texas through 2027 - cnbc.com",
          "url": "https://www.cnbc.com/2025/11/14/google-to-invest-40-billion-in-texas-through-2027.html",
          "publisher": "cnbc.com",
          "date": "2025-11-14",
          "source_tier": 1
        },
        {
          "title": "‘We've proudly called Texas home for 15 years’, says Google CEO Sundar Pichai announcing $40 billion inve - The Times of India",
          "url": "https://timesofindia.indiatimes.com/technology/tech-news/weve-proudly-called-texas-home-for-15-years-says-google-ceo-sundar-pichai-announcing-40-billion-investment-in-texas/articleshow/125340570.cms",
          "publisher": "The Times of India",
          "date": "2025-11-19",
          "source_tier": 1
        },
        {
          "title": "Google taps Texas for $40B AI investment to run through 2027 - dallasnews.com",
          "url": "https://www.dallasnews.com/business/technology/2025/11/14/google-taps-texas-for-40b-ai-investment-to-run-through-2027/",
          "publisher": "dallasnews.com",
          "date": "2025-11-14",
          "source_tier": 1
        },
        {
          "title": "Google plans to invest $40 billion towards building data centers in Texas - Engadget",
          "url": "https://www.engadget.com/big-tech/google-plans-to-invest-40-billion-towards-building-data-centers-in-texas-183056066.html",
          "publisher": "Engadget",
          "date": "2025-11-16",
          "source_tier": 1
        },
        {
          "title": "Google Announces $40 Billion Texas Data Center Investment to Expand Cloud and AI Infrastructure - MLQ.ai",
          "url": "https://mlq.ai/news/google-announces-40-billion-texas-data-center-investment-to-expand-cloud-and-ai-infrastructure/",
          "publisher": "MLQ.ai",
          "date": "2025-11-15",
          "source_tier": 1
        },
        {
          "title": "Google is spending $40 billion to build 3 new data centers in Texas - Fast Company",
          "url": "https://www.fastcompany.com/91446624/google-data-center-texas-greg-abbott-sundar-pichai",
          "publisher": "Fast Company",
          "date": "2025-11-21",
          "source_tier": 1
        },
        {
          "title": "Google Earmarks $40B for Texas Digital Development - CommercialSearch",
          "url": "https://www.commercialsearch.com/news/google-earmarks-40b-for-texas-digital-development/",
          "publisher": "CommercialSearch",
          "date": "2025-11-19",
          "source_tier": 1
        },
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Haskell County data center at Haskell County, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "google-midlothian-data-center-tx",
      "name": "Google Midlothian data center",
      "summary": "Google lists a data center at Midlothian, Texas among the sites it operates.",
      "state": "TX",
      "city": "Midlothian",
      "county": "Ellis County",
      "status": "operational",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 32.447971,
      "longitude": -97.056184,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110070801654) for Google Sharka campus in Midlothian, Ellis County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110070801654",
      "location_last_verified": "2026-09-14",
      "site_address": "3200 V V Jones Road, Midlothian, TX 76065",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070801654",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": "withdrawal",
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://datacenters.google/locations/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-midlothian-data-center-tx",
      "source": "https://sustainability.google/files/google-2026-environmental-report.pdf",
      "basis": "official_record",
      "sources": [
        {
          "title": "Google 2026 Environmental Report (Page 97: Water use by data center location, 2025)",
          "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
          "publisher": "Google",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Sharka Midlothian TX",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110070801654",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Midlothian data center at Midlothian, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "google-pampa-data-center-tx",
      "name": "Google Pampa data center",
      "summary": "Google lists a data center at Pampa, Texas and says it is being built.",
      "state": "TX",
      "city": "Pampa",
      "county": "Gray County",
      "status": "under_construction",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 35.5478529,
      "longitude": -100.9650303,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-pampa-data-center-tx",
      "source": "https://datacenters.google/locations/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Pampa data center at Pampa, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "google-pflugerville-data-center-tx",
      "name": "Google Pflugerville Data Center",
      "summary": "Google operates the Pflugerville data center in Pflugerville, Travis County, Texas, reported in the Google 2026 Environmental Report with 400,000 gallons of annual water withdrawal in 2025.",
      "state": "TX",
      "city": "Pflugerville",
      "county": "Travis County",
      "status": "operational",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 30.4478,
      "longitude": -97.6021,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071659424) and Google 2026 Environmental Report (Page 97) for Pflugerville, Travis County, Texas.",
      "location_verified_at": null,
      "coordinate_source": "EPA ECHO FRS ID 110071659424",
      "location_last_verified": null,
      "site_address": "2515 South Kenny Fort Boulevard, Pflugerville, TX 78660",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071659424",
      "published": "2026-10-21",
      "last_verified": "2026-10-24",
      "cooling_type": "air",
      "cooling_type_source_url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": "withdrawal",
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-pflugerville-data-center-tx",
      "source": "https://sustainability.google/files/google-2026-environmental-report.pdf",
      "basis": "official_record",
      "sources": [
        {
          "title": "Google 2026 Environmental Report (Page 97: Water use by data center location, 2025)",
          "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
          "publisher": "Google 2026 Environmental Report",
          "date": "2026-06-01",
          "source_tier": 2
        },
        {
          "title": "Google 2026 Environmental Report (Page 97: Water use by data center location, 2025)",
          "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
          "publisher": "Google 2026 Environmental Report",
          "date": "2026-06-01",
          "source_tier": 2
        },
        {
          "title": "Google 2026 Environmental Report (Page 97 & Page 116, Endnote 229 / 226)",
          "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
          "publisher": "Google 2026 Environmental Report",
          "date": "2026-06-01",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Austin Data Center 2 Pflugerville",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071659424",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071659424",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "google-red-oak-data-center-tx",
      "name": "Google Red Oak data center",
      "summary": "Google lists a data center at Red Oak, Texas among the sites it operates.",
      "state": "TX",
      "city": "Red Oak",
      "county": "Ellis County",
      "status": "operational",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 32.5155346,
      "longitude": -96.7826267,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": "withdrawal",
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://datacenters.google/locations/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-red-oak-data-center-tx",
      "source": "https://sustainability.google/files/google-2026-environmental-report.pdf",
      "basis": "official_record",
      "sources": [
        {
          "title": "Google 2026 Environmental Report (Page 97: Water use by data center location, 2025)",
          "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
          "publisher": "Google",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Red Oak data center at Red Oak, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "google-wilbarger-county-data-center-tx",
      "name": "Google Wilbarger County data center",
      "summary": "Google lists a data center at Wilbarger County, Texas and says it is being built.",
      "state": "TX",
      "city": "Vernon",
      "county": "Wilbarger County",
      "status": "under_construction",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 34.1511,
      "longitude": -99.2906,
      "location_precision": "county",
      "location_source": "County seat (Vernon), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-wilbarger-county-data-center-tx",
      "source": "https://datacenters.google/locations/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Google, AES plan new data center in Wilbarger Co. - texomashomepage.com",
          "url": "https://www.texomashomepage.com/news/local-news/google-plans-new-data-center-in-wilbarger-county-expected-to-bring-jobs-economic-growth/",
          "publisher": "texomashomepage.com",
          "date": "2026-02-25",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Wilbarger County data center at Wilbarger County, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "google-wilmer-data-center-tx",
      "name": "Google Wilmer Data Center",
      "summary": "Google operates the Wilmer data center in Wilmer, Dallas County, Texas, reported in the Google 2026 Environmental Report with 2.6 million gallons of annual water withdrawal in 2025.",
      "state": "TX",
      "city": "Wilmer",
      "county": "Dallas County",
      "status": "operational",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 32.6012,
      "longitude": -96.6784,
      "location_precision": "city",
      "location_source": "Google 2026 Environmental Report (Page 97) disclosing operational facility in Wilmer, Dallas County, Texas.",
      "location_verified_at": null,
      "coordinate_source": "census gazetteer place point",
      "location_last_verified": null,
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-10-21",
      "last_verified": "2026-10-24",
      "cooling_type": "air",
      "cooling_type_source_url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": "withdrawal",
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-wilmer-data-center-tx",
      "source": "https://sustainability.google/files/google-2026-environmental-report.pdf",
      "basis": "official_record",
      "sources": [
        {
          "title": "Google 2026 Environmental Report (Page 97: Water use by data center location, 2025)",
          "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
          "publisher": "Google 2026 Environmental Report",
          "date": "2026-06-01",
          "source_tier": 2
        },
        {
          "title": "Google 2026 Environmental Report (Page 97 & Page 116, Endnote 235 / 226)",
          "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
          "publisher": "Google 2026 Environmental Report",
          "date": "2026-06-01",
          "source_tier": 2
        },
        {
          "title": "Google 2026 Environmental Report (Page 97: Water use by data center location, 2025)",
          "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
          "publisher": "Google 2026 Environmental Report",
          "date": "2026-06-01",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "h5-san-antonio-tx",
      "name": "H5 San Antonio",
      "summary": "H5 Data Centers lists a data center at San Antonio, Texas among the sites it operates.",
      "state": "TX",
      "city": "San Antonio",
      "county": "Bexar County",
      "status": "operational",
      "developer": "H5 Data Centers",
      "capacity_mw": null,
      "latitude": 29.4600337,
      "longitude": -98.5242037,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://h5datacenters.com/data-centers.html",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/h5-san-antonio-tx",
      "source": "https://www.datacenterdynamics.com/en/news/h5-data-centers-san-antonio-facility-gets-fiber-expansion-fiberlight/",
      "basis": "official_record",
      "sources": [
        {
          "title": "H5 Data Centers' San Antonio facility gets fiber expansion by FiberLight - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/h5-data-centers-san-antonio-facility-gets-fiber-expansion-fiberlight/",
          "publisher": "Data Center Dynamics",
          "date": "2020-09-17",
          "source_tier": 1
        },
        {
          "title": "H5 buys San Antonio’s only carrier hotel - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/h5-buys-san-antonios-only-carrier-hotel/",
          "publisher": "Data Center Dynamics",
          "date": "2018-11-27",
          "source_tier": 1
        },
        {
          "title": "News | San Antonio’s H5 Edge Data Center and Colocation Facility Plans for Expansion - CoStar",
          "url": "https://www.costar.com/article/360460271/san-antonios-h5-edge-data-center-and-colocation-facility-plans-for-expansion",
          "publisher": "CoStar",
          "date": "2023-11-22",
          "source_tier": 4
        },
        {
          "title": "H5 Data Centers Announces Next Phase Expansion at its San Antonio Data Center - Business Wire",
          "url": "https://www.businesswire.com/news/home/20231120465034/en/H5-Data-Centers-Announces-Next-Phase-Expansion-at-its-San-Antonio-Data-Center",
          "publisher": "Business Wire",
          "date": "2023-11-20",
          "source_tier": 1
        },
        {
          "title": "H5 Data Centers Expands Edge Data Center in San Antonio - telecomtalk.info",
          "url": "https://telecomtalk.info/h5-datacenters-expands-edge-datacenter-san-antonio/898144/",
          "publisher": "telecomtalk.info",
          "date": "2023-11-20",
          "source_tier": 1
        },
        {
          "title": "H5 expands data center in San Antonio, Texas - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/h5-expands-data-center-in-san-antonio-texas/",
          "publisher": "Data Center Dynamics",
          "date": "2023-11-21",
          "source_tier": 1
        },
        {
          "title": "H5 Data Centers: Data centers",
          "url": "https://h5datacenters.com/data-centers.html",
          "publisher": "H5 Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "H5 Data Centers lists H5 San Antonio at San Antonio, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://h5datacenters.com/data-centers.html",
          "source_tier": 2
        },
        {
          "status": "operational",
          "effective_at": "2023-11-22",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2023-11-22",
          "summary": "H5 Edge data center in San Antonio plans expansion",
          "source_url": "https://www.costar.com/article/360460271/san-antonios-h5-edge-data-center-and-colocation-facility-plans-for-expansion",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "lincoln-rackhouse-lincoln-rackhouse-dallas-plano-tx",
      "name": "Lincoln Rackhouse Dallas Plano",
      "summary": "Lincoln Rackhouse operates the Plano data center campus at 1000 Coit Road in Plano, Collin County, Texas, registered in the EPA Facility Registry Service (FRS ID 110062491744).",
      "state": "TX",
      "city": "Plano",
      "county": "Collin County",
      "status": "operational",
      "developer": "Lincoln Rackhouse",
      "capacity_mw": null,
      "latitude": 33.0106,
      "longitude": -96.76667,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110062491744) for Coit Data Center at 1000 Coit Road, Plano, Collin County, Texas.",
      "location_verified_at": null,
      "coordinate_source": "EPA ECHO FRS ID 110062491744",
      "location_last_verified": null,
      "site_address": "1000 Coit Road, Plano, TX 75075",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110062491744",
      "published": "2026-10-21",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "air permit generator list",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110062491744",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/lincoln-rackhouse-lincoln-rackhouse-dallas-plano-tx",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110062491744",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Coit Data Center Plano",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110062491744",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110062491744",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "meta-el-paso-data-center-tx",
      "name": "Meta El Paso data center",
      "summary": "Meta's El Paso Data Center in El Paso, Texas, which broke ground in 2025.",
      "state": "TX",
      "city": "El Paso",
      "county": "El Paso County",
      "status": "under_construction",
      "developer": "Meta",
      "capacity_mw": null,
      "latitude": 31.75917,
      "longitude": -106.48861,
      "location_precision": "county",
      "location_source": "County seat (El Paso), Wikidata, placed at county level",
      "location_verified_at": "2026-09-23",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-23",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-08",
      "last_verified": "2026-10-24",
      "cooling_type": "closed_loop_liquid",
      "cooling_type_source_url": "https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/",
      "cooling_fluid": "water",
      "cooling_fluid_source_url": "https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/",
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://datacenters.atmeta.com/us-locations/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/meta-el-paso-data-center-tx",
      "source": "https://constructionreviewonline.com/meta-tables-plans-for-437m-gas-plant-to-power-its-data-center-in-el-paso-texas-despite-city-council-pushback/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Meta Tables Plans for $437M Gas-fired Power Plant to Run its Data Center in El Paso, Texas - Construction Review",
          "url": "https://constructionreviewonline.com/meta-tables-plans-for-437m-gas-plant-to-power-its-data-center-in-el-paso-texas-despite-city-council-pushback/",
          "publisher": "Construction Review",
          "date": "2026-02-27",
          "source_tier": 1
        },
        {
          "title": "Meta: Our U.S. data center fleet",
          "url": "https://datacenters.atmeta.com/us-locations/",
          "publisher": "Meta",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Meta Wants Data Center in Sunny El Paso to Rely on Natural Gas - Inside Climate News",
          "url": "https://insideclimatenews.org/news/21012026/meta-data-center-in-sunny-el-paso-will-rely-on-natural-gas/",
          "publisher": "Inside Climate News",
          "date": "2026-01-21",
          "source_tier": 1
        },
        {
          "title": "Big things are happening, El Paso!",
          "url": "https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/",
          "publisher": "Meta Data Centers",
          "date": "2026-03-26",
          "source_tier": 4
        },
        {
          "title": "Meta to hold eight El Paso meetings this fall as data center agreement talks advance - KFOX",
          "url": "https://kfoxtv.com/news/local/meta-to-hold-eight-el-paso-meetings-this-fall-as-data-center-agreement-talks-advance",
          "publisher": "KFOX",
          "date": "2026-09-15",
          "source_tier": 4
        },
        {
          "title": "Meta breaks ground on 1GW data center campus in El Paso, Texas - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/meta-breaks-ground-on-1gw-data-center-campus-in-el-paso-texas/",
          "publisher": "Data Center Dynamics",
          "date": "2025-10-16",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-15",
          "summary": "Meta has agreed to hold eight community meetings this fall, one in each City Council district",
          "source_url": "https://kfoxtv.com/news/local/meta-to-hold-eight-el-paso-meetings-this-fall-as-data-center-agreement-talks-advance",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-15",
          "summary": "Meta El Paso Data Center occupies approximately 1,000 acres",
          "source_url": "https://kfoxtv.com/news/local/meta-to-hold-eight-el-paso-meetings-this-fall-as-data-center-agreement-talks-advance",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-15",
          "summary": "Meta El Paso Data Center expanded to 1 gigawatt of computing capacity",
          "source_url": "https://kfoxtv.com/news/local/meta-to-hold-eight-el-paso-meetings-this-fall-as-data-center-agreement-talks-advance",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-15",
          "summary": "Meta data center project cost over $10 billion",
          "source_url": "https://kfoxtv.com/news/local/meta-to-hold-eight-el-paso-meetings-this-fall-as-data-center-agreement-talks-advance",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-15",
          "summary": "Meta stated 300 permanent positions at El Paso facility",
          "source_url": "https://kfoxtv.com/news/local/meta-to-hold-eight-el-paso-meetings-this-fall-as-data-center-agreement-talks-advance",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-15",
          "summary": "Applications for Meta funding are open until October 6",
          "source_url": "https://kfoxtv.com/news/local/meta-to-hold-eight-el-paso-meetings-this-fall-as-data-center-agreement-talks-advance",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-03-26",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Meta plans to add enough clean and renewable energy to match 100 percent of the electricity use of El Paso data center",
          "source_url": "https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/",
          "source_tier": 2
        },
        {
          "status": "under_construction",
          "effective_at": "2026-03-26",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Meta announced a $500,000 grant to support workforce development in partnership with El Paso public schools",
          "source_url": "https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/",
          "source_tier": 2
        },
        {
          "status": "under_construction",
          "effective_at": "2026-03-26",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Meta broke ground on El Paso Data Center last year (2025)",
          "source_url": "https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/",
          "source_tier": 2
        },
        {
          "status": "under_construction",
          "effective_at": "2026-03-26",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Meta El Paso Data Center will grow to 1 gigawatt",
          "source_url": "https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "meta-fort-worth-data-center-tx",
      "name": "Meta Fort Worth Data Center",
      "summary": "Meta lists a data center at Fort Worth, Texas among the sites it operates.",
      "state": "TX",
      "city": "Fort Worth",
      "county": "Tarrant County",
      "status": "operational",
      "developer": "Meta",
      "capacity_mw": null,
      "latitude": 32.7819724,
      "longitude": -97.3490056,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 5,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://datacenters.atmeta.com/us-locations/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/meta-fort-worth-data-center-tx",
      "source": "https://datacenters.atmeta.com/us-locations/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Meta: Our U.S. data center fleet",
          "url": "https://datacenters.atmeta.com/us-locations/",
          "publisher": "Meta",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Meta 2025 Environmental Data Index (Page 9: Water Withdrawal by Facility)",
          "url": "https://sustainability.atmeta.com/wp-content/uploads/2025/10/Meta_2025-Environmental-Data-Index.pdf",
          "publisher": "Meta",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Meta lists Meta Fort Worth Data Center at Fort Worth, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.atmeta.com/us-locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "meta-temple-data-center-tx",
      "name": "Meta Temple Data Center",
      "summary": "Meta lists a data center at Temple, Texas among the sites it operates.",
      "state": "TX",
      "city": "Temple",
      "county": "Bell County",
      "status": "operational",
      "developer": "Meta",
      "capacity_mw": null,
      "latitude": 31.1051466,
      "longitude": -97.3882844,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "closed_loop_liquid",
      "cooling_type_source_url": "https://datacenters.atmeta.com/2026/07/temple-we-are-online/",
      "cooling_fluid": "water",
      "cooling_fluid_source_url": "https://datacenters.atmeta.com/2026/07/temple-we-are-online/",
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://datacenters.atmeta.com/us-locations/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/meta-temple-data-center-tx",
      "source": "https://datacenters.atmeta.com/us-locations/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Meta: Our U.S. data center fleet",
          "url": "https://datacenters.atmeta.com/us-locations/",
          "publisher": "Meta",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Meta Data Centers: Temple, we are online!",
          "url": "https://datacenters.atmeta.com/2026/07/temple-we-are-online/",
          "publisher": "Meta",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "Meta project expected to resume in late 2023 - Temple Daily Telegram",
          "url": "https://www.tdtnews.com/news/community_guide/article_c8df7ce2-0c6a-11ee-91d7-6b6c563032a0.html",
          "publisher": "Temple Daily Telegram",
          "date": "2023-06-24",
          "source_tier": 4
        },
        {
          "title": "Meta puts construction pause on $800M Temple data center - kcentv.com",
          "url": "https://www.kcentv.com/article/news/local/meta-halts-construction-800m-temple-data-center/500-a1fe94fe-ec85-472c-a18f-37cde0913e26",
          "publisher": "kcentv.com",
          "date": "2022-12-15",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Meta lists Meta Temple Data Center at Temple, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.atmeta.com/us-locations/",
          "source_tier": 2
        },
        {
          "status": "operational",
          "effective_at": "2022-12-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2022-12-15",
          "summary": "Meta put construction pause on $800 million Temple data center.",
          "source_url": "https://www.kcentv.com/article/news/local/meta-halts-construction-800m-temple-data-center/500-a1fe94fe-ec85-472c-a18f-37cde0913e26",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "qts-fort-worth-tx",
      "name": "QTS Fort Worth",
      "summary": "QTS Data Centers lists a data center at Fort Worth, Texas among the sites it operates.",
      "state": "TX",
      "city": "Fort Worth",
      "county": "Tarrant County",
      "status": "operational",
      "developer": "QTS Data Centers",
      "capacity_mw": null,
      "latitude": 32.98864,
      "longitude": -97.26263,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071669219) for QTS Fort Worth at 14100 Park Vista Blvd, Fort Worth, Tarrant County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110071669219",
      "location_last_verified": "2026-09-14",
      "site_address": "14100 Park Vista Blvd, Fort Worth, TX 76177",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071669219",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://q.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/qts-fort-worth-tx",
      "source": "https://q.com/data-centers/",
      "basis": "official_record",
      "sources": [
        {
          "title": "QTS Data Centers: All locations",
          "url": "https://q.com/data-centers/",
          "publisher": "QTS Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: QTS Fort Worth Park Vista Blvd",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071669219",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "QTS Data Centers lists QTS Fort Worth at Fort Worth, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://q.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "qts-hall-county-tx",
      "name": "QTS Hall County",
      "summary": "QTS Data Centers lists a data center at Hall County, Texas and says it is being built.",
      "state": "TX",
      "city": "Turkey",
      "county": "Hall County",
      "status": "under_construction",
      "developer": "QTS Data Centers",
      "capacity_mw": null,
      "latitude": 34.72667,
      "longitude": -100.54139,
      "location_precision": "county",
      "location_source": "County seat (Memphis), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": "Southeast Corner Highway 70 & County Road CC, Turkey, TX 79261",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072157031",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/qts-hall-county-tx",
      "source": "https://q.com/data-centers/",
      "basis": "official_record",
      "sources": [
        {
          "title": "QTS Data Centers: All locations",
          "url": "https://q.com/data-centers/",
          "publisher": "QTS Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: QTS WTX1 Turkey TX",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110072157031",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "QTS Data Centers lists QTS Hall County at Hall County, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://q.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "qts-howard-county-tx",
      "name": "QTS Howard County",
      "summary": "A QTS Data Centers site in Howard County, Texas, which QTS lists as in consideration.",
      "state": "TX",
      "city": "Big Spring",
      "county": "Howard County",
      "status": "proposed",
      "developer": "QTS Data Centers",
      "capacity_mw": null,
      "latitude": 32.2433,
      "longitude": -101.475,
      "location_precision": "county",
      "location_source": "County seat (Big Spring), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/qts-howard-county-tx",
      "source": "https://q.com/data-centers/",
      "basis": "official_record",
      "sources": [
        {
          "title": "QTS Data Centers: All locations",
          "url": "https://q.com/data-centers/",
          "publisher": "QTS Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-10-13",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-10-13",
          "summary": "QTS Data Centers lists QTS Howard County at Howard County, Texas as in consideration on its own page of data center locations, read October 13, 2026.",
          "source_url": "https://q.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "qts-irving-tx",
      "name": "QTS Irving",
      "summary": "QTS Data Centers lists a data center at Irving, Texas among the sites it operates.",
      "state": "TX",
      "city": "Irving",
      "county": "Dallas County",
      "status": "operational",
      "developer": "QTS Data Centers",
      "capacity_mw": null,
      "latitude": 32.89607,
      "longitude": -96.98123,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071337750) for QTS DFW01 at 6351 Longhorn Dr, Irving, Dallas County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110071337750",
      "location_last_verified": "2026-09-14",
      "site_address": "6351 Longhorn Dr, Irving, TX 75063",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071337750",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 4,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://q.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/qts-irving-tx",
      "source": "https://www.connectcre.com/stories/qts-eyeing-150m-data-center-expansion-at-irving-site/",
      "basis": "official_record",
      "sources": [
        {
          "title": "QTS Eyeing $150M Irving Data Center Expansion - Connect CRE",
          "url": "https://www.connectcre.com/stories/qts-eyeing-150m-data-center-expansion-at-irving-site/",
          "publisher": "Connect CRE",
          "date": "2024-03-29",
          "source_tier": 1
        },
        {
          "title": "QTS Data Centers: All locations",
          "url": "https://q.com/data-centers/",
          "publisher": "QTS Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: QTS DFW01 Longhorn Dr Irving",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071337750",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "QTS Data Centers lists QTS Irving at Irving, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://q.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "qts-san-antonio-tx",
      "name": "QTS San Antonio",
      "summary": "QTS Data Centers lists a data center at San Antonio, Texas among the sites it operates.",
      "state": "TX",
      "city": "San Antonio",
      "county": "Bexar County",
      "status": "operational",
      "developer": "QTS Data Centers",
      "capacity_mw": null,
      "latitude": 29.4426,
      "longitude": -98.6852,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110070939377) for QTS SAT2 in San Antonio, Bexar County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110070939377",
      "location_last_verified": "2026-09-14",
      "site_address": "NWC Of Potranco Road And Ingram Road, San Antonio, TX 78251",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070939377",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://q.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/qts-san-antonio-tx",
      "source": "https://q.com/data-centers/",
      "basis": "official_record",
      "sources": [
        {
          "title": "QTS Data Centers: All locations",
          "url": "https://q.com/data-centers/",
          "publisher": "QTS Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: QTS SAT2 San Antonio",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110070939377",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "QTS Data Centers lists QTS San Antonio at San Antonio, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://q.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "qts-south-dallas-wilmer-tx",
      "name": "QTS South Dallas",
      "summary": "QTS Data Centers lists a data center at Wilmer, Texas and says it is being built.",
      "state": "TX",
      "city": "Wilmer",
      "county": "Dallas County",
      "status": "under_construction",
      "developer": "QTS Data Centers",
      "capacity_mw": null,
      "latitude": 32.587472,
      "longitude": -96.699838,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071946009) for QTS DFW2 DC3 in Wilmer, Dallas County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110071946009",
      "location_last_verified": "2026-09-14",
      "site_address": "1501 N Sunrise Rd, Wilmer, TX 75172",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071946009",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "air permit generator list",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071946009",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/qts-south-dallas-wilmer-tx",
      "source": "https://q.com/data-centers/",
      "basis": "official_record",
      "sources": [
        {
          "title": "QTS Data Centers: All locations",
          "url": "https://q.com/data-centers/",
          "publisher": "QTS Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: QTS DFW2 DC3 Wilmer TX",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071946009",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "QTS Data Centers lists QTS South Dallas at Wilmer, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://q.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "rackspace-us-inc-rackspace-dallas-grapevine-dfw1-grapevine-tx",
      "name": "Rackspace Dallas Grapevine (DFW1)",
      "summary": "Rackspace operates the DFW1 data center at 801 Industrial Blvd in Grapevine, Tarrant County, Texas, registered in the EPA Facility Registry Service (FRS ID 110035370504).",
      "state": "TX",
      "city": "Grapevine",
      "county": "Tarrant County",
      "status": "operational",
      "developer": "Rackspace",
      "capacity_mw": null,
      "latitude": 32.93054,
      "longitude": -97.10471,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110035370504) for Rackspace Hosting at 801 Industrial Blvd Ste 200, Grapevine, Tarrant County, Texas.",
      "location_verified_at": null,
      "coordinate_source": "EPA ECHO FRS ID 110035370504",
      "location_last_verified": null,
      "site_address": "801 Industrial Blvd Ste 200, Grapevine, TX 76051",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110035370504",
      "published": "2026-10-21",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "air permit generator list",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110035370504",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/rackspace-us-inc-rackspace-dallas-grapevine-dfw1-grapevine-tx",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110035370504",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Rackspace Hosting Grapevine",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110035370504",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110035370504",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "stack-dfw01-plano-tx",
      "name": "STACK DFW01",
      "summary": "STACK Infrastructure lists a data center at Plano, Texas among the sites it operates.",
      "state": "TX",
      "city": "Plano",
      "county": "Collin County",
      "status": "operational",
      "developer": "STACK Infrastructure",
      "capacity_mw": null,
      "latitude": 33.0502419,
      "longitude": -96.748682,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.stackinfra.com/locations/americas/dallas-fort-worth/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/stack-dfw01-plano-tx",
      "source": "https://www.stackinfra.com/locations/",
      "basis": "official_record",
      "sources": [
        {
          "title": "STACK Infrastructure: Americas locations",
          "url": "https://www.stackinfra.com/locations/",
          "publisher": "STACK Infrastructure",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "STACK Infrastructure: STACK DFW01",
          "url": "https://www.stackinfra.com/locations/americas/dallas-fort-worth/",
          "publisher": "STACK Infrastructure",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "STACK Infrastructure lists STACK DFW01 at Plano, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.stackinfra.com/locations/americas/dallas-fort-worth/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "stack-dfw02-lancaster-tx",
      "name": "STACK DFW02",
      "summary": "STACK Infrastructure lists a data center at Lancaster, Texas among the sites it operates.",
      "state": "TX",
      "city": "Lancaster",
      "county": "Dallas County",
      "status": "operational",
      "developer": "STACK Infrastructure",
      "capacity_mw": null,
      "latitude": 32.561752,
      "longitude": -96.76881,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071943842) for Lancaster Data Center at 2401 S Dallas Ave, Lancaster, Dallas County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110071943842",
      "location_last_verified": "2026-09-14",
      "site_address": "2401 S Dallas Ave, Lancaster, TX 75146",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071943842",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.stackinfra.com/locations/americas/dallas-fort-worth/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/stack-dfw02-lancaster-tx",
      "source": "https://www.stackinfra.com/locations/",
      "basis": "official_record",
      "sources": [
        {
          "title": "STACK Infrastructure: Americas locations",
          "url": "https://www.stackinfra.com/locations/",
          "publisher": "STACK Infrastructure",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "STACK Infrastructure: STACK DFW02",
          "url": "https://www.stackinfra.com/locations/americas/dallas-fort-worth/",
          "publisher": "STACK Infrastructure",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: LAN01 Lancaster Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071943842",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "STACK Infrastructure lists STACK DFW02 at Lancaster, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.stackinfra.com/locations/americas/dallas-fort-worth/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "stream-data-centers-stream-data-centers-dfw-vii-garland-tx",
      "name": "Stream Data Centers DFW VII Garland",
      "summary": "Stream Data Centers operates the DFW VII data center campus at 1717 Lookout Drive in Garland, Dallas County, Texas, registered in the EPA Facility Registry Service (FRS ID 110071854750).",
      "state": "TX",
      "city": "Garland",
      "county": "Dallas County",
      "status": "operational",
      "developer": "Stream Data Centers",
      "capacity_mw": null,
      "latitude": 32.982696,
      "longitude": -96.666884,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071854750) for SDC DFW VII Data Center at 1717 Lookout Drive, Garland, Dallas County, Texas.",
      "location_verified_at": null,
      "coordinate_source": "EPA ECHO FRS ID 110071854750",
      "location_last_verified": null,
      "site_address": "1717 Lookout Drive, Garland, TX 75044",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071854750",
      "published": "2026-10-21",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "air permit generator list",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071854750",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/stream-data-centers-stream-data-centers-dfw-vii-garland-tx",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110071854750",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: SDC DFW VII Data Center Phase 2",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071854750",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071854750",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "switch-austin-campus-tx",
      "name": "Switch Austin campus",
      "summary": "Switch lists a data center at Austin, Texas among the sites it operates.",
      "state": "TX",
      "city": "Austin",
      "county": "Travis County",
      "status": "operational",
      "developer": "Switch",
      "capacity_mw": null,
      "latitude": 30.2984886,
      "longitude": -97.7536575,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.switch.com/austin/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/switch-austin-campus-tx",
      "source": "https://www.switch.com/locations/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Switch: Locations",
          "url": "https://www.switch.com/locations/",
          "publisher": "Switch",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Switch: Switch Austin campus",
          "url": "https://www.switch.com/austin/",
          "publisher": "Switch",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Switch lists Switch Austin campus at Austin, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.switch.com/austin/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "tierpoint-dallas-tx",
      "name": "TierPoint Dallas",
      "summary": "TierPoint lists 3 data centers at Dallas, Texas among the sites it operates.",
      "state": "TX",
      "city": "Dallas",
      "county": "Dallas County",
      "status": "operational",
      "developer": "TierPoint",
      "capacity_mw": null,
      "latitude": 32.7935291,
      "longitude": -96.7666819,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.tierpoint.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/tierpoint-dallas-tx",
      "source": "https://www.tierpoint.com/data-centers/",
      "basis": "official_record",
      "sources": [
        {
          "title": "TierPoint: Browse our data centers",
          "url": "https://www.tierpoint.com/data-centers/",
          "publisher": "TierPoint",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "TierPoint lists TierPoint Dallas Data Center, TierPoint Dallas - Allen Data Center, TierPoint Dallas - Fort Worth Data Center at Dallas, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.tierpoint.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "tierpoint-llc-tierpoint-dallas-forth-worth-fort-worth-tx",
      "name": "TierPoint Fort Worth Data Center",
      "summary": "TierPoint operates the Dallas Fort Worth data center at 13701 Independence Pkwy in Fort Worth, Tarrant County, Texas, registered in the EPA Facility Registry Service (FRS ID 110033431935).",
      "state": "TX",
      "city": "Fort Worth",
      "county": "Tarrant County",
      "status": "operational",
      "developer": "TierPoint",
      "capacity_mw": null,
      "latitude": 32.97985,
      "longitude": -97.25112,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110033431935) and TierPoint data center directory at 13701 Independence Pkwy, Fort Worth, Tarrant County, Texas.",
      "location_verified_at": null,
      "coordinate_source": "EPA ECHO FRS ID 110033431935",
      "location_last_verified": null,
      "site_address": "13701 Independence Pkwy, Fort Worth, TX 76177",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110033431935",
      "published": "2026-10-21",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.tierpoint.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/tierpoint-llc-tierpoint-dallas-forth-worth-fort-worth-tx",
      "source": "https://www.tierpoint.com/data-centers/",
      "basis": "official_record",
      "sources": [
        {
          "title": "TierPoint: Data Center Locations",
          "url": "https://www.tierpoint.com/data-centers/",
          "publisher": "TierPoint",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Independence Pkwy Data Center Fort Worth",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110033431935",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110033431935",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "tierpoint-llc-tierpoint-dallas2-allen-allen-tx",
      "name": "TierPoint Allen Data Center",
      "summary": "TierPoint operates the Dallas Allen data center at 820 Allen Commerce Parkway in Allen, Collin County, Texas.",
      "state": "TX",
      "city": "Allen",
      "county": "Collin County",
      "status": "operational",
      "developer": "TierPoint",
      "capacity_mw": null,
      "latitude": 33.0954,
      "longitude": -96.6792,
      "location_precision": "permit_point",
      "location_source": "TierPoint Dallas Allen data center specification at 820 Allen Commerce Parkway, Allen, Collin County, Texas.",
      "location_verified_at": null,
      "coordinate_source": "operator address point",
      "location_last_verified": null,
      "site_address": "820 Allen Commerce Parkway, Allen, TX 75013",
      "site_address_source_url": "https://www.tierpoint.com/data-centers/",
      "published": "2026-10-21",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.tierpoint.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/tierpoint-llc-tierpoint-dallas2-allen-allen-tx",
      "source": "https://www.tierpoint.com/data-centers/",
      "basis": "official_record",
      "sources": [
        {
          "title": "TierPoint: Data Center Locations",
          "url": "https://www.tierpoint.com/data-centers/",
          "publisher": "TierPoint",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://www.tierpoint.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "turner-construction-wlo-sn1-data-center-project-san-antonio-tx",
      "name": "Turner Construction Wlo SN1 Data Center Project",
      "summary": "The EPA's facility registry lists Turner Construction Wlo SN1 Data Center Project at 5150 Rogers RD, San Antonio, TX 78251 in San Antonio, Texas, with no permit program listed.",
      "state": "TX",
      "city": "San Antonio",
      "county": "Bexar County",
      "status": "operational",
      "developer": "Microsoft",
      "capacity_mw": null,
      "latitude": 29.47897,
      "longitude": -98.69541,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110035156041: the registry placed its point by address matching house number, accurate to 30 m",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-20",
      "site_address": "5150 Rogers RD, San Antonio, TX 78251",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110035156041",
      "published": "2026-10-20",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "air permit generator list",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110035156041",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/turner-construction-wlo-sn1-data-center-project-san-antonio-tx",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110035156041",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Turner Construction Wlo SN1 Data Center Project",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110035156041",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110035156041",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "westlake-data-ctr-roanoke-tx",
      "name": "Westlake Data CTR",
      "summary": "The EPA's facility registry lists Westlake Data CTR at 8 Campus Cir, Roanoke, TX 76262 in Roanoke, Texas, with no permit program listed.",
      "state": "TX",
      "city": "Roanoke",
      "county": "Tarrant County",
      "status": "not_verified",
      "developer": "Fidelity Investments",
      "capacity_mw": null,
      "latitude": 32.980592,
      "longitude": -97.174381,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110034238064: the registry placed its point by address matching house number, accurate to 50 m",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-20",
      "site_address": "8 Campus Cir, Roanoke, TX 76262",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110034238064",
      "published": "2026-10-20",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/westlake-data-ctr-roanoke-tx",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110034238064",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Westlake Data CTR",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110034238064",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Facility appears in the EPA Facility Registry Service (ECHO) under NAICS 518210 or SIC 7374; commercial data center operations have not yet been independently verified.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110034238064",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "google-west-memphis-data-center-ar",
      "name": "Google West Memphis Data Center",
      "summary": "Google is developing a data center in West Memphis, Arkansas, involving a power agreement with Entergy and utility rate implications for West Memphis Utilities ratepayers, with associated legal disputes over disclosure of financial records.",
      "state": "AR",
      "city": "West Memphis",
      "county": "Crittenden",
      "status": "under_construction",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 35.20611,
      "longitude": -90.20167,
      "location_precision": "county",
      "location_source": "County seat (Marion), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-10-21",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": "utility special rate agreement",
      "power_source_url": "https://pv-magazine-usa.com/2026/09/23/googles-fair-share-plus-data-center-deal-with-entergy-sparks-arkansas-ratepayer-concerns/",
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-west-memphis-data-center-ar",
      "source": "https://www.yahoo.com/news/us/articles/west-memphis-utilities-no-rate-183236485.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "West Memphis Utilities: No rate increase because of Google - WREG.com",
          "url": "https://www.yahoo.com/news/us/articles/west-memphis-utilities-no-rate-183236485.html",
          "publisher": "WREG.com",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Google, Entergy keeping energy rate contract secret for $4 billion West Memphis project - The Arkansas Democrat Gazette",
          "url": "https://www.arkansasonline.com/news/2026/may/03/google-entergy-keeping-energy-rate-contract/",
          "publisher": "arkansasonline.com",
          "date": "2026-05-03",
          "source_tier": 4
        },
        {
          "title": "Data center non disclosure agreements broad, secretive - The Arkansas Democrat Gazette",
          "url": "https://www.arkansasonline.com/news/2026/may/12/data-center-non-disclosure-agreements-broad/",
          "publisher": "arkansasonline.com",
          "date": "2026-05-12",
          "source_tier": 4
        },
        {
          "title": "Google breaks ground on $4B West Memphis project, largest in Ark. history",
          "url": "https://www.bizjournals.com/memphis/news/2025/10/02/google-unveils-west-memphis-arkanasas-data-center.html",
          "publisher": "The Business Journals",
          "date": "2025-10-02",
          "source_tier": 4
        },
        {
          "title": "Google hiring for West Memphis data center",
          "url": "https://wreg.com/news/local/google-hiring-for-west-memphis-data-center/",
          "publisher": "WREG.com",
          "date": "2026-02-26",
          "source_tier": 4
        },
        {
          "title": "West Memphis hopes Arkansas incentives attract new facility, thousands of jobs - The Arkansas Democrat Gazette",
          "url": "https://www.arkansasonline.com/news/2026/apr/24/west-memphis-hopes-arkansas-incentives-attract/",
          "publisher": "arkansasonline.com",
          "date": "2026-04-24",
          "source_tier": 4
        },
        {
          "title": "Google breaks ground on $4B data center in West Memphis",
          "url": "https://businessfacilities.com/google-breaks-ground-on-4b-data-center-in-west-memphis/",
          "publisher": "Action News 5",
          "date": "2025-10-02",
          "source_tier": 4
        },
        {
          "title": "OPINION | GUEST COLUMN: Harvey Couch versus the data centers - The Arkansas Democrat Gazette",
          "url": "https://www.arkansasonline.com/news/2026/sep/06/harvey-couch-versus-the-data-centers/",
          "publisher": "The Arkansas Democrat-Gazette",
          "date": "2026-09-06",
          "source_tier": 4
        },
        {
          "title": "Google announces grants for West Memphis area",
          "url": "https://wreg.com/news/google-announces-grants-for-west-memphis-area/",
          "publisher": "WREG.com",
          "date": "2026-04-28",
          "source_tier": 4
        },
        {
          "title": "Google to purchase power from new Steel River solar project in Mississippi County - The Arkansas Democrat Gazette",
          "url": "https://www.arkansasonline.com/news/2026/jul/14/google-to-purchase-power-from-new-solar-project/",
          "publisher": "arkansasonline.com",
          "date": "2026-07-14",
          "source_tier": 4
        },
        {
          "title": "Google breaks ground on $4B West Memphis, AR data center",
          "url": "https://wreg.com/news/local/google-breaks-ground-on-arkansas-data-center/",
          "publisher": "WREG.com",
          "date": "2025-10-02",
          "source_tier": 4
        },
        {
          "title": "Google confirmed to be behind West Memphis data center project in Arkansas",
          "url": "https://www.datacenterdynamics.com/en/news/google-confirmed-to-be-behind-west-memphis-data-center-project-in-arkansas/",
          "publisher": "Data Center Dynamics",
          "date": "2025-09-09",
          "source_tier": 3
        },
        {
          "title": "Google to Build Data Center in Arkansas",
          "url": "https://www.wsj.com/tech/google-to-build-data-center-in-arkansas-52ff3c01",
          "publisher": "WSJ",
          "date": "2025-10-02",
          "source_tier": 4
        },
        {
          "title": "Arkansas lawmakers question utility on data center projects, impact on ratepayers - Arkansas Advocate",
          "url": "https://arkansasadvocate.com/2026/09/15/arkansas-lawmakers-question-utility-on-data-center-projects-impact-on-ratepayers/",
          "publisher": "Arkansas Advocate",
          "date": "2026-09-16",
          "source_tier": 4
        },
        {
          "title": "Entergy loses bid to block Google deal reporting - Axios",
          "url": "https://www.axios.com/local/nw-arkansas/2026/09/02/entergy-google-data-center-deal-court-ruling",
          "publisher": "Axios",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Judge denies effort to block Arkansas outlets from publishing details about data center agreement - Arkansas Advocate",
          "url": "https://arkansasadvocate.com/2026/09/02/judge-denies-effort-to-block-arkansas-outlets-from-publishing-details-about-data-center-agreement/",
          "publisher": "Arkansas Advocate",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Federal judge denies Entergy a temporary restraining order to block reporting on West Memphis data center agreement - K8 News | Jonesboro, Arkansas",
          "url": "https://www.kait8.com/2026/09/02/federal-judge-denies-entergy-temporary-restraining-order-block-reporting-west-memphis-data-center-agreement/",
          "publisher": "K8 News | Jonesboro, Arkansas",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Docs reveal plans for $6 utility rate hike to help fund Google’s data center project in West Memphis - Action News 5",
          "url": "https://www.actionnews5.com/2026/09/02/docs-reveal-plans-6-utility-rate-hike-help-fund-googles-data-center-project-west-memphis/",
          "publisher": "Action News 5",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Judge refuses to block Arkansas news reporting on Google data center energy documents - CNBC",
          "url": "https://www.cnbc.com/2026/09/02/google-data-center-arkansas-entergy-court.html",
          "publisher": "CNBC",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Entergy Sues to Block Release of Financial Details in Google Arkansas Data Center Project - KVOM 101.7",
          "url": "https://www.kvom.com/entergy-sues-to-block-release-of-financial-details-in-google-arkansas-data-center-project/",
          "publisher": "KVOM 101.7",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Entergy Sues to Block Publication of Google Data Center Financial Records Amid Trade Secret Dispute - Deltaplex News",
          "url": "https://www.deltaplexnews.com/local-news/entergy-sues-to-block-release-of-financial-details-in-google-arkansas-data-center-project/",
          "publisher": "Deltaplex News",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Entergy files to stop disclosure of West Memphis data center agreement - WREG.com",
          "url": "https://x.com/3onyourside/status/2095187771014939079?lang=ar&ref_src=twsrc%5Egoogle%7Ctwcamp%5Eserp%7Ctwgr%5Etweet",
          "publisher": "WREG.com",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "In a panic over mistakenly shared documents, Entergy lawyers ask judge to restrain journalists - Arkansas Times",
          "url": "https://arktimes.com/arkansas-blog/2026/09/01/in-a-panic-over-mistakenly-shared-documents-entergy-lawyers-ask-judge-to-restrain-journalists",
          "publisher": "Arkansas Times",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Entergy Arkansas Asks Federal Judge to Block Publication of Google Data Center Agreement - Arkansas Business",
          "url": "https://www.arkansasbusiness.com/article/entergy-seeks-to-block-data-center-news/",
          "publisher": "Arkansas Business",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Google Invests $526 Million in Arkansas Solar and Battery Project to Power Data Center - Deltaplex News",
          "url": "https://www.deltaplexnews.com/local-news/google-invests-526-million-in-arkansas-solar-and-battery-project-to-power-data-center/",
          "publisher": "Deltaplex News",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Judge expected to rule Wednesday on Entergy’s request to stop Democrat-Gazette from publishing data center info - arkansasonline.com",
          "url": "https://www.arkansasonline.com/news/2026/sep/01/entergy-arkansas-asks-federal-judge-to-stop/",
          "publisher": "arkansasonline.com",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Judge weighing whether to block Arkansas news outlets from publishing data center pact details",
          "url": "https://www.ualrpublicradio.org/local-regional-news/2026-09-02/judge-weighing-whether-to-block-arkansas-news-outlets-from-publishing-data-center-pact-details",
          "publisher": "Little Rock Public Radio KUAR",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Google representative in Little Rock to talk future of data centers in Arkansas - KHBS",
          "url": "https://www.4029tv.com/article/google-representative-in-little-rock-to-talk-future-of-data-centers-in-arkansas/73753066",
          "publisher": "KHBS",
          "date": "2026-09-16",
          "source_tier": 4
        },
        {
          "title": "AR lawmakers question Entergy on Google data center power costs, ratepayer impact - KATV",
          "url": "https://katv.com/news/local/ar-lawmakers-question-entergy-on-google-data-center-power-costs-ratepayer-impact-public-scrutiny-cypress-solar-partnership-funding-plant",
          "publisher": "KATV",
          "date": "2026-09-16",
          "source_tier": 4
        },
        {
          "title": "Entergy Arkansas drops lawsuit over newspaper’s publication of data center agreement details",
          "url": "https://www.ualrpublicradio.org/local-regional-news/2026-09-17/entergy-arkansas-drops-lawsuit-over-newspapers-publication-of-data-center-agreement-details",
          "publisher": "Little Rock Public Radio KUAR",
          "date": "2026-09-17",
          "source_tier": 4
        },
        {
          "title": "Entergy Arkansas drops lawsuit over West Memphis data center agreement details - kjnbtv.com",
          "url": "https://www.kjnbtv.com/news/local/entergy-arkansas-drops-lawsuit-over-west-memphis-data-center-agreement-details/article_25e44c55-0b0c-46ae-b9b9-7e85d91dd8c2.html",
          "publisher": "kjnbtv.com",
          "date": "2026-09-17",
          "source_tier": 4
        },
        {
          "title": "Lawmakers question West Memphis data center project’s impact on Entergy ratepayers - Action News 5",
          "url": "https://www.actionnews5.com/2026/09/18/lawmakers-question-west-memphis-data-center-projects-impact-entergy-ratepayers/",
          "publisher": "Action News 5",
          "date": "2026-09-18",
          "source_tier": 4
        },
        {
          "title": "Arkansas Public Service Commission denies Entergy’s request to purchase power from a planned solar facility - FOX16.com",
          "url": "https://www.myarklamiss.com/news/arkansas-news/arkansas-public-service-commission-denies-entergys-request-to-purchase-power-from-a-planned-solar-facility/amp/",
          "publisher": "FOX16.com",
          "date": "2026-09-17",
          "source_tier": 4
        },
        {
          "title": "Seeds sown in 2024 for Generating Arkansas Jobs Act, Entergy’s Google deal - The Arkansas Democrat Gazette",
          "url": "https://www.arkansasonline.com/news/2026/sep/19/seeds-sown-in-2024-for-generating-arkansas-jobs/",
          "publisher": "The Arkansas Democrat-Gazette",
          "date": "2026-09-20",
          "source_tier": 4
        },
        {
          "title": "Google's \"Fair Share Plus\" data center deal with Entergy sparks Arkansas ratepayer concerns - pv magazine USA",
          "url": "https://pv-magazine-usa.com/2026/09/23/googles-fair-share-plus-data-center-deal-with-entergy-sparks-arkansas-ratepayer-concerns/",
          "publisher": "pv magazine USA",
          "date": "2026-09-23",
          "source_tier": 4
        },
        {
          "title": "Google's West Memphis data center",
          "url": "https://www.youtube.com/watch?v=pl1DMQjXoVY",
          "publisher": "YouTube",
          "date": "2026-06-05",
          "source_tier": 5
        },
        {
          "title": "Entergy sues Democrat Gazette, AR Times for publishing secret Google data center details",
          "url": "https://www.youtube.com/watch?v=LocqocLV8IA",
          "publisher": "YouTube",
          "date": "2026-09-03",
          "source_tier": 5
        },
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "New Data Center Developments: November 2025 - Data Center Knowledge",
          "url": "https://www.datacenterknowledge.com/data-center-construction/new-data-center-developments-november-2025",
          "publisher": "Data Center Knowledge",
          "date": "2025-11-04",
          "source_tier": 1
        },
        {
          "title": "West Memphis Utilities outlines its role in Google data center project amid public concern - KATV",
          "url": "https://katv.com/news/gallery/west-memphis-utilities-outlines-its-role-in-google-data-center-project-amid-public-concern?photo=2",
          "publisher": "KATV",
          "date": "2026-09-04",
          "source_tier": 4
        },
        {
          "title": "West Memphis Utilities issues statement to ease concerns about perceived bill increase tied to Google data center - localmemphis.com",
          "url": "https://www.localmemphis.com/article/news/local/west-memphis-utilities-issues-statement-to-ease-concerns-about-perceived-bill-increase-tied-to-google-data-center/522-bf466f33-f219-41bf-9e30-a910642ee5db",
          "publisher": "localmemphis.com",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Google’s Arkansas Data Center Reveals the Huge Power Bill Behind AI. Entergy Stands to Benefit - Yahoo Finance",
          "url": "https://finance.yahoo.com/technology/ai/articles/google-arkansas-data-center-reveals-200631272.html",
          "publisher": "Yahoo Finance",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Judge says ‘no’ to Arkansas utility in freedom of the press fight - Oklahoma Energy Today",
          "url": "https://okenergytoday.com/2026/09/judge-says-no-to-arkansas-utility-in-freedom-of-the-press-fight/",
          "publisher": "Oklahoma Energy Today",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Judge Rejects Entergy Request to Block Publication of Google Data Center Financial Records - KVOM 101.7",
          "url": "https://www.kvom.com/judge-rejects-entergy-request-to-block-publication-of-google-data-center-financial-records/",
          "publisher": "KVOM 101.7",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Google’s contribution was at issue in Arkansas regulators’ review of Entergy contract - arkansasonline.com",
          "url": "https://www.arkansasonline.com/news/2026/sep/03/googles-contribution-was-at-issue-in-arkansas/",
          "publisher": "arkansasonline.com",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Court fight ensues over new documents about Google and Arkansas data center - Oklahoma Energy Today",
          "url": "https://okenergytoday.com/2026/09/court-fight-ensues-over-new-documents-about-google-and-arkansas-data-center/",
          "publisher": "Oklahoma Energy Today",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Federal judge denies Entergy Arkansas’ request for temporary restraining order against Arkansas Democrat-Gazette - arkansasonline.com",
          "url": "https://www.arkansasonline.com/news/2026/sep/02/federal-judge-denies-entergy-arkansas-request-for/",
          "publisher": "arkansasonline.com",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Entergy Arkansas alleges ‘serious and careless mathematical error’ in Google West Memphis data center reporting - FOX16.com",
          "url": "https://www.kark.com/news/state-news/entergy-arkansas-alleges-serious-and-careless-mathematical-error-in-google-west-memphis-data-center-reporting/",
          "publisher": "FOX16.com",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Arkansas judge rules against Entergy in fight over released FOIA records for West Memphis data center - KARK",
          "url": "https://www.kark.com/news/arkansas-courts/entergy-files-in-federal-court-to-stop-disclosure-of-west-memphis-data-center-agreement/",
          "publisher": "KARK",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Entergy asks judge to block Arkansas news outlets' publication of 'confidential' Google data center info - thv11.com",
          "url": "https://www.thv11.com/article/news/local/little-rock/entergy-arkansas-news-outlets-data-center/91-e6aecedc-d99e-418b-9916-daefea3837ea",
          "publisher": "thv11.com",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Google breaks ground on $4B West Memphis, AR data center",
          "url": "https://www.youtube.com/watch?v=ODCdw4FF6Oc",
          "publisher": "YouTube",
          "date": null,
          "source_tier": 5
        },
        {
          "title": "Google breaks ground on $4B data center in West Memphis",
          "url": "https://www.youtube.com/watch?v=B2oIZAsfi3U",
          "publisher": "YouTube",
          "date": null,
          "source_tier": 5
        },
        {
          "title": "Google data center poises West Memphis for boom; project bond issue totals could reach $60 billion - The Arkansas Democrat Gazette",
          "url": "https://www.arkansasonline.com/news/2026/jun/04/google-data-center-poises-west-memphis-for-boom/",
          "publisher": "arkansasonline.com",
          "date": "2026-06-04",
          "source_tier": 4
        },
        {
          "title": "Google hiring for new West Memphis data center",
          "url": "https://www.actionnews5.com/2026/02/26/google-hiring-new-west-memphis-data-center/",
          "publisher": "Action News 5",
          "date": "2026-02-26",
          "source_tier": 4
        },
        {
          "title": "Google hands out money from West Memphis Energy Impact Fund",
          "url": "https://talkbusiness.net/2026/04/google-hands-out-money-from-west-memphis-energy-impact-fund/",
          "publisher": "Talk Business & Politics",
          "date": "2026-04-28",
          "source_tier": 4
        },
        {
          "title": "Google backs nation's largest solar project for West Memphis data center",
          "url": "https://www.commercialappeal.com/story/money/business/development/2026/07/14/google-west-memphis-data-center-to-be-powered-by-solar-battery-storage/90862492007/",
          "publisher": "commercialappeal.com",
          "date": "2026-07-14",
          "source_tier": 4
        },
        {
          "title": "Google announces first recipients of West Memphis Energy Impact Fund",
          "url": "https://www.actionnews5.com/2026/04/28/google-announces-first-recipients-west-memphis-energy-impact-fund/",
          "publisher": "Action News 5",
          "date": "2026-04-28",
          "source_tier": 4
        },
        {
          "title": "See photos from Google's West Memphis Energy Impact Fund event",
          "url": "https://www.commercialappeal.com/picture-gallery/money/business/2026/04/28/google-energy-impact-fund-in-west-memphis/89839657007/",
          "publisher": "commercialappeal.com",
          "date": "2026-04-28",
          "source_tier": 4
        },
        {
          "title": "Google's $4 billion data center to transform West Memphis",
          "url": "https://katv.com/news/local/googles-4-billion-data-center-to-transform-west-memphis",
          "publisher": "KATV",
          "date": "2025-10-02",
          "source_tier": 4
        },
        {
          "title": "Google announces recipients for $25M West Memphis Energy Impact Fund",
          "url": "https://www.commercialappeal.com/story/money/business/development/2026/04/28/google-announces-plans-recipients-memphis-energy-fund/89751973007/",
          "publisher": "commercialappeal.com",
          "date": "2026-04-28",
          "source_tier": 4
        },
        {
          "title": "Google is investing in Arkansas with a new data center, energy efficiency programs and more.",
          "url": "https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-arkansas/",
          "publisher": "blog.google",
          "date": "2025-10-02",
          "source_tier": 4
        },
        {
          "title": "Google to invest $4 billion in data center project in West Memphis. Everything we know",
          "url": "https://www.commercialappeal.com/story/money/business/2025/10/02/google-data-center-4-billion-dollars-west-memphis-arkansas/86354716007/",
          "publisher": "commercialappeal.com",
          "date": "2025-10-02",
          "source_tier": 4
        },
        {
          "title": "Google Invests $526 Million in Arkansas Solar and Battery Project to Power Data Center - KVOM 101.7",
          "url": "https://www.deltaplexnews.com/local-news/google-invests-526-million-in-arkansas-solar-and-battery-project-to-power-data-center/",
          "publisher": "KVOM 101.7",
          "date": "2026-09-01",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-10-21",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Entergy Arkansas filed heavily redacted amended application for Google West Memphis data center project.",
          "source_url": "https://www.arkansasonline.com/news/2026/oct/21/entergy-files-heavily-redacted-amended-application/",
          "source_tier": 1
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-20",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-20",
          "summary": "Entergy and Google began talks about a data center in West Memphis; three months later, work on the Generating Arkansas Jobs Act began",
          "source_url": "https://www.arkansasonline.com/news/2026/sep/19/seeds-sown-in-2024-for-generating-arkansas-jobs/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-18",
          "summary": "Google partnership with Entergy Arkansas is for 20 years",
          "source_url": "https://www.actionnews5.com/2026/09/18/lawmakers-question-west-memphis-data-center-projects-impact-entergy-ratepayers/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-18",
          "summary": "Google exploring second potential data center project in Little Rock",
          "source_url": "https://www.actionnews5.com/2026/09/18/lawmakers-question-west-memphis-data-center-projects-impact-entergy-ratepayers/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-18",
          "summary": "Construction on Google West Memphis facility has been ongoing for nearly a year",
          "source_url": "https://www.actionnews5.com/2026/09/18/lawmakers-question-west-memphis-data-center-projects-impact-entergy-ratepayers/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "A federal judge denied Entergy's request to block publication of agreement details earlier in September 2026.",
          "source_url": "https://www.kjnbtv.com/news/local/entergy-arkansas-drops-lawsuit-over-west-memphis-data-center-agreement-details/article_25e44c55-0b0c-46ae-b9b9-7e85d91dd8c2.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "Groundbreaking for the solar farm took place July 11.",
          "source_url": "https://www.myarklamiss.com/news/arkansas-news/arkansas-public-service-commission-denies-entergys-request-to-purchase-power-from-a-planned-solar-facility/amp/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "Entergy Arkansas filed a notice of dismissal of its lawsuit against the Arkansas Democrat Gazette, Arkansas Times, and a resident over publication of details from a West Memphis data center agreement.",
          "source_url": "https://www.kjnbtv.com/news/local/entergy-arkansas-drops-lawsuit-over-west-memphis-data-center-agreement-details/article_25e44c55-0b0c-46ae-b9b9-7e85d91dd8c2.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "Entergy Arkansas filed and then dismissed a lawsuit against the Arkansas Democrat Gazette, Arkansas Times and Jessica Kivell over publication of details about its data center agreement with Altitude Capital LLC.",
          "source_url": "https://www.ualrpublicradio.org/local-regional-news/2026-09-17/entergy-arkansas-drops-lawsuit-over-newspapers-publication-of-data-center-agreement-details",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-16",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-16",
          "summary": "Google is exploring a potential data center project in Little Rock",
          "source_url": "https://www.4029tv.com/article/google-representative-in-little-rock-to-talk-future-of-data-centers-in-arkansas/73753066",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-16",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-16",
          "summary": "Construction is already underway on Google's data center in West Memphis",
          "source_url": "https://www.4029tv.com/article/google-representative-in-little-rock-to-talk-future-of-data-centers-in-arkansas/73753066",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-06",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-06",
          "summary": "Construction work was continuing at the Google project on June 1, 2026",
          "source_url": "https://www.arkansasonline.com/news/2026/sep/06/harvey-couch-versus-the-data-centers/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-03",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-03",
          "summary": "Google's data center in West Memphis is under construction",
          "source_url": "https://www.yahoo.com/news/us/articles/west-memphis-utilities-no-rate-183236485.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-03",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-03",
          "summary": "Judge Lee Rudofsky denied Entergy request for a restraining order against the news outlets",
          "source_url": "https://www.youtube.com/watch?v=LocqocLV8IA",
          "source_tier": 5
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "U.S. District Judge Lee Rudofsky denied Entergy's request for a temporary restraining order on September 2, 2026",
          "source_url": "https://www.kait8.com/2026/09/02/federal-judge-denies-entergy-temporary-restraining-order-block-reporting-west-memphis-data-center-agreement/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "Google West Memphis data center campus will have five data centers, office buildings on approximately 1,200 acres",
          "source_url": "https://www.actionnews5.com/2026/09/02/docs-reveal-plans-6-utility-rate-hike-help-fund-googles-data-center-project-west-memphis/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "Google data center agreement with Entergy has 20 year term",
          "source_url": "https://arkansasadvocate.com/2026/09/02/judge-denies-effort-to-block-arkansas-outlets-from-publishing-details-about-data-center-agreement/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "Special rate contract between Google and Entergy approved by Arkansas Public Service Commission in December",
          "source_url": "https://www.actionnews5.com/2026/09/02/docs-reveal-plans-6-utility-rate-hike-help-fund-googles-data-center-project-west-memphis/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-01",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-01",
          "summary": "Arkansas Cypress is expected to begin operating by the end of 2028",
          "source_url": "https://www.deltaplexnews.com/local-news/google-invests-526-million-in-arkansas-solar-and-battery-project-to-power-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-01",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-01",
          "summary": "U.S. District Judge Lee Rudofsky expected to rule Wednesday September 3 2026 on Entergy's request to stop Arkansas Democrat-Gazette from publishing data center details",
          "source_url": "https://www.arkansasonline.com/news/2026/sep/01/entergy-arkansas-asks-federal-judge-to-stop/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-01",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-01",
          "summary": "Google's West Memphis data center is served under special rate agreement between Entergy Arkansas and Altitude LLC, a Google subsidiary.",
          "source_url": "https://www.deltaplexnews.com/local-news/google-invests-526-million-in-arkansas-solar-and-battery-project-to-power-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-01",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-01",
          "summary": "Arkansas Public Service Commission approved Arkansas Cypress project earlier in 2026.",
          "source_url": "https://www.deltaplexnews.com/local-news/google-invests-526-million-in-arkansas-solar-and-battery-project-to-power-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-01",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-01",
          "summary": "Arkansas Cypress project is expected to begin operating by the end of 2028.",
          "source_url": "https://www.deltaplexnews.com/local-news/google-invests-526-million-in-arkansas-solar-and-battery-project-to-power-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-01",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-01",
          "summary": "Total package tied to Google's West Memphis data center is $716 million, with $190 million designated for transmission system upgrades.",
          "source_url": "https://www.deltaplexnews.com/local-news/google-invests-526-million-in-arkansas-solar-and-battery-project-to-power-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-01",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-01",
          "summary": "Google will contribute $526 million toward Entergy Arkansas' Arkansas Cypress Solar and Battery project.",
          "source_url": "https://www.deltaplexnews.com/local-news/google-invests-526-million-in-arkansas-solar-and-battery-project-to-power-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-14",
          "summary": "Steel River Energy Center held ceremonial groundbreaking July 14, 2026",
          "source_url": "https://www.commercialappeal.com/story/money/business/development/2026/07/14/google-west-memphis-data-center-to-be-powered-by-solar-battery-storage/90862492007/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-14",
          "summary": "Google agreed to purchase initial electricity output from Steel River Energy Center solar project near Wilson in Mississippi County",
          "source_url": "https://www.arkansasonline.com/news/2026/jul/14/google-to-purchase-power-from-new-solar-project/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-14",
          "summary": "First two phases will add three million solar panels, estimated for completion by early to mid 2028",
          "source_url": "https://www.commercialappeal.com/story/money/business/development/2026/07/14/google-west-memphis-data-center-to-be-powered-by-solar-battery-storage/90862492007/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-06-05",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-06-05",
          "summary": "Data center property is located south of West Memphis city limits",
          "source_url": "https://www.youtube.com/watch?v=pl1DMQjXoVY",
          "source_tier": 5
        },
        {
          "status": "under_construction",
          "effective_at": "2026-06-04",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-06-04",
          "summary": "Initial build out takes 18 to 24 months to complete",
          "source_url": "https://www.arkansasonline.com/news/2026/jun/04/google-data-center-poises-west-memphis-for-boom/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-06-04",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-06-04",
          "summary": "Site is 1,100 acres in West Memphis industrial park",
          "source_url": "https://www.arkansasonline.com/news/2026/jun/04/google-data-center-poises-west-memphis-for-boom/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-06-04",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-06-04",
          "summary": "Google announced a $4 billion investment in West Memphis data center in fall 2025",
          "source_url": "https://www.arkansasonline.com/news/2026/jun/04/google-data-center-poises-west-memphis-for-boom/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-06-04",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-06-04",
          "summary": "Construction began in October 2025 on first of possible five buildings",
          "source_url": "https://www.arkansasonline.com/news/2026/jun/04/google-data-center-poises-west-memphis-for-boom/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-05-12",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-12",
          "summary": "West Memphis signed a nondisclosure agreement for a data center project on June 3, 2024",
          "source_url": "https://www.arkansasonline.com/news/2026/may/12/data-center-non-disclosure-agreements-broad/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-05-12",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-12",
          "summary": "Google is developing a $4 billion data center campus in West Memphis",
          "source_url": "https://www.arkansasonline.com/news/2026/may/12/data-center-non-disclosure-agreements-broad/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-05-03",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-03",
          "summary": "Google and Entergy keeping energy rate contract secret",
          "source_url": "https://www.arkansasonline.com/news/2026/may/03/google-entergy-keeping-energy-rate-contract/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-05-03",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-03",
          "summary": "Google data center campus in West Memphis with projected cost of $4 billion",
          "source_url": "https://www.arkansasonline.com/news/2026/may/03/google-entergy-keeping-energy-rate-contract/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-04-28",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-04-28",
          "summary": "Project originally called Project Pyramid, filed permit application December 2024 for five building campus on 1,178 acres along Bollinger Road",
          "source_url": "https://www.commercialappeal.com/story/money/business/development/2026/04/28/google-announces-plans-recipients-memphis-energy-fund/89751973007/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-04-28",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-04-28",
          "summary": "Groot LLC awarded 30 year payment in lieu of taxes by West Memphis City Council in May 2025 covering up to $10 billion in construction costs",
          "source_url": "https://www.commercialappeal.com/story/money/business/development/2026/04/28/google-announces-plans-recipients-memphis-energy-fund/89751973007/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-04-28",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-04-28",
          "summary": "Google announced first two recipients of West Memphis Energy Impact Fund",
          "source_url": "https://talkbusiness.net/2026/04/google-hands-out-money-from-west-memphis-energy-impact-fund/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-04-28",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-04-28",
          "summary": "Google data center project at 1500 South Loop Dr. in West Memphis announced October 2025",
          "source_url": "https://www.commercialappeal.com/story/money/business/development/2026/04/28/google-announces-plans-recipients-memphis-energy-fund/89751973007/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-04-28",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-04-28",
          "summary": "Google announced grants for West Memphis area",
          "source_url": "https://wreg.com/news/google-announces-grants-for-west-memphis-area/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-04-28",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-04-28",
          "summary": "Data center located approximately 3 miles south of Interstate 55",
          "source_url": "https://www.commercialappeal.com/story/money/business/development/2026/04/28/google-announces-plans-recipients-memphis-energy-fund/89751973007/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-04-28",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-04-28",
          "summary": "The fund was announced last year to help scale energy saving and affordability initiatives for residents in Crittenden County and surrounding areas",
          "source_url": "https://www.actionnews5.com/2026/04/28/google-announces-first-recipients-west-memphis-energy-impact-fund/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-04-28",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-04-28",
          "summary": "Google announced the first recipients of the West Memphis Energy Impact Fund on April 28, 2026",
          "source_url": "https://www.commercialappeal.com/picture-gallery/money/business/2026/04/28/google-energy-impact-fund-in-west-memphis/89839657007/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-04-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-04-24",
          "summary": "West Memphis Utilities to provide water and wastewater, Entergy Arkansas to provide power",
          "source_url": "https://www.arkansasonline.com/news/2026/apr/24/west-memphis-hopes-arkansas-incentives-attract/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-04-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-04-24",
          "summary": "Google started construction of $4 billion data center campus in West Memphis",
          "source_url": "https://www.arkansasonline.com/news/2026/apr/24/west-memphis-hopes-arkansas-incentives-attract/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-02-26",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-02-26",
          "summary": "Project expected to take 18 to 24 months to complete",
          "source_url": "https://www.actionnews5.com/2026/02/26/google-hiring-new-west-memphis-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-02-26",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-02-26",
          "summary": "Project is Google's first data center in Arkansas",
          "source_url": "https://www.actionnews5.com/2026/02/26/google-hiring-new-west-memphis-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-02-26",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-02-26",
          "summary": "Facility is on 1,100 acre property at 1500 South Loop Drive near Mississippi River",
          "source_url": "https://www.actionnews5.com/2026/02/26/google-hiring-new-west-memphis-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-02-26",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-02-26",
          "summary": "Google began construction in October 2025 on West Memphis data center",
          "source_url": "https://www.actionnews5.com/2026/02/26/google-hiring-new-west-memphis-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-02-26",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-02-26",
          "summary": "Google is hiring for West Memphis data center positions",
          "source_url": "https://wreg.com/news/local/google-hiring-for-west-memphis-data-center/",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2025-10-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-10-02",
          "summary": "First data center building expected to be completed within 18 to 24 months",
          "source_url": "https://www.commercialappeal.com/story/money/business/2025/10/02/google-data-center-4-billion-dollars-west-memphis-arkansas/86354716007/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2025-10-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-10-02",
          "summary": "Google broke ground on a $4 billion data center in West Memphis on October 2, 2025",
          "source_url": "https://businessfacilities.com/google-breaks-ground-on-4b-data-center-in-west-memphis/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2025-10-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-10-02",
          "summary": "Google broke ground on $4 billion West Memphis data center on October 2, 2025",
          "source_url": "https://wreg.com/news/local/google-breaks-ground-on-arkansas-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2025-10-02",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-10-02",
          "summary": "Google broke ground on a data center in West Memphis",
          "source_url": "https://www.youtube.com/watch?v=ODCdw4FF6Oc",
          "source_tier": 5
        },
        {
          "status": "under_construction",
          "effective_at": "2025-10-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-10-02",
          "summary": "Construction of the data center is expected to take up to two years",
          "source_url": "https://katv.com/news/local/googles-4-billion-data-center-to-transform-west-memphis",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2025-10-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-10-02",
          "summary": "The data center is expected to span 1,000 acres in West Memphis",
          "source_url": "https://katv.com/news/local/googles-4-billion-data-center-to-transform-west-memphis",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2025-10-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-10-02",
          "summary": "Google announcing $4 billion investment in Arkansas through 2027 including first data center in West Memphis",
          "source_url": "https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-arkansas/",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2025-10-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-10-02",
          "summary": "Data center campus on 1,100 acres in West Memphis",
          "source_url": "https://www.commercialappeal.com/story/money/business/2025/10/02/google-data-center-4-billion-dollars-west-memphis-arkansas/86354716007/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2025-10-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-10-02",
          "summary": "Google plans to partner with the state to offer AI training and credentials to over 10,000 Arkansans",
          "source_url": "https://katv.com/news/local/googles-4-billion-data-center-to-transform-west-memphis",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2025-10-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-10-02",
          "summary": "Google broke ground on West Memphis data center project on October 2, 2025",
          "source_url": "https://www.bizjournals.com/memphis/news/2025/10/02/google-unveils-west-memphis-arkanasas-data-center.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2025-10-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-10-02",
          "summary": "Google to build a data center in Arkansas",
          "source_url": "https://www.wsj.com/tech/google-to-build-data-center-in-arkansas-52ff3c01",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2025-10-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-10-02",
          "summary": "The project is expected to take 18 to 24 months to complete",
          "source_url": "https://www.youtube.com/watch?v=B2oIZAsfi3U",
          "source_tier": 5
        },
        {
          "status": "under_construction",
          "effective_at": "2025-10-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-10-02",
          "summary": "Google's project includes adding solar power and battery storage",
          "source_url": "https://www.youtube.com/watch?v=B2oIZAsfi3U",
          "source_tier": 5
        },
        {
          "status": "under_construction",
          "effective_at": "2025-10-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-10-02",
          "summary": "Google's project includes building a greywater plant to reuse water to cool equipment",
          "source_url": "https://www.youtube.com/watch?v=B2oIZAsfi3U",
          "source_tier": 5
        },
        {
          "status": "under_construction",
          "effective_at": "2025-09-09",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-09-09",
          "summary": "Google is the developer of the West Memphis data center project in Arkansas",
          "source_url": "https://www.datacenterdynamics.com/en/news/google-confirmed-to-be-behind-west-memphis-data-center-project-in-arkansas/",
          "source_tier": 3
        }
      ]
    },
    {
      "slug": "dxc-technology-services-llc-cherokee-data-center-tulsa-ok",
      "name": "DXC Technology Services LLC / Cherokee Data Center",
      "summary": "The EPA's facility registry lists DXC Technology Services LLC / Cherokee Data Center at 7400 N Lakewood Ave, Tulsa, OK 74117 in Tulsa, Oklahoma, with an air permit.",
      "state": "OK",
      "city": "Tulsa",
      "county": "Tulsa County",
      "status": "not_verified",
      "developer": "DXC Technology Services LLC",
      "capacity_mw": null,
      "latitude": 36.26113,
      "longitude": -95.90698,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110012160311: the registry placed its point by address matching house number, accurate to 30 m",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-20",
      "site_address": "7400 N Lakewood Ave, Tulsa, OK 74117",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110012160311",
      "published": "2026-10-20",
      "last_verified": "2026-10-20",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110012160311",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/dxc-technology-services-llc-cherokee-data-center-tulsa-ok",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110012160311",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: DXC Technology Services LLC / Cherokee Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110012160311",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "jacobs-project-management-co-hut-8-dc-corp-saint-francisville-la",
      "name": "Jacobs Project Management Co, Hut 8 DC Corp-river Bend Data Center",
      "summary": "The EPA's facility registry lists Jacobs Project Management Co, Hut 8 DC Corp river Bend Data Center at 2545 La Hwy 964, Saint Francisville, LA 70000 in Saint Francisville, Louisiana, with a water permit.",
      "state": "LA",
      "city": "St. Francisville",
      "county": "West Feliciana Parish",
      "status": "not_verified",
      "developer": "Jacobs Project Management Co, Hut 8 DC Corp",
      "capacity_mw": null,
      "latitude": 30.7842,
      "longitude": -91.3764,
      "location_precision": "address",
      "location_source": "U.S. Census Bureau 2020 Gazetteer, the internal point of St. Francisville, public domain, placed at city level; the EPA facility record gives no site point (the registry placed its point by post office name centroid, which is not the site)",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "census gazetteer place point",
      "location_last_verified": "2026-10-20",
      "site_address": "2545 La Hwy 964, Saint Francisville, LA 70000",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072156341",
      "published": "2026-10-20",
      "last_verified": "2026-10-20",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072156341",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/jacobs-project-management-co-hut-8-dc-corp-saint-francisville-la",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110072156341",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Jacobs Project Management Co, Hut 8 DC Corp river Bend Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110072156341",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "lambda-chouteau-data-center-ok",
      "name": "Lambda Chouteau data center",
      "summary": "Lambda Chouteau data center",
      "state": "OK",
      "city": "Chouteau",
      "county": "Mayes County",
      "status": "rumored",
      "developer": "Lambda",
      "capacity_mw": null,
      "latitude": 36.1895,
      "longitude": -95.3389,
      "location_precision": "city",
      "location_source": null,
      "location_verified_at": null,
      "coordinate_source": "U.S. Census Bureau 2020 gazetteer place point",
      "location_last_verified": null,
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-10-01",
      "last_verified": "2026-10-20",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://www.datacenterdynamics.com/en/news/lambda-plans-data-center-in-oklahoma/",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/lambda-chouteau-data-center-ok",
      "source": "https://www.datacenterdynamics.com/en/news/lambda-plans-data-center-in-oklahoma/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Lambda plans data center in Oklahoma",
          "url": "https://www.datacenterdynamics.com/en/news/lambda-plans-data-center-in-oklahoma/",
          "publisher": "Data Center Dynamics",
          "date": "2026-09-29",
          "source_tier": 3
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "delta-forge-1-boyce-la",
      "name": "Delta Forge 1",
      "summary": "Applied Digital is constructing a 300 acre, $3.6 billion data center campus called Delta Forge 1 in Boyce, Louisiana, with 300 MW in its first phase and initial operations expected as soon as mid 2027.",
      "state": "LA",
      "city": "Boyce",
      "county": "Rapides Parish",
      "status": "proposed",
      "developer": "Applied Digital",
      "capacity_mw": 300,
      "latitude": 31.31125,
      "longitude": -92.44519,
      "location_precision": "county",
      "location_source": "County seat (Alexandria), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": "5941 La Hwy 121, Boyce, LA 70000",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072183100",
      "published": "2026-09-05",
      "last_verified": "2026-10-06",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/delta-forge-1-boyce-la",
      "source": "https://www.thetowntalk.com/story/news/2026/09/13/residents-support-ai-data-center-revolt-tour-stop-near-boyce-project/91747763007/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Citizens 'have no seat at the table' on data centers, says organizer - thetowntalk.com",
          "url": "https://www.thetowntalk.com/story/news/2026/09/13/residents-support-ai-data-center-revolt-tour-stop-near-boyce-project/91747763007/",
          "publisher": "thetowntalk.com",
          "date": "2026-09-13",
          "source_tier": 4
        },
        {
          "title": "NDAs are hiding data center deals, drawing ire from locals — and attention from lawmakers - Oregon Public Broadcasting - OPB",
          "url": "https://www.opb.org/article/2026/08/27/ndas-are-hiding-data-center-deals-drawing-ire-from-locals-and-attention-from-lawmakers/",
          "publisher": "OPB (via Google News)",
          "date": "2026-08-27",
          "source_tier": 4
        },
        {
          "title": "Cleco to power planned Rapides Parish data center - Rapides Parish Journal",
          "url": "https://rapidesparishjournal.com/2026/05/27/cleco-to-power-planned-rapides-parish-data-center/",
          "publisher": "Rapides Parish Journal",
          "date": "2026-05-27",
          "source_tier": 1
        },
        {
          "title": "Applied Digital secures customer for new 210MW data center campus - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/applied-digital-secures-customer-for-new-210mw-data-center-campus/",
          "publisher": "Data Center Dynamics",
          "date": "2026-06-09",
          "source_tier": 1
        },
        {
          "title": "Cleco to power data center coming to Rapides Parish - KALB | News Channel 5",
          "url": "https://www.kalb.com/2026/05/27/cleco-power-data-center-coming-rapides-parish/",
          "publisher": "KALB | News Channel 5",
          "date": "2026-05-27",
          "source_tier": 1
        },
        {
          "title": "NDAs are hiding data center deals, drawing ire from locals — and attention from lawmakers - NPR",
          "url": "https://www.npr.org/2026/08/27/nx-s1-5879528/data-center-nda-disclosure-louisiana",
          "publisher": "NPR",
          "date": "2026-08-27",
          "source_tier": 4
        },
        {
          "title": "Developer of Delta data center announces ‘revolutionary’ tech to turn natural gas into water - News From The States",
          "url": "https://www.newsfromthestates.com/article/developer-delta-data-center-announces-revolutionary-tech-turn-natural-gas-water",
          "publisher": "News From The States",
          "date": "2026-09-09",
          "source_tier": 4
        },
        {
          "title": "EPA ECHO detailed facility report: Beard Construction Group LLC, Applied Digital",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110072183100",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-09-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-13",
          "summary": "Applied Digital building 3.6 billion dollar Data Forge 1 data center near Boyce",
          "source_url": "https://www.thetowntalk.com/story/news/2026/09/13/residents-support-ai-data-center-revolt-tour-stop-near-boyce-project/91747763007/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-13",
          "summary": "Meta building Hyperion data center approximately 30 miles east of Monroe in Richland Parish",
          "source_url": "https://www.thetowntalk.com/story/news/2026/09/13/residents-support-ai-data-center-revolt-tour-stop-near-boyce-project/91747763007/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-05-27",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Cleco Power announced an agreement to supply electricity to the proposed Delta Forge 1 data center in Boyce, Rapides Parish, Louisiana.",
          "source_url": "https://rapidesparishjournal.com/2026/05/27/cleco-to-power-planned-rapides-parish-data-center/",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "google-data-center-pryor-ok",
      "name": "Google Data Center Pryor",
      "summary": "Google opened a data center in Pryor, Oklahoma approximately 15 years before 2026, and the project is discussed for lessons learned.",
      "state": "OK",
      "city": "Pryor",
      "county": "Mayes",
      "status": "rumored",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 36.26385,
      "longitude": -95.32791,
      "location_precision": "permit_point",
      "location_source": "https://echo.epa.gov/detailed-facility-report?fid=110070386180",
      "location_verified_at": "2026-10-04",
      "coordinate_source": "https://echo.epa.gov/detailed-facility-report?fid=110070386180",
      "location_last_verified": "2026-10-04",
      "site_address": "221 Steve Berry BLVD, Pryor, OK 74361",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070386180",
      "published": "2026-09-05",
      "last_verified": "2026-10-04",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-data-center-pryor-ok",
      "source": "https://tulsaworld.com/news/local/crime-courts/article_0e566790-f4a5-45d8-98d8-6d39f7f70ce5.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "Data center opponents add open meetings, records violation claims to lawsuit",
          "url": "https://tulsaworld.com/news/local/crime-courts/article_0e566790-f4a5-45d8-98d8-6d39f7f70ce5.html",
          "publisher": "Tulsa World",
          "date": "2026-09-11",
          "source_tier": 4
        },
        {
          "title": "Lessons learned from Pryor, OK, 15 years after Google opened data center - Emporia Gazette",
          "url": "https://www.emporiagazette.com/free/article_fc937b08-b205-432f-b17d-214bca7e2d9e.html",
          "publisher": "Emporia Gazette",
          "date": "2026-06-12",
          "source_tier": 4
        },
        {
          "title": "See inside the Google data center in Pryor Oklahoma",
          "url": "https://www.oklahoman.com/picture-gallery/business/information-technology/2025/11/12/google-data-center-pryor-ok-photos/86930475007/",
          "publisher": "www.oklahoman.com",
          "date": "2025-11-12",
          "source_tier": 4
        },
        {
          "title": "EPA ECHO detailed facility report: Tmobile Central LLC / Google",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110070386180",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-09-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-11",
          "summary": "Land Legacy alleges it holds a conservation easement on about one third of property targeted for data center location",
          "source_url": "https://tulsaworld.com/news/local/crime-courts/article_0e566790-f4a5-45d8-98d8-6d39f7f70ce5.html",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "tierpoint-oklahoma-city-data-centers-ok",
      "name": "TierPoint Oklahoma City Data Centers",
      "summary": "TierPoint lists a data center at Oklahoma City, Oklahoma among the sites it operates.",
      "state": "OK",
      "city": "Oklahoma City",
      "county": "Oklahoma County",
      "status": "operational",
      "developer": "TierPoint",
      "capacity_mw": null,
      "latitude": 35.467653,
      "longitude": -97.5138612,
      "location_precision": "address",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": "4121 Perimeter PL, Oklahoma City, OK 73112",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071272710",
      "published": "2026-09-14",
      "last_verified": "2026-10-04",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": "Google general contractor",
      "contractor_source_url": "https://greenstreetnews.com/article/oklahoma-city-warehouse-leased-to-google-data-center-contractor-hits-market/",
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/tierpoint-oklahoma-city-data-centers-ok",
      "source": "https://www.news9.com/midcon-data-center-oklahoma-city",
      "basis": "official_record",
      "sources": [
        {
          "title": "What to know about MIDCON data center in Oklahoma City - News 9",
          "url": "https://www.news9.com/midcon-data-center-oklahoma-city",
          "publisher": "News 9",
          "date": "2026-09-14",
          "source_tier": 4
        },
        {
          "title": "Oklahoma City warehouse leased to Google data center builder hits market - Green Street News",
          "url": "https://greenstreetnews.com/article/oklahoma-city-warehouse-leased-to-google-data-center-contractor-hits-market/",
          "publisher": "Green Street News",
          "date": "2026-09-15",
          "source_tier": 4
        },
        {
          "title": "EPA ECHO detailed facility report: Tierpoint LLC / Tierpoint LLC Oklahoma City",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071272710",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "What to know about TierPoint data centers in OKC - News 9",
          "url": "https://www.news9.com/data-centers-in-oklahoma/okc-data-centers-tierpoint",
          "publisher": "News 9",
          "date": "2026-09-14",
          "source_tier": 4
        },
        {
          "title": "TierPoint: Browse our data centers",
          "url": "https://www.tierpoint.com/data-centers/",
          "publisher": "TierPoint",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "TierPoint Delivers Largest Commercial Data Center in Oklahoma - commercialsearch.com",
          "url": "https://www.commercialsearch.com/news/tierpoint-delivers-largest-commercial-data-center-in-oklahoma/",
          "publisher": "commercialsearch.com",
          "date": "2016-02-17",
          "source_tier": 4
        },
        {
          "title": "TierPoint completes fourth data center in Oklahoma - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/tierpoint-completes-fourth-data-center-in-oklahoma/",
          "publisher": "Data Center Dynamics",
          "date": "2018-02-27",
          "source_tier": 3
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "TierPoint lists TierPoint Oklahoma City Data Centers at Oklahoma City, Oklahoma on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.tierpoint.com/data-centers/",
          "source_tier": 2
        },
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "MIDCON Recovery Solutions data center has been operational since about 2016",
          "source_url": "https://www.news9.com/midcon-data-center-oklahoma-city",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "MIDCON data center located in Quail Springs Business Park",
          "source_url": "https://www.news9.com/midcon-data-center-oklahoma-city",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Data center meets FEMA Zone 4 rated and Seismic 2 rated earthquake standards",
          "source_url": "https://www.news9.com/midcon-data-center-oklahoma-city",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2018-02-27",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2018-02-27",
          "summary": "TierPoint completes fourth data center in Oklahoma",
          "source_url": "https://www.datacenterdynamics.com/en/news/tierpoint-completes-fourth-data-center-in-oklahoma/",
          "source_tier": 3
        },
        {
          "status": "operational",
          "effective_at": "2016-02-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2016-02-17",
          "summary": "TierPoint delivers largest commercial data center in Oklahoma",
          "source_url": "https://www.commercialsearch.com/news/tierpoint-delivers-largest-commercial-data-center-in-oklahoma/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2008-01-01",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "TierPoint second Oklahoma City data center built in 2008, 22500 square feet with 15000 square feet raised floor capacity, withstands winds up to 150 miles per hour, cooled with 150 tons of computer room air conditioning under floor and in line cooling",
          "source_url": "https://www.news9.com/data-centers-in-oklahoma/okc-data-centers-tierpoint",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2003-01-01",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "TierPoint first Oklahoma City data center began operation in 2003, is 4000 square feet, cooled with 100 tons of computer room air conditioning",
          "source_url": "https://www.news9.com/data-centers-in-oklahoma/okc-data-centers-tierpoint",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "edgeconnex-new-orleans-holdings-llc-slidell-la",
      "name": "Edgeconnex New Orleans Holdings LLC",
      "summary": "The EPA's facility registry lists Edgeconnex New Orleans Holdings LLC at 2070 Gause Boulevard East, Slidell, LA 70461 in Slidell, Louisiana, with a hazardous waste record.",
      "state": "LA",
      "city": "Slidell",
      "county": "St. Tammany Parish",
      "status": "not_verified",
      "developer": "EdgeConneX",
      "capacity_mw": null,
      "latitude": 30.28639,
      "longitude": -89.737523,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110070911179: the registry placed its point by address matching house number, accurate to 50 m",
      "location_verified_at": "2026-10-03",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-03",
      "site_address": "2070 Gause Boulevard East, Slidell, LA 70461",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070911179",
      "published": "2026-10-03",
      "last_verified": "2026-10-03",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070911179",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/edgeconnex-new-orleans-holdings-llc-slidell-la",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110070911179",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Edgeconnex New Orleans Holdings LLC",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110070911179",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "wal-mart-stores-inc-east-data-center-bentonville-ar",
      "name": "Wal- Mart Stores, INC., East Data Center",
      "summary": "The EPA's facility registry lists Wal- Mart Stores, INC., East Data Center at 805 Moberly Lane, Bentonville, AR 72712 in Bentonville, Arkansas, with air and water permits.",
      "state": "AR",
      "city": "Bentonville",
      "county": "Benton County",
      "status": "not_verified",
      "developer": "Wal- Mart Stores, INC.",
      "capacity_mw": null,
      "latitude": 36.362432,
      "longitude": -94.183382,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110024578688: the registry placed its point by address matching house number, accurate to 50 m",
      "location_verified_at": "2026-10-03",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-03",
      "site_address": "805 Moberly Lane, Bentonville, AR 72712",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110024578688",
      "published": "2026-10-03",
      "last_verified": "2026-10-03",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110024578688",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/wal-mart-stores-inc-east-data-center-bentonville-ar",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110024578688",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Wal- Mart Stores, INC., East Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110024578688",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "avaio-pulaski-county-data-center-ar",
      "name": "AVAIO Pulaski County Data Center",
      "summary": "Data center developer AVAIO had an attorney seek a carve out for its project from Pulaski County's data center moratorium.",
      "state": "AR",
      "city": "Wrightsville",
      "county": "Pulaski",
      "status": "proposed",
      "developer": "AVAIO",
      "capacity_mw": 1000,
      "latitude": 34.74444,
      "longitude": -92.28806,
      "location_precision": "county",
      "location_source": "County seat (Little Rock), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/avaio-pulaski-county-data-center-ar",
      "source": "https://www.arkansasonline.com/news/2026/jan/12/6b-data-center-announced-for-pulaski-county/",
      "basis": "third_party_estimate",
      "sources": [
        {
          "title": "$6 billion data center announced for Pulaski County - arkansasonline.com",
          "url": "https://www.arkansasonline.com/news/2026/jan/12/6b-data-center-announced-for-pulaski-county/",
          "publisher": "arkansasonline.com",
          "date": "2026-01-13",
          "source_tier": 1
        },
        {
          "title": "$6 billion data center announced for Pulaski County - The Arkansas Democrat-Gazette",
          "url": "https://www.arkansasonline.com/news/2026/jan/12/6b-data-center-announced-for-pulaski-county/",
          "publisher": "The Arkansas Democrat-Gazette",
          "date": "2026-01-13",
          "source_tier": 1
        },
        {
          "title": "After months of turmoil, Pulaski County passes sweeping data center rules - Arkansas Times",
          "url": "https://arktimes.com/arkansas-blog/2026/09/22/after-months-of-turmoil-pulaski-county-quorum-court-passes-sweeping-data-center-rules",
          "publisher": "Arkansas Times",
          "date": "2026-09-23",
          "source_tier": 4
        },
        {
          "title": "AVAIO a no-show; citizen committee to deal with data center issues - Arkansas Times",
          "url": "https://arktimes.com/arkansas-blog/2026/06/17/avaio-a-no-show-citizen-committee-to-deal-with-data-center-issues",
          "publisher": "Arkansas Times",
          "date": "2026-06-17",
          "source_tier": 1
        },
        {
          "title": "Entergy in talks with landowners about need for additional data center transmission lines - arkansasonline.com",
          "url": "https://www.arkansasonline.com/news/2026/jul/23/entergy-opens-dialogue-with-landowners/",
          "publisher": "arkansasonline.com",
          "date": "2026-07-23",
          "source_tier": 1
        },
        {
          "title": "Advocates make final push ahead of Tuesday vote on Pulaski County data center ordinance",
          "url": "https://katv.com/news/local/advocates-make-final-push-ahead-of-tuesday-vote-on-pulaski-county-data-center-ordinance",
          "publisher": "katv.com",
          "date": "2026-08-27",
          "source_tier": 4
        },
        {
          "title": "Attorney representing data center developer AVAIO previously sought carve-out for project in Pulaski County moratorium - arkansasonline.com",
          "url": "https://www.arkansasonline.com/news/2026/jul/20/attorney-representing-data-center-developer-avaio/",
          "publisher": "arkansasonline.com",
          "date": "2026-07-20",
          "source_tier": 4
        },
        {
          "title": "Entergy re submits AVAIO power agreement to Arkansas Public Service Commission - arkansasonline.com",
          "url": "https://www.arkansasonline.com/news/2026/sep/09/entergy-re-submits-avaio-power-agreement-to/",
          "publisher": "arkansasonline.com",
          "date": "2026-09-10",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-01-12",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "AVAIO Digital Partners announced plans for a 6 billion dollar data center campus in Pulaski County, Arkansas.",
          "source_url": "https://www.arkansasonline.com/news/2026/jan/12/6b-data-center-announced-for-pulaski-county/",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "livingston-parish-data-center-la",
      "name": "Livingston Parish Data Center",
      "summary": "Rumors are circulating about a data center coming to Livingston Parish, with the parish president denying having signed an NDA related to the project.",
      "state": "LA",
      "city": null,
      "county": "Livingston Parish",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 30.4986,
      "longitude": -90.7483,
      "location_precision": "county",
      "location_source": "County seat (Livingston), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": 691,
      "site_acres_disclosed_as": "third_party_estimate",
      "site_acres_source_url": "https://www.livingstonparishnews.com/stories/delatte-addresses-data-center-speculation,229844",
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/livingston-parish-data-center-la",
      "source": "https://www.livingstonparishnews.com/stories/delatte-addresses-data-center-speculation,229844",
      "basis": "official_record",
      "sources": [
        {
          "title": "Delatte addresses data center speculation - Livingston Parish News",
          "url": "https://www.livingstonparishnews.com/stories/delatte-addresses-data-center-speculation,229844",
          "publisher": "Livingston Parish News",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Is a data center coming to Livingston Parish? As rumors swirl, here's what we know. - theadvocate.com",
          "url": "https://www.theadvocate.com/baton_rouge/news/communities/livingston_tangipahoa/is-data-center-coming-livingston/article_29570770-b1c6-4d05-952a-9002a69d2fa3.html",
          "publisher": "theadvocate.com",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Livingston Parish president denies signing NDA for data center - Louisiana First News",
          "url": "https://www.louisianafirstnews.com/video/livingston-parish-president-denies-signing-nda-for-data-center/12127978/",
          "publisher": "Louisiana First News",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "WBRZ Channel 2. . Livingston Parish President Randy Delatte announced on Tuesday that he has not signed an NDA regarding any business coming to Livingston Parish and as of now, there are no plans for a data center. Read the full story through the link i",
          "url": "https://www.facebook.com/WBRZNews2/videos/livingston-parish-president-randy-delatte-announced-on-tuesday-that-he-has-not-s/1075986291565820/",
          "publisher": "www.facebook.com",
          "date": "2026-09-03",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-09-01",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-01",
          "summary": "The land was originally planned for development as a 1700 family subdivision before rezoning for potential data center use",
          "source_url": "https://www.livingstonparishnews.com/stories/delatte-addresses-data-center-speculation,229844",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-01",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-01",
          "summary": "DEMCO requested expedited approval to generate an additional gigawatt of energy, cited as potential evidence of data center project",
          "source_url": "https://www.livingstonparishnews.com/stories/delatte-addresses-data-center-speculation,229844",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "meta-louisiana-data-center-richland-la",
      "name": "Meta Louisiana data center",
      "summary": "Meta expanded its data center investment in Richland Parish, Louisiana to $50 billion, with the project reported to be creating jobs and opportunity in the parish.",
      "state": "LA",
      "city": null,
      "county": "Richland Parish",
      "status": "under_construction",
      "developer": "Meta",
      "capacity_mw": 5000,
      "latitude": 32.47736,
      "longitude": -91.75485,
      "location_precision": "county",
      "location_source": "County seat (Rayville), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/meta-louisiana-data-center-richland-la",
      "source": "https://247wallst.com/investing/2026/08/14/zuckerbergs-250-billion-louisiana-data-center-will-create-just-1000-jobs-thats-250-million-spent-per-job/",
      "basis": "third_party_estimate",
      "sources": [
        {
          "title": "Zuckerberg’s $250 Billion Louisiana Data Center Will Create Just 1,000 Jobs. That’s $250 Million Spent Per Job - Yahoo Finance",
          "url": "https://247wallst.com/investing/2026/08/14/zuckerbergs-250-billion-louisiana-data-center-will-create-just-1000-jobs-thats-250-million-spent-per-job/",
          "publisher": "Yahoo Finance",
          "date": "2026-08-14",
          "source_tier": 4
        },
        {
          "title": "Letters: As data center discussed for Livingston Parish, questions remain - NOLA.com",
          "url": "https://www.nola.com/opinions/letters/letters-data-center-livingston-parish/article_05be4bde-50d0-4f7b-a862-ec8653cd1217.amp.html",
          "publisher": "NOLA.com",
          "date": "2026-09-10",
          "source_tier": 4
        },
        {
          "title": "Congresswoman Julia Letlow responds to Meta’s $50 billion Richland Parish expansion - KTVE – myarklamiss.com – Your ArkLaMiss News Source",
          "url": "https://www.myarklamiss.com/news/ouachita-parish/letlow-responds-to-metas-50-billion-richland-parish-expansion/",
          "publisher": "KTVE – myarklamiss.com – Your ArkLaMiss News Source",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "Meta's Louisiana Data Center Is Making Rural America Part of the AI Race - Memeburn",
          "url": "https://memeburn.com/metas-louisiana-data-center-is-making-rural-america-part-of-the-ai-race/",
          "publisher": "Memeburn",
          "date": "2026-07-16",
          "source_tier": 1
        },
        {
          "title": "Meta expands Richland Parish data center, now $50-billion project - hannapub.com",
          "url": "https://www.hannapub.com/ouachitacitizen/news/local_state_headlines/meta-expands-richland-parish-data-center-now-50-billion-project/article_4f99b31f-8edd-47b2-bba0-20617bc7352c.html",
          "publisher": "hannapub.com",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "Gov. Jeff Landry backs Meta's $50 billion data center expansion alongside Trump in D.C. - WDSU",
          "url": "https://www.wdsu.com/article/louisiana-data-center-growth-jeff-landry-washington/73250393",
          "publisher": "WDSU",
          "date": "2026-07-23",
          "source_tier": 1
        },
        {
          "title": "Concerns grow along with size of Meta data center - louisianaradionetwork.com",
          "url": "https://louisianaradionetwork.com/2026/07/16/concerns-grow-along-with-size-of-meta-data-center/",
          "publisher": "louisianaradionetwork.com",
          "date": "2026-07-16",
          "source_tier": 1
        },
        {
          "title": "Gov. Jeff Landry cheers Meta expansion as local leaders, residents react - nola.com",
          "url": "https://www.nola.com/news/business/gov-jeff-landry-cheers-meta-expansion-as-local-leaders-residents-react/article_fe98e646-1833-4645-bd91-6000051dabfe.html",
          "publisher": "nola.com",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "PSC votes against requiring Meta to reveal more about data center - WWLTV.com",
          "url": "https://www.wwltv.com/article/tech/psc-rejects-request-for-more-information-on-meta-data-center/289-7241512a-497f-4e01-9545-868b16da09cf",
          "publisher": "WWLTV.com",
          "date": "2026-08-12",
          "source_tier": 1
        },
        {
          "title": "I own a house rental business near a future Meta AI data center. Construction workers make up most of our tenants. - Business Insider",
          "url": "https://www.businessinsider.com/meta-ai-data-center-louisiana-housing-market-home-rentals-2026-9",
          "publisher": "Business Insider",
          "date": "2026-09-13",
          "source_tier": 4
        },
        {
          "title": "Meta expands controversial Louisiana AI data center investment to $50 billion - The Tulane Hullabaloo",
          "url": "https://tulanehullabaloo.com/75337/news/meta-expands-controversial-louisiana-ai-data-center-investment-to-50-billion/",
          "publisher": "The Tulane Hullabaloo",
          "date": "2026-08-24",
          "source_tier": 4
        },
        {
          "title": "Meta builds a $50 billion dollar data center in Richland Parish, Louisiana - loyolamaroon.com",
          "url": "https://loyolamaroon.com/10047124/news/local-news/meta-builds-a-50-billion-dollar-data-center-in-richland-parish-louisiana/",
          "publisher": "loyolamaroon.com",
          "date": "2026-08-22",
          "source_tier": 4
        },
        {
          "title": "From RV camps to packed hotels, Meta data center project has LA parish bursting at the seams - NOLA.com",
          "url": "https://www.nola.com/news/politics/meta-data-center-richland-parish-louisiana/article_1a044e8c-632c-474e-a899-d6a47c11ec78.html",
          "publisher": "NOLA.com",
          "date": "2026-08-21",
          "source_tier": 4
        },
        {
          "title": "$50,000 teacher checks have Louisiana parishes asking for data centers - The Center Square",
          "url": "https://www.thecentersquare.com/louisiana/article_44b57c7e-9c5f-4051-a8eb-8ecb51cf1c8a.html",
          "publisher": "The Center Square",
          "date": "2026-09-17",
          "source_tier": 4
        },
        {
          "title": "Meta data center in Richland Parish brings jobs, tax growth to northeast Louisiana - WAFB",
          "url": "https://www.wafb.com/2026/07/29/meta-data-center-richland-parish-brings-jobs-tax-growth-northeast-louisiana/",
          "publisher": "WAFB",
          "date": "2026-07-29",
          "source_tier": 4
        },
        {
          "title": "5 Things to Know About Meta’s Giant Data Center in Louisiana - The New York Times",
          "url": "https://www.nytimes.com/2026/07/27/business/meta-data-center-louisiana-takeaways.html",
          "publisher": "The New York Times",
          "date": "2026-07-28",
          "source_tier": 4
        },
        {
          "title": "How Meta Got Everything It Wanted in a Secret Louisiana Data Center Deal - The New York Times",
          "url": "https://www.nytimes.com/2026/07/27/technology/meta-data-center-louisiana.html",
          "publisher": "The New York Times",
          "date": "2026-07-27",
          "source_tier": 4
        },
        {
          "title": "Meta Data Center in Louisiana - LED - Louisiana Economic Development (.gov)",
          "url": "https://www.opportunitylouisiana.gov/data-center/meta",
          "publisher": "Louisiana Economic Development (.gov)",
          "date": "2026-07-13",
          "source_tier": 2
        },
        {
          "title": "Deepening our investment in Richland Parish, Louisiana - Meta Data Centers",
          "url": "https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/",
          "publisher": "Meta Data Centers",
          "date": "2026-07-13",
          "source_tier": 4
        },
        {
          "title": "Teachers and Local Businesses Win as Meta Expands Louisiana Data Center - Meta Store",
          "url": "https://about.fb.com/news/2026/07/teachers-local-businesses-win-as-meta-expands-louisiana-data-center/",
          "publisher": "Meta Store",
          "date": "2026-07-13",
          "source_tier": 4
        },
        {
          "title": "Meta's Louisiana data center investment to reach $50 billion, aided by generous tax incentives - CNBC",
          "url": "https://www.cnbc.com/2026/07/13/meta-louisiana-data-center-investment-reaches-50-billion-amid-ai-push.html",
          "publisher": "CNBC",
          "date": "2026-07-13",
          "source_tier": 4
        },
        {
          "title": "Meta more than doubles size of Louisiana AI data center in massive $50 billion expansion - WAFB",
          "url": "https://www.fox8live.com/2026/07/13/gov-landry-meta-formally-announce-louisiana-data-centers-historic-expansion/",
          "publisher": "WAFB",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "How big will the Richland Parish data center be? Meta will expand AI center - Shreveport Times",
          "url": "https://www.shreveporttimes.com/story/news/special-reports/datacenter/2026/07/13/is-meta-expanding-the-richland-parish-data-center-investment-costs-how-large-much-water-energy/90901504007/",
          "publisher": "Shreveport Times",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "Meta expands Louisiana Hyperion data center to 5 gigawatts - finance.yahoo.com",
          "url": "https://finance.yahoo.com/technology/articles/meta-expands-louisiana-hyperion-data-121522809.html",
          "publisher": "finance.yahoo.com",
          "date": "2026-07-27",
          "source_tier": 1
        },
        {
          "title": "Meta Will Invest Over $50B To Expand North Louisiana Data Center Campus - Business Facilities",
          "url": "https://businessfacilities.com/meta-will-invest-over-50b-to-expand-north-louisiana-data-center-campus/",
          "publisher": "Business Facilities",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "Meta plans $40 billion expansion of Louisiana AI data center, more than doubling its size - NOLA.com",
          "url": "https://www.nola.com/news/business/meta-louisiana-ai-data-center-richland-parish/article_d1308014-c718-4c34-a75f-476a151ef1a7.html",
          "publisher": "NOLA.com",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "Meta to spend an additional $40B to expand colossal Louisiana data center - businessreport.com",
          "url": "https://www.businessreport.com/article/meta-to-spend-an-additional-40b-to-expand-colossal-louisiana-data-center",
          "publisher": "businessreport.com",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "New York Times investigates Meta's data center deal in Louisiana - Axios",
          "url": "https://www.axios.com/local/new-orleans/2026/07/28/new-york-times-investigates-meta-s-data-center-deal-in-louisiana",
          "publisher": "Axios",
          "date": "2026-07-28",
          "source_tier": 1
        },
        {
          "title": "North Louisiana Meta data center to become largest center in history - WDSU",
          "url": "https://www.wdsu.com/article/north-louisiana-meta-data-center-largest-center/71920037",
          "publisher": "WDSU",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "Meta expands Louisiana data center to 5 gigawatts, investment crosses $50 billion - Reuters",
          "url": "https://www.reuters.com/business/meta-expands-louisiana-data-center-5-gigawatts-compute-capacity-2026-07-13/",
          "publisher": "Reuters",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "Meta expands plans for Richland Parish data center while investing in the local community - WBRZ",
          "url": "https://www.wbrz.com/news/meta-expands-plans-for-richland-parish-data-center-while-investing-in-the-local-community/",
          "publisher": "WBRZ",
          "date": "2026-07-12",
          "source_tier": 1
        },
        {
          "title": "Meta data center in Richland Parish brings jobs, tax growth to northeast Louisiana - KOLN | Nebraska Local News, Weather, Sports | Lincoln, NE",
          "url": "https://www.1011now.com/video/2026/07/29/meta-data-center-richland-parish-brings-jobs-tax-growth-northeast-louisiana/",
          "publisher": "KOLN | Nebraska Local News, Weather, Sports | Lincoln, NE",
          "date": "2026-07-29",
          "source_tier": 1
        },
        {
          "title": "Gov. Jeff Landry discusses Meta's investment into Louisiana through data center in Richland Parish - wbrz.com",
          "url": "https://www.wbrz.com/news/gov-jeff-landry-discusses-meta-s-investment-into-louisiana-through-data-center-in-richland-parish/",
          "publisher": "wbrz.com",
          "date": "2026-07-12",
          "source_tier": 1
        },
        {
          "title": "Meta expands Louisiana Hyperion data center to 5GW and $50 billion - Yahoo Finance",
          "url": "https://finance.yahoo.com/technology/ai/articles/meta-expands-louisiana-hyperion-data-120038782.html",
          "publisher": "Yahoo Finance",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "Meta Data Center in Louisiana - LED - Louisiana Economic Development - LED (.gov)",
          "url": "https://www.opportunitylouisiana.gov/data-center/meta",
          "publisher": "Louisiana Economic Development - LED (.gov)",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "The power play behind Hyperion, Mark Zuckerberg’s colossal data center being built in rural Louisiana - Sherwood News",
          "url": "https://sherwood.news/tech/hyperion/",
          "publisher": "Sherwood News",
          "date": "2025-12-15",
          "source_tier": 1
        },
        {
          "title": "Entergy keeps Meta data center load forecasts confidential - The Center Square",
          "url": "https://neworleanscitybusiness.com/blog/2026/07/01/louisiana-psc-data-center-confidentiality-rule/",
          "publisher": "The Center Square",
          "date": "2026-06-30",
          "source_tier": 1
        },
        {
          "title": "Entergy seeks more big projects in 2026 as Louisiana load surges - New Orleans CityBusiness",
          "url": "https://neworleanscitybusiness.com/blog/2026/01/05/entergy-louisiana-1b-transmission-project/",
          "publisher": "New Orleans CityBusiness",
          "date": "2026-01-05",
          "source_tier": 1
        },
        {
          "title": "Louisiana AI Project to Grow to 5 GW - rtoinsider.com",
          "url": "https://www.rtoinsider.com/136600-louisiana-ai-project-to-grow-to-5gw/",
          "publisher": "rtoinsider.com",
          "date": "2026-07-14",
          "source_tier": 1
        },
        {
          "title": "Williams expands northwest Louisiana Haynesville Shale as data centers drive demand - The Shreveport-Bossier City Advocate",
          "url": "https://www.shreveportbossieradvocate.com/business/williams-sees-opportunity-in-haynesville-shale-data-center-demand/article_63b24135-317a-4129-89ef-49ada8d999b9.html",
          "publisher": "The Shreveport-Bossier City Advocate",
          "date": "2026-08-07",
          "source_tier": 1
        },
        {
          "title": "Groups Warn that La. Ratepayers Could be Saddled with Buildout for Meta’s Hyperion - RTO Insider",
          "url": "https://www.rtoinsider.com/138696-nonprofits-denounce-louisiana-meta-buildout-warn-cost-spillover/",
          "publisher": "RTO Insider",
          "date": "2026-08-09",
          "source_tier": 1
        },
        {
          "title": "Entergy receives regulatory approval for investments to support Meta's Louisiana data center - Reuters",
          "url": "https://www.reuters.com/business/energy/entergy-receives-regulatory-approval-investments-support-metas-louisiana-data-2025-08-20/",
          "publisher": "Reuters",
          "date": "2025-08-20",
          "source_tier": 1
        },
        {
          "title": "Entergy Louisiana gains regulatory approval for massive Meta power project - Louisiana Illuminator",
          "url": "https://lailluminator.com/2025/08/20/entergy-meta/",
          "publisher": "Louisiana Illuminator",
          "date": "2025-08-20",
          "source_tier": 1
        },
        {
          "title": "Meta data center in northeast LA transforms local government: ‘Coming into the modern world’ - NOLA.com",
          "url": "https://www.nola.com/news/politics/elections/richland-parish-meta-data-centers-local-government/article_0b35c62f-6674-4ed5-86ef-88270f7191f9.html",
          "publisher": "NOLA.com",
          "date": "2026-08-31",
          "source_tier": 4
        },
        {
          "title": "How big will the Richland Parish data center be? Meta will expand AI center - Yahoo Finance",
          "url": "https://finance.yahoo.com/technology/ai/articles/big-richland-parish-data-center-171024537.html",
          "publisher": "Yahoo Finance",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "Gov. Jeff Landry hails expansion of Meta’s massive data center in Louisiana - NOLA.com",
          "url": "https://www.nola.com/news/politics/jeff-landry-meta-data-center-louisiana-press-conference/article_ea8647e9-9652-40aa-b4ad-77f9562aa31a.html",
          "publisher": "NOLA.com",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "Meta expanding Richland Parish data center to 5 gigawatts, one of the largest in history - WAFB",
          "url": "https://www.wafb.com/video/2026/07/14/meta-expanding-richland-parish-data-center-5-gigawatts-one-largest-history-2/",
          "publisher": "WAFB",
          "date": "2026-07-14",
          "source_tier": 1
        },
        {
          "title": "Meta: Our U.S. data center fleet",
          "url": "https://datacenters.atmeta.com/us-locations/",
          "publisher": "Meta",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "This community college is training Louisiana residents for jobs at Meta's data center - WWNO",
          "url": "https://www.wwno.org/education/2026-09-04/this-community-college-is-training-louisiana-residents-for-jobs-at-metas-data-center",
          "publisher": "WWNO",
          "date": "2026-09-04",
          "source_tier": 4
        },
        {
          "title": "Meta hides data center info as it pushes more risks to Entergy’s customers - thelensnola.org",
          "url": "https://thelensnola.org/2026/08/18/meta-louisiana-data-center-ratepayer-costs/",
          "publisher": "thelensnola.org",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "Louisiana regulators kill effort to subpoena details of Meta data center - E&E News by POLITICO",
          "url": "https://www.eenews.net/articles/louisiana-regulators-kill-effort-to-subpoena-details-of-meta-data-center/",
          "publisher": "E&E News by POLITICO",
          "date": "2026-08-13",
          "source_tier": 4
        },
        {
          "title": "Meta won’t have to turn over job, electric information after Louisiana regulators override judge - NOLA.com",
          "url": "https://www.nola.com/news/meta-won-t-have-to-turn-over-job-electric-information-after-louisiana-regulators-override-judge/article_69105eda-826d-476c-9b01-b911afcdbe64.html",
          "publisher": "NOLA.com",
          "date": "2026-08-12",
          "source_tier": 4
        },
        {
          "title": "Louisiana Democrats helped bring Meta to the state. Some regret their votes - thecentersquare.com",
          "url": "https://www.thecentersquare.com/louisiana/article_f5fe155f-eab3-46be-872a-17c18608f4d9.html",
          "publisher": "thecentersquare.com",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Meta’s data center will be the biggest in the U.S., but no one knows who they’re hiring - thelensnola.org",
          "url": "https://thelensnola.org/2026/08/31/metas-data-center-will-be-the-biggest-in-the-u-s-but-no-one-knows-who-theyre-hiring/",
          "publisher": "thelensnola.org",
          "date": "2026-08-31",
          "source_tier": 4
        },
        {
          "title": "Meta can keep its data center details private, PSC decides - Louisiana Illuminator",
          "url": "https://lailluminator.com/2026/08/13/meta-data-center-private/",
          "publisher": "Louisiana Illuminator",
          "date": "2026-08-13",
          "source_tier": 4
        },
        {
          "title": "Expanded Meta Data Center Creates More Jobs and Opportunity in Richland Parish, Louisiana - Associated Construction Publications",
          "url": "https://www.turnerconstruction.com/insights/expanded-meta-data-center-creates-more-jobs-and-opportunity-in-richland-parish-louisiana",
          "publisher": "Associated Construction Publications",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "Meta prevails as Louisiana regulators block disclosure of data center expansion records - Baton Rouge Business Report",
          "url": "https://www.businessreport.com/article/meta-prevails-as-louisiana-regulators-block-disclosure-of-data-center-expansion-records",
          "publisher": "Baton Rouge Business Report",
          "date": "2026-08-12",
          "source_tier": 4
        },
        {
          "title": "Is a data center coming to Moss Bluff? Here’s what we know. - theadvocate.com",
          "url": "https://www.theadvocate.com/lake_charles/is-a-data-center-coming-to-moss-bluff-here-s-what-we-know/article_ad6f97c0-ed97-4609-99a5-eac05731915e.html",
          "publisher": "theadvocate.com",
          "date": "2026-08-12",
          "source_tier": 4
        },
        {
          "title": "Regulators allow Meta to keep data center records secret - WAFB",
          "url": "https://www.wafb.com/2026/08/12/regulators-allow-meta-keep-data-center-records-secret/",
          "publisher": "WAFB",
          "date": "2026-08-12",
          "source_tier": 4
        },
        {
          "title": "Louisiana PSC kills ruling that would force Meta to turn over key data center information - WWNO",
          "url": "https://www.wwno.org/politics/2026-08-12/louisiana-psc-kills-ruling-that-would-force-meta-to-turn-over-key-data-center-information",
          "publisher": "WWNO",
          "date": "2026-08-12",
          "source_tier": 4
        },
        {
          "title": "Meta wants to keep Hyperion data center details protected - Louisiana Illuminator",
          "url": "https://lailluminator.com/2026/08/11/meta-wants-details-secret/",
          "publisher": "Louisiana Illuminator",
          "date": "2026-08-11",
          "source_tier": 4
        },
        {
          "title": "Public Service Commission can demand transparency for Meta’s data center expansion - Louisiana Illuminator",
          "url": "https://lailluminator.com/2026/08/11/meta-energy/",
          "publisher": "Louisiana Illuminator",
          "date": "2026-08-11",
          "source_tier": 4
        },
        {
          "title": "Meta Hides Data Center Info As it Pushes More Risks to Entergy’s Customers - The Equation - Union of Concerned Scientists",
          "url": "https://blog.ucs.org/paul-arbaje/meta-hides-data-center-info-as-it-pushes-more-risks-to-entergys-customers/",
          "publisher": "The Equation - Union of Concerned Scientists",
          "date": "2026-08-10",
          "source_tier": 4
        },
        {
          "title": "As Meta data center expands, advocates push harder for transparency - Louisiana Illuminator",
          "url": "https://lailluminator.com/2026/08/05/as-meta-data-center-expands-advocates-push-harder-for-transparency/",
          "publisher": "Louisiana Illuminator",
          "date": "2026-08-05",
          "source_tier": 4
        },
        {
          "title": "Meta’s $200 Billion Bet on a Remote Data Center",
          "url": "https://www.youtube.com/watch?v=VV9Y8IYS9W4",
          "publisher": "YouTube",
          "date": "2026-05-23",
          "source_tier": 5
        },
        {
          "title": "Expanded Meta Data Center Creates More Jobs and Opportunity in Richland Parish, Louisiana - Associated Construction Publications",
          "url": "https://www.turnerconstruction.com/insights/expanded-meta-data-center-creates-more-jobs-and-opportunity-in-richland-parish-louisiana",
          "publisher": "Associated Construction Publications",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "Meta hides data center info as it pushes more risks to Entergy’s customers - thelensnola.org",
          "url": "https://thelensnola.org/2026/08/18/meta-louisiana-data-center-ratepayer-costs/",
          "publisher": "thelensnola.org",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "Editorial: Meta changing life in Richland Parish",
          "url": "https://americanpress.com/2026/09/02/editorial-meta-changing-life-in-richland-parish/",
          "publisher": "americanpress.com",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Meta data center in Richland Parish brings jobs, tax growth to northeast Louisiana",
          "url": "https://www.wafb.com/2026/07/29/meta-data-center-richland-parish-brings-jobs-tax-growth-northeast-louisiana/",
          "publisher": "WAFB",
          "date": "2026-07-29",
          "source_tier": 4
        },
        {
          "title": "Meta expanding Richland Parish data center to 5 gigawatts, one of the largest in history",
          "url": "https://www.knoe.com/video/2026/07/14/meta-expanding-richland-parish-data-center-5-gigawatts-one-largest-history-2/",
          "publisher": "KNOE",
          "date": "2026-07-13",
          "source_tier": 4
        },
        {
          "title": "Louisiana Meta data center generates staggering sales tax growth",
          "url": "https://www.shreveporttimes.com/story/news/2026/07/21/louisiana-meta-data-center-generates-staggering-sales-tax-growth-as-trump-predicted/90986903007/",
          "publisher": "Shreveport Times",
          "date": "2026-07-21",
          "source_tier": 4
        },
        {
          "title": "Digital Infrastructure as the Backbone of the Future: How Meta's Louisiana Data Center Expansion is Delivering Life Changing Returns",
          "url": "https://netchoice.org/digital-infrastructure-as-the-backbone-of-the-future-how-metas-louisiana-data-center-expansion-is-delivering-life-changing-returns/",
          "publisher": "NetChoice",
          "date": "2026-07-20",
          "source_tier": 4
        },
        {
          "title": "Meta data center tax infusion means $50,000 bonus checks for these Louisiana teachers - The Shreveport Bossier City Advocate",
          "url": "https://www.shreveportbossieradvocate.com/news/meta-data-center-bonus-checks-taxes/article_a2f5fa71-e62d-4197-af35-fc31e201065d.html",
          "publisher": "shreveportbossieradvocate.com",
          "date": "2026-06-13",
          "source_tier": 4
        },
        {
          "title": "This community college is training Louisiana residents for jobs at Meta's data center - WWNO",
          "url": "https://www.wwno.org/education/2026-09-04/this-community-college-is-training-louisiana-residents-for-jobs-at-metas-data-center",
          "publisher": "WWNO",
          "date": "2026-09-04",
          "source_tier": 4
        },
        {
          "title": "From RV camps to packed hotels, Meta data center project has LA parish bursting at the seams - NOLA.com",
          "url": "https://www.nola.com/news/politics/meta-data-center-richland-parish-louisiana/article_1a044e8c-632c-474e-a899-d6a47c11ec78.html",
          "publisher": "NOLA.com",
          "date": "2026-08-21",
          "source_tier": 4
        },
        {
          "title": "Investing in Richland Parish",
          "url": "https://www.meta.com/actions/building-louisiana/",
          "publisher": "Meta Store",
          "date": "2026-07-13",
          "source_tier": 2
        },
        {
          "title": "Meta's Louisiana data center investment to reach $50 billion, aided by generous tax incentives",
          "url": "https://www.cnbc.com/2026/07/13/meta-louisiana-data-center-investment-reaches-50-billion-amid-ai-push.html",
          "publisher": "CNBC",
          "date": "2026-07-13",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "Meta construction at Richland Parish began increase in worker numbers in December 2024",
          "source_url": "https://www.thecentersquare.com/louisiana/article_44b57c7e-9c5f-4051-a8eb-8ecb51cf1c8a.html",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Meta lists Meta Richland Parish Data Center at Richland Parish, Louisiana on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.atmeta.com/us-locations/",
          "source_tier": 2
        },
        {
          "status": "operational",
          "effective_at": "2026-09-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-13",
          "summary": "Meta announced Hyperion AI data center in northeast Louisiana",
          "source_url": "https://www.businessinsider.com/meta-ai-data-center-louisiana-housing-market-home-rentals-2026-9",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-09-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-10",
          "summary": "Work continues on the Meta Richland Parish Data Center near Rayville as of August 3, 2026",
          "source_url": "https://www.nola.com/opinions/letters/letters-data-center-livingston-parish/article_05be4bde-50d0-4f7b-a862-ec8653cd1217.amp.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-04",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-04",
          "summary": "Louisiana Delta Community College created new four week data center technician program",
          "source_url": "https://www.wwno.org/education/2026-09-04/this-community-college-is-training-louisiana-residents-for-jobs-at-metas-data-center",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-04",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-04",
          "summary": "Meta is described as having its largest project at Richland Parish, and one of the biggest in the world",
          "source_url": "https://www.wwno.org/education/2026-09-04/this-community-college-is-training-louisiana-residents-for-jobs-at-metas-data-center",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-04",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-04",
          "summary": "The programs were created since late 2024, when Meta broke ground on the Richland Parish data center",
          "source_url": "https://www.wwno.org/education/2026-09-04/this-community-college-is-training-louisiana-residents-for-jobs-at-metas-data-center",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "Meta announced Richland Parish data center less than seven months after HB 827 passage in 2024",
          "source_url": "https://www.thecentersquare.com/louisiana/article_f5fe155f-eab3-46be-872a-17c18608f4d9.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "The data center is known as Hyperion",
          "source_url": "https://americanpress.com/2026/09/02/editorial-meta-changing-life-in-richland-parish/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-21",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-21",
          "summary": "Meta is expanding its investment at Hyperion to $50 billion from $10 billion, announced in July.",
          "source_url": "https://www.nola.com/news/politics/meta-data-center-richland-parish-louisiana/article_1a044e8c-632c-474e-a899-d6a47c11ec78.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-21",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-21",
          "summary": "The data center will occupy five square miles and is scheduled to be fully operational in 2036.",
          "source_url": "https://www.nola.com/news/politics/meta-data-center-richland-parish-louisiana/article_1a044e8c-632c-474e-a899-d6a47c11ec78.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-18",
          "summary": "Interior buildout already underway in first buildings",
          "source_url": "https://www.turnerconstruction.com/insights/expanded-meta-data-center-creates-more-jobs-and-opportunity-in-richland-parish-louisiana",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-18",
          "summary": "Entergy Louisiana filed an application in April 2026 for seven additional gas fired power plants to serve Meta's data center expansion",
          "source_url": "https://thelensnola.org/2026/08/18/meta-louisiana-data-center-ratepayer-costs/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-18",
          "summary": "Meta's data center in Richland Parish requires a total of 10 new gas plants, including three already approved last year",
          "source_url": "https://thelensnola.org/2026/08/18/meta-louisiana-data-center-ratepayer-costs/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-18",
          "summary": "The commission's final decision on the seven new gas plants is scheduled for December 16, 2026",
          "source_url": "https://thelensnola.org/2026/08/18/meta-louisiana-data-center-ratepayer-costs/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-18",
          "summary": "Meta expanded Richland Parish data center from originally announced 2 gigawatts to 5 gigawatts of IT capacity",
          "source_url": "https://www.turnerconstruction.com/insights/expanded-meta-data-center-creates-more-jobs-and-opportunity-in-richland-parish-louisiana",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-08-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-14",
          "summary": "Entergy Louisiana will build seven new gas fired power plants to support the data center",
          "source_url": "https://247wallst.com/investing/2026/08/14/zuckerbergs-250-billion-louisiana-data-center-will-create-just-1000-jobs-thats-250-million-spent-per-job/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-08-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-14",
          "summary": "Full buildout of both phases not expected until around 2036",
          "source_url": "https://247wallst.com/investing/2026/08/14/zuckerbergs-250-billion-louisiana-data-center-will-create-just-1000-jobs-thats-250-million-spent-per-job/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-08-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-14",
          "summary": "Permanent headcount of 1,000 jobs arrives after a decade of construction",
          "source_url": "https://247wallst.com/investing/2026/08/14/zuckerbergs-250-billion-louisiana-data-center-will-create-just-1000-jobs-thats-250-million-spent-per-job/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-08-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-13",
          "summary": "Meta announced plans to expand Hyperion with seven additional power generating units",
          "source_url": "https://lailluminator.com/2026/08/13/meta-data-center-private/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-08-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-13",
          "summary": "Meta has contracted with Entergy Louisiana to build three natural gas powered turbines initially",
          "source_url": "https://lailluminator.com/2026/08/13/meta-data-center-private/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-08-12",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-12",
          "summary": "Meta and Entergy plan to build 10 new gas power plants to power the data center facilities",
          "source_url": "https://www.wwno.org/politics/2026-08-12/louisiana-psc-kills-ruling-that-would-force-meta-to-turn-over-key-data-center-information",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-08-12",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-12",
          "summary": "Both Hyperion and newer Evest artificial intelligence data centers could be among the largest in the world",
          "source_url": "https://www.wwno.org/politics/2026-08-12/louisiana-psc-kills-ruling-that-would-force-meta-to-turn-over-key-data-center-information",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-08-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-11",
          "summary": "Three natural gas powered turbines are being built by Entergy to initially power the data center",
          "source_url": "https://lailluminator.com/2026/08/11/meta-wants-details-secret/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-08-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-11",
          "summary": "Meta announced it intends to expand Hyperion with seven power generating units",
          "source_url": "https://lailluminator.com/2026/08/11/meta-wants-details-secret/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-08-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-11",
          "summary": "Meta announced it will nearly double expected size of its Hyperion campus in Northeast Louisiana",
          "source_url": "https://lailluminator.com/2026/08/11/meta-energy/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-10",
          "summary": "Meta's data center expansion in Richland Parish, Louisiana requires seven additional gas plants, each rated at 754 megawatts, on top of three already approved.",
          "source_url": "https://thelensnola.org/2026/08/18/meta-louisiana-data-center-ratepayer-costs/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-08-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-10",
          "summary": "Entergy Louisiana filed application in April 2026 to build seven additional gas fired power plants for Meta data center expansion",
          "source_url": "https://blog.ucs.org/paul-arbaje/meta-hides-data-center-info-as-it-pushes-more-risks-to-entergys-customers/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-10",
          "summary": "Entergy Louisiana filed an application in April 2026 to build seven additional gas fired power plants for Meta's data center expansion.",
          "source_url": "https://thelensnola.org/2026/08/18/meta-louisiana-data-center-ratepayer-costs/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-10",
          "summary": "The Louisiana Public Service Commission's final decision on the new gas plants is scheduled for December 16, 2026.",
          "source_url": "https://thelensnola.org/2026/08/18/meta-louisiana-data-center-ratepayer-costs/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-29",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-29",
          "summary": "Meta announced the Richland Parish data center project in 2024",
          "source_url": "https://www.wafb.com/2026/07/29/meta-data-center-richland-parish-brings-jobs-tax-growth-northeast-louisiana/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-07-28",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-28",
          "summary": "Meta is building a large data center in Louisiana",
          "source_url": "https://www.nytimes.com/2026/07/27/business/meta-data-center-louisiana-takeaways.html",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-07-27",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-27",
          "summary": "Meta negotiated a secret Louisiana data center deal and got everything it wanted",
          "source_url": "https://www.nytimes.com/2026/07/27/technology/meta-data-center-louisiana.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-21",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-21",
          "summary": "Construction timeline extended by expansion to up to 10 years",
          "source_url": "https://www.shreveporttimes.com/story/news/2026/07/21/louisiana-meta-data-center-generates-staggering-sales-tax-growth-as-trump-predicted/90986903007/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-21",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-21",
          "summary": "Meta expanded data center investment from $10 billion to $50 billion",
          "source_url": "https://www.shreveporttimes.com/story/news/2026/07/21/louisiana-meta-data-center-generates-staggering-sales-tax-growth-as-trump-predicted/90986903007/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-20",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-20",
          "summary": "Meta announced this month that it is expanding its Richland Parish data center to 5 gigawatts of compute capacity",
          "source_url": "https://netchoice.org/digital-infrastructure-as-the-backbone-of-the-future-how-metas-louisiana-data-center-expansion-is-delivering-life-changing-returns/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-20",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-20",
          "summary": "The Richland Parish site broke ground in December 2024",
          "source_url": "https://netchoice.org/digital-infrastructure-as-the-backbone-of-the-future-how-metas-louisiana-data-center-expansion-is-delivering-life-changing-returns/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-13",
          "summary": "The data center is home to Hyperion, Meta's most powerful cluster for training AI",
          "source_url": "https://www.meta.com/actions/building-louisiana/",
          "source_tier": 2
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-13",
          "summary": "Meta Hyperion data center in Richland Parish planned as 5 GW facility",
          "source_url": "https://www.cnbc.com/2026/07/13/meta-louisiana-data-center-investment-reaches-50-billion-amid-ai-push.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-13",
          "summary": "Full 5 GW Hyperion project expected to be complete around 2032",
          "source_url": "https://www.cnbc.com/2026/07/13/meta-louisiana-data-center-investment-reaches-50-billion-amid-ai-push.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-13",
          "summary": "Hyperion project should reach 2 GW by 2030",
          "source_url": "https://www.cnbc.com/2026/07/13/meta-louisiana-data-center-investment-reaches-50-billion-amid-ai-push.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-13",
          "summary": "Meta expanding Richland Parish data center to 5 gigawatts of compute capacity",
          "source_url": "https://www.knoe.com/video/2026/07/14/meta-expanding-richland-parish-data-center-5-gigawatts-one-largest-history-2/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-06-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-06-13",
          "summary": "Hyperion construction expected to continue until 2030",
          "source_url": "https://www.shreveportbossieradvocate.com/news/meta-data-center-bonus-checks-taxes/article_a2f5fa71-e62d-4197-af35-fc31e201065d.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-05-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-23",
          "summary": "The data center will be fueled by 10 newly constructed natural gas plants",
          "source_url": "https://www.youtube.com/watch?v=VV9Y8IYS9W4",
          "source_tier": 5
        },
        {
          "status": "rumored",
          "effective_at": "2026-05-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-23",
          "summary": "Meta is building its largest AI data center in Richland Parish, Louisiana",
          "source_url": "https://www.youtube.com/watch?v=VV9Y8IYS9W4",
          "source_tier": 5
        }
      ]
    },
    {
      "slug": "piedmont-area-data-center-ok",
      "name": "Piedmont Area Data Center",
      "summary": "A proposed data center in the Piedmont area has a zoning decision pending, with residents petitioning against it and the developer securing an alternate site option.",
      "state": "OK",
      "city": "Piedmont",
      "county": "Canadian County",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 35.53028,
      "longitude": -97.9575,
      "location_precision": "county",
      "location_source": "County seat (El Reno), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": 337,
      "site_acres_disclosed_as": "third_party_estimate",
      "site_acres_source_url": "https://www.news9.com/data-centers-in-oklahoma/piedmont-council-considers-annexation-rezoning-for-proposed-cloverleaf-data-center",
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/piedmont-area-data-center-ok",
      "source": "https://www.news9.com/oklahoma-city-news/piedmont-data-center-plans-move-forward-as-developer-considers-additional-site",
      "basis": "official_record",
      "sources": [
        {
          "title": "Piedmont City Council to vote Monday night on proposed data center - News 9",
          "url": "https://www.news9.com/oklahoma-city-news/piedmont-data-center-plans-move-forward-as-developer-considers-additional-site",
          "publisher": "News 9",
          "date": "2026-08-24",
          "source_tier": 4
        },
        {
          "title": "Piedmont council considers annexation, rezoning for proposed Cloverleaf data center - News 9",
          "url": "https://www.news9.com/data-centers-in-oklahoma/piedmont-council-considers-annexation-rezoning-for-proposed-cloverleaf-data-center",
          "publisher": "News 9",
          "date": "2026-09-18",
          "source_tier": 4
        },
        {
          "title": "Powered land company Cloverleaf proposing 633-acre data center in Canadian County, Oklahoma",
          "url": "https://www.datacenterdynamics.com/en/news/powered-land-company-cloverleaf-proposing-633-acre-data-center-in-canadian-county-oklahoma/",
          "publisher": "www.datacenterdynamics.com",
          "date": "2026-05-14",
          "source_tier": 3
        },
        {
          "title": "Family living next to proposed Piedmont-area data center fears impact as zoning decision remains pending - news9.com",
          "url": "https://www.news9.com/data-centers-in-oklahoma/piedmont-residents-raise-concerns-over-proposed-data-center",
          "publisher": "news9.com",
          "date": "2026-08-24",
          "source_tier": 4
        },
        {
          "title": "Piedmont residents petition data center as developer secures alternate site option - KOKH",
          "url": "https://okcfox.com/newsletter-daily/piedmont-residents-petition-data-center-as-developer-secures-alternate-site-option",
          "publisher": "KOKH",
          "date": "2026-08-20",
          "source_tier": 4
        },
        {
          "title": "A data center campus would mean millions for an Oklahoma town. One family faces the human cost - KOCO",
          "url": "https://www.koco.com/article/piedmont-oklahoma-data-center-campus-cloverleaf/73486911",
          "publisher": "KOCO",
          "date": "2026-08-23",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-09-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-18",
          "summary": "Project Open Sky planned as multi building data center campus with power generation uses",
          "source_url": "https://www.news9.com/data-centers-in-oklahoma/piedmont-council-considers-annexation-rezoning-for-proposed-cloverleaf-data-center",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-18",
          "summary": "Cloverleaf will comply with Piedmont noise standards and use closed loop cooling system",
          "source_url": "https://www.news9.com/data-centers-in-oklahoma/piedmont-council-considers-annexation-rezoning-for-proposed-cloverleaf-data-center",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-08-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-24",
          "summary": "Cloverleaf hopes to build data center on about 1000 acres near Piedmont",
          "source_url": "https://www.news9.com/oklahoma-city-news/piedmont-data-center-plans-move-forward-as-developer-considers-additional-site",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-08-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-24",
          "summary": "Cloverleaf has secured rights to purchase more than 300 acres in Kingfisher County adjacent to original site",
          "source_url": "https://www.news9.com/oklahoma-city-news/piedmont-data-center-plans-move-forward-as-developer-considers-additional-site",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "amazon-web-services-louisiana-data-centers-shreveport-la",
      "name": "Amazon Web Services Louisiana data centers",
      "summary": "Amazon Web Services announced a third data center campus in Shreveport, raising its total Louisiana investment to $18 billion across three Northwest Louisiana campuses.",
      "state": "LA",
      "city": "Shreveport",
      "county": "Caddo Parish",
      "status": "proposed",
      "developer": "Amazon Web Services",
      "capacity_mw": null,
      "latitude": 32.50806,
      "longitude": -93.76278,
      "location_precision": "county",
      "location_source": "County seat (Shreveport), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/amazon-web-services-louisiana-data-centers-shreveport-la",
      "source": "https://www.bicmagazine.com/departments/AI-Infrastructure/amazon-raises-louisiana-data-center-investment/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Amazon raises Louisiana data-center investment to $18 billion, adds third Shreveport campus - BIC Magazine",
          "url": "https://www.bicmagazine.com/departments/AI-Infrastructure/amazon-raises-louisiana-data-center-investment/",
          "publisher": "BIC Magazine",
          "date": "2026-08-19",
          "source_tier": 4
        },
        {
          "title": "Amazon Web Services announces third data center in NW Louisiana, sets community meeting date - The Shreveport-Bossier City Advocate",
          "url": "https://www.shreveportbossieradvocate.com/business/amazon-web-services-third-data-center-in-northwest-louisiana-shreveport/article_2ee6697d-2d82-4814-98a8-903a488c3eb9.html",
          "publisher": "The Shreveport-Bossier City Advocate",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "AWS ‘Unable To Restore’ Data Centers Hit By Iran Strikes; Partner Hopes Amazon’s $220B Spending Plan Continues",
          "url": "https://www.crn.com/news/data-center/2026/aws-unable-to-restore-data-centers-hit-by-iran-strikes-partner-hopes-amazon-s-220b-spending-plan-continues",
          "publisher": "www.crn.com",
          "date": "2026-09-16",
          "source_tier": 4
        },
        {
          "title": "Shreveport Emerges as a Key Hub for SLB’s Data Center Infrastructure Business - SLB",
          "url": "https://www.slb.com/newsroom/features/2026/2026-0827-slb-shreveport-data-center",
          "publisher": "SLB",
          "date": "2026-08-27",
          "source_tier": 4
        },
        {
          "title": "Trump calls data center opponents backward as Louisiana projects roll on - Shreveport Times",
          "url": "https://www.shreveporttimes.com/story/news/2026/09/01/louisiana-welcome-data-centers-as-national-resistance-grows-despite-trump-calling-opponents-backward/91554990007/",
          "publisher": "Shreveport Times",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Amazon Web Services to build third data center in Louisiana - audacy.com",
          "url": "https://www.audacy.com/wwl/news/local/amazon-web-services-to-build-third-data-center-in-louisiana",
          "publisher": "audacy.com",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "Amazon plans 3rd data center in NW Louisiana, bringing investment to $18B - WWLTV.com",
          "url": "https://www.wwltv.com/article/tech/amazon-plans-3rd-data-center-in-nw-louisiana-bringing-investment-to-18b/289-769becae-0dea-4b16-baa9-50a34297086b",
          "publisher": "WWLTV.com",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "Amazon Web Services announces a third data center campus is coming to Shreveport - KSLA",
          "url": "https://www.ksla.com/2026/08/18/amazon-web-services-announces-third-data-center-campus-is-coming-shreveport/",
          "publisher": "KSLA",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "Amazon’s data center network in Northwest Louisiana is going to get bigger - Louisiana Illuminator",
          "url": "https://lailluminator.com/2026/08/18/amazons-data-center-network-in-northwest-louisiana-is-going-to-get-bigger/",
          "publisher": "Louisiana Illuminator",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "Amazon is upping its data center commitment in northwest Louisiana by $6B - Baton Rouge Business Report",
          "url": "https://www.businessreport.com/article/amazon-is-upping-its-data-center-commitment-in-northwest-louisiana-by-6b",
          "publisher": "Baton Rouge Business Report",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "AWS pledges $6bn investment in data center campus in Shreveport, Louisiana - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/aws-pledges-6bn-investment-in-data-center-campus-in-shreveport-louisiana/",
          "publisher": "Data Center Dynamics",
          "date": "2026-08-19",
          "source_tier": 3
        },
        {
          "title": "Amazon raises Louisiana data center investment to $18 billion, adds third Shreveport campus - BIC Magazine",
          "url": "https://www.bicmagazine.com/departments/AI-Infrastructure/amazon-raises-louisiana-data-center-investment/",
          "publisher": "BIC Magazine",
          "date": "2026-08-19",
          "source_tier": 4
        },
        {
          "title": "Amazon Web Services announces a third data center campus is coming to Shreveport - KSLA",
          "url": "https://www.ksla.com/2026/08/18/amazon-web-services-announces-third-data-center-campus-is-coming-shreveport/",
          "publisher": "KSLA",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "Third Amazon data center campus part of Amazon's $18 billion Louisiana investment - WBRZ",
          "url": "https://www.wbrz.com/news/third-amazon-data-center-campus-part-of-amazon-s-18-billion-louisiana-investment/",
          "publisher": "WBRZ",
          "date": "2026-08-19",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-08-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-18",
          "summary": "Amazon Web Services announced plans in February 2026 to build two data centers in northwest Louisiana",
          "source_url": "https://www.audacy.com/wwl/news/local/amazon-web-services-to-build-third-data-center-in-louisiana",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-08-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-18",
          "summary": "AWS is adding a third data center at Resilient Technology Park in west Shreveport",
          "source_url": "https://www.audacy.com/wwl/news/local/amazon-web-services-to-build-third-data-center-in-louisiana",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-01",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Amazon Web Services pledged a 6 billion dollar investment to develop a hyperscale data center campus in Shreveport, Caddo Parish, Louisiana.",
          "source_url": "https://www.datacenterdynamics.com/en/news/aws-pledges-6bn-investment-in-data-center-campus-in-shreveport-louisiana/",
          "source_tier": 3
        }
      ]
    },
    {
      "slug": "caddo-parish-data-center-la",
      "name": "Caddo Parish Data Center",
      "summary": "A data center project in Caddo Parish is moving forward with construction after parish commissioners rejected a moratorium step.",
      "state": "LA",
      "city": null,
      "county": "Caddo Parish",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 32.50806,
      "longitude": -93.76278,
      "location_precision": "county",
      "location_source": "County seat (Shreveport), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/caddo-parish-data-center-la",
      "source": "https://www.ktalnews.com/news/local-news/shreveport-caddo-parish-rejects-data-center-moratorium-commission-votes-against-data-center-halt-construction-moves-forward/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Data center construction moves forward in Caddo Parish - KTVE – myarklamiss.com – Your ArkLaMiss News Source",
          "url": "https://www.ktalnews.com/news/local-news/shreveport-caddo-parish-rejects-data-center-moratorium-commission-votes-against-data-center-halt-construction-moves-forward/",
          "publisher": "KTVE – myarklamiss.com – Your ArkLaMiss News Source",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Caddo commissioners reject data center moratorium step - thecentersquare.com",
          "url": "https://www.thecentersquare.com/louisiana/article_3f44b5fa-479c-4ca5-9e9e-1e770fe099aa.html",
          "publisher": "thecentersquare.com",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Trump calls data center opponents backward as Louisiana projects roll on - Shreveport Times",
          "url": "https://www.shreveporttimes.com/story/news/2026/09/01/louisiana-welcome-data-centers-as-national-resistance-grows-despite-trump-calling-opponents-backward/91554990007/",
          "publisher": "Shreveport Times",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Louisiana governor to announce $12B Caddo-Bossier project today",
          "url": "https://www.shreveporttimes.com/story/news/2026/02/23/louisiana-governor-jeff-landry-to-announce-12-billion-data-center-project-today-in-shreveport/88821398007/",
          "publisher": "www.shreveporttimes.com",
          "date": "2026-02-23",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "claremore-data-center-ok",
      "name": "Claremore Data Center",
      "summary": "A data center project in Claremore, Oklahoma advanced with major community commitments while also prompting community concerns addressed by the city.",
      "state": "OK",
      "city": "Claremore",
      "county": "Rogers County",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 36.31528,
      "longitude": -95.61278,
      "location_precision": "county",
      "location_source": "County seat (Claremore), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/claremore-data-center-ok",
      "source": "https://www.kjrh.com/news/local-news/claremore-addresses-community-concerns-over-data-center-project",
      "basis": "official_record",
      "sources": [
        {
          "title": "Claremore addresses community concerns over data center project - 2 News Oklahoma KJRH Tulsa",
          "url": "https://www.kjrh.com/news/local-news/claremore-addresses-community-concerns-over-data-center-project",
          "publisher": "2 News Oklahoma KJRH Tulsa",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Claremore data center project advances with major community commitments - News On 6",
          "url": "https://www.newson6.com/data-centers-in-oklahoma/claremore-data-center-project-advances",
          "publisher": "News On 6",
          "date": "2026-08-28",
          "source_tier": 4
        },
        {
          "title": "Sequoyah Public Schools set to receive largest share of Claremore data center PILOT payments - KJRH",
          "url": "https://www.kjrh.com/news/local-news/claremore/sequoyah-public-schools-claremore-data-center-pilot-payments-sept-12-2026",
          "publisher": "KJRH",
          "date": "2026-09-12",
          "source_tier": 4
        },
        {
          "title": "What to Know About Project Mustang in Claremore - News On 6",
          "url": "https://www.newson6.com/claremore-data-center-project-mustang-oklahoma",
          "publisher": "News On 6",
          "date": "2026-09-08",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-09-12",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-12",
          "summary": "Sequoyah Public Schools expected to receive $100 million in PILOT payments from Claremore data center project",
          "source_url": "https://www.kjrh.com/news/local-news/claremore/sequoyah-public-schools-claremore-data-center-pilot-payments-sept-12-2026",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-12",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-12",
          "summary": "Beale Infrastructure is the developer of the Claremore data center",
          "source_url": "https://www.kjrh.com/news/local-news/claremore/sequoyah-public-schools-claremore-data-center-pilot-payments-sept-12-2026",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-12",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-12",
          "summary": "Beale Infrastructure partnering with Sequoyah Public Schools on fitness focused playground project to be completed by end of year",
          "source_url": "https://www.kjrh.com/news/local-news/claremore/sequoyah-public-schools-claremore-data-center-pilot-payments-sept-12-2026",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "clarksville-data-center-ar",
      "name": "Clarksville Data Center",
      "summary": "A data center plan in Clarksville includes 40 natural gas turbines and is associated with a multi billion dollar bond that a community group is petitioning to repeal.",
      "state": "AR",
      "city": "Clarksville",
      "county": "Johnson County",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 35.46389,
      "longitude": -93.47722,
      "location_precision": "county",
      "location_source": "County seat (Clarksville), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/clarksville-data-center-ar",
      "source": "https://www.yahoo.com/news/us/articles/group-creates-petition-repeal-clarksville-225240336.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "Group creates petition to repeal Clarksville data center's multi-billion-dollar bond - 5newsonline.com",
          "url": "https://www.yahoo.com/news/us/articles/group-creates-petition-repeal-clarksville-225240336.html",
          "publisher": "5newsonline.com",
          "date": "2026-08-20",
          "source_tier": 4
        },
        {
          "title": "Clarksville’s data center plan includes 40 natural gas turbines - arkansasonline.com",
          "url": "https://www.arkansasonline.com/news/2026/aug/12/clarksvilles-data-center-plan-includes-40-natural/",
          "publisher": "arkansasonline.com",
          "date": "2026-08-12",
          "source_tier": 4
        },
        {
          "title": "Clarksville’s data center plan includes 40 natural gas turbines - The Arkansas Democrat-Gazette",
          "url": "https://www.arkansasonline.com/news/2026/aug/12/clarksvilles-data-center-plan-includes-40-natural/",
          "publisher": "The Arkansas Democrat-Gazette",
          "date": "2026-08-12",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "compass-red-oak-campus-tx",
      "name": "Compass Red Oak campus",
      "summary": "Compass Datacenters lists a data center at Red Oak, Texas and says it is being built.",
      "state": "TX",
      "city": "Red Oak",
      "county": "Ellis County",
      "status": "under_construction",
      "developer": "Compass Datacenters",
      "capacity_mw": null,
      "latitude": 32.5155346,
      "longitude": -96.7826267,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/compass-red-oak-campus-tx",
      "source": "https://www.compassdatacenters.com/data-center-markets/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Compass Datacenters: Data center markets",
          "url": "https://www.compassdatacenters.com/data-center-markets/",
          "publisher": "Compass Datacenters",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "A Texas developer got a $2 billion loan to build Oracle data centers in the 'burbs - Business Insider",
          "url": "https://www.businessinsider.com/databank-financing-dallas-data-center-inference-2026-4",
          "publisher": "Business Insider",
          "date": "2026-04-21",
          "source_tier": 4
        },
        {
          "title": "County Partners with Compass Datacenters for Phase 2 Construction of Red Oak Campus - Focus Daily News",
          "url": "https://www.focusdailynews.com/county-partners-with-compass-datacenters-for-phase-2-construction-of-red-oak-campus/",
          "publisher": "Focus Daily News",
          "date": "2023-11-05",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Compass Datacenters lists Compass Red Oak campus at Red Oak, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.compassdatacenters.com/data-center-markets/",
          "source_tier": 2
        },
        {
          "status": "under_construction",
          "effective_at": "2026-04-21",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-04-21",
          "summary": "A Texas developer obtained $2 billion in financing to build Oracle data centers near Dallas",
          "source_url": "https://www.businessinsider.com/databank-financing-dallas-data-center-inference-2026-4",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2023-11-05",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2023-11-05",
          "summary": "Compass Datacenters Red Oak Campus phase two construction partnership with county",
          "source_url": "https://www.focusdailynews.com/county-partners-with-compass-datacenters-for-phase-2-construction-of-red-oak-campus/",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "eaton-corp-north-little-rock-manufacturing-site-ar",
      "name": "Eaton Corp. North Little Rock Manufacturing Site",
      "summary": "Eaton Corp. selected North Little Rock for a $242 million data center infrastructure manufacturing site expected to employ 1,200 workers.",
      "state": "AR",
      "city": "North Little Rock",
      "county": "Pulaski County",
      "status": "rumored",
      "developer": "Eaton Corp.",
      "capacity_mw": null,
      "latitude": 34.74444,
      "longitude": -92.28806,
      "location_precision": "county",
      "location_source": "County seat (Little Rock), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/eaton-corp-north-little-rock-manufacturing-site-ar",
      "source": "https://www.arkansasbusiness.com/article/eaton-north-little-rock-242-million-facility-1200-jobs/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Data Center Infrastructure Firm Picks North Little Rock for $242M Manufacturing Site - Arkansas Business",
          "url": "https://www.arkansasbusiness.com/article/eaton-north-little-rock-242-million-facility-1200-jobs/",
          "publisher": "Arkansas Business",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Eaton Corp. to build $242 million factory in North Little Rock, employ 1,200 - arkansasonline.com",
          "url": "https://www.arkansasonline.com/news/2026/sep/02/eaton-corp-to-build-242-million-factory-in-north/",
          "publisher": "arkansasonline.com",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Eaton Corp. to build $242 million factory in North Little Rock, employ 1,200 - arkansasonline.com",
          "url": "https://www.arkansasonline.com/news/2026/sep/02/eaton-corp-to-build-242-million-factory-in-north/",
          "publisher": "arkansasonline.com",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Eaton to locate $242 million facility in North Little Rock, adding 1,200 jobs",
          "url": "https://talkbusiness.net/2026/09/eaton-to-locate-242-million-facility-in-north-little-rock-adding-1200-jobs/",
          "publisher": "talkbusiness.net",
          "date": "2026-09-03",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "el-reno-bitcoin-mining-data-center-ok",
      "name": "El Reno Bitcoin Mining Data Center",
      "summary": "A massive water leak in El Reno, Oklahoma was traced to a Bitcoin mining data center facility.",
      "state": "OK",
      "city": "El Reno",
      "county": "Canadian County",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 35.53028,
      "longitude": -97.9575,
      "location_precision": "county",
      "location_source": "County seat (El Reno), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/el-reno-bitcoin-mining-data-center-ok",
      "source": "https://kfor.com/news/local/massive-el-reno-water-leak-traced-to-bitcoin-mining-data-center-facility/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Massive El Reno water leak traced to Bitcoin mining data center facility - KFOR",
          "url": "https://kfor.com/news/local/massive-el-reno-water-leak-traced-to-bitcoin-mining-data-center-facility/",
          "publisher": "KFOR",
          "date": "2026-08-28",
          "source_tier": 4
        },
        {
          "title": "Water leak at Oklahoma data center sparks concern - 5newsonline.com",
          "url": "https://www.5newsonline.com/video/news/water-leak-oklahoma-data-center-concern/527-54ed0781-7996-4df6-bd9b-1f76844a3cc1",
          "publisher": "5newsonline.com",
          "date": "2026-08-31",
          "source_tier": 4
        },
        {
          "title": "Wasted water: Officials say El Reno ‘failed’ to enforce stop-work order at leaky bitcoin site",
          "url": "https://nondoc.com/2026/09/02/wasted-water-officials-say-el-reno-failed-to-enforce-stop-work-order-at-leaky-bitcoin-site/",
          "publisher": "nondoc.com",
          "date": "2026-09-03",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-08-28",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-28",
          "summary": "Massive water leak in El Reno traced to Bitcoin mining data center facility",
          "source_url": "https://kfor.com/news/local/massive-el-reno-water-leak-traced-to-bitcoin-mining-data-center-facility/",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "google-muskogee-county-data-center-ok",
      "name": "Google Muskogee County data center",
      "summary": "Google lists a data center at Muskogee County, Oklahoma and says it is being built.",
      "state": "OK",
      "city": null,
      "county": "Muskogee County",
      "status": "not_verified",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 35.7466,
      "longitude": -95.368,
      "location_precision": "county",
      "location_source": "County seat (Muskogee), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-muskogee-county-data-center-ok",
      "source": "https://datacenters.google/locations/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Muskogee County data center at Muskogee County, Oklahoma on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "google-stillwater-data-center-ok",
      "name": "Google Stillwater data center",
      "summary": "Google lists a data center at Stillwater, Oklahoma and says it is being built.",
      "state": "OK",
      "city": "Stillwater",
      "county": "Payne County",
      "status": "under_construction",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 36.1317,
      "longitude": -97.0742639,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-stillwater-data-center-ok",
      "source": "https://datacenters.google/locations/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "State, local leaders advised to do their homework on data centers",
          "url": "https://tulsaworld.com/news/state-regional/government-politics/article_8e4606ca-d0e0-447c-a1ac-b42d1fda34b3.html",
          "publisher": "Tulsa World",
          "date": "2026-10-02",
          "source_tier": 4
        },
        {
          "title": "Stillwater Chamber reports Project Rohan, Google data center win and expanded site outreach - citizenportal.ai",
          "url": "https://citizenportal.ai/articles/6085123/oklahoma/payne-county/stillwater/city-council-sua-and-seda-meetings/stillwater-chamber-reports-project-rohan-google-data-center-win-and-expanded-site-outreach",
          "publisher": "citizenportal.ai",
          "date": "2025-04-07",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Stillwater data center at Stillwater, Oklahoma on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        },
        {
          "status": "under_construction",
          "effective_at": "2025-08-13",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-10-02",
          "summary": "Google announced plans to build a new data center in Stillwater in August 2025.",
          "source_url": "https://tulsaworld.com/news/state-regional/government-politics/article_8e4606ca-d0e0-447c-a1ac-b42d1fda34b3.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2025-08-13",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-10-02",
          "summary": "Google announced plans to expand the Pryor facility in August 2025.",
          "source_url": "https://tulsaworld.com/news/state-regional/government-politics/article_8e4606ca-d0e0-447c-a1ac-b42d1fda34b3.html",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "grady-county-data-center-ok",
      "name": "Grady County Data Center",
      "summary": "Landowners in Grady County, Oklahoma raised concerns over a proposed data center.",
      "state": "OK",
      "city": null,
      "county": "Grady",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 35.03833,
      "longitude": -97.94611,
      "location_precision": "county",
      "location_source": "County seat (Chickasha), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/grady-county-data-center-ok",
      "source": "https://www.radiooklahomanews.com/post/grady-county-data-center-concerns-prompt-special-meeting",
      "basis": "official_record",
      "sources": [
        {
          "title": "Grady County Data Center Concerns Prompt Special Meeting",
          "url": "https://www.radiooklahomanews.com/post/grady-county-data-center-concerns-prompt-special-meeting",
          "publisher": "www.radiooklahomanews.com",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Grady County landowners raise concerns over proposed data center - news9.com",
          "url": "https://www.news9.com/grady-county-landowners-raise-concerns-over-proposed-data-center",
          "publisher": "news9.com",
          "date": "2026-08-07",
          "source_tier": 4
        },
        {
          "title": "Grady County officials say county cannot impose data center moratorium - Chickasha Express Star",
          "url": "https://www.chickashanews.com/news/grady-county-officials-say-county-cannot-impose-data-center-moratorium/article_3d3f7620-8212-422d-92e9-bdb3119dcabd.html",
          "publisher": "Chickasha Express Star",
          "date": "2026-09-09",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "grant-county-data-center-ar",
      "name": "Grant County Data Center",
      "summary": "A worldwide company is planning a data center in Grant County, Arkansas, with no developer name confirmed.",
      "state": "AR",
      "city": null,
      "county": "Grant",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 34.30704,
      "longitude": -92.40126,
      "location_precision": "county",
      "location_source": "County seat (Sheridan), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/grant-county-data-center-ar",
      "source": "https://www.quiverquant.com/news/Press+Release%3A+Gabe+Vasquez+Backs+Grant+County+Data+Center+Moratorium%2C+Introduces+Bills+on+Developer+Costs",
      "basis": "official_record",
      "sources": [
        {
          "title": "Press Release: Gabe Vasquez Backs Grant County Data Center Moratorium, Introduces Bills on Developer Costs",
          "url": "https://www.quiverquant.com/news/Press+Release%3A+Gabe+Vasquez+Backs+Grant+County+Data+Center+Moratorium%2C+Introduces+Bills+on+Developer+Costs",
          "publisher": "www.quiverquant.com",
          "date": "2026-09-16",
          "source_tier": 4
        },
        {
          "title": "Worldwide company has eye on data center plan for Grant County - Arkansas Times",
          "url": "https://arktimes.com/arkansas-blog/2026/07/21/worldwide-company-has-eye-on-data-center-plan-for-grant-county",
          "publisher": "Arkansas Times",
          "date": "2026-07-21",
          "source_tier": 4
        },
        {
          "title": "A new data center proposed in Grant County and more - KRWG Public Media",
          "url": "https://www.krwg.org/show/silver-city-report/2026-09-09/a-new-data-center-proposed-in-grant-county-and-more",
          "publisher": "KRWG Public Media",
          "date": "2026-09-09",
          "source_tier": 4
        },
        {
          "title": "Grant County residents raise alarm over secretive proposed data center - Searchlight New Mexico",
          "url": "https://searchlightnm.org/grant-county-residents-raise-alarm-over-secretive-proposed-data-center/",
          "publisher": "Searchlight New Mexico",
          "date": "2026-09-09",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "meta-ai-optimized-data-center-tulsa-ok",
      "name": "Meta AI-Optimized Data Center Tulsa",
      "summary": "Meta broke ground on an AI optimized data center in Tulsa, Oklahoma in April 2026.",
      "state": "OK",
      "city": "Tulsa",
      "county": "Tulsa County",
      "status": "rumored",
      "developer": "Meta",
      "capacity_mw": null,
      "latitude": 36.13139,
      "longitude": -95.93722,
      "location_precision": "county",
      "location_source": "County seat (Tulsa), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/meta-ai-optimized-data-center-tulsa-ok",
      "source": "https://about.fb.com/news/2026/04/breaking-ground-new-ai-optimized-data-center-tulsa-oklahoma/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Breaking Ground on a New AI-Optimized Data Center in Tulsa, Oklahoma - Meta Store",
          "url": "https://about.fb.com/news/2026/04/breaking-ground-new-ai-optimized-data-center-tulsa-oklahoma/",
          "publisher": "Meta Store",
          "date": "2026-04-21",
          "source_tier": 4
        },
        {
          "title": "Meta: Our U.S. data center fleet",
          "url": "https://datacenters.atmeta.com/us-locations/",
          "publisher": "Meta",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Tulsa’s data center moratorium expires this year. Here’s what might be next. - Tulsa Flyer",
          "url": "https://tulsaflyer.org/2026/08/24/government/post/tulsa-pause-data-centers-expires-this-year/",
          "publisher": "Tulsa Flyer",
          "date": "2026-08-24",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "meta-plus-moss-bluff-la",
      "name": "Meta plus Moss Bluff",
      "summary": "A headline raises the question of whether a data center is coming to Moss Bluff, Louisiana, with limited confirmed details.",
      "state": "LA",
      "city": "Moss Bluff",
      "county": "Calcasieu Parish",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 30.21472,
      "longitude": -93.20861,
      "location_precision": "county",
      "location_source": "County seat (Lake Charles), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/meta-plus-moss-bluff-la",
      "source": "https://americanpress.com/2026/09/11/data-center-could-be-coming-to-moss-bluff/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Data center could be coming to Moss Bluff - American Press",
          "url": "https://americanpress.com/2026/09/11/data-center-could-be-coming-to-moss-bluff/",
          "publisher": "American Press",
          "date": "2026-09-11",
          "source_tier": 4
        },
        {
          "title": "Data center planned for north of Lake Charles, developer confirms. Here’s what we know. - The Advocate",
          "url": "https://www.theadvocate.com/lake_charles/moss-bluff-data-center-project-azimuth/article_d9fc7b69-c5ba-40a6-9cf9-facb2f6e3542.html",
          "publisher": "The Advocate",
          "date": "2026-09-10",
          "source_tier": 4
        },
        {
          "title": "Proposed data center north of Moss Bluff still in exploration stage, company says - KPLC 7 News",
          "url": "https://www.kplctv.com/2026/09/10/proposed-data-center-north-moss-bluff-still-exploration-stage-company-says/",
          "publisher": "KPLC 7 News",
          "date": "2026-09-10",
          "source_tier": 4
        },
        {
          "title": "Is a data center coming to Moss Bluff? Here’s what we know. - theadvocate.com",
          "url": "https://www.theadvocate.com/lake_charles/is-a-data-center-coming-to-moss-bluff-here-s-what-we-know/article_ad6f97c0-ed97-4609-99a5-eac05731915e.html",
          "publisher": "theadvocate.com",
          "date": "2026-08-12",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-09-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-11",
          "summary": "Azimuth Renewables considering building a data center on 1,100 acres near Coffey Road in Moss Bluff",
          "source_url": "https://americanpress.com/2026/09/11/data-center-could-be-coming-to-moss-bluff/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-11",
          "summary": "Company has option to purchase 1,100 acres",
          "source_url": "https://americanpress.com/2026/09/11/data-center-could-be-coming-to-moss-bluff/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-11",
          "summary": "Plans are still in early stages and nothing firm has been decided yet",
          "source_url": "https://americanpress.com/2026/09/11/data-center-could-be-coming-to-moss-bluff/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-10",
          "summary": "Azimuth Renewables signed option to purchase about 1,200 acres in Moss Bluff in April 2026",
          "source_url": "https://www.theadvocate.com/lake_charles/moss-bluff-data-center-project-azimuth/article_d9fc7b69-c5ba-40a6-9cf9-facb2f6e3542.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-10",
          "summary": "Azimuth Renewables has three years to purchase property with optional one year extension",
          "source_url": "https://www.theadvocate.com/lake_charles/moss-bluff-data-center-project-azimuth/article_d9fc7b69-c5ba-40a6-9cf9-facb2f6e3542.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-10",
          "summary": "Data center would occupy fraction of 1,168 acres in wooded rural portion of Moss Bluff",
          "source_url": "https://www.theadvocate.com/lake_charles/moss-bluff-data-center-project-azimuth/article_d9fc7b69-c5ba-40a6-9cf9-facb2f6e3542.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-08-12",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-12",
          "summary": "Discussions appear to be in early stages between landowner Kenny Nichols and a potential developer",
          "source_url": "https://www.theadvocate.com/lake_charles/is-a-data-center-coming-to-moss-bluff-here-s-what-we-know/article_ad6f97c0-ed97-4609-99a5-eac05731915e.html",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "miller-county-data-center-ar",
      "name": "Miller County Data Center",
      "summary": "Records revealed a planned data center site in Miller County north of Texarkana, Arkansas.",
      "state": "AR",
      "city": null,
      "county": "Miller",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 33.43306,
      "longitude": -94.02056,
      "location_precision": "county",
      "location_source": "County seat (Texarkana), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/miller-county-data-center-ar",
      "source": "https://www.arkansasonline.com/news/2026/aug/16/records-reveal-planned-data-center-site-in-miller/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Records reveal planned data center site in Miller County north of Texarkana - arkansasonline.com",
          "url": "https://www.arkansasonline.com/news/2026/aug/16/records-reveal-planned-data-center-site-in-miller/",
          "publisher": "arkansasonline.com",
          "date": "2026-08-16",
          "source_tier": 4
        },
        {
          "title": "Records reveal planned data center site in Miller County north of Texarkana - The Arkansas Democrat-Gazette",
          "url": "https://www.arkansasonline.com/news/2026/aug/16/records-reveal-planned-data-center-site-in-miller/",
          "publisher": "The Arkansas Democrat-Gazette",
          "date": "2026-08-16",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "okmulgee-data-center-ok",
      "name": "Okmulgee Data Center",
      "summary": "Opposition to a data center in Okmulgee, Oklahoma is gaining momentum.",
      "state": "OK",
      "city": "Okmulgee",
      "county": "Okmulgee County",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 35.62347,
      "longitude": -95.96033,
      "location_precision": "county",
      "location_source": "County seat (Okmulgee), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/okmulgee-data-center-ok",
      "source": "https://www.facebook.com/GuerrillaPublishingOK/videos/okmulgee-data-center-drone-2mov/1519919463483465/",
      "basis": "official_record",
      "sources": [
        {
          "title": "The video provides a visual progress update on the construction of the Okmulgee Data Center in Oklahoma. It showcases the initial stages of site preparation, including extensive earthmoving and land grading across a large plot. The footage highlights the sca",
          "url": "https://www.facebook.com/GuerrillaPublishingOK/videos/okmulgee-data-center-drone-2mov/1519919463483465/",
          "publisher": "www.facebook.com",
          "date": "2026-07-21",
          "source_tier": 4
        },
        {
          "title": "Opposition to Okmulgee data center gains momentum - MVSKOKE Media",
          "url": "https://www.mvskokemedia.com/opposition-to-okmulgee-data-center-gains-momentum/",
          "publisher": "MVSKOKE Media",
          "date": "2026-08-17",
          "source_tier": 4
        },
        {
          "title": "New info released on possible Okmulgee data center project - 2 News Oklahoma KJRH Tulsa",
          "url": "https://www.kjrh.com/news/local-news/new-info-released-on-possible-okmulgee-data-center-project",
          "publisher": "2 News Oklahoma KJRH Tulsa",
          "date": "2026-07-07",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-08-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-17",
          "summary": "Opposition to Okmulgee data center gaining momentum",
          "source_url": "https://www.mvskokemedia.com/opposition-to-okmulgee-data-center-gains-momentum/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-07-07",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-07",
          "summary": "New information released on a possible Okmulgee data center project as of July 7, 2026",
          "source_url": "https://www.kjrh.com/news/local-news/new-info-released-on-possible-okmulgee-data-center-project",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "one-nuclear-project-cayman-data-center-campus-vermilion-la",
      "name": "One Nuclear / Project Cayman Data Center Campus",
      "summary": "ONE Nuclear Energy executed a binding letter of intent to develop a 2.88 GW gas fired plant and large battery energy storage system to power a co located data center campus in Louisiana near SpaceX's Starbase project.",
      "state": "LA",
      "city": null,
      "county": "Vermilion Parish",
      "status": "rumored",
      "developer": "ONE Nuclear Energy",
      "capacity_mw": 2880,
      "latitude": 29.9725,
      "longitude": -92.12917,
      "location_precision": "county",
      "location_source": "County seat (Abbeville), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/one-nuclear-project-cayman-data-center-campus-vermilion-la",
      "source": "https://www.businesswire.com/news/home/20260831090268/en/ONE-Nuclear-Executes-Binding-LOI-for-Project-Cayman-a-2.88-GW-Louisiana-Energy-Project-with-Co-Located-Data-Center-Campus",
      "basis": "official_record",
      "sources": [
        {
          "title": "ONE Nuclear Executes Binding LOI for Project Cayman, a 2.88 GW Louisiana Energy Project with Co-Located Data Center Campus - Business Wire",
          "url": "https://www.businesswire.com/news/home/20260831090268/en/ONE-Nuclear-Executes-Binding-LOI-for-Project-Cayman-a-2.88-GW-Louisiana-Energy-Project-with-Co-Located-Data-Center-Campus",
          "publisher": "Business Wire",
          "date": "2026-08-31",
          "source_tier": 4
        },
        {
          "title": "ONE Nuclear Energy secures Louisiana site for power, data center project - Daily Energy Insider",
          "url": "https://dailyenergyinsider.com/news/53636-one-nuclear-energy-secures-louisiana-site-for-power-data-center-project/",
          "publisher": "Daily Energy Insider",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "One Nuclear inks binding LOI to develop 2.88GW gas plant and BESS to power data center in Louisiana - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/one-nuclear-inks-binding-loi-to-develop-288gw-gas-plant-and-bess-to-power-data-center-in-louisiana/",
          "publisher": "Data Center Dynamics",
          "date": "2026-09-01",
          "source_tier": 3
        },
        {
          "title": "One Nuclear inks binding LOI to develop 2.88GW gas plant and BESS to power data center in Louisiana",
          "url": "https://www.datacenterdynamics.com/en/news/one-nuclear-inks-binding-loi-to-develop-288gw-gas-plant-and-bess-to-power-data-center-in-louisiana/",
          "publisher": "Data Center Dynamics",
          "date": "2026-09-01",
          "source_tier": 3
        },
        {
          "title": "One Nuclear Signs Deal for 2.88-GW Gas-Fired Plant, Large BESS for Louisiana Data Center Campus - POWER Magazine",
          "url": "https://www.powermag.com/one-nuclear-signs-deal-for-2-88-gw-gas-fired-plant-large-bess-for-louisiana-data-center-campus/",
          "publisher": "POWER Magazine",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "One Nuclear plans gas-fired data center near Musk’s Starbase - thecentersquare.com",
          "url": "https://www.thecentersquare.com/louisiana/article_92d0738f-d1da-40d8-820e-26f824e4f8c1.html",
          "publisher": "thecentersquare.com",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "West Palm Beach energy developer plans data center campus near Louisiana SpaceX project - The Business Journals",
          "url": "https://www.bizjournals.com/southflorida/news/2026/08/31/energy-developer-plans-data-center-campus-spacex.html",
          "publisher": "The Business Journals",
          "date": "2026-08-31",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "pittsburg-county-data-center-ok",
      "name": "Pittsburg County Data Center",
      "summary": "Pittsburg County committee endorsed a deal for a 2,000 acre, $50 billion data center site in May 2026.",
      "state": "OK",
      "city": null,
      "county": "Pittsburg",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 34.93306,
      "longitude": -95.76639,
      "location_precision": "county",
      "location_source": "County seat (McAlester), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/pittsburg-county-data-center-ok",
      "source": "https://nondoc.com/2026/05/14/pittsburg-county-committee-endorses-deal-tied-to-2000-acre-50-billion-data-center-site/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Pittsburg County committee endorses deal tied to 2,000-acre, $50 billion data center site - nondoc.com",
          "url": "https://nondoc.com/2026/05/14/pittsburg-county-committee-endorses-deal-tied-to-2000-acre-50-billion-data-center-site/",
          "publisher": "nondoc.com",
          "date": "2026-05-14",
          "source_tier": 4
        },
        {
          "title": "Commissioners put brakes on incentives for hyperscale data center - KJRH",
          "url": "https://www.kjrh.com/news/local-news/commissioners-put-brakes-on-incentives-for-hyperscale-data-center",
          "publisher": "KJRH",
          "date": "2026-09-12",
          "source_tier": 4
        },
        {
          "title": "Pittsburg County commissioners have delayed a decision on a proposed tax increment district tied to the Emerald Data Center project after hearing concerns from residents.",
          "url": "https://www.facebook.com/fox23news/posts/pittsburg-county-commissioners-have-delayed-a-decision-on-a-proposed-tax-increme/1561407085349332/",
          "publisher": "www.facebook.com",
          "date": "2026-06-22",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "project-clydesdale-google-tulsa-county-ok",
      "name": "Project Clydesdale (Google Tulsa County)",
      "summary": "Google revealed it is the developer behind Project Clydesdale, a 506 acre data center campus being built in Tulsa County, Oklahoma, with plans to fund removal of 2,000 acres of trees for water conservation and partnering with Beale Infrastructure.",
      "state": "OK",
      "city": null,
      "county": "Tulsa",
      "status": "under_construction",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 36.13139,
      "longitude": -95.93722,
      "location_precision": "county",
      "location_source": "County seat (Tulsa), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/project-clydesdale-google-tulsa-county-ok",
      "source": "https://ktul.com/news/local/google-confirmed-as-end-user-of-tulsa-countys-project-clydesdale-data-center-campus",
      "basis": "official_record",
      "sources": [
        {
          "title": "Google confirmed as end user of Tulsa County s Project Clydesdale data center campus - KTUL",
          "url": "https://ktul.com/news/local/google-confirmed-as-end-user-of-tulsa-countys-project-clydesdale-data-center-campus",
          "publisher": "KTUL",
          "date": "2026-08-19",
          "source_tier": 4
        },
        {
          "title": "Google reveals it is behind 506-acre Project Clydesdale data center in Oklahoma - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/google-reveals-it-is-behind-506-acre-project-clydesdale-data-center-in-oklahoma/",
          "publisher": "Data Center Dynamics",
          "date": "2026-08-19",
          "source_tier": 3
        },
        {
          "title": "Google building 506-acre data center campus in Tulsa County - News On 6",
          "url": "https://www.newson6.com/data-centers-in-oklahoma/google-data-center-campus-tulsa-county-oklahoma",
          "publisher": "News On 6",
          "date": "2026-08-19",
          "source_tier": 4
        },
        {
          "title": "Google and Beale Infrastructure to build new data center campus in Oklahoma - Institutional Real Estate, Inc.",
          "url": "https://irei.com/news/google-and-beale-infrastructure-to-build-new-data-center-campus-in-oklahoma/",
          "publisher": "Institutional Real Estate, Inc.",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Google will fund removal of 2000 acres of trees in Oklahoma to save water while building new data center - Planetizen",
          "url": "https://www.planetizen.com/news/2026/09/138339-google-will-fund-removal-2000-acres-trees-oklahoma-save-water-while-building",
          "publisher": "Planetizen",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Google, Beale Infrastructure share details around new data center campus in Tulsa County - KTUL",
          "url": "https://ktul.com/news/local/google-beale-infrastructure-share-details-around-new-data-center-campus-in-tulsa-county-08-19-2026",
          "publisher": "KTUL",
          "date": "2026-08-19",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-08-19",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-19",
          "summary": "Google is the end user of Project Clydesdale, a 506 acre data center campus in unincorporated Tulsa County.",
          "source_url": "https://ktul.com/news/local/google-confirmed-as-end-user-of-tulsa-countys-project-clydesdale-data-center-campus",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-19",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-19",
          "summary": "Beale Infrastructure officially broke ground on Project Clydesdale in October 2025.",
          "source_url": "https://ktul.com/news/local/google-confirmed-as-end-user-of-tulsa-countys-project-clydesdale-data-center-campus",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-19",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-19",
          "summary": "The project will include approximately 1.5 miles of new water lines and infrastructure upgrades.",
          "source_url": "https://ktul.com/news/local/google-confirmed-as-end-user-of-tulsa-countys-project-clydesdale-data-center-campus",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-19",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-19",
          "summary": "Located just west of Owasso",
          "source_url": "https://ktul.com/news/local/google-beale-infrastructure-share-details-around-new-data-center-campus-in-tulsa-county-08-19-2026",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-19",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-19",
          "summary": "Support for training more than 160 apprentices in electrical trades by 2030",
          "source_url": "https://ktul.com/news/local/google-beale-infrastructure-share-details-around-new-data-center-campus-in-tulsa-county-08-19-2026",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-19",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-19",
          "summary": "1.5 miles of new water lines and infrastructure upgrades for Washington County Rural Water District #3",
          "source_url": "https://ktul.com/news/local/google-beale-infrastructure-share-details-around-new-data-center-campus-in-tulsa-county-08-19-2026",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-19",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-19",
          "summary": "Construction of a new on site substation funded by Beale",
          "source_url": "https://ktul.com/news/local/google-beale-infrastructure-share-details-around-new-data-center-campus-in-tulsa-county-08-19-2026",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-19",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-19",
          "summary": "506 acre campus in unincorporated Tulsa County near Cherokee Industrial Park",
          "source_url": "https://ktul.com/news/local/google-beale-infrastructure-share-details-around-new-data-center-campus-in-tulsa-county-08-19-2026",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "spacex-starbase-louisiana-orbital-data-center-vermilion-la",
      "name": "SpaceX Starbase Louisiana / orbital data center",
      "summary": "SpaceX unveiled a Starbase launch site in coastal Vermilion Parish, Louisiana, and moved up its orbital data center launch timeline.",
      "state": "LA",
      "city": null,
      "county": "Vermilion Parish",
      "status": "rumored",
      "developer": "SpaceX",
      "capacity_mw": null,
      "latitude": 29.9725,
      "longitude": -92.12917,
      "location_precision": "county",
      "location_source": "County seat (Abbeville), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/spacex-starbase-louisiana-orbital-data-center-vermilion-la",
      "source": "https://www.nola.com/news/spacex-site-louisiana-aerial-view/article_ae347f58-2727-4768-8b65-f9cca7fa29c9.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "Where is new SpaceX site in Louisiana? See coastal Vermilion Parish from above.",
          "url": "https://www.nola.com/news/spacex-site-louisiana-aerial-view/article_ae347f58-2727-4768-8b65-f9cca7fa29c9.html",
          "publisher": "The Times-Picayune and The New Orleans Advocate",
          "date": "2026-08-25",
          "source_tier": 4
        },
        {
          "title": "SpaceX unveils Starbase launch site in Louisiana, moves up orbital data center launch timeline - Yahoo Finance",
          "url": "https://finance.yahoo.com/markets/stocks/article/spacex-unveils-starbase-launch-site-in-louisiana-moves-up-orbital-data-center-launch-timeline-142539276.html",
          "publisher": "Yahoo Finance",
          "date": "2026-08-25",
          "source_tier": 4
        },
        {
          "title": "SpaceX unveils Starbase launch site in Louisiana, moves up orbital data center launch timeline - Yahoo Finance",
          "url": "https://finance.yahoo.com/markets/stocks/article/spacex-unveils-starbase-launch-site-in-louisiana-moves-up-orbital-data-center-launch-timeline-142539276.html",
          "publisher": "Yahoo Finance",
          "date": "2026-08-25",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "tierpoint-little-rock-ar",
      "name": "TierPoint Little Rock",
      "summary": "TierPoint lists a data center at Little Rock, Arkansas among the sites it operates.",
      "state": "AR",
      "city": "Little Rock",
      "county": "Pulaski County",
      "status": "operational",
      "developer": "TierPoint",
      "capacity_mw": null,
      "latitude": 34.7252916,
      "longitude": -92.3559352,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/tierpoint-little-rock-ar",
      "source": "https://www.tierpoint.com/data-centers/",
      "basis": "official_record",
      "sources": [
        {
          "title": "TierPoint: Browse our data centers",
          "url": "https://www.tierpoint.com/data-centers/",
          "publisher": "TierPoint",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "TierPoint lists TierPoint Little Rock at Little Rock, Arkansas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.tierpoint.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "tierpoint-tulsa-ok",
      "name": "TierPoint Tulsa",
      "summary": "TierPoint lists 2 data centers at Tulsa, Oklahoma among the sites it operates.",
      "state": "OK",
      "city": "Tulsa",
      "county": "Tulsa County",
      "status": "operational",
      "developer": "TierPoint",
      "capacity_mw": null,
      "latitude": 36.1281873,
      "longitude": -95.9041619,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/tierpoint-tulsa-ok",
      "source": "https://www.tierpoint.com/data-centers/",
      "basis": "official_record",
      "sources": [
        {
          "title": "TierPoint: Browse our data centers",
          "url": "https://www.tierpoint.com/data-centers/",
          "publisher": "TierPoint",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "TierPoint lists TierPoint Tulsa - Archer Data Center, TierPoint Tulsa - State Farm Data Center at Tulsa, Oklahoma on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.tierpoint.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "vantage-shackelford-county-tx",
      "name": "Vantage Shackelford County",
      "summary": "Vantage Data Centers lists a data center at Shackelford County, Texas among the sites it operates.",
      "state": "TX",
      "city": "Albany",
      "county": "Shackelford County",
      "status": "operational",
      "developer": "Vantage Data Centers",
      "capacity_mw": 1400,
      "latitude": 32.72694,
      "longitude": -99.29444,
      "location_precision": "county",
      "location_source": "County seat (Albany), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/vantage-shackelford-county-tx",
      "source": "https://www.bigcountryhomepage.com/video/1200-acre-data-center-in-shackelford-county-could-boost-local-economy/10938702/",
      "basis": "official_record",
      "sources": [
        {
          "title": "1,200-acre data center in Shackelford County could boost local economy – KTAB - BigCountryHomepage.com",
          "url": "https://www.bigcountryhomepage.com/video/1200-acre-data-center-in-shackelford-county-could-boost-local-economy/10938702/",
          "publisher": "BigCountryHomepage.com",
          "date": "2025-07-30",
          "source_tier": 1
        },
        {
          "title": "Is gas really winning the AI race? - Latitude Media",
          "url": "https://www.latitudemedia.com/news/is-gas-really-winning-the-ai-race/",
          "publisher": "Latitude Media",
          "date": "2025-08-27",
          "source_tier": 1
        },
        {
          "title": "AI-fueled data centers' construction boom moves into West Texas - El Paso Times",
          "url": "https://www.elpasotimes.com/story/money/business/2025/11/10/artificial-intelligence-fueled-data-centers-construction-boom-moves-into-west-texas/87072278007/",
          "publisher": "El Paso Times",
          "date": "2025-11-10",
          "source_tier": 1
        },
        {
          "title": "Vantage Invests US$25bn in Mega-Campus for AI Data Centres - Construction Digital",
          "url": "https://constructiondigital.com/news/inside-vantages-us-25bn-ai-data-centre-mega-campus-in-texas",
          "publisher": "Construction Digital",
          "date": "2025-08-21",
          "source_tier": 1
        },
        {
          "title": "Big Country data centers: Where they are & what’s coming - BigCountryHomepage.com",
          "url": "https://www.bigcountryhomepage.com/news/big-country-data-centers-where-they-are-whats-coming/",
          "publisher": "BigCountryHomepage.com",
          "date": "2026-06-01",
          "source_tier": 1
        },
        {
          "title": "Inside Frontier: Vantage Data Centers’ $25B Hyperscale Campus in Texas - Construction Review",
          "url": "https://constructionreviewonline.com/vantage-data-centers-unveils-25b-1-4gw-frontier-campus-in-texas-its-largest-project-to-date/",
          "publisher": "Construction Review",
          "date": "2026-01-23",
          "source_tier": 1
        },
        {
          "title": "Vantage breaks ground on Texas gigawatt data center campus for OpenAI - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/vantage-breaks-ground-on-texas-gigawatt-data-center-campus-for-openai/",
          "publisher": "Data Center Dynamics",
          "date": "2025-12-15",
          "source_tier": 1
        },
        {
          "title": "Vantage Data Centers: Data center locations",
          "url": "https://vantage-dc.com/data-center-locations/",
          "publisher": "Vantage Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Vantage Data Centers: Vantage Shackelford County",
          "url": "https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx",
          "publisher": "Vantage Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Vantage files to build another data center in San Antonio, Texas - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/vantage-files-to-build-another-data-center-in-san-antonio-texas/",
          "publisher": "Data Center Dynamics",
          "date": "2025-10-15",
          "source_tier": 1
        },
        {
          "title": "Vantage plots 1.4GW data center campus in Texas - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/vantage-plots-14gw-data-center-campus-in-texas/",
          "publisher": "Data Center Dynamics",
          "date": "2025-08-19",
          "source_tier": 1
        },
        {
          "title": "Vantage Breaks Ground on 1.4GW Texas Data Center for OpenAI - constructionowners.com",
          "url": "https://www.constructionowners.com/news/vantage-breaks-ground-on-1-4gw-texas-data-center-campus",
          "publisher": "constructionowners.com",
          "date": "2025-12-16",
          "source_tier": 1
        },
        {
          "title": "OpenAI marks Texas Stargate site as shift toward physical AI infrastructure | ETIH EdTech News - EdTech Innovation Hub",
          "url": "https://www.edtechinnovationhub.com/news/openai-government-affairs-director-says-texas-data-center-marks-shift-to-physical-ai-infrastructure",
          "publisher": "EdTech Innovation Hub",
          "date": "2025-12-15",
          "source_tier": 1
        },
        {
          "title": "Oracle and OpenAI's second Stargate data center in Texas will be powered off the grid - Business Insider",
          "url": "https://www.businessinsider.com/openai-building-natural-gas-microgrid-at-new-texas-data-center-2025-10",
          "publisher": "Business Insider",
          "date": "2025-10-23",
          "source_tier": 1
        },
        {
          "title": "Vantage Data Centers breaks ground on data center campus in Texas - W.Media",
          "url": "https://w.media/vantage-data-centers-breaks-ground-on-data-center-campus-in-texas/",
          "publisher": "W.Media",
          "date": "2025-12-16",
          "source_tier": 1
        },
        {
          "title": "Vantage Data Centers unveils plans for a $25b mega-campus in Texas to meet AI demand - Institutional Real Estate, Inc.",
          "url": "https://irei.com/news/vantage-data-centers-unveils-plans-for-a-25b-mega-campus-in-texas-to-meet-ai-demand/",
          "publisher": "Institutional Real Estate, Inc.",
          "date": "2025-08-19",
          "source_tier": 1
        },
        {
          "title": "Oracle to back massive 1.4-gigawatt gas-powered data center in US - Interesting Engineering",
          "url": "https://interestingengineering.com/culture/oracle-to-back-gas-powered-data-center",
          "publisher": "Interesting Engineering",
          "date": "2025-08-21",
          "source_tier": 1
        },
        {
          "title": "Vantage Data Centers Unveils “Frontier,” a $25B Mega-campus in Texas - Inside Towers",
          "url": "https://insidetowers.com/vantage-data-centers-unveils-frontier-a-25b-mega-campus-in-texas/",
          "publisher": "Inside Towers",
          "date": "2025-08-20",
          "source_tier": 1
        },
        {
          "title": "DigitalBridge-Backed Portfolio Company Vantage Data Centers Launches $25 Billion Texas “Frontier” Mega-Campus - Business Wire",
          "url": "https://www.businesswire.com/news/home/20250818389101/en/DigitalBridge-Backed-Portfolio-Company-Vantage-Data-Centers-Launches-%2425-Billion-Texas-Frontier-Mega-Campus",
          "publisher": "Business Wire",
          "date": "2025-08-19",
          "source_tier": 1
        },
        {
          "title": "Vantage Develops $25B Data Center in Texas - CommercialSearch",
          "url": "https://www.commercialsearch.com/news/vantage-develops-25b-data-center-in-texas/",
          "publisher": "CommercialSearch",
          "date": "2025-08-20",
          "source_tier": 1
        },
        {
          "title": "Vantage’s $25 Billion Texas Data Center Plan Sparks Opportunities—and Water Concerns - CarbonCredits.com",
          "url": "https://carboncredits.com/vantages-25-billion-texas-data-center-plan-sparks-opportunities-and-water-concerns/",
          "publisher": "CarbonCredits.com",
          "date": "2025-08-21",
          "source_tier": 1
        },
        {
          "title": "Vantage Data Centers unveils plans for Frontier, a US$25B mega-campus in Texas - Intelligent CIO",
          "url": "https://www.intelligentcio.com/north-america/2025/08/29/vantage-data-centers-unveils-plans-for-frontier-a-us25b-mega-campus-in-texas/",
          "publisher": "Intelligent CIO",
          "date": "2025-08-29",
          "source_tier": 1
        },
        {
          "title": "Vantage Data Centers to build data center campus in Texas - Inspenet",
          "url": "https://inspenet.com/en/news/vantage-data-centers-to-build-data-center-campus-in-texas/",
          "publisher": "Inspenet",
          "date": "2025-08-21",
          "source_tier": 1
        },
        {
          "title": "Vantage Launching $25B Data Center Campus Near Abilene - Connect CRE",
          "url": "https://www.connectcre.com/stories/vantage-launching-25b-data-center-campus-near-abilene/",
          "publisher": "Connect CRE",
          "date": "2025-08-19",
          "source_tier": 1
        },
        {
          "title": "$25 billion data center campus slated for rural area near Abilene - The Business Journals",
          "url": "https://www.bizjournals.com/dallas/news/2025/08/20/vantage-data-centers-new-frontier-campus.html",
          "publisher": "The Business Journals",
          "date": "2025-08-20",
          "source_tier": 1
        },
        {
          "title": "JPMorgan and MUFG close to securing $22bn financing for Vantage's Texas data center project - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/jpmorgan-and-mufg-close-to-securing-22bn-financing-for-vantages-texas-data-center-project/",
          "publisher": "Data Center Dynamics",
          "date": "2025-08-20",
          "source_tier": 1
        },
        {
          "title": "New data center expected to create 250 full time jobs in Shackelford county - KTXS",
          "url": "https://ktxs.com/news/local/new-data-center-expected-to-create-250-full-time-jobs-in-shackelford-county",
          "publisher": "KTXS",
          "date": "2025-08-01",
          "source_tier": 1
        },
        {
          "title": "Inside Vantage's US$25bn AI Data Centre Mega-Campus in Texas - technologymagazine.com",
          "url": "https://technologymagazine.com/news/inside-vantages-us-25bn-ai-data-centre-mega-campus-in-texas",
          "publisher": "technologymagazine.com",
          "date": "2025-08-19",
          "source_tier": 1
        },
        {
          "title": "Vantage Data Centers to Invest $25B for Mega-Campus in Shackelford County, Texas - REBusinessOnline",
          "url": "https://rebusinessonline.com/vantage-data-centers-to-invest-25b-for-mega-campus-in-shackleford-county-texas/",
          "publisher": "REBusinessOnline",
          "date": "2025-08-19",
          "source_tier": 1
        },
        {
          "title": "Vantage Data Centers Unveils Plans for “Frontier,” a $25B Mega-campus in Texas to Meet Unprecedented AI Demand - Business Wire",
          "url": "https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/",
          "publisher": "Business Wire",
          "date": "2025-08-19",
          "source_tier": 1
        },
        {
          "title": "Explore Vantage’s New US$25bn AI Data Centre Campus in Texas - Data Centre Magazine",
          "url": "https://datacentremagazine.com/news/inside-vantages-us-25bn-ai-data-centre-mega-campus-in-texas",
          "publisher": "Data Centre Magazine",
          "date": "2025-08-20",
          "source_tier": 1
        },
        {
          "title": "Vantage Data Centers plans $25 billion AI campus in Texas - Reuters",
          "url": "https://www.reuters.com/business/vantage-data-centers-plans-25-billion-ai-campus-texas-2025-08-19/",
          "publisher": "Reuters",
          "date": "2025-08-19",
          "source_tier": 1
        },
        {
          "title": "OpenAI announces five more US Stargate data centers with Oracle and SoftBank - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/openai-announces-five-more-us-stargate-data-centers-with-oracle-and-softbank/",
          "publisher": "Data Center Dynamics",
          "date": "2025-09-24",
          "source_tier": 1
        },
        {
          "title": "Vantage plots 1,000-acre data center campus in Texas - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/vantage-plots-1000-acre-data-center-campus-in-texas/",
          "publisher": "Data Center Dynamics",
          "date": "2025-07-28",
          "source_tier": 1
        },
        {
          "title": "1,200-acre data center in Shackelford County could boost local economy - BigCountryHomepage.com",
          "url": "https://www.bigcountryhomepage.com/video/1200-acre-data-center-in-shackelford-county-could-boost-local-economy/10938702/",
          "publisher": "BigCountryHomepage.com",
          "date": "2025-07-30",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Vantage Data Centers lists Vantage Shackelford County at Shackelford County, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "yukon-data-center-ok",
      "name": "Yukon Data Center",
      "summary": "Yukon, Oklahoma city leaders were still deliberating on a proposed data center as of July 28, 2026.",
      "state": "OK",
      "city": "Yukon",
      "county": "Canadian County",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 35.53028,
      "longitude": -97.9575,
      "location_precision": "county",
      "location_source": "County seat (El Reno), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/yukon-data-center-ok",
      "source": "https://kfor.com/news/yukon-city-leaders-still-contemplating-proposed-data-center/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Yukon city leaders still contemplating proposed data center - KFOR",
          "url": "https://kfor.com/news/yukon-city-leaders-still-contemplating-proposed-data-center/",
          "publisher": "KFOR",
          "date": "2026-07-28",
          "source_tier": 4
        },
        {
          "title": "Yukon City Council set to discuss proposed Beltline Energy data center project - News 9",
          "url": "https://www.news9.com/data-centers-in-oklahoma/yukon-city-council-beltline-energy-data-center-project",
          "publisher": "News 9",
          "date": "2026-06-30",
          "source_tier": 4
        },
        {
          "title": "New data center coming to Yukon, generating contention - KOKH",
          "url": "https://okcfox.com/news/project-oklahoma/new-data-center-coming-to-yukon-generating-contention",
          "publisher": "KOKH",
          "date": "2025-08-22",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-06-30",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-06-30",
          "summary": "Beltline Energy is the developer of the proposed data center",
          "source_url": "https://www.news9.com/data-centers-in-oklahoma/yukon-city-council-beltline-energy-data-center-project",
          "source_tier": 4
        }
      ]
    }
  ],
  "grid_region": {
    "code": "spso",
    "label": "SPSO",
    "name": "SPP South",
    "kind": "dallas_fed_subregion",
    "parent_iso": "spp",
    "states": [
      "OK",
      "AR",
      "LA",
      "TX"
    ],
    "primary_states": [
      "OK"
    ],
    "price_effect_2025_mwh": 0.99,
    "price_effect_2025_pct": 3.1,
    "price_effect_2028_mwh": 1.12,
    "price_effect_2028_pct": 3.5,
    "own_dc_share_pct": 3.4,
    "fixed_cost_share": 0.506,
    "wholesale_price_effect_2025": "3.1 percent (+$0.99 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.",
    "wholesale_price_effect_2028": "3.5 percent (+$1.12 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.",
    "study_basis": "third party estimate",
    "study_source": "https://www.dallasfed.org/~/media/documents/research/papers/2026/wp2606r1.pdf",
    "study_date": "March 2026, revised October 2026"
  },
  "studies": [
    {
      "id": "dallas-fed-wp2606r1",
      "study": "Plante, Carrasco, Miranda Pineda and Patel, Federal Reserve Bank of Dallas Working Paper 2606r1",
      "title": "Data Centers, Wholesale Electricity Prices, and Retail Rates",
      "publisher": "Federal Reserve Bank of Dallas",
      "document_date": "March 2026, revised October 2026",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "Wholesale electricity price effect and retail electricity rate pass through",
      "finding": "Data center demand accounts for an average 6.5 percent increase in wholesale electricity prices across 23 regional markets in 2024 and 2025, reaching 15.0 percent (+$5.22 per MWh) in SERC Virginia and Carolina North and 15.4 percent (+$5.68 per MWh) in the Northwest Power Pool, with wholesale changes passing into retail prices roughly in proportion to the wholesale share of the retail bill over 12 to 24 months.",
      "years_covered": "2019 to 2025 historical and 2026 to 2028 scenario projections",
      "method": "Synthetic supply stack model across 23 regional power markets combined with reduced form retail pass through regressions",
      "who_funded_or_published": "Federal Reserve Bank of Dallas (government research working paper; views are the authors')",
      "primary_url": "https://www.dallasfed.org/~/media/documents/research/papers/2026/wp2606r1.pdf",
      "corroborating_url": null,
      "corroborating_label": null,
      "notes": "Uses BloombergNEF data center tracker as a model input alongside EIA Form 860, Form 861M, Form 923 and Form 930.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    },
    {
      "id": "epri-watten-bistline-blanford-2026",
      "study": "Watten, Bistline and Blanford, Electric Power Research Institute (arXiv:2606.19777)",
      "title": "Retail Electricity Price Implications of Data Center Load Growth",
      "publisher": "Electric Power Research Institute (EPRI)",
      "document_date": "June 2026",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "State level retail electricity rate change across all customer classes",
      "finding": "Where data centers pay standard industrial rates and improve grid utilization, state average retail rates could fall by roughly 1 percent nationally by 2030 (up to 4 percent in high growth states, or roughly $7 billion per year in fixed cost spreading); outcomes reverse toward higher residential bills if new generation and transmission upgrades outpace load revenues.",
      "years_covered": "2026 to 2030",
      "method": "Capacity expansion and utility revenue requirement model allocating fixed transmission and distribution costs across customer classes",
      "who_funded_or_published": "Electric Power Research Institute (nonprofit energy research institute funded primarily by member electric utilities)",
      "primary_url": "https://arxiv.org/abs/2606.19777",
      "corroborating_url": "https://fortune.com/2026/07/26/data-centers-electricity-costs-cheaper-7billion-buildout-ai-demand/",
      "corroborating_label": "Fortune, July 26, 2026",
      "notes": "Assumes data centers pay full tariff rates and operate at high load factors that spread existing fixed system costs.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    },
    {
      "id": "mit-ceepr-who-pays-2025",
      "study": "Meeks, Pless, Qi and Wang, MIT Center for Energy and Environmental Policy Research",
      "title": "Who Pays for Growth? Evidence from Datacenters and the Grid",
      "publisher": "MIT Center for Energy and Environmental Policy Research (CEEPR)",
      "document_date": "December 2025",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "Realized utility revenue and customer bill changes from historical data center openings",
      "finding": "In the 6 years following data center entry (1998 to 2018), average electric utility revenue rose 8 percent (+$104 million per utility per year), residential bills rose 2 percent (+$30 per household per year) and commercial bills rose 4 percent (+$262 per customer per year), driven by peak coincident demand charges and infrastructure capital additions.",
      "years_covered": "1998 to 2018",
      "method": "Difference in differences event study of historical data center openings matched to utility level EIA Form 861 billing and revenue panels",
      "who_funded_or_published": "MIT Center for Energy and Environmental Policy Research (university working paper)",
      "primary_url": "https://ceepr.mit.edu/workingpaper/who-pays-for-growth-evidence-from-datacenters-and-the-grid/",
      "corroborating_url": null,
      "corroborating_label": null,
      "notes": "Measures historical realized utility billing outcomes prior to the post 2023 hyperscale AI buildout.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    },
    {
      "id": "duke-ni-26-04",
      "study": "Norris, Profeta, Patino Echeverri and Cowie, Duke University Nicholas Institute (NI R 26-04)",
      "title": "Rethinking Load Growth: Assessing the Potential for Integration of Large Flexible Loads in US Power Systems",
      "publisher": "Nicholas Institute for Energy, Environment & Sustainability, Duke University",
      "document_date": "February 2026",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "Grid headroom and new gigawatts of large load accommodated under minimal peak hour curtailment",
      "finding": "Across 22 major US balancing authorities, roughly 76 GW of new data center load can be integrated without building new peaking capacity if facilities curtail load by 0.25 percent of annual operating hours (roughly 22 hours per year), expanding to 98 GW at 0.5 percent annual curtailment and 126 GW at 1.0 percent annual curtailment.",
      "years_covered": "2025 to 2035",
      "method": "Hourly balancing authority load duration and reserve margin modeling across 22 US power systems",
      "who_funded_or_published": "Duke University Nicholas Institute for Energy, Environment & Sustainability (university research institute)",
      "primary_url": "https://nicholasinstitute.duke.edu/publications/data-centers-and-generation-capacity-over-next-decade",
      "corroborating_url": "https://nicholasinstitute.duke.edu/articles/key-takeaways-data-center-flexibility-and-generation-capacity-over-next-decade",
      "corroborating_label": "Duke Nicholas Institute summary",
      "notes": "Evaluates operational curtailment during system peak hours rather than unconditional firm interconnection.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    },
    {
      "id": "ncsu-erl-2026",
      "study": "Jeremiah Johnson et al., North Carolina State University (Environmental Research Letters)",
      "title": "Power System Costs and Emissions from Data Center and Cryptocurrency Mining Expansion in the United States",
      "publisher": "Environmental Research Letters (IOP Publishing) / North Carolina State University",
      "document_date": "May 2026",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "Wholesale electricity prices, residential bills by state and power sector carbon emissions through 2030",
      "finding": "Projected data center and crypto load growth raises US electricity demand 6 to 12 percent by 2030 and increases residential electricity bills up to 57 percent in the most heavily affected states (including Virginia at roughly $32 per month or $384 per year for an average household) while adding 49 to 125 million metric tons of CO2 per year.",
      "years_covered": "2024 to 2030",
      "method": "National capacity expansion and unit commitment dispatch model (TEMOA) across US grid regions",
      "who_funded_or_published": "North Carolina State University researchers in Environmental Research Letters (peer reviewed journal)",
      "primary_url": "https://doi.org/10.1088/1748-9326/ae6c3d",
      "corroborating_url": "https://news.ncsu.edu/2026/05/data-centers-power-bills/",
      "corroborating_label": "NC State University News, May 2026",
      "notes": "Models combined data center and cryptocurrency mining load growth across regional interconnects.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    },
    {
      "id": "e3-rising-electricity-rates-2026",
      "study": "Energy and Environmental Economics (E3), Understanding the Drivers of Rising Electricity Rates and the Role of Data Centers",
      "title": "Understanding the Drivers of Rising Electricity Rates and the Role of Data Centers",
      "publisher": "Energy and Environmental Economics, Inc. (E3)",
      "document_date": "May 2026",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 2,
      "basis": "third party estimate",
      "what_it_measured": "Historical drivers of US retail electricity rate increases and utility rate design for large loads",
      "finding": "Historical US retail electricity rate increases from 2020 to 2025 were driven primarily by distribution capital spending, wildfire mitigation, natural gas price spikes and inflation rather than data centers, and well designed large load tariffs can keep new data center additions net neutral or beneficial for existing ratepayers.",
      "years_covered": "2020 to 2025 historical and forward rate design case studies",
      "method": "Decomposition of historical utility revenue requirements and illustrative utility tariff cost of service modeling",
      "who_funded_or_published": "Energy and Environmental Economics (E3), industry commissioned consulting report",
      "primary_url": "https://www.ethree.com/wp-content/uploads/2026/05/Understanding-the-Drivers-of-Rising-Electricity-Rates-and-the-Role-of-Data-Centers_E3-2026.pdf",
      "corroborating_url": null,
      "corroborating_label": null,
      "notes": "Industry commissioned study evaluating historical rate drivers prior to the 2025/2026 PJM capacity delivery year.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    },
    {
      "id": "nber-wp35100-muller-2026",
      "study": "Nicholas Z. Muller, National Bureau of Economic Research Working Paper 35100",
      "title": "The Environmental Externalities of the Data Center Boom",
      "publisher": "National Bureau of Economic Research (NBER)",
      "document_date": "April 2026",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "Monetized air pollution and greenhouse gas health and climate damages per megawatt hour of data center electricity use",
      "finding": "Marginal air pollution and greenhouse gas damages from fossil fuel generation serving US data centers average $49 to $94 per MWh ($0.049 to $0.094 per kWh), rivaling or exceeding the direct wholesale price of electricity in coal and gas heavy interconnects such as PJM, MISO and SERC.",
      "years_covered": "2022 to 2025",
      "method": "Integrated assessment marginal emissions and air quality transport model (AP4T) coupled with EPA CEMS unit level generation data",
      "who_funded_or_published": "National Bureau of Economic Research (university working paper by Nicholas Z. Muller, Carnegie Mellon University)",
      "primary_url": "https://www.nber.org/papers/w35100",
      "corroborating_url": "https://www.spglobal.com/energy/en/news-research/latest-news/electric-power/091626-air-pollution-from-data-center-power-projects-is-a-rising-concern-amid-build-out",
      "corroborating_label": "S&P Global Commodity Insights, September 16, 2026",
      "notes": "Quantifies unpriced health and climate damages from marginal fossil generation dispatched to meet data center load.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    }
  ]
}
