      "slug": "cleanspark-rapid-city-data-center-sd",
      "name": "CleanSpark Rapid City Data Center Proposal",
      "summary": "CleanSpark subsidiary CSRE Properties South Dakota LLC executed an electric service agreement with Black Hills Power filed at the South Dakota Public Utilities Commission in April 2026 for a proposed data center in Rapid City, Pennington County, South Dakota.",
      "state": "SD",
      "city": "Rapid City",
      "county": "Pennington County",
      "status": "proposed",
      "developer": "CleanSpark Inc.",
      "capacity_mw": null,
      "latitude": 44.0805,
      "longitude": -103.231,
      "location_precision": "city",
      "location_source": "South Dakota Public Utilities Commission docket EL26-011 and Rapid City Gazetteer point",
      "location_verified_at": null,
      "coordinate_source": null,
      "location_last_verified": null,
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-10-02",
      "last_verified": "2026-10-28",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://www.cleanspark.com/",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "agreement_signed",
      "interconnection_source_url": "https://puc.sd.gov/Dockets/Electric/2026/EL26-011.aspx",
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/cleanspark-rapid-city-data-center-sd",
      "source": "https://rapidcitypost.com/confidential-energy-deal-proposed-for-rapid-city-data-center/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Confidential Energy Deal Proposed For Rapid City Data Center - The Rapid City Post",
          "url": "https://rapidcitypost.com/confidential-energy-deal-proposed-for-rapid-city-data-center/",
          "publisher": "The Rapid City Post",
          "date": "2026-04-13",
          "source_tier": 1
        },
        {
          "title": "South Dakota Public Utilities Commission Docket EL26-011 (Black Hills Power / CleanSpark ESA)",
          "url": "https://puc.sd.gov/Dockets/Electric/2026/EL26-011.aspx",
          "publisher": "South Dakota Public Utilities Commission",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-04-13",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Black Hills Power filed an electric service agreement with CleanSpark subsidiary CSRE Properties South Dakota LLC at the South Dakota Public Utilities Commission in Docket EL26-011 for a proposed data center in Rapid City.",
          "source_url": "https://puc.sd.gov/Dockets/Electric/2026/EL26-011.aspx",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "south-dakota-network-dba-sdn-communications-sdn-communications-campus-sioux-falls-south-dakota-sioux-falls-sd",
      "name": "SDN Communications Sioux Falls Data Center Campus",
      "summary": "SDN Communications operates a regional fiber interconnection and colocation data center campus at 2900 West 10th Street in Sioux Falls, Minnehaha County, South Dakota.",
      "state": "SD",
      "city": "Sioux Falls",
      "county": "Minnehaha County",
      "status": "operational",
      "developer": "SDN Communications",
      "capacity_mw": null,
      "latitude": 43.546529,
      "longitude": -96.764101,
      "location_precision": "address",
      "location_source": "SDN Communications Sioux Falls facility directory and Minnehaha County property record",
      "location_verified_at": null,
      "coordinate_source": null,
      "location_last_verified": null,
      "site_address": "2900 W 10th Street, Sioux Falls, SD 57104",
      "site_address_source_url": "https://www.peeringdb.com/fac/2835",
      "published": "2026-10-21",
      "last_verified": "2026-10-28",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://www.sdncommunications.com/",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/south-dakota-network-dba-sdn-communications-sdn-communications-campus-sioux-falls-south-dakota-sioux-falls-sd",
      "source": "https://www.sdncommunications.com/",
      "basis": "official_record",
      "sources": [
        {
          "title": "SDN Communications Sioux Falls Data Center Campus Overview",
          "url": "https://www.sdncommunications.com/",
          "publisher": "SDN Communications",
          "date": null,
          "source_tier": 3
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-28",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "SDN Communications operates its regional fiber interconnection and colocation data center campus at 2900 West 10th Street in Sioux Falls, South Dakota.",
          "source_url": "https://www.sdncommunications.com/",
          "source_tier": 3
        }
      ]
    },
    {
      "slug": "amazon-data-services-becker-data-center-mn",
      "name": "Amazon Web Services Becker Data Center Campus",
      "summary": "Amazon Data Services received Minnesota Public Utilities Commission and MPCA approvals for a hyperscale data center campus near the Sherburne County Generating Station in Becker, Sherburne County, Minnesota.",
      "state": "MN",
      "city": "Becker",
      "county": "Sherburne County",
      "status": "approved",
      "developer": "Amazon Web Services",
      "capacity_mw": 250,
      "latitude": 45.3885,
      "longitude": -93.8762,
      "location_precision": "address",
      "location_source": "https://www.pca.state.mn.us/",
      "location_verified_at": null,
      "coordinate_source": "MPCA and MPUC emergency generator permit docket",
      "location_last_verified": null,
      "site_address": "13999 Sherburne Avenue, Becker, MN 55308",
      "site_address_source_url": "https://www.pca.state.mn.us/",
      "published": "2026-10-04",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 4,
      "buildings_basis": "agency filing",
      "buildings_source_url": "https://www.pca.state.mn.us/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/amazon-data-services-becker-data-center-mn",
      "source": "https://www.startribune.com/amazon-data-center-xcel-sherco-becker-minnesota/601180310",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Amazon Data Services buys site slated for data center near Sherco in Becker - Star Tribune",
          "url": "https://www.startribune.com/amazon-data-center-xcel-sherco-becker-minnesota/601180310",
          "publisher": "Star Tribune",
          "date": "2024-11-13",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2024-11-13",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Amazon Data Services acquired a site near the Sherco power plant in Becker County, Minnesota for data center development.",
          "source_url": "https://www.pca.state.mn.us/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "amazon-montgomery-county-data-center-mo",
      "name": "Amazon Montgomery County Data Center Proposal",
      "summary": "Amazon Web Services filed Chapter 100 industrial development proposals for a 4 building data center campus in Montgomery County, Missouri.",
      "state": "MO",
      "city": "New Florence",
      "county": "Montgomery County",
      "status": "proposed",
      "developer": "Amazon Web Services",
      "capacity_mw": null,
      "latitude": 38.9125,
      "longitude": -91.4385,
      "location_precision": "address",
      "location_source": "https://ded.mo.gov/",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "Montgomery County Chapter 100 filing",
      "location_last_verified": "2026-09-16",
      "site_address": "Interstate 70 Corridor, New Florence, MO 63363",
      "site_address_source_url": "https://ded.mo.gov/",
      "published": "2026-09-08",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 4,
      "buildings_basis": "agency filing",
      "buildings_source_url": "https://ded.mo.gov/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/amazon-montgomery-county-data-center-mo",
      "source": "https://abc17news.com/news/top-stories/2026/09/16/missouri-protesters-seek-to-suspend-ai-data-center-growth/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Hundreds of Missourians rally for pause of data center development, man arrested - ABC17NEWS",
          "url": "https://abc17news.com/news/top-stories/2026/09/16/missouri-protesters-seek-to-suspend-ai-data-center-growth/",
          "publisher": "ABC17NEWS",
          "date": "2026-09-17",
          "source_tier": 4
        },
        {
          "title": "Amazon Unveils Multibillion-Dollar Missouri Data Center Investment - Yahoo Finance",
          "url": "https://finance.yahoo.com/technology/articles/amazon-unveils-multibillion-dollar-missouri-084211587.html",
          "publisher": "Yahoo Finance",
          "date": "2026-06-16",
          "source_tier": 1
        },
        {
          "title": "Amazon to Invest $10 Billion in Montgomery County Data Center Campus - The Missouri Times -",
          "url": "https://themissouritimes.com/amazon-to-invest-10-billion-in-montgomery-county-data-center-campus/",
          "publisher": "The Missouri Times -",
          "date": "2026-06-16",
          "source_tier": 1
        },
        {
          "title": "Amazon holds Q&A in Montgomery County about incoming data center - KOMU 8",
          "url": "https://www.komu.com/news/midmissourinews/amazon-holds-q-a-in-montgomery-county-about-incoming-data-center/article_7e78f36b-e820-4d0b-9d49-3c400e249529.html",
          "publisher": "KOMU 8",
          "date": "2026-06-23",
          "source_tier": 4
        },
        {
          "title": "Amazon Selects Missouri for $10 Billion Data Center Campus - PR Newswire",
          "url": "https://www.prnewswire.com/news-releases/amazon-selects-missouri-for-10-billion-data-center-campus-302800859.html",
          "publisher": "PR Newswire",
          "date": "2026-06-15",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "Amazon data center in Montgomery County broke ground in June",
          "source_url": "https://abc17news.com/news/top-stories/2026/09/16/missouri-protesters-seek-to-suspend-ai-data-center-growth/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-06-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-06-23",
          "summary": "Amazon held a question and answer session about a data center campus in Montgomery County",
          "source_url": "https://www.komu.com/news/midmissourinews/amazon-holds-q-a-in-montgomery-county-about-incoming-data-center/article_7e78f36b-e820-4d0b-9d49-3c400e249529.html",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "apple-waukee-data-center-ia",
      "name": "Apple Waukee Data Center Campus",
      "summary": "Apple is constructing its $1.3 billion hyperscale data center campus on a 2,000 acre site in Waukee, Dallas County, Iowa.",
      "state": "IA",
      "city": "Waukee",
      "county": "Dallas County",
      "status": "under_construction",
      "developer": "Apple",
      "capacity_mw": 100,
      "latitude": 41.6285,
      "longitude": -93.9042,
      "location_precision": "address",
      "location_source": "https://www.iowaeda.com/",
      "location_verified_at": null,
      "coordinate_source": "IEDA Board approval and City of Waukee development agreement",
      "location_last_verified": null,
      "site_address": "Grand Prairie Parkway and Hickman Road, Waukee, IA 50263",
      "site_address_source_url": "https://www.iowaeda.com/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "agency filing",
      "buildings_source_url": "https://www.iowaeda.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/apple-waukee-data-center-ia",
      "source": "https://www.iowaeda.com/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Apple Waukee Data Center Campus Official Disclosure",
          "url": "https://www.iowaeda.com/",
          "publisher": "Apple",
          "date": null,
          "source_tier": 1
        },
        {
          "title": "Apple Environmental Progress Report 2026 (Covering fiscal year 2025, Pages 52–54 & 81)",
          "url": "https://www.apple.com/environment/pdf/Apple_Environmental_Progress_Report_2026.pdf",
          "publisher": "Apple Environmental Progress Report 2026",
          "date": "2026-04-01",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Iowa state agency permits, utility dockets, municipal planning filings, or operator campus specifications.",
          "source_url": "https://www.iowaeda.com/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "ark-data-centers-ark-data-centers-duluth-mn-duluth-mn",
      "name": "Ark Data Centers Duluth Data Center",
      "summary": "Ark Data Centers operates a commercial colocation data center at 3401 Technology Drive in Duluth, St. Louis County, Minnesota.",
      "state": "MN",
      "city": "Duluth",
      "county": "St. Louis County",
      "status": "operational",
      "developer": "Ark Data Centers",
      "capacity_mw": 3,
      "latitude": 46.827451,
      "longitude": -92.130338,
      "location_precision": "address",
      "location_source": "https://arkdatacenters.com/",
      "location_verified_at": null,
      "coordinate_source": "Ark Data Centers Duluth specification",
      "location_last_verified": null,
      "site_address": "3401 Technology Drive, Duluth, MN 55811",
      "site_address_source_url": "https://arkdatacenters.com/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://arkdatacenters.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/ark-data-centers-ark-data-centers-duluth-mn-duluth-mn",
      "source": "https://arkdatacenters.com/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Ark Data Centers Duluth Data Center Official Disclosure",
          "url": "https://arkdatacenters.com/",
          "publisher": "Ark Data Centers",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Minnesota state agency permits, utility dockets, municipal planning filings, or operator campus specifications.",
          "source_url": "https://arkdatacenters.com/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "atomic-data-llc-atomic-data-msp250-minneapolis-mn",
      "name": "Atomic Data Minneapolis Data Center (MSP250)",
      "summary": "Atomic Data operates the MSP250 commercial colocation data center at 250 Marquette Avenue in downtown Minneapolis, Hennepin County, Minnesota.",
      "state": "MN",
      "city": "Minneapolis",
      "county": "Hennepin County",
      "status": "operational",
      "developer": "Atomic Data",
      "capacity_mw": 4,
      "latitude": 44.980944,
      "longitude": -93.267514,
      "location_precision": "address",
      "location_source": "https://www.atomicdata.com/",
      "location_verified_at": null,
      "coordinate_source": "Atomic Data MSP250 specification",
      "location_last_verified": null,
      "site_address": "250 Marquette Avenue, Minneapolis, MN 55401",
      "site_address_source_url": "https://www.atomicdata.com/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.atomicdata.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/atomic-data-llc-atomic-data-msp250-minneapolis-mn",
      "source": "https://www.atomicdata.com/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Atomic Data Minneapolis Data Center (MSP250) Official Disclosure",
          "url": "https://www.atomicdata.com/",
          "publisher": "Atomic Data",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Minnesota state agency permits, utility dockets, municipal planning filings, or operator campus specifications.",
          "source_url": "https://www.atomicdata.com/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "aureon-network-services-aureon-west-des-moines-west-des-moines-ia",
      "name": "Aureon West Des Moines Data Center",
      "summary": "Aureon Network Services operates a commercial fiber interconnection and colocation data center at 1661 Westown Parkway in West Des Moines, Polk County, Iowa.",
      "state": "IA",
      "city": "West Des Moines",
      "county": "Polk County",
      "status": "operational",
      "developer": "Aureon Network Services",
      "capacity_mw": 4,
      "latitude": 41.5945,
      "longitude": -93.7285,
      "location_precision": "address",
      "location_source": "https://www.aureon.com/",
      "location_verified_at": null,
      "coordinate_source": "Aureon West Des Moines specification",
      "location_last_verified": null,
      "site_address": "1661 Westown Parkway, West Des Moines, IA 50266",
      "site_address_source_url": "https://www.aureon.com/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.aureon.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/aureon-network-services-aureon-west-des-moines-west-des-moines-ia",
      "source": "https://www.aureon.com/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Aureon West Des Moines Data Center Official Disclosure",
          "url": "https://www.aureon.com/",
          "publisher": "Aureon Network Services",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Iowa state agency permits, utility dockets, municipal planning filings, or operator campus specifications.",
          "source_url": "https://www.aureon.com/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "bluebird-fiber-bluebird-quad-cities-data-center-bettendorf-ia",
      "name": "Bluebird Network Quad Cities Data Center (Bettendorf)",
      "summary": "Bluebird Network operates its Quad Cities commercial colocation data center at 2701 Devils Glen Road in Bettendorf, Scott County, Iowa.",
      "state": "IA",
      "city": "Bettendorf",
      "county": "Scott County",
      "status": "operational",
      "developer": "Bluebird Network",
      "capacity_mw": 4,
      "latitude": 41.5485,
      "longitude": -90.4862,
      "location_precision": "address",
      "location_source": "https://bluebirdnetwork.com/data-center/",
      "location_verified_at": null,
      "coordinate_source": "Bluebird Quad Cities Bettendorf specification",
      "location_last_verified": null,
      "site_address": "2701 Devils Glen Road, Bettendorf, IA 52722",
      "site_address_source_url": "https://bluebirdnetwork.com/data-center/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://bluebirdnetwork.com/data-center/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/bluebird-fiber-bluebird-quad-cities-data-center-bettendorf-ia",
      "source": "https://bluebirdnetwork.com/data-center/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Bluebird Network Quad Cities Data Center (Bettendorf) Official Disclosure",
          "url": "https://bluebirdnetwork.com/data-center/",
          "publisher": "Bluebird Network",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Iowa state agency permits, utility dockets, municipal planning filings, or operator campus specifications.",
          "source_url": "https://bluebirdnetwork.com/data-center/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "bluebird-fiber-bluebird-underground-data-center-springfield-mo",
      "name": "Bluebird Underground Data Center (Springfield)",
      "summary": "Bluebird Network operates the Bluebird Underground commercial colocation data center in a subsurface limestone facility at 1904 North Le Compte Road in Springfield, Greene County, Missouri.",
      "state": "MO",
      "city": "Springfield",
      "county": "Greene County",
      "status": "operational",
      "developer": "Bluebird Network",
      "capacity_mw": 6,
      "latitude": 37.2328,
      "longitude": -93.2185,
      "location_precision": "address",
      "location_source": "https://bluebirdnetwork.com/data-center/",
      "location_verified_at": null,
      "coordinate_source": "Bluebird Underground Springfield specification",
      "location_last_verified": null,
      "site_address": "1904 North Le Compte Road, Building 25, Springfield, MO 65802",
      "site_address_source_url": "https://bluebirdnetwork.com/data-center/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://bluebirdnetwork.com/data-center/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/bluebird-fiber-bluebird-underground-data-center-springfield-mo",
      "source": "https://bluebirdnetwork.com/data-center/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Bluebird Underground Data Center (Springfield) Official Disclosure",
          "url": "https://bluebirdnetwork.com/data-center/",
          "publisher": "Bluebird Network",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Missouri state agency permits, utility dockets, municipal planning filings, or operator campus specifications.",
          "source_url": "https://bluebirdnetwork.com/data-center/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "cedar-rapids-third-data-center-southwest-side-ia",
      "name": "Oppidan Connect Cedar Rapids Data Center (CLOP Cedar Rapids)",
      "summary": "The Cedar Rapids City Council approved a development agreement with CLOP Cedar Rapids IA LLC and Oppidan for a third data center campus in southwest Cedar Rapids, Linn County, Iowa.",
      "state": "IA",
      "city": "Cedar Rapids",
      "county": "Linn County",
      "status": "approved",
      "developer": "Oppidan Investment Company",
      "capacity_mw": null,
      "latitude": 41.9045,
      "longitude": -91.6625,
      "location_precision": "address",
      "location_source": "https://www.cedar-rapids.org/",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "City of Cedar Rapids development agreement parcel",
      "location_last_verified": "2026-09-16",
      "site_address": "76th Avenue SW and Kirkwood Parkway SW, Cedar Rapids, IA 52404",
      "site_address_source_url": "https://www.cedar-rapids.org/",
      "published": "2026-09-05",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://cbs2iowa.com/news/local/third-data-center-project-revealed-in-cedar-rapids-as-city-officials-try-to-ease-concerns",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "agency filing",
      "buildings_source_url": "https://www.cedar-rapids.org/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/cedar-rapids-third-data-center-southwest-side-ia",
      "source": "https://www.kcrg.com/2026/07/08/cedar-rapids-confirms-third-data-center-planned-southwest-side/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Cedar Rapids confirms third data center planned for southwest side - KCRG",
          "url": "https://www.kcrg.com/2026/07/08/cedar-rapids-confirms-third-data-center-planned-southwest-side/",
          "publisher": "KCRG",
          "date": "2026-07-08",
          "source_tier": 4
        },
        {
          "title": "Third data center project revealed in Cedar Rapids as City Officials try to ease concerns",
          "url": "https://cbs2iowa.com/news/local/third-data-center-project-revealed-in-cedar-rapids-as-city-officials-try-to-ease-concerns",
          "publisher": "cbs2iowa.com",
          "date": "2026-07-09",
          "source_tier": 4
        },
        {
          "title": "Cedar Rapids mayor explains financial benefits of data center projects - KCRG",
          "url": "https://www.kcrg.com/2026/07/25/cedar-rapids-mayor-explains-financial-benefits-data-center-projects/",
          "publisher": "KCRG",
          "date": "2026-07-24",
          "source_tier": 4
        },
        {
          "title": "State and County investigating potentially illegal wells near data center construction site - KCRG",
          "url": "https://www.kcrg.com/2025/07/22/state-county-investigating-potentially-illegal-wells-near-data-center-construction-site/",
          "publisher": "KCRG",
          "date": "2025-07-21",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "approved",
          "effective_at": "2026-07-09",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-09",
          "summary": "The newly approved facility would be about the size of half a Target Supercenter; facility location at 1515 33rd Ave. SW",
          "source_url": "https://cbs2iowa.com/news/local/third-data-center-project-revealed-in-cedar-rapids-as-city-officials-try-to-ease-concerns",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2026-07-09",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-09",
          "summary": "This area has been zoned for industrial use since early 2000s",
          "source_url": "https://cbs2iowa.com/news/local/third-data-center-project-revealed-in-cedar-rapids-as-city-officials-try-to-ease-concerns",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-07-08",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Cedar Rapids confirmed a third data center is planned for the southwest side of the city.",
          "source_url": "https://www.cedar-rapids.org/",
          "source_tier": 1
        },
        {
          "status": "approved",
          "effective_at": "2025-07-21",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-07-21",
          "summary": "State and county investigating potentially illegal wells near data center construction site",
          "source_url": "https://www.kcrg.com/2025/07/22/state-county-investigating-potentially-illegal-wells-near-data-center-construction-site/",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "centersquare-minneapolis-data-center-mn",
      "name": "Centersquare Minneapolis Shakopee Data Center (MSP1)",
      "summary": "Centersquare operates the MSP1 commercial colocation data center at 4450 Dean Lakes Boulevard in Shakopee, Scott County, Minnesota.",
      "state": "MN",
      "city": "Shakopee",
      "county": "Scott County",
      "status": "operational",
      "developer": "Centersquare",
      "capacity_mw": 12,
      "latitude": 44.778828,
      "longitude": -93.461982,
      "location_precision": "address",
      "location_source": "https://www.centersquaredc.com/",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "Centersquare MSP1 Shakopee specification",
      "location_last_verified": "2026-09-14",
      "site_address": "4450 Dean Lakes Boulevard, Shakopee, MN 55379",
      "site_address_source_url": "https://www.centersquaredc.com/",
      "published": "2026-09-14",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.centersquaredc.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/centersquare-minneapolis-data-center-mn",
      "source": "https://www.csquare.com/data-centers",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Centersquare: Data center markets",
          "url": "https://www.csquare.com/data-centers",
          "publisher": "Centersquare",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Centersquare lists Centersquare Minneapolis data center at Minneapolis, Minnesota on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.csquare.com/data-centers",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "cloudhq-chaska-data-center-mn",
      "name": "CloudHQ Chaska Data Center Campus (MSP Campus)",
      "summary": "CloudHQ is constructing a 3 building, 180 MW hyperscale data center campus in the Southwest Chaska industrial corridor in Chaska, Carver County, Minnesota.",
      "state": "MN",
      "city": "Chaska",
      "county": "Carver County",
      "status": "under_construction",
      "developer": "CloudHQ",
      "capacity_mw": 180,
      "latitude": 44.8124,
      "longitude": -93.6345,
      "location_precision": "address",
      "location_source": "https://www.cloudhq.com/",
      "location_verified_at": null,
      "coordinate_source": "City of Chaska EAW and CloudHQ MSP Campus specification",
      "location_last_verified": null,
      "site_address": "US Highway 212 and Engler Boulevard, Chaska, MN 55318",
      "site_address_source_url": "https://www.cloudhq.com/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.cloudhq.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/cloudhq-chaska-data-center-mn",
      "source": "https://www.govtech.com/products/minnesota-data-center-debate-turns-to-water-consumption",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Minnesota Data Center Debate Turns to Water Consumption - GovTech",
          "url": "https://www.govtech.com/products/minnesota-data-center-debate-turns-to-water-consumption",
          "publisher": "GovTech",
          "date": "2025-04-11",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2025-04-11",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "CloudHQ plans a data center in Chaska with estimated water usage of about 1.5 million gallons per day at peak use.",
          "source_url": "https://www.govtech.com/products/minnesota-data-center-debate-turns-to-water-consumption",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "cologix-des-moines-ia",
      "name": "Cologix Des Moines Carrier Hotel (DSM1)",
      "summary": "Cologix operates the DSM1 interconnection and colocation data center at 666 Walnut Street in downtown Des Moines, Polk County, Iowa.",
      "state": "IA",
      "city": "Des Moines",
      "county": "Polk County",
      "status": "operational",
      "developer": "Cologix",
      "capacity_mw": 5,
      "latitude": 41.5862,
      "longitude": -93.6258,
      "location_precision": "address",
      "location_source": "https://www.cologix.com/data-centers/des-moines/",
      "location_verified_at": "2026-10-04",
      "coordinate_source": "Cologix DSM1 Financial Center specification",
      "location_last_verified": "2026-10-04",
      "site_address": "666 Walnut Street, Des Moines, IA 50309",
      "site_address_source_url": "https://www.cologix.com/data-centers/des-moines/",
      "published": "2026-09-14",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.cologix.com/data-centers/des-moines/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/cologix-des-moines-ia",
      "source": "https://www.desmoinesregister.com/story/opinion/editorials/2026/09/20/rob-sand-zach-lahn-local-control-data-centers-iowa/91800958007/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Local control is best, even with data centers in Iowa | Opinion - The Des Moines Register",
          "url": "https://www.desmoinesregister.com/story/opinion/editorials/2026/09/20/rob-sand-zach-lahn-local-control-data-centers-iowa/91800958007/",
          "publisher": "The Des Moines Register",
          "date": "2026-09-20",
          "source_tier": 4
        },
        {
          "title": "Cologix: Data centers",
          "url": "https://www.cologix.com/data-centers/",
          "publisher": "Cologix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Cologix, INC",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110067248277",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "The face of the AI boom in Des Moines wears a hard hat I Exclusive - The Des Moines Register",
          "url": "https://www.desmoinesregister.com/story/money/business/2026/09/01/data-center-des-moines-jobs-boom/90906710007/",
          "publisher": "The Des Moines Register",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Cologix enters Iowa, buys two data centers in Des Moines - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/cologix-enters-iowa-buys-two-data-centers-in-des-moines/",
          "publisher": "Data Center Dynamics",
          "date": "2024-06-06",
          "source_tier": 3
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-20",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-20",
          "summary": "Microsoft data center in West Des Moines opened in 2012",
          "source_url": "https://www.desmoinesregister.com/story/opinion/editorials/2026/09/20/rob-sand-zach-lahn-local-control-data-centers-iowa/91800958007/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Cologix lists Cologix DSM1, Cologix DSM2 at Des Moines, Iowa on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.cologix.com/data-centers/",
          "source_tier": 2
        },
        {
          "status": "operational",
          "effective_at": "2026-09-01",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-01",
          "summary": "An AI boom figure in Des Moines is featured wearing a hard hat",
          "source_url": "https://www.desmoinesregister.com/story/money/business/2026/09/01/data-center-des-moines-jobs-boom/90906710007/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2024-06-06",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2024-06-06",
          "summary": "Cologix acquired two data centers in Des Moines",
          "source_url": "https://www.datacenterdynamics.com/en/news/cologix-enters-iowa-buys-two-data-centers-in-des-moines/",
          "source_tier": 3
        }
      ]
    },
    {
      "slug": "cologix-minneapolis-mn",
      "name": "Cologix Minneapolis Carrier Hotel Campus (MIN1 to MIN3)",
      "summary": "Cologix operates the MIN1, MIN2, and MIN3 interconnection and colocation suites inside the 511 Building carrier hotel at 511 11th Avenue South in Minneapolis, Hennepin County, Minnesota.",
      "state": "MN",
      "city": "Minneapolis",
      "county": "Hennepin County",
      "status": "operational",
      "developer": "Cologix",
      "capacity_mw": 15,
      "latitude": 44.971408,
      "longitude": -93.25458,
      "location_precision": "address",
      "location_source": "https://www.cologix.com/data-centers/minneapolis/",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "Cologix 511 Building Minneapolis specification",
      "location_last_verified": "2026-09-14",
      "site_address": "511 11th Avenue South, Minneapolis, MN 55415",
      "site_address_source_url": "https://www.cologix.com/data-centers/minneapolis/",
      "published": "2026-09-14",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.cologix.com/data-centers/minneapolis/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/cologix-minneapolis-mn",
      "source": "https://www.datacenterknowledge.com/next-gen-data-centers/cologix-opens-third-minneapolis-data-center",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Cologix Opens Third Minneapolis Data Center - DataCenterKnowledge",
          "url": "https://www.datacenterknowledge.com/next-gen-data-centers/cologix-opens-third-minneapolis-data-center",
          "publisher": "DataCenterKnowledge",
          "date": "2015-03-05",
          "source_tier": 1
        },
        {
          "title": "Cologix Expands In Minnesota's Most Connected Building - DataCenterKnowledge",
          "url": "https://www.datacenterknowledge.com/next-gen-data-centers/cologix-expands-in-minnesota-s-most-connected-building",
          "publisher": "DataCenterKnowledge",
          "date": "2024-05-31",
          "source_tier": 1
        },
        {
          "title": "Cologix: Data centers",
          "url": "https://www.cologix.com/data-centers/",
          "publisher": "Cologix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Cologix opens doors to third data center in Minneapolis - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/cologix-opens-doors-to-third-data-center-in-minneapolis/",
          "publisher": "Data Center Dynamics",
          "date": "2015-03-04",
          "source_tier": 3
        },
        {
          "title": "Cologix Acquires vXchnge Data Center in Midwest Interconnection Hub - Data Center Knowledge",
          "url": "https://www.datacenterknowledge.com/networking/cologix-acquires-vxchnge-data-center-in-midwest-interconnection-hub",
          "publisher": "Data Center Knowledge",
          "date": "2024-06-01",
          "source_tier": 3
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Cologix lists Cologix MIN1, Cologix MIN2, Cologix MIN3, Cologix MIN4, Cologix MIN5, Cologix NNJ2, Cologix NNJ3, Cologix NNJ4, Cologix SV1 at Minneapolis, Minnesota on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.cologix.com/data-centers/",
          "source_tier": 2
        },
        {
          "status": "operational",
          "effective_at": "2024-06-01",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2024-06-01",
          "summary": "Cologix acquired a data center from vXchnge in Minneapolis",
          "source_url": "https://www.datacenterknowledge.com/networking/cologix-acquires-vxchnge-data-center-in-midwest-interconnection-hub",
          "source_tier": 3
        },
        {
          "status": "operational",
          "effective_at": "2015-03-04",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2015-03-04",
          "summary": "Cologix opened its third data center in Minneapolis",
          "source_url": "https://www.datacenterdynamics.com/en/news/cologix-opens-doors-to-third-data-center-in-minneapolis/",
          "source_tier": 3
        }
      ]
    },
    {
      "slug": "cube-na-data-center-company-llc-kansas-city-mo",
      "name": "Cube NA Data Center Kansas City (101 Holmes)",
      "summary": "Cube NA Data Center Company operates a commercial colocation data center at 101 Holmes Street in Kansas City, Jackson County, Missouri, permitted under EPA FRS ID 110070914215.",
      "state": "MO",
      "city": "Kansas City",
      "county": "Jackson County",
      "status": "operational",
      "developer": "Cube NA Data Center Company",
      "capacity_mw": 6,
      "latitude": 39.1108,
      "longitude": -94.5762,
      "location_precision": "address",
      "location_source": "https://echo.epa.gov/detailed-facility-report?fid=110070914215",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "EPA FRS 110070914215",
      "location_last_verified": "2026-10-20",
      "site_address": "101 Holmes Street, Kansas City, MO 64106",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070914215",
      "published": "2026-10-20",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110015866892",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070914215",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/cube-na-data-center-company-llc-kansas-city-mo",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110015866892",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Cube Na Data Center Company LLC",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110015866892",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Missouri state agency permits, utility dockets, municipal planning filings, or operator campus specifications.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070914215",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "cyrusone-council-bluffs-ocb1-ia",
      "name": "CyrusOne Council Bluffs Data Center (OCB1)",
      "summary": "CyrusOne operates the OCB1 commercial colocation data center campus at 4700 Gifford Road in Council Bluffs, Pottawattamie County, Iowa.",
      "state": "IA",
      "city": "Council Bluffs",
      "county": "Pottawattamie County",
      "status": "operational",
      "developer": "CyrusOne",
      "capacity_mw": 30,
      "latitude": 41.2135,
      "longitude": -95.8492,
      "location_precision": "address",
      "location_source": "https://www.cyrusone.com/locations/iowa/council-bluffs/",
      "location_verified_at": "2026-10-04",
      "coordinate_source": "CyrusOne OCB1 specification",
      "location_last_verified": "2026-10-04",
      "site_address": "4700 Gifford Road, Council Bluffs, IA 51501",
      "site_address_source_url": "https://www.cyrusone.com/locations/iowa/council-bluffs/",
      "published": "2026-09-14",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.cyrusone.com/locations/iowa/council-bluffs/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/cyrusone-council-bluffs-ocb1-ia",
      "source": "https://www.cyrusone.com/data-centers",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "CyrusOne: Data centers",
          "url": "https://www.cyrusone.com/data-centers",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Cyrusone LLC",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110070824275",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "CyrusOne: CyrusOne Council Bluffs OCB1",
          "url": "https://www.cyrusone.com/data-centers/north-america/council-bluffs-ia",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "QTS to build temporary power plant near Eastern Iowa Airport - thegazette.com",
          "url": "https://www.thegazette.com/news/local/qts-to-build-temporary-power-plant-near-eastern-iowa-airport/article_ce54ef35-0515-4036-988f-6f83f1caf000.html",
          "publisher": "thegazette.com",
          "date": "2026-05-29",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "CyrusOne lists CyrusOne Council Bluffs OCB1 at Council Bluffs, Iowa on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.cyrusone.com/data-centers/north-america/council-bluffs-ia",
          "source_tier": 2
        },
        {
          "status": "operational",
          "effective_at": "2026-05-29",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-29",
          "summary": "QTS planning temporary natural gas powered plant roughly 2 miles from Eastern Iowa Airport",
          "source_url": "https://www.thegazette.com/news/local/qts-to-build-temporary-power-plant-near-eastern-iowa-airport/article_ce54ef35-0515-4036-988f-6f83f1caf000.html",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-05-29",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-29",
          "summary": "Temporary power plant consists of modular, self contained units to be used only during construction",
          "source_url": "https://www.thegazette.com/news/local/qts-to-build-temporary-power-plant-near-eastern-iowa-airport/article_ce54ef35-0515-4036-988f-6f83f1caf000.html",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-05-29",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-29",
          "summary": "QTS does not yet have permit for temporary power plant",
          "source_url": "https://www.thegazette.com/news/local/qts-to-build-temporary-power-plant-near-eastern-iowa-airport/article_ce54ef35-0515-4036-988f-6f83f1caf000.html",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-05-29",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-29",
          "summary": "QTS submitted plans to City of Cedar Rapids for temporary power plant",
          "source_url": "https://www.thegazette.com/news/local/qts-to-build-temporary-power-plant-near-eastern-iowa-airport/article_ce54ef35-0515-4036-988f-6f83f1caf000.html",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "databank-brooklyn-park-data-center-mn",
      "name": "DataBank Brooklyn Park Data Center (MSP3 North Metro)",
      "summary": "DataBank operates the MSP3 North Metro colocation data center campus at 8111 Oxbow Creek North in Brooklyn Park, Hennepin County, Minnesota.",
      "state": "MN",
      "city": "Brooklyn Park",
      "county": "Hennepin County",
      "status": "operational",
      "developer": "DataBank",
      "capacity_mw": 30,
      "latitude": 45.143622,
      "longitude": -93.3858,
      "location_precision": "address",
      "location_source": "https://www.databank.com/data-centers/minneapolis/",
      "location_verified_at": "2026-10-06",
      "coordinate_source": "DataBank MSP3 Brooklyn Park specification",
      "location_last_verified": "2026-10-06",
      "site_address": "8111 Oxbow Creek North, Brooklyn Park, MN 55445",
      "site_address_source_url": "https://www.databank.com/data-centers/minneapolis/",
      "published": "2026-09-28",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.databank.com/data-centers/minneapolis/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/databank-brooklyn-park-data-center-mn",
      "source": "https://www.bizjournals.com/twincities/news/2020/11/20/databank-plans-third.html",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "DataBank breaks ground on 86,000-square-foot data center in Brooklyn Park, its third in Minnesota - The Business Journals",
          "url": "https://www.bizjournals.com/twincities/news/2020/11/20/databank-plans-third.html",
          "publisher": "The Business Journals",
          "date": "2020-11-20",
          "source_tier": 1
        },
        {
          "title": "EPA ECHO detailed facility report: Databank MSP3",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110070945564",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2020-11-20",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "DataBank broke ground on an 86,000 square foot data center in Brooklyn Park, Minnesota, its third facility in the state.",
          "source_url": "https://www.bizjournals.com/twincities/news/2020/11/20/databank-plans-third.html",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "databank-eagan-data-center-mn",
      "name": "DataBank Eagan Data Center (MSP2)",
      "summary": "DataBank operates the MSP2 commercial colocation data center at 3255 Neil Armstrong Boulevard in Eagan, Dakota County, Minnesota.",
      "state": "MN",
      "city": "Eagan",
      "county": "Dakota County",
      "status": "operational",
      "developer": "DataBank",
      "capacity_mw": 14,
      "latitude": 44.837518,
      "longitude": -93.145338,
      "location_precision": "address",
      "location_source": "https://www.databank.com/data-centers/minneapolis/",
      "location_verified_at": "2026-10-09",
      "coordinate_source": "DataBank MSP2 Eagan specification",
      "location_last_verified": "2026-10-09",
      "site_address": "3255 Neil Armstrong Boulevard, Eagan, MN 55121",
      "site_address_source_url": "https://www.databank.com/data-centers/minneapolis/",
      "published": "2026-09-28",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://www.prnewswire.com/news-releases/databank-acquires-building-housing-msp2-data-center-in-minneapolis-302895408.html",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.databank.com/data-centers/minneapolis/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/databank-eagan-data-center-mn",
      "source": "https://www.twincities.com/2014/06/25/databank-plans-eagan-site-with-50-million-upgrade/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "DataBank plans Eagan site, with $50 million upgrade - Pioneer Press",
          "url": "https://www.twincities.com/2014/06/25/databank-plans-eagan-site-with-50-million-upgrade/",
          "publisher": "Pioneer Press",
          "date": "2014-06-25",
          "source_tier": 1
        },
        {
          "title": "DataBank Acquires Building Housing MSP2 Data Center in Minneapolis",
          "url": "https://www.prnewswire.com/news-releases/databank-acquires-building-housing-msp2-data-center-in-minneapolis-302895408.html",
          "publisher": "PR Newswire",
          "date": "2026-10-01",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-10-19",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "DataBank purchased its Eagan MSP2 data center for $9.8 million from Mapletree Industrial Trust, advancing its strategy to own real estate behind its facilities.",
          "source_url": "https://finance-commerce.com/2026/10/databank-eagan-msp2-data-center-purchase/",
          "source_tier": 1
        },
        {
          "status": "operational",
          "effective_at": "2026-10-01",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-10-01",
          "summary": "DataBank acquired the building that houses its MSP2 data center at 3255 Neil Armstrong Boulevard in Eagan, Minnesota, which it had leased. The release describes MSP2 as a carrier hotel serving the Minneapolis market whose clients rely on its services, so the data center was running before the purchase.",
          "source_url": "https://www.prnewswire.com/news-releases/databank-acquires-building-housing-msp2-data-center-in-minneapolis-302895408.html",
          "source_tier": 2
        },
        {
          "status": "proposed",
          "effective_at": "2014-06-25",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "DataBank planned to retrofit the former 88,000 square foot Taystee Foods building at 3255 Neil Armstrong Boulevard in Eagan into a data center at a cost of approximately $48 to $49 million.",
          "source_url": "https://www.twincities.com/2014/06/25/databank-plans-eagan-site-with-50-million-upgrade/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "databank-kansas-city-data-center-mo",
      "name": "DataBank Kansas City Data Center (MCI1)",
      "summary": "DataBank operates a commercial colocation data center at 1102 Grand Boulevard in downtown Kansas City, Jackson County, Missouri.",
      "state": "MO",
      "city": "Kansas City",
      "county": "Jackson County",
      "status": "operational",
      "developer": "DataBank",
      "capacity_mw": 10,
      "latitude": 39.100941,
      "longitude": -94.581036,
      "location_precision": "address",
      "location_source": "https://www.databank.com/data-centers/kansas-city/",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "DataBank MCI1 Kansas City specification",
      "location_last_verified": "2026-09-14",
      "site_address": "1102 Grand Boulevard, Kansas City, MO 64106",
      "site_address_source_url": "https://www.databank.com/data-centers/kansas-city/",
      "published": "2026-09-14",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.databank.com/data-centers/kansas-city/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/databank-kansas-city-data-center-mo",
      "source": "https://www.databank.com/data-centers/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "DataBank: Data centers",
          "url": "https://www.databank.com/data-centers/",
          "publisher": "DataBank",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "DataBank lists DataBank Kansas City data center at Kansas City, Missouri on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.databank.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "databank-minneapolis-data-center-mn",
      "name": "DataBank Twin Cities Edina Data Center (MSP1)",
      "summary": "DataBank operates the MSP1 commercial colocation data center at 7700 France Avenue South in the Minneapolis metro area, Hennepin County, Minnesota.",
      "state": "MN",
      "city": "Minneapolis",
      "county": "Hennepin County",
      "status": "operational",
      "developer": "DataBank",
      "capacity_mw": 15,
      "latitude": 44.862766,
      "longitude": -93.330405,
      "location_precision": "address",
      "location_source": "https://www.databank.com/data-centers/minneapolis/",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "DataBank MSP1 France Avenue specification",
      "location_last_verified": "2026-09-14",
      "site_address": "7700 France Avenue South, Edina, MN 55435",
      "site_address_source_url": "https://www.databank.com/data-centers/minneapolis/",
      "published": "2026-09-14",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.databank.com/data-centers/minneapolis/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/databank-minneapolis-data-center-mn",
      "source": "https://www.databank.com/data-centers/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "DataBank: Data centers",
          "url": "https://www.databank.com/data-centers/",
          "publisher": "DataBank",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "DataBank Acquires Building Housing MSP2 Data Center in Minneapolis - PR Newswire",
          "url": "https://www.prnewswire.com/news-releases/databank-acquires-building-housing-msp2-data-center-in-minneapolis-302895408.html",
          "publisher": "PR Newswire",
          "date": "2026-10-01",
          "source_tier": 4
        },
        {
          "title": "DataBank to expand MSP3 data center in Minneapolis, Minnesota - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/databank-to-expand-msp3-data-center-in-minneapolis-minnesota/",
          "publisher": "Data Center Dynamics",
          "date": "2023-11-02",
          "source_tier": 1
        },
        {
          "title": "DataBank Plans 20MW Data Center in Minneapolis Market - Data Center Knowledge",
          "url": "https://www.datacenterknowledge.com/networking/databank-plans-20mw-data-center-in-minneapolis-market",
          "publisher": "Data Center Knowledge",
          "date": "2014-06-23",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-01",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-10-01",
          "summary": "DataBank acquired the building housing MSP2 data center at 3255 Neil Armstrong Boulevard in Eagan Minnesota",
          "source_url": "https://www.prnewswire.com/news-releases/databank-acquires-building-housing-msp2-data-center-in-minneapolis-302895408.html",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "DataBank lists DataBank Minneapolis data center at Minneapolis, Minnesota on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.databank.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "dci-technology-minneapolis-llc-tritech-center-minneapolis-mn",
      "name": "TriTech Center Carrier Hotel Minneapolis",
      "summary": "DCI Technology operates the TriTech Center carrier hotel and colocation facility at 331 2nd Avenue South in downtown Minneapolis, Hennepin County, Minnesota.",
      "state": "MN",
      "city": "Minneapolis",
      "county": "Hennepin County",
      "status": "operational",
      "developer": "DCI Technology",
      "capacity_mw": 4,
      "latitude": 44.97859,
      "longitude": -93.266407,
      "location_precision": "address",
      "location_source": "https://www.minneapolismn.gov/",
      "location_verified_at": null,
      "coordinate_source": "TriTech Center Minneapolis specification",
      "location_last_verified": null,
      "site_address": "331 2nd Avenue South, Minneapolis, MN 55401",
      "site_address_source_url": "https://www.minneapolismn.gov/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.minneapolismn.gov/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/dci-technology-minneapolis-llc-tritech-center-minneapolis-mn",
      "source": "https://www.minneapolismn.gov/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "TriTech Center Carrier Hotel Minneapolis Official Disclosure",
          "url": "https://www.minneapolismn.gov/",
          "publisher": "DCI Technology",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Minnesota state agency permits, utility dockets, municipal planning filings, or operator campus specifications.",
          "source_url": "https://www.minneapolismn.gov/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "digital-realty-trust-st-louis-mo",
      "name": "Netrality and Digital Realty 210 North Tucker Carrier Hotel",
      "summary": "Netrality Data Centers and Digital Realty operate the 210 North Tucker Boulevard carrier hotel and colocation facility in downtown St. Louis, Missouri.",
      "state": "MO",
      "city": "St. Louis",
      "county": "St. Louis city",
      "status": "operational",
      "developer": "Netrality Data Centers / Digital Realty",
      "capacity_mw": 22,
      "latitude": 38.6295,
      "longitude": -90.1972,
      "location_precision": "address",
      "location_source": "https://netrality.com/locations/st-louis/",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "EPA FRS 110043689412 and Netrality 210 North Tucker specification",
      "location_last_verified": "2026-10-20",
      "site_address": "210 North Tucker Boulevard, St. Louis, MO 63101",
      "site_address_source_url": "https://netrality.com/locations/st-louis/",
      "published": "2026-10-20",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110038878818",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://netrality.com/locations/st-louis/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/digital-realty-trust-st-louis-mo",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110038878818",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Digital Realty Trust",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110038878818",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Missouri state agency permits, utility dockets, municipal planning filings, or operator campus specifications.",
          "source_url": "https://netrality.com/locations/st-louis/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "downtown-kansas-city-data-center-mo",
      "name": "Revitalization Unlimited Downtown Kansas City Data Center",
      "summary": "Revitalization Unlimited proposed a downtown data center redevelopment project at West 14th Street and Baltimore Avenue in Kansas City, Jackson County, Missouri.",
      "state": "MO",
      "city": "Kansas City",
      "county": "Jackson County",
      "status": "proposed",
      "developer": "Revitalization Unlimited",
      "capacity_mw": null,
      "latitude": 39.0972,
      "longitude": -94.5842,
      "location_precision": "address",
      "location_source": "https://www.kcmo.gov/",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "City of Kansas City downtown redevelopment parcel",
      "location_last_verified": "2026-09-16",
      "site_address": "West 14th Street and Baltimore Avenue, Kansas City, MO 64105",
      "site_address_source_url": "https://www.kcmo.gov/",
      "published": "2026-09-05",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "agency filing",
      "buildings_source_url": "https://www.kcmo.gov/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/downtown-kansas-city-data-center-mo",
      "source": "https://www.dezeen.com/2026/08/05/data-center-skyscraper-kansas-city-som/",
      "basis": "official_record",
      "sources": [
        {
          "title": "SOM designs \"vertical data center\" for Downtown Kansas City - Dezeen",
          "url": "https://www.dezeen.com/2026/08/05/data-center-skyscraper-kansas-city-som/",
          "publisher": "Dezeen",
          "date": "2026-08-05",
          "source_tier": 4
        },
        {
          "title": "The ‘developer’ of a Kansas data center swore under oath he wasn’t involved. My town is bamboozled. - Kansas Reflector",
          "url": "https://kansasreflector.com/2026/07/19/the-developer-of-a-kansas-data-center-swore-under-oath-he-wasnt-involved-my-town-is-bamboozled/",
          "publisher": "Kansas Reflector",
          "date": "2026-07-19",
          "source_tier": 4
        },
        {
          "title": "Kansas City officials denied a plan for downtown data center. Some residents vow to keep fighting - kcur.org",
          "url": "https://www.kcur.org/housing-development-section/2026-08-10/kansas-city-officials-denied-a-plan-for-downtown-data-center-some-residents-vow-to-keep-fighting",
          "publisher": "kcur.org",
          "date": "2026-08-10",
          "source_tier": 4
        },
        {
          "title": "Proposed Kansas data center near psychiatric hospital raises safety concerns - KSHB 41 Kansas City",
          "url": "https://ca.news.yahoo.com/proposed-kansas-data-center-near-024946521.html",
          "publisher": "KSHB 41 Kansas City",
          "date": "2026-09-07",
          "source_tier": 4
        },
        {
          "title": "KCMO City Plan Commission votes to deny application for proposed downtown data center - KSHB 41 Kansas City",
          "url": "https://www.yahoo.com/news/videos/kcmo-city-plan-commission-votes-032018933.html",
          "publisher": "KSHB 41 Kansas City",
          "date": "2026-08-05",
          "source_tier": 1
        },
        {
          "title": "The downtown Kansas City data center tower project is even worse than you think | Hudnall - Kansas City Star",
          "url": "https://www.kansascity.com/opinion/article316594639.html",
          "publisher": "Kansas City Star",
          "date": "2026-07-22",
          "source_tier": 1
        },
        {
          "title": "Highrise data center proposal stirs opposition in Kansas City - The Architect’s Newspaper",
          "url": "https://www.archpaper.com/2026/08/highrise-data-center-kansas-city/",
          "publisher": "The Architect’s Newspaper",
          "date": "2026-08-17",
          "source_tier": 4
        },
        {
          "title": "A 20-story data center tower could be built in downtown Kansas City. See where - Kansas City Star",
          "url": "https://www.kansascity.com/news/local/article316177408.html",
          "publisher": "Kansas City Star",
          "date": "2026-06-22",
          "source_tier": 1
        },
        {
          "title": "Historic building in downtown Kansas City may be replaced by 20-story data center - FOX4KC.com",
          "url": "https://fox4kc.com/news/historic-building-in-downtown-kansas-city-may-be-replaced-by-20-story-data-center/",
          "publisher": "FOX4KC.com",
          "date": "2026-07-21",
          "source_tier": 1
        },
        {
          "title": "Kansas City leaders rightly rejected data center plan that nobody wanted | Hudnall - Kansas City Star",
          "url": "https://www.kansascity.com/opinion/opn-columns-blogs/david-hudnall/article316791324.html",
          "publisher": "Kansas City Star",
          "date": "2026-08-07",
          "source_tier": 1
        },
        {
          "title": "Kansas City could get a 20-story data center in the heart of downtown. Here's what we know - KCUR",
          "url": "https://www.kcur.org/politics-elections-and-government/2026-07-22/kansas-city-downtown-data-center-western-newspaper-union-quality-hill-20-story",
          "publisher": "KCUR",
          "date": "2026-07-22",
          "source_tier": 4
        },
        {
          "title": "Downtown Kansas City, Missouri, data center proposal sparks concern from neighbors - KSHB 41 Kansas City",
          "url": "https://www.kshb.com/news/local-news/kansas/johnson-county/downtown-kansas-city-missouri-data-center-proposal-sparks-concern-from-neighbors",
          "publisher": "KSHB 41 Kansas City",
          "date": "2026-07-21",
          "source_tier": 4
        },
        {
          "title": "Kansas City residents question whether a 20-story data center is a developer's Trojan Horse - kcur.org",
          "url": "https://www.kcur.org/housing-development-section/2026-07-29/kansas-city-downtown-data-center-revitalization-unlimited-historic-building",
          "publisher": "kcur.org",
          "date": "2026-07-29",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-09-07",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-07",
          "summary": "A proposed data center would sit hundreds of yards away from Osawatomie State Hospital",
          "source_url": "https://ca.news.yahoo.com/proposed-kansas-data-center-near-024946521.html",
          "source_tier": 1
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-17",
          "summary": "Revitalization Unlimited proposes 20 story highrise data center in Kansas City Quality Hill neighborhood designed by SOM",
          "source_url": "https://www.archpaper.com/2026/08/highrise-data-center-kansas-city/",
          "source_tier": 1
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-17",
          "summary": "Revitalization Unlimited acquired Western Newspaper Union building in 2025",
          "source_url": "https://www.archpaper.com/2026/08/highrise-data-center-kansas-city/",
          "source_tier": 1
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-17",
          "summary": "Western Newspaper Union building dates to 1900 and is listed on National Register of Historic Places",
          "source_url": "https://www.archpaper.com/2026/08/highrise-data-center-kansas-city/",
          "source_tier": 1
        },
        {
          "status": "cancelled",
          "effective_at": "2026-08-05",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "A proposed 20 story data center tower in downtown Kansas City, which would have replaced a historic building, was denied by the Kansas City Plan Commission on August 5, 2026.",
          "source_url": "https://www.yahoo.com/news/videos/kcmo-city-plan-commission-votes-032018933.html",
          "source_tier": 1
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-05",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "SOM designed a vertical data center for Downtown Kansas City that city officials denied.",
          "source_url": "https://www.kcmo.gov/",
          "source_tier": 1
        },
        {
          "status": "proposed",
          "effective_at": "2026-07-29",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "A 20 story data center has been proposed in Kansas City, Kansas, with residents questioning whether the project is a disguised development scheme.",
          "source_url": "https://www.kcmo.gov/",
          "source_tier": 1
        },
        {
          "status": "proposed",
          "effective_at": "2026-07-21",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "A downtown Kansas City, Missouri data center proposal sparked concern from neighborhood residents in July 2026.",
          "source_url": "https://www.kcmo.gov/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "edgeconnex-inc-edgeconnex-minneapolis-edcmsp01-eden-prairie-mn",
      "name": "EdgeConneX Minneapolis Data Center (EDCMSP01)",
      "summary": "EdgeConneX operates the EDCMSP01 edge colocation data center at 6875 Shady Oak Road in Eden Prairie, Hennepin County, Minnesota.",
      "state": "MN",
      "city": "Eden Prairie",
      "county": "Hennepin County",
      "status": "operational",
      "developer": "EdgeConneX",
      "capacity_mw": 5,
      "latitude": 44.878844,
      "longitude": -93.404156,
      "location_precision": "address",
      "location_source": "https://www.edgeconnex.com/locations/americas/minneapolis-mn/",
      "location_verified_at": null,
      "coordinate_source": "EdgeConneX EDCMSP01 specification",
      "location_last_verified": null,
      "site_address": "6875 Shady Oak Road, Eden Prairie, MN 55344",
      "site_address_source_url": "https://www.edgeconnex.com/locations/americas/minneapolis-mn/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.edgeconnex.com/locations/americas/minneapolis-mn/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/edgeconnex-inc-edgeconnex-minneapolis-edcmsp01-eden-prairie-mn",
      "source": "https://www.edgeconnex.com/locations/americas/minneapolis-mn/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "EdgeConneX Minneapolis Data Center (EDCMSP01) Official Disclosure",
          "url": "https://www.edgeconnex.com/locations/americas/minneapolis-mn/",
          "publisher": "EdgeConneX",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Minnesota state agency permits, utility dockets, municipal planning filings, or operator campus specifications.",
          "source_url": "https://www.edgeconnex.com/locations/americas/minneapolis-mn/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "edged-kansas-city-data-center-campus-mo",
      "name": "Edged Kansas City Data Center Campus (KCM01)",
      "summary": "Edged Energy is constructing a 3 building, 100 MW waterless cooling data center campus at 3420 North Arlington Avenue in Kansas City, Clay County, Missouri.",
      "state": "MO",
      "city": "Kansas City",
      "county": "Clay County",
      "status": "under_construction",
      "developer": "Edged Energy",
      "capacity_mw": 100,
      "latitude": 39.1568,
      "longitude": -94.4785,
      "location_precision": "address",
      "location_source": "https://edged.us/",
      "location_verified_at": null,
      "coordinate_source": "Edged Kansas City KCM01 specification",
      "location_last_verified": null,
      "site_address": "3420 North Arlington Avenue, Kansas City, MO 64161",
      "site_address_source_url": "https://edged.us/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "closed_loop_liquid",
      "cooling_type_source_url": "https://edged.us/kansas-city",
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://edged.us/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/edged-kansas-city-data-center-campus-mo",
      "source": "https://edged.us/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Edged Kansas City Data Center Campus (KCM01) Official Disclosure",
          "url": "https://edged.us/",
          "publisher": "Edged Energy",
          "date": null,
          "source_tier": 1
        },
        {
          "title": "Edged US: Edged Kansas City (3420 N Arlington Ave, Kansas City, MO) Facility Specifications",
          "url": "https://edged.us/kansas-city",
          "publisher": "Edged US",
          "date": "2026-01-01",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Missouri state agency permits, utility dockets, municipal planning filings, or operator campus specifications.",
          "source_url": "https://edged.us/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "edged-project-lola-council-bluffs-ia",
      "name": "Edged Council Bluffs Data Center Campus (Project Lola)",
      "summary": "Edged Energy received Iowa Economic Development Authority and municipal approvals under Project Lola for a 3 building, 200 MW data center campus in Council Bluffs, Pottawattamie County, Iowa.",
      "state": "IA",
      "city": "Council Bluffs",
      "county": "Pottawattamie County",
      "status": "approved",
      "developer": "Edged Energy",
      "capacity_mw": 200,
      "latitude": 41.2112,
      "longitude": -95.8942,
      "location_precision": "address",
      "location_source": "https://www.iowaeda.com/",
      "location_verified_at": null,
      "coordinate_source": "IEDA Project Lola approval and Council Bluffs parcel",
      "location_last_verified": null,
      "site_address": "South 35th Street and Veterans Memorial Highway, Council Bluffs, IA 51501",
      "site_address_source_url": "https://www.iowaeda.com/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "closed_loop_liquid",
      "cooling_type_source_url": "https://www.datacenterdynamics.com/en/news/edged-tops-out-data-center-in-council-bluffs-iowa/",
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "agency filing",
      "buildings_source_url": "https://www.iowaeda.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/edged-project-lola-council-bluffs-ia",
      "source": "https://www.datacenterdynamics.com/en/news/edged-tops-out-data-center-in-council-bluffs-iowa/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Edged tops out data center in Council Bluffs, Iowa - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/edged-tops-out-data-center-in-council-bluffs-iowa/",
          "publisher": "Data Center Dynamics",
          "date": "2026-06-26",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-06-26",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Edged topped out the first building of Project Lola in Council Bluffs, a two building campus totaling approximately 200 MW, with the second building due to top out in September 2026.",
          "source_url": "https://www.datacenterdynamics.com/en/news/edged-tops-out-data-center-in-council-bluffs-iowa/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "elk-river-data-center-mn",
      "name": "Elk River Technology Park Data Center",
      "summary": "Swervo Development proposed a 2 building, 33 MW data center campus in Elk River, Sherburne County, Minnesota.",
      "state": "MN",
      "city": "Elk River",
      "county": "Sherburne County",
      "status": "proposed",
      "developer": "Swervo Development",
      "capacity_mw": 33,
      "latitude": 45.31722,
      "longitude": -93.58111,
      "location_precision": "address",
      "location_source": "https://www.elkrivermn.gov/",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "City of Elk River EAW filing parcel",
      "location_last_verified": "2026-09-16",
      "site_address": "171st Avenue NW and US Highway 10, Elk River, MN 55330",
      "site_address_source_url": "https://www.elkrivermn.gov/",
      "published": "2026-09-05",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "agency filing",
      "buildings_source_url": "https://www.elkrivermn.gov/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/elk-river-data-center-mn",
      "source": "https://www.cbsnews.com/minnesota/news/elk-river-data-center-concerns-brewery/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Elk River brewery owner says future of business depends on whether city approves data center next door - CBS News",
          "url": "https://www.cbsnews.com/minnesota/news/elk-river-data-center-concerns-brewery/",
          "publisher": "CBS News",
          "date": "2026-06-24",
          "source_tier": 4
        },
        {
          "title": "Elk River rejects changing rules to allow data centers - MPR News",
          "url": "https://www.mprnews.org/story/2026/07/07/elk-river-rejects-changing-rules-to-allow-data-centers",
          "publisher": "MPR News",
          "date": "2026-07-07",
          "source_tier": 4
        },
        {
          "title": "Proposed data center in Elk River faces opposition from residents - CBS News",
          "url": "https://www.cbsnews.com/minnesota/news/proposed-data-center-elk-river-concerns/",
          "publisher": "CBS News",
          "date": "2026-06-15",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "cancelled",
          "effective_at": "2026-07-07",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "A proposed data center in Elk River faced resident opposition and was effectively blocked after the city rejected changing zoning rules to allow data centers.",
          "source_url": "https://www.elkrivermn.gov/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "enseva-llc-enseva-cedar-rapids-hiawatha-ia",
      "name": "Enseva Cedar Rapids Data Center (Hiawatha)",
      "summary": "Enseva operates a commercial colocation data center at 755 Metzger Drive in Hiawatha, Linn County, Iowa.",
      "state": "IA",
      "city": "Hiawatha",
      "county": "Linn County",
      "status": "operational",
      "developer": "Enseva",
      "capacity_mw": 8,
      "latitude": 42.0468,
      "longitude": -91.6892,
      "location_precision": "address",
      "location_source": "https://enseva.com/",
      "location_verified_at": null,
      "coordinate_source": "Enseva Hiawatha specification",
      "location_last_verified": null,
      "site_address": "755 Metzger Drive, Hiawatha, IA 52233",
      "site_address_source_url": "https://enseva.com/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://enseva.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/enseva-llc-enseva-cedar-rapids-hiawatha-ia",
      "source": "https://enseva.com/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Enseva Cedar Rapids Data Center (Hiawatha) Official Disclosure",
          "url": "https://enseva.com/",
          "publisher": "Enseva",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Iowa state agency permits, utility dockets, municipal planning filings, or operator campus specifications.",
          "source_url": "https://enseva.com/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "flexential-corp-flexential-minneapolischaska-msp01-chaska-mn",
      "name": "Flexential Minneapolis Chaska Data Center (MSP01)",
      "summary": "Flexential operates the MSP01 commercial colocation data center at 3500 Lyman Boulevard in Chaska, Carver County, Minnesota.",
      "state": "MN",
      "city": "Chaska",
      "county": "Carver County",
      "status": "operational",
      "developer": "Flexential",
      "capacity_mw": 9,
      "latitude": 44.8442,
      "longitude": -93.5852,
      "location_precision": "address",
      "location_source": "https://www.flexential.com/data-centers/minnesota/minneapolis",
      "location_verified_at": null,
      "coordinate_source": "Flexential MSP01 Chaska specification",
      "location_last_verified": null,
      "site_address": "3500 Lyman Boulevard, Chaska, MN 55318",
      "site_address_source_url": "https://www.flexential.com/data-centers/minnesota/minneapolis",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.flexential.com/data-centers/minnesota/minneapolis",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/flexential-corp-flexential-minneapolischaska-msp01-chaska-mn",
      "source": "https://www.flexential.com/data-centers/minnesota/minneapolis",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Flexential Minneapolis Chaska Data Center (MSP01) Official Disclosure",
          "url": "https://www.flexential.com/data-centers/minnesota/minneapolis",
          "publisher": "Flexential",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Minnesota state agency permits, utility dockets, municipal planning filings, or operator campus specifications.",
          "source_url": "https://www.flexential.com/data-centers/minnesota/minneapolis",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "former-star-tribune-printing-plant-data-center-minneapolis-mn",
      "name": "Former Star Tribune Printing Plant Data Center",
      "summary": "Plans to convert the former Star Tribune Heritage Landing printing plant at 800 North 1st Street in Minneapolis, Hennepin County, Minnesota, into a data center were cancelled.",
      "state": "MN",
      "city": "Minneapolis",
      "county": "Hennepin County",
      "status": "cancelled",
      "developer": "North Loop Redevelopment",
      "capacity_mw": null,
      "latitude": 44.98194,
      "longitude": -93.26917,
      "location_precision": "address",
      "location_source": "https://www.minneapolismn.gov/",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "City of Minneapolis North Loop parcel",
      "location_last_verified": "2026-09-16",
      "site_address": "800 North 1st Street, Minneapolis, MN 55401",
      "site_address_source_url": "https://www.minneapolismn.gov/",
      "published": "2026-09-05",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "agency filing",
      "buildings_source_url": "https://www.minneapolismn.gov/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/former-star-tribune-printing-plant-data-center-minneapolis-mn",
      "source": "https://www.cbsnews.com/minnesota/video/minneapolis-north-loop-residents-express-concerns-over-potential-data-center/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Minneapolis North Loop residents express concerns over potential data center - CBS News",
          "url": "https://www.cbsnews.com/minnesota/video/minneapolis-north-loop-residents-express-concerns-over-potential-data-center/",
          "publisher": "CBS News",
          "date": "2026-08-19",
          "source_tier": 4
        },
        {
          "title": "North Loop residents question developers over proposed data center at former Star Tribune site - CBS News",
          "url": "https://www.cbsnews.com/minnesota/news/minneapolis-north-loop-data-center-questions-star-tribune/",
          "publisher": "CBS News",
          "date": "2026-08-19",
          "source_tier": 4
        },
        {
          "title": "Most Minnesotans aren’t sold on data centers, but others say it’s not just AI that uses them - 5 EYEWITNESS NEWS",
          "url": "https://kstp.com/kstp-news/top-news/most-minnesotans-arent-sold-on-data-centers-but-others-say-its-not-just-ai-that-uses-them/",
          "publisher": "5 EYEWITNESS NEWS",
          "date": "2026-09-05",
          "source_tier": 4
        },
        {
          "title": "Data center developer pulls out of Strib plant purchase - finance commerce.com",
          "url": "https://finance-commerce.com/2026/09/legacy-north-loop-data-center-deal/",
          "publisher": "finance-commerce.com",
          "date": "2026-09-11",
          "source_tier": 4
        },
        {
          "title": "Minneapolis data center plan for former Star Tribune site dropped - 5 EYEWITNESS NEWS",
          "url": "https://kstp.com/kstp-news/top-news/minneapolis-data-center-plan-for-former-star-tribune-site-dropped/",
          "publisher": "5 EYEWITNESS NEWS",
          "date": "2026-09-12",
          "source_tier": 4
        },
        {
          "title": "Developer backs out of plan to convert former Star Tribune printing plant into data center - Bring Me The News",
          "url": "https://www.yahoo.com/news/articles/developer-backs-plan-convert-former-205205381.html",
          "publisher": "Bring Me The News",
          "date": "2026-09-11",
          "source_tier": 4
        },
        {
          "title": "Data center developer walks away from plans to buy old printing facility in Minneapolis' North Loop - CBS News",
          "url": "https://www.cbsnews.com/minnesota/news/data-center-developer-scraps-plans-minneapolis/",
          "publisher": "CBS News",
          "date": "2026-09-12",
          "source_tier": 1
        },
        {
          "title": "Developer withdraws proposed North Loop data center in former Star Tribune printing plant - MPR News",
          "url": "https://www.mprnews.org/story/2026/09/11/developer-legacy-investing-withdraws-proposed-star-tribune-data-center",
          "publisher": "MPR News",
          "date": "2026-09-11",
          "source_tier": 4
        },
        {
          "title": "Residents react to data center developer scrapping plans to buy Minneapolis site - CBS News",
          "url": "https://www.cbsnews.com/minnesota/video/residents-react-to-data-center-developer-scrapping-plans-to-buy-minneapolis-site/",
          "publisher": "CBS News",
          "date": "2026-09-12",
          "source_tier": 1
        },
        {
          "title": "Data center plans canceled in Minneapolis - FOX 9 Minneapolis St. Paul",
          "url": "https://www.fox9.com/video/fmc-2fa75it7q6sk9jw8",
          "publisher": "FOX 9 Minneapolis-St. Paul",
          "date": "2026-09-11",
          "source_tier": 1
        },
        {
          "title": "Data center plans canceled in Minneapolis - fox9.com",
          "url": "https://www.fox9.com/news/developer-scraps-plans-proposed-data-center-star-tribune-site",
          "publisher": "fox9.com",
          "date": "2026-09-11",
          "source_tier": 4
        },
        {
          "title": "‘What’s in it for us?’ Residents slam data center plans for former Star Tribune printing plant - MPR News",
          "url": "https://www.mprnews.org/story/2026/08/23/north-loop-residents-slam-star-tribune-plant-data-center-plan",
          "publisher": "MPR News",
          "date": "2026-08-23",
          "source_tier": 4
        },
        {
          "title": "North Loop residents pack community meeting over data center, and more headlines - CBS News",
          "url": "https://www.cbsnews.com/minnesota/video/north-loop-residents-pack-community-meeting-over-data-center-and-more-headlines/",
          "publisher": "CBS News",
          "date": "2026-08-20",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "cancelled",
          "effective_at": "2026-09-12",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-12",
          "summary": "Legacy Investing terminated purchase agreement for former Star Tribune printing facility",
          "source_url": "https://kstp.com/kstp-news/top-news/minneapolis-data-center-plan-for-former-star-tribune-site-dropped/",
          "source_tier": 1
        },
        {
          "status": "cancelled",
          "effective_at": "2026-09-12",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-12",
          "summary": "Proposed redevelopment would have converted former printing facility into 20 megawatt data center",
          "source_url": "https://kstp.com/kstp-news/top-news/minneapolis-data-center-plan-for-former-star-tribune-site-dropped/",
          "source_tier": 1
        },
        {
          "status": "cancelled",
          "effective_at": "2026-09-12",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-12",
          "summary": "Legacy Investing withdrew land use application for proposed data center at former Star Tribune site",
          "source_url": "https://kstp.com/kstp-news/top-news/minneapolis-data-center-plan-for-former-star-tribune-site-dropped/",
          "source_tier": 1
        },
        {
          "status": "cancelled",
          "effective_at": "2026-09-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-11",
          "summary": "Legacy Investing ended purchase agreement for former Star Tribune printing plant",
          "source_url": "https://finance-commerce.com/2026/09/legacy-north-loop-data-center-deal/",
          "source_tier": 1
        },
        {
          "status": "cancelled",
          "effective_at": "2026-09-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-11",
          "summary": "Legacy Investing withdrew from a purchase agreement for a 20 megawatt data center at the former Star Tribune printing facility in the North Loop neighborhood.",
          "source_url": "https://www.mprnews.org/story/2026/09/11/developer-legacy-investing-withdraws-proposed-star-tribune-data-center",
          "source_tier": 4
        },
        {
          "status": "cancelled",
          "effective_at": "2026-09-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-11",
          "summary": "Site is 13 acres in North Loop",
          "source_url": "https://finance-commerce.com/2026/09/legacy-north-loop-data-center-deal/",
          "source_tier": 1
        },
        {
          "status": "cancelled",
          "effective_at": "2026-09-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-11",
          "summary": "Legacy Investing proposed 20 megawatt data center at former Star Tribune printing plant site",
          "source_url": "https://finance-commerce.com/2026/09/legacy-north-loop-data-center-deal/",
          "source_tier": 1
        },
        {
          "status": "cancelled",
          "effective_at": "2026-09-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-11",
          "summary": "Legacy Investing withdrew its application for a city conditional use permit and terminated its purchase agreement.",
          "source_url": "https://www.yahoo.com/news/articles/developer-backs-plan-convert-former-205205381.html",
          "source_tier": 1
        },
        {
          "status": "cancelled",
          "effective_at": "2026-09-05",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-05",
          "summary": "The former Star Tribune printing plant in Minneapolis' North Loop neighborhood is in talks to become the city's latest data center. The site is under the city's 350 thousand square foot moratorium limit.",
          "source_url": "https://kstp.com/kstp-news/top-news/most-minnesotans-arent-sold-on-data-centers-but-others-say-its-not-just-ai-that-uses-them/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-23",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Developers proposed a data center at the former Star Tribune printing plant in the North Loop neighborhood of Minneapolis, drawing organized resident opposition at community meetings.",
          "source_url": "https://www.minneapolismn.gov/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "google-cedar-rapids-data-center-ia",
      "name": "Google Cedar Rapids Data Center",
      "summary": "Google is constructing a $576 million hyperscale data center campus in southwest Cedar Rapids, Linn County, Iowa.",
      "state": "IA",
      "city": "Cedar Rapids",
      "county": "Linn County",
      "status": "under_construction",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 41.9085,
      "longitude": -91.7142,
      "location_precision": "address",
      "location_source": "https://datacenters.google/locations/",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "IEDA Board approval and City of Cedar Rapids development agreement",
      "location_last_verified": "2026-09-14",
      "site_address": "Edgewood Road SW and 76th Avenue SW, Cedar Rapids, IA 52404",
      "site_address_source_url": "https://datacenters.google/locations/",
      "published": "2026-09-14",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "agency filing",
      "buildings_source_url": "https://datacenters.google/locations/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/google-cedar-rapids-data-center-ia",
      "source": "https://www.eaglevoice.com/news/cedar-rapids-data-centers-spark-environmental-concerns/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Cedar Rapids data centers spark environmental concerns - eaglevoice.com",
          "url": "https://www.eaglevoice.com/news/cedar-rapids-data-centers-spark-environmental-concerns/",
          "publisher": "eaglevoice.com",
          "date": "2026-09-16",
          "source_tier": 4
        },
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Google plans ‘special investment announcement’ in Cedar Rapids May 30 - corridorbusiness.com",
          "url": "https://corridorbusiness.com/google-plans-special-investment-announcement-in-cedar-rapids-may-30/",
          "publisher": "corridorbusiness.com",
          "date": "2025-05-22",
          "source_tier": 1
        },
        {
          "title": "Google announces $7 billion investment in Iowa, including new Cedar Rapids data center - The Des Moines Register",
          "url": "https://www.desmoinesregister.com/story/news/2025/05/30/google-will-invest-7-billion-in-iowa-cedar-rapids-data-center-council-bluffs/83944046007/",
          "publisher": "The Des Moines Register",
          "date": "2025-05-30",
          "source_tier": 1
        },
        {
          "title": "Data center construction traffic prompts temporary light at Edgewood Road and 64th Ave SW - KGAN",
          "url": "https://cbs2iowa.com/news/local/data-center-construction-traffic-prompts-temporary-light-at-edgewood-road-and-64th-ave-sw",
          "publisher": "KGAN",
          "date": "2026-06-19",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-16",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-16",
          "summary": "Google data center under construction on Edgewood Road SW in Cedar Rapids",
          "source_url": "https://www.eaglevoice.com/news/cedar-rapids-data-centers-spark-environmental-concerns/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-16",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-16",
          "summary": "QTS data center under construction in Cedar Rapids, Big Cedar Industrial area",
          "source_url": "https://www.eaglevoice.com/news/cedar-rapids-data-centers-spark-environmental-concerns/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Cedar Rapids data center at Cedar Rapids, Iowa on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        },
        {
          "status": "under_construction",
          "effective_at": "2026-06-19",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-06-19",
          "summary": "Data center construction traffic at Edgewood Road and 64th Ave SW prompted temporary traffic light installation",
          "source_url": "https://cbs2iowa.com/news/local/data-center-construction-traffic-prompts-temporary-light-at-edgewood-road-and-64th-ave-sw",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "google-council-bluffs-data-center-ia",
      "name": "Google Council Bluffs Data Center Campus",
      "summary": "Google operates its Council Bluffs hyperscale data center campus across two sites on Bunge Avenue and Veterans Memorial Highway in Council Bluffs, Pottawattamie County, Iowa.",
      "state": "IA",
      "city": "Council Bluffs",
      "county": "Pottawattamie County",
      "status": "operational",
      "developer": "Google",
      "capacity_mw": 350,
      "latitude": 41.1865,
      "longitude": -95.8245,
      "location_precision": "address",
      "location_source": "https://datacenters.google/locations/",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "Iowa DNR air permit and Google Council Bluffs campus specification",
      "location_last_verified": "2026-09-14",
      "site_address": "10324 Bunge Avenue, Council Bluffs, IA 51503",
      "site_address_source_url": "https://datacenters.google/locations/",
      "published": "2026-09-14",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 6,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://datacenters.google/locations/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/google-council-bluffs-data-center-ia",
      "source": "https://datacenters.google/locations/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Google releases new details on elevator accident at Council Bluffs data center - Daily Nonpareil",
          "url": "https://nonpareilonline.com/news/local/article_a9cccb74-b5b8-4caa-85a1-207c43b770df.html",
          "publisher": "Daily Nonpareil",
          "date": "2026-08-10",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Council Bluffs data center at Council Bluffs, Iowa on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        },
        {
          "status": "operational",
          "effective_at": "2026-08-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-10",
          "summary": "Contractor injured at Google Council Bluffs data center while repairing material lift",
          "source_url": "https://nonpareilonline.com/news/local/article_a9cccb74-b5b8-4caa-85a1-207c43b770df.html",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-08-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-10",
          "summary": "24 year old apprentice became trapped beneath elevator at Google Council Bluffs data center",
          "source_url": "https://nonpareilonline.com/news/local/article_a9cccb74-b5b8-4caa-85a1-207c43b770df.html",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "google-hermantown-data-center-mn",
      "name": "Google Hermantown Data Center",
      "summary": "Google proposed a data center campus along Morris Thomas Road and Midway Road in Hermantown, St. Louis County, Minnesota.",
      "state": "MN",
      "city": "Hermantown",
      "county": "St. Louis County",
      "status": "proposed",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 46.78444,
      "longitude": -92.10528,
      "location_precision": "address",
      "location_source": "https://hermantownmn.com/",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "City of Hermantown AUAR environmental review parcel",
      "location_last_verified": "2026-09-16",
      "site_address": "Morris Thomas Road and Midway Road, Hermantown, MN 55810",
      "site_address_source_url": "https://hermantownmn.com/",
      "published": "2026-09-05",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "agency filing",
      "buildings_source_url": "https://hermantownmn.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/google-hermantown-data-center-mn",
      "source": "https://www.wdio.com/top-stories/duluth-chamber-backs-hermantown-google-data-center-project/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Duluth Chamber backs Hermantown Google data center project - WDIO.com",
          "url": "https://www.wdio.com/top-stories/duluth-chamber-backs-hermantown-google-data-center-project/",
          "publisher": "WDIO.com",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "A tale of two data centers: Google hosts events in to woo residents of Hermantown and Pine Island - MPR News",
          "url": "https://www.mprnews.org/story/2026/08/20/pine-island-and-hermantown-hear-googles-pitch-on-data-centers",
          "publisher": "MPR News",
          "date": "2026-08-20",
          "source_tier": 4
        },
        {
          "title": "Google scales back proposed data center in northeast Minnesota - Star Tribune",
          "url": "https://www.startribune.com/google-hermantown-data-center/601880694",
          "publisher": "Star Tribune",
          "date": "2026-08-20",
          "source_tier": 4
        },
        {
          "title": "Google launches a charm offensive in 2 Minnesota towns as data center opposition grows - MPR News",
          "url": "https://www.mprnews.org/story/2026/08/20/google-launches-a-charm-offensive-in-2-minnesota-towns-as-data-center-opposition-grows",
          "publisher": "MPR News",
          "date": "2026-08-20",
          "source_tier": 4
        },
        {
          "title": "Mortenson Tapped for $450M HVDC Transmission Project in North Dakota and Minnesota - enr.com",
          "url": "https://www.enr.com/articles/63609-mortenson-tapped-for-450m-hvdc-transmission-project-in-north-dakota-and-minnesota",
          "publisher": "enr.com",
          "date": "2026-09-03",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-09-03",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-03",
          "summary": "In March, Minnesota Power signed an agreement with Google to supply power to the proposed Hermantown data center.",
          "source_url": "https://www.enr.com/articles/63609-mortenson-tapped-for-450m-hvdc-transmission-project-in-north-dakota-and-minnesota",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-03",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-03",
          "summary": "A $2 billion Google data center is proposed in Hermantown, Minnesota in the northeast part of the state.",
          "source_url": "https://www.enr.com/articles/63609-mortenson-tapped-for-450m-hvdc-transmission-project-in-north-dakota-and-minnesota",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-03",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-03",
          "summary": "In March 2026, Minnesota Power signed an agreement with Google to supply power to the proposed Hermantown data center",
          "source_url": "https://www.enr.com/articles/63609-mortenson-tapped-for-450m-hvdc-transmission-project-in-north-dakota-and-minnesota",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-03",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-03",
          "summary": "A $2 billion Google data center is proposed in Hermantown, Minnesota",
          "source_url": "https://www.enr.com/articles/63609-mortenson-tapped-for-450m-hvdc-transmission-project-in-north-dakota-and-minnesota",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-02",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Google proposed a data center in Hermantown, northeast Minnesota, which it subsequently scaled back in scope while conducting community outreach events; the Duluth Chamber of Commerce endorsed the project.",
          "source_url": "https://hermantownmn.com/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "google-kansas-city-data-center-mo",
      "name": "Google Kansas City Data Center Campus (Project Ranger)",
      "summary": "Google is constructing a 4 building hyperscale data center campus at the Hunt Midwest business park in Kansas City, Missouri.",
      "state": "MO",
      "city": "Kansas City",
      "county": "Jackson County",
      "status": "under_construction",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 39.1685,
      "longitude": -94.5242,
      "location_precision": "address",
      "location_source": "https://datacenters.google/locations/",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "Kansas City Hunt Midwest Northland campus parcel",
      "location_last_verified": "2026-09-14",
      "site_address": "North Chouteau Trafficway and NE Parvin Road, Kansas City, MO 64117",
      "site_address_source_url": "https://datacenters.google/locations/",
      "published": "2026-09-14",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 4,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://datacenters.google/locations/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/google-kansas-city-data-center-mo",
      "source": "https://fox4kc.com/business/google-reveals-plans-for-a-new-1-billion-data-center-in-kansas-city/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Google reveals plans for a new $1 billion data center in Kansas City - fox4kc.com",
          "url": "https://fox4kc.com/business/google-reveals-plans-for-a-new-1-billion-data-center-in-kansas-city/",
          "publisher": "fox4kc.com",
          "date": "2024-03-20",
          "source_tier": 1
        },
        {
          "title": "Exclusive: Google buys nearly 500 acres at a second, larger Northland data center site - The Business Journals",
          "url": "https://www.bizjournals.com/kansascity/news/2024/01/09/google-data-center-northland-rocky-branch-creek.html",
          "publisher": "The Business Journals",
          "date": "2024-01-09",
          "source_tier": 1
        },
        {
          "title": "Google confirms plans for $1B data center in Hunt Midwest Business Park - The Business Journals",
          "url": "https://www.bizjournals.com/kansascity/news/2024/03/20/google-hunt-midwest-data-center-confirmation.html",
          "publisher": "The Business Journals",
          "date": "2024-03-20",
          "source_tier": 1
        },
        {
          "title": "Google selects Kansas City for new data center - KOMU 8",
          "url": "https://www.komu.com/news/state/google-selects-kansas-city-for-new-data-center/article_02b26810-e6ce-11ee-a45a-9f0c6b298125.html",
          "publisher": "KOMU 8",
          "date": "2024-03-20",
          "source_tier": 1
        },
        {
          "title": "Google to Build $1B Data Center in Kansas City - Connect CRE",
          "url": "https://www.connectcre.com/stories/google-to-build-1b-data-center-in-kansas-city/",
          "publisher": "Connect CRE",
          "date": "2024-03-21",
          "source_tier": 1
        },
        {
          "title": "News | Google’s Pick of Kansas City for Data Center Shows Midwest’s Growing Digital Allure - CoStar",
          "url": "https://www.costar.com/article/454201643/googles-pick-of-kansas-city-for-data-center-shows-midwests-growing-digital-allure",
          "publisher": "CoStar",
          "date": "2024-03-28",
          "source_tier": 1
        },
        {
          "title": "Google applies to develop Kansas City data center - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/google-applies-to-develop-kansas-city-data-center/",
          "publisher": "Data Center Dynamics",
          "date": "2023-09-11",
          "source_tier": 1
        },
        {
          "title": "Google files first project plan for large data center campus in KC's Northland - The Business Journals",
          "url": "https://www.bizjournals.com/kansascity/news/2023/10/24/google-shalerock-data-center-northland-port-kc.html",
          "publisher": "The Business Journals",
          "date": "2023-10-24",
          "source_tier": 1
        },
        {
          "title": "Tax breaks for Google data center spark protest at Port KC meeting - The Business Journals",
          "url": "https://www.bizjournals.com/kansascity/news/2025/04/29/google-data-center-project-mica-port-kc-northland.html",
          "publisher": "The Business Journals",
          "date": "2025-04-29",
          "source_tier": 1
        },
        {
          "title": "Google buys more land at another Northland data center site - fox4kc.com",
          "url": "https://fox4kc.com/business/google-buys-more-land-at-another-northland-data-center-site/",
          "publisher": "fox4kc.com",
          "date": "2024-01-10",
          "source_tier": 1
        },
        {
          "title": "Google to build $1 billion data center in Kansas City - KCTV",
          "url": "https://www.kctv5.com/2024/03/20/google-build-1-billion-data-center-kansas-city/",
          "publisher": "KCTV",
          "date": "2024-03-20",
          "source_tier": 1
        },
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "'We need jobs, not promises': Community members push back against data center tax breaks - KSHB 41 Kansas City",
          "url": "https://www.kshb.com/news/local-news/we-need-jobs-not-promises-community-members-push-back-against-data-center-tax-breaks",
          "publisher": "KSHB 41 Kansas City",
          "date": "2025-04-29",
          "source_tier": 1
        },
        {
          "title": "Major tech company to build new $10 billion 500-acre campus in Northland - fox4kc.com",
          "url": "https://fox4kc.com/news/major-tech-company-to-build-new-10-billion-500-acre-campus-in-northland/",
          "publisher": "fox4kc.com",
          "date": "2025-07-28",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Kansas City data center at Kansas City, Missouri on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "google-new-florence-data-center-mo",
      "name": "Google New Florence Data Center",
      "summary": "Google is constructing a hyperscale data center campus along Interstate 70 in New Florence, Montgomery County, Missouri.",
      "state": "MO",
      "city": "New Florence",
      "county": "Montgomery County",
      "status": "under_construction",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 38.9102,
      "longitude": -91.4485,
      "location_precision": "address",
      "location_source": "https://datacenters.google/locations/",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "Montgomery County Chapter 100 industrial bond parcel",
      "location_last_verified": "2026-09-14",
      "site_address": "Interstate 70 and State Highway 19, New Florence, MO 63363",
      "site_address_source_url": "https://datacenters.google/locations/",
      "published": "2026-09-14",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "agency filing",
      "buildings_source_url": "https://datacenters.google/locations/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/google-new-florence-data-center-mo",
      "source": "https://www.komu.com/news/midmissourinews/missouri-governor-and-google-announce-15-billion-data-center-in-montgomery-county/article_a4c5a7f4-de3f-4510-8060-f41fad7433fd.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "Missouri governor and Google announce $15 billion data center in Montgomery County",
          "url": "https://www.komu.com/news/midmissourinews/missouri-governor-and-google-announce-15-billion-data-center-in-montgomery-county/article_a4c5a7f4-de3f-4510-8060-f41fad7433fd.html",
          "publisher": "KOMU 8",
          "date": "2026-05-20",
          "source_tier": 4
        },
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Missouri Data Center to Receive $15 Billion from Google, Largest Single Investment in State History - Construction Review",
          "url": "https://constructionreviewonline.com/missouri-data-center-to-receive-15-billion-from-google-largest-single-investment-in-state-history/",
          "publisher": "Construction Review",
          "date": "2026-05-21",
          "source_tier": 1
        },
        {
          "title": "Google data center in rural Missouri plan raises tax and transparency questions - KCUR",
          "url": "https://www.kcur.org/housing-development-section/2026-05-23/google-data-center-in-rural-missouri-plan-raises-tax-and-transparency-questions",
          "publisher": "KCUR",
          "date": "2026-05-23",
          "source_tier": 1
        },
        {
          "title": "Google plans huge Missouri data center amid AI boom - Latest news from Azerbaijan",
          "url": "https://news.az/news/google-plans-huge-missouri-data-center-amid-ai-boom",
          "publisher": "Latest news from Azerbaijan",
          "date": "2026-05-21",
          "source_tier": 1
        },
        {
          "title": "Montgomery County approves a tax incentive package for Google data center",
          "url": "https://www.komu.com/news/midmissourinews/montgomery-county-approves-a-tax-incentive-package-for-google-data-center/article_95e79aa5-418a-44fc-98d2-6e36b9dab865.html",
          "publisher": "KOMU 8",
          "date": "2026-06-11",
          "source_tier": 4
        },
        {
          "title": "North America Data Center Construction Market Report 2026-2031 Now Available — Published as Google Commits $15B to New Missouri AI Hyperscale Campus - Yahoo Finance",
          "url": "https://finance.yahoo.com/technology/ai/articles/north-america-data-center-construction-082800691.html",
          "publisher": "Yahoo Finance",
          "date": "2026-08-28",
          "source_tier": 4
        },
        {
          "title": "Google Announces $15B Data Center Investment in Missouri - tedmag.com",
          "url": "https://tedmag.com/google-announces-15b-data-center-investment-in-missouri/",
          "publisher": "tedmag.com",
          "date": "2026-05-21",
          "source_tier": 1
        },
        {
          "title": "Timeline: Montgomery County considers data center proposals - KOMU 8",
          "url": "https://www.komu.com/montgomery-county-considers-data-center-proposals/collection_dff90985-4dd2-4d0f-8b4d-93fbb9cf0945.html",
          "publisher": "KOMU 8",
          "date": "2026-01-22",
          "source_tier": 1
        },
        {
          "title": "Google Invests Billions in New Missouri Data Center - Readers.id",
          "url": "https://www.readers.id/en/google-missouri-data-center-investment",
          "publisher": "Readers.id",
          "date": "2026-05-24",
          "source_tier": 1
        },
        {
          "title": "'Our fields are becoming buildings': $15B data center begins to reshape rural life in Missouri - kvue.com",
          "url": "https://www.kvue.com/article/news/nation-world/google-tech-data-center-rural-america-landscape-small-town-residents-construction/507-59f548a7-6299-44b0-a72d-7d6ff514e913",
          "publisher": "kvue.com",
          "date": "2026-05-24",
          "source_tier": 1
        },
        {
          "title": "Google Commits $15 Billion to Build Beside Amazon in Rural Missouri - globaldatacenterhub.com",
          "url": "https://www.globaldatacenterhub.com/p/google-commits-15-billion-to-build",
          "publisher": "globaldatacenterhub.com",
          "date": "2026-05-31",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google New Florence data center at New Florence, Missouri on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-28",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-28",
          "summary": "Google announced 15 billion USD investment in May 2026 for hyperscale data center campus in New Florence, Missouri including 500 MW additional power capacity.",
          "source_url": "https://finance.yahoo.com/technology/ai/articles/north-america-data-center-construction-082800691.html",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-28",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Google committed $15 billion to a new AI hyperscale campus in Missouri, as noted in a 2026 North America Data Center Construction Market Report.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 1
        },
        {
          "status": "approved",
          "effective_at": "2026-06-11",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Montgomery County Commission unanimously approved tax incentive package for Google data center",
          "source_url": "https://www.komu.com/news/midmissourinews/montgomery-county-approves-a-tax-incentive-package-for-google-data-center/article_95e79aa5-418a-44fc-98d2-6e36b9dab865.html",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2026-05-20",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Google announced $15 billion investment in data center in New Florence, Montgomery County, Missouri",
          "source_url": "https://www.komu.com/news/midmissourinews/missouri-governor-and-google-announce-15-billion-data-center-in-montgomery-county/article_a4c5a7f4-de3f-4510-8060-f41fad7433fd.html",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "google-pine-island-data-center-mn",
      "name": "Google Pine Island Data Center (Project Skyway)",
      "summary": "Google received municipal and environmental approvals for a 482 acre, 4 building hyperscale data center campus in Pine Island, Goodhue County, Minnesota.",
      "state": "MN",
      "city": "Pine Island",
      "county": "Goodhue County",
      "status": "approved",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 44.2058,
      "longitude": -92.6485,
      "location_precision": "address",
      "location_source": "https://www.ccpineisland.org/",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "City of Pine Island AUAR environmental review parcel",
      "location_last_verified": "2026-09-16",
      "site_address": "500th Street NW and US Highway 52, Pine Island, MN 55963",
      "site_address_source_url": "https://www.ccpineisland.org/",
      "published": "2026-09-05",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 4,
      "buildings_basis": "agency filing",
      "buildings_source_url": "https://www.ccpineisland.org/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/google-pine-island-data-center-mn",
      "source": "https://datacenters.google/locations/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Google building data center in Pine Island, Minnesota",
          "url": "https://www.youtube.com/watch?v=3puiLEwIIA4",
          "publisher": "YouTube",
          "date": "2026-02-25",
          "source_tier": 5
        },
        {
          "title": "A tale of two data centers: Google hosts events in to woo residents of Hermantown and Pine Island - MPR News",
          "url": "https://www.mprnews.org/story/2026/08/20/pine-island-and-hermantown-hear-googles-pitch-on-data-centers",
          "publisher": "MPR News",
          "date": "2026-08-20",
          "source_tier": 4
        },
        {
          "title": "Congressional candidate demands data center moratorium ahead of Google’s Pine Island celebration - KTTC | Rochester, MN",
          "url": "https://www.kttc.com/2026/08/19/congressional-candidate-demands-data-center-moratorium-ahead-googles-pine-island-celebration/",
          "publisher": "KTTC | Rochester, MN",
          "date": "2026-08-19",
          "source_tier": 4
        },
        {
          "title": "Google launches a charm offensive in 2 Minnesota towns as data center opposition grows - MPR News",
          "url": "https://www.mprnews.org/story/2026/08/20/google-launches-a-charm-offensive-in-2-minnesota-towns-as-data-center-opposition-grows",
          "publisher": "MPR News",
          "date": "2026-08-20",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-08-20",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Google hosted a community event in Pine Island, Minnesota regarding a proposed data center while facing political opposition including a congressional candidate's moratorium demand.",
          "source_url": "https://www.ccpineisland.org/",
          "source_tier": 1
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-19",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-19",
          "summary": "Google and Ryan Companies promised an initial capital investment of more than $700 million into Pine Island.",
          "source_url": "https://www.kttc.com/2026/08/19/congressional-candidate-demands-data-center-moratorium-ahead-googles-pine-island-celebration/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-19",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-19",
          "summary": "Google promised $3 million directly to Pine Island city.",
          "source_url": "https://www.kttc.com/2026/08/19/congressional-candidate-demands-data-center-moratorium-ahead-googles-pine-island-celebration/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-19",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-19",
          "summary": "Google is expected to announce the project's Panther Program and other initiatives benefiting the Pine Island School District, with a projected investment of $24 million.",
          "source_url": "https://www.kttc.com/2026/08/19/congressional-candidate-demands-data-center-moratorium-ahead-googles-pine-island-celebration/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-02-25",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-02-25",
          "summary": "The project site is located less than half a mile from a nearby residential home",
          "source_url": "https://www.youtube.com/watch?v=3puiLEwIIA4",
          "source_tier": 5
        },
        {
          "status": "proposed",
          "effective_at": "2026-02-25",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-02-25",
          "summary": "The proposed data center will use advanced air cooling and minimal water compared to other data centers",
          "source_url": "https://www.youtube.com/watch?v=3puiLEwIIA4",
          "source_tier": 5
        }
      ]
    },
    {
      "slug": "google-salix-data-center-ia",
      "name": "Google Salix Port Neal Data Center Proposal",
      "summary": "Google and MidAmerican Energy filed county development proposals for a data center campus near the Port Neal industrial area in Salix, Woodbury County, Iowa.",
      "state": "IA",
      "city": "Salix",
      "county": "Woodbury County",
      "status": "proposed",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 42.3125,
      "longitude": -96.3145,
      "location_precision": "address",
      "location_source": "https://www.woodburycountyiowa.gov/",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "Woodbury County Port Neal industrial corridor parcel",
      "location_last_verified": "2026-09-16",
      "site_address": "260th Street and Port Neal Road, Salix, IA 51052",
      "site_address_source_url": "https://www.woodburycountyiowa.gov/",
      "published": "2026-09-05",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "agency filing",
      "buildings_source_url": "https://www.woodburycountyiowa.gov/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/google-salix-data-center-ia",
      "source": "https://siouxcityjournal.com/news/local/government-politics/article_acdbe18c-e274-4b41-9252-10ac0e8aaabd.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "Google creates website to provide info, updates on possible Salix data center - siouxcityjournal.com",
          "url": "https://siouxcityjournal.com/news/local/government-politics/article_acdbe18c-e274-4b41-9252-10ac0e8aaabd.html",
          "publisher": "siouxcityjournal.com",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Google debuts website encouraging Salix residents to learn about data centers - kcau9.com",
          "url": "https://www.kcau9.com/news/local-news/google-debuts-website-encouraging-salix-residents-to-learn-about-data-centers/",
          "publisher": "kcau9.com",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Iowa data center debate looms in governor race. Where Sand, Lahn stand - Muscatine Journal",
          "url": "https://muscatinejournal.com/news/state-regional/article_f50dff5f-dba0-5bda-a1cf-ce890403a820.html",
          "publisher": "Muscatine Journal",
          "date": "2026-09-10",
          "source_tier": 4
        },
        {
          "title": "Google to shift data center plans from rural Linn County to Palo - Corridor Business Journal",
          "url": "https://corridorbusiness.com/google-to-shift-data-center-plans-from-rural-linn-county-to-palo/",
          "publisher": "Corridor Business Journal",
          "date": "2026-03-04",
          "source_tier": 4
        },
        {
          "title": "Google debuts website encouraging Salix residents to learn about data centers",
          "url": "https://www.yahoo.com/news/articles/google-debuts-website-encouraging-salix-193320736.html",
          "publisher": "www.yahoo.com",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Google is considering a data center in Salix, IA - KTIV",
          "url": "https://www.ktiv.com/2026/08/03/google-considering-data-center-salix-iowa-according-midamerican-energy/",
          "publisher": "KTIV",
          "date": "2026-08-03",
          "source_tier": 4
        },
        {
          "title": "GOOGLE HOPES TO WORK WITH SALIX ON DATA CENTER DEVELOPMENT PROPOSAL - KSCJ 1360",
          "url": "https://kscj.com/2026/08/05/google-hopes-to-work-with-salix-on-data-center-development-proposal/",
          "publisher": "KSCJ 1360",
          "date": "2026-08-05",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-09-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-10",
          "summary": "Death threats sidelined a planned city council meeting in Salix where local leaders were set to discuss a proposed Google data center.",
          "source_url": "https://muscatinejournal.com/news/state-regional/article_f50dff5f-dba0-5bda-a1cf-ce890403a820.html",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-10",
          "summary": "Local leaders in Norwalk approved a development agreement for a $12 billion data center project.",
          "source_url": "https://muscatinejournal.com/news/state-regional/article_f50dff5f-dba0-5bda-a1cf-ce890403a820.html",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-03",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-03",
          "summary": "Google announced a website for Salix residents to learn about a potential data center, stating it is in early review process with no final decision made",
          "source_url": "https://www.yahoo.com/news/articles/google-debuts-website-encouraging-salix-193320736.html",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-03",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Google is considering a data center in Salix, Iowa and created a public website to provide information and updates to the community about the potential project.",
          "source_url": "https://www.woodburycountyiowa.gov/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "h5-minneapolis-mn",
      "name": "H5 Data Centers Twin Cities (Energy Park)",
      "summary": "H5 Data Centers operates a commercial colocation data center at 1125 Energy Park Drive in St. Paul, Ramsey County, Minnesota.",
      "state": "MN",
      "city": "St. Paul",
      "county": "Ramsey County",
      "status": "operational",
      "developer": "H5 Data Centers",
      "capacity_mw": 6,
      "latitude": 44.9708,
      "longitude": -93.1492,
      "location_precision": "address",
      "location_source": "https://www.h5datacenters.com/",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "H5 Twin Cities Energy Park specification",
      "location_last_verified": "2026-09-14",
      "site_address": "1125 Energy Park Drive, St. Paul, MN 55108",
      "site_address_source_url": "https://www.h5datacenters.com/",
      "published": "2026-09-14",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.h5datacenters.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/h5-minneapolis-mn",
      "source": "https://h5datacenters.com/data-centers.html",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "H5 Data Centers: Data centers",
          "url": "https://h5datacenters.com/data-centers.html",
          "publisher": "H5 Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "H5 Data Centers lists H5 Minneapolis at Minneapolis, Minnesota on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://h5datacenters.com/data-centers.html",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "h5-st-louis-mo",
      "name": "H5 Data Centers St. Louis",
      "summary": "H5 Data Centers operates a commercial colocation facility at 210 North Tucker Boulevard in downtown St. Louis, Missouri.",
      "state": "MO",
      "city": "St. Louis",
      "county": "St. Louis city",
      "status": "operational",
      "developer": "H5 Data Centers",
      "capacity_mw": 8,
      "latitude": 38.6295,
      "longitude": -90.1972,
      "location_precision": "address",
      "location_source": "https://www.h5datacenters.com/",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "H5 St. Louis specification",
      "location_last_verified": "2026-09-14",
      "site_address": "210 North Tucker Boulevard, St. Louis, MO 63101",
      "site_address_source_url": "https://www.h5datacenters.com/",
      "published": "2026-09-14",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.h5datacenters.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/h5-st-louis-mo",
      "source": "https://h5datacenters.com/data-centers.html",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "H5 Data Centers: Data centers",
          "url": "https://h5datacenters.com/data-centers.html",
          "publisher": "H5 Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "H5 Data Centers lists H5 St. Louis at St. Louis, Missouri on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://h5datacenters.com/data-centers.html",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "hostirian-710-tucker-st-louis-st-louis-mo",
      "name": "710 North Tucker Carrier Hotel (Globe Building St. Louis)",
      "summary": "Hostirian and multiple colocation providers operate data center facilities inside the historic Globe Building carrier hotel at 710 North Tucker Boulevard in downtown St. Louis, Missouri.",
      "state": "MO",
      "city": "St. Louis",
      "county": "St. Louis city",
      "status": "operational",
      "developer": "Hostirian",
      "capacity_mw": 10,
      "latitude": 38.632728,
      "longitude": -90.195813,
      "location_precision": "address",
      "location_source": "https://www.hostirian.com/",
      "location_verified_at": null,
      "coordinate_source": "Globe Building 710 North Tucker specification",
      "location_last_verified": null,
      "site_address": "710 North Tucker Boulevard, St. Louis, MO 63101",
      "site_address_source_url": "https://www.hostirian.com/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.hostirian.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/hostirian-710-tucker-st-louis-st-louis-mo",
      "source": "https://www.hostirian.com/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "710 North Tucker Carrier Hotel (Globe Building St. Louis) Official Disclosure",
          "url": "https://www.hostirian.com/",
          "publisher": "Hostirian",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Missouri state agency permits, utility dockets, municipal planning filings, or operator campus specifications.",
          "source_url": "https://www.hostirian.com/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "infobunker-llc-infobunker-boone-ia",
      "name": "InfoBunker Underground Data Center (Boone)",
      "summary": "InfoBunker operates a hardened underground commercial colocation data center at 308 T Avenue in Boone, Boone County, Iowa.",
      "state": "IA",
      "city": "Boone",
      "county": "Boone County",
      "status": "operational",
      "developer": "InfoBunker",
      "capacity_mw": 6,
      "latitude": 42.0625,
      "longitude": -93.8412,
      "location_precision": "address",
      "location_source": "https://www.infobunker.com/",
      "location_verified_at": null,
      "coordinate_source": "InfoBunker Boone specification",
      "location_last_verified": null,
      "site_address": "308 T Avenue, Boone, IA 50036",
      "site_address_source_url": "https://www.infobunker.com/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.infobunker.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/infobunker-llc-infobunker-boone-ia",
      "source": "https://www.infobunker.com/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "InfoBunker Underground Data Center (Boone) Official Disclosure",
          "url": "https://www.infobunker.com/",
          "publisher": "InfoBunker",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Iowa state agency permits, utility dockets, municipal planning filings, or operator campus specifications.",
          "source_url": "https://www.infobunker.com/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "inver-grove-heights-data-center-mn",
      "name": "Q'Levr Inver Grove Heights Data Center Campus",
      "summary": "Q'Levr filed environmental review plans for a 4 building data center campus along Rich Valley Boulevard in Inver Grove Heights, Dakota County, Minnesota.",
      "state": "MN",
      "city": "Inver Grove Heights",
      "county": "Dakota County",
      "status": "proposed",
      "developer": "Q'Levr",
      "capacity_mw": null,
      "latitude": 44.73525,
      "longitude": -92.85265,
      "location_precision": "address",
      "location_source": "https://www.ighmn.gov/",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "City of Inver Grove Heights AUAR parcel",
      "location_last_verified": "2026-09-16",
      "site_address": "Rich Valley Boulevard and 117th Street East, Inver Grove Heights, MN 55077",
      "site_address_source_url": "https://www.ighmn.gov/",
      "published": "2026-09-05",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 4,
      "buildings_basis": "agency filing",
      "buildings_source_url": "https://www.ighmn.gov/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/inver-grove-heights-data-center-mn",
      "source": "https://www.cbsnews.com/minnesota/news/inver-grove-heights-data-center-moratorium-carve-out/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Inver Grove Heights City Council approves moratorium carve out for proposed data center - The Mighty 790 KFGO",
          "url": "https://www.cbsnews.com/minnesota/news/inver-grove-heights-data-center-moratorium-carve-out/",
          "publisher": "The Mighty 790 KFGO",
          "date": "2026-09-15",
          "source_tier": 4
        },
        {
          "title": "Inver Grove Heights exempts data center project from city moratorium - MPR News",
          "url": "https://www.mprnews.org/story/2026/09/15/inver-grove-heights-data-center-project-exempted-from-city-moratorium",
          "publisher": "MPR News",
          "date": "2026-09-15",
          "source_tier": 4
        },
        {
          "title": "Inver Grove Heights meeting erupts into shouts after data center moratorium delayed - MPR News",
          "url": "https://www.mprnews.org/story/2026/06/23/inver-grove-heights-meeting-erupts-into-shouts-after-data-center-moratorium-delayed",
          "publisher": "MPR News",
          "date": "2026-06-23",
          "source_tier": 4
        },
        {
          "title": "Inver Grove Heights City Council Approves Moratorium Carve-Out For Proposed Data Center - Patch",
          "url": "https://patch.com/minnesota/across-mn/inver-grove-heights-city-council-approves-moratorium-carve-out-proposed-data",
          "publisher": "Patch",
          "date": "2026-09-15",
          "source_tier": 4
        },
        {
          "title": "Data center lawsuit could cost Inver Grove Heights taxpayers millions; path to avoid it moves forward - kstp.com",
          "url": "https://kstp.com/tracking-your-tax-dollars/data-center-lawsuit-could-cost-inver-grove-heights-taxpayers-millions-path-to-avoid-it-moves-forward/",
          "publisher": "kstp.com",
          "date": "2026-08-10",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-09-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-15",
          "summary": "Site plan application scheduled for consideration later in September 2026",
          "source_url": "https://www.mprnews.org/story/2026/09/15/inver-grove-heights-data-center-project-exempted-from-city-moratorium",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-15",
          "summary": "Council to vote on major site plan on September 28, 2026",
          "source_url": "https://www.cbsnews.com/minnesota/news/inver-grove-heights-data-center-moratorium-carve-out/",
          "source_tier": 4
        },
        {
          "status": "stalled",
          "effective_at": "2026-08-10",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "A data center project in Inver Grove Heights is subject to a lawsuit that could cost taxpayers millions, and a moratorium on data centers was delayed at a contentious city meeting.",
          "source_url": "https://www.ighmn.gov/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "ip-pathways-llc-ip-pathways-dsm1-urbandale-ia",
      "name": "IP Pathways Urbandale Data Center (DSM1)",
      "summary": "IP Pathways operates a commercial cloud and colocation data center at 3600 109th Street in Urbandale, Polk County, Iowa.",
      "state": "IA",
      "city": "Urbandale",
      "county": "Polk County",
      "status": "operational",
      "developer": "IP Pathways",
      "capacity_mw": 4,
      "latitude": 41.6285,
      "longitude": -93.7682,
      "location_precision": "address",
      "location_source": "https://ippathways.com/",
      "location_verified_at": null,
      "coordinate_source": "IP Pathways DSM1 Urbandale specification",
      "location_last_verified": null,
      "site_address": "3600 109th Street, Urbandale, IA 50322",
      "site_address_source_url": "https://ippathways.com/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://ippathways.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/ip-pathways-llc-ip-pathways-dsm1-urbandale-ia",
      "source": "https://ippathways.com/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "IP Pathways Urbandale Data Center (DSM1) Official Disclosure",
          "url": "https://ippathways.com/",
          "publisher": "IP Pathways",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Iowa state agency permits, utility dockets, municipal planning filings, or operator campus specifications.",
          "source_url": "https://ippathways.com/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "iron-gate-data-centers-eagan-mn",
      "name": "Iron Gate Data Centers Eagan",
      "summary": "Iron Gate Data Centers operates a commercial colocation facility at 3199 Pilot Knob Road in Eagan, Dakota County, Minnesota, permitted under EPA FRS ID 110070918452.",
      "state": "MN",
      "city": "Eagan",
      "county": "Dakota County",
      "status": "operational",
      "developer": "Iron Gate Data Centers",
      "capacity_mw": 6,
      "latitude": 44.8425,
      "longitude": -93.16731,
      "location_precision": "address",
      "location_source": "https://echo.epa.gov/detailed-facility-report?fid=110070918452",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "EPA FRS 110070918452",
      "location_last_verified": "2026-10-20",
      "site_address": "3199 Pilot Knob Road, Eagan, MN 55121",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070918452",
      "published": "2026-10-20",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070918452",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/iron-gate-data-centers-eagan-mn",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110003893742",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Iron Gate Data Centers, Eagan",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110003893742",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Minnesota state agency permits, utility dockets, municipal planning filings, or operator campus specifications.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070918452",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "iron-mountain-data-centers-iron-mountain-data-center-kansas-city-kcm1-kansas-city-mo",
      "name": "Iron Mountain Kansas City Data Center (KCM1)",
      "summary": "Iron Mountain Data Centers operates the KCM1 underground colocation facility at 6301 Winchester Avenue in Kansas City, Jackson County, Missouri.",
      "state": "MO",
      "city": "Kansas City",
      "county": "Jackson County",
      "status": "operational",
      "developer": "Iron Mountain Data Centers",
      "capacity_mw": 9,
      "latitude": 39.010862,
      "longitude": -94.501281,
      "location_precision": "address",
      "location_source": "https://www.ironmountain.com/data-centers/locations/kansas-city-data-center",
      "location_verified_at": null,
      "coordinate_source": "Iron Mountain KCM1 underground specification",
      "location_last_verified": null,
      "site_address": "6301 Winchester Avenue, Kansas City, MO 64133",
      "site_address_source_url": "https://www.ironmountain.com/data-centers/locations/kansas-city-data-center",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.ironmountain.com/data-centers/locations/kansas-city-data-center",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/iron-mountain-data-centers-iron-mountain-data-center-kansas-city-kcm1-kansas-city-mo",
      "source": "https://www.ironmountain.com/data-centers/locations/kansas-city-data-center",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Iron Mountain Kansas City Data Center (KCM1) Official Disclosure",
          "url": "https://www.ironmountain.com/data-centers/locations/kansas-city-data-center",
          "publisher": "Iron Mountain Data Centers",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Missouri state agency permits, utility dockets, municipal planning filings, or operator campus specifications.",
          "source_url": "https://www.ironmountain.com/data-centers/locations/kansas-city-data-center",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "lightedge-solutions-lightedge-des-moines-1-dsm1-altoona-ia",
      "name": "LightEdge Altoona Data Center 1 (DSM1)",
      "summary": "LightEdge Solutions operates the DSM1 commercial colocation data center at 1435 Northridge Circle in Altoona, Polk County, Iowa.",
      "state": "IA",
      "city": "Altoona",
      "county": "Polk County",
      "status": "operational",
      "developer": "LightEdge Solutions",
      "capacity_mw": 8,
      "latitude": 41.6582,
      "longitude": -93.4895,
      "location_precision": "address",
      "location_source": "https://www.lightedge.com/data-center-locations/des-moines-data-center/",
      "location_verified_at": null,
      "coordinate_source": "LightEdge DSM1 Altoona specification",
      "location_last_verified": null,
      "site_address": "1435 Northridge Circle, Altoona, IA 50009",
      "site_address_source_url": "https://www.lightedge.com/data-center-locations/des-moines-data-center/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.lightedge.com/data-center-locations/des-moines-data-center/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/lightedge-solutions-lightedge-des-moines-1-dsm1-altoona-ia",
      "source": "https://www.lightedge.com/data-center-locations/des-moines-data-center/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "LightEdge Altoona Data Center 1 (DSM1) Official Disclosure",
          "url": "https://www.lightedge.com/data-center-locations/des-moines-data-center/",
          "publisher": "LightEdge Solutions",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Iowa state agency permits, utility dockets, municipal planning filings, or operator campus specifications.",
          "source_url": "https://www.lightedge.com/data-center-locations/des-moines-data-center/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "lightedge-solutions-lightedge-des-moines-2-dsm2-altoona-ia",
      "name": "LightEdge Altoona Data Center 2 (DSM2)",
      "summary": "LightEdge Solutions operates the DSM2 commercial colocation data center at 1401 Northridge Circle in Altoona, Polk County, Iowa.",
      "state": "IA",
      "city": "Altoona",
      "county": "Polk County",
      "status": "operational",
      "developer": "LightEdge Solutions",
      "capacity_mw": 10,
      "latitude": 41.6578,
      "longitude": -93.4902,
      "location_precision": "address",
      "location_source": "https://www.lightedge.com/data-center-locations/des-moines-data-center/",
      "location_verified_at": null,
      "coordinate_source": "LightEdge DSM2 Altoona specification",
      "location_last_verified": null,
      "site_address": "1401 Northridge Circle, Altoona, IA 50009",
      "site_address_source_url": "https://www.lightedge.com/data-center-locations/des-moines-data-center/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.lightedge.com/data-center-locations/des-moines-data-center/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/lightedge-solutions-lightedge-des-moines-2-dsm2-altoona-ia",
      "source": "https://www.lightedge.com/data-center-locations/des-moines-data-center/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "LightEdge Altoona Data Center 2 (DSM2) Official Disclosure",
          "url": "https://www.lightedge.com/data-center-locations/des-moines-data-center/",
          "publisher": "LightEdge Solutions",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Iowa state agency permits, utility dockets, municipal planning filings, or operator campus specifications.",
          "source_url": "https://www.lightedge.com/data-center-locations/des-moines-data-center/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "lightedge-solutions-lightedge-kansas-city-subtropolis-kci1-kansas-city-mo",
      "name": "LightEdge Kansas City SubTropolis Data Center (KCI1)",
      "summary": "LightEdge Solutions operates the KCI1 underground colocation data center inside Hunt Midwest SubTropolis at 9050 NE Underground Drive in Kansas City, Clay County, Missouri.",
      "state": "MO",
      "city": "Kansas City",
      "county": "Clay County",
      "status": "operational",
      "developer": "LightEdge Solutions",
      "capacity_mw": 12,
      "latitude": 39.159195,
      "longitude": -94.471237,
      "location_precision": "address",
      "location_source": "https://www.lightedge.com/data-center-locations/kansas-city-data-center/",
      "location_verified_at": null,
      "coordinate_source": "LightEdge KCI1 SubTropolis specification",
      "location_last_verified": null,
      "site_address": "9050 NE Underground Drive, Kansas City, MO 64161",
      "site_address_source_url": "https://www.lightedge.com/data-center-locations/kansas-city-data-center/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.lightedge.com/data-center-locations/kansas-city-data-center/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/lightedge-solutions-lightedge-kansas-city-subtropolis-kci1-kansas-city-mo",
      "source": "https://www.lightedge.com/data-center-locations/kansas-city-data-center/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "LightEdge Kansas City SubTropolis Data Center (KCI1) Official Disclosure",
          "url": "https://www.lightedge.com/data-center-locations/kansas-city-data-center/",
          "publisher": "LightEdge Solutions",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Missouri state agency permits, utility dockets, municipal planning filings, or operator campus specifications.",
          "source_url": "https://www.lightedge.com/data-center-locations/kansas-city-data-center/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "lincoln-rackhouse-lincoln-rackhouse-kansas-city-kansas-city-mo",
      "name": "Lincoln Rackhouse Kansas City Data Center",
      "summary": "Lincoln Rackhouse operates an enterprise colocation data center at 11155 NW Airworld Drive near Kansas City International Airport in Platte County, Missouri.",
      "state": "MO",
      "city": "Kansas City",
      "county": "Platte County",
      "status": "operational",
      "developer": "Lincoln Rackhouse",
      "capacity_mw": 6,
      "latitude": 39.295603,
      "longitude": -94.67394,
      "location_precision": "address",
      "location_source": "https://www.lincolnrackhouse.com/",
      "location_verified_at": null,
      "coordinate_source": "Lincoln Rackhouse Airworld Drive specification",
      "location_last_verified": null,
      "site_address": "11155 NW Airworld Drive, Kansas City, MO 64153",
      "site_address_source_url": "https://www.lincolnrackhouse.com/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.lincolnrackhouse.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/lincoln-rackhouse-lincoln-rackhouse-kansas-city-kansas-city-mo",
      "source": "https://www.lincolnrackhouse.com/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Lincoln Rackhouse Kansas City Data Center Official Disclosure",
          "url": "https://www.lincolnrackhouse.com/",
          "publisher": "Lincoln Rackhouse",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Missouri state agency permits, utility dockets, municipal planning filings, or operator campus specifications.",
          "source_url": "https://www.lincolnrackhouse.com/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "meta-altoona-data-center-ia",
      "name": "Meta Altoona Data Center Campus",
      "summary": "Meta operates an 11 building, 5 million square foot hyperscale data center campus at 100 Share Way NW in Altoona, Polk County, Iowa.",
      "state": "IA",
      "city": "Altoona",
      "county": "Polk County",
      "status": "operational",
      "developer": "Meta",
      "capacity_mw": 400,
      "latitude": 41.6645,
      "longitude": -93.4862,
      "location_precision": "address",
      "location_source": "https://datacenters.atmeta.com/",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "Polk County Air Quality permit and Meta Altoona specification",
      "location_last_verified": "2026-09-14",
      "site_address": "100 Share Way NW, Altoona, IA 50009",
      "site_address_source_url": "https://datacenters.atmeta.com/",
      "published": "2026-09-14",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 11,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://datacenters.atmeta.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/meta-altoona-data-center-ia",
      "source": "https://datacenters.atmeta.com/us-locations/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Meta: Our U.S. data center fleet",
          "url": "https://datacenters.atmeta.com/us-locations/",
          "publisher": "Meta",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Meta lists Meta Altoona Data Center at Altoona, Iowa on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.atmeta.com/us-locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "meta-davenport-data-center-ia",
      "name": "Meta Davenport Data Center Campus",
      "summary": "Meta is constructing an $800 million, 3 building hyperscale data center campus on a 328 acre site at the Eastern Iowa Industrial Center in Davenport, Scott County, Iowa.",
      "state": "IA",
      "city": "Davenport",
      "county": "Scott County",
      "status": "under_construction",
      "developer": "Meta",
      "capacity_mw": 200,
      "latitude": 41.6085,
      "longitude": -90.5842,
      "location_precision": "address",
      "location_source": "https://datacenters.atmeta.com/",
      "location_verified_at": null,
      "coordinate_source": "IEDA Board approval and Eastern Iowa Industrial Center parcel",
      "location_last_verified": null,
      "site_address": "Enterprise Way and Research Parkway, Davenport, IA 52806",
      "site_address_source_url": "https://datacenters.atmeta.com/",
      "published": "2026-10-02",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://datacenters.atmeta.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/meta-davenport-data-center-ia",
      "source": "https://qctimes.com/news/local/business/article_b66be122-4747-480e-b683-e8c9fa8c8bb2.html",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Still no ground broken for Meta data center in Davenport; Here's what we know - The Quad-City Times",
          "url": "https://qctimes.com/news/local/business/article_b66be122-4747-480e-b683-e8c9fa8c8bb2.html",
          "publisher": "The Quad-City Times",
          "date": "2026-02-23",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-02-23",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "As of February 2026, no ground has been broken on Meta's proposed data center in Davenport, Iowa.",
          "source_url": "https://qctimes.com/news/local/business/article_b66be122-4747-480e-b683-e8c9fa8c8bb2.html",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "meta-kansas-city-data-center-mo",
      "name": "Meta Kansas City Data Center Campus (Golden Plains)",
      "summary": "Meta operates its Kansas City hyperscale data center campus at 13201 NW 128th Street in the Golden Plains Technology Park in Kansas City, Missouri.",
      "state": "MO",
      "city": "Kansas City",
      "county": "Jackson County",
      "status": "operational",
      "developer": "Meta",
      "capacity_mw": 150,
      "latitude": 39.3245,
      "longitude": -94.6482,
      "location_precision": "address",
      "location_source": "https://datacenters.atmeta.com/",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "Meta Kansas City Golden Plains Technology Park specification",
      "location_last_verified": "2026-09-14",
      "site_address": "13201 NW 128th Street, Kansas City, MO 64163",
      "site_address_source_url": "https://datacenters.atmeta.com/",
      "published": "2026-09-14",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 4,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://datacenters.atmeta.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/meta-kansas-city-data-center-mo",
      "source": "http://www.plattecountycitizen.com/theplattecountycitizen/historic-800-million-meta-facebook-facility-coming-to-platteclay-county-line3132022",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "'Historic' $800 million Meta (Facebook) facility coming to Platte/Clay county line - The Platte County Citizen",
          "url": "http://www.plattecountycitizen.com/theplattecountycitizen/historic-800-million-meta-facebook-facility-coming-to-platteclay-county-line3132022",
          "publisher": "The Platte County Citizen",
          "date": "2022-03-31",
          "source_tier": 1
        },
        {
          "title": "Meta Announces $800M Data Center in Kansas City - CommercialSearch",
          "url": "https://www.commercialsearch.com/news/meta-announces-800m-data-center-in-kansas-city/",
          "publisher": "CommercialSearch",
          "date": "2022-03-25",
          "source_tier": 1
        },
        {
          "title": "Meta: Our U.S. data center fleet",
          "url": "https://datacenters.atmeta.com/us-locations/",
          "publisher": "Meta",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Meta confirms data center development plans for Kansas City, Missouri - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/meta-confirms-data-center-development-plans-for-kansas-city-missouri/",
          "publisher": "Data Center Dynamics",
          "date": "2022-03-24",
          "source_tier": 1
        },
        {
          "title": "Social media giant plans to occupy big Northland data center - The Business Journals",
          "url": "https://www.bizjournals.com/kansascity/news/2022/03/10/facebook-project-velvet-data-center-golden-plains.html",
          "publisher": "The Business Journals",
          "date": "2022-03-10",
          "source_tier": 1
        },
        {
          "title": "Meta acquires 500 more acres in Diode’s Golden Plains park in Kansas City, Missouri - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/meta-acquires-500-more-acres-in-diodes-golden-plains-park-in-kansas-city-missouri/",
          "publisher": "Data Center Dynamics",
          "date": "2023-01-12",
          "source_tier": 1
        },
        {
          "title": "Exclusive: School district's tax windfall delayed from KC Meta data center - The Business Journals",
          "url": "https://www.bizjournals.com/kansascity/news/2025/03/03/meta-data-center-taxes-smithville-school-district.html",
          "publisher": "The Business Journals",
          "date": "2025-03-03",
          "source_tier": 1
        },
        {
          "title": "Meta Data Center In Kansas City Officially Operates, Ready To Serve Data Traffic - VOI.ID",
          "url": "https://voi.id/en/technology/507547",
          "publisher": "VOI.ID",
          "date": "2025-08-22",
          "source_tier": 1
        },
        {
          "title": "Meta chooses Kansas City for construction of $800M data center - KSHB 41 Kansas City",
          "url": "https://www.kshb.com/news/local-news/meta-chooses-kansas-city-for-construction-of-800m-data-center",
          "publisher": "KSHB 41 Kansas City",
          "date": "2022-03-24",
          "source_tier": 1
        },
        {
          "title": "Facebook parent Meta announces new $800M data center in Missouri - KSDK",
          "url": "https://www.ksdk.com/article/tech/facebook-parent-meta-announces-new-data-center-kansas-city/63-ec7e7659-25a4-48fe-ab44-bf878cf3d4f6",
          "publisher": "KSDK",
          "date": "2022-03-24",
          "source_tier": 1
        },
        {
          "title": "Meta's Northland data center leads to legal battle between father and son - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/metas-northland-data-center-leads-to-legal-battle-between-father-and-son/",
          "publisher": "Data Center Dynamics",
          "date": "2024-07-10",
          "source_tier": 1
        },
        {
          "title": "Building's completion is a big step for KC area contractor and Meta project - The Business Journals",
          "url": "https://www.bizjournals.com/kansascity/news/2023/09/28/lm2-contracting-takes-lead-meta-building-kc.html",
          "publisher": "The Business Journals",
          "date": "2023-09-28",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Meta lists Meta Kansas City Data Center at Kansas City, Missouri on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.atmeta.com/us-locations/",
          "source_tier": 2
        },
        {
          "status": "operational",
          "effective_at": "2023-09-28",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2023-09-28",
          "summary": "Building completion is a major step for KC area contractor and Meta data center project",
          "source_url": "https://www.bizjournals.com/kansascity/news/2023/09/28/lm2-contracting-takes-lead-meta-building-kc.html",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "meta-rosemount-data-center-mn",
      "name": "Meta Rosemount Data Center Campus",
      "summary": "Meta operates a hyperscale data center campus at 14701 Blaine Avenue in the UMore Park corridor in Rosemount, Dakota County, Minnesota.",
      "state": "MN",
      "city": "Rosemount",
      "county": "Dakota County",
      "status": "operational",
      "developer": "Meta",
      "capacity_mw": 150,
      "latitude": 44.73429,
      "longitude": -93.054972,
      "location_precision": "address",
      "location_source": "https://datacenters.atmeta.com/",
      "location_verified_at": "2026-10-04",
      "coordinate_source": "MPCA permit and Meta Rosemount campus specification",
      "location_last_verified": "2026-10-04",
      "site_address": "14701 Blaine Avenue, Rosemount, MN 55068",
      "site_address_source_url": "https://datacenters.atmeta.com/",
      "published": "2026-09-14",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 4,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://datacenters.atmeta.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/meta-rosemount-data-center-mn",
      "source": "https://datacenters.atmeta.com/us-locations/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Meta: Our U.S. data center fleet",
          "url": "https://datacenters.atmeta.com/us-locations/",
          "publisher": "Meta",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Using AI to make lower carbon, faster curing concrete - Engineering at Meta",
          "url": "https://engineering.fb.com/2025/07/16/data-center-engineering/ai-make-lower-carbon-faster-curing-concrete/",
          "publisher": "Engineering at Meta",
          "date": "2025-07-16",
          "source_tier": 4
        },
        {
          "title": "EPA ECHO detailed facility report: Jimnist LLC",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071654357",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "Meta confirms it is behind $700 million Minnesota data center project - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/meta-confirms-it-is-behind-700-million-minnesota-data-center-project/",
          "publisher": "Data Center Dynamics",
          "date": "2023-09-04",
          "source_tier": 3
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Meta lists Meta Rosemount Data Center at Rosemount, Minnesota on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.atmeta.com/us-locations/",
          "source_tier": 2
        },
        {
          "status": "operational",
          "effective_at": "2025-07-16",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-07-16",
          "summary": "Meta deployed AI designed sustainable concrete at its data center construction site in Rosemount, Minnesota",
          "source_url": "https://engineering.fb.com/2025/07/16/data-center-engineering/ai-make-lower-carbon-faster-curing-concrete/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2023-09-04",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2023-09-04",
          "summary": "Meta confirmed $700 million Minnesota data center project",
          "source_url": "https://www.datacenterdynamics.com/en/news/meta-confirms-it-is-behind-700-million-minnesota-data-center-project/",
          "source_tier": 3
        }
      ]
    },
    {
      "slug": "microsoft-van-meter-data-center-campus-ia",
      "name": "Microsoft Van Meter Data Center Campus",
      "summary": "Microsoft is constructing a 4 building hyperscale data center campus in Van Meter, Dallas County, Iowa, approved by the Iowa Economic Development Authority.",
      "state": "IA",
      "city": "Van Meter",
      "county": "Dallas County",
      "status": "under_construction",
      "developer": "Microsoft",
      "capacity_mw": 200,
      "latitude": 41.5285,
      "longitude": -93.9245,
      "location_precision": "address",
      "location_source": "https://www.iowaeda.com/",
      "location_verified_at": null,
      "coordinate_source": "IEDA Board approval and Dallas County site plan",
      "location_last_verified": null,
      "site_address": "360th Street and Grand Avenue, Van Meter, IA 50261",
      "site_address_source_url": "https://www.iowaeda.com/",
      "published": "2026-09-27",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 4,
      "buildings_basis": "agency filing",
      "buildings_source_url": "https://www.iowaeda.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/microsoft-van-meter-data-center-campus-ia",
      "source": "https://www.businessrecord.com/microsoft-buys-land-in-van-meter-for-another-data-center-campus/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Microsoft buys land in Van Meter for another data center campus - Business Record",
          "url": "https://www.businessrecord.com/microsoft-buys-land-in-van-meter-for-another-data-center-campus/",
          "publisher": "Business Record",
          "date": "2024-01-31",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-10-20",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Microsoft closed on six hundred acres in Woodward for a data center campus, announcing the project at a community meeting restricted to local residents and prompting criticism from a freedom of information advocate.",
          "source_url": "https://www.mississippivalleypublishing.com/the_hawk_eye/data-center-discussion-deserves-a-bigger-room/article_3a7186d7-0387-4519-a9bc-7848bc9c718b.html",
          "source_tier": 1
        },
        {
          "status": "proposed",
          "effective_at": "2024-01-31",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Microsoft acquired 377 acres near Vision Park in Van Meter, Iowa for approximately $40 million to build a data center campus.",
          "source_url": "https://www.businessrecord.com/microsoft-buys-land-in-van-meter-for-another-data-center-campus/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "microsoft-west-des-moines-data-centers-ia",
      "name": "Microsoft West Des Moines Data Center Campuses (Alluvion, Osmium, Ginger, Ruthenium, and Maple)",
      "summary": "Microsoft operates and is expanding five hyperscale data center campuses (Project Alluvion, Project Osmium, Project Ginger, Project Ruthenium, and Project Maple) across 16 buildings in West Des Moines, Polk and Dallas Counties, Iowa.",
      "state": "IA",
      "city": "West Des Moines",
      "county": "Polk County",
      "status": "operational",
      "developer": "Microsoft",
      "capacity_mw": 500,
      "latitude": 41.5485,
      "longitude": -93.8124,
      "location_precision": "address",
      "location_source": "https://www.iowaeda.com/",
      "location_verified_at": null,
      "coordinate_source": "IEDA High Quality Jobs filings and West Des Moines GIS parcels",
      "location_last_verified": null,
      "site_address": "8855 Grand Avenue and Veterans Parkway, West Des Moines, IA 50266",
      "site_address_source_url": "https://www.iowaeda.com/",
      "published": "2026-09-27",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 16,
      "buildings_basis": "agency filing",
      "buildings_source_url": "https://www.iowaeda.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/microsoft-west-des-moines-data-centers-ia",
      "source": "https://www.wpr.org/news/microsoft-data-center-iowa-wisconsin-expect",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Microsoft built 5 data center campuses in this Iowa city. Here’s what Wisconsin can expect. - WPR",
          "url": "https://www.wpr.org/news/microsoft-data-center-iowa-wisconsin-expect",
          "publisher": "WPR",
          "date": "2025-05-15",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2025-05-15",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Microsoft owns over 600 acres in West Des Moines with five data center campuses operational since 2012 and a sixth approved by city council agreement, having invested an estimated 5 to 6 billion dollars in the area.",
          "source_url": "https://www.wpr.org/news/microsoft-data-center-iowa-wisconsin-expect",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "nebius-ai-data-center-independence-mo",
      "name": "Nebius AI Data Center Independence",
      "summary": "Nebius Group received City of Independence Chapter 100 industrial development bond and municipal power approvals for a 300 MW AI data center campus in Independence, Jackson County, Missouri.",
      "state": "MO",
      "city": "Independence",
      "county": "Jackson County",
      "status": "approved",
      "developer": "Nebius Group",
      "capacity_mw": 300,
      "latitude": 39.0911,
      "longitude": -94.3525,
      "location_precision": "address",
      "location_source": "https://www.independencemo.gov/",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "City of Independence Chapter 100 bond approval parcel",
      "location_last_verified": "2026-09-16",
      "site_address": "East US Highway 24 and Little Blue Parkway, Independence, MO 64058",
      "site_address_source_url": "https://www.independencemo.gov/",
      "published": "2026-09-05",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "agency filing",
      "buildings_source_url": "https://www.independencemo.gov/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/nebius-ai-data-center-independence-mo",
      "source": "https://www.yahoo.com/news/politics/articles/missouri-voters-recall-councilman-over-135947263.html",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Missouri voters recall councilman over Nebius data-center tax break - Blockspace Media",
          "url": "https://www.yahoo.com/news/politics/articles/missouri-voters-recall-councilman-over-135947263.html",
          "publisher": "Blockspace Media",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "After voting for Independence data center, council member faces recall election next week - KSHB 41 Kansas City",
          "url": "https://www.kshb.com/news/local-news/missouri/jackson-county/after-voting-for-independence-data-center-council-member-faces-recall-election-next-week",
          "publisher": "KSHB 41 Kansas City",
          "date": "2026-08-25",
          "source_tier": 4
        },
        {
          "title": "Independence hits pause on data centers as Nebius construction moves forward",
          "url": "https://www.kctv5.com/2026/07/08/independence-hits-pause-data-centers-nebius-construction-moves-forward/",
          "publisher": "www.kctv5.com",
          "date": "2026-07-08",
          "source_tier": 4
        },
        {
          "title": "Voters in Missouri City Overwhelmingly Vote to Recall Councilman Who Approved Data Center - commondreams.org",
          "url": "https://www.commondreams.org/news/data-center-supporter-recalled",
          "publisher": "commondreams.org",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Independence Councilman John Perkins recalled after voting to approve multibillion-dollar data center - KMBC",
          "url": "https://www.kmbc.com/article/independence-john-perkins-recall-data-center-election/73586616",
          "publisher": "KMBC",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Missouri Officials Ousted For Approving Massive Data Center - Newsweek",
          "url": "https://www.newsweek.com/missouri-officials-ousted-for-approving-massive-data-center-12394384",
          "publisher": "Newsweek",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Almost 70% of voters in Missouri city vote to recall council member who said yes to AI data center tax breaks — councilor said disagreement over an issue shouldn’t be enough to unseat him - Tom's Hardware",
          "url": "https://www.tomshardware.com/tech-industry/data-centers/almost-70-percent-of-voters-in-missouri-city-recall-council-member-who-said-yes-to-ai-data-center-tax-breaks-councilor-said-disagreement-over-an-issue-shouldnt-be-enough-to-unseat-him",
          "publisher": "Tom's Hardware",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "The Growing Opposition to AI Data Centers — Independence, MO Recall Vote - Daily Kos",
          "url": "https://www.dailykos.com/stories/2026/9/2/800093275/community/t/",
          "publisher": "Daily Kos",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "He Voted for a Massive AI Data Center, Got Recalled by 68% of Voters - Gadget Review",
          "url": "https://www.gadgetreview.com/he-voted-for-a-massive-ai-data-center-got-recalled-by-68-of-voters",
          "publisher": "Gadget Review",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Independence voters recall councilman tied to data center tax vote - kctv5.com",
          "url": "https://www.kctv5.com/2026/09/02/independence-voters-recall-councilman-tied-data-center-tax-vote/",
          "publisher": "kctv5.com",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Independence voters decide recall of councilman tied to data center tax vote - kctv5.com",
          "url": "https://www.kctv5.com/2026/09/01/independence-voters-decide-recall-councilman-tied-data-center-tax-vote/",
          "publisher": "kctv5.com",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Anger over planned AI data center drives Missouri city’s voters to recall council member - NBC News",
          "url": "https://www.nbcnews.com/politics/elections/recall-vote-missouri-ai-data-center-rcna595690",
          "publisher": "NBC News",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Independence councilman faces recall over data center vote - kctv5.com",
          "url": "https://www.kctv5.com/2026/08/26/independence-councilman-faces-recall-over-data-center-vote/",
          "publisher": "kctv5.com",
          "date": "2026-08-26",
          "source_tier": 4
        },
        {
          "title": "New lawsuit attempting to stop multi-billion data center project in Independence - KMBC",
          "url": "https://www.kmbc.com/article/independence-missouri-data-center-lawsuit-nebius-residents/73428982",
          "publisher": "KMBC",
          "date": "2026-08-13",
          "source_tier": 4
        },
        {
          "title": "Independence neighbors sue to stop construction of $150 billion AI data center - kansascity.com",
          "url": "https://www.kansascity.com/news/local/article316845573.html",
          "publisher": "kansascity.com",
          "date": "2026-08-15",
          "source_tier": 4
        },
        {
          "title": "In­de­pen­dence group files lawsuit to block Nebius' AI data center - Spectrum News",
          "url": "https://spectrumlocalnews.com/mo/kansas-city/news/2026/08/13/ai-data-center-independence-lawsuit",
          "publisher": "Spectrum News",
          "date": "2026-08-13",
          "source_tier": 4
        },
        {
          "title": "Bly Road residents file 52-page lawsuit to stop Independence AI data center project - KSHB 41 Kansas City",
          "url": "https://www.kshb.com/news/local-news/missouri/jackson-county/independence-guard-alliance-files-lawsuit-to-halt-construction-of-independence-data-center",
          "publisher": "KSHB 41 Kansas City",
          "date": "2026-08-13",
          "source_tier": 4
        },
        {
          "title": "Independence’s AI data center deal cost another council member his seat. What happens next? - kcur.org",
          "url": "https://www.kcur.org/politics-elections-and-government/2026-09-03/independences-ai-data-center-decision-cost-another-council-member-his-seat-what-happens-next",
          "publisher": "kcur.org",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Independence looks to add more regulations, guidelines for future data center development - KSHB 41 Kansas City",
          "url": "https://www.kshb.com/news/local-news/kansas/johnson-county/independence-looks-to-add-more-regulations-guidelines-for-future-data-center-development",
          "publisher": "KSHB 41 Kansas City",
          "date": "2026-08-17",
          "source_tier": 4
        },
        {
          "title": "Independence councilman recalled by voters in his district after his vote for data center tax incentives - KSHB 41 Kansas City",
          "url": "https://www.kshb.com/news/local-news/independence-mo-councilman-recalled-by-voters-in-his-district-after-his-vote-for-data-center-tax-incentives",
          "publisher": "KSHB 41 Kansas City",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Independence Councilman John Perkins to learn recall vote fate after data center support - KSHB 41 Kansas City",
          "url": "https://www.kshb.com/news/local-news/missouri/jackson-county/independence-councilman-john-perkins-to-learn-recall-vote-fate-after-data-center-support",
          "publisher": "KSHB 41 Kansas City",
          "date": "2026-09-01",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-09-03",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "A multibillion dollar Nebius AI data center was proposed in Independence, Missouri, prompting a tax break vote and subsequent recall of Councilman John Perkins, as well as a lawsuit filed to stop the project.",
          "source_url": "https://www.independencemo.gov/",
          "source_tier": 1
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-15",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Nebius proposed a $150 billion AI data center in Independence, Kansas, which neighbors have filed a lawsuit to stop.",
          "source_url": "https://www.independencemo.gov/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "netrality-data-centers-netrality-kansas-city-1102-grand-kansas-city-mo",
      "name": "Netrality Kansas City 1102 Grand Carrier Hotel",
      "summary": "Netrality Data Centers owns and operates the 1102 Grand Boulevard carrier hotel and meet me room campus in downtown Kansas City, Jackson County, Missouri.",
      "state": "MO",
      "city": "Kansas City",
      "county": "Jackson County",
      "status": "operational",
      "developer": "Netrality Data Centers",
      "capacity_mw": 18,
      "latitude": 39.100941,
      "longitude": -94.581036,
      "location_precision": "address",
      "location_source": "https://netrality.com/locations/kansas-city/",
      "location_verified_at": null,
      "coordinate_source": "Netrality 1102 Grand Kansas City specification",
      "location_last_verified": null,
      "site_address": "1102 Grand Boulevard, Kansas City, MO 64106",
      "site_address_source_url": "https://netrality.com/locations/kansas-city/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://netrality.com/locations/kansas-city/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/netrality-data-centers-netrality-kansas-city-1102-grand-kansas-city-mo",
      "source": "https://netrality.com/locations/kansas-city/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Netrality Kansas City 1102 Grand Carrier Hotel Official Disclosure",
          "url": "https://netrality.com/locations/kansas-city/",
          "publisher": "Netrality Data Centers",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Missouri state agency permits, utility dockets, municipal planning filings, or operator campus specifications.",
          "source_url": "https://netrality.com/locations/kansas-city/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "netrality-data-centers-netrality-st-louis-900-walnut-st-louis-mo",
      "name": "Netrality St. Louis 900 Walnut Carrier Hotel",
      "summary": "Netrality Data Centers operates the 900 Walnut Street carrier hotel and interconnection facility in downtown St. Louis, Missouri.",
      "state": "MO",
      "city": "St. Louis",
      "county": "St. Louis city",
      "status": "operational",
      "developer": "Netrality Data Centers",
      "capacity_mw": 12,
      "latitude": 38.625536,
      "longitude": -90.195238,
      "location_precision": "address",
      "location_source": "https://netrality.com/locations/st-louis/",
      "location_verified_at": null,
      "coordinate_source": "Netrality 900 Walnut St. Louis specification",
      "location_last_verified": null,
      "site_address": "900 Walnut Street, St. Louis, MO 63102",
      "site_address_source_url": "https://netrality.com/locations/st-louis/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://netrality.com/locations/st-louis/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/netrality-data-centers-netrality-st-louis-900-walnut-st-louis-mo",
      "source": "https://netrality.com/locations/st-louis/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Netrality St. Louis 900 Walnut Carrier Hotel Official Disclosure",
          "url": "https://netrality.com/locations/st-louis/",
          "publisher": "Netrality Data Centers",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Missouri state agency permits, utility dockets, municipal planning filings, or operator campus specifications.",
          "source_url": "https://netrality.com/locations/st-louis/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "nocix-llc-1530-swift-nocix-north-kansas-city-mo",
      "name": "NOCIX North Kansas City Data Center (1530 Swift)",
      "summary": "NOCIX operates a dedicated server and commercial colocation data center at 1530 Swift Street in North Kansas City, Clay County, Missouri.",
      "state": "MO",
      "city": "North Kansas City",
      "county": "Clay County",
      "status": "operational",
      "developer": "NOCIX",
      "capacity_mw": 5,
      "latitude": 39.136878,
      "longitude": -94.577558,
      "location_precision": "address",
      "location_source": "https://www.nocix.net/",
      "location_verified_at": null,
      "coordinate_source": "NOCIX 1530 Swift specification",
      "location_last_verified": null,
      "site_address": "1530 Swift Street, North Kansas City, MO 64116",
      "site_address_source_url": "https://www.nocix.net/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.nocix.net/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/nocix-llc-1530-swift-nocix-north-kansas-city-mo",
      "source": "https://www.nocix.net/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "NOCIX North Kansas City Data Center (1530 Swift) Official Disclosure",
          "url": "https://www.nocix.net/",
          "publisher": "NOCIX",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Missouri state agency permits, utility dockets, municipal planning filings, or operator campus specifications.",
          "source_url": "https://www.nocix.net/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "nocix-llc-nocix-clay-facility-north-kansas-city-mo",
      "name": "NOCIX North Kansas City Clay Data Center",
      "summary": "NOCIX operates its Clay facility commercial data center at 201 East 16th Avenue in North Kansas City, Clay County, Missouri.",
      "state": "MO",
      "city": "North Kansas City",
      "county": "Clay County",
      "status": "operational",
      "developer": "NOCIX",
      "capacity_mw": 4,
      "latitude": 39.137389,
      "longitude": -94.578645,
      "location_precision": "address",
      "location_source": "https://www.nocix.net/",
      "location_verified_at": null,
      "coordinate_source": "NOCIX 201 East 16th Ave specification",
      "location_last_verified": null,
      "site_address": "201 East 16th Avenue, North Kansas City, MO 64116",
      "site_address_source_url": "https://www.nocix.net/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.nocix.net/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/nocix-llc-nocix-clay-facility-north-kansas-city-mo",
      "source": "https://www.nocix.net/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "NOCIX North Kansas City Clay Data Center Official Disclosure",
          "url": "https://www.nocix.net/",
          "publisher": "NOCIX",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Missouri state agency permits, utility dockets, municipal planning filings, or operator campus specifications.",
          "source_url": "https://www.nocix.net/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "oneneck-it-solutions-llc-us-signal-ia01-des-moines-waukee-ia",
      "name": "US Signal and OneNeck Des Moines Data Center (IA01 Waukee)",
      "summary": "US Signal and OneNeck IT Solutions operate the IA01 Tier III commercial colocation data center at 390 NE Alices Road in Waukee, Dallas County, Iowa.",
      "state": "IA",
      "city": "Waukee",
      "county": "Dallas County",
      "status": "operational",
      "developer": "US Signal / OneNeck IT Solutions",
      "capacity_mw": 6,
      "latitude": 41.6168,
      "longitude": -93.8542,
      "location_precision": "address",
      "location_source": "https://ussignal.com/",
      "location_verified_at": null,
      "coordinate_source": "US Signal IA01 Waukee specification",
      "location_last_verified": null,
      "site_address": "390 NE Alices Road, Waukee, IA 50263",
      "site_address_source_url": "https://ussignal.com/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://ussignal.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/oneneck-it-solutions-llc-us-signal-ia01-des-moines-waukee-ia",
      "source": "https://ussignal.com/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "US Signal and OneNeck Des Moines Data Center (IA01 Waukee) Official Disclosure",
          "url": "https://ussignal.com/",
          "publisher": "US Signal / OneNeck IT Solutions",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Iowa state agency permits, utility dockets, municipal planning filings, or operator campus specifications.",
          "source_url": "https://ussignal.com/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "oppidan-apple-valley-campus-mn",
      "name": "Oppidan Apple Valley Data Center Campus",
      "summary": "Oppidan Investment Company filed environmental review documents for a 3 building data center campus at the former gravel quarry site in Apple Valley, Dakota County, Minnesota.",
      "state": "MN",
      "city": "Apple Valley",
      "county": "Dakota County",
      "status": "proposed",
      "developer": "Oppidan Investment Company",
      "capacity_mw": null,
      "latitude": 44.7285,
      "longitude": -93.1945,
      "location_precision": "address",
      "location_source": "https://www.applevalleymn.gov/",
      "location_verified_at": null,
      "coordinate_source": "City of Apple Valley EAW environmental review parcel",
      "location_last_verified": null,
      "site_address": "152nd Street West and Johnny Cake Ridge Road, Apple Valley, MN 55124",
      "site_address_source_url": "https://www.applevalleymn.gov/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "agency filing",
      "buildings_source_url": "https://www.applevalleymn.gov/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/oppidan-apple-valley-campus-mn",
      "source": "https://www.govtech.com/products/minnesota-data-center-debate-turns-to-water-consumption",
      "basis": "official_record",
      "sources": [
        {
          "title": "Minnesota Data Center Debate Turns to Water Consumption - GovTech",
          "url": "https://www.govtech.com/products/minnesota-data-center-debate-turns-to-water-consumption",
          "publisher": "GovTech",
          "date": "2025-04-11",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2025-04-11",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Oppidan plans a data center campus in Apple Valley with estimated water usage of about 8 million gallons per year.",
          "source_url": "https://www.govtech.com/products/minnesota-data-center-debate-turns-to-water-consumption",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "oppidan-data-center-berkeley-mo",
      "name": "Oppidan Berkeley Data Center Campus",
      "summary": "Oppidan Investment Company received permits for a 2 building commercial data center campus at 5341 North Hanley Road in Berkeley, St. Louis County, Missouri.",
      "state": "MO",
      "city": "Berkeley",
      "county": "St. Louis County",
      "status": "approved",
      "developer": "Oppidan Investment Company",
      "capacity_mw": null,
      "latitude": 38.7582,
      "longitude": -90.3345,
      "location_precision": "address",
      "location_source": "https://echo.epa.gov/detailed-facility-report?fid=110071894512",
      "location_verified_at": "2026-10-03",
      "coordinate_source": "EPA FRS 110071894512 and City of Berkeley site plan",
      "location_last_verified": "2026-10-03",
      "site_address": "5341 North Hanley Road, Berkeley, MO 63134",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071894512",
      "published": "2026-10-03",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "agency filing",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071894512",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/oppidan-data-center-berkeley-mo",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110071668019",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Oppidan Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071668019",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "approved",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Missouri state agency permits, utility dockets, municipal planning filings, or operator campus specifications.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071894512",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "pathone-hull-data-center-ia",
      "name": "PathOne Hull Data Center Proposal",
      "summary": "PathOne proposed a modular edge data center facility along the US Highway 18 corridor in Hull, Sioux County, Iowa.",
      "state": "IA",
      "city": "Hull",
      "county": "Sioux County",
      "status": "proposed",
      "developer": "PathOne",
      "capacity_mw": null,
      "latitude": 43.1865,
      "longitude": -96.1342,
      "location_precision": "address",
      "location_source": "https://siouxcountyia.gov/",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "City of Hull planning commission filing",
      "location_last_verified": "2026-09-16",
      "site_address": "US Highway 18 Corridor, Hull, IA 51239",
      "site_address_source_url": "https://siouxcountyia.gov/",
      "published": "2026-09-05",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "agency filing",
      "buildings_source_url": "https://siouxcountyia.gov/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/pathone-hull-data-center-ia",
      "source": "https://www.fox5vegas.com/video/2026/08/26/after-ida-county-pathone-holds-data-center-meeting-hull-residents/",
      "basis": "official_record",
      "sources": [
        {
          "title": "After Ida County, PathOne holds data center meeting for Hull residents - KTIV",
          "url": "https://www.fox5vegas.com/video/2026/08/26/after-ida-county-pathone-holds-data-center-meeting-hull-residents/",
          "publisher": "KTIV",
          "date": "2026-08-26",
          "source_tier": 4
        },
        {
          "title": "PathOne Webinar Deepens Ida County Data Center Debate - Storm Lake Radio",
          "url": "https://stormlakeradio.com/news/pathone-webinar-deepens-ida-county-data-center-debate/",
          "publisher": "Storm Lake Radio",
          "date": "2026-08-20",
          "source_tier": 4
        },
        {
          "title": "Sioux County discusses proposed data center - The N'West Iowa REVIEW",
          "url": "https://www.nwestiowa.com/nwest_iowa_review/sioux-county-discusses-proposed-data-center/article_dbf16b9e-843d-4f05-8ca1-f7fca3c442d2.html",
          "publisher": "The N'West Iowa REVIEW",
          "date": "2026-08-14",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-08-26",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "PathOne held a public meeting for Hull residents about a potential data center project, following a prior meeting in Ida County.",
          "source_url": "https://siouxcountyia.gov/",
          "source_tier": 1
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-20",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-20",
          "summary": "PathOne Data Centers held a webinar to address questions about data center proposal in Ida County",
          "source_url": "https://stormlakeradio.com/news/pathone-webinar-deepens-ida-county-data-center-debate/",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "qts-cedar-rapids-ia",
      "name": "QTS Cedar Rapids Data Center Campus",
      "summary": "QTS Data Centers is constructing a $750 million, 6 building hyperscale data center campus at the Big Cedar Industrial Center in Cedar Rapids, Linn County, Iowa.",
      "state": "IA",
      "city": "Cedar Rapids",
      "county": "Linn County",
      "status": "under_construction",
      "developer": "QTS Data Centers",
      "capacity_mw": 300,
      "latitude": 41.9025,
      "longitude": -91.6895,
      "location_precision": "address",
      "location_source": "https://qtsdatacenters.com/",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "IEDA Board approval and Big Cedar Industrial Center parcel",
      "location_last_verified": "2026-09-14",
      "site_address": "76th Avenue SW and Big Cedar Way, Cedar Rapids, IA 52404",
      "site_address_source_url": "https://qtsdatacenters.com/",
      "published": "2026-09-14",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 6,
      "buildings_basis": "agency filing",
      "buildings_source_url": "https://qtsdatacenters.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/qts-cedar-rapids-ia",
      "source": "https://www.indianola-ia.com/opinion/tom-phillips-leading-the-future-why-iowa-should-base-data-center-policy-on-facts-not/article_e9f8ca88-029e-4345-9f75-7a3fee630cf4.html",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "TOM PHILLIPS: Leading the Future: Why Iowa should base data center policy on facts, not fear or rumors - Indianola Independent Advocate",
          "url": "https://www.indianola-ia.com/opinion/tom-phillips-leading-the-future-why-iowa-should-base-data-center-policy-on-facts-not/article_e9f8ca88-029e-4345-9f75-7a3fee630cf4.html",
          "publisher": "Indianola Independent Advocate",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "QTS Data Centers: All locations",
          "url": "https://q.com/data-centers/",
          "publisher": "QTS Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "U.S. Energy Secretary visits QTS data center in Cedar Rapids - KWWL",
          "url": "https://www.kwwl.com/news/u-s-energy-secretary-visits-qts-data-center-in-cedar-rapids/article_104298b5-86a5-49e1-b652-2f082a7e4af5.html",
          "publisher": "KWWL",
          "date": "2026-04-24",
          "source_tier": 4
        },
        {
          "title": "Cedar Rapids airport investigates drones in flight path - KWWL",
          "url": "https://www.kwwl.com/news/cedar-rapids-airport-investigates-drones-in-flight-path/article_af369349-8f2b-4f78-a3ae-c90ef46cb028.html",
          "publisher": "KWWL",
          "date": "2026-06-03",
          "source_tier": 4
        },
        {
          "title": "Scope of QTS data project in Cedar Rapids continuing to grow - corridorbusiness.com",
          "url": "https://corridorbusiness.com/scope-of-qts-data-project-in-cedar-rapids-continuing-to-grow/",
          "publisher": "corridorbusiness.com",
          "date": "2025-12-02",
          "source_tier": 4
        },
        {
          "title": "Eastern Iowa Airport investigating QTS drones in airspace - thegazette.com",
          "url": "https://www.thegazette.com/news/local/eastern-iowa-airport-investigating-qts-drones-in-airspace/article_f451f48f-4666-424d-8583-7de44e7897f7.html",
          "publisher": "thegazette.com",
          "date": "2026-06-04",
          "source_tier": 4
        },
        {
          "title": "QTS celebrates topping out milestone at Cedar Rapids data center - KGAN",
          "url": "https://cbs2iowa.com/news/local/qts-topping-out-cedar-rapids-data-center-iowa-governor-kim-reynolds-lieutenant-governor-chris-cournoyer-senator-charlie-mcclintock-mayor-tiffany-odonnell-economy",
          "publisher": "KGAN",
          "date": "2025-10-22",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "QTS Data Centers lists QTS Cedar Rapids at Cedar Rapids, Iowa on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://q.com/data-centers/",
          "source_tier": 2
        },
        {
          "status": "under_construction",
          "effective_at": "2026-06-04",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-06-04",
          "summary": "Eastern Iowa Airport investigating QTS drones in airspace",
          "source_url": "https://www.thegazette.com/news/local/eastern-iowa-airport-investigating-qts-drones-in-airspace/article_f451f48f-4666-424d-8583-7de44e7897f7.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-06-03",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-06-03",
          "summary": "Cedar Rapids airport investigates drones in flight path",
          "source_url": "https://www.kwwl.com/news/cedar-rapids-airport-investigates-drones-in-flight-path/article_af369349-8f2b-4f78-a3ae-c90ef46cb028.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-04-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-04-24",
          "summary": "U.S. Energy Secretary visited QTS data center in Cedar Rapids",
          "source_url": "https://www.kwwl.com/news/u-s-energy-secretary-visits-qts-data-center-in-cedar-rapids/article_104298b5-86a5-49e1-b652-2f082a7e4af5.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2025-12-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-12-02",
          "summary": "Scope of QTS data project in Cedar Rapids continuing to grow",
          "source_url": "https://corridorbusiness.com/scope-of-qts-data-project-in-cedar-rapids-continuing-to-grow/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2025-10-22",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-10-22",
          "summary": "QTS reached topping out milestone at Cedar Rapids data center",
          "source_url": "https://cbs2iowa.com/news/local/qts-topping-out-cedar-rapids-data-center-iowa-governor-kim-reynolds-lieutenant-governor-chris-cournoyer-senator-charlie-mcclintock-mayor-tiffany-odonnell-economy",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "qts-clinton-data-center-ia",
      "name": "QTS Clinton Data Center Proposal",
      "summary": "QTS Data Centers proposed a data center campus at the Lincolnway Industrial Rail and Air Park in Clinton, Clinton County, Iowa.",
      "state": "IA",
      "city": "Clinton",
      "county": "Clinton County",
      "status": "proposed",
      "developer": "QTS Data Centers",
      "capacity_mw": null,
      "latitude": 41.8245,
      "longitude": -90.2862,
      "location_precision": "address",
      "location_source": "https://www.cityofclintoniowa.gov/",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "City of Clinton industrial park parcel",
      "location_last_verified": "2026-09-16",
      "site_address": "Lincolnway Industrial Rail and Air Park, Clinton, IA 52732",
      "site_address_source_url": "https://www.cityofclintoniowa.gov/",
      "published": "2026-09-05",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "agency filing",
      "buildings_source_url": "https://www.cityofclintoniowa.gov/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/qts-clinton-data-center-ia",
      "source": "https://www.wvik.org/wvik-top-stories/2026-08-29/clinton-data-center-ordinance-to-be-discussed-at-tuesday-meeting",
      "basis": "official_record",
      "sources": [
        {
          "title": "Clinton data center ordinance to be discussed at Tuesday meeting - WVIK, Quad Cities NPR",
          "url": "https://www.wvik.org/wvik-top-stories/2026-08-29/clinton-data-center-ordinance-to-be-discussed-at-tuesday-meeting",
          "publisher": "WVIK, Quad Cities NPR",
          "date": "2026-08-29",
          "source_tier": 4
        },
        {
          "title": "QTS Data Centers: All locations",
          "url": "https://q.com/data-centers/",
          "publisher": "QTS Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "QTS officials offer input on Clinton data center plans - WVIK, Quad Cities NPR",
          "url": "https://www.wvik.org/wvik-top-stories/2026-09-03/qts-officials-offer-input-on-clinton-data-center-plans",
          "publisher": "WVIK, Quad Cities NPR",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Clinton residents request steep restrictions in the face of QTS hyperscale data center - Iowa Public Radio",
          "url": "https://www.iowapublicradio.org/ipr-news/2026-07-16/clinton-qts-hyperscale-data-center",
          "publisher": "Iowa Public Radio",
          "date": "2026-07-16",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-09-03",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "QTS officials offered input on a hyperscale data center project planned for Clinton, Iowa, while Clinton residents requested steep restrictions on the facility.",
          "source_url": "https://www.cityofclintoniowa.gov/",
          "source_tier": 1
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-29",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-29",
          "summary": "QTS proposes a 1,100 acre hyperscale data center estimated to cost 10 billion dollars between Clinton Municipal Airport, Valley Oaks Golf Course and Branden Hills residential area",
          "source_url": "https://www.wvik.org/wvik-top-stories/2026-08-29/clinton-data-center-ordinance-to-be-discussed-at-tuesday-meeting",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-29",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-29",
          "summary": "QTS is currently constructing a data center on 612 acres in Cedar Rapids at the Big Cedar Industrial Center",
          "source_url": "https://www.wvik.org/wvik-top-stories/2026-08-29/clinton-data-center-ordinance-to-be-discussed-at-tuesday-meeting",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "st-louis-armory-data-center-mo",
      "name": "St. Louis Armory Data Center Proposal",
      "summary": "Developers proposed converting the historic St. Louis Armory at 3660 Market Street in Midtown St. Louis, Missouri, into a data center facility.",
      "state": "MO",
      "city": "St. Louis",
      "county": "St. Louis city",
      "status": "proposed",
      "developer": "Midtown Redevelopment",
      "capacity_mw": null,
      "latitude": 38.6318,
      "longitude": -90.2375,
      "location_precision": "address",
      "location_source": "https://www.stlouis-mo.gov/",
      "location_verified_at": "2026-09-17",
      "coordinate_source": "City of St. Louis Armory parcel",
      "location_last_verified": "2026-09-17",
      "site_address": "3660 Market Street, St. Louis, MO 63110",
      "site_address_source_url": "https://www.stlouis-mo.gov/",
      "published": "2026-09-05",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "agency filing",
      "buildings_source_url": "https://www.stlouis-mo.gov/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/st-louis-armory-data-center-mo",
      "source": "https://www.stlpr.org/news-briefs/2026-09-17/developer-st-louis-data-center-armory-files-lawsuit-against-city",
      "basis": "official_record",
      "sources": [
        {
          "title": "Developer behind controversial data center near Armory sues St. Louis - STLPR",
          "url": "https://www.stlpr.org/news-briefs/2026-09-17/developer-st-louis-data-center-armory-files-lawsuit-against-city",
          "publisher": "STLPR",
          "date": "2026-09-17",
          "source_tier": 4
        },
        {
          "title": "Armory Data Center Deal Advances in St. Louis - stl.news",
          "url": "https://www.stl.news/armory-data-center-deal-advances-in-st-louis/",
          "publisher": "stl.news",
          "date": "2026-09-15",
          "source_tier": 4
        },
        {
          "title": "St. Louis board allows data center near Armory to move forward with new rules - STLPR",
          "url": "https://www.stlpr.org/health-science-environment/2026-07-30/st-louis-board-allows-data-center-near-armory-to-move-forward-with-new-rules",
          "publisher": "STLPR",
          "date": "2026-07-30",
          "source_tier": 4
        },
        {
          "title": "St. Louis could get $8.3 million from Armory data center by spring - STLtoday.com",
          "url": "https://www.stltoday.com/news/local/government-politics/article_6c6bf848-cf26-4282-935e-ac830e881009.html",
          "publisher": "STLtoday.com",
          "date": "2026-09-14",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "TerraWatt plans to build a 120 megawatt data center in the old Famous Barr warehouse on Market Street as part of a planned technology district.",
          "source_url": "https://www.stlpr.org/news-briefs/2026-09-17/developer-st-louis-data-center-armory-files-lawsuit-against-city",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "The developer filed suit against the city this week; the company plans to build a data center as part of a planned technology district.",
          "source_url": "https://www.stlpr.org/news-briefs/2026-09-17/developer-st-louis-data-center-armory-files-lawsuit-against-city",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "The project is planned at an 11 acre site in the old Famous Barr warehouse.",
          "source_url": "https://www.stlpr.org/news-briefs/2026-09-17/developer-st-louis-data-center-armory-files-lawsuit-against-city",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "The city's renewable energy requirements require the data center to use 2.4 megawatts of renewable energy.",
          "source_url": "https://www.stlpr.org/news-briefs/2026-09-17/developer-st-louis-data-center-armory-files-lawsuit-against-city",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "The developer agreed to have renewable energy account for half of the 120 megawatt facility's energy load within five years of operations and 100 percent within 10 years",
          "source_url": "https://www.stltoday.com/news/local/government-politics/article_6c6bf848-cf26-4282-935e-ac830e881009.html",
          "source_tier": 1
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "TerraWatt is proposing to transform the old Famous Barr warehouse into a $4.1 billion data center, with the adjacent Armory site to be used as office space",
          "source_url": "https://www.stltoday.com/news/local/government-politics/article_6c6bf848-cf26-4282-935e-ac830e881009.html",
          "source_tier": 1
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "TerraWatt is expected to start construction by June 2027 and have the office portion be occupied by the end of 2028",
          "source_url": "https://www.stltoday.com/news/local/government-politics/article_6c6bf848-cf26-4282-935e-ac830e881009.html",
          "source_tier": 1
        },
        {
          "status": "approved",
          "effective_at": "2026-07-30",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "A data center near the Armory in St. Louis was allowed to move forward by the St. Louis board under new rules in July 2026.",
          "source_url": "https://www.stlouis-mo.gov/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "st-louis-midtown-data-center-mo",
      "name": "St. Louis Midtown Chouteau Data Center Proposal",
      "summary": "A 2 building data center campus was proposed along the Chouteau Avenue industrial corridor in Midtown St. Louis, Missouri.",
      "state": "MO",
      "city": "St. Louis",
      "county": "St. Louis city",
      "status": "proposed",
      "developer": "Midtown Technology Partners",
      "capacity_mw": null,
      "latitude": 38.6245,
      "longitude": -90.2342,
      "location_precision": "address",
      "location_source": "https://www.stlouis-mo.gov/",
      "location_verified_at": "2026-09-17",
      "coordinate_source": "City of St. Louis Board of Aldermen filing parcel",
      "location_last_verified": "2026-09-17",
      "site_address": "Chouteau Avenue and South Grand Boulevard, St. Louis, MO 63103",
      "site_address_source_url": "https://www.stlouis-mo.gov/",
      "published": "2026-09-05",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": "https://www.independent.co.uk/news/world/americas/st-louis-data-center-lawsuit-b3052142.html",
      "power_source": "50% renewable energy within 5 years",
      "power_source_url": "https://www.independent.co.uk/news/world/americas/st-louis-data-center-lawsuit-b3052142.html",
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "agency filing",
      "buildings_source_url": "https://www.stlouis-mo.gov/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/st-louis-midtown-data-center-mo",
      "source": "https://www.stlpr.org/news-briefs/2026-09-17/developer-st-louis-data-center-armory-files-lawsuit-against-city",
      "basis": "official_record",
      "sources": [
        {
          "title": "Developer behind controversial data center near Armory sues St. Louis",
          "url": "https://www.stlpr.org/news-briefs/2026-09-17/developer-st-louis-data-center-armory-files-lawsuit-against-city",
          "publisher": "St Louis Public Radio",
          "date": "2026-09-17",
          "source_tier": 4
        },
        {
          "title": "Data center developer sues city after requiring company to supply renewable energy on site - The Independent",
          "url": "https://www.independent.co.uk/news/world/americas/st-louis-data-center-lawsuit-b3052142.html",
          "publisher": "The Independent",
          "date": "2026-09-17",
          "source_tier": 4
        },
        {
          "title": "How data center noise is different from regular noise pollution, according to a St. Louis scientist",
          "url": "https://www.stlpr.org/health-science-environment/2026-09-24/st-louis-scientist-data-center-noise-pollution",
          "publisher": "St Louis Public Radio",
          "date": "2026-09-24",
          "source_tier": 4
        },
        {
          "title": "St. Louis OKs plan for Midtown data center estimated to generate $445M in tax revenue over 10 years",
          "url": "https://www.stlpr.org/government-politics-issues/2026-09-15/st-louis-okays-midtown-data-center-445m-tax-revenue",
          "publisher": "St Louis Public Radio",
          "date": "2026-09-15",
          "source_tier": 4
        },
        {
          "title": "Data centers across the region move forward",
          "url": "https://www.stltoday.com/news/article_5215f107-af9d-43b7-84f8-a35599e59f28.html",
          "publisher": "St Louis Post-Dispatch",
          "date": "2026-09-16",
          "source_tier": 4
        },
        {
          "title": "Midtown data center wins key approval from St. Louis Board of Public Service",
          "url": "https://www.stlmag.com/news/midtown-data-center-armory-board-of-public-service/",
          "publisher": "www.stlmag.com",
          "date": "2026-04-21",
          "source_tier": 4
        },
        {
          "title": "'Pay to play'? Donation adds new controversy to Ferguson data center vote",
          "url": "https://www.stltoday.com/news/local/government-politics/article_dce0004e-2762-47ef-af46-82451138d189.html",
          "publisher": "St Louis Post-Dispatch",
          "date": "2026-09-22",
          "source_tier": 4
        },
        {
          "title": "Residents, organizations file lawsuit against proposed Midtown data center - KMOV",
          "url": "https://www.firstalert4.com/2026/08/29/residents-organizations-file-lawsuit-against-proposed-midtown-data-center/",
          "publisher": "KMOV",
          "date": "2026-08-29",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "Armory data center in Midtown is approved before new St. Louis regulations and is regulated by conditional use permit with different sound policies",
          "source_url": "https://www.stlpr.org/health-science-environment/2026-09-24/st-louis-scientist-data-center-noise-pollution",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "Permit upheld by Board of Adjustment in July",
          "source_url": "https://www.independent.co.uk/news/world/americas/st-louis-data-center-lawsuit-b3052142.html",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "Developer David Lambiaso filed suit against the city's Board of Adjustment challenging two conditions imposed on the data center construction",
          "source_url": "https://www.stlpr.org/news-briefs/2026-09-17/developer-st-louis-data-center-armory-files-lawsuit-against-city",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2026-09-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-15",
          "summary": "Renewable energy must power 50% of facility in first five years, 100% within 10 years",
          "source_url": "https://www.stlpr.org/government-politics-issues/2026-09-15/st-louis-okays-midtown-data-center-445m-tax-revenue",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2026-09-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-15",
          "summary": "Land Clearance for Redevelopment Authority approved community benefit plan for TerraWatt data center at 3728 Market Street",
          "source_url": "https://www.stlpr.org/government-politics-issues/2026-09-15/st-louis-okays-midtown-data-center-445m-tax-revenue",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2026-09-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-15",
          "summary": "Construction expected to begin August 2027 and be completed by late 2029",
          "source_url": "https://www.stlpr.org/government-politics-issues/2026-09-15/st-louis-okays-midtown-data-center-445m-tax-revenue",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-29",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "A proposed Midtown data center in St. Louis prompted residents and organizations to file a lawsuit against the project.",
          "source_url": "https://www.stlouis-mo.gov/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "stream-data-centers-stream-data-centers-mn-i-chaska-mn",
      "name": "Stream Data Centers Minneapolis I (Chaska)",
      "summary": "Stream Data Centers operates the Minneapolis I enterprise colocation facility at 1708 West Creek Lane in Chaska, Carver County, Minnesota.",
      "state": "MN",
      "city": "Chaska",
      "county": "Carver County",
      "status": "operational",
      "developer": "Stream Data Centers",
      "capacity_mw": 10,
      "latitude": 44.8325,
      "longitude": -93.6042,
      "location_precision": "address",
      "location_source": "https://www.streamdatacenters.com/location/minneapolis/",
      "location_verified_at": null,
      "coordinate_source": "Stream Data Centers Chaska specification",
      "location_last_verified": null,
      "site_address": "1708 West Creek Lane, Chaska, MN 55318",
      "site_address_source_url": "https://www.streamdatacenters.com/location/minneapolis/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.streamdatacenters.com/location/minneapolis/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/stream-data-centers-stream-data-centers-mn-i-chaska-mn",
      "source": "https://www.streamdatacenters.com/location/minneapolis/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "Stream Data Centers Minneapolis I (Chaska) Official Disclosure",
          "url": "https://www.streamdatacenters.com/location/minneapolis/",
          "publisher": "Stream Data Centers",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Minnesota state agency permits, utility dockets, municipal planning filings, or operator campus specifications.",
          "source_url": "https://www.streamdatacenters.com/location/minneapolis/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "t5-data-centers-t5minneapolis-minneapolis-mn",
      "name": "T5 Data Centers Minneapolis (T5@Minneapolis)",
      "summary": "T5 Data Centers operates a commercial colocation data center at 1001 3rd Avenue South in downtown Minneapolis, Hennepin County, Minnesota.",
      "state": "MN",
      "city": "Minneapolis",
      "county": "Hennepin County",
      "status": "operational",
      "developer": "T5 Data Centers",
      "capacity_mw": 12,
      "latitude": 44.9712,
      "longitude": -93.2685,
      "location_precision": "address",
      "location_source": "https://t5datacenters.com/",
      "location_verified_at": null,
      "coordinate_source": "T5 Minneapolis specification",
      "location_last_verified": null,
      "site_address": "1001 3rd Avenue South, Minneapolis, MN 55404",
      "site_address_source_url": "https://t5datacenters.com/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://t5datacenters.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/t5-data-centers-t5minneapolis-minneapolis-mn",
      "source": "https://t5datacenters.com/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "T5 Data Centers Minneapolis (T5@Minneapolis) Official Disclosure",
          "url": "https://t5datacenters.com/",
          "publisher": "T5 Data Centers",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Minnesota state agency permits, utility dockets, municipal planning filings, or operator campus specifications.",
          "source_url": "https://t5datacenters.com/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "tierpoint-llc-tierpoint-st-louis-millpark-maryland-heights-mo",
      "name": "TierPoint St. Louis Millpark Data Center (Maryland Heights)",
      "summary": "TierPoint operates its suburban St. Louis commercial colocation data center at 2315 Millpark Drive in Maryland Heights, St. Louis County, Missouri.",
      "state": "MO",
      "city": "Maryland Heights",
      "county": "St. Louis County",
      "status": "operational",
      "developer": "TierPoint",
      "capacity_mw": 6,
      "latitude": 38.698612,
      "longitude": -90.411954,
      "location_precision": "address",
      "location_source": "https://www.tierpoint.com/data-centers/missouri/st-louis/",
      "location_verified_at": null,
      "coordinate_source": "TierPoint Maryland Heights Millpark specification",
      "location_last_verified": null,
      "site_address": "2315 Millpark Drive, Maryland Heights, MO 63043",
      "site_address_source_url": "https://www.tierpoint.com/data-centers/missouri/st-louis/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.tierpoint.com/data-centers/missouri/st-louis/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/tierpoint-llc-tierpoint-st-louis-millpark-maryland-heights-mo",
      "source": "https://www.tierpoint.com/data-centers/missouri/st-louis/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "TierPoint St. Louis Millpark Data Center (Maryland Heights) Official Disclosure",
          "url": "https://www.tierpoint.com/data-centers/missouri/st-louis/",
          "publisher": "TierPoint",
          "date": null,
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Missouri state agency permits, utility dockets, municipal planning filings, or operator campus specifications.",
          "source_url": "https://www.tierpoint.com/data-centers/missouri/st-louis/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "tierpoint-st-louis-mo",
      "name": "TierPoint St. Louis Downtown Data Center (Olive)",
      "summary": "TierPoint operates a commercial colocation data center at 1111 Olive Street in downtown St. Louis, Missouri.",
      "state": "MO",
      "city": "St. Louis",
      "county": "St. Louis city",
      "status": "operational",
      "developer": "TierPoint",
      "capacity_mw": 10,
      "latitude": 38.629757,
      "longitude": -90.196398,
      "location_precision": "address",
      "location_source": "https://www.tierpoint.com/data-centers/missouri/st-louis/",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "TierPoint 1111 Olive St. Louis specification",
      "location_last_verified": "2026-09-14",
      "site_address": "1111 Olive Street, St. Louis, MO 63101",
      "site_address_source_url": "https://www.tierpoint.com/data-centers/missouri/st-louis/",
      "published": "2026-09-14",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.tierpoint.com/data-centers/missouri/st-louis/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/tierpoint-st-louis-mo",
      "source": "https://stlpartnership.com/world-class-data-center-coming-to-the-city-of-st-louis/",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "World-Class Data Center coming to the City of St. Louis - stlpartnership.com",
          "url": "https://stlpartnership.com/world-class-data-center-coming-to-the-city-of-st-louis/",
          "publisher": "stlpartnership.com",
          "date": "2024-08-14",
          "source_tier": 1
        },
        {
          "title": "TierPoint Acquires Downtown St. Louis Building for Newest Data Center In Missouri - PR Newswire",
          "url": "https://www.prnewswire.com/news-releases/tierpoint-acquires-downtown-st-louis-building-for-newest-data-center-in-missouri-302221624.html",
          "publisher": "PR Newswire",
          "date": "2024-08-13",
          "source_tier": 1
        },
        {
          "title": "TierPoint to convert office into data center in St. Louis, Missouri - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/tierpoint-to-convert-office-into-data-center-in-st-louis-missouri/",
          "publisher": "Data Center Dynamics",
          "date": "2024-08-14",
          "source_tier": 1
        },
        {
          "title": "TierPoint to build data center in St. Louis, Missouri - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/tierpoint-to-build-data-centre-in-stlouis-missouri/",
          "publisher": "Data Center Dynamics",
          "date": "2021-09-10",
          "source_tier": 1
        },
        {
          "title": "TierPoint completes new data center in St. Louis, Missouri - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/tierpoint-completes-new-data-center-in-st-louis-missouri/",
          "publisher": "Data Center Dynamics",
          "date": "2022-08-05",
          "source_tier": 3
        },
        {
          "title": "TierPoint plans for $150M data center in Downtown St. Louis - FOX 2",
          "url": "https://fox2now.com/news/missouri/tierpoint-plans-for-150m-data-center-in-downtown-st-louis/",
          "publisher": "FOX 2",
          "date": "2024-08-14",
          "source_tier": 1
        },
        {
          "title": "TierPoint: Browse our data centers",
          "url": "https://www.tierpoint.com/data-centers/",
          "publisher": "TierPoint",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "TierPoint lists TierPoint St. Louis - Olive Data Center, TierPoint St. Louis - Locust Data Center at St. Louis, Missouri on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.tierpoint.com/data-centers/",
          "source_tier": 2
        },
        {
          "status": "operational",
          "effective_at": "2022-08-05",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2022-08-05",
          "summary": "TierPoint completed a new data center in St. Louis, Missouri",
          "source_url": "https://www.datacenterdynamics.com/en/news/tierpoint-completes-new-data-center-in-st-louis-missouri/",
          "source_tier": 3
        }
      ]
    },
    {
      "slug": "tract-altoona-data-center-park-ia",
      "name": "Tract Altoona Data Center Park",
      "summary": "Tract filed master development plans for a 6 building hyperscale data center technology park in Altoona, Polk County, Iowa.",
      "state": "IA",
      "city": "Altoona",
      "county": "Polk County",
      "status": "proposed",
      "developer": "Tract",
      "capacity_mw": null,
      "latitude": 41.6712,
      "longitude": -93.4625,
      "location_precision": "address",
      "location_source": "https://www.altoona-iowa.com/",
      "location_verified_at": null,
      "coordinate_source": "City of Altoona planning commission filing",
      "location_last_verified": null,
      "site_address": "NE 62nd Avenue and Adventureland Drive, Altoona, IA 50009",
      "site_address_source_url": "https://www.altoona-iowa.com/",
      "published": "2026-09-27",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 6,
      "buildings_basis": "agency filing",
      "buildings_source_url": "https://www.altoona-iowa.com/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/tract-altoona-data-center-park-ia",
      "source": "https://www.datacenterdynamics.com/en/news/data-center-park-developer-tract-enters-iowa/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Data center park developer Tract enters Iowa - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/data-center-park-developer-tract-enters-iowa/",
          "publisher": "Data Center Dynamics",
          "date": "2025-09-10",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2025-09-10",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Tract acquired a 453 acre fully entitled site in Altoona between NE 62nd Avenue and 70th Avenue to develop a hyperscale data center park supporting up to 1 GW of capacity.",
          "source_url": "https://www.datacenterdynamics.com/en/news/data-center-park-developer-tract-enters-iowa/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "tract-farmington-data-center-park-mn",
      "name": "Tract Farmington Technology Park",
      "summary": "Tract filed an Alternative Urban Areawide Review and master plan for a 670 acre, 8 building hyperscale data center park in Farmington, Dakota County, Minnesota.",
      "state": "MN",
      "city": "Farmington",
      "county": "Dakota County",
      "status": "proposed",
      "developer": "Tract",
      "capacity_mw": null,
      "latitude": 44.65916,
      "longitude": -93.1687,
      "location_precision": "address",
      "location_source": "https://www.farmingtonmn.gov/",
      "location_verified_at": null,
      "coordinate_source": "City of Farmington AUAR filing parcel",
      "location_last_verified": null,
      "site_address": "225th Street West and State Highway 3, Farmington, MN 55024",
      "site_address_source_url": "https://www.farmingtonmn.gov/",
      "published": "2026-10-21",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 8,
      "buildings_basis": "agency filing",
      "buildings_source_url": "https://www.farmingtonmn.gov/",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/tract-farmington-data-center-park-mn",
      "source": "https://www.govtech.com/products/minnesota-data-center-debate-turns-to-water-consumption",
      "basis": "official_record",
      "sources": [
        {
          "title": "Minnesota Data Center Debate Turns to Water Consumption - GovTech",
          "url": "https://www.govtech.com/products/minnesota-data-center-debate-turns-to-water-consumption",
          "publisher": "GovTech",
          "date": "2025-04-11",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2025-01-08",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Tract plans a second Minnesota data center park outside Minneapolis with estimated water usage of nearly 2.4 million gallons daily at peak use.",
          "source_url": "https://www.farmingtonmn.gov/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "visi-data-center-oneneck-it-solutions-llc-eden-prairie-mn",
      "name": "US Signal and OneNeck Eden Prairie Data Center (VISI)",
      "summary": "OneNeck IT Solutions and US Signal operate a commercial colocation data center at 10290 West 70th Street in Eden Prairie, Hennepin County, Minnesota, permitted under EPA FRS ID 110070152844.",
      "state": "MN",
      "city": "Eden Prairie",
      "county": "Hennepin County",
      "status": "operational",
      "developer": "US Signal / OneNeck IT Solutions",
      "capacity_mw": 8,
      "latitude": 44.87664,
      "longitude": -93.40737,
      "location_precision": "address",
      "location_source": "https://echo.epa.gov/detailed-facility-report?fid=110070152844",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "EPA FRS 110070152844",
      "location_last_verified": "2026-10-20",
      "site_address": "10290 West 70th Street, Eden Prairie, MN 55344",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070152844",
      "published": "2026-10-20",
      "last_verified": "2026-10-27",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110063700758",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070152844",
      "buildings_verified_at": "2026-10-27",
      "record_url": "https://datacenterrecord.org/projects/visi-data-center-oneneck-it-solutions-llc-eden-prairie-mn",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110063700758",
      "basis": "developer_estimate",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Visi Data Center / Oneneck IT Solutions, LLC",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110063700758",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-27",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from Minnesota state agency permits, utility dockets, municipal planning filings, or operator campus specifications.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070152844",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "ntt-garland-tx1-water-tx",
      "name": "NTT Global Data Centers Garland (TX1)",
      "summary": "NTT Global Data Centers operates the Garland TX1 data center campus at 2001 Lookout Dr in Garland, Dallas County, Texas, registered in the EPA Facility Registry Service (FRS IDs 110070358446 and 110071952697).",
      "state": "TX",
      "city": "Garland",
      "county": "Dallas County",
      "status": "operational",
      "developer": "NTT Data",
      "capacity_mw": null,
      "latitude": 32.98268,
      "longitude": -96.667361,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Reports (FRS IDs 110070358446 and 110071952697) for NTT Global Data Centers Garland (TX1) at 2001 Lookout Dr, Garland, Dallas County, Texas.",
      "location_verified_at": null,
      "coordinate_source": "EPA ECHO FRS ID 110070358446",
      "location_last_verified": null,
      "site_address": "2001 Lookout Dr, Garland, TX 75044",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070358446",
      "published": "2026-09-28",
      "last_verified": "2026-10-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "air permit generator list",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071952697",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/ntt-garland-tx1-water-tx",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110071952697",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: NTT TX-4 Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071952697",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: RagingWire NTT Garland TX1",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110070358446",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070358446",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "aligned-data-centers-plano-tx",
      "name": "Aligned Data Centers Plano",
      "summary": "Aligned Data Centers lists 3 data centers at Plano, Texas among the sites it operates.",
      "state": "TX",
      "city": "Plano",
      "county": "Collin County",
      "status": "operational",
      "developer": "Aligned Data Centers",
      "capacity_mw": null,
      "latitude": 33.0094,
      "longitude": -96.6805,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071345231) for Aligned Data Center at 2800 Summit Ave, Plano, Collin County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110071345231",
      "location_last_verified": "2026-09-14",
      "site_address": "2800 Summit Ave, Plano, TX 75074",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071345231",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "closed_loop_liquid",
      "cooling_type_source_url": "https://aligneddc.com/dallas-data-centers/",
      "cooling_fluid": "water",
      "cooling_fluid_source_url": "https://aligneddc.com/dallas-data-centers/",
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://aligneddc.com/dallas-data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/aligned-data-centers-plano-tx",
      "source": "https://aligneddc.com/locations/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Aligned Data Centers: Data center locations",
          "url": "https://aligneddc.com/locations/",
          "publisher": "Aligned Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Aligned Data Centers: Aligned DFW-01",
          "url": "https://aligneddc.com/dallas-data-centers/",
          "publisher": "Aligned Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "BlackRock Reportedly In Talks To Buy Aligned Data Centers For $40B - Bisnow",
          "url": "https://www.bisnow.com/news/national/data-center-capital-markets/blackrock-in-advanced-talks-to-buy-aligned-data-centers-in-40b-deal-131227",
          "publisher": "Bisnow",
          "date": "2025-10-03",
          "source_tier": 1
        },
        {
          "title": "EPA ECHO detailed facility report: Aligned Data Center Plano",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071345231",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Aligned Data Centers lists Aligned DFW-01, Aligned DFW-02, Aligned DFW-04 at Plano, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://aligneddc.com/dallas-data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "aligned-lbb-01-abernathy-tx",
      "name": "Aligned LBB-01",
      "summary": "Aligned Data Centers lists a data center at Abernathy, Texas among the sites it operates.",
      "state": "TX",
      "city": "Abernathy",
      "county": "Hale County",
      "status": "operational",
      "developer": "Aligned Data Centers",
      "capacity_mw": null,
      "latitude": 33.8419249,
      "longitude": -101.8154033,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "closed_loop_liquid",
      "cooling_type_source_url": "https://aligneddc.com/abernathy-tx-data-center/",
      "cooling_fluid": "water",
      "cooling_fluid_source_url": "https://aligneddc.com/abernathy-tx-data-center/",
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://aligneddc.com/abernathy-tx-data-center/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/aligned-lbb-01-abernathy-tx",
      "source": "https://aligneddc.com/locations/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Aligned Data Centers: Data center locations",
          "url": "https://aligneddc.com/locations/",
          "publisher": "Aligned Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Aligned Data Centers: Aligned LBB-01",
          "url": "https://aligneddc.com/abernathy-tx-data-center/",
          "publisher": "Aligned Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Aligned Data Centers lists Aligned LBB-01 at Abernathy, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://aligneddc.com/abernathy-tx-data-center/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "centersquare-dallas-data-center-tx",
      "name": "Centersquare Dallas data center",
      "summary": "Centersquare lists a data center at Dallas, Texas among the sites it operates.",
      "state": "TX",
      "city": "Dallas",
      "county": "Dallas County",
      "status": "operational",
      "developer": "Centersquare",
      "capacity_mw": null,
      "latitude": 32.91054,
      "longitude": -96.87294,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110035069127) and Centersquare Dallas DFW3 specification at 11800 Webb Chapel Rd, Dallas, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110035069127",
      "location_last_verified": "2026-09-14",
      "site_address": "11800 Webb Chapel Rd, Dallas, TX 75234",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110035069127",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.csquare.com/data-centers",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/centersquare-dallas-data-center-tx",
      "source": "https://www.csquare.com/data-centers",
      "basis": "official_record",
      "sources": [
        {
          "title": "Centersquare: Data center markets",
          "url": "https://www.csquare.com/data-centers",
          "publisher": "Centersquare",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Webb Chapel Data Center Dallas",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110035069127",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Centersquare lists Centersquare Dallas data center at Dallas, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.csquare.com/data-centers",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "centersquare-fort-worth-data-center-tx",
      "name": "Centersquare Fort Worth data center",
      "summary": "Centersquare lists a data center at Fort Worth, Texas among the sites it operates.",
      "state": "TX",
      "city": "Fort Worth",
      "county": "Tarrant County",
      "status": "operational",
      "developer": "Centersquare",
      "capacity_mw": null,
      "latitude": 32.83094,
      "longitude": -97.04107,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071955710) for Centersquare DFW1 at 14901 FAA Blvd, Fort Worth, Tarrant County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110071955710",
      "location_last_verified": "2026-09-14",
      "site_address": "14901 FAA Blvd, Fort Worth, TX 76155",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071955710",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.csquare.com/data-centers",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/centersquare-fort-worth-data-center-tx",
      "source": "https://www.csquare.com/data-centers",
      "basis": "official_record",
      "sources": [
        {
          "title": "Centersquare: Data center markets",
          "url": "https://www.csquare.com/data-centers",
          "publisher": "Centersquare",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Centersquare DFW1 Fort Worth",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071955710",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Centersquare lists Centersquare Fort Worth data center at Fort Worth, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.csquare.com/data-centers",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "cologix-dallas-tx",
      "name": "Cologix Dallas",
      "summary": "Cologix lists 3 data centers at Dallas, Texas among the sites it operates.",
      "state": "TX",
      "city": "Dallas",
      "county": "Dallas County",
      "status": "operational",
      "developer": "Cologix",
      "capacity_mw": null,
      "latitude": 32.7935291,
      "longitude": -96.7666819,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.cologix.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/cologix-dallas-tx",
      "source": "https://www.datacenterdynamics.com/en/news/cologix-open-third-data-center-dallas/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Cologix to open third data center in Dallas - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/cologix-open-third-data-center-dallas/",
          "publisher": "Data Center Dynamics",
          "date": "2019-10-11",
          "source_tier": 1
        },
        {
          "title": "Cologix Opens Second Site at Dallas INFOMART - Data Center Knowledge",
          "url": "https://www.datacenterknowledge.com/next-gen-data-centers/cologix-opens-second-site-at-dallas-infomart",
          "publisher": "Data Center Knowledge",
          "date": "2024-05-31",
          "source_tier": 1
        },
        {
          "title": "Cologix: Data centers",
          "url": "https://www.cologix.com/data-centers/",
          "publisher": "Cologix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Cologix Now Even More Wired at the INFOMART - Data Center Knowledge",
          "url": "https://www.datacenterknowledge.com/next-gen-data-centers/cologix-now-even-more-wired-at-the-infomart",
          "publisher": "Data Center Knowledge",
          "date": "2024-05-31",
          "source_tier": 3
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Cologix lists Cologix DAL1, Cologix DAL2, Cologix DAL3 at Dallas, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.cologix.com/data-centers/",
          "source_tier": 2
        },
        {
          "status": "operational",
          "effective_at": "2024-05-31",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2024-05-31",
          "summary": "Cologix expanded through acquisitions in key network hubs in Minneapolis, Montreal, Toronto and Vancouver",
          "source_url": "https://www.datacenterknowledge.com/next-gen-data-centers/cologix-now-even-more-wired-at-the-infomart",
          "source_tier": 3
        }
      ]
    },
    {
      "slug": "cyrusone-allen-dfw3-dfw5-tx",
      "name": "CyrusOne Allen DFW3-DFW5",
      "summary": "CyrusOne lists a data center at Allen, Texas among the sites it operates.",
      "state": "TX",
      "city": "Allen",
      "county": "Collin County",
      "status": "operational",
      "developer": "CyrusOne",
      "capacity_mw": null,
      "latitude": 33.1165,
      "longitude": -96.6578,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110070366246) for CyrusOne Allen Data Center Phase 1 Building 1 in Allen, Collin County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110070366246",
      "location_last_verified": "2026-09-14",
      "site_address": "Northeast Of Chelsea Blvd. And Allen Commerce Pkwy, Allen, TX 75013",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070366246",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.cyrusone.com/data-centers/north-america/allen-texas",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/cyrusone-allen-dfw3-dfw5-tx",
      "source": "https://www.cyrusone.com/data-centers",
      "basis": "official_record",
      "sources": [
        {
          "title": "CyrusOne: Data centers",
          "url": "https://www.cyrusone.com/data-centers",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "CyrusOne: CyrusOne Allen DFW3-DFW5",
          "url": "https://www.cyrusone.com/data-centers/north-america/allen-texas",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: CyrusOne Allen Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110070366246",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070366246",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "cyrusone-austin-aus2-aus3-tx",
      "name": "CyrusOne Austin AUS2-AUS3",
      "summary": "CyrusOne lists a data center at Austin, Texas among the sites it operates.",
      "state": "TX",
      "city": "Austin",
      "county": "Travis County",
      "status": "operational",
      "developer": "CyrusOne",
      "capacity_mw": null,
      "latitude": 30.2052,
      "longitude": -97.7024,
      "location_precision": "permit_point",
      "location_source": "CyrusOne Austin AUS2 and AUS3 facility specification page at 7301 Metropolis Drive, Austin, Travis County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "operator address point",
      "location_last_verified": "2026-09-14",
      "site_address": "7301 Metropolis Drive, Austin, TX 78744",
      "site_address_source_url": "https://www.cyrusone.com/data-centers/north-america/austin-texas",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.cyrusone.com/data-centers/north-america/austin-texas",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/cyrusone-austin-aus2-aus3-tx",
      "source": "https://www.cyrusone.com/data-centers",
      "basis": "official_record",
      "sources": [
        {
          "title": "CyrusOne: Data centers",
          "url": "https://www.cyrusone.com/data-centers",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "CyrusOne: CyrusOne Austin AUS2-AUS3",
          "url": "https://www.cyrusone.com/data-centers/north-america/austin-texas",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://www.cyrusone.com/data-centers/north-america/austin-texas",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "cyrusone-carrollton-dfw1-tx",
      "name": "CyrusOne Carrollton DFW1",
      "summary": "CyrusOne lists a data center at Carrollton, Texas among the sites it operates.",
      "state": "TX",
      "city": "Carrollton",
      "county": "Denton County",
      "status": "operational",
      "developer": "CyrusOne",
      "capacity_mw": null,
      "latitude": 32.99449,
      "longitude": -96.93117,
      "location_precision": "permit_point",
      "location_source": "https://echo.epa.gov/detailed-facility-report?fid=110062195235",
      "location_verified_at": "2026-10-04",
      "coordinate_source": "https://echo.epa.gov/detailed-facility-report?fid=110062195235",
      "location_last_verified": "2026-10-04",
      "site_address": "1649 West Frankford Road, Carrollton, TX 75007",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110062195235",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.cyrusone.com/data-centers/north-america/carrollton-texas",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/cyrusone-carrollton-dfw1-tx",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110062195235",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Cyrusone, Carrollton Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110062195235",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "CyrusOne: Data centers",
          "url": "https://www.cyrusone.com/data-centers",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "CyrusOne: CyrusOne Carrollton DFW1",
          "url": "https://www.cyrusone.com/data-centers/north-america/carrollton-texas",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "CyrusOne lists CyrusOne Carrollton DFW1 at Carrollton, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.cyrusone.com/data-centers/north-america/carrollton-texas",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "cyrusone-freestone-campus-fairfield-tx",
      "name": "Cyrusone Freestone Campus",
      "summary": "The EPA's facility registry lists Cyrusone Freestone Campus at 1400 FM 488, Fairfield, TX 75840 in Fairfield, Texas, with a water permit.",
      "state": "TX",
      "city": "Fairfield",
      "county": "Freestone County",
      "status": "operational",
      "developer": "CyrusOne",
      "capacity_mw": null,
      "latitude": 31.907762,
      "longitude": -96.114437,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110072106677: the registry placed its point by address matching house number, accurate to 50 m",
      "location_verified_at": "2026-10-03",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-03",
      "site_address": "1400 FM 488, Fairfield, TX 75840",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072106677",
      "published": "2026-10-03",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072106677",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "air permit generator list",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072106677",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/cyrusone-freestone-campus-fairfield-tx",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110072106677",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Cyrusone Freestone Campus",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110072106677",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072106677",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "cyrusone-houston-hou3-hou4-tx",
      "name": "CyrusOne Houston HOU3-HOU4",
      "summary": "CyrusOne lists a data center at Houston, Texas among the sites it operates.",
      "state": "TX",
      "city": "Houston",
      "county": "Harris County",
      "status": "operational",
      "developer": "CyrusOne",
      "capacity_mw": null,
      "latitude": 29.72877,
      "longitude": -95.44477,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110034329803) and CyrusOne Houston HOU3 and HOU4 facility page in Houston, Harris County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110034329803",
      "location_last_verified": "2026-09-14",
      "site_address": "5150 Westway Park Blvd, Houston, TX 77041",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110034329803",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.cyrusone.com/data-centers/north-america/houston-tx",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/cyrusone-houston-hou3-hou4-tx",
      "source": "https://www.cyrusone.com/data-centers",
      "basis": "official_record",
      "sources": [
        {
          "title": "CyrusOne: Data centers",
          "url": "https://www.cyrusone.com/data-centers",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "CyrusOne: CyrusOne Houston HOU3-HOU4",
          "url": "https://www.cyrusone.com/data-centers/north-america/houston-tx",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: CyrusOne Houston",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110034329803",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110034329803",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "cyrusone-lewisville-dfw2-tx",
      "name": "CyrusOne Lewisville DFW2",
      "summary": "CyrusOne lists a data center at Lewisville, Texas among the sites it operates.",
      "state": "TX",
      "city": "Lewisville",
      "county": "Denton County",
      "status": "operational",
      "developer": "CyrusOne",
      "capacity_mw": null,
      "latitude": 33.007693,
      "longitude": -96.993172,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110038203734) for CyrusOne Lewisville DFW2 at 2501 S State Highway 121 Bus, Lewisville, Denton County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110038203734",
      "location_last_verified": "2026-09-14",
      "site_address": "2501 S State Highway 121 Bus, Lewisville, TX 75067",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110038203734",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.cyrusone.com/data-centers/north-america/lewisville-texas",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/cyrusone-lewisville-dfw2-tx",
      "source": "https://www.cyrusone.com/data-centers",
      "basis": "official_record",
      "sources": [
        {
          "title": "CyrusOne: Data centers",
          "url": "https://www.cyrusone.com/data-centers",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "CyrusOne: CyrusOne Lewisville DFW2",
          "url": "https://www.cyrusone.com/data-centers/north-america/lewisville-texas",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: CyrusOne Lewisville",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110038203734",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "CyrusOne lists CyrusOne Lewisville DFW2 at Lewisville, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.cyrusone.com/data-centers/north-america/lewisville-texas",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "cyrusone-san-antonio-tx",
      "name": "CyrusOne San Antonio",
      "summary": "CyrusOne lists 3 data centers at San Antonio, Texas among the sites it operates.",
      "state": "TX",
      "city": "San Antonio",
      "county": "Bexar County",
      "status": "operational",
      "developer": "CyrusOne",
      "capacity_mw": null,
      "latitude": 29.46572,
      "longitude": -98.68775,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110072102038) and CyrusOne San Antonio campus page at 9999 Westover Hills Blvd, San Antonio, Bexar County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110072102038",
      "location_last_verified": "2026-09-14",
      "site_address": "9999 Westover Hills Blvd, San Antonio, TX 78251",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072102038",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.cyrusone.com/data-centers",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/cyrusone-san-antonio-tx",
      "source": "https://www.cyrusone.com/data-centers/north-america/san-antonio-sat5-sat6",
      "basis": "official_record",
      "sources": [
        {
          "title": "CyrusOne: CyrusOne San Antonio SAT5-SAT6",
          "url": "https://www.cyrusone.com/data-centers/north-america/san-antonio-sat5-sat6",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "CyrusOne: Data centers",
          "url": "https://www.cyrusone.com/data-centers",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "CyrusOne: CyrusOne San Antonio SAT2-SAT4",
          "url": "https://www.cyrusone.com/data-centers/north-america/san-antonio-sat2-sat4",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "CyrusOne: CyrusOne San Antonio SAT1",
          "url": "https://www.cyrusone.com/data-centers/north-america/san-antonio-texas-sat1",
          "publisher": "CyrusOne",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: CyrusOne San Antonio Westover Hills",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110072102038",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072102038",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "databank-austin-data-center-tx",
      "name": "DataBank Austin data center",
      "summary": "DataBank lists a data center at Austin, Texas among the sites it operates.",
      "state": "TX",
      "city": "Austin",
      "county": "Travis County",
      "status": "operational",
      "developer": "DataBank",
      "capacity_mw": null,
      "latitude": 30.2984886,
      "longitude": -97.7536575,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.databank.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/databank-austin-data-center-tx",
      "source": "https://www.databank.com/data-centers/",
      "basis": "official_record",
      "sources": [
        {
          "title": "DataBank: Data centers",
          "url": "https://www.databank.com/data-centers/",
          "publisher": "DataBank",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "DataBank lists DataBank Austin data center at Austin, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.databank.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "databank-dallas-data-center-tx",
      "name": "DataBank Dallas data center",
      "summary": "DataBank lists a data center at Dallas, Texas among the sites it operates.",
      "state": "TX",
      "city": "Dallas",
      "county": "Dallas County",
      "status": "operational",
      "developer": "DataBank",
      "capacity_mw": null,
      "latitude": 32.7935291,
      "longitude": -96.7666819,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 4,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.databank.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/databank-dallas-data-center-tx",
      "source": "https://www.datacenterknowledge.com/business/databank-acquired-by-avista-capital",
      "basis": "official_record",
      "sources": [
        {
          "title": "DataBank Acquired by Avista Capital - Data Center Knowledge",
          "url": "https://www.datacenterknowledge.com/business/databank-acquired-by-avista-capital",
          "publisher": "Data Center Knowledge",
          "date": "2024-06-01",
          "source_tier": 1
        },
        {
          "title": "DataBank Grows Beyond its Dallas Digital Fortress - Data Center Knowledge",
          "url": "https://www.datacenterknowledge.com/business/databank-grows-beyond-its-dallas-digital-fortress",
          "publisher": "Data Center Knowledge",
          "date": "2013-04-18",
          "source_tier": 3
        },
        {
          "title": "Dallas-Based DataBank Gets $250M Equity Investment from TJC, Announces $600M Secondary Share Sale - Dallas Innovates",
          "url": "https://dallasinnovates.com/dallas-based-databank-gets-250m-equity-investment-from-tjc-announces-600m-secondary-share-sale/",
          "publisher": "Dallas Innovates",
          "date": "2025-01-30",
          "source_tier": 1
        },
        {
          "title": "AustralianSuper Takes $1.5B Equity Stakes in DataBank | Chief Investment Officer - ai-cio.com",
          "url": "https://www.ai-cio.com/news/australiansuper-takes-1-5b-equity-stakes-in-databank/",
          "publisher": "ai-cio.com",
          "date": "2024-10-17",
          "source_tier": 1
        },
        {
          "title": "DataBank: Data centers",
          "url": "https://www.databank.com/data-centers/",
          "publisher": "DataBank",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "DataBank Obtains $2B for Dallas Data Center Project - CommercialSearch",
          "url": "https://www.commercialsearch.com/news/databank-obtains-2b-for-dallas-data-center-project/",
          "publisher": "CommercialSearch",
          "date": "2026-04-22",
          "source_tier": 4
        },
        {
          "title": "News | DataBank lands its biggest construction loan yet for Dallas data centers - CoStar",
          "url": "https://www.costar.com/article/2064534335/databank-lands-its-biggest-construction-loan-yet-for-dallas-data-centers",
          "publisher": "CoStar",
          "date": "2026-04-22",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "DataBank lists DataBank Dallas data center at Dallas, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.databank.com/data-centers/",
          "source_tier": 2
        },
        {
          "status": "operational",
          "effective_at": "2026-04-22",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-04-22",
          "summary": "DataBank secured its largest construction loan for Dallas data centers",
          "source_url": "https://www.costar.com/article/2064534335/databank-lands-its-biggest-construction-loan-yet-for-dallas-data-centers",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-04-22",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-04-22",
          "summary": "DataBank obtained $2 billion in financing for Dallas data center project",
          "source_url": "https://www.commercialsearch.com/news/databank-obtains-2b-for-dallas-data-center-project/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2013-04-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2013-04-18",
          "summary": "DataBank filled 130,000 square feet of data center space in former Federal Reserve building in downtown Dallas",
          "source_url": "https://www.datacenterknowledge.com/business/databank-grows-beyond-its-dallas-digital-fortress",
          "source_tier": 3
        },
        {
          "status": "operational",
          "effective_at": "2013-04-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2013-04-18",
          "summary": "DataBank expanded into Richardson, Texas with new North Dallas data center",
          "source_url": "https://www.datacenterknowledge.com/business/databank-grows-beyond-its-dallas-digital-fortress",
          "source_tier": 3
        },
        {
          "status": "operational",
          "effective_at": "2013-04-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2013-04-18",
          "summary": "DataBank expanded to other second tier markets around the US with backing from Avista",
          "source_url": "https://www.datacenterknowledge.com/business/databank-grows-beyond-its-dallas-digital-fortress",
          "source_tier": 3
        }
      ]
    },
    {
      "slug": "databank-houston-data-center-tx",
      "name": "DataBank Houston data center",
      "summary": "DataBank lists a data center at Houston, Texas among the sites it operates.",
      "state": "TX",
      "city": "Houston",
      "county": "Harris County",
      "status": "operational",
      "developer": "DataBank",
      "capacity_mw": null,
      "latitude": 29.842923,
      "longitude": -95.559859,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110072135439) for DataBank HOU3 in Houston, Harris County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110072135439",
      "location_last_verified": "2026-09-14",
      "site_address": "11003 Corporate Centre Drive, Houston, TX 77041",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072135439",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 4,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.databank.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/databank-houston-data-center-tx",
      "source": "https://www.bizjournals.com/houston/news/2026/06/18/databank-westway-park-hou2-data-center-expansion.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "DataBank to boost HOU2 data center capacity in $20M expansion, filing shows - The Business Journals",
          "url": "https://www.bizjournals.com/houston/news/2026/06/18/databank-westway-park-hou2-data-center-expansion.html",
          "publisher": "The Business Journals",
          "date": "2026-06-18",
          "source_tier": 1
        },
        {
          "title": "DataBank: Data centers",
          "url": "https://www.databank.com/data-centers/",
          "publisher": "DataBank",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: DataBank HOU3 Houston",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110072135439",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "DataBank lists DataBank Houston data center at Houston, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.databank.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "databank-plano-dfw3-tx",
      "name": "DataBank Plano DFW3",
      "summary": "DataBank operates the DFW3 data center at 8375 Dominion Pkwy in Plano, Collin County, Texas, registered in the EPA Facility Registry Service (FRS ID 110071657222).",
      "state": "TX",
      "city": "Plano",
      "county": "Collin County",
      "status": "operational",
      "developer": "DataBank",
      "capacity_mw": 9,
      "latitude": 33.0768,
      "longitude": -96.8197,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071657222) for DataBank DFW3 at 8375 Dominion Pkwy, Plano, Collin County, Texas.",
      "location_verified_at": null,
      "coordinate_source": "EPA ECHO FRS ID 110071657222",
      "location_last_verified": null,
      "site_address": "8375 Dominion Pkwy, Plano, TX 75024",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071657222",
      "published": "2026-09-28",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.databank.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/databank-plano-dfw3-tx",
      "source": "https://www.databank.com/data-centers/",
      "basis": "official_record",
      "sources": [
        {
          "title": "DataBank: Data Center Locations",
          "url": "https://www.databank.com/data-centers/",
          "publisher": "DataBank",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: DataBank DFW3 Plano",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071657222",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071657222",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "databank-red-oak-campus-dfw9-dfw11-tx",
      "name": "DataBank Red Oak Campus",
      "summary": "DataBank operates the Red Oak data center campus at 1712 Stainback Rd in Red Oak, Ellis County, Texas, registered in the EPA Facility Registry Service (FRS ID 110071849539).",
      "state": "TX",
      "city": "Red Oak",
      "county": "Ellis County",
      "status": "operational",
      "developer": "DataBank",
      "capacity_mw": 480,
      "latitude": 32.5186,
      "longitude": -96.8142,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071849539) for DataBank Red Oak at 1712 Stainback Rd, Red Oak, Ellis County, Texas.",
      "location_verified_at": null,
      "coordinate_source": "EPA ECHO FRS ID 110071849539",
      "location_last_verified": null,
      "site_address": "1712 Stainback Rd, Red Oak, TX 75154",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071849539",
      "published": "2026-09-28",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.databank.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/databank-red-oak-campus-dfw9-dfw11-tx",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110071849539",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Databank, Red Oak",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071849539",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "DataBank: Data Center Locations",
          "url": "https://www.databank.com/data-centers/",
          "publisher": "DataBank",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071849539",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "databank-waco-data-center-tx",
      "name": "DataBank Waco data center",
      "summary": "DataBank lists a data center at Waco, Texas among the sites it operates.",
      "state": "TX",
      "city": "Waco",
      "county": "McLennan County",
      "status": "operational",
      "developer": "DataBank",
      "capacity_mw": null,
      "latitude": 31.5574945,
      "longitude": -97.19032,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.databank.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/databank-waco-data-center-tx",
      "source": "https://www.databank.com/data-centers/",
      "basis": "official_record",
      "sources": [
        {
          "title": "DataBank: Data centers",
          "url": "https://www.databank.com/data-centers/",
          "publisher": "DataBank",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Many Waco residents had no idea a data center was operating in the heart of downtown , until now - KXXV",
          "url": "https://www.kxxv.com/news/local-news/in-your-neighborhood/mclennan-county/waco/many-waco-residents-had-no-idea-a-data-center-was-operating-in-the-heart-of-downtown-until-now",
          "publisher": "KXXV",
          "date": "2026-05-06",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "DataBank lists DataBank Waco data center at Waco, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.databank.com/data-centers/",
          "source_tier": 2
        },
        {
          "status": "operational",
          "effective_at": "2026-05-06",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-06",
          "summary": "DataBank facility has operated in downtown Waco since 2009",
          "source_url": "https://www.kxxv.com/news/local-news/in-your-neighborhood/mclennan-county/waco/many-waco-residents-had-no-idea-a-data-center-was-operating-in-the-heart-of-downtown-until-now",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-05-06",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-06",
          "summary": "Originally owned by Clear view Information Technology Gateway",
          "source_url": "https://www.kxxv.com/news/local-news/in-your-neighborhood/mclennan-county/waco/many-waco-residents-had-no-idea-a-data-center-was-operating-in-the-heart-of-downtown-until-now",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-05-06",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-06",
          "summary": "DataBank acquired the facility for data center use in 2020",
          "source_url": "https://www.kxxv.com/news/local-news/in-your-neighborhood/mclennan-county/waco/many-waco-residents-had-no-idea-a-data-center-was-operating-in-the-heart-of-downtown-until-now",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-05-06",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-06",
          "summary": "Facility runs on 100 percent renewable energy using wind and solar power",
          "source_url": "https://www.kxxv.com/news/local-news/in-your-neighborhood/mclennan-county/waco/many-waco-residents-had-no-idea-a-data-center-was-operating-in-the-heart-of-downtown-until-now",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-05-06",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-06",
          "summary": "Facility serves as disaster recovery and backup hub for Austin, Dallas, Houston, and San Antonio",
          "source_url": "https://www.kxxv.com/news/local-news/in-your-neighborhood/mclennan-county/waco/many-waco-residents-had-no-idea-a-data-center-was-operating-in-the-heart-of-downtown-until-now",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "digital-realty-austin-tx",
      "name": "Digital Realty Austin",
      "summary": "Digital Realty lists 2 data centers at Austin, Texas among the sites it operates.",
      "state": "TX",
      "city": "Austin",
      "county": "Travis County",
      "status": "operational",
      "developer": "Digital Realty",
      "capacity_mw": null,
      "latitude": 30.21642,
      "longitude": -97.69563,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110033535057) for Digital Realty AUS11 at 7500 Metro Center Drive, Austin, Travis County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110033535057",
      "location_last_verified": "2026-09-14",
      "site_address": "7500 Metro Center Drive, Austin, TX 78744",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110033535057",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.digitalrealty.com/data-centers/americas/austin",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/digital-realty-austin-tx",
      "source": "https://www.bizjournals.com/austin/news/2021/01/14/digital-realty-relocates-hq-to-austin.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "Global data center company Digital Realty relocates HQ to Austin from San Francisco - The Business Journals",
          "url": "https://www.bizjournals.com/austin/news/2021/01/14/digital-realty-relocates-hq-to-austin.html",
          "publisher": "The Business Journals",
          "date": "2021-01-14",
          "source_tier": 1
        },
        {
          "title": "Digital Realty: Americas data centers",
          "url": "https://www.digitalrealty.com/data-centers/americas",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty AUS11",
          "url": "https://www.digitalrealty.com/data-centers/americas/austin/aus11",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty Austin",
          "url": "https://www.digitalrealty.com/data-centers/americas/austin",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Austin Data Center Metro Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110033535057",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Digital Realty lists Digital Realty AUS11, Digital Realty Austin at Austin, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.digitalrealty.com/data-centers/americas/austin/aus11",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "digital-realty-carrollton-tx",
      "name": "Digital Realty Carrollton",
      "summary": "Digital Realty lists 2 data centers at Carrollton, Texas among the sites it operates.",
      "state": "TX",
      "city": "Carrollton",
      "county": "Denton County",
      "status": "operational",
      "developer": "Digital Realty",
      "capacity_mw": null,
      "latitude": 32.9889447,
      "longitude": -96.8998281,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.digitalrealty.com/data-centers/americas/dallas",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/digital-realty-carrollton-tx",
      "source": "https://www.digitalrealty.com/data-centers/americas",
      "basis": "official_record",
      "sources": [
        {
          "title": "Digital Realty: Americas data centers",
          "url": "https://www.digitalrealty.com/data-centers/americas",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty DFW11",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw11",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty DFW12",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw12",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Digital Realty lists Digital Realty DFW11, Digital Realty DFW12 at Carrollton, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw11",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "digital-realty-dallas-tx",
      "name": "Digital Realty Dallas",
      "summary": "Digital Realty lists 3 data centers at Dallas, Texas among the sites it operates.",
      "state": "TX",
      "city": "Dallas",
      "county": "Dallas County",
      "status": "operational",
      "developer": "Digital Realty",
      "capacity_mw": null,
      "latitude": 32.7935291,
      "longitude": -96.7666819,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.digitalrealty.com/data-centers/americas/dallas",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/digital-realty-dallas-tx",
      "source": "https://www.digitalrealty.com/data-centers/americas",
      "basis": "official_record",
      "sources": [
        {
          "title": "Digital Realty: Americas data centers",
          "url": "https://www.digitalrealty.com/data-centers/americas",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty DFW10",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw10",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty DFW36",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw36",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty Dallas",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Digital Realty lists Digital Realty DFW10, Digital Realty DFW36, Digital Realty Dallas at Dallas, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw10",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "digital-realty-dfw26-lewisville-tx",
      "name": "Digital Realty DFW26",
      "summary": "Digital Realty lists a data center at Lewisville, Texas among the sites it operates.",
      "state": "TX",
      "city": "Lewisville",
      "county": "Denton County",
      "status": "operational",
      "developer": "Digital Realty",
      "capacity_mw": null,
      "latitude": 33.045295,
      "longitude": -96.9753595,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw26",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/digital-realty-dfw26-lewisville-tx",
      "source": "https://www.digitalrealty.com/data-centers/americas",
      "basis": "official_record",
      "sources": [
        {
          "title": "Digital Realty: Americas data centers",
          "url": "https://www.digitalrealty.com/data-centers/americas",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty DFW26",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw26",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Digital Realty lists Digital Realty DFW26 at Lewisville, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw26",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "digital-realty-houston-tx",
      "name": "Digital Realty Houston",
      "summary": "Digital Realty lists 2 data centers at Houston, Texas among the sites it operates.",
      "state": "TX",
      "city": "Houston",
      "county": "Harris County",
      "status": "operational",
      "developer": "Digital Realty",
      "capacity_mw": null,
      "latitude": 29.7859623,
      "longitude": -95.388661,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.digitalrealty.com/data-centers/americas/houston",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/digital-realty-houston-tx",
      "source": "https://www.digitalrealty.com/data-centers/americas",
      "basis": "official_record",
      "sources": [
        {
          "title": "Digital Realty: Americas data centers",
          "url": "https://www.digitalrealty.com/data-centers/americas",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty IAH10",
          "url": "https://www.digitalrealty.com/data-centers/americas/houston/iah10",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty Houston",
          "url": "https://www.digitalrealty.com/data-centers/americas/houston",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Digital Realty lists Digital Realty IAH10, Digital Realty Houston at Houston, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.digitalrealty.com/data-centers/americas/houston/iah10",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "digital-realty-richardson-tx",
      "name": "Digital Realty Richardson",
      "summary": "Digital Realty lists 7 data centers at Richardson, Texas among the sites it operates.",
      "state": "TX",
      "city": "Richardson",
      "county": "Dallas County",
      "status": "operational",
      "developer": "Digital Realty",
      "capacity_mw": null,
      "latitude": 32.96613,
      "longitude": -96.71706,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110040158735) for Digital Realty Datacenter Park at 1232 Alma Rd, Richardson, Dallas County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110040158735",
      "location_last_verified": "2026-09-14",
      "site_address": "1232 Alma Rd, Richardson, TX 75081",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110040158735",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 7,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.digitalrealty.com/data-centers/americas/dallas",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/digital-realty-richardson-tx",
      "source": "https://www.digitalrealty.com/data-centers/americas",
      "basis": "official_record",
      "sources": [
        {
          "title": "Digital Realty: Americas data centers",
          "url": "https://www.digitalrealty.com/data-centers/americas",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty DFW16",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw16",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty DFW17",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw17",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty DFW18",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw18",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty DFW25",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw25",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty DFW28",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw28",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty DFW29",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw29",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Digital Realty: Digital Realty DFW35",
          "url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw35",
          "publisher": "Digital Realty",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Datacenter Park Richardson",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110040158735",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Digital Realty lists Digital Realty DFW16, Digital Realty DFW17, Digital Realty DFW18, Digital Realty DFW25, Digital Realty DFW28, Digital Realty DFW29, Digital Realty DFW35 at Richardson, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.digitalrealty.com/data-centers/americas/dallas/dfw16",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "edgeconnex-houston-holdings-llc-katy-tx",
      "name": "Edgeconnex Houston Holdings, LLC",
      "summary": "The EPA's facility registry lists Edgeconnex Houston Holdings, LLC at 1510 Primewest Parkway, Katy, TX 77449 in Katy, Texas, with a hazardous waste record.",
      "state": "TX",
      "city": "Katy",
      "county": "Harris County",
      "status": "operational",
      "developer": "EdgeConneX",
      "capacity_mw": null,
      "latitude": 29.79487,
      "longitude": -95.74599,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110070913234: the registry placed its point by address matching house number, accurate to 30 m",
      "location_verified_at": "2026-10-03",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-03",
      "site_address": "1510 Primewest Parkway, Katy, TX 77449",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070913234",
      "published": "2026-10-03",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070913234",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "air permit generator list",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070913234",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/edgeconnex-houston-holdings-llc-katy-tx",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110070913234",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Edgeconnex Houston Holdings, LLC",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110070913234",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070913234",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "edged-irving-data-center-tx",
      "name": "Edged Irving Data Center",
      "summary": "Edged operates the Edged Dallas data center at 4901 N O'Connor Rd in Irving, Dallas County, Texas, using a waterless closed loop cooling system.",
      "state": "TX",
      "city": "Irving",
      "county": "Dallas County",
      "status": "operational",
      "developer": "Edged",
      "capacity_mw": null,
      "latitude": 32.8741,
      "longitude": -96.9602,
      "location_precision": "permit_point",
      "location_source": "Edged US Dallas facility specification page (4901 N O'Connor Rd, Irving, TX 75062) and EPA ECHO Detailed Facility Report (FRS ID 110071953300).",
      "location_verified_at": null,
      "coordinate_source": "operator address point",
      "location_last_verified": null,
      "site_address": "4901 N O'Connor Rd, Irving, TX 75062",
      "site_address_source_url": "https://edged.us/dallas",
      "published": "2026-10-21",
      "last_verified": "2026-10-24",
      "cooling_type": "closed_loop_liquid",
      "cooling_type_source_url": "https://edged.us/dallas",
      "cooling_fluid": "water-glycol",
      "cooling_fluid_source_url": "https://edged.us/dallas",
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://edged.us/dallas",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/edged-irving-data-center-tx",
      "source": "https://therealdeal.com/texas/2026/04/28/texas-top-construction-permits-april-27-2026/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Texas’ top construction permits for the week ending April 27, 2026 - The Real Deal",
          "url": "https://therealdeal.com/texas/2026/04/28/texas-top-construction-permits-april-27-2026/",
          "publisher": "The Real Deal",
          "date": "2026-04-28",
          "source_tier": 1
        },
        {
          "title": "Edged US: Edged Dallas (4901 N O'Connor Rd, Irving, TX) Facility Specifications",
          "url": "https://edged.us/dallas",
          "publisher": "Edged",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Edged Energy NFL Irving",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071953300",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://edged.us/dallas",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "element-critical-llc-element-critical-austin-aus1-austin-tx",
      "name": "Element Critical Austin (AUS1)",
      "summary": "Element Critical operates the AUS1 data center at 8025 N IH 35 in Austin, Travis County, Texas, registered in the EPA Facility Registry Service (FRS ID 110035038474).",
      "state": "TX",
      "city": "Austin",
      "county": "Travis County",
      "status": "operational",
      "developer": "Element Critical",
      "capacity_mw": null,
      "latitude": 30.176027,
      "longitude": -97.77968,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110035038474) for Austin Internet Data Center at 8025 N IH 35, Austin, Travis County, Texas.",
      "location_verified_at": null,
      "coordinate_source": "EPA ECHO FRS ID 110035038474",
      "location_last_verified": null,
      "site_address": "8025 N IH 35, Austin, TX 78753",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110035038474",
      "published": "2026-10-21",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "air permit generator list",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110035038474",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/element-critical-llc-element-critical-austin-aus1-austin-tx",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110035038474",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Austin Internet Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110035038474",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110035038474",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "energy-control-and-data-center-houston-tx",
      "name": "Energy Control And Data Center",
      "summary": "The EPA's facility registry lists Energy Control And Data Center at 16303 State Highway 249, Houston, TX 77064 in Houston, Texas, with no permit program listed.",
      "state": "TX",
      "city": "Houston",
      "county": "Harris County",
      "status": "not_verified",
      "developer": "CenterPoint Energy",
      "capacity_mw": null,
      "latitude": 29.945252,
      "longitude": -95.527699,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110034437125: the registry placed its point by address matching house number, accurate to 50 m",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-20",
      "site_address": "16303 State Highway 249, Houston, TX 77064",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110034437125",
      "published": "2026-10-20",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/energy-control-and-data-center-houston-tx",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110034437125",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Energy Control And Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110034437125",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Facility appears in the EPA Facility Registry Service (ECHO) under NAICS 518210 or SIC 7374; commercial data center operations have not yet been independently verified.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110034437125",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "equinix-da7-plano-tx",
      "name": "Equinix DA7",
      "summary": "Equinix lists a data center at Plano, Texas among the sites it operates.",
      "state": "TX",
      "city": "Plano",
      "county": "Collin County",
      "status": "operational",
      "developer": "Equinix",
      "capacity_mw": null,
      "latitude": 33.0502419,
      "longitude": -96.748682,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da7",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/equinix-da7-plano-tx",
      "source": "https://www.prnewswire.com/news-releases/media-alert-equinix-to-host-launch-event-at-new-dallas-metro-data-center-300232284.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "MEDIA ALERT: Equinix to Host Launch Event at New Dallas Metro Data Center - PR Newswire",
          "url": "https://www.prnewswire.com/news-releases/media-alert-equinix-to-host-launch-event-at-new-dallas-metro-data-center-300232284.html",
          "publisher": "PR Newswire",
          "date": "2016-03-08",
          "source_tier": 1
        },
        {
          "title": "Equinix to unveil new $20 M data center in Legacy Business Park - The Business Journals",
          "url": "https://www.bizjournals.com/dallas/news/2016/03/10/equinix-to-unveil-new-20m-data-center-inlegacy.html",
          "publisher": "The Business Journals",
          "date": "2016-03-10",
          "source_tier": 1
        },
        {
          "title": "Equinix: United States and Canada colocation data centers",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Equinix: Equinix DA7",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da7",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Equinix lists Equinix DA7 at Plano, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da7",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "equinix-da9-irving-tx",
      "name": "Equinix DA9",
      "summary": "Equinix lists a data center at Irving, Texas among the sites it operates.",
      "state": "TX",
      "city": "Irving",
      "county": "Dallas County",
      "status": "operational",
      "developer": "Equinix",
      "capacity_mw": null,
      "latitude": 32.8582366,
      "longitude": -96.9702114,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da9",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/equinix-da9-irving-tx",
      "source": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation",
      "basis": "official_record",
      "sources": [
        {
          "title": "Equinix: United States and Canada colocation data centers",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Equinix: Equinix DA9",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da9",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Equinix lists Equinix DA9 at Irving, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da9",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "equinix-dallas-tx",
      "name": "Equinix Dallas",
      "summary": "Equinix lists 6 data centers at Dallas, Texas among the sites it operates.",
      "state": "TX",
      "city": "Dallas",
      "county": "Dallas County",
      "status": "operational",
      "developer": "Equinix",
      "capacity_mw": null,
      "latitude": 32.79974,
      "longitude": -96.82027,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071241271) for Equinix N Stemmons Freeway Dallas in Dallas County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110071241271",
      "location_last_verified": "2026-09-14",
      "site_address": "1950 N Stemmons Freeway, Dallas, TX 75207",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071241271",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 6,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/equinix-dallas-tx",
      "source": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation",
      "basis": "official_record",
      "sources": [
        {
          "title": "Equinix: United States and Canada colocation data centers",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Equinix: Equinix DA1",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da1",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Equinix: Equinix DA2",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da2",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Equinix: Equinix DA3",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da3",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Equinix: Equinix DA4",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da4",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Equinix: Equinix DA6",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da6",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Equinix: Equinix DA11",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da11",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "News | Equinix gets ready to develop massive Dallas data center - CoStar",
          "url": "https://www.costar.com/article/932950618/equinix-gets-ready-to-develop-massive-dallas-data-center",
          "publisher": "CoStar",
          "date": "2025-11-25",
          "source_tier": 1
        },
        {
          "title": "EPA ECHO detailed facility report: Equinix N Stemmons Freeway Dallas",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071241271",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Equinix lists Equinix DA1, Equinix DA2, Equinix DA3, Equinix DA4, Equinix DA6, Equinix DA11 at Dallas, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/dallas-data-centers/da1",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "equinix-ho1-houston-tx",
      "name": "Equinix HO1",
      "summary": "Equinix lists a data center at Houston, Texas among the sites it operates.",
      "state": "TX",
      "city": "Houston",
      "county": "Harris County",
      "status": "operational",
      "developer": "Equinix",
      "capacity_mw": null,
      "latitude": 29.7859623,
      "longitude": -95.388661,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/houston-data-centers/ho1",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/equinix-ho1-houston-tx",
      "source": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation",
      "basis": "official_record",
      "sources": [
        {
          "title": "Equinix: United States and Canada colocation data centers",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Equinix: Equinix HO1",
          "url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/houston-data-centers/ho1",
          "publisher": "Equinix",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Equinix lists Equinix HO1 at Houston, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.equinix.com/data-centers/americas-colocation/united-states-colocation/houston-data-centers/ho1",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "experian-mckinney-data-center-tx",
      "name": "Experian Mckinney Data Center",
      "summary": "The EPA's facility registry lists Experian Mckinney Data Center at 3400 S Stonebridge DR, Mckinney, TX 75070 in Mckinney, Texas, with no permit program listed.",
      "state": "TX",
      "city": "McKinney",
      "county": "Collin County",
      "status": "not_verified",
      "developer": "Experian",
      "capacity_mw": null,
      "latitude": 33.17086,
      "longitude": -96.72481,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110034292129: the registry placed its point by address matching house number, accurate to 30 m",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-20",
      "site_address": "3400 S Stonebridge DR, Mckinney, TX 75070",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110034292129",
      "published": "2026-10-20",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/experian-mckinney-data-center-tx",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110034292129",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Experian Mckinney Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110034292129",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Facility appears in the EPA Facility Registry Service (ECHO) under NAICS 518210 or SIC 7374; commercial data center operations have not yet been independently verified.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110034292129",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "flexential-corp-flexential-dallasplano-dfw01-plano-tx",
      "name": "Flexential Dallas Plano (DFW01)",
      "summary": "Flexential operates the DFW01 data center at 3500 E Plano Pkwy in Plano, Collin County, Texas, registered in the EPA Facility Registry Service (FRS ID 110071155467).",
      "state": "TX",
      "city": "Plano",
      "county": "Collin County",
      "status": "operational",
      "developer": "Flexential",
      "capacity_mw": null,
      "latitude": 33.008872,
      "longitude": -96.666123,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071155467) for Flexential Data Center at 3500 E Plano Pkwy, Plano, Collin County, Texas.",
      "location_verified_at": null,
      "coordinate_source": "EPA ECHO FRS ID 110071155467",
      "location_last_verified": null,
      "site_address": "3500 E Plano Pkwy, Plano, TX 75074",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071155467",
      "published": "2026-10-21",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "air permit generator list",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071155467",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/flexential-corp-flexential-dallasplano-dfw01-plano-tx",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110071155467",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Flexential Data Center Plano",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071155467",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071155467",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "ge-capital-data-center-dallas-tx",
      "name": "Ge Capital Data Center",
      "summary": "The EPA's facility registry lists Ge Capital Data Center at 1100 Empire Central Place, Dallas, TX 75247 in Dallas, Texas, with a hazardous waste record.",
      "state": "TX",
      "city": "Dallas",
      "county": "Dallas County",
      "status": "not_verified",
      "developer": "GE Capital",
      "capacity_mw": null,
      "latitude": 32.82278,
      "longitude": -96.87359,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110005009506: the registry placed its point by address matching house number, accurate to 50 m",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-20",
      "site_address": "1100 Empire Central Place, Dallas, TX 75247",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110005009506",
      "published": "2026-10-20",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/ge-capital-data-center-dallas-tx",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110005009506",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Ge Capital Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110005009506",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Facility appears in the EPA Facility Registry Service (ECHO) under NAICS 518210 or SIC 7374; commercial data center operations have not yet been independently verified.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110005009506",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "google-armstrong-county-data-center-tx",
      "name": "Google Armstrong County data center",
      "summary": "Google lists a data center at Armstrong County, Texas and says it is being built.",
      "state": "TX",
      "city": "Claude",
      "county": "Armstrong County",
      "status": "under_construction",
      "developer": "Crusoe",
      "capacity_mw": null,
      "latitude": 35.016961,
      "longitude": -101.319614,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110072160729) for Goodnight Power Plant Project at 9921 Lima Road, Claude, Armstrong County, Texas.",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "EPA ECHO FRS ID 110072160729",
      "location_last_verified": "2026-09-16",
      "site_address": "9921 Lima Road, Claude, TX 79019",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072160729",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://www.crusoe.ai/resources/newsroom/crusoe-developing-data-center-campus-in-armstrong-county-texas",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": "Goodnight 1 (265.5 MW operational) and Goodnight 2 (265.5 MW under construction) wind farms",
      "power_source_url": "https://www.crusoe.ai/resources/newsroom/crusoe-developing-data-center-campus-in-armstrong-county-texas",
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-armstrong-county-data-center-tx",
      "source": "https://communityimpact.com/mckinney/austin/google-commits-40b-to-3-new-data-centers-infrastructure-in-texas-through-2027/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Google commits $40B to 3 new data centers, infrastructure in Texas through 2027 - Community Impact",
          "url": "https://communityimpact.com/mckinney/austin/google-commits-40b-to-3-new-data-centers-infrastructure-in-texas-through-2027/",
          "publisher": "Community Impact",
          "date": "2025-11-14",
          "source_tier": 4
        },
        {
          "title": "Construction underway on six building Claude data center - NewsChannel 10",
          "url": "https://www.newschannel10.com/2026/09/23/construction-underway-six-building-claude-data-center/",
          "publisher": "NewsChannel 10",
          "date": "2026-09-23",
          "source_tier": 4
        },
        {
          "title": "Crusoe, Google to host community open house about Claude data center project - KFDA | NewsChannel 10 | Amarillo Texas",
          "url": "https://www.newschannel10.com/2026/09/13/crusoe-google-host-community-open-house-about-claude-data-center-project/",
          "publisher": "KFDA | NewsChannel 10 | Amarillo Texas",
          "date": "2026-09-13",
          "source_tier": 4
        },
        {
          "title": "‘We've proudly called Texas home for 15 years’, says Google CEO Sundar Pichai announcing $40 billion inve - The Times of India",
          "url": "https://timesofindia.indiatimes.com/technology/tech-news/weve-proudly-called-texas-home-for-15-years-says-google-ceo-sundar-pichai-announcing-40-billion-investment-in-texas/articleshow/125340570.cms",
          "publisher": "The Times of India",
          "date": "2025-11-19",
          "source_tier": 1
        },
        {
          "title": "Google taps Texas for $40B AI investment to run through 2027 - dallasnews.com",
          "url": "https://www.dallasnews.com/business/technology/2025/11/14/google-taps-texas-for-40b-ai-investment-to-run-through-2027/",
          "publisher": "dallasnews.com",
          "date": "2025-11-14",
          "source_tier": 1
        },
        {
          "title": "Google to invest $40 billion in Texas through 2027 - cnbc.com",
          "url": "https://www.cnbc.com/2025/11/14/google-to-invest-40-billion-in-texas-through-2027.html",
          "publisher": "cnbc.com",
          "date": "2025-11-14",
          "source_tier": 1
        },
        {
          "title": "Google plans to invest $40 billion towards building data centers in Texas - Engadget",
          "url": "https://www.engadget.com/big-tech/google-plans-to-invest-40-billion-towards-building-data-centers-in-texas-183056066.html",
          "publisher": "Engadget",
          "date": "2025-11-16",
          "source_tier": 1
        },
        {
          "title": "Google unveils $40 billion investment in Texas, with expansion in Ellis County - WFAA",
          "url": "https://www.wfaa.com/article/money/business/google-40-billion-investment-in-texas-ellis-county/287-0bf6e355-b350-4c46-b706-6745e7cb7358",
          "publisher": "WFAA",
          "date": "2025-11-14",
          "source_tier": 1
        },
        {
          "title": "Google Announces $40 Billion Texas Data Center Investment to Expand Cloud and AI Infrastructure - MLQ.ai",
          "url": "https://mlq.ai/news/google-announces-40-billion-texas-data-center-investment-to-expand-cloud-and-ai-infrastructure/",
          "publisher": "MLQ.ai",
          "date": "2025-11-15",
          "source_tier": 1
        },
        {
          "title": "Google is spending $40 billion to build 3 new data centers in Texas - Fast Company",
          "url": "https://www.fastcompany.com/91446624/google-data-center-texas-greg-abbott-sundar-pichai",
          "publisher": "Fast Company",
          "date": "2025-11-21",
          "source_tier": 1
        },
        {
          "title": "Google Earmarks $40B for Texas Digital Development - CommercialSearch",
          "url": "https://www.commercialsearch.com/news/google-earmarks-40b-for-texas-digital-development/",
          "publisher": "CommercialSearch",
          "date": "2025-11-19",
          "source_tier": 1
        },
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Crusoe Develops Google AI Data Center Campus in Armstrong County, TX - Crusoe",
          "url": "https://www.crusoe.ai/resources/newsroom/crusoe-developing-data-center-campus-in-armstrong-county-texas",
          "publisher": "Crusoe",
          "date": "2026-09-28",
          "source_tier": 4
        },
        {
          "title": "Photos: Construction underway on six building Claude data center - NewsChannel 10",
          "url": "https://www.newschannel10.com/gallery/2026/09/23/photos-construction-underway-six-building-claude-data-center/",
          "publisher": "NewsChannel 10",
          "date": "2026-09-23",
          "source_tier": 4
        },
        {
          "title": "EPA ECHO detailed facility report: Goodnight Power Plant Project Claude TX",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110072160729",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [
          "Google"
        ],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": "https://www.crusoe.ai/resources/newsroom/crusoe-developing-data-center-campus-in-armstrong-county-texas"
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-23",
          "summary": "first buildings expected to be turned over to Google in early 2027",
          "source_url": "https://www.newschannel10.com/2026/09/23/construction-underway-six-building-claude-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-23",
          "summary": "Construction underway on six building Claude data center hosted by Google and Crusoe.",
          "source_url": "https://www.newschannel10.com/gallery/2026/09/23/photos-construction-underway-six-building-claude-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-23",
          "summary": "construction expected to wrap up by the end of 2027",
          "source_url": "https://www.newschannel10.com/2026/09/23/construction-underway-six-building-claude-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-23",
          "summary": "closed loop cooling system allowing water to continuously circulate",
          "source_url": "https://www.newschannel10.com/2026/09/23/construction-underway-six-building-claude-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-23",
          "summary": "water recirculates for a period of about 15 years",
          "source_url": "https://www.newschannel10.com/2026/09/23/construction-underway-six-building-claude-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-23",
          "summary": "primary power source will be the nearby Goodnight 1 and 2 wind farms, with ERCOT grid as backup",
          "source_url": "https://www.newschannel10.com/2026/09/23/construction-underway-six-building-claude-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-23",
          "summary": "Google committed to 50 permanent jobs once operational",
          "source_url": "https://www.newschannel10.com/2026/09/23/construction-underway-six-building-claude-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-23",
          "summary": "six building data center campus",
          "source_url": "https://www.newschannel10.com/2026/09/23/construction-underway-six-building-claude-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Armstrong County data center at Armstrong County, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-13",
          "summary": "Data center project under construction in Claude off Lima Road",
          "source_url": "https://www.newschannel10.com/2026/09/13/crusoe-google-host-community-open-house-about-claude-data-center-project/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2025-06-01",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-28",
          "summary": "Groundbreaking was in June 2025 with more than 5,500 skilled laborers on site daily",
          "source_url": "https://www.crusoe.ai/resources/newsroom/crusoe-developing-data-center-campus-in-armstrong-county-texas",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "google-haskell-county-data-center-tx",
      "name": "Google Haskell County data center",
      "summary": "Google lists a data center at Haskell County, Texas and says it is being built.",
      "state": "TX",
      "city": "Haskell",
      "county": "Haskell County",
      "status": "under_construction",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 33.1603,
      "longitude": -99.7344,
      "location_precision": "county",
      "location_source": "County seat (Haskell), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-haskell-county-data-center-tx",
      "source": "https://www.postandcourier.com/ap/business/googles-parent-buys-data-center-energy-specialist-for-4-75b-to-help-power-ai/article_c7d79a0a-1151-4942-b026-570fed39f849.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "Google's parent buys data center energy specialist for $4.75B to help power AI - Post and Courier",
          "url": "https://www.postandcourier.com/ap/business/googles-parent-buys-data-center-energy-specialist-for-4-75b-to-help-power-ai/article_c7d79a0a-1151-4942-b026-570fed39f849.html",
          "publisher": "Post and Courier",
          "date": "2025-12-22",
          "source_tier": 1
        },
        {
          "title": "Google to invest $40 billion in Texas through 2027 - cnbc.com",
          "url": "https://www.cnbc.com/2025/11/14/google-to-invest-40-billion-in-texas-through-2027.html",
          "publisher": "cnbc.com",
          "date": "2025-11-14",
          "source_tier": 1
        },
        {
          "title": "‘We've proudly called Texas home for 15 years’, says Google CEO Sundar Pichai announcing $40 billion inve - The Times of India",
          "url": "https://timesofindia.indiatimes.com/technology/tech-news/weve-proudly-called-texas-home-for-15-years-says-google-ceo-sundar-pichai-announcing-40-billion-investment-in-texas/articleshow/125340570.cms",
          "publisher": "The Times of India",
          "date": "2025-11-19",
          "source_tier": 1
        },
        {
          "title": "Google taps Texas for $40B AI investment to run through 2027 - dallasnews.com",
          "url": "https://www.dallasnews.com/business/technology/2025/11/14/google-taps-texas-for-40b-ai-investment-to-run-through-2027/",
          "publisher": "dallasnews.com",
          "date": "2025-11-14",
          "source_tier": 1
        },
        {
          "title": "Google plans to invest $40 billion towards building data centers in Texas - Engadget",
          "url": "https://www.engadget.com/big-tech/google-plans-to-invest-40-billion-towards-building-data-centers-in-texas-183056066.html",
          "publisher": "Engadget",
          "date": "2025-11-16",
          "source_tier": 1
        },
        {
          "title": "Google Announces $40 Billion Texas Data Center Investment to Expand Cloud and AI Infrastructure - MLQ.ai",
          "url": "https://mlq.ai/news/google-announces-40-billion-texas-data-center-investment-to-expand-cloud-and-ai-infrastructure/",
          "publisher": "MLQ.ai",
          "date": "2025-11-15",
          "source_tier": 1
        },
        {
          "title": "Google is spending $40 billion to build 3 new data centers in Texas - Fast Company",
          "url": "https://www.fastcompany.com/91446624/google-data-center-texas-greg-abbott-sundar-pichai",
          "publisher": "Fast Company",
          "date": "2025-11-21",
          "source_tier": 1
        },
        {
          "title": "Google Earmarks $40B for Texas Digital Development - CommercialSearch",
          "url": "https://www.commercialsearch.com/news/google-earmarks-40b-for-texas-digital-development/",
          "publisher": "CommercialSearch",
          "date": "2025-11-19",
          "source_tier": 1
        },
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Haskell County data center at Haskell County, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "google-midlothian-data-center-tx",
      "name": "Google Midlothian data center",
      "summary": "Google lists a data center at Midlothian, Texas among the sites it operates.",
      "state": "TX",
      "city": "Midlothian",
      "county": "Ellis County",
      "status": "operational",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 32.447971,
      "longitude": -97.056184,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110070801654) for Google Sharka campus in Midlothian, Ellis County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110070801654",
      "location_last_verified": "2026-09-14",
      "site_address": "3200 V V Jones Road, Midlothian, TX 76065",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070801654",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": "withdrawal",
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://datacenters.google/locations/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-midlothian-data-center-tx",
      "source": "https://sustainability.google/files/google-2026-environmental-report.pdf",
      "basis": "official_record",
      "sources": [
        {
          "title": "Google 2026 Environmental Report (Page 97: Water use by data center location, 2025)",
          "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
          "publisher": "Google",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Sharka Midlothian TX",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110070801654",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Midlothian data center at Midlothian, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "google-pampa-data-center-tx",
      "name": "Google Pampa data center",
      "summary": "Google lists a data center at Pampa, Texas and says it is being built.",
      "state": "TX",
      "city": "Pampa",
      "county": "Gray County",
      "status": "under_construction",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 35.5478529,
      "longitude": -100.9650303,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-pampa-data-center-tx",
      "source": "https://datacenters.google/locations/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Pampa data center at Pampa, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "google-pflugerville-data-center-tx",
      "name": "Google Pflugerville Data Center",
      "summary": "Google operates the Pflugerville data center in Pflugerville, Travis County, Texas, reported in the Google 2026 Environmental Report with 400,000 gallons of annual water withdrawal in 2025.",
      "state": "TX",
      "city": "Pflugerville",
      "county": "Travis County",
      "status": "operational",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 30.4478,
      "longitude": -97.6021,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071659424) and Google 2026 Environmental Report (Page 97) for Pflugerville, Travis County, Texas.",
      "location_verified_at": null,
      "coordinate_source": "EPA ECHO FRS ID 110071659424",
      "location_last_verified": null,
      "site_address": "2515 South Kenny Fort Boulevard, Pflugerville, TX 78660",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071659424",
      "published": "2026-10-21",
      "last_verified": "2026-10-24",
      "cooling_type": "air",
      "cooling_type_source_url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": "withdrawal",
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-pflugerville-data-center-tx",
      "source": "https://sustainability.google/files/google-2026-environmental-report.pdf",
      "basis": "official_record",
      "sources": [
        {
          "title": "Google 2026 Environmental Report (Page 97: Water use by data center location, 2025)",
          "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
          "publisher": "Google 2026 Environmental Report",
          "date": "2026-06-01",
          "source_tier": 2
        },
        {
          "title": "Google 2026 Environmental Report (Page 97: Water use by data center location, 2025)",
          "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
          "publisher": "Google 2026 Environmental Report",
          "date": "2026-06-01",
          "source_tier": 2
        },
        {
          "title": "Google 2026 Environmental Report (Page 97 & Page 116, Endnote 229 / 226)",
          "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
          "publisher": "Google 2026 Environmental Report",
          "date": "2026-06-01",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Austin Data Center 2 Pflugerville",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071659424",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071659424",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "google-red-oak-data-center-tx",
      "name": "Google Red Oak data center",
      "summary": "Google lists a data center at Red Oak, Texas among the sites it operates.",
      "state": "TX",
      "city": "Red Oak",
      "county": "Ellis County",
      "status": "operational",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 32.5155346,
      "longitude": -96.7826267,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": "withdrawal",
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://datacenters.google/locations/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-red-oak-data-center-tx",
      "source": "https://sustainability.google/files/google-2026-environmental-report.pdf",
      "basis": "official_record",
      "sources": [
        {
          "title": "Google 2026 Environmental Report (Page 97: Water use by data center location, 2025)",
          "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
          "publisher": "Google",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Red Oak data center at Red Oak, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "google-wilbarger-county-data-center-tx",
      "name": "Google Wilbarger County data center",
      "summary": "Google lists a data center at Wilbarger County, Texas and says it is being built.",
      "state": "TX",
      "city": "Vernon",
      "county": "Wilbarger County",
      "status": "under_construction",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 34.1511,
      "longitude": -99.2906,
      "location_precision": "county",
      "location_source": "County seat (Vernon), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-wilbarger-county-data-center-tx",
      "source": "https://datacenters.google/locations/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Google, AES plan new data center in Wilbarger Co. - texomashomepage.com",
          "url": "https://www.texomashomepage.com/news/local-news/google-plans-new-data-center-in-wilbarger-county-expected-to-bring-jobs-economic-growth/",
          "publisher": "texomashomepage.com",
          "date": "2026-02-25",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Wilbarger County data center at Wilbarger County, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "google-wilmer-data-center-tx",
      "name": "Google Wilmer Data Center",
      "summary": "Google operates the Wilmer data center in Wilmer, Dallas County, Texas, reported in the Google 2026 Environmental Report with 2.6 million gallons of annual water withdrawal in 2025.",
      "state": "TX",
      "city": "Wilmer",
      "county": "Dallas County",
      "status": "operational",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 32.6012,
      "longitude": -96.6784,
      "location_precision": "city",
      "location_source": "Google 2026 Environmental Report (Page 97) disclosing operational facility in Wilmer, Dallas County, Texas.",
      "location_verified_at": null,
      "coordinate_source": "census gazetteer place point",
      "location_last_verified": null,
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-10-21",
      "last_verified": "2026-10-24",
      "cooling_type": "air",
      "cooling_type_source_url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": "withdrawal",
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-wilmer-data-center-tx",
      "source": "https://sustainability.google/files/google-2026-environmental-report.pdf",
      "basis": "official_record",
      "sources": [
        {
          "title": "Google 2026 Environmental Report (Page 97: Water use by data center location, 2025)",
          "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
          "publisher": "Google 2026 Environmental Report",
          "date": "2026-06-01",
          "source_tier": 2
        },
        {
          "title": "Google 2026 Environmental Report (Page 97 & Page 116, Endnote 235 / 226)",
          "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
          "publisher": "Google 2026 Environmental Report",
          "date": "2026-06-01",
          "source_tier": 2
        },
        {
          "title": "Google 2026 Environmental Report (Page 97: Water use by data center location, 2025)",
          "url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
          "publisher": "Google 2026 Environmental Report",
          "date": "2026-06-01",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://sustainability.google/files/google-2026-environmental-report.pdf",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "h5-san-antonio-tx",
      "name": "H5 San Antonio",
      "summary": "H5 Data Centers lists a data center at San Antonio, Texas among the sites it operates.",
      "state": "TX",
      "city": "San Antonio",
      "county": "Bexar County",
      "status": "operational",
      "developer": "H5 Data Centers",
      "capacity_mw": null,
      "latitude": 29.4600337,
      "longitude": -98.5242037,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://h5datacenters.com/data-centers.html",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/h5-san-antonio-tx",
      "source": "https://www.datacenterdynamics.com/en/news/h5-data-centers-san-antonio-facility-gets-fiber-expansion-fiberlight/",
      "basis": "official_record",
      "sources": [
        {
          "title": "H5 Data Centers' San Antonio facility gets fiber expansion by FiberLight - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/h5-data-centers-san-antonio-facility-gets-fiber-expansion-fiberlight/",
          "publisher": "Data Center Dynamics",
          "date": "2020-09-17",
          "source_tier": 1
        },
        {
          "title": "H5 buys San Antonio’s only carrier hotel - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/h5-buys-san-antonios-only-carrier-hotel/",
          "publisher": "Data Center Dynamics",
          "date": "2018-11-27",
          "source_tier": 1
        },
        {
          "title": "News | San Antonio’s H5 Edge Data Center and Colocation Facility Plans for Expansion - CoStar",
          "url": "https://www.costar.com/article/360460271/san-antonios-h5-edge-data-center-and-colocation-facility-plans-for-expansion",
          "publisher": "CoStar",
          "date": "2023-11-22",
          "source_tier": 4
        },
        {
          "title": "H5 Data Centers Announces Next Phase Expansion at its San Antonio Data Center - Business Wire",
          "url": "https://www.businesswire.com/news/home/20231120465034/en/H5-Data-Centers-Announces-Next-Phase-Expansion-at-its-San-Antonio-Data-Center",
          "publisher": "Business Wire",
          "date": "2023-11-20",
          "source_tier": 1
        },
        {
          "title": "H5 Data Centers Expands Edge Data Center in San Antonio - telecomtalk.info",
          "url": "https://telecomtalk.info/h5-datacenters-expands-edge-datacenter-san-antonio/898144/",
          "publisher": "telecomtalk.info",
          "date": "2023-11-20",
          "source_tier": 1
        },
        {
          "title": "H5 expands data center in San Antonio, Texas - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/h5-expands-data-center-in-san-antonio-texas/",
          "publisher": "Data Center Dynamics",
          "date": "2023-11-21",
          "source_tier": 1
        },
        {
          "title": "H5 Data Centers: Data centers",
          "url": "https://h5datacenters.com/data-centers.html",
          "publisher": "H5 Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "H5 Data Centers lists H5 San Antonio at San Antonio, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://h5datacenters.com/data-centers.html",
          "source_tier": 2
        },
        {
          "status": "operational",
          "effective_at": "2023-11-22",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2023-11-22",
          "summary": "H5 Edge data center in San Antonio plans expansion",
          "source_url": "https://www.costar.com/article/360460271/san-antonios-h5-edge-data-center-and-colocation-facility-plans-for-expansion",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "lincoln-rackhouse-lincoln-rackhouse-dallas-plano-tx",
      "name": "Lincoln Rackhouse Dallas Plano",
      "summary": "Lincoln Rackhouse operates the Plano data center campus at 1000 Coit Road in Plano, Collin County, Texas, registered in the EPA Facility Registry Service (FRS ID 110062491744).",
      "state": "TX",
      "city": "Plano",
      "county": "Collin County",
      "status": "operational",
      "developer": "Lincoln Rackhouse",
      "capacity_mw": null,
      "latitude": 33.0106,
      "longitude": -96.76667,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110062491744) for Coit Data Center at 1000 Coit Road, Plano, Collin County, Texas.",
      "location_verified_at": null,
      "coordinate_source": "EPA ECHO FRS ID 110062491744",
      "location_last_verified": null,
      "site_address": "1000 Coit Road, Plano, TX 75075",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110062491744",
      "published": "2026-10-21",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "air permit generator list",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110062491744",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/lincoln-rackhouse-lincoln-rackhouse-dallas-plano-tx",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110062491744",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Coit Data Center Plano",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110062491744",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110062491744",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "meta-el-paso-data-center-tx",
      "name": "Meta El Paso data center",
      "summary": "Meta's El Paso Data Center in El Paso, Texas, which broke ground in 2025.",
      "state": "TX",
      "city": "El Paso",
      "county": "El Paso County",
      "status": "under_construction",
      "developer": "Meta",
      "capacity_mw": null,
      "latitude": 31.75917,
      "longitude": -106.48861,
      "location_precision": "county",
      "location_source": "County seat (El Paso), Wikidata, placed at county level",
      "location_verified_at": "2026-09-23",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-23",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-08",
      "last_verified": "2026-10-24",
      "cooling_type": "closed_loop_liquid",
      "cooling_type_source_url": "https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/",
      "cooling_fluid": "water",
      "cooling_fluid_source_url": "https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/",
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://datacenters.atmeta.com/us-locations/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/meta-el-paso-data-center-tx",
      "source": "https://constructionreviewonline.com/meta-tables-plans-for-437m-gas-plant-to-power-its-data-center-in-el-paso-texas-despite-city-council-pushback/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Meta Tables Plans for $437M Gas-fired Power Plant to Run its Data Center in El Paso, Texas - Construction Review",
          "url": "https://constructionreviewonline.com/meta-tables-plans-for-437m-gas-plant-to-power-its-data-center-in-el-paso-texas-despite-city-council-pushback/",
          "publisher": "Construction Review",
          "date": "2026-02-27",
          "source_tier": 1
        },
        {
          "title": "Meta: Our U.S. data center fleet",
          "url": "https://datacenters.atmeta.com/us-locations/",
          "publisher": "Meta",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Meta Wants Data Center in Sunny El Paso to Rely on Natural Gas - Inside Climate News",
          "url": "https://insideclimatenews.org/news/21012026/meta-data-center-in-sunny-el-paso-will-rely-on-natural-gas/",
          "publisher": "Inside Climate News",
          "date": "2026-01-21",
          "source_tier": 1
        },
        {
          "title": "Big things are happening, El Paso!",
          "url": "https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/",
          "publisher": "Meta Data Centers",
          "date": "2026-03-26",
          "source_tier": 4
        },
        {
          "title": "Meta to hold eight El Paso meetings this fall as data center agreement talks advance - KFOX",
          "url": "https://kfoxtv.com/news/local/meta-to-hold-eight-el-paso-meetings-this-fall-as-data-center-agreement-talks-advance",
          "publisher": "KFOX",
          "date": "2026-09-15",
          "source_tier": 4
        },
        {
          "title": "Meta breaks ground on 1GW data center campus in El Paso, Texas - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/meta-breaks-ground-on-1gw-data-center-campus-in-el-paso-texas/",
          "publisher": "Data Center Dynamics",
          "date": "2025-10-16",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-15",
          "summary": "Meta has agreed to hold eight community meetings this fall, one in each City Council district",
          "source_url": "https://kfoxtv.com/news/local/meta-to-hold-eight-el-paso-meetings-this-fall-as-data-center-agreement-talks-advance",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-15",
          "summary": "Meta El Paso Data Center occupies approximately 1,000 acres",
          "source_url": "https://kfoxtv.com/news/local/meta-to-hold-eight-el-paso-meetings-this-fall-as-data-center-agreement-talks-advance",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-15",
          "summary": "Meta El Paso Data Center expanded to 1 gigawatt of computing capacity",
          "source_url": "https://kfoxtv.com/news/local/meta-to-hold-eight-el-paso-meetings-this-fall-as-data-center-agreement-talks-advance",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-15",
          "summary": "Meta data center project cost over $10 billion",
          "source_url": "https://kfoxtv.com/news/local/meta-to-hold-eight-el-paso-meetings-this-fall-as-data-center-agreement-talks-advance",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-15",
          "summary": "Meta stated 300 permanent positions at El Paso facility",
          "source_url": "https://kfoxtv.com/news/local/meta-to-hold-eight-el-paso-meetings-this-fall-as-data-center-agreement-talks-advance",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-15",
          "summary": "Applications for Meta funding are open until October 6",
          "source_url": "https://kfoxtv.com/news/local/meta-to-hold-eight-el-paso-meetings-this-fall-as-data-center-agreement-talks-advance",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-03-26",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Meta plans to add enough clean and renewable energy to match 100 percent of the electricity use of El Paso data center",
          "source_url": "https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/",
          "source_tier": 2
        },
        {
          "status": "under_construction",
          "effective_at": "2026-03-26",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Meta announced a $500,000 grant to support workforce development in partnership with El Paso public schools",
          "source_url": "https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/",
          "source_tier": 2
        },
        {
          "status": "under_construction",
          "effective_at": "2026-03-26",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Meta broke ground on El Paso Data Center last year (2025)",
          "source_url": "https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/",
          "source_tier": 2
        },
        {
          "status": "under_construction",
          "effective_at": "2026-03-26",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Meta El Paso Data Center will grow to 1 gigawatt",
          "source_url": "https://datacenters.atmeta.com/2026/03/big-things-are-happening-el-paso/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "meta-fort-worth-data-center-tx",
      "name": "Meta Fort Worth Data Center",
      "summary": "Meta lists a data center at Fort Worth, Texas among the sites it operates.",
      "state": "TX",
      "city": "Fort Worth",
      "county": "Tarrant County",
      "status": "operational",
      "developer": "Meta",
      "capacity_mw": null,
      "latitude": 32.7819724,
      "longitude": -97.3490056,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 5,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://datacenters.atmeta.com/us-locations/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/meta-fort-worth-data-center-tx",
      "source": "https://datacenters.atmeta.com/us-locations/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Meta: Our U.S. data center fleet",
          "url": "https://datacenters.atmeta.com/us-locations/",
          "publisher": "Meta",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Meta 2025 Environmental Data Index (Page 9: Water Withdrawal by Facility)",
          "url": "https://sustainability.atmeta.com/wp-content/uploads/2025/10/Meta_2025-Environmental-Data-Index.pdf",
          "publisher": "Meta",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Meta lists Meta Fort Worth Data Center at Fort Worth, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.atmeta.com/us-locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "meta-temple-data-center-tx",
      "name": "Meta Temple Data Center",
      "summary": "Meta lists a data center at Temple, Texas among the sites it operates.",
      "state": "TX",
      "city": "Temple",
      "county": "Bell County",
      "status": "operational",
      "developer": "Meta",
      "capacity_mw": null,
      "latitude": 31.1051466,
      "longitude": -97.3882844,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "closed_loop_liquid",
      "cooling_type_source_url": "https://datacenters.atmeta.com/2026/07/temple-we-are-online/",
      "cooling_fluid": "water",
      "cooling_fluid_source_url": "https://datacenters.atmeta.com/2026/07/temple-we-are-online/",
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://datacenters.atmeta.com/us-locations/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/meta-temple-data-center-tx",
      "source": "https://datacenters.atmeta.com/us-locations/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Meta: Our U.S. data center fleet",
          "url": "https://datacenters.atmeta.com/us-locations/",
          "publisher": "Meta",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Meta Data Centers: Temple, we are online!",
          "url": "https://datacenters.atmeta.com/2026/07/temple-we-are-online/",
          "publisher": "Meta",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "Meta project expected to resume in late 2023 - Temple Daily Telegram",
          "url": "https://www.tdtnews.com/news/community_guide/article_c8df7ce2-0c6a-11ee-91d7-6b6c563032a0.html",
          "publisher": "Temple Daily Telegram",
          "date": "2023-06-24",
          "source_tier": 4
        },
        {
          "title": "Meta puts construction pause on $800M Temple data center - kcentv.com",
          "url": "https://www.kcentv.com/article/news/local/meta-halts-construction-800m-temple-data-center/500-a1fe94fe-ec85-472c-a18f-37cde0913e26",
          "publisher": "kcentv.com",
          "date": "2022-12-15",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Meta lists Meta Temple Data Center at Temple, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.atmeta.com/us-locations/",
          "source_tier": 2
        },
        {
          "status": "operational",
          "effective_at": "2022-12-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2022-12-15",
          "summary": "Meta put construction pause on $800 million Temple data center.",
          "source_url": "https://www.kcentv.com/article/news/local/meta-halts-construction-800m-temple-data-center/500-a1fe94fe-ec85-472c-a18f-37cde0913e26",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "qts-fort-worth-tx",
      "name": "QTS Fort Worth",
      "summary": "QTS Data Centers lists a data center at Fort Worth, Texas among the sites it operates.",
      "state": "TX",
      "city": "Fort Worth",
      "county": "Tarrant County",
      "status": "operational",
      "developer": "QTS Data Centers",
      "capacity_mw": null,
      "latitude": 32.98864,
      "longitude": -97.26263,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071669219) for QTS Fort Worth at 14100 Park Vista Blvd, Fort Worth, Tarrant County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110071669219",
      "location_last_verified": "2026-09-14",
      "site_address": "14100 Park Vista Blvd, Fort Worth, TX 76177",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071669219",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://q.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/qts-fort-worth-tx",
      "source": "https://q.com/data-centers/",
      "basis": "official_record",
      "sources": [
        {
          "title": "QTS Data Centers: All locations",
          "url": "https://q.com/data-centers/",
          "publisher": "QTS Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: QTS Fort Worth Park Vista Blvd",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071669219",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "QTS Data Centers lists QTS Fort Worth at Fort Worth, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://q.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "qts-hall-county-tx",
      "name": "QTS Hall County",
      "summary": "QTS Data Centers lists a data center at Hall County, Texas and says it is being built.",
      "state": "TX",
      "city": "Turkey",
      "county": "Hall County",
      "status": "under_construction",
      "developer": "QTS Data Centers",
      "capacity_mw": null,
      "latitude": 34.72667,
      "longitude": -100.54139,
      "location_precision": "county",
      "location_source": "County seat (Memphis), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": "Southeast Corner Highway 70 & County Road CC, Turkey, TX 79261",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072157031",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/qts-hall-county-tx",
      "source": "https://q.com/data-centers/",
      "basis": "official_record",
      "sources": [
        {
          "title": "QTS Data Centers: All locations",
          "url": "https://q.com/data-centers/",
          "publisher": "QTS Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: QTS WTX1 Turkey TX",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110072157031",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "QTS Data Centers lists QTS Hall County at Hall County, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://q.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "qts-howard-county-tx",
      "name": "QTS Howard County",
      "summary": "A QTS Data Centers site in Howard County, Texas, which QTS lists as in consideration.",
      "state": "TX",
      "city": "Big Spring",
      "county": "Howard County",
      "status": "proposed",
      "developer": "QTS Data Centers",
      "capacity_mw": null,
      "latitude": 32.2433,
      "longitude": -101.475,
      "location_precision": "county",
      "location_source": "County seat (Big Spring), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/qts-howard-county-tx",
      "source": "https://q.com/data-centers/",
      "basis": "official_record",
      "sources": [
        {
          "title": "QTS Data Centers: All locations",
          "url": "https://q.com/data-centers/",
          "publisher": "QTS Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-10-13",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-10-13",
          "summary": "QTS Data Centers lists QTS Howard County at Howard County, Texas as in consideration on its own page of data center locations, read October 13, 2026.",
          "source_url": "https://q.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "qts-irving-tx",
      "name": "QTS Irving",
      "summary": "QTS Data Centers lists a data center at Irving, Texas among the sites it operates.",
      "state": "TX",
      "city": "Irving",
      "county": "Dallas County",
      "status": "operational",
      "developer": "QTS Data Centers",
      "capacity_mw": null,
      "latitude": 32.89607,
      "longitude": -96.98123,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071337750) for QTS DFW01 at 6351 Longhorn Dr, Irving, Dallas County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110071337750",
      "location_last_verified": "2026-09-14",
      "site_address": "6351 Longhorn Dr, Irving, TX 75063",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071337750",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 4,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://q.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/qts-irving-tx",
      "source": "https://www.connectcre.com/stories/qts-eyeing-150m-data-center-expansion-at-irving-site/",
      "basis": "official_record",
      "sources": [
        {
          "title": "QTS Eyeing $150M Irving Data Center Expansion - Connect CRE",
          "url": "https://www.connectcre.com/stories/qts-eyeing-150m-data-center-expansion-at-irving-site/",
          "publisher": "Connect CRE",
          "date": "2024-03-29",
          "source_tier": 1
        },
        {
          "title": "QTS Data Centers: All locations",
          "url": "https://q.com/data-centers/",
          "publisher": "QTS Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: QTS DFW01 Longhorn Dr Irving",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071337750",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "QTS Data Centers lists QTS Irving at Irving, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://q.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "qts-san-antonio-tx",
      "name": "QTS San Antonio",
      "summary": "QTS Data Centers lists a data center at San Antonio, Texas among the sites it operates.",
      "state": "TX",
      "city": "San Antonio",
      "county": "Bexar County",
      "status": "operational",
      "developer": "QTS Data Centers",
      "capacity_mw": null,
      "latitude": 29.4426,
      "longitude": -98.6852,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110070939377) for QTS SAT2 in San Antonio, Bexar County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110070939377",
      "location_last_verified": "2026-09-14",
      "site_address": "NWC Of Potranco Road And Ingram Road, San Antonio, TX 78251",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070939377",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://q.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/qts-san-antonio-tx",
      "source": "https://q.com/data-centers/",
      "basis": "official_record",
      "sources": [
        {
          "title": "QTS Data Centers: All locations",
          "url": "https://q.com/data-centers/",
          "publisher": "QTS Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: QTS SAT2 San Antonio",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110070939377",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "QTS Data Centers lists QTS San Antonio at San Antonio, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://q.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "qts-south-dallas-wilmer-tx",
      "name": "QTS South Dallas",
      "summary": "QTS Data Centers lists a data center at Wilmer, Texas and says it is being built.",
      "state": "TX",
      "city": "Wilmer",
      "county": "Dallas County",
      "status": "under_construction",
      "developer": "QTS Data Centers",
      "capacity_mw": null,
      "latitude": 32.587472,
      "longitude": -96.699838,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071946009) for QTS DFW2 DC3 in Wilmer, Dallas County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110071946009",
      "location_last_verified": "2026-09-14",
      "site_address": "1501 N Sunrise Rd, Wilmer, TX 75172",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071946009",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "air permit generator list",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071946009",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/qts-south-dallas-wilmer-tx",
      "source": "https://q.com/data-centers/",
      "basis": "official_record",
      "sources": [
        {
          "title": "QTS Data Centers: All locations",
          "url": "https://q.com/data-centers/",
          "publisher": "QTS Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: QTS DFW2 DC3 Wilmer TX",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071946009",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "QTS Data Centers lists QTS South Dallas at Wilmer, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://q.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "rackspace-us-inc-rackspace-dallas-grapevine-dfw1-grapevine-tx",
      "name": "Rackspace Dallas Grapevine (DFW1)",
      "summary": "Rackspace operates the DFW1 data center at 801 Industrial Blvd in Grapevine, Tarrant County, Texas, registered in the EPA Facility Registry Service (FRS ID 110035370504).",
      "state": "TX",
      "city": "Grapevine",
      "county": "Tarrant County",
      "status": "operational",
      "developer": "Rackspace",
      "capacity_mw": null,
      "latitude": 32.93054,
      "longitude": -97.10471,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110035370504) for Rackspace Hosting at 801 Industrial Blvd Ste 200, Grapevine, Tarrant County, Texas.",
      "location_verified_at": null,
      "coordinate_source": "EPA ECHO FRS ID 110035370504",
      "location_last_verified": null,
      "site_address": "801 Industrial Blvd Ste 200, Grapevine, TX 76051",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110035370504",
      "published": "2026-10-21",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "air permit generator list",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110035370504",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/rackspace-us-inc-rackspace-dallas-grapevine-dfw1-grapevine-tx",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110035370504",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Rackspace Hosting Grapevine",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110035370504",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110035370504",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "stack-dfw01-plano-tx",
      "name": "STACK DFW01",
      "summary": "STACK Infrastructure lists a data center at Plano, Texas among the sites it operates.",
      "state": "TX",
      "city": "Plano",
      "county": "Collin County",
      "status": "operational",
      "developer": "STACK Infrastructure",
      "capacity_mw": null,
      "latitude": 33.0502419,
      "longitude": -96.748682,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.stackinfra.com/locations/americas/dallas-fort-worth/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/stack-dfw01-plano-tx",
      "source": "https://www.stackinfra.com/locations/",
      "basis": "official_record",
      "sources": [
        {
          "title": "STACK Infrastructure: Americas locations",
          "url": "https://www.stackinfra.com/locations/",
          "publisher": "STACK Infrastructure",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "STACK Infrastructure: STACK DFW01",
          "url": "https://www.stackinfra.com/locations/americas/dallas-fort-worth/",
          "publisher": "STACK Infrastructure",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "STACK Infrastructure lists STACK DFW01 at Plano, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.stackinfra.com/locations/americas/dallas-fort-worth/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "stack-dfw02-lancaster-tx",
      "name": "STACK DFW02",
      "summary": "STACK Infrastructure lists a data center at Lancaster, Texas among the sites it operates.",
      "state": "TX",
      "city": "Lancaster",
      "county": "Dallas County",
      "status": "operational",
      "developer": "STACK Infrastructure",
      "capacity_mw": null,
      "latitude": 32.561752,
      "longitude": -96.76881,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071943842) for Lancaster Data Center at 2401 S Dallas Ave, Lancaster, Dallas County, Texas.",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "EPA ECHO FRS ID 110071943842",
      "location_last_verified": "2026-09-14",
      "site_address": "2401 S Dallas Ave, Lancaster, TX 75146",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071943842",
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.stackinfra.com/locations/americas/dallas-fort-worth/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/stack-dfw02-lancaster-tx",
      "source": "https://www.stackinfra.com/locations/",
      "basis": "official_record",
      "sources": [
        {
          "title": "STACK Infrastructure: Americas locations",
          "url": "https://www.stackinfra.com/locations/",
          "publisher": "STACK Infrastructure",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "STACK Infrastructure: STACK DFW02",
          "url": "https://www.stackinfra.com/locations/americas/dallas-fort-worth/",
          "publisher": "STACK Infrastructure",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: LAN01 Lancaster Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071943842",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "STACK Infrastructure lists STACK DFW02 at Lancaster, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.stackinfra.com/locations/americas/dallas-fort-worth/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "stream-data-centers-stream-data-centers-dfw-vii-garland-tx",
      "name": "Stream Data Centers DFW VII Garland",
      "summary": "Stream Data Centers operates the DFW VII data center campus at 1717 Lookout Drive in Garland, Dallas County, Texas, registered in the EPA Facility Registry Service (FRS ID 110071854750).",
      "state": "TX",
      "city": "Garland",
      "county": "Dallas County",
      "status": "operational",
      "developer": "Stream Data Centers",
      "capacity_mw": null,
      "latitude": 32.982696,
      "longitude": -96.666884,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110071854750) for SDC DFW VII Data Center at 1717 Lookout Drive, Garland, Dallas County, Texas.",
      "location_verified_at": null,
      "coordinate_source": "EPA ECHO FRS ID 110071854750",
      "location_last_verified": null,
      "site_address": "1717 Lookout Drive, Garland, TX 75044",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071854750",
      "published": "2026-10-21",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 2,
      "buildings_basis": "air permit generator list",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071854750",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/stream-data-centers-stream-data-centers-dfw-vii-garland-tx",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110071854750",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: SDC DFW VII Data Center Phase 2",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071854750",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071854750",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "switch-austin-campus-tx",
      "name": "Switch Austin campus",
      "summary": "Switch lists a data center at Austin, Texas among the sites it operates.",
      "state": "TX",
      "city": "Austin",
      "county": "Travis County",
      "status": "operational",
      "developer": "Switch",
      "capacity_mw": null,
      "latitude": 30.2984886,
      "longitude": -97.7536575,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.switch.com/austin/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/switch-austin-campus-tx",
      "source": "https://www.switch.com/locations/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Switch: Locations",
          "url": "https://www.switch.com/locations/",
          "publisher": "Switch",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Switch: Switch Austin campus",
          "url": "https://www.switch.com/austin/",
          "publisher": "Switch",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Switch lists Switch Austin campus at Austin, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.switch.com/austin/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "tierpoint-dallas-tx",
      "name": "TierPoint Dallas",
      "summary": "TierPoint lists 3 data centers at Dallas, Texas among the sites it operates.",
      "state": "TX",
      "city": "Dallas",
      "county": "Dallas County",
      "status": "operational",
      "developer": "TierPoint",
      "capacity_mw": null,
      "latitude": 32.7935291,
      "longitude": -96.7666819,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 3,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.tierpoint.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/tierpoint-dallas-tx",
      "source": "https://www.tierpoint.com/data-centers/",
      "basis": "official_record",
      "sources": [
        {
          "title": "TierPoint: Browse our data centers",
          "url": "https://www.tierpoint.com/data-centers/",
          "publisher": "TierPoint",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "TierPoint lists TierPoint Dallas Data Center, TierPoint Dallas - Allen Data Center, TierPoint Dallas - Fort Worth Data Center at Dallas, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.tierpoint.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "tierpoint-llc-tierpoint-dallas-forth-worth-fort-worth-tx",
      "name": "TierPoint Fort Worth Data Center",
      "summary": "TierPoint operates the Dallas Fort Worth data center at 13701 Independence Pkwy in Fort Worth, Tarrant County, Texas, registered in the EPA Facility Registry Service (FRS ID 110033431935).",
      "state": "TX",
      "city": "Fort Worth",
      "county": "Tarrant County",
      "status": "operational",
      "developer": "TierPoint",
      "capacity_mw": null,
      "latitude": 32.97985,
      "longitude": -97.25112,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO Detailed Facility Report (FRS ID 110033431935) and TierPoint data center directory at 13701 Independence Pkwy, Fort Worth, Tarrant County, Texas.",
      "location_verified_at": null,
      "coordinate_source": "EPA ECHO FRS ID 110033431935",
      "location_last_verified": null,
      "site_address": "13701 Independence Pkwy, Fort Worth, TX 76177",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110033431935",
      "published": "2026-10-21",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.tierpoint.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/tierpoint-llc-tierpoint-dallas-forth-worth-fort-worth-tx",
      "source": "https://www.tierpoint.com/data-centers/",
      "basis": "official_record",
      "sources": [
        {
          "title": "TierPoint: Data Center Locations",
          "url": "https://www.tierpoint.com/data-centers/",
          "publisher": "TierPoint",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "EPA ECHO detailed facility report: Independence Pkwy Data Center Fort Worth",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110033431935",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110033431935",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "tierpoint-llc-tierpoint-dallas2-allen-allen-tx",
      "name": "TierPoint Allen Data Center",
      "summary": "TierPoint operates the Dallas Allen data center at 820 Allen Commerce Parkway in Allen, Collin County, Texas.",
      "state": "TX",
      "city": "Allen",
      "county": "Collin County",
      "status": "operational",
      "developer": "TierPoint",
      "capacity_mw": null,
      "latitude": 33.0954,
      "longitude": -96.6792,
      "location_precision": "permit_point",
      "location_source": "TierPoint Dallas Allen data center specification at 820 Allen Commerce Parkway, Allen, Collin County, Texas.",
      "location_verified_at": null,
      "coordinate_source": "operator address point",
      "location_last_verified": null,
      "site_address": "820 Allen Commerce Parkway, Allen, TX 75013",
      "site_address_source_url": "https://www.tierpoint.com/data-centers/",
      "published": "2026-10-21",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "operator page",
      "buildings_source_url": "https://www.tierpoint.com/data-centers/",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/tierpoint-llc-tierpoint-dallas2-allen-allen-tx",
      "source": "https://www.tierpoint.com/data-centers/",
      "basis": "official_record",
      "sources": [
        {
          "title": "TierPoint: Data Center Locations",
          "url": "https://www.tierpoint.com/data-centers/",
          "publisher": "TierPoint",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://www.tierpoint.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "turner-construction-wlo-sn1-data-center-project-san-antonio-tx",
      "name": "Turner Construction Wlo SN1 Data Center Project",
      "summary": "The EPA's facility registry lists Turner Construction Wlo SN1 Data Center Project at 5150 Rogers RD, San Antonio, TX 78251 in San Antonio, Texas, with no permit program listed.",
      "state": "TX",
      "city": "San Antonio",
      "county": "Bexar County",
      "status": "operational",
      "developer": "Microsoft",
      "capacity_mw": null,
      "latitude": 29.47897,
      "longitude": -98.69541,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110035156041: the registry placed its point by address matching house number, accurate to 30 m",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-20",
      "site_address": "5150 Rogers RD, San Antonio, TX 78251",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110035156041",
      "published": "2026-10-20",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": 1,
      "buildings_basis": "air permit generator list",
      "buildings_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110035156041",
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/turner-construction-wlo-sn1-data-center-project-san-antonio-tx",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110035156041",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Turner Construction Wlo SN1 Data Center Project",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110035156041",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Verified facility status from primary EPA ECHO or operator record.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110035156041",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "westlake-data-ctr-roanoke-tx",
      "name": "Westlake Data CTR",
      "summary": "The EPA's facility registry lists Westlake Data CTR at 8 Campus Cir, Roanoke, TX 76262 in Roanoke, Texas, with no permit program listed.",
      "state": "TX",
      "city": "Roanoke",
      "county": "Tarrant County",
      "status": "not_verified",
      "developer": "Fidelity Investments",
      "capacity_mw": null,
      "latitude": 32.980592,
      "longitude": -97.174381,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110034238064: the registry placed its point by address matching house number, accurate to 50 m",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-20",
      "site_address": "8 Campus Cir, Roanoke, TX 76262",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110034238064",
      "published": "2026-10-20",
      "last_verified": "2026-10-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/westlake-data-ctr-roanoke-tx",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110034238064",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Westlake Data CTR",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110034238064",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-24",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Facility appears in the EPA Facility Registry Service (ECHO) under NAICS 518210 or SIC 7374; commercial data center operations have not yet been independently verified.",
          "source_url": "https://echo.epa.gov/detailed-facility-report?fid=110034238064",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "google-west-memphis-data-center-ar",
      "name": "Google West Memphis Data Center",
      "summary": "Google is developing a data center in West Memphis, Arkansas, involving a power agreement with Entergy and utility rate implications for West Memphis Utilities ratepayers, with associated legal disputes over disclosure of financial records.",
      "state": "AR",
      "city": "West Memphis",
      "county": "Crittenden",
      "status": "under_construction",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 35.20611,
      "longitude": -90.20167,
      "location_precision": "county",
      "location_source": "County seat (Marion), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-10-21",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": "utility special rate agreement",
      "power_source_url": "https://pv-magazine-usa.com/2026/09/23/googles-fair-share-plus-data-center-deal-with-entergy-sparks-arkansas-ratepayer-concerns/",
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-west-memphis-data-center-ar",
      "source": "https://www.yahoo.com/news/us/articles/west-memphis-utilities-no-rate-183236485.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "West Memphis Utilities: No rate increase because of Google - WREG.com",
          "url": "https://www.yahoo.com/news/us/articles/west-memphis-utilities-no-rate-183236485.html",
          "publisher": "WREG.com",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Google, Entergy keeping energy rate contract secret for $4 billion West Memphis project - The Arkansas Democrat Gazette",
          "url": "https://www.arkansasonline.com/news/2026/may/03/google-entergy-keeping-energy-rate-contract/",
          "publisher": "arkansasonline.com",
          "date": "2026-05-03",
          "source_tier": 4
        },
        {
          "title": "Data center non disclosure agreements broad, secretive - The Arkansas Democrat Gazette",
          "url": "https://www.arkansasonline.com/news/2026/may/12/data-center-non-disclosure-agreements-broad/",
          "publisher": "arkansasonline.com",
          "date": "2026-05-12",
          "source_tier": 4
        },
        {
          "title": "Google breaks ground on $4B West Memphis project, largest in Ark. history",
          "url": "https://www.bizjournals.com/memphis/news/2025/10/02/google-unveils-west-memphis-arkanasas-data-center.html",
          "publisher": "The Business Journals",
          "date": "2025-10-02",
          "source_tier": 4
        },
        {
          "title": "Google hiring for West Memphis data center",
          "url": "https://wreg.com/news/local/google-hiring-for-west-memphis-data-center/",
          "publisher": "WREG.com",
          "date": "2026-02-26",
          "source_tier": 4
        },
        {
          "title": "West Memphis hopes Arkansas incentives attract new facility, thousands of jobs - The Arkansas Democrat Gazette",
          "url": "https://www.arkansasonline.com/news/2026/apr/24/west-memphis-hopes-arkansas-incentives-attract/",
          "publisher": "arkansasonline.com",
          "date": "2026-04-24",
          "source_tier": 4
        },
        {
          "title": "Google breaks ground on $4B data center in West Memphis",
          "url": "https://businessfacilities.com/google-breaks-ground-on-4b-data-center-in-west-memphis/",
          "publisher": "Action News 5",
          "date": "2025-10-02",
          "source_tier": 4
        },
        {
          "title": "OPINION | GUEST COLUMN: Harvey Couch versus the data centers - The Arkansas Democrat Gazette",
          "url": "https://www.arkansasonline.com/news/2026/sep/06/harvey-couch-versus-the-data-centers/",
          "publisher": "The Arkansas Democrat-Gazette",
          "date": "2026-09-06",
          "source_tier": 4
        },
        {
          "title": "Google announces grants for West Memphis area",
          "url": "https://wreg.com/news/google-announces-grants-for-west-memphis-area/",
          "publisher": "WREG.com",
          "date": "2026-04-28",
          "source_tier": 4
        },
        {
          "title": "Google to purchase power from new Steel River solar project in Mississippi County - The Arkansas Democrat Gazette",
          "url": "https://www.arkansasonline.com/news/2026/jul/14/google-to-purchase-power-from-new-solar-project/",
          "publisher": "arkansasonline.com",
          "date": "2026-07-14",
          "source_tier": 4
        },
        {
          "title": "Google breaks ground on $4B West Memphis, AR data center",
          "url": "https://wreg.com/news/local/google-breaks-ground-on-arkansas-data-center/",
          "publisher": "WREG.com",
          "date": "2025-10-02",
          "source_tier": 4
        },
        {
          "title": "Google confirmed to be behind West Memphis data center project in Arkansas",
          "url": "https://www.datacenterdynamics.com/en/news/google-confirmed-to-be-behind-west-memphis-data-center-project-in-arkansas/",
          "publisher": "Data Center Dynamics",
          "date": "2025-09-09",
          "source_tier": 3
        },
        {
          "title": "Google to Build Data Center in Arkansas",
          "url": "https://www.wsj.com/tech/google-to-build-data-center-in-arkansas-52ff3c01",
          "publisher": "WSJ",
          "date": "2025-10-02",
          "source_tier": 4
        },
        {
          "title": "Arkansas lawmakers question utility on data center projects, impact on ratepayers - Arkansas Advocate",
          "url": "https://arkansasadvocate.com/2026/09/15/arkansas-lawmakers-question-utility-on-data-center-projects-impact-on-ratepayers/",
          "publisher": "Arkansas Advocate",
          "date": "2026-09-16",
          "source_tier": 4
        },
        {
          "title": "Entergy loses bid to block Google deal reporting - Axios",
          "url": "https://www.axios.com/local/nw-arkansas/2026/09/02/entergy-google-data-center-deal-court-ruling",
          "publisher": "Axios",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Judge denies effort to block Arkansas outlets from publishing details about data center agreement - Arkansas Advocate",
          "url": "https://arkansasadvocate.com/2026/09/02/judge-denies-effort-to-block-arkansas-outlets-from-publishing-details-about-data-center-agreement/",
          "publisher": "Arkansas Advocate",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Federal judge denies Entergy a temporary restraining order to block reporting on West Memphis data center agreement - K8 News | Jonesboro, Arkansas",
          "url": "https://www.kait8.com/2026/09/02/federal-judge-denies-entergy-temporary-restraining-order-block-reporting-west-memphis-data-center-agreement/",
          "publisher": "K8 News | Jonesboro, Arkansas",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Docs reveal plans for $6 utility rate hike to help fund Google’s data center project in West Memphis - Action News 5",
          "url": "https://www.actionnews5.com/2026/09/02/docs-reveal-plans-6-utility-rate-hike-help-fund-googles-data-center-project-west-memphis/",
          "publisher": "Action News 5",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Judge refuses to block Arkansas news reporting on Google data center energy documents - CNBC",
          "url": "https://www.cnbc.com/2026/09/02/google-data-center-arkansas-entergy-court.html",
          "publisher": "CNBC",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Entergy Sues to Block Release of Financial Details in Google Arkansas Data Center Project - KVOM 101.7",
          "url": "https://www.kvom.com/entergy-sues-to-block-release-of-financial-details-in-google-arkansas-data-center-project/",
          "publisher": "KVOM 101.7",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Entergy Sues to Block Publication of Google Data Center Financial Records Amid Trade Secret Dispute - Deltaplex News",
          "url": "https://www.deltaplexnews.com/local-news/entergy-sues-to-block-release-of-financial-details-in-google-arkansas-data-center-project/",
          "publisher": "Deltaplex News",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Entergy files to stop disclosure of West Memphis data center agreement - WREG.com",
          "url": "https://x.com/3onyourside/status/2095187771014939079?lang=ar&ref_src=twsrc%5Egoogle%7Ctwcamp%5Eserp%7Ctwgr%5Etweet",
          "publisher": "WREG.com",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "In a panic over mistakenly shared documents, Entergy lawyers ask judge to restrain journalists - Arkansas Times",
          "url": "https://arktimes.com/arkansas-blog/2026/09/01/in-a-panic-over-mistakenly-shared-documents-entergy-lawyers-ask-judge-to-restrain-journalists",
          "publisher": "Arkansas Times",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Entergy Arkansas Asks Federal Judge to Block Publication of Google Data Center Agreement - Arkansas Business",
          "url": "https://www.arkansasbusiness.com/article/entergy-seeks-to-block-data-center-news/",
          "publisher": "Arkansas Business",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Google Invests $526 Million in Arkansas Solar and Battery Project to Power Data Center - Deltaplex News",
          "url": "https://www.deltaplexnews.com/local-news/google-invests-526-million-in-arkansas-solar-and-battery-project-to-power-data-center/",
          "publisher": "Deltaplex News",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Judge expected to rule Wednesday on Entergy’s request to stop Democrat-Gazette from publishing data center info - arkansasonline.com",
          "url": "https://www.arkansasonline.com/news/2026/sep/01/entergy-arkansas-asks-federal-judge-to-stop/",
          "publisher": "arkansasonline.com",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Judge weighing whether to block Arkansas news outlets from publishing data center pact details",
          "url": "https://www.ualrpublicradio.org/local-regional-news/2026-09-02/judge-weighing-whether-to-block-arkansas-news-outlets-from-publishing-data-center-pact-details",
          "publisher": "Little Rock Public Radio KUAR",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Google representative in Little Rock to talk future of data centers in Arkansas - KHBS",
          "url": "https://www.4029tv.com/article/google-representative-in-little-rock-to-talk-future-of-data-centers-in-arkansas/73753066",
          "publisher": "KHBS",
          "date": "2026-09-16",
          "source_tier": 4
        },
        {
          "title": "AR lawmakers question Entergy on Google data center power costs, ratepayer impact - KATV",
          "url": "https://katv.com/news/local/ar-lawmakers-question-entergy-on-google-data-center-power-costs-ratepayer-impact-public-scrutiny-cypress-solar-partnership-funding-plant",
          "publisher": "KATV",
          "date": "2026-09-16",
          "source_tier": 4
        },
        {
          "title": "Entergy Arkansas drops lawsuit over newspaper’s publication of data center agreement details",
          "url": "https://www.ualrpublicradio.org/local-regional-news/2026-09-17/entergy-arkansas-drops-lawsuit-over-newspapers-publication-of-data-center-agreement-details",
          "publisher": "Little Rock Public Radio KUAR",
          "date": "2026-09-17",
          "source_tier": 4
        },
        {
          "title": "Entergy Arkansas drops lawsuit over West Memphis data center agreement details - kjnbtv.com",
          "url": "https://www.kjnbtv.com/news/local/entergy-arkansas-drops-lawsuit-over-west-memphis-data-center-agreement-details/article_25e44c55-0b0c-46ae-b9b9-7e85d91dd8c2.html",
          "publisher": "kjnbtv.com",
          "date": "2026-09-17",
          "source_tier": 4
        },
        {
          "title": "Lawmakers question West Memphis data center project’s impact on Entergy ratepayers - Action News 5",
          "url": "https://www.actionnews5.com/2026/09/18/lawmakers-question-west-memphis-data-center-projects-impact-entergy-ratepayers/",
          "publisher": "Action News 5",
          "date": "2026-09-18",
          "source_tier": 4
        },
        {
          "title": "Arkansas Public Service Commission denies Entergy’s request to purchase power from a planned solar facility - FOX16.com",
          "url": "https://www.myarklamiss.com/news/arkansas-news/arkansas-public-service-commission-denies-entergys-request-to-purchase-power-from-a-planned-solar-facility/amp/",
          "publisher": "FOX16.com",
          "date": "2026-09-17",
          "source_tier": 4
        },
        {
          "title": "Seeds sown in 2024 for Generating Arkansas Jobs Act, Entergy’s Google deal - The Arkansas Democrat Gazette",
          "url": "https://www.arkansasonline.com/news/2026/sep/19/seeds-sown-in-2024-for-generating-arkansas-jobs/",
          "publisher": "The Arkansas Democrat-Gazette",
          "date": "2026-09-20",
          "source_tier": 4
        },
        {
          "title": "Google's \"Fair Share Plus\" data center deal with Entergy sparks Arkansas ratepayer concerns - pv magazine USA",
          "url": "https://pv-magazine-usa.com/2026/09/23/googles-fair-share-plus-data-center-deal-with-entergy-sparks-arkansas-ratepayer-concerns/",
          "publisher": "pv magazine USA",
          "date": "2026-09-23",
          "source_tier": 4
        },
        {
          "title": "Google's West Memphis data center",
          "url": "https://www.youtube.com/watch?v=pl1DMQjXoVY",
          "publisher": "YouTube",
          "date": "2026-06-05",
          "source_tier": 5
        },
        {
          "title": "Entergy sues Democrat Gazette, AR Times for publishing secret Google data center details",
          "url": "https://www.youtube.com/watch?v=LocqocLV8IA",
          "publisher": "YouTube",
          "date": "2026-09-03",
          "source_tier": 5
        },
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "New Data Center Developments: November 2025 - Data Center Knowledge",
          "url": "https://www.datacenterknowledge.com/data-center-construction/new-data-center-developments-november-2025",
          "publisher": "Data Center Knowledge",
          "date": "2025-11-04",
          "source_tier": 1
        },
        {
          "title": "West Memphis Utilities outlines its role in Google data center project amid public concern - KATV",
          "url": "https://katv.com/news/gallery/west-memphis-utilities-outlines-its-role-in-google-data-center-project-amid-public-concern?photo=2",
          "publisher": "KATV",
          "date": "2026-09-04",
          "source_tier": 4
        },
        {
          "title": "West Memphis Utilities issues statement to ease concerns about perceived bill increase tied to Google data center - localmemphis.com",
          "url": "https://www.localmemphis.com/article/news/local/west-memphis-utilities-issues-statement-to-ease-concerns-about-perceived-bill-increase-tied-to-google-data-center/522-bf466f33-f219-41bf-9e30-a910642ee5db",
          "publisher": "localmemphis.com",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Google’s Arkansas Data Center Reveals the Huge Power Bill Behind AI. Entergy Stands to Benefit - Yahoo Finance",
          "url": "https://finance.yahoo.com/technology/ai/articles/google-arkansas-data-center-reveals-200631272.html",
          "publisher": "Yahoo Finance",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Judge says ‘no’ to Arkansas utility in freedom of the press fight - Oklahoma Energy Today",
          "url": "https://okenergytoday.com/2026/09/judge-says-no-to-arkansas-utility-in-freedom-of-the-press-fight/",
          "publisher": "Oklahoma Energy Today",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Judge Rejects Entergy Request to Block Publication of Google Data Center Financial Records - KVOM 101.7",
          "url": "https://www.kvom.com/judge-rejects-entergy-request-to-block-publication-of-google-data-center-financial-records/",
          "publisher": "KVOM 101.7",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Google’s contribution was at issue in Arkansas regulators’ review of Entergy contract - arkansasonline.com",
          "url": "https://www.arkansasonline.com/news/2026/sep/03/googles-contribution-was-at-issue-in-arkansas/",
          "publisher": "arkansasonline.com",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Court fight ensues over new documents about Google and Arkansas data center - Oklahoma Energy Today",
          "url": "https://okenergytoday.com/2026/09/court-fight-ensues-over-new-documents-about-google-and-arkansas-data-center/",
          "publisher": "Oklahoma Energy Today",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Federal judge denies Entergy Arkansas’ request for temporary restraining order against Arkansas Democrat-Gazette - arkansasonline.com",
          "url": "https://www.arkansasonline.com/news/2026/sep/02/federal-judge-denies-entergy-arkansas-request-for/",
          "publisher": "arkansasonline.com",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Entergy Arkansas alleges ‘serious and careless mathematical error’ in Google West Memphis data center reporting - FOX16.com",
          "url": "https://www.kark.com/news/state-news/entergy-arkansas-alleges-serious-and-careless-mathematical-error-in-google-west-memphis-data-center-reporting/",
          "publisher": "FOX16.com",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Arkansas judge rules against Entergy in fight over released FOIA records for West Memphis data center - KARK",
          "url": "https://www.kark.com/news/arkansas-courts/entergy-files-in-federal-court-to-stop-disclosure-of-west-memphis-data-center-agreement/",
          "publisher": "KARK",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Entergy asks judge to block Arkansas news outlets' publication of 'confidential' Google data center info - thv11.com",
          "url": "https://www.thv11.com/article/news/local/little-rock/entergy-arkansas-news-outlets-data-center/91-e6aecedc-d99e-418b-9916-daefea3837ea",
          "publisher": "thv11.com",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Google breaks ground on $4B West Memphis, AR data center",
          "url": "https://www.youtube.com/watch?v=ODCdw4FF6Oc",
          "publisher": "YouTube",
          "date": null,
          "source_tier": 5
        },
        {
          "title": "Google breaks ground on $4B data center in West Memphis",
          "url": "https://www.youtube.com/watch?v=B2oIZAsfi3U",
          "publisher": "YouTube",
          "date": null,
          "source_tier": 5
        },
        {
          "title": "Google data center poises West Memphis for boom; project bond issue totals could reach $60 billion - The Arkansas Democrat Gazette",
          "url": "https://www.arkansasonline.com/news/2026/jun/04/google-data-center-poises-west-memphis-for-boom/",
          "publisher": "arkansasonline.com",
          "date": "2026-06-04",
          "source_tier": 4
        },
        {
          "title": "Google hiring for new West Memphis data center",
          "url": "https://www.actionnews5.com/2026/02/26/google-hiring-new-west-memphis-data-center/",
          "publisher": "Action News 5",
          "date": "2026-02-26",
          "source_tier": 4
        },
        {
          "title": "Google hands out money from West Memphis Energy Impact Fund",
          "url": "https://talkbusiness.net/2026/04/google-hands-out-money-from-west-memphis-energy-impact-fund/",
          "publisher": "Talk Business & Politics",
          "date": "2026-04-28",
          "source_tier": 4
        },
        {
          "title": "Google backs nation's largest solar project for West Memphis data center",
          "url": "https://www.commercialappeal.com/story/money/business/development/2026/07/14/google-west-memphis-data-center-to-be-powered-by-solar-battery-storage/90862492007/",
          "publisher": "commercialappeal.com",
          "date": "2026-07-14",
          "source_tier": 4
        },
        {
          "title": "Google announces first recipients of West Memphis Energy Impact Fund",
          "url": "https://www.actionnews5.com/2026/04/28/google-announces-first-recipients-west-memphis-energy-impact-fund/",
          "publisher": "Action News 5",
          "date": "2026-04-28",
          "source_tier": 4
        },
        {
          "title": "See photos from Google's West Memphis Energy Impact Fund event",
          "url": "https://www.commercialappeal.com/picture-gallery/money/business/2026/04/28/google-energy-impact-fund-in-west-memphis/89839657007/",
          "publisher": "commercialappeal.com",
          "date": "2026-04-28",
          "source_tier": 4
        },
        {
          "title": "Google's $4 billion data center to transform West Memphis",
          "url": "https://katv.com/news/local/googles-4-billion-data-center-to-transform-west-memphis",
          "publisher": "KATV",
          "date": "2025-10-02",
          "source_tier": 4
        },
        {
          "title": "Google announces recipients for $25M West Memphis Energy Impact Fund",
          "url": "https://www.commercialappeal.com/story/money/business/development/2026/04/28/google-announces-plans-recipients-memphis-energy-fund/89751973007/",
          "publisher": "commercialappeal.com",
          "date": "2026-04-28",
          "source_tier": 4
        },
        {
          "title": "Google is investing in Arkansas with a new data center, energy efficiency programs and more.",
          "url": "https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-arkansas/",
          "publisher": "blog.google",
          "date": "2025-10-02",
          "source_tier": 4
        },
        {
          "title": "Google to invest $4 billion in data center project in West Memphis. Everything we know",
          "url": "https://www.commercialappeal.com/story/money/business/2025/10/02/google-data-center-4-billion-dollars-west-memphis-arkansas/86354716007/",
          "publisher": "commercialappeal.com",
          "date": "2025-10-02",
          "source_tier": 4
        },
        {
          "title": "Google Invests $526 Million in Arkansas Solar and Battery Project to Power Data Center - KVOM 101.7",
          "url": "https://www.deltaplexnews.com/local-news/google-invests-526-million-in-arkansas-solar-and-battery-project-to-power-data-center/",
          "publisher": "KVOM 101.7",
          "date": "2026-09-01",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-10-21",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Entergy Arkansas filed heavily redacted amended application for Google West Memphis data center project.",
          "source_url": "https://www.arkansasonline.com/news/2026/oct/21/entergy-files-heavily-redacted-amended-application/",
          "source_tier": 1
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-20",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-20",
          "summary": "Entergy and Google began talks about a data center in West Memphis; three months later, work on the Generating Arkansas Jobs Act began",
          "source_url": "https://www.arkansasonline.com/news/2026/sep/19/seeds-sown-in-2024-for-generating-arkansas-jobs/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-18",
          "summary": "Google partnership with Entergy Arkansas is for 20 years",
          "source_url": "https://www.actionnews5.com/2026/09/18/lawmakers-question-west-memphis-data-center-projects-impact-entergy-ratepayers/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-18",
          "summary": "Google exploring second potential data center project in Little Rock",
          "source_url": "https://www.actionnews5.com/2026/09/18/lawmakers-question-west-memphis-data-center-projects-impact-entergy-ratepayers/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-18",
          "summary": "Construction on Google West Memphis facility has been ongoing for nearly a year",
          "source_url": "https://www.actionnews5.com/2026/09/18/lawmakers-question-west-memphis-data-center-projects-impact-entergy-ratepayers/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "A federal judge denied Entergy's request to block publication of agreement details earlier in September 2026.",
          "source_url": "https://www.kjnbtv.com/news/local/entergy-arkansas-drops-lawsuit-over-west-memphis-data-center-agreement-details/article_25e44c55-0b0c-46ae-b9b9-7e85d91dd8c2.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "Groundbreaking for the solar farm took place July 11.",
          "source_url": "https://www.myarklamiss.com/news/arkansas-news/arkansas-public-service-commission-denies-entergys-request-to-purchase-power-from-a-planned-solar-facility/amp/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "Entergy Arkansas filed a notice of dismissal of its lawsuit against the Arkansas Democrat Gazette, Arkansas Times, and a resident over publication of details from a West Memphis data center agreement.",
          "source_url": "https://www.kjnbtv.com/news/local/entergy-arkansas-drops-lawsuit-over-west-memphis-data-center-agreement-details/article_25e44c55-0b0c-46ae-b9b9-7e85d91dd8c2.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "Entergy Arkansas filed and then dismissed a lawsuit against the Arkansas Democrat Gazette, Arkansas Times and Jessica Kivell over publication of details about its data center agreement with Altitude Capital LLC.",
          "source_url": "https://www.ualrpublicradio.org/local-regional-news/2026-09-17/entergy-arkansas-drops-lawsuit-over-newspapers-publication-of-data-center-agreement-details",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-16",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-16",
          "summary": "Google is exploring a potential data center project in Little Rock",
          "source_url": "https://www.4029tv.com/article/google-representative-in-little-rock-to-talk-future-of-data-centers-in-arkansas/73753066",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-16",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-16",
          "summary": "Construction is already underway on Google's data center in West Memphis",
          "source_url": "https://www.4029tv.com/article/google-representative-in-little-rock-to-talk-future-of-data-centers-in-arkansas/73753066",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-06",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-06",
          "summary": "Construction work was continuing at the Google project on June 1, 2026",
          "source_url": "https://www.arkansasonline.com/news/2026/sep/06/harvey-couch-versus-the-data-centers/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-03",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-03",
          "summary": "Google's data center in West Memphis is under construction",
          "source_url": "https://www.yahoo.com/news/us/articles/west-memphis-utilities-no-rate-183236485.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-03",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-03",
          "summary": "Judge Lee Rudofsky denied Entergy request for a restraining order against the news outlets",
          "source_url": "https://www.youtube.com/watch?v=LocqocLV8IA",
          "source_tier": 5
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "U.S. District Judge Lee Rudofsky denied Entergy's request for a temporary restraining order on September 2, 2026",
          "source_url": "https://www.kait8.com/2026/09/02/federal-judge-denies-entergy-temporary-restraining-order-block-reporting-west-memphis-data-center-agreement/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "Google West Memphis data center campus will have five data centers, office buildings on approximately 1,200 acres",
          "source_url": "https://www.actionnews5.com/2026/09/02/docs-reveal-plans-6-utility-rate-hike-help-fund-googles-data-center-project-west-memphis/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "Google data center agreement with Entergy has 20 year term",
          "source_url": "https://arkansasadvocate.com/2026/09/02/judge-denies-effort-to-block-arkansas-outlets-from-publishing-details-about-data-center-agreement/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "Special rate contract between Google and Entergy approved by Arkansas Public Service Commission in December",
          "source_url": "https://www.actionnews5.com/2026/09/02/docs-reveal-plans-6-utility-rate-hike-help-fund-googles-data-center-project-west-memphis/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-01",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-01",
          "summary": "Arkansas Cypress is expected to begin operating by the end of 2028",
          "source_url": "https://www.deltaplexnews.com/local-news/google-invests-526-million-in-arkansas-solar-and-battery-project-to-power-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-01",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-01",
          "summary": "U.S. District Judge Lee Rudofsky expected to rule Wednesday September 3 2026 on Entergy's request to stop Arkansas Democrat-Gazette from publishing data center details",
          "source_url": "https://www.arkansasonline.com/news/2026/sep/01/entergy-arkansas-asks-federal-judge-to-stop/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-01",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-01",
          "summary": "Google's West Memphis data center is served under special rate agreement between Entergy Arkansas and Altitude LLC, a Google subsidiary.",
          "source_url": "https://www.deltaplexnews.com/local-news/google-invests-526-million-in-arkansas-solar-and-battery-project-to-power-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-01",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-01",
          "summary": "Arkansas Public Service Commission approved Arkansas Cypress project earlier in 2026.",
          "source_url": "https://www.deltaplexnews.com/local-news/google-invests-526-million-in-arkansas-solar-and-battery-project-to-power-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-01",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-01",
          "summary": "Arkansas Cypress project is expected to begin operating by the end of 2028.",
          "source_url": "https://www.deltaplexnews.com/local-news/google-invests-526-million-in-arkansas-solar-and-battery-project-to-power-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-01",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-01",
          "summary": "Total package tied to Google's West Memphis data center is $716 million, with $190 million designated for transmission system upgrades.",
          "source_url": "https://www.deltaplexnews.com/local-news/google-invests-526-million-in-arkansas-solar-and-battery-project-to-power-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-01",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-01",
          "summary": "Google will contribute $526 million toward Entergy Arkansas' Arkansas Cypress Solar and Battery project.",
          "source_url": "https://www.deltaplexnews.com/local-news/google-invests-526-million-in-arkansas-solar-and-battery-project-to-power-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-14",
          "summary": "Steel River Energy Center held ceremonial groundbreaking July 14, 2026",
          "source_url": "https://www.commercialappeal.com/story/money/business/development/2026/07/14/google-west-memphis-data-center-to-be-powered-by-solar-battery-storage/90862492007/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-14",
          "summary": "Google agreed to purchase initial electricity output from Steel River Energy Center solar project near Wilson in Mississippi County",
          "source_url": "https://www.arkansasonline.com/news/2026/jul/14/google-to-purchase-power-from-new-solar-project/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-14",
          "summary": "First two phases will add three million solar panels, estimated for completion by early to mid 2028",
          "source_url": "https://www.commercialappeal.com/story/money/business/development/2026/07/14/google-west-memphis-data-center-to-be-powered-by-solar-battery-storage/90862492007/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-06-05",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-06-05",
          "summary": "Data center property is located south of West Memphis city limits",
          "source_url": "https://www.youtube.com/watch?v=pl1DMQjXoVY",
          "source_tier": 5
        },
        {
          "status": "under_construction",
          "effective_at": "2026-06-04",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-06-04",
          "summary": "Initial build out takes 18 to 24 months to complete",
          "source_url": "https://www.arkansasonline.com/news/2026/jun/04/google-data-center-poises-west-memphis-for-boom/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-06-04",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-06-04",
          "summary": "Site is 1,100 acres in West Memphis industrial park",
          "source_url": "https://www.arkansasonline.com/news/2026/jun/04/google-data-center-poises-west-memphis-for-boom/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-06-04",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-06-04",
          "summary": "Google announced a $4 billion investment in West Memphis data center in fall 2025",
          "source_url": "https://www.arkansasonline.com/news/2026/jun/04/google-data-center-poises-west-memphis-for-boom/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-06-04",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-06-04",
          "summary": "Construction began in October 2025 on first of possible five buildings",
          "source_url": "https://www.arkansasonline.com/news/2026/jun/04/google-data-center-poises-west-memphis-for-boom/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-05-12",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-12",
          "summary": "West Memphis signed a nondisclosure agreement for a data center project on June 3, 2024",
          "source_url": "https://www.arkansasonline.com/news/2026/may/12/data-center-non-disclosure-agreements-broad/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-05-12",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-12",
          "summary": "Google is developing a $4 billion data center campus in West Memphis",
          "source_url": "https://www.arkansasonline.com/news/2026/may/12/data-center-non-disclosure-agreements-broad/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-05-03",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-03",
          "summary": "Google and Entergy keeping energy rate contract secret",
          "source_url": "https://www.arkansasonline.com/news/2026/may/03/google-entergy-keeping-energy-rate-contract/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-05-03",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-03",
          "summary": "Google data center campus in West Memphis with projected cost of $4 billion",
          "source_url": "https://www.arkansasonline.com/news/2026/may/03/google-entergy-keeping-energy-rate-contract/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-04-28",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-04-28",
          "summary": "Project originally called Project Pyramid, filed permit application December 2024 for five building campus on 1,178 acres along Bollinger Road",
          "source_url": "https://www.commercialappeal.com/story/money/business/development/2026/04/28/google-announces-plans-recipients-memphis-energy-fund/89751973007/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-04-28",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-04-28",
          "summary": "Groot LLC awarded 30 year payment in lieu of taxes by West Memphis City Council in May 2025 covering up to $10 billion in construction costs",
          "source_url": "https://www.commercialappeal.com/story/money/business/development/2026/04/28/google-announces-plans-recipients-memphis-energy-fund/89751973007/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-04-28",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-04-28",
          "summary": "Google announced first two recipients of West Memphis Energy Impact Fund",
          "source_url": "https://talkbusiness.net/2026/04/google-hands-out-money-from-west-memphis-energy-impact-fund/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-04-28",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-04-28",
          "summary": "Google data center project at 1500 South Loop Dr. in West Memphis announced October 2025",
          "source_url": "https://www.commercialappeal.com/story/money/business/development/2026/04/28/google-announces-plans-recipients-memphis-energy-fund/89751973007/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-04-28",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-04-28",
          "summary": "Google announced grants for West Memphis area",
          "source_url": "https://wreg.com/news/google-announces-grants-for-west-memphis-area/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-04-28",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-04-28",
          "summary": "Data center located approximately 3 miles south of Interstate 55",
          "source_url": "https://www.commercialappeal.com/story/money/business/development/2026/04/28/google-announces-plans-recipients-memphis-energy-fund/89751973007/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-04-28",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-04-28",
          "summary": "The fund was announced last year to help scale energy saving and affordability initiatives for residents in Crittenden County and surrounding areas",
          "source_url": "https://www.actionnews5.com/2026/04/28/google-announces-first-recipients-west-memphis-energy-impact-fund/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-04-28",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-04-28",
          "summary": "Google announced the first recipients of the West Memphis Energy Impact Fund on April 28, 2026",
          "source_url": "https://www.commercialappeal.com/picture-gallery/money/business/2026/04/28/google-energy-impact-fund-in-west-memphis/89839657007/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-04-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-04-24",
          "summary": "West Memphis Utilities to provide water and wastewater, Entergy Arkansas to provide power",
          "source_url": "https://www.arkansasonline.com/news/2026/apr/24/west-memphis-hopes-arkansas-incentives-attract/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-04-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-04-24",
          "summary": "Google started construction of $4 billion data center campus in West Memphis",
          "source_url": "https://www.arkansasonline.com/news/2026/apr/24/west-memphis-hopes-arkansas-incentives-attract/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-02-26",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-02-26",
          "summary": "Project expected to take 18 to 24 months to complete",
          "source_url": "https://www.actionnews5.com/2026/02/26/google-hiring-new-west-memphis-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-02-26",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-02-26",
          "summary": "Project is Google's first data center in Arkansas",
          "source_url": "https://www.actionnews5.com/2026/02/26/google-hiring-new-west-memphis-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-02-26",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-02-26",
          "summary": "Facility is on 1,100 acre property at 1500 South Loop Drive near Mississippi River",
          "source_url": "https://www.actionnews5.com/2026/02/26/google-hiring-new-west-memphis-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-02-26",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-02-26",
          "summary": "Google began construction in October 2025 on West Memphis data center",
          "source_url": "https://www.actionnews5.com/2026/02/26/google-hiring-new-west-memphis-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-02-26",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-02-26",
          "summary": "Google is hiring for West Memphis data center positions",
          "source_url": "https://wreg.com/news/local/google-hiring-for-west-memphis-data-center/",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2025-10-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-10-02",
          "summary": "First data center building expected to be completed within 18 to 24 months",
          "source_url": "https://www.commercialappeal.com/story/money/business/2025/10/02/google-data-center-4-billion-dollars-west-memphis-arkansas/86354716007/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2025-10-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-10-02",
          "summary": "Google broke ground on a $4 billion data center in West Memphis on October 2, 2025",
          "source_url": "https://businessfacilities.com/google-breaks-ground-on-4b-data-center-in-west-memphis/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2025-10-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-10-02",
          "summary": "Google broke ground on $4 billion West Memphis data center on October 2, 2025",
          "source_url": "https://wreg.com/news/local/google-breaks-ground-on-arkansas-data-center/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2025-10-02",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-10-02",
          "summary": "Google broke ground on a data center in West Memphis",
          "source_url": "https://www.youtube.com/watch?v=ODCdw4FF6Oc",
          "source_tier": 5
        },
        {
          "status": "under_construction",
          "effective_at": "2025-10-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-10-02",
          "summary": "Construction of the data center is expected to take up to two years",
          "source_url": "https://katv.com/news/local/googles-4-billion-data-center-to-transform-west-memphis",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2025-10-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-10-02",
          "summary": "The data center is expected to span 1,000 acres in West Memphis",
          "source_url": "https://katv.com/news/local/googles-4-billion-data-center-to-transform-west-memphis",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2025-10-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-10-02",
          "summary": "Google announcing $4 billion investment in Arkansas through 2027 including first data center in West Memphis",
          "source_url": "https://blog.google/company-news/inside-google/company-announcements/google-american-innovation-arkansas/",
          "source_tier": 4
        },
        {
          "status": "approved",
          "effective_at": "2025-10-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-10-02",
          "summary": "Data center campus on 1,100 acres in West Memphis",
          "source_url": "https://www.commercialappeal.com/story/money/business/2025/10/02/google-data-center-4-billion-dollars-west-memphis-arkansas/86354716007/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2025-10-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-10-02",
          "summary": "Google plans to partner with the state to offer AI training and credentials to over 10,000 Arkansans",
          "source_url": "https://katv.com/news/local/googles-4-billion-data-center-to-transform-west-memphis",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2025-10-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-10-02",
          "summary": "Google broke ground on West Memphis data center project on October 2, 2025",
          "source_url": "https://www.bizjournals.com/memphis/news/2025/10/02/google-unveils-west-memphis-arkanasas-data-center.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2025-10-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-10-02",
          "summary": "Google to build a data center in Arkansas",
          "source_url": "https://www.wsj.com/tech/google-to-build-data-center-in-arkansas-52ff3c01",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2025-10-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-10-02",
          "summary": "The project is expected to take 18 to 24 months to complete",
          "source_url": "https://www.youtube.com/watch?v=B2oIZAsfi3U",
          "source_tier": 5
        },
        {
          "status": "under_construction",
          "effective_at": "2025-10-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-10-02",
          "summary": "Google's project includes adding solar power and battery storage",
          "source_url": "https://www.youtube.com/watch?v=B2oIZAsfi3U",
          "source_tier": 5
        },
        {
          "status": "under_construction",
          "effective_at": "2025-10-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-10-02",
          "summary": "Google's project includes building a greywater plant to reuse water to cool equipment",
          "source_url": "https://www.youtube.com/watch?v=B2oIZAsfi3U",
          "source_tier": 5
        },
        {
          "status": "under_construction",
          "effective_at": "2025-09-09",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2025-09-09",
          "summary": "Google is the developer of the West Memphis data center project in Arkansas",
          "source_url": "https://www.datacenterdynamics.com/en/news/google-confirmed-to-be-behind-west-memphis-data-center-project-in-arkansas/",
          "source_tier": 3
        }
      ]
    },
    {
      "slug": "apld-jamestown-datacenter-nd",
      "name": "Apld Jamestown Datacenter",
      "summary": "The EPA's facility registry lists Apld Jamestown Datacenter at 2671 Hwy 20 SE, Jamestown, ND 58401 in Jamestown, North Dakota, with a water permit.",
      "state": "ND",
      "city": "Jamestown",
      "county": "Stutsman County",
      "status": "not_verified",
      "developer": null,
      "capacity_mw": null,
      "latitude": 47.027314,
      "longitude": -98.679253,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110071785777: the registry placed its point by interpolation photo, accurate to 300 m",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-20",
      "site_address": "2671 Hwy 20 SE, Jamestown, ND 58401",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071785777",
      "published": "2026-10-20",
      "last_verified": "2026-10-20",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/apld-jamestown-datacenter-nd",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110071785777",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Apld Jamestown Datacenter",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071785777",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "bitpower-data-center-anaconda-mt",
      "name": "Bitpower Data Center",
      "summary": "The EPA's facility registry lists Bitpower Data Center at Along Mill Creek Hwy S Of Ba&p Railroad On E Side, Anaconda, MT 59711 in Anaconda, Montana, with a water permit.",
      "state": "MT",
      "city": null,
      "county": "Deer Lodge County",
      "status": "not_verified",
      "developer": null,
      "capacity_mw": null,
      "latitude": 46.101667,
      "longitude": -112.879444,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110070159639: the registry placed its point by interpolation map, accurate to 50 m",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-20",
      "site_address": "Along Mill Creek Hwy S Of Ba&p Railroad On E Side, Anaconda, MT 59711",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070159639",
      "published": "2026-10-20",
      "last_verified": "2026-10-20",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/bitpower-data-center-anaconda-mt",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110070159639",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Bitpower Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110070159639",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "cryptowatt-mining-data-center-butte-mt",
      "name": "Cryptowatt Mining Data Center",
      "summary": "The EPA's facility registry lists Cryptowatt Mining Data Center at 200 Technology Way, Butte, MT 59701 in Butte, Montana, with a water permit.",
      "state": "MT",
      "city": "Butte",
      "county": "Silver Bow County",
      "status": "not_verified",
      "developer": null,
      "capacity_mw": null,
      "latitude": 45.92972,
      "longitude": -112.51841,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110070235199: the registry placed its point by address matching house number, accurate to 30 m",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-20",
      "site_address": "200 Technology Way, Butte, MT 59701",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070235199",
      "published": "2026-10-20",
      "last_verified": "2026-10-20",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/cryptowatt-mining-data-center-butte-mt",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110070235199",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Cryptowatt Mining Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110070235199",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "dxc-technology-services-llc-cherokee-data-center-tulsa-ok",
      "name": "DXC Technology Services LLC / Cherokee Data Center",
      "summary": "The EPA's facility registry lists DXC Technology Services LLC / Cherokee Data Center at 7400 N Lakewood Ave, Tulsa, OK 74117 in Tulsa, Oklahoma, with an air permit.",
      "state": "OK",
      "city": "Tulsa",
      "county": "Tulsa County",
      "status": "not_verified",
      "developer": "DXC Technology Services LLC",
      "capacity_mw": null,
      "latitude": 36.26113,
      "longitude": -95.90698,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110012160311: the registry placed its point by address matching house number, accurate to 30 m",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-20",
      "site_address": "7400 N Lakewood Ave, Tulsa, OK 74117",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110012160311",
      "published": "2026-10-20",
      "last_verified": "2026-10-20",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110012160311",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/dxc-technology-services-llc-cherokee-data-center-tulsa-ok",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110012160311",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: DXC Technology Services LLC / Cherokee Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110012160311",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "iea-sbd-9403-aegon-data-center-cedar-rapids-ia",
      "name": "Iea, SBD, 9403- Aegon Data Center",
      "summary": "The EPA facility registry lists the Aegon and Transamerica internal insurance enterprise data center at 6910 Tower Road SW in Cedar Rapids, Linn County, Iowa.",
      "state": "IA",
      "city": "Cedar Rapids",
      "county": "Linn County",
      "status": "not_verified",
      "developer": null,
      "capacity_mw": null,
      "latitude": 41.90862,
      "longitude": -91.65418,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110040471414: the registry placed its point by address matching house number, accurate to 50 m",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-20",
      "site_address": "6910 Tower RD SW, Cedar Rapids, IA 52404",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110040471414",
      "published": "2026-10-20",
      "last_verified": "2026-10-20",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/iea-sbd-9403-aegon-data-center-cedar-rapids-ia",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110040471414",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Iea, SBD, 9403- Aegon Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110040471414",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "jacobs-project-management-co-hut-8-dc-corp-saint-francisville-la",
      "name": "Jacobs Project Management Co, Hut 8 DC Corp-river Bend Data Center",
      "summary": "The EPA's facility registry lists Jacobs Project Management Co, Hut 8 DC Corp river Bend Data Center at 2545 La Hwy 964, Saint Francisville, LA 70000 in Saint Francisville, Louisiana, with a water permit.",
      "state": "LA",
      "city": "St. Francisville",
      "county": "West Feliciana Parish",
      "status": "not_verified",
      "developer": "Jacobs Project Management Co, Hut 8 DC Corp",
      "capacity_mw": null,
      "latitude": 30.7842,
      "longitude": -91.3764,
      "location_precision": "address",
      "location_source": "U.S. Census Bureau 2020 Gazetteer, the internal point of St. Francisville, public domain, placed at city level; the EPA facility record gives no site point (the registry placed its point by post office name centroid, which is not the site)",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "census gazetteer place point",
      "location_last_verified": "2026-10-20",
      "site_address": "2545 La Hwy 964, Saint Francisville, LA 70000",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072156341",
      "published": "2026-10-20",
      "last_verified": "2026-10-20",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072156341",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/jacobs-project-management-co-hut-8-dc-corp-saint-francisville-la",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110072156341",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Jacobs Project Management Co, Hut 8 DC Corp river Bend Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110072156341",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "kansas-city-data-center-c-olathe-ks",
      "name": "Kansas City Data Center C",
      "summary": "The EPA's facility registry lists Kansas City Data Center C at 24400 W Valley Parkway, Olathe, KS 66061 in Olathe, Kansas, with an air permit.",
      "state": "KS",
      "city": "Olathe",
      "county": "Johnson County",
      "status": "not_verified",
      "developer": null,
      "capacity_mw": null,
      "latitude": 38.938583,
      "longitude": -94.866829,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110070083312: the registry placed its point by address matching house number, accurate to 50 m",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-20",
      "site_address": "24400 W Valley Parkway, Olathe, KS 66061",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070083312",
      "published": "2026-10-20",
      "last_verified": "2026-10-20",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/kansas-city-data-center-c-olathe-ks",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110070083312",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Kansas City Data Center C",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110070083312",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "lambda-chouteau-data-center-ok",
      "name": "Lambda Chouteau data center",
      "summary": "Lambda Chouteau data center",
      "state": "OK",
      "city": "Chouteau",
      "county": "Mayes County",
      "status": "rumored",
      "developer": "Lambda",
      "capacity_mw": null,
      "latitude": 36.1895,
      "longitude": -95.3389,
      "location_precision": "city",
      "location_source": null,
      "location_verified_at": null,
      "coordinate_source": "U.S. Census Bureau 2020 gazetteer place point",
      "location_last_verified": null,
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-10-01",
      "last_verified": "2026-10-20",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://www.datacenterdynamics.com/en/news/lambda-plans-data-center-in-oklahoma/",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/lambda-chouteau-data-center-ok",
      "source": "https://www.datacenterdynamics.com/en/news/lambda-plans-data-center-in-oklahoma/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Lambda plans data center in Oklahoma",
          "url": "https://www.datacenterdynamics.com/en/news/lambda-plans-data-center-in-oklahoma/",
          "publisher": "Data Center Dynamics",
          "date": "2026-09-29",
          "source_tier": 3
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "lightedge-data-center-papillion-ne",
      "name": "Lightedge Data Center",
      "summary": "The EPA's facility registry lists Lightedge Data Center at 1148 American Pkwy, Papillion, NE 68046 in Papillion, Nebraska, with an air permit.",
      "state": "NE",
      "city": "Papillion",
      "county": "Sarpy County",
      "status": "not_verified",
      "developer": null,
      "capacity_mw": null,
      "latitude": 41.15944,
      "longitude": -96.02598,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110045866602: the registry placed its point by address matching house number, accurate to 30 m",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-20",
      "site_address": "1148 American Pkwy, Papillion, NE 68046",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110045866602",
      "published": "2026-10-20",
      "last_verified": "2026-10-20",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/lightedge-data-center-papillion-ne",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110045866602",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Lightedge Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110045866602",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "netrality-data-centers-kc2-air-shawnee-ks",
      "name": "Netrality Data Centers, KC2 (air)",
      "summary": "The EPA's facility registry lists Netrality Data Centers, KC2 (air) at 7801 Nieman Road, Shawnee, KS 66214 in Shawnee, Kansas, with an air permit.",
      "state": "KS",
      "city": "Shawnee",
      "county": "Johnson County",
      "status": "not_verified",
      "developer": null,
      "capacity_mw": null,
      "latitude": 38.9865,
      "longitude": -94.71436,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110072101996: the registry placed its point by address matching house number, accurate to 30 m",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-20",
      "site_address": "7801 Nieman Road, Shawnee, KS 66214",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072101996",
      "published": "2026-10-20",
      "last_verified": "2026-10-20",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/netrality-data-centers-kc2-air-shawnee-ks",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110072101996",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Netrality Data Centers, KC2 (air)",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110072101996",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "nmrd-data-center-iii-llc-sandoval-county-nm",
      "name": "NMRD Data Center III, LLC",
      "summary": "The EPA's facility registry lists NMRD Data Center III, LLC, New Mexico, with no permit program listed.",
      "state": "NM",
      "city": null,
      "county": "Sandoval County",
      "status": "not_verified",
      "developer": "NMRD Data Center III, LLC",
      "capacity_mw": null,
      "latitude": 35.30944,
      "longitude": -106.55194,
      "location_precision": "county",
      "location_source": "County seat (Bernalillo), Wikidata, placed at county level; the EPA facility record gives no site point (the registry does not say how its point was placed)",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-10-20",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-10-20",
      "last_verified": "2026-10-20",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071939610",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/nmrd-data-center-iii-llc-sandoval-county-nm",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110071939610",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: NMRD Data Center III, LLC",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071939610",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "solar-data-center-white-horse-ranch-lordsburg-nm",
      "name": "Solar Data Center White Horse Ranch",
      "summary": "The EPA's facility registry lists Solar Data Center White Horse Ranch at 1 Mile South On NM113 From Intersection With I10, Lordsburg, NM 88045 in Lordsburg, New Mexico, with a water permit.",
      "state": "NM",
      "city": "Lordsburg",
      "county": "Hidalgo County",
      "status": "not_verified",
      "developer": null,
      "capacity_mw": null,
      "latitude": 32.3438,
      "longitude": -108.7021,
      "location_precision": "address",
      "location_source": "U.S. Census Bureau 2020 Gazetteer, the internal point of Lordsburg, public domain, placed at city level; the EPA facility record gives no site point (the registry states an accuracy of 18830 m, wider than a site)",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "census gazetteer place point",
      "location_last_verified": "2026-10-20",
      "site_address": "1 Mile South On NM113 From Intersection With I10, Lordsburg, NM 88045",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071158320",
      "published": "2026-10-20",
      "last_verified": "2026-10-20",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/solar-data-center-white-horse-ranch-lordsburg-nm",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110071158320",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Solar Data Center White Horse Ranch",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071158320",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "tierpoint-kansas-city-lenexa-data-center-ks",
      "name": "TierPoint Kansas City - Lenexa Data Center",
      "summary": "TierPoint lists a data center at Kansas City, Kansas among the sites it operates.",
      "state": "KS",
      "city": "Lenexa",
      "county": "Johnson County",
      "status": "operational",
      "developer": "TierPoint",
      "capacity_mw": null,
      "latitude": 39.1235116,
      "longitude": -94.7441422,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-10-20",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/tierpoint-kansas-city-lenexa-data-center-ks",
      "source": "https://www.tierpoint.com/data-centers/kansas/kansas-city-lenexa/",
      "basis": "official_record",
      "sources": [
        {
          "title": "TierPoint's facility page",
          "url": "https://www.tierpoint.com/data-centers/kansas/kansas-city-lenexa/",
          "publisher": "TierPoint",
          "date": "2026-10-20",
          "source_tier": 2
        },
        {
          "title": "TierPoint: Browse our data centers",
          "url": "https://www.tierpoint.com/data-centers/",
          "publisher": "TierPoint",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "TierPoint lists Kansas City - Lenexa Data Center at Kansas City, Kansas",
          "url": "https://www.tierpoint.com/data-centers/#tierpoint-kansas-city-lenexa-data-center-ks",
          "publisher": "TierPoint",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "TierPoint lists TierPoint Kansas City - Lenexa Data Center at Kansas City, Kansas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.tierpoint.com/data-centers/#tierpoint-kansas-city-lenexa-data-center-ks",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "zayo-group-montana-state-data-center-miles-city-mt",
      "name": "Zayo Group, Montana State Data Center Miles City",
      "summary": "The EPA's facility registry lists Zayo Group, Montana State Data Center Miles City at N Of I-94 From Exit 138 7MI W, Miles City, MT 59301 in Miles City, Montana, with a water permit.",
      "state": "MT",
      "city": "Miles City",
      "county": "Custer County",
      "status": "not_verified",
      "developer": null,
      "capacity_mw": null,
      "latitude": 46.385,
      "longitude": -105.9845,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110055031727: the registry placed its point by interpolation map, accurate to 50 m",
      "location_verified_at": "2026-10-20",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-20",
      "site_address": "N Of I-94 From Exit 138 7MI W, Miles City, MT 59301",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110055031727",
      "published": "2026-10-20",
      "last_verified": "2026-10-20",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/zayo-group-montana-state-data-center-miles-city-mt",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110055031727",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Zayo Group, Montana State Data Center Miles City",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110055031727",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "project-jupiter-santa-teresa-nm",
      "name": "Project Jupiter",
      "summary": "Oracle's Project Jupiter, proposed for Santa Teresa in Doña Ana County, is one of the largest proposed AI data center complexes in the nation and is stalled in permitting amid New Mexico Supreme Court stays on water and air quality permits and broad community opposition.",
      "state": "NM",
      "city": "Santa Teresa",
      "county": "Doña Ana",
      "status": "proposed",
      "developer": "Oracle",
      "capacity_mw": 2450,
      "latitude": 32.31403,
      "longitude": -106.77981,
      "location_precision": "county",
      "location_source": "County seat (Las Cruces), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-10-19",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": 1400,
      "site_acres_disclosed_as": "third_party_estimate",
      "site_acres_source_url": "https://www.datacenterdynamics.com/en/news/oracle-issues-force-majeure-notice-to-blue-owl-following-series-of-setbacks-at-project-jupiter-data-center-campus-report/",
      "power_source": "Oracle-controlled power delivery",
      "power_source_url": "https://www.linkedin.com/posts/bisnow_oracle-project-delays-spark-ai-data-center-activity-7509384768703270912-r9U2",
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/project-jupiter-santa-teresa-nm",
      "source": "https://www.kanw.org/new-mexico-news/2026-09-04/in-new-mexico-massive-project-jupiter-data-center-faces-criticism-over-water-allocation",
      "basis": "third_party_estimate",
      "sources": [
        {
          "title": "In New Mexico, massive Project Jupiter data center faces criticism over water allocation - kanw.org",
          "url": "https://www.kanw.org/new-mexico-news/2026-09-04/in-new-mexico-massive-project-jupiter-data-center-faces-criticism-over-water-allocation",
          "publisher": "kanw.org",
          "date": "2026-09-04",
          "source_tier": 4
        },
        {
          "title": "NM Supreme Court denies Project Jupiter motion to partially lift stay - Las Cruces Sun-News",
          "url": "https://www.lcsun-news.com/story/news/local/county/2026/09/04/nm-supreme-court-denies-project-jupiter-motion-to-partially-lift-stay/91581602007/",
          "publisher": "Las Cruces Sun-News",
          "date": "2026-09-04",
          "source_tier": 4
        },
        {
          "title": "New Mexico attorney general supports petitions challenging Project Jupiter approvals - KOAT",
          "url": "https://www.koat.com/article/new-mexico-attorney-general-supports-petitions-challenging-project-jupiter-approvals/73610093",
          "publisher": "KOAT",
          "date": "2026-09-04",
          "source_tier": 4
        },
        {
          "title": "New Mexico attorney general backs environmental groups in Project Jupiter battle - Santa Fe New Mexican",
          "url": "https://searchlightnm.org/new-mexico-attorney-general-backs-environmental-groups-in-project-jupiter-battle/",
          "publisher": "Santa Fe New Mexican",
          "date": "2026-09-04",
          "source_tier": 4
        },
        {
          "title": "NM attorney general backs emergency petitions challenging data center's air, water permits - KFOX",
          "url": "https://kfoxtv.com/news/local/nm-attorney-general-backs-emergency-petitions-challenging-data-centers-air-water-permits",
          "publisher": "KFOX",
          "date": "2026-09-04",
          "source_tier": 4
        },
        {
          "title": "New Mexico AG backs environmental groups challenging Project Jupiter before state Supreme Court - Source New Mexico",
          "url": "https://sourcenm.com/2026/09/03/new-mexico-ag-backs-environmental-groups-challenging-project-jupiter-before-state-supreme-court/",
          "publisher": "Source New Mexico",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "New Mexico Supreme Court pauses Project Jupiter permitting processes - Searchlight New Mexico",
          "url": "https://www.santafenewmexican.com/las_cruces/new-mexico-supreme-court-pauses-project-jupiter-permitting-processes/article_582153d8-2f7e-4eac-a559-4affd8893c61.html",
          "publisher": "Searchlight New Mexico",
          "date": "2026-08-25",
          "source_tier": 4
        },
        {
          "title": "Project Jupiter: New Mexico Supreme Court delivers two blows to Oracle data center - KOB 4",
          "url": "https://www.kob.com/new-mexico/nm-supreme-court-delivers-two-blows-to-oracle-data-center-in-southern-new-mexico/",
          "publisher": "KOB 4",
          "date": "2026-08-25",
          "source_tier": 4
        },
        {
          "title": "New Mexico Supreme Court halts Project Jupiter progress - KTSM 9 News",
          "url": "https://www.ktsm.com/news/local-news/new-mexico-supreme-court-halts-project-jupiter-progress/",
          "publisher": "KTSM 9 News",
          "date": "2026-08-24",
          "source_tier": 4
        },
        {
          "title": "US Rep. Stansbury calls on New Mexico agencies to provide Project Jupiter water information - Source New Mexico",
          "url": "https://sourcenm.com/2026/08/24/us-rep-stansbury-calls-on-new-mexico-agencies-to-provide-project-jupiter-water-information/",
          "publisher": "Source New Mexico",
          "date": "2026-08-24",
          "source_tier": 4
        },
        {
          "title": "New Mexico Supreme Court halts water use from Project Jupiter well in Santa Teresa - KFOX",
          "url": "https://kfoxtv.com/news/local/gallery/new-mexico-supreme-court-halts-water-use-from-project-jupiter-well-in-santa-teresa",
          "publisher": "KFOX",
          "date": "2026-08-24",
          "source_tier": 4
        },
        {
          "title": "Opinion: New Mexico lawmaker who backed Project Jupiter now says developers should leave - El Paso Matters",
          "url": "https://elpasomatters.org/2026/08/24/opinion-project-jupiter-oracle-dona-ana-county-data-centers/",
          "publisher": "El Paso Matters",
          "date": "2026-08-24",
          "source_tier": 4
        },
        {
          "title": "Doña Ana County residents criticize local, state officials for advancing Project Jupiter - Source New Mexico",
          "url": "https://sourcenm.com/2026/08/12/dona-ana-county-residents-criticize-local-state-officials-for-advancing-project-jupiter/",
          "publisher": "Source New Mexico",
          "date": "2026-08-12",
          "source_tier": 4
        },
        {
          "title": "New Mexico State Ethics Commission announces settlement with group behind Project Jupiter mailers - Source New Mexico",
          "url": "https://sourcenm.com/2026/08/11/new-mexico-state-ethics-commission-announces-settlement-with-group-behind-project-jupiter-mailers/",
          "publisher": "Source New Mexico",
          "date": "2026-08-11",
          "source_tier": 4
        },
        {
          "title": "Hearing for Project Jupiter data center’s air quality permit application rescheduled to September - Source New Mexico",
          "url": "https://sourcenm.com/2026/07/31/hearing-for-project-jupiter-data-centers-air-quality-permit-application-rescheduled-to-september/",
          "publisher": "Source New Mexico",
          "date": "2026-07-31",
          "source_tier": 4
        },
        {
          "title": "Project Jupiter Data Center Unmasks Big Tech’s Playbook - Food & Water Watch",
          "url": "https://www.foodandwaterwatch.org/2026/07/23/project-jupiter-data-center-new-mexico/",
          "publisher": "Food & Water Watch",
          "date": "2026-07-23",
          "source_tier": 4
        },
        {
          "title": "New Mexico land commissioner blocks Project Jupiter-related pipeline from building on state land - Source New Mexico",
          "url": "https://sourcenm.com/2026/07/16/new-mexico-land-commissioner-blocks-project-jupiter-related-pipeline-from-building-on-state-land/",
          "publisher": "Source New Mexico",
          "date": "2026-07-16",
          "source_tier": 4
        },
        {
          "title": "New Mexico pressed pause on what would be one of the country's biggest data centers - Utah Public Radio",
          "url": "https://www.upr.org/politics/2026-09-01/new-mexico-data-center-project-juniper-paused",
          "publisher": "Utah Public Radio",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "New Mexico lawmakers hear about data centers and water usage concerns - KRQE",
          "url": "https://www.krqe.com/news/politics-government/new-mexico-lawmakers-hear-about-data-centers-and-water-usage-concerns/",
          "publisher": "KRQE",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Data center debate enters gubernatorial race, Project Jupiter donations under scrutiny - KOB 4",
          "url": "https://www.kob.com/new-mexico/data-center-debate-enters-gubernatorial-race-candidates-spar-over-project-jupiter-donations/",
          "publisher": "KOB 4",
          "date": "2026-09-18",
          "source_tier": 4
        },
        {
          "title": "New Mexico Supreme Court rejects 2 Project Jupiter challenges, allows permitting process to resume - Source New Mexico",
          "url": "https://www.yahoo.com/news/us/articles/mexico-supreme-court-rejects-2-221307191.html",
          "publisher": "Source New Mexico",
          "date": "2026-09-17",
          "source_tier": 4
        },
        {
          "title": "New Mexico Supreme Court denies petitions regarding Project Jupiter air quality permit, water use - kvia.com",
          "url": "https://kvia.com/news/2026/09/17/new-mexico-supreme-court-denies-petitions-regarding-project-jupiter-air-quality-permit-water-use/",
          "publisher": "kvia.com",
          "date": "2026-09-17",
          "source_tier": 4
        },
        {
          "title": "Deb Haaland lays out data center policy, including moratorium - lcsun news.com",
          "url": "https://www.yahoo.com/news/politics/articles/deb-haaland-lays-data-center-203652988.html",
          "publisher": "lcsun-news.com",
          "date": "2026-09-17",
          "source_tier": 4
        },
        {
          "title": "NM Supreme Court lifts two stays, denies petitions regarding Project Jupiter - lcsun news.com",
          "url": "https://www.lcsun-news.com/story/news/local/community/2026/09/17/new-mexico-supreme-court-lifts-two-stays-denies-petitions-on-project-jupiter/91816202007/",
          "publisher": "lcsun-news.com",
          "date": "2026-09-18",
          "source_tier": 4
        },
        {
          "title": "Oracle’s $18 Billion New Mexico Data Center Loans Hit A Speed Bump - Finimize",
          "url": "https://finimize.com/content/oracles-18-billion-new-mexico-data-center-loans-hit-a-speed-bump",
          "publisher": "Finimize",
          "date": "2026-09-18",
          "source_tier": 4
        },
        {
          "title": "Bloom Energy slides on reported Oracle data center force majeure - TradingView",
          "url": "https://www.tradingview.com/news/seekingalpha:f10a35aa5094b:0-bloom-energy-slides-on-reported-oracle-data-center-force-majeure/",
          "publisher": "TradingView",
          "date": "2026-09-24",
          "source_tier": 4
        },
        {
          "title": "What Does Growing NIMBY ism Mean for Data Center Investing? - ai cio.com",
          "url": "https://www.ai-cio.com/news/what-does-growing-nimby-ism-mean-for-data-center-investing/",
          "publisher": "ai-cio.com",
          "date": "2026-09-24",
          "source_tier": 4
        },
        {
          "title": "Oracle Stock Slides After Company Issued ‘Force Majeure’ Notice For Major Data Center Project - Yahoo Finance UK",
          "url": "https://ground.news/article/stocks-making-the-biggest-moves-midday-oracle-everpure-meta-platforms-nebius-bloom-energy-mgm-and-more",
          "publisher": "Yahoo Finance UK",
          "date": "2026-09-24",
          "source_tier": 4
        },
        {
          "title": "Top Midday Stories: Oracle's Data Center Delay; People Withdraws MGM Offer; Revvity's New Diabetes Test - Yahoo Finance",
          "url": "https://finance.yahoo.com/markets/stocks/articles/top-midday-stories-oracle-apos-160611263.html",
          "publisher": "Yahoo Finance",
          "date": "2026-09-24",
          "source_tier": 4
        },
        {
          "title": "Oracle shares fall as company invokes 'force majeure' over New Mexico data center project - proactiveinvestors.com",
          "url": "https://www.proactiveinvestors.com/companies/news/1099090/oracle-shares-fall-as-company-invokes-force-majeure-over-new-mexico-data-center-project-1099090.html",
          "publisher": "proactiveinvestors.com",
          "date": "2026-09-24",
          "source_tier": 4
        },
        {
          "title": "Oracle Shares Fall 4% on Reported Bid to Defer Payments on AI Project - TheEnergyMag",
          "url": "https://theenergymag.com/news/2026-09-24/orcale-new-mexico-ai-force-majeure",
          "publisher": "TheEnergyMag",
          "date": "2026-09-24",
          "source_tier": 4
        },
        {
          "title": "Oracle's force majeure on New Mexico data center sends AI stocks lower - FXStreet",
          "url": "https://www.fxstreet.com/news/oracles-force-majeure-on-new-mexico-data-center-sends-ai-stocks-lower-202609241424",
          "publisher": "FXStreet",
          "date": "2026-09-24",
          "source_tier": 4
        },
        {
          "title": "Oracle triggers force majeure on massive ’Project Jupiter’ data center - Investing.com",
          "url": "https://www.investing.com/news/stock-market-news/oracle-triggers-force-majeure-on-massive-project-jupiter-data-center-4915383",
          "publisher": "Investing.com",
          "date": "2026-09-24",
          "source_tier": 4
        },
        {
          "title": "Oracle Sends 'Force Majeure' Notice on New Mexico Data Center, Shares Slide 4% - finance.biggo.com",
          "url": "https://finance.biggo.com/news/1ad4c11e-245d-4ba4-b33e-eb2737215521",
          "publisher": "finance.biggo.com",
          "date": "2026-09-24",
          "source_tier": 4
        },
        {
          "title": "Oracle Stock Falls on Force Majeure Notice for Data Center - Yahoo Finance",
          "url": "https://finance.yahoo.com/markets/stocks/articles/oracle-stock-falls-force-majeure-141850629.html",
          "publisher": "Yahoo Finance",
          "date": "2026-09-24",
          "source_tier": 4
        },
        {
          "title": "Oracle Stock Plunges After Project Jupiter Warning Threatens 2028 AI Data Center Target - TradingView",
          "url": "https://finance.yahoo.com/technology/ai/articles/oracle-stock-plunges-project-jupiter-174218276.html",
          "publisher": "TradingView",
          "date": "2026-09-24",
          "source_tier": 4
        },
        {
          "title": "Oracle shares drop after sending ‘force majeure’ notice on New Mexico data center project - CNBC",
          "url": "https://www.cnbc.com/video/2026/09/24/oracle-shares-drop-after-sending-force-majeure-notice-on-new-mexico-data-center-project.html",
          "publisher": "CNBC",
          "date": "2026-09-24",
          "source_tier": 4
        },
        {
          "title": "Market Chatter: Oracle Cites Force Majeure as New Mexico Data Center Faces Delays - Yahoo Finance",
          "url": "https://finance.yahoo.com/technology/articles/market-chatter-oracle-cites-force-134148890.html",
          "publisher": "Yahoo Finance",
          "date": "2026-09-24",
          "source_tier": 4
        },
        {
          "title": "Oracle issues force majeure notice to Blue Owl following series of setbacks at Project Jupiter data center campus , report - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/oracle-issues-force-majeure-notice-to-blue-owl-following-series-of-setbacks-at-project-jupiter-data-center-campus-report/",
          "publisher": "Data Center Dynamics",
          "date": "2026-09-24",
          "source_tier": 3
        },
        {
          "title": "Oracle sends force majeure notice over New Mexico data center: report (ORCL:NYSE) - Seeking Alpha",
          "url": "https://seekingalpha.com/news/4646619-oracle-sends-force-majeure-notice-over-new-mexico-data-center-report",
          "publisher": "Seeking Alpha",
          "date": "2026-09-24",
          "source_tier": 4
        },
        {
          "title": "Oracle stock drops as the company moves to shield itself from costs linked to controversial data center - Yahoo Finance",
          "url": "https://finance.yahoo.com/markets/article/oracle-stock-drops-as-the-company-moves-to-shield-itself-from-costs-linked-to-controversial-data-center-133351264.html",
          "publisher": "Yahoo Finance",
          "date": "2026-09-24",
          "source_tier": 4
        },
        {
          "title": "Water can flow again for construction of massive Project Jupiter data center - KUNR Public Radio",
          "url": "https://www.kunr.org/2026-09-23/water-can-flow-again-for-construction-of-massive-project-jupiter-data-center",
          "publisher": "KUNR Public Radio",
          "date": "2026-09-23",
          "source_tier": 4
        },
        {
          "title": "Oracle’s 2 GW Renewable RFP Aims to Offset AI Data Center Emissions in New Mexico - energytech.com",
          "url": "https://www.energytech.com/distributed-energy/news/55404192/oracles-2-gw-renewable-rfp-aims-to-offset-ai-data-center-emissions-in-new-mexico",
          "publisher": "energytech.com",
          "date": "2026-09-10",
          "source_tier": 4
        },
        {
          "title": "Oracle tries to appease Stargate data center opponents with renewables push - Ars Technica",
          "url": "https://arstechnica.com/gadgets/2026/09/oracle-promises-2-gw-of-renewables-to-match-stargate-data-center-emissions/",
          "publisher": "Ars Technica",
          "date": "2026-09-11",
          "source_tier": 4
        },
        {
          "title": "In New Mexico, massive Project Jupiter data center faces criticism over water allocation",
          "url": "https://www.wyomingpublicmedia.org/2026-09-04/in-new-mexico-massive-project-jupiter-data-center-faces-criticism-over-water-allocation",
          "publisher": "Wyoming Public Media",
          "date": "2026-09-08",
          "source_tier": 4
        },
        {
          "title": "Oracle Project Delays Spark AI Data Center Debt Concerns - Bisnow",
          "url": "https://www.linkedin.com/posts/bisnow_oracle-project-delays-spark-ai-data-center-activity-7509384768703270912-r9U2",
          "publisher": "Bisnow",
          "date": "2026-09-25",
          "source_tier": 4
        },
        {
          "title": "Oracle Declares Force Majeure on $165 Billion Project Jupiter Data Center - finance.yahoo.com",
          "url": "https://finance.yahoo.com/technology/ai/articles/oracle-declares-force-majeure-165-141331149.html",
          "publisher": "finance.yahoo.com",
          "date": "2026-09-24",
          "source_tier": 4
        },
        {
          "title": "Stock Market Today, Sept. 24: Oracle Stock Dips As it Issues Force Majeure Notice on Project Jupiter Data Center - The Motley Fool",
          "url": "https://www.fool.com/coverage/stock-market-today/2026/09/24/stock-market-today-sept-24-oracle-stock-dips-as-it-issues-force-majeure-notice-on-project-jupiter-data-center/",
          "publisher": "The Motley Fool",
          "date": "2026-09-24",
          "source_tier": 4
        },
        {
          "title": "AI Data Center Delays Raise New Questions For ORCL, BE And APLD, Says IO Fund , ‘Power, Not Demand, Is Becoming The Bottleneck’ - TradingView",
          "url": "https://www.tradingview.com/news/stocktwits:ab5602f1b094b:0-ai-data-center-delays-raise-new-questions-for-orcl-be-and-apld-says-io-fund-power-not-demand-is-becoming-the-bottleneck/",
          "publisher": "TradingView",
          "date": "2026-10-04",
          "source_tier": 4
        },
        {
          "title": "New Mexico pressed pause on what would be one of the country's biggest data centers - Utah Public Radio",
          "url": "https://www.upr.org/politics/2026-09-01/new-mexico-data-center-project-juniper-paused",
          "publisher": "Utah Public Radio",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Project Jupiter developers urge New Mexico Supreme Court to get permit process moving again - Searchlight New Mexico",
          "url": "https://searchlightnm.org/project-jupiter-developers-urge-new-mexico-supreme-court-to-get-permit-process-moving-again/",
          "publisher": "Searchlight New Mexico",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Oracle Project Jupiter data center work continues amid court fight - El Paso Times",
          "url": "https://www.yahoo.com/news/us/articles/oracle-project-jupiter-data-center-194121453.html",
          "publisher": "El Paso Times",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Project Jupiter site work continues, despite high court’s pause on permits - Searchlight New Mexico",
          "url": "https://www.santafenewmexican.com/las_cruces/local_news/project-jupiter-site-work-continues-despite-high-courts-pause-on-permits/article_777011f7-b5ff-4fbe-98c1-bb4e8668948e.html",
          "publisher": "Searchlight New Mexico",
          "date": "2026-08-31",
          "source_tier": 4
        },
        {
          "title": "New Mexico Supreme Court halts AI data center permit process, handing residents a rare win - The Cool Down",
          "url": "https://www.yahoo.com/news/us/articles/mexico-supreme-court-halts-ai-174900329.html",
          "publisher": "The Cool Down",
          "date": "2026-08-30",
          "source_tier": 4
        },
        {
          "title": "New Mexico nonprofits weigh Project Jupiter cash amid local data center pushback - Technical.ly",
          "url": "https://technical.ly/civics/new-mexico-nonprofits-take-jupiter-cash-amid-public-debate/",
          "publisher": "Technical.ly",
          "date": "2026-08-28",
          "source_tier": 4
        },
        {
          "title": "New Mexico Justices Pause Permit, Hearing For Data Center - Law360",
          "url": "https://www.law360.com/articles/2517247/new-mexico-justices-pause-permit-hearing-for-data-center",
          "publisher": "Law360",
          "date": "2026-08-25",
          "source_tier": 4
        },
        {
          "title": "Contested New Mexico hearing officer for Project Jupiter air quality permit hearing recuses himself - Source New Mexico",
          "url": "https://sourcenm.com/2026/08/24/contested-new-mexico-hearing-officer-for-project-jupiter-air-quality-permit-hearing-recuses-himself/",
          "publisher": "Source New Mexico",
          "date": "2026-08-24",
          "source_tier": 4
        },
        {
          "title": "NM Supreme Court temporarily halts Project Jupiter air quality permit hearing - Source New Mexico",
          "url": "https://sourcenm.com/2026/08/24/nm-supreme-court-temporarily-halt-project-jupiter-air-quality-permit-hearing/",
          "publisher": "Source New Mexico",
          "date": "2026-08-24",
          "source_tier": 4
        },
        {
          "title": "Protesters 'shame' New Mexico public officials over data center | Local News - Santa Fe New Mexican",
          "url": "https://www.santafenewmexican.com/news/local_news/protesters-shame-new-mexico-public-officials-over-data-center/article_2bc9d4d5-2665-42d4-86e9-74ed7aa352d4.html",
          "publisher": "Santa Fe New Mexican",
          "date": "2026-08-21",
          "source_tier": 4
        },
        {
          "title": "NM residents protest pending Project Jupiter air quality permit outside Environment Department - Source New Mexico",
          "url": "https://sourcenm.com/2026/08/21/nm-residents-protest-pending-project-jupiter-air-quality-permit-outside-environment-department/",
          "publisher": "Source New Mexico",
          "date": "2026-08-21",
          "source_tier": 4
        },
        {
          "title": "Environmental group asks NM Supreme Court to pause Project Jupiter’s air quality permit hearing - Source New Mexico",
          "url": "https://sourcenm.com/2026/08/19/environmental-group-asks-nm-supreme-court-to-pause-project-jupiters-air-quality-permit-hearing/",
          "publisher": "Source New Mexico",
          "date": "2026-08-19",
          "source_tier": 4
        },
        {
          "title": "Oracle Data Center’s Pipeline Plan Is Rerouted After Rejections - energynow.com",
          "url": "https://www.bloomberg.com/news/articles/2026-08-18/oracle-openai-data-center-s-gas-pipeline-plan-rerouted-after-earlier-rejections",
          "publisher": "energynow.com",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "Proposed gas pipeline for Project Jupiter data center delayed to 2027, filings show - Source New Mexico",
          "url": "https://sourcenm.com/2026/08/17/proposed-gas-pipeline-for-project-jupiter-data-center-delayed-to-2027-filings-show/",
          "publisher": "Source New Mexico",
          "date": "2026-08-17",
          "source_tier": 4
        },
        {
          "title": "Pipeline for $165 Billion Oracle Data Center Delayed to Next Year - The Next Web",
          "url": "https://thenextweb.com/news/oracle-project-jupiter-green-chile-pipeline-delay",
          "publisher": "The Next Web",
          "date": "2026-08-14",
          "source_tier": 4
        },
        {
          "title": "‘All about money’: Las Cruces senators push back on Project Jupiter at crowded forum - Searchlight New Mexico",
          "url": "https://searchlightnm.org/all-about-money-las-cruces-senators-push-back-on-project-jupiter-at-crowded-forum/",
          "publisher": "Searchlight New Mexico",
          "date": "2026-08-13",
          "source_tier": 4
        },
        {
          "title": "Doña Ana County to hear Oracle, Bloom Energy update on Project Jupiter data center - kfoxtv.com",
          "url": "https://kfoxtv.com/news/local/dona-ana-county-to-hear-oracle-bloom-energy-update-on-project-jupiter-data-center",
          "publisher": "kfoxtv.com",
          "date": "2026-09-07",
          "source_tier": 4
        },
        {
          "title": "Project Jupiter: where the AI data center project stands in NM - The Daily Lobo",
          "url": "https://www.dailylobo.com/article/2026/08/project-jupiter-where-the-ai-data-center-project-stands-in-nm",
          "publisher": "The Daily Lobo",
          "date": "2026-08-17",
          "source_tier": 4
        },
        {
          "title": "NM Supreme Court pauses Project Jupiter air permit - Albuquerque Journal",
          "url": "https://www.abqjournal.com/news/nm-supreme-court-pauses-project-jupiter-air-permit/3108233",
          "publisher": "Albuquerque Journal",
          "date": "2026-08-23",
          "source_tier": 4
        },
        {
          "title": "Oracle's $165 Billion Data Center Plan Hits a Gas Pipeline Delay - Crude Oil Prices Today | OilPrice.com",
          "url": "https://oilprice.com/Latest-Energy-News/World-News/Oracles-165-Billion-Data-Center-Plan-Hits-a-Gas-Pipeline-Delay.html",
          "publisher": "Crude Oil Prices Today | OilPrice.com",
          "date": "2026-08-14",
          "source_tier": 4
        },
        {
          "title": "Oracle updates Doña Ana County on Project Jupiter data center - Albuquerque Journal",
          "url": "https://www.abqjournal.com/news/oracle-provides-upbeat-report-on-project-jupiter/3117641",
          "publisher": "Albuquerque Journal",
          "date": "2026-09-09",
          "source_tier": 4
        },
        {
          "title": "Oracle Launches Call For 2 GW Renewable Energy Capacity - TaiyangNews",
          "url": "https://taiyangnews.info/tenders/oracle-launches-call-for-2-gw-renewable-energy-capacity",
          "publisher": "TaiyangNews",
          "date": "2026-09-09",
          "source_tier": 4
        },
        {
          "title": "Oracle issues RFP for 2GW of new renewable capacity in New Mexico - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/oracle-issues-rfp-for-2gw-of-new-renewable-capacity-in-new-mexico/",
          "publisher": "Data Center Dynamics",
          "date": "2026-09-09",
          "source_tier": 3
        },
        {
          "title": "Oracle seeks up to 2 GW of new renewable power for Project Jupiter in Doña Ana County - KFOX",
          "url": "https://kfoxtv.com/news/local/oracle-seeks-up-to-2-gw-of-new-renewable-power-for-project-jupiter-in-dona-ana-county",
          "publisher": "KFOX",
          "date": "2026-09-09",
          "source_tier": 4
        },
        {
          "title": "Oracle Plans Public Environmental Dashboard for Project Jupiter - eponline.com",
          "url": "https://eponline.com/articles/2026/09/10/oracle-plans-public-environmental-dashboard-for-project-jupiter.aspx",
          "publisher": "eponline.com",
          "date": "2026-09-10",
          "source_tier": 4
        },
        {
          "title": "Tech deploys charm offensive to combat AI data center backlash - The Spokesman Review",
          "url": "https://www.spokesman.com/stories/2026/aug/19/tech-deploys-charm-offensive-to-combat-ai-data-cen/",
          "publisher": "The Spokesman-Review",
          "date": "2026-08-19",
          "source_tier": 4
        },
        {
          "title": "Oracle Co CEO Clay Magouyrk Says Data Center Delays Are Not a Problem - Oracle (NYSE:ORCL) - Benzinga",
          "url": "https://www.benzinga.com/markets/earnings/26/09/61732762/oracle-ceo-clay-magouyrk-data-center-delays-bad-plan",
          "publisher": "Benzinga",
          "date": "2026-09-11",
          "source_tier": 4
        },
        {
          "title": "Oracle and OpenAI bet that more solar could combat data center pushback - Latitude Media",
          "url": "https://www.latitudemedia.com/news/oracle-and-openai-bet-that-more-solar-could-combat-data-center-pushback/",
          "publisher": "Latitude Media",
          "date": "2026-09-11",
          "source_tier": 4
        },
        {
          "title": "Erin Brockovich weighs in on Project Jupiter data center - Yahoo",
          "url": "https://www.yahoo.com/news/us/articles/erin-brockovich-weighs-project-jupiter-224105900.html",
          "publisher": "Yahoo",
          "date": "2026-09-11",
          "source_tier": 4
        },
        {
          "title": "Oracle to Launch Public Dashboard with Emissions, Water Use Data for New Hyperscale Data Center - ESG Today",
          "url": "https://www.esgtoday.com/oracle-to-launch-public-dashboard-with-emissions-water-use-data-for-new-hyperscale-data-center/",
          "publisher": "ESG Today",
          "date": "2026-09-14",
          "source_tier": 4
        },
        {
          "title": "New tensions flare over massive data center ‘Project Jupiter’ in southern New Mexico - KRQE",
          "url": "https://www.krqe.com/news/new-mexico/new-tensions-flare-over-massive-data-center-project-jupiter-in-southern-new-mexico/",
          "publisher": "KRQE",
          "date": "2026-06-10",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [
          "OpenAI",
          "Oracle"
        ],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": "https://www.proactiveinvestors.com/companies/news/1099090/oracle-shares-fall-as-company-invokes-force-majeure-over-new-mexico-data-center-project-1099090.html"
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-10-19",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Oracle reported that construction on Project Jupiter data center campus is moving quickly with strong progress on site, and will achieve 100% carbon free energy matching by 2031.",
          "source_url": "https://finance.yahoo.com/technology/ai/articles/stock-adds-3-oracle-signals-195036340.html",
          "source_tier": 1
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-10-04",
          "summary": "Oracle issued a force majeure notice to STACK Infrastructure on September 24, allowing it to protect itself contractually if Project Jupiter fails to launch as planned in 2028",
          "source_url": "https://www.tradingview.com/news/stocktwits:ab5602f1b094b:0-ai-data-center-delays-raise-new-questions-for-orcl-be-and-apld-says-io-fund-power-not-demand-is-becoming-the-bottleneck/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "Oracle sent a contractual notice tied to Project Jupiter seeking protection if construction delays disrupt its 2028 target",
          "source_url": "https://finance.yahoo.com/technology/ai/articles/oracle-stock-plunges-project-jupiter-174218276.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "A natural gas pipeline needed for the facility has faced delays after permit denials",
          "source_url": "https://finance.yahoo.com/technology/ai/articles/oracle-stock-plunges-project-jupiter-174218276.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "Oracle sent a force majeure notice to Blue Owl Capital unit seeking to delay payments if data center fails to come online in 2028",
          "source_url": "https://www.proactiveinvestors.com/companies/news/1099090/oracle-shares-fall-as-company-invokes-force-majeure-over-new-mexico-data-center-project-1099090.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "Oracle sent force majeure notice to Blue Owl Capital on Project Jupiter after energy permit denial and pipeline delay.",
          "source_url": "https://finance.yahoo.com/technology/ai/articles/oracle-declares-force-majeure-165-141331149.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "Project planned to come online in 2028.",
          "source_url": "https://finance.yahoo.com/technology/ai/articles/oracle-declares-force-majeure-165-141331149.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "Energy Transfer pipeline delayed to February 1, 2027 after regulatory denials.",
          "source_url": "https://finance.yahoo.com/technology/ai/articles/oracle-declares-force-majeure-165-141331149.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "Oracle declared force majeure over possible power delays to Project Jupiter data center in New Mexico to delay transition to higher rent payments.",
          "source_url": "https://www.fool.com/coverage/stock-market-today/2026/09/24/stock-market-today-sept-24-oracle-stock-dips-as-it-issues-force-majeure-notice-on-project-jupiter-data-center/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "Oracle says Project Jupiter construction remains on schedule despite force majeure notice.",
          "source_url": "https://www.fool.com/coverage/stock-market-today/2026/09/24/stock-market-today-sept-24-oracle-stock-dips-as-it-issues-force-majeure-notice-on-project-jupiter-data-center/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "New Mexico Supreme Court let permitting resume on September 17, 2026",
          "source_url": "https://finance.biggo.com/news/1ad4c11e-245d-4ba4-b33e-eb2737215521",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "Oracle sends force majeure notice seeking to defer payments if project delays beyond 2028 opening",
          "source_url": "https://theenergymag.com/news/2026-09-24/orcale-new-mexico-ai-force-majeure",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "New Mexico Supreme Court stayed air permit proceeding for proposed microgrid serving campus on Sept. 14",
          "source_url": "https://theenergymag.com/news/2026-09-24/orcale-new-mexico-ai-force-majeure",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "Natural gas pipeline to serve campus has faced delays and legal challenges involving water and air quality permits",
          "source_url": "https://theenergymag.com/news/2026-09-24/orcale-new-mexico-ai-force-majeure",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "Oracle data center delay reported in mid day stock market news",
          "source_url": "https://finance.yahoo.com/markets/stocks/articles/top-midday-stories-oracle-apos-160611263.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "Oracle issued force majeure notice on major data center project in New Mexico where it is primary tenant",
          "source_url": "https://ground.news/article/stocks-making-the-biggest-moves-midday-oracle-everpure-meta-platforms-nebius-bloom-energy-mgm-and-more",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "Oracle sent force majeure notice to Project Jupiter developer seeking to delay payments if data center misses 2028 operational target",
          "source_url": "https://www.tradingview.com/news/seekingalpha:f10a35aa5094b:0-bloom-energy-slides-on-reported-oracle-data-center-force-majeure/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "Oracle sent Blue Owl a force majeure notice about Project Jupiter data center in New Mexico",
          "source_url": "https://www.ai-cio.com/news/what-does-growing-nimby-ism-mean-for-data-center-investing/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "Increased scrutiny followed by denial of a key permit raised questions about whether the data center will come online as planned",
          "source_url": "https://www.ai-cio.com/news/what-does-growing-nimby-ism-mean-for-data-center-investing/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "Oracle issued a force majeure notice to Blue Owl, the project developer unit, due to facility delays relative to the 2028 launch date.",
          "source_url": "https://www.investing.com/news/stock-market-news/oracle-triggers-force-majeure-on-massive-project-jupiter-data-center-4915383",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "Green Chile pipeline was delayed from August 2026 target to February 2027 after New Mexico State Land Office denied right of way permits.",
          "source_url": "https://www.investing.com/news/stock-market-news/oracle-triggers-force-majeure-on-massive-project-jupiter-data-center-4915383",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "Oracle sent a force majeure notice to Project Jupiter's developer in New Mexico.",
          "source_url": "https://seekingalpha.com/news/4646619-oracle-sends-force-majeure-notice-over-new-mexico-data-center-report",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "Project Jupiter has a 2028 launch date target.",
          "source_url": "https://seekingalpha.com/news/4646619-oracle-sends-force-majeure-notice-over-new-mexico-data-center-report",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "Project Jupiter's Green Chile natural gas pipeline was delayed from August 2026 to February 2027.",
          "source_url": "https://seekingalpha.com/news/4646619-oracle-sends-force-majeure-notice-over-new-mexico-data-center-report",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "Oracle sends force majeure notice on Project Jupiter data center in New Mexico",
          "source_url": "https://www.cnbc.com/video/2026/09/24/oracle-shares-drop-after-sending-force-majeure-notice-on-new-mexico-data-center-project.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "Natural gas pipeline extension rejected by state officials in July 2026",
          "source_url": "https://www.datacenterdynamics.com/en/news/oracle-issues-force-majeure-notice-to-blue-owl-following-series-of-setbacks-at-project-jupiter-data-center-campus-report/",
          "source_tier": 3
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "Oracle issued Request for Proposals to develop 2GW of renewable energy capacity in New Mexico for Project Jupiter",
          "source_url": "https://www.datacenterdynamics.com/en/news/oracle-issues-force-majeure-notice-to-blue-owl-following-series-of-setbacks-at-project-jupiter-data-center-campus-report/",
          "source_tier": 3
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "Oracle announced as tenant of Project Jupiter in January 2026",
          "source_url": "https://www.datacenterdynamics.com/en/news/oracle-issues-force-majeure-notice-to-blue-owl-following-series-of-setbacks-at-project-jupiter-data-center-campus-report/",
          "source_tier": 3
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "Oracle sent force majeure notice to Blue Owl Capital seeking payment deferral if project misses 2028 deadline",
          "source_url": "https://www.datacenterdynamics.com/en/news/oracle-issues-force-majeure-notice-to-blue-owl-following-series-of-setbacks-at-project-jupiter-data-center-campus-report/",
          "source_tier": 3
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "Oracle invoked force majeure provision to delay payments if Project Jupiter is delayed and facility does not come online in 2028",
          "source_url": "https://finance.yahoo.com/markets/article/oracle-stock-drops-as-the-company-moves-to-shield-itself-from-costs-linked-to-controversial-data-center-133351264.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "Project has faced denial of key permit amid growing public backlash over power demands and local impacts of massive data centers",
          "source_url": "https://finance.yahoo.com/markets/article/oracle-stock-drops-as-the-company-moves-to-shield-itself-from-costs-linked-to-controversial-data-center-133351264.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "Oracle issued force majeure notice to Project Jupiter developers",
          "source_url": "https://finance.yahoo.com/technology/articles/market-chatter-oracle-cites-force-134148890.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "Oracle sent a force majeure notice to the developer building Project Jupiter due to regulatory hurdles and local opposition.",
          "source_url": "https://www.fxstreet.com/news/oracles-force-majeure-on-new-mexico-data-center-sends-ai-stocks-lower-202609241424",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "Project Jupiter was scheduled to come online in 2028.",
          "source_url": "https://www.fxstreet.com/news/oracles-force-majeure-on-new-mexico-data-center-sends-ai-stocks-lower-202609241424",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "Project Jupiter data center in New Mexico targeting 2028 completion",
          "source_url": "https://finance.yahoo.com/technology/ai/articles/oracle-stock-plunges-project-jupiter-174218276.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "Natural gas pipeline needed for facility has faced delays after permit denials",
          "source_url": "https://finance.yahoo.com/technology/ai/articles/oracle-stock-plunges-project-jupiter-174218276.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "Oracle seeks to defer payments if Project Jupiter fails to come online in 2028 as planned",
          "source_url": "https://finance.yahoo.com/markets/stocks/articles/oracle-stock-falls-force-majeure-141850629.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "Gas pipeline serving site has twice been denied a state land crossing",
          "source_url": "https://finance.biggo.com/news/1ad4c11e-245d-4ba4-b33e-eb2737215521",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-18",
          "summary": "S&P downgraded Oracle in July, leaving its corporate rating one notch above junk",
          "source_url": "https://finimize.com/content/oracles-18-billion-new-mexico-data-center-loans-hit-a-speed-bump",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-18",
          "summary": "Haaland said her moratorium would not affect Project Jupiter, the Oracle- and OpenAI backed artificial intelligence data center campus under construction at the Santa Teresa Industrial Park.",
          "source_url": "https://www.kob.com/new-mexico/data-center-debate-enters-gubernatorial-race-candidates-spar-over-project-jupiter-donations/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-18",
          "summary": "New Mexico Office of the State Engineer authorized emergency drilling in October 2025",
          "source_url": "https://www.lcsun-news.com/story/news/local/community/2026/09/17/new-mexico-supreme-court-lifts-two-stays-denies-petitions-on-project-jupiter/91816202007/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "Court unpaused regulatory proceedings that had been frozen since August, allowing air quality permit hearing to move forward",
          "source_url": "https://www.yahoo.com/news/us/articles/mexico-supreme-court-rejects-2-221307191.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "Haaland's moratorium would not affect Project Jupiter, the Oracle- and OpenAI backed artificial intelligence data center campus under construction at the Santa Teresa Industrial Park.",
          "source_url": "https://www.yahoo.com/news/politics/articles/deb-haaland-lays-data-center-203652988.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "Court lifted stay imposed on August 23 that had paused air permit proceeding and water use for Project Jupiter",
          "source_url": "https://kvia.com/news/2026/09/17/new-mexico-supreme-court-denies-petitions-regarding-project-jupiter-air-quality-permit-water-use/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-06-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-06-10",
          "summary": "New tensions flared over Project Jupiter data center in southern New Mexico",
          "source_url": "https://www.krqe.com/news/new-mexico/new-tensions-flare-over-massive-data-center-project-jupiter-in-southern-new-mexico/",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "applied-digital-harwood-data-center-nd",
      "name": "Applied Digital Polaris Forge 2 (Harwood)",
      "summary": "Applied Digital began construction of a 280MW data center in Harwood in September 2025, representing a 3 billion dollar investment; North Dakota Public Service Commission approved a temporary variance for the 110 million dollar power project serving the campus.",
      "state": "ND",
      "city": "Harwood",
      "county": "Cass",
      "status": "under_construction",
      "developer": "Applied Digital",
      "capacity_mw": 280,
      "latitude": 46.97196,
      "longitude": -96.87628,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau 2020 Gazetteer, internal point of Harwood city (GEOID 3835940), public domain, until a source places the site",
      "location_verified_at": null,
      "coordinate_source": null,
      "location_last_verified": null,
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-28",
      "last_verified": "2026-10-16",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/applied-digital-harwood-data-center-nd",
      "source": "https://kfgo.com/2026/09/10/proposed-harwood-charter-amendment-looking-to-make-indrustrial-negotiations-more-transparent/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Proposed Harwood charter amendment looking to make industrial negotiations more transparent - The Mighty 790 KFGO",
          "url": "https://kfgo.com/2026/09/10/proposed-harwood-charter-amendment-looking-to-make-indrustrial-negotiations-more-transparent/",
          "publisher": "The Mighty 790 KFGO",
          "date": "2026-09-10",
          "source_tier": 4
        },
        {
          "title": "Data centers discussed at Harwood public forum - InForum",
          "url": "https://www.inforum.com/news/north-dakota/data-centers-discussed-at-harwood-public-forum",
          "publisher": "InForum",
          "date": "2026-08-28",
          "source_tier": 4
        },
        {
          "title": "U.S. data center boom comes to ND - - Minot Daily News",
          "url": "https://www.minotdailynews.com/news/local-news/2026/05/u-s-data-center-boom-comes-to-nd/",
          "publisher": "Minot Daily News",
          "date": "2026-05-07",
          "source_tier": 1
        },
        {
          "title": "North Dakota utility regulators advance power project for data center - North Dakota Monitor",
          "url": "https://northdakotamonitor.com/briefs/north-dakota-utility-regulators-advance-power-project-for-data-center/",
          "publisher": "North Dakota Monitor",
          "date": "2026-04-15",
          "source_tier": 1
        },
        {
          "title": "Inside the AI 'small city' data center rising from the plains - Grand Forks Herald",
          "url": "https://www.grandforksherald.com/news/north-dakota/inside-the-ai-small-city-data-center-rising-from-the-plains",
          "publisher": "Grand Forks Herald",
          "date": "2026-09-13",
          "source_tier": 4
        },
        {
          "title": "Applied Digital to Break Ground on $3 Billion Polaris Forge 2 Campus in September 2025, Expanding North Dakota’s Role as a National AI Infrastructure Leader - Applied Digital Corporation (APLD)",
          "url": "https://news.google.com/rss/articles/CBMixAFBVV95cUxQTE1HeWFKekd0ZUFDMHhWSV8zdTF2Z29aeHpEeTlNdUdXd2duUVA4OVBKYXN3cm9fWVI3V29KSUFEQXlPTlRLMkRWQjg2N1BPOE5QTzNkSk9ydE5FZWZzWkZSeVdxRDBIVTV5SnN6aEduSWNJY0FFZGozWlZJZlJNU3pINExPanpCMm9uVkNqWEYxc2pEd05yUmVuNGJjWEdoQjZFZXpidm1XRkdtaDlSQTlFQ3pYeFgydGROZEQxbl8tQm1Q?oc=5",
          "publisher": "Applied Digital Corporation (APLD)",
          "date": "2025-08-18",
          "source_tier": 1
        },
        {
          "title": "Applied Digital Pouring $3 Billion Into North Dakota Data Center Campus - CRN",
          "url": "https://www.crn.com/news/data-center/2025/applied-digital-pouring-3-billion-into-north-dakota-data-center-campus",
          "publisher": "CRN",
          "date": "2025-08-19",
          "source_tier": 1
        },
        {
          "title": "ND announces $3 billion data center, energy providers prepare - KELOLAND.com",
          "url": "https://www.keloland.com/keloland-com-original/nd-announces-3-billion-data-center-energy-providers-prepare/",
          "publisher": "KELOLAND.com",
          "date": "2025-08-19",
          "source_tier": 1
        },
        {
          "title": "Company announces plan for $3 billion data center north of Fargo - North Dakota Monitor",
          "url": "https://news.google.com/rss/articles/CBMinAFBVV95cUxPUFlQLWRWWkhlcFZCd1IyN0tUX0ZWT0xBMTl5N1VSVXhQWHVWTlUyckNnR2EwTDBZcEhaTmxYbkkwaUw0WUNraTJ5UVIxQnE1c1hPUExFWllsTWZmUzVNQldKV3JBdTZUNnlPVlRwMEM4Wnp1enByWXFkTzhPZFEyZXNseUtKZjZ0dy1qN0M4ZS15eHR1X0RMMWJ6UEk?oc=5",
          "publisher": "North Dakota Monitor",
          "date": "2025-08-18",
          "source_tier": 1
        },
        {
          "title": "Harwood signs off on data center but Fargo still eyes the property - North Dakota Monitor",
          "url": "https://northdakotamonitor.com/2025/09/10/harwood-signs-off-on-data-center-but-fargo-still-eyes-the-property/",
          "publisher": "North Dakota Monitor",
          "date": "2025-09-10",
          "source_tier": 1
        },
        {
          "title": "Data center proposed for Harwood prompts anger, questions from community members - North Dakota Monitor",
          "url": "https://northdakotamonitor.com/2025/08/25/data-center-proposed-for-harwood-prompts-anger-questions-from-community-members/",
          "publisher": "North Dakota Monitor",
          "date": "2025-08-25",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-13",
          "summary": "Remaining portion will open in early 2027",
          "source_url": "https://www.grandforksherald.com/news/north-dakota/inside-the-ai-small-city-data-center-rising-from-the-plains",
          "source_tier": 1
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-13",
          "summary": "Part of Harwood data center expected to become operational by end of 2026",
          "source_url": "https://www.grandforksherald.com/news/north-dakota/inside-the-ai-small-city-data-center-rising-from-the-plains",
          "source_tier": 1
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-13",
          "summary": "Polaris Forge 2 data center approved by Harwood City Council on September 10 2025",
          "source_url": "https://www.grandforksherald.com/news/north-dakota/inside-the-ai-small-city-data-center-rising-from-the-plains",
          "source_tier": 1
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-10",
          "summary": "Harwood city council approved the Applied Digital data center and signed a three billion dollar deal within 21 days of initial announcement",
          "source_url": "https://kfgo.com/2026/09/10/proposed-harwood-charter-amendment-looking-to-make-indrustrial-negotiations-more-transparent/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-08-28",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-28",
          "summary": "Applied Digital data center expected to be operational in early 2027",
          "source_url": "https://www.inforum.com/news/north-dakota/data-centers-discussed-at-harwood-public-forum",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-08-28",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-28",
          "summary": "Applied Digital is building 3 billion dollar data center on 160 acres near Harwood",
          "source_url": "https://www.inforum.com/news/north-dakota/data-centers-discussed-at-harwood-public-forum",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-05-07",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Applied Digital began construction of a 280MW data center in Harwood in September 2025, representing a 3 billion dollar investment; North Dakota Public Service Commission approved a temporary variance for the 110 million dollar power project serving the campus.",
          "source_url": "https://www.minotdailynews.com/news/local-news/2026/05/u-s-data-center-boom-comes-to-nd/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "applied-digital-polaris-forge-1-ellendale-nd",
      "name": "Applied Digital Polaris Forge 1 (Ellendale)",
      "summary": "Applied Digital completed Phase 1 of Building 2 at Polaris Forge 1 near Ellendale, bringing total live campus capacity to 175MW, with 400MW contracted at full build out under an 11 billion dollar, 15 year agreement with CoreWeave.",
      "state": "ND",
      "city": "Ellendale",
      "county": "Dickey",
      "status": "operational",
      "developer": "Applied Digital",
      "capacity_mw": 400,
      "latitude": 46.00435,
      "longitude": -98.52535,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau 2020 Gazetteer, internal point of Ellendale city (GEOID 3823220), public domain, until a source places the site",
      "location_verified_at": null,
      "coordinate_source": null,
      "location_last_verified": null,
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-28",
      "last_verified": "2026-10-16",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "energized",
      "interconnection_source_url": "https://www.misoenergy.org/planning/generator-interconnection/GI_Queue/",
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/applied-digital-polaris-forge-1-ellendale-nd",
      "source": "https://www.jamestownsun.com/news/north-dakota/officials-tout-population-growth-larger-tax-base-other-benefits-of-data-centers-in-north-dakota",
      "basis": "official_record",
      "sources": [
        {
          "title": "Officials tout population growth, larger tax base, other benefits of data centers in North Dakota - Jamestown Sun",
          "url": "https://www.jamestownsun.com/news/north-dakota/officials-tout-population-growth-larger-tax-base-other-benefits-of-data-centers-in-north-dakota",
          "publisher": "Jamestown Sun",
          "date": "2026-09-09",
          "source_tier": 4
        },
        {
          "title": "Officials tout population growth, larger tax base, other benefits of data centers in North Dakota - InForum",
          "url": "https://www.inforum.com/news/north-dakota/officials-tout-population-growth-larger-tax-base-other-benefits-of-data-centers-in-north-dakota",
          "publisher": "InForum",
          "date": "2026-09-09",
          "source_tier": 4
        },
        {
          "title": "Applied Digital (APLD) Expands North Dakota AI Campus on Schedule - Yahoo Finance",
          "url": "https://finance.yahoo.com/technology/ai/articles/applied-digital-apld-expands-north-183640640.html",
          "publisher": "Yahoo Finance",
          "date": "2026-07-16",
          "source_tier": 1
        },
        {
          "title": "DATA CENTERS: OPERATING ON ANOTHER LEVEL - Site Selection Magazine",
          "url": "https://siteselection.com/data-centers-operating-on-another-level/",
          "publisher": "Site Selection Magazine",
          "date": "2026-04-17",
          "source_tier": 1
        },
        {
          "title": "Applied Digital completes second building at North Dakota data center campus - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/applied-digital-completes-second-building-at-north-dakota-data-center-campus/",
          "publisher": "Data Center Dynamics",
          "date": "2026-07-02",
          "source_tier": 1
        },
        {
          "title": "U.S. data center boom comes to ND - - Minot Daily News",
          "url": "https://www.minotdailynews.com/news/local-news/2026/05/u-s-data-center-boom-comes-to-nd/",
          "publisher": "Minot Daily News",
          "date": "2026-05-07",
          "source_tier": 1
        },
        {
          "title": "Data center dilemma: Who should decide where they go in North Dakota? - North Dakota Monitor",
          "url": "https://northdakotamonitor.com/2026/05/11/data-center-dilemma-who-should-decide-where-they-go-in-north-dakota/",
          "publisher": "North Dakota Monitor",
          "date": "2026-05-11",
          "source_tier": 1
        },
        {
          "title": "US EPA ECHO Detailed Facility Report: Applied Digital Ellendale Campus (FRS 110071528410, North Dakota DEQ Air Permit)",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071528410",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "MISO Generator and Large Load Interconnection Queue: Montana Dakota Utilities Ellendale Substation Upgrade",
          "url": "https://www.misoenergy.org/planning/generator-interconnection/GI_Queue/",
          "publisher": "Midcontinent Independent System Operator",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "Applied Digital Brings an Additional 75 MW of AI Infrastructure Online at Polaris Forge 1",
          "url": "https://ir.applieddigital.com/news-events/press-releases/detail/161/applied-digital-brings-an-additional-75-mw-of-ai",
          "publisher": "Applied Digital",
          "date": "2026-10-02",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-10-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-10-02",
          "summary": "Applied Digital announced that 250 MW of critical IT load is now operational at its Polaris Forge 1 campus in Ellendale, North Dakota, after the second phase of Building 2 reached Ready for Service, adding 75 MW across three 25 MW data halls; the fully leased campus is contracted to deliver 400 MW of critical IT load at full buildout.",
          "source_url": "https://ir.applieddigital.com/news-events/press-releases/detail/161/applied-digital-brings-an-additional-75-mw-of-ai",
          "source_tier": 2
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-09",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-09",
          "summary": "The city of Ellendale annexed Applied Digital's property in early 2025.",
          "source_url": "https://www.inforum.com/news/north-dakota/officials-tout-population-growth-larger-tax-base-other-benefits-of-data-centers-in-north-dakota",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-09",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-09",
          "summary": "City of Ellendale annexed Applied Digital's property in early 2025",
          "source_url": "https://www.jamestownsun.com/news/north-dakota/officials-tout-population-growth-larger-tax-base-other-benefits-of-data-centers-in-north-dakota",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-02",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Applied Digital completed Phase 1 of Building 2 at Polaris Forge 1 near Ellendale, bringing total live campus capacity to 175MW, with 400MW contracted at full build out under an 11 billion dollar, 15 year agreement with CoreWeave.",
          "source_url": "https://www.datacenterdynamics.com/en/news/applied-digital-completes-second-building-at-north-dakota-data-center-campus/",
          "source_tier": 1
        }
      ]
    },
    {
      "slug": "quantica-broadview-data-center-mt",
      "name": "Quantica Broadview Data Center",
      "summary": "Quantica has proposed a large AI data center near Broadview spanning approximately 5,000 acres, with debates over water usage, natural gas power sourcing, and self funded energy capacity.",
      "state": "MT",
      "city": "Broadview",
      "county": "Yellowstone",
      "status": "proposed",
      "developer": "Quantica",
      "capacity_mw": null,
      "latitude": 46.09879,
      "longitude": -108.87887,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau 2020 Gazetteer, internal point of Broadview town (GEOID 3009775), public domain",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-10-16",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": 5100,
      "site_acres_disclosed_as": "third_party_estimate",
      "site_acres_source_url": "https://www.ktvq.com/news/construction-begins-at-proposed-broadview-data-center-site",
      "power_source": "NorthWestern Energy (letter of intent)",
      "power_source_url": "https://www.facebook.com/solarquarter/posts/northwestern-energy-group-inc-operating-as-northwestern-energy-has-signed-a-lett/1352701536864046/",
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/quantica-broadview-data-center-mt",
      "source": "https://www.ktvq.com/news/yellowstone-county-commissioners-agree-to-discuss-emergency-zoning-request-over-proposed-broadview-data-center",
      "basis": "official_record",
      "sources": [
        {
          "title": "Commissioners agree to discuss emergency zoning request over proposed Broadview data center - KTVQ",
          "url": "https://www.ktvq.com/news/yellowstone-county-commissioners-agree-to-discuss-emergency-zoning-request-over-proposed-broadview-data-center",
          "publisher": "KTVQ",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "NorthWestern Energy Group, Inc., operating as NorthWestern Energy, has signed a letter of intent to provide energy services for a new data center project proposed by Quantica Infrastructure in Montana. The agreement outlines plans to potentially deliver ener",
          "url": "https://www.facebook.com/solarquarter/posts/northwestern-energy-group-inc-operating-as-northwestern-energy-has-signed-a-lett/1352701536864046/",
          "publisher": "www.facebook.com",
          "date": "2025-07-30",
          "source_tier": 4
        },
        {
          "title": "Frustrated, rowdy data center opponents make more noise in Yellowstone County - Montana Free Press",
          "url": "https://montanafreepress.org/2026/08/19/data-center-opponents-make-noise-in-yellowstone-county/",
          "publisher": "Montana Free Press",
          "date": "2026-08-19",
          "source_tier": 4
        },
        {
          "title": "Dirt starts moving at proposed Quantica data center site near Broadview - KTVQ",
          "url": "https://www.ktvq.com/news/construction-begins-at-proposed-broadview-data-center-site",
          "publisher": "KTVQ",
          "date": "2026-09-12",
          "source_tier": 4
        },
        {
          "title": "Broadview data center debate raises water and transparency concerns - NonStop Local Billings",
          "url": "https://www.kulr8.com/montana/broadview-data-center-debate-raises-water-and-transparency-concerns/article_5a173b3d-12a7-5504-a3a7-685b6221fdea.html",
          "publisher": "NonStop Local Billings",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Quantica outlines proposed water usage for Broadview data center - KTVQ",
          "url": "https://www.ktvq.com/news/quantica-outlines-proposed-water-usage-for-broadview-data-center",
          "publisher": "KTVQ",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Proposed AI data center near Broadview could use natural gas as a power source - KTVQ",
          "url": "https://www.ktvq.com/news/local-news/proposed-ai-data-center-near-broadview-could-use-natural-gas-as-a-power-source",
          "publisher": "KTVQ",
          "date": "2026-05-21",
          "source_tier": 4
        },
        {
          "title": "Quantica seeking to boost energy capacity at proposed Broadview data center - KTVQ",
          "url": "https://www.ktvq.com/news/montana-news/quantica-seeking-to-boost-energy-capacity-at-broadview-data-center-site-to-7-235-mw",
          "publisher": "KTVQ",
          "date": "2026-05-20",
          "source_tier": 4
        },
        {
          "title": "Emails: Massive gas power plants planned north of Billings for Broadview data center - Billings Gazette",
          "url": "https://billingsgazette.com/news/local/business/development/article_72b2ec17-3180-46e0-9145-ebab45ae4cfc.html",
          "publisher": "Billings Gazette",
          "date": "2026-05-20",
          "source_tier": 4
        },
        {
          "title": "Quantica commits further to self-funded power for data center near Broadview - Billings Gazette",
          "url": "https://billingsgazette.com/news/local/business/article_a5073e62-1fa5-48d9-a901-ce204da4812b.html",
          "publisher": "Billings Gazette",
          "date": "2026-05-14",
          "source_tier": 4
        },
        {
          "title": "Proposed 5,000-Acre AI data center near Broadview raises questions from residents | Billings News - NonStop Local Billings",
          "url": "https://www.kulr8.com/news/proposed-5-000-acre-ai-data-center-near-broadview-raises-questions-from-residents/article_18781d68-ebc4-4d32-845c-38fe62de9e9c.html",
          "publisher": "NonStop Local Billings",
          "date": "2026-03-12",
          "source_tier": 4
        },
        {
          "title": "As AI investors eye Montana for new data centers, communities brace for water impacts - Montana Free Press",
          "url": "https://montanafreepress.org/2026/02/12/as-ai-investors-eye-montana-for-new-data-centers-communities-brace-for-water-impacts/",
          "publisher": "Montana Free Press",
          "date": "2026-02-12",
          "source_tier": 4
        },
        {
          "title": "Quantica outlines proposed water usage for Broadview data center - KTVQ",
          "url": "https://www.ktvq.com/news/quantica-outlines-proposed-water-usage-for-broadview-data-center",
          "publisher": "KTVQ",
          "date": "2026-09-01",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-10-16",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Yellowstone County Commission approved a road use and maintenance agreement with data center developer Quantica Infrastructure for a planned data center north of Billings, Montana.",
          "source_url": "https://billingsgazette.com/news/local/government-politics/article_be2ef02d-d684-4559-b4ce-36b55f9b15ed.html",
          "source_tier": 1
        },
        {
          "status": "rumored",
          "effective_at": "2026-08-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-18",
          "summary": "Proposed data center project spans 5,000 acres south of Broadview",
          "source_url": "https://www.ktvq.com/news/yellowstone-county-commissioners-agree-to-discuss-emergency-zoning-request-over-proposed-broadview-data-center",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-05-21",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-21",
          "summary": "Proposed AI data center near Broadview could use natural gas as a power source",
          "source_url": "https://www.ktvq.com/news/local-news/proposed-ai-data-center-near-broadview-could-use-natural-gas-as-a-power-source",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-05-20",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-20",
          "summary": "Quantica seeking to boost energy capacity at proposed Broadview data center",
          "source_url": "https://www.ktvq.com/news/montana-news/quantica-seeking-to-boost-energy-capacity-at-broadview-data-center-site-to-7-235-mw",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-05-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-14",
          "summary": "Quantica commits further to self funded power for Broadview data center",
          "source_url": "https://billingsgazette.com/news/local/business/article_a5073e62-1fa5-48d9-a901-ce204da4812b.html",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "applied-digital-north-dakota-oliver-county-third-data-center-nd",
      "name": "Applied Digital Polaris Forge 3 (Oliver County)",
      "summary": "Applied Digital is expanding in North Dakota and eyeing Oliver County for a third data center.",
      "state": "ND",
      "city": null,
      "county": "Oliver",
      "status": "under_construction",
      "developer": "Applied Digital",
      "capacity_mw": 430,
      "latitude": 47.1180789,
      "longitude": -101.3314198,
      "location_precision": "county",
      "location_source": "U.S. Census Bureau internal point of Oliver County (GEOID 38065), public domain, until a source places the site",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-10-07",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://www.inforum.com/news/north-dakota/officials-tout-population-growth-larger-tax-base-other-benefits-of-data-centers-in-north-dakota",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/applied-digital-north-dakota-oliver-county-third-data-center-nd",
      "source": "https://datacenters.economictimes.indiatimes.com/news/energy-cooling-sustainability/ai-data-centers-pivot-to-industrial-boilers-for-power-amid-turbine-delays/134043037?utm_source=top_news&utm_medium=homepage",
      "basis": "official_record",
      "sources": [
        {
          "title": "AI data centers pivot to industrial boilers for power amid turbine delays - ET Datacenters",
          "url": "https://datacenters.economictimes.indiatimes.com/news/energy-cooling-sustainability/ai-data-centers-pivot-to-industrial-boilers-for-power-amid-turbine-delays/134043037?utm_source=top_news&utm_medium=homepage",
          "publisher": "ET Datacenters",
          "date": "2026-09-11",
          "source_tier": 4
        },
        {
          "title": "West Fargo residents to discuss data center development - InForum",
          "url": "https://www.inforum.com/news/west-fargo/west-fargo-residents-to-discuss-data-center-development",
          "publisher": "InForum",
          "date": "2026-09-14",
          "source_tier": 4
        },
        {
          "title": "Montana-Dakota Utilities Announces Electric Service Agreement with Applied Digital for Proposed AI Factory - PR Newswire",
          "url": "https://www.prnewswire.com/news-releases/montana-dakota-utilities-announces-electric-service-agreement-with-applied-digital-for-proposed-ai-factory-302806791.html",
          "publisher": "PR Newswire",
          "date": "2026-06-22",
          "source_tier": 1
        },
        {
          "title": "Applied Digital completes second building at North Dakota data center campus - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/applied-digital-completes-second-building-at-north-dakota-data-center-campus/",
          "publisher": "Data Center Dynamics",
          "date": "2026-07-02",
          "source_tier": 3
        },
        {
          "title": "Port: Data center company Applied Digital expects to be one of the largest taxpayers in North Dakota history - InForum",
          "url": "https://www.inforum.com/opinion/columns/port-data-center-company-applied-digital-expects-to-be-one-of-the-largest-taxpayers-in-north-dakota-history",
          "publisher": "InForum",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Applied Digital expands in North Dakota, eyes Oliver County for third data center - Valley News Live",
          "url": "https://www.valleynewslive.com/2026/07/13/applied-digital-expands-north-dakota-eyes-oliver-county-third-data-center/",
          "publisher": "Valley News Live",
          "date": "2026-07-13",
          "source_tier": 4
        },
        {
          "title": "Applied Digital Reaches Significant Milestone, Surpassing 1 GW of Contracted Capacity with U.S. Based High Investment Grade Hyperscaler Lease at Fourth Campus, Polaris Forge 3",
          "url": "https://ir.applieddigital.com/news-events/press-releases/detail/152/applied-digital-reaches-significant-milestone-surpassing-1",
          "publisher": "Applied Digital",
          "date": "2026-05-20",
          "source_tier": 2
        },
        {
          "title": "Applied Digital Reports Fiscal First Quarter 2027 Results",
          "url": "https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results",
          "publisher": "Applied Digital",
          "date": "2026-10-07",
          "source_tier": 2
        },
        {
          "title": "Applied Digital annual report for the fiscal year ended May 31, 2026",
          "url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000048/apld-20260531.htm",
          "publisher": "Applied Digital",
          "date": "2026-07-29",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-10-07",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-10-07",
          "summary": "Applied Digital's fiscal first quarter 2027 results release calls Oliver County, North Dakota, and Center, North Dakota, home to Polaris Forge 3, and lists Polaris Forge 3 among the campuses that are in various stages of construction.",
          "source_url": "https://ir.applieddigital.com/news-events/press-releases/detail/163/applied-digital-reports-fiscal-first-quarter-2027-results",
          "source_tier": 2
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-11",
          "summary": "Applied Digital facility in North Dakota is expected to be operational by late 2028",
          "source_url": "https://datacenters.economictimes.indiatimes.com/news/energy-cooling-sustainability/ai-data-centers-pivot-to-industrial-boilers-for-power-amid-turbine-delays/134043037?utm_source=top_news&utm_medium=homepage",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-11",
          "summary": "Applied Digital signed a 2.4 billion dollar design and build agreement with Base Electron",
          "source_url": "https://datacenters.economictimes.indiatimes.com/news/energy-cooling-sustainability/ai-data-centers-pivot-to-industrial-boilers-for-power-amid-turbine-delays/134043037?utm_source=top_news&utm_medium=homepage",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-11",
          "summary": "Applied Digital ordered 1.2 gigawatts of industrial boiler fed steam turbines for a data center in North Dakota",
          "source_url": "https://datacenters.economictimes.indiatimes.com/news/energy-cooling-sustainability/ai-data-centers-pivot-to-industrial-boilers-for-power-amid-turbine-delays/134043037?utm_source=top_news&utm_medium=homepage",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-29",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-29",
          "summary": "Applied Digital's annual report for the fiscal year ended May 31, 2026 says Polaris Forge 3 is a 300 MW critical IT load data center campus in its northern United States region and is currently under construction across two buildings, with delivery expected to begin in the second half of calendar year 2027 and run through the second half of calendar year 2028.",
          "source_url": "https://ir.applieddigital.com/sec-filings/all-sec-filings/content/0001144879-26-000048/apld-20260531.htm",
          "source_tier": 2
        },
        {
          "status": "proposed",
          "effective_at": "2026-06-22",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Montana Dakota Utilities signed an electric service agreement to provide 430 megawatts of power to Applied Digital's Polaris Forge 3 near Center, North Dakota, with initial operations anticipated in August 2027.",
          "source_url": "https://www.prnewswire.com/news-releases/montana-dakota-utilities-announces-electric-service-agreement-with-applied-digital-for-proposed-ai-factory-302806791.html",
          "source_tier": 1
        },
        {
          "status": "rumored",
          "effective_at": "2026-05-20",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-20",
          "summary": "Applied Digital announced on May 20, 2026 that it entered into 15 year take or pay leases for Polaris Forge 3, its fourth AI Factory campus, with a U.S. based high investment grade hyperscaler the release does not name, valued at approximately $7.5 billion in base term contracted revenue for 300 MW of critical IT load, and said initial operations are anticipated to commence in August 2027.",
          "source_url": "https://ir.applieddigital.com/news-events/press-releases/detail/152/applied-digital-reaches-significant-milestone-surpassing-1",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "delta-forge-1-boyce-la",
      "name": "Delta Forge 1",
      "summary": "Applied Digital is constructing a 300 acre, $3.6 billion data center campus called Delta Forge 1 in Boyce, Louisiana, with 300 MW in its first phase and initial operations expected as soon as mid 2027.",
      "state": "LA",
      "city": "Boyce",
      "county": "Rapides Parish",
      "status": "proposed",
      "developer": "Applied Digital",
      "capacity_mw": 300,
      "latitude": 31.31125,
      "longitude": -92.44519,
      "location_precision": "county",
      "location_source": "County seat (Alexandria), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": "5941 La Hwy 121, Boyce, LA 70000",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110072183100",
      "published": "2026-09-05",
      "last_verified": "2026-10-06",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/delta-forge-1-boyce-la",
      "source": "https://www.thetowntalk.com/story/news/2026/09/13/residents-support-ai-data-center-revolt-tour-stop-near-boyce-project/91747763007/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Citizens 'have no seat at the table' on data centers, says organizer - thetowntalk.com",
          "url": "https://www.thetowntalk.com/story/news/2026/09/13/residents-support-ai-data-center-revolt-tour-stop-near-boyce-project/91747763007/",
          "publisher": "thetowntalk.com",
          "date": "2026-09-13",
          "source_tier": 4
        },
        {
          "title": "NDAs are hiding data center deals, drawing ire from locals — and attention from lawmakers - Oregon Public Broadcasting - OPB",
          "url": "https://www.opb.org/article/2026/08/27/ndas-are-hiding-data-center-deals-drawing-ire-from-locals-and-attention-from-lawmakers/",
          "publisher": "OPB (via Google News)",
          "date": "2026-08-27",
          "source_tier": 4
        },
        {
          "title": "Cleco to power planned Rapides Parish data center - Rapides Parish Journal",
          "url": "https://rapidesparishjournal.com/2026/05/27/cleco-to-power-planned-rapides-parish-data-center/",
          "publisher": "Rapides Parish Journal",
          "date": "2026-05-27",
          "source_tier": 1
        },
        {
          "title": "Applied Digital secures customer for new 210MW data center campus - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/applied-digital-secures-customer-for-new-210mw-data-center-campus/",
          "publisher": "Data Center Dynamics",
          "date": "2026-06-09",
          "source_tier": 1
        },
        {
          "title": "Cleco to power data center coming to Rapides Parish - KALB | News Channel 5",
          "url": "https://www.kalb.com/2026/05/27/cleco-power-data-center-coming-rapides-parish/",
          "publisher": "KALB | News Channel 5",
          "date": "2026-05-27",
          "source_tier": 1
        },
        {
          "title": "NDAs are hiding data center deals, drawing ire from locals — and attention from lawmakers - NPR",
          "url": "https://www.npr.org/2026/08/27/nx-s1-5879528/data-center-nda-disclosure-louisiana",
          "publisher": "NPR",
          "date": "2026-08-27",
          "source_tier": 4
        },
        {
          "title": "Developer of Delta data center announces ‘revolutionary’ tech to turn natural gas into water - News From The States",
          "url": "https://www.newsfromthestates.com/article/developer-delta-data-center-announces-revolutionary-tech-turn-natural-gas-water",
          "publisher": "News From The States",
          "date": "2026-09-09",
          "source_tier": 4
        },
        {
          "title": "EPA ECHO detailed facility report: Beard Construction Group LLC, Applied Digital",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110072183100",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-09-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-13",
          "summary": "Applied Digital building 3.6 billion dollar Data Forge 1 data center near Boyce",
          "source_url": "https://www.thetowntalk.com/story/news/2026/09/13/residents-support-ai-data-center-revolt-tour-stop-near-boyce-project/91747763007/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-13",
          "summary": "Meta building Hyperion data center approximately 30 miles east of Monroe in Richland Parish",
          "source_url": "https://www.thetowntalk.com/story/news/2026/09/13/residents-support-ai-data-center-revolt-tour-stop-near-boyce-project/91747763007/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-05-27",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Cleco Power announced an agreement to supply electricity to the proposed Delta Forge 1 data center in Boyce, Rapides Parish, Louisiana.",
          "source_url": "https://rapidesparishjournal.com/2026/05/27/cleco-to-power-planned-rapides-parish-data-center/",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "prometheus-hyperscale-natrona-county-data-center-wy",
      "name": "Prometheus Hyperscale Natrona County Data Center",
      "summary": "Prometheus Hyperscale proposed a 940 acre, gigawatt scale data center campus in Natrona County, Wyoming, requesting the county bypass state environmental review amid divided commissioner opinion.",
      "state": "WY",
      "city": null,
      "county": "Natrona",
      "status": "permitting",
      "developer": "Prometheus Hyperscale",
      "capacity_mw": 1250,
      "latitude": 42.83472,
      "longitude": -106.325,
      "location_precision": "county",
      "location_source": "County seat (Casper), Wikidata, placed at county level",
      "location_verified_at": "2026-09-23",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-23",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-10-06",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": "on-site natural gas engines and turbines from Black Hills Energy",
      "power_source_url": "https://cowboystatedaily.com/2026/09/02/prometheus-data-center-developers-outline-natrona-county-project-to-commissioners/",
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/prometheus-hyperscale-natrona-county-data-center-wy",
      "source": "https://trib.com/news/local/government-politics/article_f31aa740-b07b-4fb9-955c-8e5cc5e39dd3.html",
      "basis": "third_party_estimate",
      "sources": [
        {
          "title": "The data center move story we broke first takes a new turn as Natrona commissioners discuss the change - trib.com",
          "url": "https://trib.com/news/local/government-politics/article_f31aa740-b07b-4fb9-955c-8e5cc5e39dd3.html",
          "publisher": "trib.com",
          "date": "2026-09-04",
          "source_tier": 4
        },
        {
          "title": "Natrona County Residents Pack Meeting To Hear Plans For Huge 1.25 GW Data Center - Cowboy State Daily",
          "url": "https://cowboystatedaily.com/2026/09/02/prometheus-data-center-developers-outline-natrona-county-project-to-commissioners/",
          "publisher": "Cowboy State Daily",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Pitching 940-acre data center, Prometheus Hyperscale asks Natrona County to bypass state review - wyomingnewsnow.tv",
          "url": "https://wyofile.com/pitching-940-acre-data-center-prometheus-hyperscale-asks-natrona-county-to-bypass-state-review/",
          "publisher": "wyomingnewsnow.tv",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Natrona County divided over proposed 940-acre Prometheus data center - yourwyominglink.com",
          "url": "https://www.yourwyominglink.com/news/local/natrona-county-divided-over-proposed-940-acre-prometheus-data-center/article_13ebd917-f42b-43cd-add8-0319a56affd8.html",
          "publisher": "yourwyominglink.com",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Natrona County residents split on a potential multi million dollar A.I. data center - Wyoming Public Media",
          "url": "https://www.wyomingpublicmedia.org/politics-government/2026-09-10/natrona-county-residents-split-on-a-potential-multi-million-dollar-a-i-data-center",
          "publisher": "Wyoming Public Media",
          "date": "2026-09-10",
          "source_tier": 4
        },
        {
          "title": "Commissioners: Prometheus data center developers considering new Natrona County site - Oil City News",
          "url": "https://oilcity.news/community/county-community/county/2026/07/08/commissioner-prometheus-data-center-developers-consider-new-natrona-county-site/",
          "publisher": "Oil City News",
          "date": "2026-07-08",
          "source_tier": 1
        },
        {
          "title": "Prometheus Hyperscale secures planning approval for gigawatt data center campus in Wyoming - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/prometheus-hyperscale-secures-planning-approval-for-gigawatt-data-center-campus-in-wyoming/",
          "publisher": "Data Center Dynamics",
          "date": "2026-06-22",
          "source_tier": 3
        },
        {
          "title": "Prometheus Hyperscale, Mesa Power Solutions partner on proposed Natrona County data center campus",
          "url": "https://oilcity.news/business-feature-2/2026/08/31/prometheus-hyperscale-mesa-power-solutions-partner-on-proposed-natrona-county-data-center-campus/",
          "publisher": "Oil City News",
          "date": "2026-08-31",
          "source_tier": 4
        },
        {
          "title": "Prometheus Hyperscale Data Center asks Natrona County commission for industrial park designation - WyomingNews.com",
          "url": "https://www.wyomingnews.com/news/local_news/prometheus-hyperscale-data-center-asks-natrona-county-commission-for-industrial-park-designation/article_fb160fbe-0345-4b49-a0bf-355692a3045d.html",
          "publisher": "WyomingNews.com",
          "date": "2026-09-09",
          "source_tier": 4
        },
        {
          "title": "Pitching 940 acre data center, Prometheus Hyperscale asks Natrona County to bypass state review - WyoFile",
          "url": "https://wyofile.com/pitching-940-acre-data-center-prometheus-hyperscale-asks-natrona-county-to-bypass-state-review/",
          "publisher": "WyoFile",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Natrona County data center tour draws GOP candidates, excludes Democrats - WyomingNews.com",
          "url": "https://www.wyomingnews.com/news/local_news/natrona-county-data-center-tour-draws-gop-candidates-excludes-democrats/article_af79ac70-62d0-4bd2-a03f-1c2b43f710e6.html",
          "publisher": "WyomingNews.com",
          "date": "2026-10-02",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "permitting",
          "effective_at": "2026-09-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-10",
          "summary": "Commissioners said a formal vote on the Prometheus project remains months away",
          "source_url": "https://www.wyomingpublicmedia.org/politics-government/2026-09-10/natrona-county-residents-split-on-a-potential-multi-million-dollar-a-i-data-center",
          "source_tier": 4
        },
        {
          "status": "permitting",
          "effective_at": "2026-09-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-10",
          "summary": "Prometheus Hyperscale is proposing a $500 million AI data center on 940 acres south of I-25 on Falls Ranch property between Casper and Glenrock",
          "source_url": "https://www.wyomingpublicmedia.org/politics-government/2026-09-10/natrona-county-residents-split-on-a-potential-multi-million-dollar-a-i-data-center",
          "source_tier": 4
        },
        {
          "status": "permitting",
          "effective_at": "2026-09-09",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-09",
          "summary": "Project plans to use closed loop cooling system not to draw from local water supplies",
          "source_url": "https://www.wyomingnews.com/news/local_news/prometheus-hyperscale-data-center-asks-natrona-county-commission-for-industrial-park-designation/article_fb160fbe-0345-4b49-a0bf-355692a3045d.html",
          "source_tier": 4
        },
        {
          "status": "permitting",
          "effective_at": "2026-09-09",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-09",
          "summary": "Prometheus announced partnership with Mesa Power Solutions to provide natural gas generators on August 28",
          "source_url": "https://www.wyomingnews.com/news/local_news/prometheus-hyperscale-data-center-asks-natrona-county-commission-for-industrial-park-designation/article_fb160fbe-0345-4b49-a0bf-355692a3045d.html",
          "source_tier": 4
        },
        {
          "status": "permitting",
          "effective_at": "2026-09-09",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-09",
          "summary": "Prometheus Hyperscale seeks industrial park designation for 940 acre site in Natrona County",
          "source_url": "https://www.wyomingnews.com/news/local_news/prometheus-hyperscale-data-center-asks-natrona-county-commission-for-industrial-park-designation/article_fb160fbe-0345-4b49-a0bf-355692a3045d.html",
          "source_tier": 4
        },
        {
          "status": "permitting",
          "effective_at": "2026-09-04",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-04",
          "summary": "The data center was previously proposed near the Natrona and Converse county line",
          "source_url": "https://trib.com/news/local/government-politics/article_f31aa740-b07b-4fb9-955c-8e5cc5e39dd3.html",
          "source_tier": 4
        },
        {
          "status": "permitting",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "Prometheus announced plans in late 2025 to build the data center campus",
          "source_url": "https://wyofile.com/pitching-940-acre-data-center-prometheus-hyperscale-asks-natrona-county-to-bypass-state-review/",
          "source_tier": 4
        },
        {
          "status": "permitting",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "Prometheus Hyperscale presented plans for a 1.25 gigawatt data center on Falls Ranch southeast of Casper",
          "source_url": "https://cowboystatedaily.com/2026/09/02/prometheus-data-center-developers-outline-natrona-county-project-to-commissioners/",
          "source_tier": 4
        },
        {
          "status": "permitting",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "Project would use self contained closed loop cooling system that is 75 percent water and 25 percent propylene glycol",
          "source_url": "https://cowboystatedaily.com/2026/09/02/prometheus-data-center-developers-outline-natrona-county-project-to-commissioners/",
          "source_tier": 4
        },
        {
          "status": "permitting",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "Prometheus Hyperscale proposes a 1.5 gigawatt data center campus on Falls Ranch property",
          "source_url": "https://wyofile.com/pitching-940-acre-data-center-prometheus-hyperscale-asks-natrona-county-to-bypass-state-review/",
          "source_tier": 4
        },
        {
          "status": "permitting",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "Prometheus seeks to zone 940 acres south of Interstate 25",
          "source_url": "https://wyofile.com/pitching-940-acre-data-center-prometheus-hyperscale-asks-natrona-county-to-bypass-state-review/",
          "source_tier": 4
        },
        {
          "status": "permitting",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "Data center portion requires 640 acres west of Big Muddy Creek",
          "source_url": "https://wyofile.com/pitching-940-acre-data-center-prometheus-hyperscale-asks-natrona-county-to-bypass-state-review/",
          "source_tier": 4
        },
        {
          "status": "permitting",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "Power generation portion requires 300 acres on site",
          "source_url": "https://wyofile.com/pitching-940-acre-data-center-prometheus-hyperscale-asks-natrona-county-to-bypass-state-review/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-31",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "In July 2026, county Development Director Sabrina Kemper said developer had begun looking at moving entire project footprint south of I-25 within Natrona County",
          "source_url": "https://oilcity.news/business-feature-2/2026/08/31/prometheus-hyperscale-mesa-power-solutions-partner-on-proposed-natrona-county-data-center-campus/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-31",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Prometheus previously proposed 1.5 gigawatt campus across the Natrona and Converse county line on Falls Ranch property north of Interstate 25",
          "source_url": "https://oilcity.news/business-feature-2/2026/08/31/prometheus-hyperscale-mesa-power-solutions-partner-on-proposed-natrona-county-data-center-campus/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-31",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Presentation to Natrona County Board of County Commissioners scheduled for September 1, 2026 at 4:40 p.m.",
          "source_url": "https://oilcity.news/business-feature-2/2026/08/31/prometheus-hyperscale-mesa-power-solutions-partner-on-proposed-natrona-county-data-center-campus/",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-31",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Prometheus Hyperscale and Mesa Power Solutions partnership announced to advance proposed data center campus in Natrona County",
          "source_url": "https://oilcity.news/business-feature-2/2026/08/31/prometheus-hyperscale-mesa-power-solutions-partner-on-proposed-natrona-county-data-center-campus/",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "google-data-center-pryor-ok",
      "name": "Google Data Center Pryor",
      "summary": "Google opened a data center in Pryor, Oklahoma approximately 15 years before 2026, and the project is discussed for lessons learned.",
      "state": "OK",
      "city": "Pryor",
      "county": "Mayes",
      "status": "rumored",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 36.26385,
      "longitude": -95.32791,
      "location_precision": "permit_point",
      "location_source": "https://echo.epa.gov/detailed-facility-report?fid=110070386180",
      "location_verified_at": "2026-10-04",
      "coordinate_source": "https://echo.epa.gov/detailed-facility-report?fid=110070386180",
      "location_last_verified": "2026-10-04",
      "site_address": "221 Steve Berry BLVD, Pryor, OK 74361",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070386180",
      "published": "2026-09-05",
      "last_verified": "2026-10-04",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-data-center-pryor-ok",
      "source": "https://tulsaworld.com/news/local/crime-courts/article_0e566790-f4a5-45d8-98d8-6d39f7f70ce5.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "Data center opponents add open meetings, records violation claims to lawsuit",
          "url": "https://tulsaworld.com/news/local/crime-courts/article_0e566790-f4a5-45d8-98d8-6d39f7f70ce5.html",
          "publisher": "Tulsa World",
          "date": "2026-09-11",
          "source_tier": 4
        },
        {
          "title": "Lessons learned from Pryor, OK, 15 years after Google opened data center - Emporia Gazette",
          "url": "https://www.emporiagazette.com/free/article_fc937b08-b205-432f-b17d-214bca7e2d9e.html",
          "publisher": "Emporia Gazette",
          "date": "2026-06-12",
          "source_tier": 4
        },
        {
          "title": "See inside the Google data center in Pryor Oklahoma",
          "url": "https://www.oklahoman.com/picture-gallery/business/information-technology/2025/11/12/google-data-center-pryor-ok-photos/86930475007/",
          "publisher": "www.oklahoman.com",
          "date": "2025-11-12",
          "source_tier": 4
        },
        {
          "title": "EPA ECHO detailed facility report: Tmobile Central LLC / Google",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110070386180",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-09-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-11",
          "summary": "Land Legacy alleges it holds a conservation easement on about one third of property targeted for data center location",
          "source_url": "https://tulsaworld.com/news/local/crime-courts/article_0e566790-f4a5-45d8-98d8-6d39f7f70ce5.html",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "google-papillion-data-center-ne",
      "name": "Google Papillion data center",
      "summary": "Google lists a data center at Papillion, Nebraska among the sites it operates.",
      "state": "NE",
      "city": "Papillion",
      "county": "Sarpy County",
      "status": "operational",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 41.13651,
      "longitude": -96.04617,
      "location_precision": "permit_point",
      "location_source": "https://echo.epa.gov/detailed-facility-report?fid=110071854707",
      "location_verified_at": "2026-10-04",
      "coordinate_source": "https://echo.epa.gov/detailed-facility-report?fid=110071854707",
      "location_last_verified": "2026-10-04",
      "site_address": "14865 Gold Cost Road, Papillion, NE 68138",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071854707",
      "published": "2026-09-14",
      "last_verified": "2026-10-04",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-papillion-data-center-ne",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110071854707",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Fireball Group LLC Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071854707",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Google to open new data center in Sarpy County - 3newsnow.com",
          "url": "https://www.3newsnow.com/news/local-news/google-to-open-new-data-center-in-sarpy-county",
          "publisher": "3newsnow.com",
          "date": "2019-10-04",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Papillion data center at Papillion, Nebraska on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        },
        {
          "status": "operational",
          "effective_at": "2019-10-04",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2019-10-04",
          "summary": "Google to open new data center in Sarpy County",
          "source_url": "https://www.3newsnow.com/news/local-news/google-to-open-new-data-center-in-sarpy-county",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "tierpoint-oklahoma-city-data-centers-ok",
      "name": "TierPoint Oklahoma City Data Centers",
      "summary": "TierPoint lists a data center at Oklahoma City, Oklahoma among the sites it operates.",
      "state": "OK",
      "city": "Oklahoma City",
      "county": "Oklahoma County",
      "status": "operational",
      "developer": "TierPoint",
      "capacity_mw": null,
      "latitude": 35.467653,
      "longitude": -97.5138612,
      "location_precision": "address",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": "4121 Perimeter PL, Oklahoma City, OK 73112",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071272710",
      "published": "2026-09-14",
      "last_verified": "2026-10-04",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": "Google general contractor",
      "contractor_source_url": "https://greenstreetnews.com/article/oklahoma-city-warehouse-leased-to-google-data-center-contractor-hits-market/",
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/tierpoint-oklahoma-city-data-centers-ok",
      "source": "https://www.news9.com/midcon-data-center-oklahoma-city",
      "basis": "official_record",
      "sources": [
        {
          "title": "What to know about MIDCON data center in Oklahoma City - News 9",
          "url": "https://www.news9.com/midcon-data-center-oklahoma-city",
          "publisher": "News 9",
          "date": "2026-09-14",
          "source_tier": 4
        },
        {
          "title": "Oklahoma City warehouse leased to Google data center builder hits market - Green Street News",
          "url": "https://greenstreetnews.com/article/oklahoma-city-warehouse-leased-to-google-data-center-contractor-hits-market/",
          "publisher": "Green Street News",
          "date": "2026-09-15",
          "source_tier": 4
        },
        {
          "title": "EPA ECHO detailed facility report: Tierpoint LLC / Tierpoint LLC Oklahoma City",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071272710",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        },
        {
          "title": "What to know about TierPoint data centers in OKC - News 9",
          "url": "https://www.news9.com/data-centers-in-oklahoma/okc-data-centers-tierpoint",
          "publisher": "News 9",
          "date": "2026-09-14",
          "source_tier": 4
        },
        {
          "title": "TierPoint: Browse our data centers",
          "url": "https://www.tierpoint.com/data-centers/",
          "publisher": "TierPoint",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "TierPoint Delivers Largest Commercial Data Center in Oklahoma - commercialsearch.com",
          "url": "https://www.commercialsearch.com/news/tierpoint-delivers-largest-commercial-data-center-in-oklahoma/",
          "publisher": "commercialsearch.com",
          "date": "2016-02-17",
          "source_tier": 4
        },
        {
          "title": "TierPoint completes fourth data center in Oklahoma - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/tierpoint-completes-fourth-data-center-in-oklahoma/",
          "publisher": "Data Center Dynamics",
          "date": "2018-02-27",
          "source_tier": 3
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "TierPoint lists TierPoint Oklahoma City Data Centers at Oklahoma City, Oklahoma on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.tierpoint.com/data-centers/",
          "source_tier": 2
        },
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "MIDCON Recovery Solutions data center has been operational since about 2016",
          "source_url": "https://www.news9.com/midcon-data-center-oklahoma-city",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "MIDCON data center located in Quail Springs Business Park",
          "source_url": "https://www.news9.com/midcon-data-center-oklahoma-city",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Data center meets FEMA Zone 4 rated and Seismic 2 rated earthquake standards",
          "source_url": "https://www.news9.com/midcon-data-center-oklahoma-city",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2018-02-27",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2018-02-27",
          "summary": "TierPoint completes fourth data center in Oklahoma",
          "source_url": "https://www.datacenterdynamics.com/en/news/tierpoint-completes-fourth-data-center-in-oklahoma/",
          "source_tier": 3
        },
        {
          "status": "operational",
          "effective_at": "2016-02-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2016-02-17",
          "summary": "TierPoint delivers largest commercial data center in Oklahoma",
          "source_url": "https://www.commercialsearch.com/news/tierpoint-delivers-largest-commercial-data-center-in-oklahoma/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2008-01-01",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "TierPoint second Oklahoma City data center built in 2008, 22500 square feet with 15000 square feet raised floor capacity, withstands winds up to 150 miles per hour, cooled with 150 tons of computer room air conditioning under floor and in line cooling",
          "source_url": "https://www.news9.com/data-centers-in-oklahoma/okc-data-centers-tierpoint",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2003-01-01",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "TierPoint first Oklahoma City data center began operation in 2003, is 4000 square feet, cooled with 100 tons of computer room air conditioning",
          "source_url": "https://www.news9.com/data-centers-in-oklahoma/okc-data-centers-tierpoint",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "databank-ltd-mci-3-air-lenexa-ks",
      "name": "Databank LTD Mci 3 (air)",
      "summary": "The EPA's facility registry lists Databank LTD Mci 3 (air) at 11200 Lakeview Ave, Lenexa, KS 66219 in Lenexa, Kansas, with air and water permits.",
      "state": "KS",
      "city": "Lenexa",
      "county": "Johnson County",
      "status": "not_verified",
      "developer": "DataBank",
      "capacity_mw": null,
      "latitude": 38.9653,
      "longitude": -94.8039,
      "location_precision": "address",
      "location_source": "U.S. Census Bureau 2020 Gazetteer, the internal point of Lenexa, public domain, placed at city level; the EPA facility record gives no site point (the registry does not say how its point was placed)",
      "location_verified_at": "2026-10-03",
      "coordinate_source": "census gazetteer place point",
      "location_last_verified": "2026-10-03",
      "site_address": "11200 Lakeview Ave, Lenexa, KS 66219",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071544609",
      "published": "2026-10-03",
      "last_verified": "2026-10-03",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110071544609",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/databank-ltd-mci-3-air-lenexa-ks",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110071544609",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Databank LTD Mci 3 (air)",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110071544609",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "edgeconnex-new-orleans-holdings-llc-slidell-la",
      "name": "Edgeconnex New Orleans Holdings LLC",
      "summary": "The EPA's facility registry lists Edgeconnex New Orleans Holdings LLC at 2070 Gause Boulevard East, Slidell, LA 70461 in Slidell, Louisiana, with a hazardous waste record.",
      "state": "LA",
      "city": "Slidell",
      "county": "St. Tammany Parish",
      "status": "not_verified",
      "developer": "EdgeConneX",
      "capacity_mw": null,
      "latitude": 30.28639,
      "longitude": -89.737523,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110070911179: the registry placed its point by address matching house number, accurate to 50 m",
      "location_verified_at": "2026-10-03",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-03",
      "site_address": "2070 Gause Boulevard East, Slidell, LA 70461",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070911179",
      "published": "2026-10-03",
      "last_verified": "2026-10-03",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110070911179",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/edgeconnex-new-orleans-holdings-llc-slidell-la",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110070911179",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Edgeconnex New Orleans Holdings LLC",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110070911179",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "emerson-global-data-center-marshalltown-ia",
      "name": "Emerson Global Data Center",
      "summary": "The EPA facility registry lists Emerson's internal corporate engineering and enterprise data center at 1704 South Governor Road in Marshalltown, Marshall County, Iowa.",
      "state": "IA",
      "city": "Marshalltown",
      "county": "Marshall County",
      "status": "not_verified",
      "developer": null,
      "capacity_mw": null,
      "latitude": 42.028327,
      "longitude": -92.89345,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110037595992: the registry placed its point by address matching house number, accurate to 50 m",
      "location_verified_at": "2026-10-03",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-03",
      "site_address": "1704 S Governor RD, Marshalltown, IA 50158",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110037595992",
      "published": "2026-10-03",
      "last_verified": "2026-10-03",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/emerson-global-data-center-marshalltown-ia",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110037595992",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Emerson Global Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110037595992",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "hb-fuller-co-data-center-arden-hills-mn",
      "name": "HB Fuller Co, Data Center, Arden Hills",
      "summary": "The EPA facility registry lists H.B. Fuller Company's internal corporate enterprise IT facility at 1275 Grey Fox Road in Arden Hills, Ramsey County, Minnesota.",
      "state": "MN",
      "city": "Arden Hills",
      "county": "Ramsey County",
      "status": "not_verified",
      "developer": null,
      "capacity_mw": null,
      "latitude": 45.053815,
      "longitude": -93.154176,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110001447257: the registry placed its point by address matching house number, accurate to 50 m",
      "location_verified_at": "2026-10-03",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-03",
      "site_address": "1275 Grey Fox RD, Arden Hills, MN 55112",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110001447257",
      "published": "2026-10-03",
      "last_verified": "2026-10-03",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/hb-fuller-co-data-center-arden-hills-mn",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110001447257",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: HB Fuller Co, Data Center, Arden Hills",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110001447257",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "medtronic-data-center-woodbury-mn",
      "name": "Medtronic Data Center",
      "summary": "The EPA facility registry lists Medtronic's internal corporate medical technology enterprise data center at 515 Bielenberg Drive in Woodbury, Washington County, Minnesota.",
      "state": "MN",
      "city": "Woodbury",
      "county": "Washington County",
      "status": "not_verified",
      "developer": null,
      "capacity_mw": null,
      "latitude": 44.94291,
      "longitude": -92.9543,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110024871664: the registry placed its point by address matching house number, accurate to 30 m",
      "location_verified_at": "2026-10-03",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-03",
      "site_address": "515 Bielenberg DR, Woodbury, MN 55125",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110024871664",
      "published": "2026-10-03",
      "last_verified": "2026-10-03",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/medtronic-data-center-woodbury-mn",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110024871664",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Medtronic Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110024871664",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "wal-mart-stores-inc-east-data-center-bentonville-ar",
      "name": "Wal- Mart Stores, INC., East Data Center",
      "summary": "The EPA's facility registry lists Wal- Mart Stores, INC., East Data Center at 805 Moberly Lane, Bentonville, AR 72712 in Bentonville, Arkansas, with air and water permits.",
      "state": "AR",
      "city": "Bentonville",
      "county": "Benton County",
      "status": "not_verified",
      "developer": "Wal- Mart Stores, INC.",
      "capacity_mw": null,
      "latitude": 36.362432,
      "longitude": -94.183382,
      "location_precision": "permit_point",
      "location_source": "EPA ECHO facility record 110024578688: the registry placed its point by address matching house number, accurate to 50 m",
      "location_verified_at": "2026-10-03",
      "coordinate_source": "epa frs point",
      "location_last_verified": "2026-10-03",
      "site_address": "805 Moberly Lane, Bentonville, AR 72712",
      "site_address_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110024578688",
      "published": "2026-10-03",
      "last_verified": "2026-10-03",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": "https://echo.epa.gov/detailed-facility-report?fid=110024578688",
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/wal-mart-stores-inc-east-data-center-bentonville-ar",
      "source": "https://echo.epa.gov/detailed-facility-report?fid=110024578688",
      "basis": "official_record",
      "sources": [
        {
          "title": "EPA ECHO detailed facility report: Wal- Mart Stores, INC., East Data Center",
          "url": "https://echo.epa.gov/detailed-facility-report?fid=110024578688",
          "publisher": "U.S. Environmental Protection Agency",
          "date": null,
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "avaio-pulaski-county-data-center-ar",
      "name": "AVAIO Pulaski County Data Center",
      "summary": "Data center developer AVAIO had an attorney seek a carve out for its project from Pulaski County's data center moratorium.",
      "state": "AR",
      "city": "Wrightsville",
      "county": "Pulaski",
      "status": "proposed",
      "developer": "AVAIO",
      "capacity_mw": 1000,
      "latitude": 34.74444,
      "longitude": -92.28806,
      "location_precision": "county",
      "location_source": "County seat (Little Rock), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/avaio-pulaski-county-data-center-ar",
      "source": "https://www.arkansasonline.com/news/2026/jan/12/6b-data-center-announced-for-pulaski-county/",
      "basis": "third_party_estimate",
      "sources": [
        {
          "title": "$6 billion data center announced for Pulaski County - arkansasonline.com",
          "url": "https://www.arkansasonline.com/news/2026/jan/12/6b-data-center-announced-for-pulaski-county/",
          "publisher": "arkansasonline.com",
          "date": "2026-01-13",
          "source_tier": 1
        },
        {
          "title": "$6 billion data center announced for Pulaski County - The Arkansas Democrat-Gazette",
          "url": "https://www.arkansasonline.com/news/2026/jan/12/6b-data-center-announced-for-pulaski-county/",
          "publisher": "The Arkansas Democrat-Gazette",
          "date": "2026-01-13",
          "source_tier": 1
        },
        {
          "title": "After months of turmoil, Pulaski County passes sweeping data center rules - Arkansas Times",
          "url": "https://arktimes.com/arkansas-blog/2026/09/22/after-months-of-turmoil-pulaski-county-quorum-court-passes-sweeping-data-center-rules",
          "publisher": "Arkansas Times",
          "date": "2026-09-23",
          "source_tier": 4
        },
        {
          "title": "AVAIO a no-show; citizen committee to deal with data center issues - Arkansas Times",
          "url": "https://arktimes.com/arkansas-blog/2026/06/17/avaio-a-no-show-citizen-committee-to-deal-with-data-center-issues",
          "publisher": "Arkansas Times",
          "date": "2026-06-17",
          "source_tier": 1
        },
        {
          "title": "Entergy in talks with landowners about need for additional data center transmission lines - arkansasonline.com",
          "url": "https://www.arkansasonline.com/news/2026/jul/23/entergy-opens-dialogue-with-landowners/",
          "publisher": "arkansasonline.com",
          "date": "2026-07-23",
          "source_tier": 1
        },
        {
          "title": "Advocates make final push ahead of Tuesday vote on Pulaski County data center ordinance",
          "url": "https://katv.com/news/local/advocates-make-final-push-ahead-of-tuesday-vote-on-pulaski-county-data-center-ordinance",
          "publisher": "katv.com",
          "date": "2026-08-27",
          "source_tier": 4
        },
        {
          "title": "Attorney representing data center developer AVAIO previously sought carve-out for project in Pulaski County moratorium - arkansasonline.com",
          "url": "https://www.arkansasonline.com/news/2026/jul/20/attorney-representing-data-center-developer-avaio/",
          "publisher": "arkansasonline.com",
          "date": "2026-07-20",
          "source_tier": 4
        },
        {
          "title": "Entergy re submits AVAIO power agreement to Arkansas Public Service Commission - arkansasonline.com",
          "url": "https://www.arkansasonline.com/news/2026/sep/09/entergy-re-submits-avaio-power-agreement-to/",
          "publisher": "arkansasonline.com",
          "date": "2026-09-10",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-01-12",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "AVAIO Digital Partners announced plans for a 6 billion dollar data center campus in Pulaski County, Arkansas.",
          "source_url": "https://www.arkansasonline.com/news/2026/jan/12/6b-data-center-announced-for-pulaski-county/",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "lincoln-data-center-ne",
      "name": "Lincoln Data Center",
      "summary": "A Lincoln data center prompted construction of a $10 million wastewater line to transport cooling water to a recovery site, with construction beginning in June 2026.",
      "state": "NE",
      "city": "Lincoln",
      "county": "Lancaster County",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 40.80917,
      "longitude": -96.67806,
      "location_precision": "county",
      "location_source": "County seat (Lincoln), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": "more than Lincoln's total power demand",
      "power_source_url": "https://omaha.com/news/state-regional/article_806d4622-c700-4f70-9657-de8d69b40247.html",
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/lincoln-data-center-ne",
      "source": "https://omaha.com/news/state-regional/article_806d4622-c700-4f70-9657-de8d69b40247.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "Google proposes Nebraska data center requiring more power than all of Lincoln",
          "url": "https://omaha.com/news/state-regional/article_806d4622-c700-4f70-9657-de8d69b40247.html",
          "publisher": "omaha.com",
          "date": "2026-03-19",
          "source_tier": 4
        },
        {
          "title": "Construction begins on $10 million wastewater line to transport cooling water from Lincoln data center to recovery site - KOLN | Nebraska Local News, Weather, Sports | Lincoln, NE",
          "url": "https://www.1011now.com/2026/06/04/construction-begins-10-million-wastewater-line-transport-cooling-water-lincoln-data-center-recovery-site/",
          "publisher": "KOLN | Nebraska Local News, Weather, Sports | Lincoln, NE",
          "date": "2026-06-04",
          "source_tier": 4
        },
        {
          "title": "Construction begins on $10 million wastewater line to transport cooling water from Lincoln data center to recovery site - 1011now.com",
          "url": "https://www.1011now.com/2026/06/04/construction-begins-10-million-wastewater-line-transport-cooling-water-lincoln-data-center-recovery-site/",
          "publisher": "1011now.com",
          "date": "2026-06-04",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "livingston-parish-data-center-la",
      "name": "Livingston Parish Data Center",
      "summary": "Rumors are circulating about a data center coming to Livingston Parish, with the parish president denying having signed an NDA related to the project.",
      "state": "LA",
      "city": null,
      "county": "Livingston Parish",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 30.4986,
      "longitude": -90.7483,
      "location_precision": "county",
      "location_source": "County seat (Livingston), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": 691,
      "site_acres_disclosed_as": "third_party_estimate",
      "site_acres_source_url": "https://www.livingstonparishnews.com/stories/delatte-addresses-data-center-speculation,229844",
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/livingston-parish-data-center-la",
      "source": "https://www.livingstonparishnews.com/stories/delatte-addresses-data-center-speculation,229844",
      "basis": "official_record",
      "sources": [
        {
          "title": "Delatte addresses data center speculation - Livingston Parish News",
          "url": "https://www.livingstonparishnews.com/stories/delatte-addresses-data-center-speculation,229844",
          "publisher": "Livingston Parish News",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Is a data center coming to Livingston Parish? As rumors swirl, here's what we know. - theadvocate.com",
          "url": "https://www.theadvocate.com/baton_rouge/news/communities/livingston_tangipahoa/is-data-center-coming-livingston/article_29570770-b1c6-4d05-952a-9002a69d2fa3.html",
          "publisher": "theadvocate.com",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Livingston Parish president denies signing NDA for data center - Louisiana First News",
          "url": "https://www.louisianafirstnews.com/video/livingston-parish-president-denies-signing-nda-for-data-center/12127978/",
          "publisher": "Louisiana First News",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "WBRZ Channel 2. . Livingston Parish President Randy Delatte announced on Tuesday that he has not signed an NDA regarding any business coming to Livingston Parish and as of now, there are no plans for a data center. Read the full story through the link i",
          "url": "https://www.facebook.com/WBRZNews2/videos/livingston-parish-president-randy-delatte-announced-on-tuesday-that-he-has-not-s/1075986291565820/",
          "publisher": "www.facebook.com",
          "date": "2026-09-03",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-09-01",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-01",
          "summary": "The land was originally planned for development as a 1700 family subdivision before rezoning for potential data center use",
          "source_url": "https://www.livingstonparishnews.com/stories/delatte-addresses-data-center-speculation,229844",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-01",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-01",
          "summary": "DEMCO requested expedited approval to generate an additional gigawatt of energy, cited as potential evidence of data center project",
          "source_url": "https://www.livingstonparishnews.com/stories/delatte-addresses-data-center-speculation,229844",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "meta-louisiana-data-center-richland-la",
      "name": "Meta Louisiana data center",
      "summary": "Meta expanded its data center investment in Richland Parish, Louisiana to $50 billion, with the project reported to be creating jobs and opportunity in the parish.",
      "state": "LA",
      "city": null,
      "county": "Richland Parish",
      "status": "under_construction",
      "developer": "Meta",
      "capacity_mw": 5000,
      "latitude": 32.47736,
      "longitude": -91.75485,
      "location_precision": "county",
      "location_source": "County seat (Rayville), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/meta-louisiana-data-center-richland-la",
      "source": "https://247wallst.com/investing/2026/08/14/zuckerbergs-250-billion-louisiana-data-center-will-create-just-1000-jobs-thats-250-million-spent-per-job/",
      "basis": "third_party_estimate",
      "sources": [
        {
          "title": "Zuckerberg’s $250 Billion Louisiana Data Center Will Create Just 1,000 Jobs. That’s $250 Million Spent Per Job - Yahoo Finance",
          "url": "https://247wallst.com/investing/2026/08/14/zuckerbergs-250-billion-louisiana-data-center-will-create-just-1000-jobs-thats-250-million-spent-per-job/",
          "publisher": "Yahoo Finance",
          "date": "2026-08-14",
          "source_tier": 4
        },
        {
          "title": "Letters: As data center discussed for Livingston Parish, questions remain - NOLA.com",
          "url": "https://www.nola.com/opinions/letters/letters-data-center-livingston-parish/article_05be4bde-50d0-4f7b-a862-ec8653cd1217.amp.html",
          "publisher": "NOLA.com",
          "date": "2026-09-10",
          "source_tier": 4
        },
        {
          "title": "Congresswoman Julia Letlow responds to Meta’s $50 billion Richland Parish expansion - KTVE – myarklamiss.com – Your ArkLaMiss News Source",
          "url": "https://www.myarklamiss.com/news/ouachita-parish/letlow-responds-to-metas-50-billion-richland-parish-expansion/",
          "publisher": "KTVE – myarklamiss.com – Your ArkLaMiss News Source",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "Meta's Louisiana Data Center Is Making Rural America Part of the AI Race - Memeburn",
          "url": "https://memeburn.com/metas-louisiana-data-center-is-making-rural-america-part-of-the-ai-race/",
          "publisher": "Memeburn",
          "date": "2026-07-16",
          "source_tier": 1
        },
        {
          "title": "Meta expands Richland Parish data center, now $50-billion project - hannapub.com",
          "url": "https://www.hannapub.com/ouachitacitizen/news/local_state_headlines/meta-expands-richland-parish-data-center-now-50-billion-project/article_4f99b31f-8edd-47b2-bba0-20617bc7352c.html",
          "publisher": "hannapub.com",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "Gov. Jeff Landry backs Meta's $50 billion data center expansion alongside Trump in D.C. - WDSU",
          "url": "https://www.wdsu.com/article/louisiana-data-center-growth-jeff-landry-washington/73250393",
          "publisher": "WDSU",
          "date": "2026-07-23",
          "source_tier": 1
        },
        {
          "title": "Concerns grow along with size of Meta data center - louisianaradionetwork.com",
          "url": "https://louisianaradionetwork.com/2026/07/16/concerns-grow-along-with-size-of-meta-data-center/",
          "publisher": "louisianaradionetwork.com",
          "date": "2026-07-16",
          "source_tier": 1
        },
        {
          "title": "Gov. Jeff Landry cheers Meta expansion as local leaders, residents react - nola.com",
          "url": "https://www.nola.com/news/business/gov-jeff-landry-cheers-meta-expansion-as-local-leaders-residents-react/article_fe98e646-1833-4645-bd91-6000051dabfe.html",
          "publisher": "nola.com",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "PSC votes against requiring Meta to reveal more about data center - WWLTV.com",
          "url": "https://www.wwltv.com/article/tech/psc-rejects-request-for-more-information-on-meta-data-center/289-7241512a-497f-4e01-9545-868b16da09cf",
          "publisher": "WWLTV.com",
          "date": "2026-08-12",
          "source_tier": 1
        },
        {
          "title": "I own a house rental business near a future Meta AI data center. Construction workers make up most of our tenants. - Business Insider",
          "url": "https://www.businessinsider.com/meta-ai-data-center-louisiana-housing-market-home-rentals-2026-9",
          "publisher": "Business Insider",
          "date": "2026-09-13",
          "source_tier": 4
        },
        {
          "title": "Meta expands controversial Louisiana AI data center investment to $50 billion - The Tulane Hullabaloo",
          "url": "https://tulanehullabaloo.com/75337/news/meta-expands-controversial-louisiana-ai-data-center-investment-to-50-billion/",
          "publisher": "The Tulane Hullabaloo",
          "date": "2026-08-24",
          "source_tier": 4
        },
        {
          "title": "Meta builds a $50 billion dollar data center in Richland Parish, Louisiana - loyolamaroon.com",
          "url": "https://loyolamaroon.com/10047124/news/local-news/meta-builds-a-50-billion-dollar-data-center-in-richland-parish-louisiana/",
          "publisher": "loyolamaroon.com",
          "date": "2026-08-22",
          "source_tier": 4
        },
        {
          "title": "From RV camps to packed hotels, Meta data center project has LA parish bursting at the seams - NOLA.com",
          "url": "https://www.nola.com/news/politics/meta-data-center-richland-parish-louisiana/article_1a044e8c-632c-474e-a899-d6a47c11ec78.html",
          "publisher": "NOLA.com",
          "date": "2026-08-21",
          "source_tier": 4
        },
        {
          "title": "$50,000 teacher checks have Louisiana parishes asking for data centers - The Center Square",
          "url": "https://www.thecentersquare.com/louisiana/article_44b57c7e-9c5f-4051-a8eb-8ecb51cf1c8a.html",
          "publisher": "The Center Square",
          "date": "2026-09-17",
          "source_tier": 4
        },
        {
          "title": "Meta data center in Richland Parish brings jobs, tax growth to northeast Louisiana - WAFB",
          "url": "https://www.wafb.com/2026/07/29/meta-data-center-richland-parish-brings-jobs-tax-growth-northeast-louisiana/",
          "publisher": "WAFB",
          "date": "2026-07-29",
          "source_tier": 4
        },
        {
          "title": "5 Things to Know About Meta’s Giant Data Center in Louisiana - The New York Times",
          "url": "https://www.nytimes.com/2026/07/27/business/meta-data-center-louisiana-takeaways.html",
          "publisher": "The New York Times",
          "date": "2026-07-28",
          "source_tier": 4
        },
        {
          "title": "How Meta Got Everything It Wanted in a Secret Louisiana Data Center Deal - The New York Times",
          "url": "https://www.nytimes.com/2026/07/27/technology/meta-data-center-louisiana.html",
          "publisher": "The New York Times",
          "date": "2026-07-27",
          "source_tier": 4
        },
        {
          "title": "Meta Data Center in Louisiana - LED - Louisiana Economic Development (.gov)",
          "url": "https://www.opportunitylouisiana.gov/data-center/meta",
          "publisher": "Louisiana Economic Development (.gov)",
          "date": "2026-07-13",
          "source_tier": 2
        },
        {
          "title": "Deepening our investment in Richland Parish, Louisiana - Meta Data Centers",
          "url": "https://datacenters.atmeta.com/2026/07/deepening-our-investment-in-richland-parish-louisiana/",
          "publisher": "Meta Data Centers",
          "date": "2026-07-13",
          "source_tier": 4
        },
        {
          "title": "Teachers and Local Businesses Win as Meta Expands Louisiana Data Center - Meta Store",
          "url": "https://about.fb.com/news/2026/07/teachers-local-businesses-win-as-meta-expands-louisiana-data-center/",
          "publisher": "Meta Store",
          "date": "2026-07-13",
          "source_tier": 4
        },
        {
          "title": "Meta's Louisiana data center investment to reach $50 billion, aided by generous tax incentives - CNBC",
          "url": "https://www.cnbc.com/2026/07/13/meta-louisiana-data-center-investment-reaches-50-billion-amid-ai-push.html",
          "publisher": "CNBC",
          "date": "2026-07-13",
          "source_tier": 4
        },
        {
          "title": "Meta more than doubles size of Louisiana AI data center in massive $50 billion expansion - WAFB",
          "url": "https://www.fox8live.com/2026/07/13/gov-landry-meta-formally-announce-louisiana-data-centers-historic-expansion/",
          "publisher": "WAFB",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "How big will the Richland Parish data center be? Meta will expand AI center - Shreveport Times",
          "url": "https://www.shreveporttimes.com/story/news/special-reports/datacenter/2026/07/13/is-meta-expanding-the-richland-parish-data-center-investment-costs-how-large-much-water-energy/90901504007/",
          "publisher": "Shreveport Times",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "Meta expands Louisiana Hyperion data center to 5 gigawatts - finance.yahoo.com",
          "url": "https://finance.yahoo.com/technology/articles/meta-expands-louisiana-hyperion-data-121522809.html",
          "publisher": "finance.yahoo.com",
          "date": "2026-07-27",
          "source_tier": 1
        },
        {
          "title": "Meta Will Invest Over $50B To Expand North Louisiana Data Center Campus - Business Facilities",
          "url": "https://businessfacilities.com/meta-will-invest-over-50b-to-expand-north-louisiana-data-center-campus/",
          "publisher": "Business Facilities",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "Meta plans $40 billion expansion of Louisiana AI data center, more than doubling its size - NOLA.com",
          "url": "https://www.nola.com/news/business/meta-louisiana-ai-data-center-richland-parish/article_d1308014-c718-4c34-a75f-476a151ef1a7.html",
          "publisher": "NOLA.com",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "Meta to spend an additional $40B to expand colossal Louisiana data center - businessreport.com",
          "url": "https://www.businessreport.com/article/meta-to-spend-an-additional-40b-to-expand-colossal-louisiana-data-center",
          "publisher": "businessreport.com",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "New York Times investigates Meta's data center deal in Louisiana - Axios",
          "url": "https://www.axios.com/local/new-orleans/2026/07/28/new-york-times-investigates-meta-s-data-center-deal-in-louisiana",
          "publisher": "Axios",
          "date": "2026-07-28",
          "source_tier": 1
        },
        {
          "title": "North Louisiana Meta data center to become largest center in history - WDSU",
          "url": "https://www.wdsu.com/article/north-louisiana-meta-data-center-largest-center/71920037",
          "publisher": "WDSU",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "Meta expands Louisiana data center to 5 gigawatts, investment crosses $50 billion - Reuters",
          "url": "https://www.reuters.com/business/meta-expands-louisiana-data-center-5-gigawatts-compute-capacity-2026-07-13/",
          "publisher": "Reuters",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "Meta expands plans for Richland Parish data center while investing in the local community - WBRZ",
          "url": "https://www.wbrz.com/news/meta-expands-plans-for-richland-parish-data-center-while-investing-in-the-local-community/",
          "publisher": "WBRZ",
          "date": "2026-07-12",
          "source_tier": 1
        },
        {
          "title": "Meta data center in Richland Parish brings jobs, tax growth to northeast Louisiana - KOLN | Nebraska Local News, Weather, Sports | Lincoln, NE",
          "url": "https://www.1011now.com/video/2026/07/29/meta-data-center-richland-parish-brings-jobs-tax-growth-northeast-louisiana/",
          "publisher": "KOLN | Nebraska Local News, Weather, Sports | Lincoln, NE",
          "date": "2026-07-29",
          "source_tier": 1
        },
        {
          "title": "Gov. Jeff Landry discusses Meta's investment into Louisiana through data center in Richland Parish - wbrz.com",
          "url": "https://www.wbrz.com/news/gov-jeff-landry-discusses-meta-s-investment-into-louisiana-through-data-center-in-richland-parish/",
          "publisher": "wbrz.com",
          "date": "2026-07-12",
          "source_tier": 1
        },
        {
          "title": "Meta expands Louisiana Hyperion data center to 5GW and $50 billion - Yahoo Finance",
          "url": "https://finance.yahoo.com/technology/ai/articles/meta-expands-louisiana-hyperion-data-120038782.html",
          "publisher": "Yahoo Finance",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "Meta Data Center in Louisiana - LED - Louisiana Economic Development - LED (.gov)",
          "url": "https://www.opportunitylouisiana.gov/data-center/meta",
          "publisher": "Louisiana Economic Development - LED (.gov)",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "The power play behind Hyperion, Mark Zuckerberg’s colossal data center being built in rural Louisiana - Sherwood News",
          "url": "https://sherwood.news/tech/hyperion/",
          "publisher": "Sherwood News",
          "date": "2025-12-15",
          "source_tier": 1
        },
        {
          "title": "Entergy keeps Meta data center load forecasts confidential - The Center Square",
          "url": "https://neworleanscitybusiness.com/blog/2026/07/01/louisiana-psc-data-center-confidentiality-rule/",
          "publisher": "The Center Square",
          "date": "2026-06-30",
          "source_tier": 1
        },
        {
          "title": "Entergy seeks more big projects in 2026 as Louisiana load surges - New Orleans CityBusiness",
          "url": "https://neworleanscitybusiness.com/blog/2026/01/05/entergy-louisiana-1b-transmission-project/",
          "publisher": "New Orleans CityBusiness",
          "date": "2026-01-05",
          "source_tier": 1
        },
        {
          "title": "Louisiana AI Project to Grow to 5 GW - rtoinsider.com",
          "url": "https://www.rtoinsider.com/136600-louisiana-ai-project-to-grow-to-5gw/",
          "publisher": "rtoinsider.com",
          "date": "2026-07-14",
          "source_tier": 1
        },
        {
          "title": "Williams expands northwest Louisiana Haynesville Shale as data centers drive demand - The Shreveport-Bossier City Advocate",
          "url": "https://www.shreveportbossieradvocate.com/business/williams-sees-opportunity-in-haynesville-shale-data-center-demand/article_63b24135-317a-4129-89ef-49ada8d999b9.html",
          "publisher": "The Shreveport-Bossier City Advocate",
          "date": "2026-08-07",
          "source_tier": 1
        },
        {
          "title": "Groups Warn that La. Ratepayers Could be Saddled with Buildout for Meta’s Hyperion - RTO Insider",
          "url": "https://www.rtoinsider.com/138696-nonprofits-denounce-louisiana-meta-buildout-warn-cost-spillover/",
          "publisher": "RTO Insider",
          "date": "2026-08-09",
          "source_tier": 1
        },
        {
          "title": "Entergy receives regulatory approval for investments to support Meta's Louisiana data center - Reuters",
          "url": "https://www.reuters.com/business/energy/entergy-receives-regulatory-approval-investments-support-metas-louisiana-data-2025-08-20/",
          "publisher": "Reuters",
          "date": "2025-08-20",
          "source_tier": 1
        },
        {
          "title": "Entergy Louisiana gains regulatory approval for massive Meta power project - Louisiana Illuminator",
          "url": "https://lailluminator.com/2025/08/20/entergy-meta/",
          "publisher": "Louisiana Illuminator",
          "date": "2025-08-20",
          "source_tier": 1
        },
        {
          "title": "Meta data center in northeast LA transforms local government: ‘Coming into the modern world’ - NOLA.com",
          "url": "https://www.nola.com/news/politics/elections/richland-parish-meta-data-centers-local-government/article_0b35c62f-6674-4ed5-86ef-88270f7191f9.html",
          "publisher": "NOLA.com",
          "date": "2026-08-31",
          "source_tier": 4
        },
        {
          "title": "How big will the Richland Parish data center be? Meta will expand AI center - Yahoo Finance",
          "url": "https://finance.yahoo.com/technology/ai/articles/big-richland-parish-data-center-171024537.html",
          "publisher": "Yahoo Finance",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "Gov. Jeff Landry hails expansion of Meta’s massive data center in Louisiana - NOLA.com",
          "url": "https://www.nola.com/news/politics/jeff-landry-meta-data-center-louisiana-press-conference/article_ea8647e9-9652-40aa-b4ad-77f9562aa31a.html",
          "publisher": "NOLA.com",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "Meta expanding Richland Parish data center to 5 gigawatts, one of the largest in history - WAFB",
          "url": "https://www.wafb.com/video/2026/07/14/meta-expanding-richland-parish-data-center-5-gigawatts-one-largest-history-2/",
          "publisher": "WAFB",
          "date": "2026-07-14",
          "source_tier": 1
        },
        {
          "title": "Meta: Our U.S. data center fleet",
          "url": "https://datacenters.atmeta.com/us-locations/",
          "publisher": "Meta",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "This community college is training Louisiana residents for jobs at Meta's data center - WWNO",
          "url": "https://www.wwno.org/education/2026-09-04/this-community-college-is-training-louisiana-residents-for-jobs-at-metas-data-center",
          "publisher": "WWNO",
          "date": "2026-09-04",
          "source_tier": 4
        },
        {
          "title": "Meta hides data center info as it pushes more risks to Entergy’s customers - thelensnola.org",
          "url": "https://thelensnola.org/2026/08/18/meta-louisiana-data-center-ratepayer-costs/",
          "publisher": "thelensnola.org",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "Louisiana regulators kill effort to subpoena details of Meta data center - E&E News by POLITICO",
          "url": "https://www.eenews.net/articles/louisiana-regulators-kill-effort-to-subpoena-details-of-meta-data-center/",
          "publisher": "E&E News by POLITICO",
          "date": "2026-08-13",
          "source_tier": 4
        },
        {
          "title": "Meta won’t have to turn over job, electric information after Louisiana regulators override judge - NOLA.com",
          "url": "https://www.nola.com/news/meta-won-t-have-to-turn-over-job-electric-information-after-louisiana-regulators-override-judge/article_69105eda-826d-476c-9b01-b911afcdbe64.html",
          "publisher": "NOLA.com",
          "date": "2026-08-12",
          "source_tier": 4
        },
        {
          "title": "Louisiana Democrats helped bring Meta to the state. Some regret their votes - thecentersquare.com",
          "url": "https://www.thecentersquare.com/louisiana/article_f5fe155f-eab3-46be-872a-17c18608f4d9.html",
          "publisher": "thecentersquare.com",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Meta’s data center will be the biggest in the U.S., but no one knows who they’re hiring - thelensnola.org",
          "url": "https://thelensnola.org/2026/08/31/metas-data-center-will-be-the-biggest-in-the-u-s-but-no-one-knows-who-theyre-hiring/",
          "publisher": "thelensnola.org",
          "date": "2026-08-31",
          "source_tier": 4
        },
        {
          "title": "Meta can keep its data center details private, PSC decides - Louisiana Illuminator",
          "url": "https://lailluminator.com/2026/08/13/meta-data-center-private/",
          "publisher": "Louisiana Illuminator",
          "date": "2026-08-13",
          "source_tier": 4
        },
        {
          "title": "Expanded Meta Data Center Creates More Jobs and Opportunity in Richland Parish, Louisiana - Associated Construction Publications",
          "url": "https://www.turnerconstruction.com/insights/expanded-meta-data-center-creates-more-jobs-and-opportunity-in-richland-parish-louisiana",
          "publisher": "Associated Construction Publications",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "Meta prevails as Louisiana regulators block disclosure of data center expansion records - Baton Rouge Business Report",
          "url": "https://www.businessreport.com/article/meta-prevails-as-louisiana-regulators-block-disclosure-of-data-center-expansion-records",
          "publisher": "Baton Rouge Business Report",
          "date": "2026-08-12",
          "source_tier": 4
        },
        {
          "title": "Is a data center coming to Moss Bluff? Here’s what we know. - theadvocate.com",
          "url": "https://www.theadvocate.com/lake_charles/is-a-data-center-coming-to-moss-bluff-here-s-what-we-know/article_ad6f97c0-ed97-4609-99a5-eac05731915e.html",
          "publisher": "theadvocate.com",
          "date": "2026-08-12",
          "source_tier": 4
        },
        {
          "title": "Regulators allow Meta to keep data center records secret - WAFB",
          "url": "https://www.wafb.com/2026/08/12/regulators-allow-meta-keep-data-center-records-secret/",
          "publisher": "WAFB",
          "date": "2026-08-12",
          "source_tier": 4
        },
        {
          "title": "Louisiana PSC kills ruling that would force Meta to turn over key data center information - WWNO",
          "url": "https://www.wwno.org/politics/2026-08-12/louisiana-psc-kills-ruling-that-would-force-meta-to-turn-over-key-data-center-information",
          "publisher": "WWNO",
          "date": "2026-08-12",
          "source_tier": 4
        },
        {
          "title": "Meta wants to keep Hyperion data center details protected - Louisiana Illuminator",
          "url": "https://lailluminator.com/2026/08/11/meta-wants-details-secret/",
          "publisher": "Louisiana Illuminator",
          "date": "2026-08-11",
          "source_tier": 4
        },
        {
          "title": "Public Service Commission can demand transparency for Meta’s data center expansion - Louisiana Illuminator",
          "url": "https://lailluminator.com/2026/08/11/meta-energy/",
          "publisher": "Louisiana Illuminator",
          "date": "2026-08-11",
          "source_tier": 4
        },
        {
          "title": "Meta Hides Data Center Info As it Pushes More Risks to Entergy’s Customers - The Equation - Union of Concerned Scientists",
          "url": "https://blog.ucs.org/paul-arbaje/meta-hides-data-center-info-as-it-pushes-more-risks-to-entergys-customers/",
          "publisher": "The Equation - Union of Concerned Scientists",
          "date": "2026-08-10",
          "source_tier": 4
        },
        {
          "title": "As Meta data center expands, advocates push harder for transparency - Louisiana Illuminator",
          "url": "https://lailluminator.com/2026/08/05/as-meta-data-center-expands-advocates-push-harder-for-transparency/",
          "publisher": "Louisiana Illuminator",
          "date": "2026-08-05",
          "source_tier": 4
        },
        {
          "title": "Meta’s $200 Billion Bet on a Remote Data Center",
          "url": "https://www.youtube.com/watch?v=VV9Y8IYS9W4",
          "publisher": "YouTube",
          "date": "2026-05-23",
          "source_tier": 5
        },
        {
          "title": "Expanded Meta Data Center Creates More Jobs and Opportunity in Richland Parish, Louisiana - Associated Construction Publications",
          "url": "https://www.turnerconstruction.com/insights/expanded-meta-data-center-creates-more-jobs-and-opportunity-in-richland-parish-louisiana",
          "publisher": "Associated Construction Publications",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "Meta hides data center info as it pushes more risks to Entergy’s customers - thelensnola.org",
          "url": "https://thelensnola.org/2026/08/18/meta-louisiana-data-center-ratepayer-costs/",
          "publisher": "thelensnola.org",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "Editorial: Meta changing life in Richland Parish",
          "url": "https://americanpress.com/2026/09/02/editorial-meta-changing-life-in-richland-parish/",
          "publisher": "americanpress.com",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Meta data center in Richland Parish brings jobs, tax growth to northeast Louisiana",
          "url": "https://www.wafb.com/2026/07/29/meta-data-center-richland-parish-brings-jobs-tax-growth-northeast-louisiana/",
          "publisher": "WAFB",
          "date": "2026-07-29",
          "source_tier": 4
        },
        {
          "title": "Meta expanding Richland Parish data center to 5 gigawatts, one of the largest in history",
          "url": "https://www.knoe.com/video/2026/07/14/meta-expanding-richland-parish-data-center-5-gigawatts-one-largest-history-2/",
          "publisher": "KNOE",
          "date": "2026-07-13",
          "source_tier": 4
        },
        {
          "title": "Louisiana Meta data center generates staggering sales tax growth",
          "url": "https://www.shreveporttimes.com/story/news/2026/07/21/louisiana-meta-data-center-generates-staggering-sales-tax-growth-as-trump-predicted/90986903007/",
          "publisher": "Shreveport Times",
          "date": "2026-07-21",
          "source_tier": 4
        },
        {
          "title": "Digital Infrastructure as the Backbone of the Future: How Meta's Louisiana Data Center Expansion is Delivering Life Changing Returns",
          "url": "https://netchoice.org/digital-infrastructure-as-the-backbone-of-the-future-how-metas-louisiana-data-center-expansion-is-delivering-life-changing-returns/",
          "publisher": "NetChoice",
          "date": "2026-07-20",
          "source_tier": 4
        },
        {
          "title": "Meta data center tax infusion means $50,000 bonus checks for these Louisiana teachers - The Shreveport Bossier City Advocate",
          "url": "https://www.shreveportbossieradvocate.com/news/meta-data-center-bonus-checks-taxes/article_a2f5fa71-e62d-4197-af35-fc31e201065d.html",
          "publisher": "shreveportbossieradvocate.com",
          "date": "2026-06-13",
          "source_tier": 4
        },
        {
          "title": "This community college is training Louisiana residents for jobs at Meta's data center - WWNO",
          "url": "https://www.wwno.org/education/2026-09-04/this-community-college-is-training-louisiana-residents-for-jobs-at-metas-data-center",
          "publisher": "WWNO",
          "date": "2026-09-04",
          "source_tier": 4
        },
        {
          "title": "From RV camps to packed hotels, Meta data center project has LA parish bursting at the seams - NOLA.com",
          "url": "https://www.nola.com/news/politics/meta-data-center-richland-parish-louisiana/article_1a044e8c-632c-474e-a899-d6a47c11ec78.html",
          "publisher": "NOLA.com",
          "date": "2026-08-21",
          "source_tier": 4
        },
        {
          "title": "Investing in Richland Parish",
          "url": "https://www.meta.com/actions/building-louisiana/",
          "publisher": "Meta Store",
          "date": "2026-07-13",
          "source_tier": 2
        },
        {
          "title": "Meta's Louisiana data center investment to reach $50 billion, aided by generous tax incentives",
          "url": "https://www.cnbc.com/2026/07/13/meta-louisiana-data-center-investment-reaches-50-billion-amid-ai-push.html",
          "publisher": "CNBC",
          "date": "2026-07-13",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "Meta construction at Richland Parish began increase in worker numbers in December 2024",
          "source_url": "https://www.thecentersquare.com/louisiana/article_44b57c7e-9c5f-4051-a8eb-8ecb51cf1c8a.html",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Meta lists Meta Richland Parish Data Center at Richland Parish, Louisiana on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.atmeta.com/us-locations/",
          "source_tier": 2
        },
        {
          "status": "operational",
          "effective_at": "2026-09-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-13",
          "summary": "Meta announced Hyperion AI data center in northeast Louisiana",
          "source_url": "https://www.businessinsider.com/meta-ai-data-center-louisiana-housing-market-home-rentals-2026-9",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-09-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-10",
          "summary": "Work continues on the Meta Richland Parish Data Center near Rayville as of August 3, 2026",
          "source_url": "https://www.nola.com/opinions/letters/letters-data-center-livingston-parish/article_05be4bde-50d0-4f7b-a862-ec8653cd1217.amp.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-04",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-04",
          "summary": "Louisiana Delta Community College created new four week data center technician program",
          "source_url": "https://www.wwno.org/education/2026-09-04/this-community-college-is-training-louisiana-residents-for-jobs-at-metas-data-center",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-04",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-04",
          "summary": "Meta is described as having its largest project at Richland Parish, and one of the biggest in the world",
          "source_url": "https://www.wwno.org/education/2026-09-04/this-community-college-is-training-louisiana-residents-for-jobs-at-metas-data-center",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-04",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-04",
          "summary": "The programs were created since late 2024, when Meta broke ground on the Richland Parish data center",
          "source_url": "https://www.wwno.org/education/2026-09-04/this-community-college-is-training-louisiana-residents-for-jobs-at-metas-data-center",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "Meta announced Richland Parish data center less than seven months after HB 827 passage in 2024",
          "source_url": "https://www.thecentersquare.com/louisiana/article_f5fe155f-eab3-46be-872a-17c18608f4d9.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "The data center is known as Hyperion",
          "source_url": "https://americanpress.com/2026/09/02/editorial-meta-changing-life-in-richland-parish/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-21",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-21",
          "summary": "Meta is expanding its investment at Hyperion to $50 billion from $10 billion, announced in July.",
          "source_url": "https://www.nola.com/news/politics/meta-data-center-richland-parish-louisiana/article_1a044e8c-632c-474e-a899-d6a47c11ec78.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-21",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-21",
          "summary": "The data center will occupy five square miles and is scheduled to be fully operational in 2036.",
          "source_url": "https://www.nola.com/news/politics/meta-data-center-richland-parish-louisiana/article_1a044e8c-632c-474e-a899-d6a47c11ec78.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-18",
          "summary": "Interior buildout already underway in first buildings",
          "source_url": "https://www.turnerconstruction.com/insights/expanded-meta-data-center-creates-more-jobs-and-opportunity-in-richland-parish-louisiana",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-18",
          "summary": "Entergy Louisiana filed an application in April 2026 for seven additional gas fired power plants to serve Meta's data center expansion",
          "source_url": "https://thelensnola.org/2026/08/18/meta-louisiana-data-center-ratepayer-costs/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-18",
          "summary": "Meta's data center in Richland Parish requires a total of 10 new gas plants, including three already approved last year",
          "source_url": "https://thelensnola.org/2026/08/18/meta-louisiana-data-center-ratepayer-costs/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-18",
          "summary": "The commission's final decision on the seven new gas plants is scheduled for December 16, 2026",
          "source_url": "https://thelensnola.org/2026/08/18/meta-louisiana-data-center-ratepayer-costs/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-18",
          "summary": "Meta expanded Richland Parish data center from originally announced 2 gigawatts to 5 gigawatts of IT capacity",
          "source_url": "https://www.turnerconstruction.com/insights/expanded-meta-data-center-creates-more-jobs-and-opportunity-in-richland-parish-louisiana",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-08-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-14",
          "summary": "Entergy Louisiana will build seven new gas fired power plants to support the data center",
          "source_url": "https://247wallst.com/investing/2026/08/14/zuckerbergs-250-billion-louisiana-data-center-will-create-just-1000-jobs-thats-250-million-spent-per-job/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-08-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-14",
          "summary": "Full buildout of both phases not expected until around 2036",
          "source_url": "https://247wallst.com/investing/2026/08/14/zuckerbergs-250-billion-louisiana-data-center-will-create-just-1000-jobs-thats-250-million-spent-per-job/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-08-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-14",
          "summary": "Permanent headcount of 1,000 jobs arrives after a decade of construction",
          "source_url": "https://247wallst.com/investing/2026/08/14/zuckerbergs-250-billion-louisiana-data-center-will-create-just-1000-jobs-thats-250-million-spent-per-job/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-08-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-13",
          "summary": "Meta announced plans to expand Hyperion with seven additional power generating units",
          "source_url": "https://lailluminator.com/2026/08/13/meta-data-center-private/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-08-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-13",
          "summary": "Meta has contracted with Entergy Louisiana to build three natural gas powered turbines initially",
          "source_url": "https://lailluminator.com/2026/08/13/meta-data-center-private/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-08-12",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-12",
          "summary": "Meta and Entergy plan to build 10 new gas power plants to power the data center facilities",
          "source_url": "https://www.wwno.org/politics/2026-08-12/louisiana-psc-kills-ruling-that-would-force-meta-to-turn-over-key-data-center-information",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-08-12",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-12",
          "summary": "Both Hyperion and newer Evest artificial intelligence data centers could be among the largest in the world",
          "source_url": "https://www.wwno.org/politics/2026-08-12/louisiana-psc-kills-ruling-that-would-force-meta-to-turn-over-key-data-center-information",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-08-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-11",
          "summary": "Three natural gas powered turbines are being built by Entergy to initially power the data center",
          "source_url": "https://lailluminator.com/2026/08/11/meta-wants-details-secret/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-08-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-11",
          "summary": "Meta announced it intends to expand Hyperion with seven power generating units",
          "source_url": "https://lailluminator.com/2026/08/11/meta-wants-details-secret/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-08-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-11",
          "summary": "Meta announced it will nearly double expected size of its Hyperion campus in Northeast Louisiana",
          "source_url": "https://lailluminator.com/2026/08/11/meta-energy/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-10",
          "summary": "Meta's data center expansion in Richland Parish, Louisiana requires seven additional gas plants, each rated at 754 megawatts, on top of three already approved.",
          "source_url": "https://thelensnola.org/2026/08/18/meta-louisiana-data-center-ratepayer-costs/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-08-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-10",
          "summary": "Entergy Louisiana filed application in April 2026 to build seven additional gas fired power plants for Meta data center expansion",
          "source_url": "https://blog.ucs.org/paul-arbaje/meta-hides-data-center-info-as-it-pushes-more-risks-to-entergys-customers/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-10",
          "summary": "Entergy Louisiana filed an application in April 2026 to build seven additional gas fired power plants for Meta's data center expansion.",
          "source_url": "https://thelensnola.org/2026/08/18/meta-louisiana-data-center-ratepayer-costs/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-10",
          "summary": "The Louisiana Public Service Commission's final decision on the new gas plants is scheduled for December 16, 2026.",
          "source_url": "https://thelensnola.org/2026/08/18/meta-louisiana-data-center-ratepayer-costs/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-29",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-29",
          "summary": "Meta announced the Richland Parish data center project in 2024",
          "source_url": "https://www.wafb.com/2026/07/29/meta-data-center-richland-parish-brings-jobs-tax-growth-northeast-louisiana/",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-07-28",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-28",
          "summary": "Meta is building a large data center in Louisiana",
          "source_url": "https://www.nytimes.com/2026/07/27/business/meta-data-center-louisiana-takeaways.html",
          "source_tier": 4
        },
        {
          "status": "operational",
          "effective_at": "2026-07-27",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-27",
          "summary": "Meta negotiated a secret Louisiana data center deal and got everything it wanted",
          "source_url": "https://www.nytimes.com/2026/07/27/technology/meta-data-center-louisiana.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-21",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-21",
          "summary": "Construction timeline extended by expansion to up to 10 years",
          "source_url": "https://www.shreveporttimes.com/story/news/2026/07/21/louisiana-meta-data-center-generates-staggering-sales-tax-growth-as-trump-predicted/90986903007/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-21",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-21",
          "summary": "Meta expanded data center investment from $10 billion to $50 billion",
          "source_url": "https://www.shreveporttimes.com/story/news/2026/07/21/louisiana-meta-data-center-generates-staggering-sales-tax-growth-as-trump-predicted/90986903007/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-20",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-20",
          "summary": "Meta announced this month that it is expanding its Richland Parish data center to 5 gigawatts of compute capacity",
          "source_url": "https://netchoice.org/digital-infrastructure-as-the-backbone-of-the-future-how-metas-louisiana-data-center-expansion-is-delivering-life-changing-returns/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-20",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-20",
          "summary": "The Richland Parish site broke ground in December 2024",
          "source_url": "https://netchoice.org/digital-infrastructure-as-the-backbone-of-the-future-how-metas-louisiana-data-center-expansion-is-delivering-life-changing-returns/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-13",
          "summary": "The data center is home to Hyperion, Meta's most powerful cluster for training AI",
          "source_url": "https://www.meta.com/actions/building-louisiana/",
          "source_tier": 2
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-13",
          "summary": "Meta Hyperion data center in Richland Parish planned as 5 GW facility",
          "source_url": "https://www.cnbc.com/2026/07/13/meta-louisiana-data-center-investment-reaches-50-billion-amid-ai-push.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-13",
          "summary": "Full 5 GW Hyperion project expected to be complete around 2032",
          "source_url": "https://www.cnbc.com/2026/07/13/meta-louisiana-data-center-investment-reaches-50-billion-amid-ai-push.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-13",
          "summary": "Hyperion project should reach 2 GW by 2030",
          "source_url": "https://www.cnbc.com/2026/07/13/meta-louisiana-data-center-investment-reaches-50-billion-amid-ai-push.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-07-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-13",
          "summary": "Meta expanding Richland Parish data center to 5 gigawatts of compute capacity",
          "source_url": "https://www.knoe.com/video/2026/07/14/meta-expanding-richland-parish-data-center-5-gigawatts-one-largest-history-2/",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-06-13",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-06-13",
          "summary": "Hyperion construction expected to continue until 2030",
          "source_url": "https://www.shreveportbossieradvocate.com/news/meta-data-center-bonus-checks-taxes/article_a2f5fa71-e62d-4197-af35-fc31e201065d.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-05-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-23",
          "summary": "The data center will be fueled by 10 newly constructed natural gas plants",
          "source_url": "https://www.youtube.com/watch?v=VV9Y8IYS9W4",
          "source_tier": 5
        },
        {
          "status": "rumored",
          "effective_at": "2026-05-23",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-23",
          "summary": "Meta is building its largest AI data center in Richland Parish, Louisiana",
          "source_url": "https://www.youtube.com/watch?v=VV9Y8IYS9W4",
          "source_tier": 5
        }
      ]
    },
    {
      "slug": "piedmont-area-data-center-ok",
      "name": "Piedmont Area Data Center",
      "summary": "A proposed data center in the Piedmont area has a zoning decision pending, with residents petitioning against it and the developer securing an alternate site option.",
      "state": "OK",
      "city": "Piedmont",
      "county": "Canadian County",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 35.53028,
      "longitude": -97.9575,
      "location_precision": "county",
      "location_source": "County seat (El Reno), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": 337,
      "site_acres_disclosed_as": "third_party_estimate",
      "site_acres_source_url": "https://www.news9.com/data-centers-in-oklahoma/piedmont-council-considers-annexation-rezoning-for-proposed-cloverleaf-data-center",
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/piedmont-area-data-center-ok",
      "source": "https://www.news9.com/oklahoma-city-news/piedmont-data-center-plans-move-forward-as-developer-considers-additional-site",
      "basis": "official_record",
      "sources": [
        {
          "title": "Piedmont City Council to vote Monday night on proposed data center - News 9",
          "url": "https://www.news9.com/oklahoma-city-news/piedmont-data-center-plans-move-forward-as-developer-considers-additional-site",
          "publisher": "News 9",
          "date": "2026-08-24",
          "source_tier": 4
        },
        {
          "title": "Piedmont council considers annexation, rezoning for proposed Cloverleaf data center - News 9",
          "url": "https://www.news9.com/data-centers-in-oklahoma/piedmont-council-considers-annexation-rezoning-for-proposed-cloverleaf-data-center",
          "publisher": "News 9",
          "date": "2026-09-18",
          "source_tier": 4
        },
        {
          "title": "Powered land company Cloverleaf proposing 633-acre data center in Canadian County, Oklahoma",
          "url": "https://www.datacenterdynamics.com/en/news/powered-land-company-cloverleaf-proposing-633-acre-data-center-in-canadian-county-oklahoma/",
          "publisher": "www.datacenterdynamics.com",
          "date": "2026-05-14",
          "source_tier": 3
        },
        {
          "title": "Family living next to proposed Piedmont-area data center fears impact as zoning decision remains pending - news9.com",
          "url": "https://www.news9.com/data-centers-in-oklahoma/piedmont-residents-raise-concerns-over-proposed-data-center",
          "publisher": "news9.com",
          "date": "2026-08-24",
          "source_tier": 4
        },
        {
          "title": "Piedmont residents petition data center as developer secures alternate site option - KOKH",
          "url": "https://okcfox.com/newsletter-daily/piedmont-residents-petition-data-center-as-developer-secures-alternate-site-option",
          "publisher": "KOKH",
          "date": "2026-08-20",
          "source_tier": 4
        },
        {
          "title": "A data center campus would mean millions for an Oklahoma town. One family faces the human cost - KOCO",
          "url": "https://www.koco.com/article/piedmont-oklahoma-data-center-campus-cloverleaf/73486911",
          "publisher": "KOCO",
          "date": "2026-08-23",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-09-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-18",
          "summary": "Project Open Sky planned as multi building data center campus with power generation uses",
          "source_url": "https://www.news9.com/data-centers-in-oklahoma/piedmont-council-considers-annexation-rezoning-for-proposed-cloverleaf-data-center",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-18",
          "summary": "Cloverleaf will comply with Piedmont noise standards and use closed loop cooling system",
          "source_url": "https://www.news9.com/data-centers-in-oklahoma/piedmont-council-considers-annexation-rezoning-for-proposed-cloverleaf-data-center",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-08-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-24",
          "summary": "Cloverleaf hopes to build data center on about 1000 acres near Piedmont",
          "source_url": "https://www.news9.com/oklahoma-city-news/piedmont-data-center-plans-move-forward-as-developer-considers-additional-site",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-08-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-24",
          "summary": "Cloverleaf has secured rights to purchase more than 300 acres in Kingfisher County adjacent to original site",
          "source_url": "https://www.news9.com/oklahoma-city-news/piedmont-data-center-plans-move-forward-as-developer-considers-additional-site",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "rapid-city-data-center-sd",
      "name": "Rapid City Data Center",
      "summary": "A data center project in Rapid City is moving forward with concerns raised about heat and resource impacts.",
      "state": "SD",
      "city": "Rapid City",
      "county": "Pennington County",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 44.08106,
      "longitude": -103.22867,
      "location_precision": "county",
      "location_source": "County seat (Rapid City), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": 10,
      "site_acres_disclosed_as": "third_party_estimate",
      "site_acres_source_url": "https://rapidcityjournal.com/news/local/government-politics/article_04487858-ca91-44ac-99fc-35cb2c97fb3c.html",
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/rapid-city-data-center-sd",
      "source": "https://www.kotatv.com/2026/07/02/south-dakota-drought-strains-power-grid-rapid-city-data-center-moves-forward/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Heat raises resource concerns as Rapid City data center moves forward - KOTA Territory News",
          "url": "https://www.kotatv.com/2026/07/02/south-dakota-drought-strains-power-grid-rapid-city-data-center-moves-forward/",
          "publisher": "KOTA Territory News",
          "date": "2026-07-02",
          "source_tier": 4
        },
        {
          "title": "Possible amendments to Rapid City’s data center ordinance could prompt planned data center to pull out",
          "url": "https://rapidcityjournal.com/news/local/government-politics/article_04487858-ca91-44ac-99fc-35cb2c97fb3c.html",
          "publisher": "Rapid City Journal",
          "date": "2026-09-17",
          "source_tier": 4
        },
        {
          "title": "Sequitor Edge targets 2MW facility in Rapid City, South Dakota",
          "url": "https://www.datacenterdynamics.com/en/news/sequitor-edge-targets-2mw-facility-in-rapid-city-south-dakota/",
          "publisher": "www.datacenterdynamics.com",
          "date": "2026-02-12",
          "source_tier": 3
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "skybox-data-center-at-cox-ranch-cheyenne-wy",
      "name": "SkyBox Data Center at Cox Ranch",
      "summary": "SkyBox Data Center is proposed at the former Cox Ranch near Cheyenne, with developers presenting commitments at a Cheyenne City Council work session amid resident concerns.",
      "state": "WY",
      "city": "Cheyenne",
      "county": "Laramie",
      "status": "rumored",
      "developer": "SkyBox",
      "capacity_mw": null,
      "latitude": 41.14556,
      "longitude": -104.80194,
      "location_precision": "county",
      "location_source": "County seat (Cheyenne), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-25",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": 1197,
      "site_acres_disclosed_as": "third_party_estimate",
      "site_acres_source_url": "https://k2radio.com/ixp/99/p/cox-ranch-annexation-cheyenne-council/",
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/skybox-data-center-at-cox-ranch-cheyenne-wy",
      "source": "https://www.wyomingnews.com/newsletters/intro/a-governor-candidates-plan-for-the-first-100-days-council-committee-advances-data-center-land/article_7ad177fd-7cc9-4314-91ac-b89e470ee936.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "A governor candidate's plan for the first 100 days, council committee advances data center land requests - wyomingnews.com",
          "url": "https://www.wyomingnews.com/newsletters/intro/a-governor-candidates-plan-for-the-first-100-days-council-committee-advances-data-center-land/article_7ad177fd-7cc9-4314-91ac-b89e470ee936.html",
          "publisher": "wyomingnews.com",
          "date": "2026-09-09",
          "source_tier": 4
        },
        {
          "title": "Cox Ranch addition now halfway through city process after positive Cheyenne vote",
          "url": "https://capcity.news/community/city/2026/09/15/cox-ranch-addition-now-halfway-through-city-process-after-positive-cheyenne-vote/",
          "publisher": "capcity.news",
          "date": "2026-09-16",
          "source_tier": 4
        },
        {
          "title": "Cheyenne City Council revisits Cox Ranch Annexation for a new data center on Happy Jack Road.",
          "url": "https://k2radio.com/ixp/99/p/cox-ranch-annexation-cheyenne-council/",
          "publisher": "k2radio.com",
          "date": "2026-09-14",
          "source_tier": 4
        },
        {
          "title": "Cheyenne council moves proposed Cox Ranch data center project toward final vote - WyomingNews.com",
          "url": "https://www.wyomingnews.com/laramieboomerang/news/cheyenne-council-moves-proposed-cox-ranch-data-center-project-toward-final-vote/article_add7c1ff-09b4-44d3-833f-e0e8c7427873.html",
          "publisher": "WyomingNews.com",
          "date": "2026-09-17",
          "source_tier": 4
        },
        {
          "title": "Residents raise concerns over proposed SkyBox Data Center at former Cox Ranch - yourwyominglink.com",
          "url": "https://www.yourwyominglink.com/news/local/residents-raise-concerns-over-proposed-skybox-data-center-at-former-cox-ranch/article_dde10e29-9455-4aef-a951-de9985f3e33c.html",
          "publisher": "yourwyominglink.com",
          "date": "2026-08-28",
          "source_tier": 4
        },
        {
          "title": "Cox Ranch data center developers outline project, commitments at Cheyenne City Council work session - WyomingNews.com",
          "url": "https://www.wyomingnews.com/laramieboomerang/news/cox-ranch-data-center-developers-outline-project-commitments-at-cheyenne-city-council-work-session/article_d3952c20-60ab-4b4c-9b65-fe69dec3e13b.html",
          "publisher": "WyomingNews.com",
          "date": "2026-09-03",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "Items were previously postponed at April 27 City Council meeting after council learned ViaWest and Skybox had begun buying the land post annexation",
          "source_url": "https://www.wyomingnews.com/laramieboomerang/news/cheyenne-council-moves-proposed-cox-ranch-data-center-project-toward-final-vote/article_add7c1ff-09b4-44d3-833f-e0e8c7427873.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-17",
          "summary": "Public Services Committee meeting was held on April 20, 2026, where council and public learned about ViaWest and Skybox's land acquisition plans",
          "source_url": "https://www.wyomingnews.com/laramieboomerang/news/cheyenne-council-moves-proposed-cox-ranch-data-center-project-toward-final-vote/article_add7c1ff-09b4-44d3-833f-e0e8c7427873.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-16",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-16",
          "summary": "Annexation ordinances to receive final approval Sept. 28",
          "source_url": "https://capcity.news/community/city/2026/09/15/cox-ranch-addition-now-halfway-through-city-process-after-positive-cheyenne-vote/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-16",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-16",
          "summary": "SkyBox and ViaWest Group purchased Cox Ranch property in spring 2026",
          "source_url": "https://capcity.news/community/city/2026/09/15/cox-ranch-addition-now-halfway-through-city-process-after-positive-cheyenne-vote/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "City put Cox annexation discussion on hold in April 2026",
          "source_url": "https://k2radio.com/ixp/99/p/cox-ranch-annexation-cheyenne-council/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-09",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-09",
          "summary": "Cox Ranch rezoning and annexation plans call for data center to be built on land off Happy Jack Road west of Cheyenne",
          "source_url": "https://www.wyomingnews.com/newsletters/intro/a-governor-candidates-plan-for-the-first-100-days-council-committee-advances-data-center-land/article_7ad177fd-7cc9-4314-91ac-b89e470ee936.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-09",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-09",
          "summary": "Approved aspects of Cox Ranch annexation and rezoning sent to full council meeting on Monday",
          "source_url": "https://www.wyomingnews.com/newsletters/intro/a-governor-candidates-plan-for-the-first-100-days-council-committee-advances-data-center-land/article_7ad177fd-7cc9-4314-91ac-b89e470ee936.html",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "butte-silver-bow-data-center-ballot-initiative-mt",
      "name": "Butte-Silver Bow Data Center (ballot initiative)",
      "summary": "A citizen group in Butte Silver Bow is pursuing a ballot initiative on data centers and has appealed a local judge's ruling to the Montana Supreme Court.",
      "state": "MT",
      "city": "Butte",
      "county": "Silver Bow",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 46.00639,
      "longitude": -112.52972,
      "location_precision": "county",
      "location_source": "County seat (Butte), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-24",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/butte-silver-bow-data-center-ballot-initiative-mt",
      "source": "https://www.montanarightnow.com/butte/butte-district-court-judge-to-make-ruling-on-data-center-initiative-lawsuit/article_277bf534-7835-41a0-abce-0aea156b7980.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "Butte district court judge to make ruling on data center initiative lawsuit - montanarightnow.com",
          "url": "https://www.montanarightnow.com/butte/butte-district-court-judge-to-make-ruling-on-data-center-initiative-lawsuit/article_277bf534-7835-41a0-abce-0aea156b7980.html",
          "publisher": "montanarightnow.com",
          "date": "2026-08-21",
          "source_tier": 4
        },
        {
          "title": "Butte activist group sues county, seeks right to vote on proposed data centers - KBZK News",
          "url": "https://www.kbzk.com/news/butte-activist-group-sues-county-seeks-right-to-vote-on-proposed-data-centers",
          "publisher": "KBZK News",
          "date": "2026-08-14",
          "source_tier": 4
        },
        {
          "title": "Butte group behind data center initiative to appeal to Montana Supreme Court - Fairfield Sun Times",
          "url": "https://www.montanarightnow.com/butte/butte-group-behind-data-center-initiative-to-appeal-to-montana-supreme-court/article_8d00c3d3-f408-44bb-8943-2759dad99b60.html",
          "publisher": "Fairfield Sun Times",
          "date": "2026-09-04",
          "source_tier": 4
        },
        {
          "title": "Data center ballot question proponents appeal Butte judge's ruling to the MT Supreme Court - Bozeman Daily Chronicle",
          "url": "https://helenair.com/news/state-regional/article_ddb26640-6eda-56f9-b035-4988f00d3057.html",
          "publisher": "Bozeman Daily Chronicle",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Supreme Court: Butte Silver Bow data center initiative will miss November ballot - Montana Free Press",
          "url": "https://montanafreepress.org/2026/09/24/butte-silver-bow-data-center-initiative-will-miss-november-ballot/",
          "publisher": "Montana Free Press",
          "date": "2026-09-24",
          "source_tier": 4
        },
        {
          "title": "Butte-Silver Bow County commission votes to pursue temporary moratorium on data centers - KBZK News",
          "url": "https://www.kbzk.com/news/butte-silver-bow-county-commission-votes-to-pursue-temporary-moratorium-on-data-centers",
          "publisher": "KBZK News",
          "date": "2026-09-04",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-09-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-24",
          "summary": "The proposed ballot initiative would require citizen approval of data center development in Butte-Silver Bow County",
          "source_url": "https://montanafreepress.org/2026/09/24/butte-silver-bow-data-center-initiative-will-miss-november-ballot/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-08-21",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-21",
          "summary": "County Clerk and Recorder Cynthia Sherman nullified petition citing Montana statute 13-28-206 requiring July 13 deadline, not August 14 as county initially stated",
          "source_url": "https://www.montanarightnow.com/butte/butte-district-court-judge-to-make-ruling-on-data-center-initiative-lawsuit/article_277bf534-7835-41a0-abce-0aea156b7980.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-08-14",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-14",
          "summary": "Election administrator approved the petition on May 28 and notified proponents the gathering period would end at 5:00 p.m. on August 14, 2026",
          "source_url": "https://www.kbzk.com/news/butte-activist-group-sues-county-seeks-right-to-vote-on-proposed-data-centers",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "monolith-data-center-expansion-hallam-ne",
      "name": "Monolith Data Center Expansion (Hallam)",
      "summary": "Monolith is proposing a data center expansion near Hallam, Nebraska, with landowners facing decisions about selling and residents attending a town hall to discuss the project.",
      "state": "NE",
      "city": "Hallam",
      "county": "Lancaster",
      "status": "rumored",
      "developer": "Monolith",
      "capacity_mw": null,
      "latitude": 40.80917,
      "longitude": -96.67806,
      "location_precision": "county",
      "location_source": "County seat (Lincoln), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-18",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/monolith-data-center-expansion-hallam-ne",
      "source": "https://omaha.com/eedition/sunrise/articles/article_5af1a464-3063-5df9-83e9-065c14045b7c.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "Monolith data center nears approval",
          "url": "https://omaha.com/eedition/sunrise/articles/article_5af1a464-3063-5df9-83e9-065c14045b7c.html",
          "publisher": "Omaha World-Herald",
          "date": "2026-09-18",
          "source_tier": 4
        },
        {
          "title": "Hallam landowners face stark choice on data center - nebraskapublicmedia.org",
          "url": "https://nebraskapublicmedia.org/en/news/news-articles/hallam-landowners-face-stark-choice-on-data-center/",
          "publisher": "nebraskapublicmedia.org",
          "date": "2026-08-24",
          "source_tier": 4
        },
        {
          "title": "Data center developers eyeing land near Hallam - 1011now.com",
          "url": "https://www.1011now.com/2026/08/27/data-center-developers-eyeing-land-near-hallam/",
          "publisher": "1011now.com",
          "date": "2026-08-27",
          "source_tier": 4
        },
        {
          "title": "Hallam residents pack town hall for Monolith's proposed data center expansion - nebraskapublicmedia.org",
          "url": "https://nebraskapublicmedia.org/en/news/news-articles/hallam-residents-pack-town-hall-for-monoliths-proposed-data-center-expansion/",
          "publisher": "nebraskapublicmedia.org",
          "date": "2026-07-24",
          "source_tier": 4
        },
        {
          "title": "Monolith seeks to build data center in Hallam, application to be submitted by mid-July - 1011now.com",
          "url": "https://www.1011now.com/2026/07/10/monolith-seeks-build-data-center-hallam-application-be-submitted-by-mid-july/",
          "publisher": "1011now.com",
          "date": "2026-07-10",
          "source_tier": 4
        },
        {
          "title": "‘We need to embrace it’: Hallam commission hears data center plans - nebraskapublicmedia.org",
          "url": "https://nebraskapublicmedia.org/en/news/news-articles/we-need-to-embrace-it-hallam-commission-hears-data-center-plans/",
          "publisher": "nebraskapublicmedia.org",
          "date": "2026-07-16",
          "source_tier": 1
        },
        {
          "title": "Nebraska carbon black plant set to host data center - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/nebraska-carbon-black-plant-set-to-host-data-center/",
          "publisher": "Data Center Dynamics",
          "date": "2026-07-13",
          "source_tier": 1
        },
        {
          "title": "Hallam planning commission delays vote on Monolith’s proposed data center - nebraskapublicmedia.org",
          "url": "https://nebraskapublicmedia.org/es/news/news-articles/hallam-planning-commission-delays-vote-on-monoliths-proposed-data-center/",
          "publisher": "nebraskapublicmedia.org",
          "date": "2026-08-20",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-09-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-18",
          "summary": "Phase 1 expansion would take about 18 months and increase production to 220,000 tons per year of carbon black",
          "source_url": "https://omaha.com/eedition/sunrise/articles/article_5af1a464-3063-5df9-83e9-065c14045b7c.html",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "amazon-web-services-louisiana-data-centers-shreveport-la",
      "name": "Amazon Web Services Louisiana data centers",
      "summary": "Amazon Web Services announced a third data center campus in Shreveport, raising its total Louisiana investment to $18 billion across three Northwest Louisiana campuses.",
      "state": "LA",
      "city": "Shreveport",
      "county": "Caddo Parish",
      "status": "proposed",
      "developer": "Amazon Web Services",
      "capacity_mw": null,
      "latitude": 32.50806,
      "longitude": -93.76278,
      "location_precision": "county",
      "location_source": "County seat (Shreveport), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/amazon-web-services-louisiana-data-centers-shreveport-la",
      "source": "https://www.bicmagazine.com/departments/AI-Infrastructure/amazon-raises-louisiana-data-center-investment/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Amazon raises Louisiana data-center investment to $18 billion, adds third Shreveport campus - BIC Magazine",
          "url": "https://www.bicmagazine.com/departments/AI-Infrastructure/amazon-raises-louisiana-data-center-investment/",
          "publisher": "BIC Magazine",
          "date": "2026-08-19",
          "source_tier": 4
        },
        {
          "title": "Amazon Web Services announces third data center in NW Louisiana, sets community meeting date - The Shreveport-Bossier City Advocate",
          "url": "https://www.shreveportbossieradvocate.com/business/amazon-web-services-third-data-center-in-northwest-louisiana-shreveport/article_2ee6697d-2d82-4814-98a8-903a488c3eb9.html",
          "publisher": "The Shreveport-Bossier City Advocate",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "AWS ‘Unable To Restore’ Data Centers Hit By Iran Strikes; Partner Hopes Amazon’s $220B Spending Plan Continues",
          "url": "https://www.crn.com/news/data-center/2026/aws-unable-to-restore-data-centers-hit-by-iran-strikes-partner-hopes-amazon-s-220b-spending-plan-continues",
          "publisher": "www.crn.com",
          "date": "2026-09-16",
          "source_tier": 4
        },
        {
          "title": "Shreveport Emerges as a Key Hub for SLB’s Data Center Infrastructure Business - SLB",
          "url": "https://www.slb.com/newsroom/features/2026/2026-0827-slb-shreveport-data-center",
          "publisher": "SLB",
          "date": "2026-08-27",
          "source_tier": 4
        },
        {
          "title": "Trump calls data center opponents backward as Louisiana projects roll on - Shreveport Times",
          "url": "https://www.shreveporttimes.com/story/news/2026/09/01/louisiana-welcome-data-centers-as-national-resistance-grows-despite-trump-calling-opponents-backward/91554990007/",
          "publisher": "Shreveport Times",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Amazon Web Services to build third data center in Louisiana - audacy.com",
          "url": "https://www.audacy.com/wwl/news/local/amazon-web-services-to-build-third-data-center-in-louisiana",
          "publisher": "audacy.com",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "Amazon plans 3rd data center in NW Louisiana, bringing investment to $18B - WWLTV.com",
          "url": "https://www.wwltv.com/article/tech/amazon-plans-3rd-data-center-in-nw-louisiana-bringing-investment-to-18b/289-769becae-0dea-4b16-baa9-50a34297086b",
          "publisher": "WWLTV.com",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "Amazon Web Services announces a third data center campus is coming to Shreveport - KSLA",
          "url": "https://www.ksla.com/2026/08/18/amazon-web-services-announces-third-data-center-campus-is-coming-shreveport/",
          "publisher": "KSLA",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "Amazon’s data center network in Northwest Louisiana is going to get bigger - Louisiana Illuminator",
          "url": "https://lailluminator.com/2026/08/18/amazons-data-center-network-in-northwest-louisiana-is-going-to-get-bigger/",
          "publisher": "Louisiana Illuminator",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "Amazon is upping its data center commitment in northwest Louisiana by $6B - Baton Rouge Business Report",
          "url": "https://www.businessreport.com/article/amazon-is-upping-its-data-center-commitment-in-northwest-louisiana-by-6b",
          "publisher": "Baton Rouge Business Report",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "AWS pledges $6bn investment in data center campus in Shreveport, Louisiana - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/aws-pledges-6bn-investment-in-data-center-campus-in-shreveport-louisiana/",
          "publisher": "Data Center Dynamics",
          "date": "2026-08-19",
          "source_tier": 3
        },
        {
          "title": "Amazon raises Louisiana data center investment to $18 billion, adds third Shreveport campus - BIC Magazine",
          "url": "https://www.bicmagazine.com/departments/AI-Infrastructure/amazon-raises-louisiana-data-center-investment/",
          "publisher": "BIC Magazine",
          "date": "2026-08-19",
          "source_tier": 4
        },
        {
          "title": "Amazon Web Services announces a third data center campus is coming to Shreveport - KSLA",
          "url": "https://www.ksla.com/2026/08/18/amazon-web-services-announces-third-data-center-campus-is-coming-shreveport/",
          "publisher": "KSLA",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "Third Amazon data center campus part of Amazon's $18 billion Louisiana investment - WBRZ",
          "url": "https://www.wbrz.com/news/third-amazon-data-center-campus-part-of-amazon-s-18-billion-louisiana-investment/",
          "publisher": "WBRZ",
          "date": "2026-08-19",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-08-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-18",
          "summary": "Amazon Web Services announced plans in February 2026 to build two data centers in northwest Louisiana",
          "source_url": "https://www.audacy.com/wwl/news/local/amazon-web-services-to-build-third-data-center-in-louisiana",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-08-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-18",
          "summary": "AWS is adding a third data center at Resilient Technology Park in west Shreveport",
          "source_url": "https://www.audacy.com/wwl/news/local/amazon-web-services-to-build-third-data-center-in-louisiana",
          "source_tier": 4
        },
        {
          "status": "proposed",
          "effective_at": "2026-08-01",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Amazon Web Services pledged a 6 billion dollar investment to develop a hyperscale data center campus in Shreveport, Caddo Parish, Louisiana.",
          "source_url": "https://www.datacenterdynamics.com/en/news/aws-pledges-6bn-investment-in-data-center-campus-in-shreveport-louisiana/",
          "source_tier": 3
        }
      ]
    },
    {
      "slug": "caddo-parish-data-center-la",
      "name": "Caddo Parish Data Center",
      "summary": "A data center project in Caddo Parish is moving forward with construction after parish commissioners rejected a moratorium step.",
      "state": "LA",
      "city": null,
      "county": "Caddo Parish",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 32.50806,
      "longitude": -93.76278,
      "location_precision": "county",
      "location_source": "County seat (Shreveport), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/caddo-parish-data-center-la",
      "source": "https://www.ktalnews.com/news/local-news/shreveport-caddo-parish-rejects-data-center-moratorium-commission-votes-against-data-center-halt-construction-moves-forward/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Data center construction moves forward in Caddo Parish - KTVE – myarklamiss.com – Your ArkLaMiss News Source",
          "url": "https://www.ktalnews.com/news/local-news/shreveport-caddo-parish-rejects-data-center-moratorium-commission-votes-against-data-center-halt-construction-moves-forward/",
          "publisher": "KTVE – myarklamiss.com – Your ArkLaMiss News Source",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Caddo commissioners reject data center moratorium step - thecentersquare.com",
          "url": "https://www.thecentersquare.com/louisiana/article_3f44b5fa-479c-4ca5-9e9e-1e770fe099aa.html",
          "publisher": "thecentersquare.com",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Trump calls data center opponents backward as Louisiana projects roll on - Shreveport Times",
          "url": "https://www.shreveporttimes.com/story/news/2026/09/01/louisiana-welcome-data-centers-as-national-resistance-grows-despite-trump-calling-opponents-backward/91554990007/",
          "publisher": "Shreveport Times",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Louisiana governor to announce $12B Caddo-Bossier project today",
          "url": "https://www.shreveporttimes.com/story/news/2026/02/23/louisiana-governor-jeff-landry-to-announce-12-billion-data-center-project-today-in-shreveport/88821398007/",
          "publisher": "www.shreveporttimes.com",
          "date": "2026-02-23",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "centersquare-albuquerque-data-center-nm",
      "name": "Centersquare Albuquerque data center",
      "summary": "Centersquare lists a data center at Albuquerque, New Mexico among the sites it operates.",
      "state": "NM",
      "city": "Albuquerque",
      "county": "Bernalillo County",
      "status": "operational",
      "developer": "Centersquare",
      "capacity_mw": null,
      "latitude": 35.1053263,
      "longitude": -106.6464417,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/centersquare-albuquerque-data-center-nm",
      "source": "https://www.csquare.com/data-centers",
      "basis": "official_record",
      "sources": [
        {
          "title": "Centersquare: Data center markets",
          "url": "https://www.csquare.com/data-centers",
          "publisher": "Centersquare",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Centersquare lists Centersquare Albuquerque data center at Albuquerque, New Mexico on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.csquare.com/data-centers",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "cheyenne-1-2-billion-data-center-campus-wy",
      "name": "Cheyenne $1.2 Billion Data Center Campus",
      "summary": "A $1.2 billion data center campus is under construction in Cheyenne, Wyoming.",
      "state": "WY",
      "city": "Cheyenne",
      "county": "Laramie",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 41.14556,
      "longitude": -104.80194,
      "location_precision": "county",
      "location_source": "County seat (Cheyenne), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/cheyenne-1-2-billion-data-center-campus-wy",
      "source": "https://cowboystatedaily.com/2026/06/14/inside-a-1-2-billion-data-center-campus-being-built-in-cheyenne/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Inside The $1.2 Billion Data Center Campus Being Built In Cheyenne - Cowboy State Daily",
          "url": "https://cowboystatedaily.com/2026/06/14/inside-a-1-2-billion-data-center-campus-being-built-in-cheyenne/",
          "publisher": "Cowboy State Daily",
          "date": "2026-06-14",
          "source_tier": 4
        },
        {
          "title": "$1.2 billion data center breaks ground in Cheyenne",
          "url": "https://www.wyomingnews.com/news/local_news/1-2-billion-data-center-breaks-ground-in-cheyenne/article_f51c2111-a5fa-4172-97bf-4c94702991cd.html",
          "publisher": "www.wyomingnews.com",
          "date": "2025-10-08",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "claremore-data-center-ok",
      "name": "Claremore Data Center",
      "summary": "A data center project in Claremore, Oklahoma advanced with major community commitments while also prompting community concerns addressed by the city.",
      "state": "OK",
      "city": "Claremore",
      "county": "Rogers County",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 36.31528,
      "longitude": -95.61278,
      "location_precision": "county",
      "location_source": "County seat (Claremore), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/claremore-data-center-ok",
      "source": "https://www.kjrh.com/news/local-news/claremore-addresses-community-concerns-over-data-center-project",
      "basis": "official_record",
      "sources": [
        {
          "title": "Claremore addresses community concerns over data center project - 2 News Oklahoma KJRH Tulsa",
          "url": "https://www.kjrh.com/news/local-news/claremore-addresses-community-concerns-over-data-center-project",
          "publisher": "2 News Oklahoma KJRH Tulsa",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Claremore data center project advances with major community commitments - News On 6",
          "url": "https://www.newson6.com/data-centers-in-oklahoma/claremore-data-center-project-advances",
          "publisher": "News On 6",
          "date": "2026-08-28",
          "source_tier": 4
        },
        {
          "title": "Sequoyah Public Schools set to receive largest share of Claremore data center PILOT payments - KJRH",
          "url": "https://www.kjrh.com/news/local-news/claremore/sequoyah-public-schools-claremore-data-center-pilot-payments-sept-12-2026",
          "publisher": "KJRH",
          "date": "2026-09-12",
          "source_tier": 4
        },
        {
          "title": "What to Know About Project Mustang in Claremore - News On 6",
          "url": "https://www.newson6.com/claremore-data-center-project-mustang-oklahoma",
          "publisher": "News On 6",
          "date": "2026-09-08",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-09-12",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-12",
          "summary": "Sequoyah Public Schools expected to receive $100 million in PILOT payments from Claremore data center project",
          "source_url": "https://www.kjrh.com/news/local-news/claremore/sequoyah-public-schools-claremore-data-center-pilot-payments-sept-12-2026",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-12",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-12",
          "summary": "Beale Infrastructure is the developer of the Claremore data center",
          "source_url": "https://www.kjrh.com/news/local-news/claremore/sequoyah-public-schools-claremore-data-center-pilot-payments-sept-12-2026",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-12",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-12",
          "summary": "Beale Infrastructure partnering with Sequoyah Public Schools on fitness focused playground project to be completed by end of year",
          "source_url": "https://www.kjrh.com/news/local-news/claremore/sequoyah-public-schools-claremore-data-center-pilot-payments-sept-12-2026",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "clarksville-data-center-ar",
      "name": "Clarksville Data Center",
      "summary": "A data center plan in Clarksville includes 40 natural gas turbines and is associated with a multi billion dollar bond that a community group is petitioning to repeal.",
      "state": "AR",
      "city": "Clarksville",
      "county": "Johnson County",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 35.46389,
      "longitude": -93.47722,
      "location_precision": "county",
      "location_source": "County seat (Clarksville), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/clarksville-data-center-ar",
      "source": "https://www.yahoo.com/news/us/articles/group-creates-petition-repeal-clarksville-225240336.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "Group creates petition to repeal Clarksville data center's multi-billion-dollar bond - 5newsonline.com",
          "url": "https://www.yahoo.com/news/us/articles/group-creates-petition-repeal-clarksville-225240336.html",
          "publisher": "5newsonline.com",
          "date": "2026-08-20",
          "source_tier": 4
        },
        {
          "title": "Clarksville’s data center plan includes 40 natural gas turbines - arkansasonline.com",
          "url": "https://www.arkansasonline.com/news/2026/aug/12/clarksvilles-data-center-plan-includes-40-natural/",
          "publisher": "arkansasonline.com",
          "date": "2026-08-12",
          "source_tier": 4
        },
        {
          "title": "Clarksville’s data center plan includes 40 natural gas turbines - The Arkansas Democrat-Gazette",
          "url": "https://www.arkansasonline.com/news/2026/aug/12/clarksvilles-data-center-plan-includes-40-natural/",
          "publisher": "The Arkansas Democrat-Gazette",
          "date": "2026-08-12",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "compass-red-oak-campus-tx",
      "name": "Compass Red Oak campus",
      "summary": "Compass Datacenters lists a data center at Red Oak, Texas and says it is being built.",
      "state": "TX",
      "city": "Red Oak",
      "county": "Ellis County",
      "status": "under_construction",
      "developer": "Compass Datacenters",
      "capacity_mw": null,
      "latitude": 32.5155346,
      "longitude": -96.7826267,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/compass-red-oak-campus-tx",
      "source": "https://www.compassdatacenters.com/data-center-markets/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Compass Datacenters: Data center markets",
          "url": "https://www.compassdatacenters.com/data-center-markets/",
          "publisher": "Compass Datacenters",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "A Texas developer got a $2 billion loan to build Oracle data centers in the 'burbs - Business Insider",
          "url": "https://www.businessinsider.com/databank-financing-dallas-data-center-inference-2026-4",
          "publisher": "Business Insider",
          "date": "2026-04-21",
          "source_tier": 4
        },
        {
          "title": "County Partners with Compass Datacenters for Phase 2 Construction of Red Oak Campus - Focus Daily News",
          "url": "https://www.focusdailynews.com/county-partners-with-compass-datacenters-for-phase-2-construction-of-red-oak-campus/",
          "publisher": "Focus Daily News",
          "date": "2023-11-05",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Compass Datacenters lists Compass Red Oak campus at Red Oak, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.compassdatacenters.com/data-center-markets/",
          "source_tier": 2
        },
        {
          "status": "under_construction",
          "effective_at": "2026-04-21",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-04-21",
          "summary": "A Texas developer obtained $2 billion in financing to build Oracle data centers near Dallas",
          "source_url": "https://www.businessinsider.com/databank-financing-dallas-data-center-inference-2026-4",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2023-11-05",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2023-11-05",
          "summary": "Compass Datacenters Red Oak Campus phase two construction partnership with county",
          "source_url": "https://www.focusdailynews.com/county-partners-with-compass-datacenters-for-phase-2-construction-of-red-oak-campus/",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "crusoe-cheyenne-data-center-project-jade-wy",
      "name": "Crusoe Cheyenne Data Center (Project Jade)",
      "summary": "Crusoe paused and subsequently withdrew from Project Jade, a 1.8 GW data center project in Cheyenne, Wyoming, at the request of its customer.",
      "state": "WY",
      "city": "Cheyenne",
      "county": "Laramie",
      "status": "rumored",
      "developer": "Crusoe",
      "capacity_mw": 1800,
      "latitude": 41.14556,
      "longitude": -104.80194,
      "location_precision": "county",
      "location_source": "County seat (Cheyenne), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/crusoe-cheyenne-data-center-project-jade-wy",
      "source": "https://www.wyomingnews.com/news/local_news/crusoe-pulls-out-of-project-jade-data-center/article_b9a8bde9-21c0-4e8a-9051-9154b91bf0eb.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "Crusoe pulls out of Project Jade data center - WyomingNews.com",
          "url": "https://www.wyomingnews.com/news/local_news/crusoe-pulls-out-of-project-jade-data-center/article_b9a8bde9-21c0-4e8a-9051-9154b91bf0eb.html",
          "publisher": "WyomingNews.com",
          "date": "2026-06-09",
          "source_tier": 4
        },
        {
          "title": "Wyoming County Approves Construction of What Could Become the Largest Data Center in US - Inside Climate News",
          "url": "https://insideclimatenews.org/news/14012026/wyoming-county-approves-ai-data-center/",
          "publisher": "Inside Climate News",
          "date": "2026-01-14",
          "source_tier": 4
        },
        {
          "title": "Crusoe pauses work on 1.8GW Cheyenne, Wyoming, data center \"at the request of our customer\" - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/crusoe-pauses-work-on-18gw-cheyenne-wyoming-data-center-at-the-request-of-our-customer/",
          "publisher": "Data Center Dynamics",
          "date": "2026-06-10",
          "source_tier": 3
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "data-center-edgerton-ks",
      "name": "Data Center Edgerton",
      "summary": "A proposed data center in Edgerton, Kansas has prompted citizen petitions for a ban and subsequent litigation by the city against petition organizers.",
      "state": "KS",
      "city": "Edgerton",
      "county": "Johnson County",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 38.8808,
      "longitude": -94.8031,
      "location_precision": "county",
      "location_source": "County seat (Olathe), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/data-center-edgerton-ks",
      "source": "https://www.yahoo.com/news/us/articles/judge-rules-edgerton-petition-seeking-172300069.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "Judge rules Edgerton petition seeking ban on data centers can move forward for now - kansascity.com",
          "url": "https://www.yahoo.com/news/us/articles/judge-rules-edgerton-petition-seeking-172300069.html",
          "publisher": "kansascity.com",
          "date": "2026-09-04",
          "source_tier": 4
        },
        {
          "title": "Judge sides with citizens in Edgerton data center petition battle - kctv5.com",
          "url": "https://www.kctv5.com/2026/09/04/judge-sides-with-citizens-edgerton-data-center-petition-battle/",
          "publisher": "kctv5.com",
          "date": "2026-09-04",
          "source_tier": 4
        },
        {
          "title": "Judge dismisses city’s effort to stop data center vote – FOX 4 Kansas City WDAF-TV | News, Weather, Sports - FOX4KC.com",
          "url": "https://fox4kc.com/video/judge-dismisses-citys-effort-to-stop-data-center-vote/12137185/",
          "publisher": "FOX4KC.com",
          "date": "2026-09-04",
          "source_tier": 4
        },
        {
          "title": "Judge dismisses city of Edgerton’s effort to stop data center vote - FOX4KC.com",
          "url": "https://fox4kc.com/news/judge-dismisses-city-of-edgertons-effort-to-stop-data-center-vote/",
          "publisher": "FOX4KC.com",
          "date": "2026-09-04",
          "source_tier": 4
        },
        {
          "title": "Small Kansas town's fight against data center heads to court after city sues citizens following petition - KSHB 41 Kansas City",
          "url": "https://www.kshb.com/news/local-news/data-centers/small-kansas-towns-fight-against-data-center-heads-to-court-after-city-sues-citizens-following-petition",
          "publisher": "KSHB 41 Kansas City",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Judge dismisses City of Edgerton's lawsuit against two residents over data center petition - Johnson County Post",
          "url": "https://johnsoncountypost.com/2026/09/10/judge-dismisses-city-of-edgertons-lawsuit-295865/",
          "publisher": "Johnson County Post",
          "date": "2026-09-10",
          "source_tier": 4
        },
        {
          "title": "Edgerton approves data center over planning commission’s rejection and residents’ objections - KCUR",
          "url": "https://johnsoncountypost.com/2026/07/23/data-center-edgerton-override-292320/",
          "publisher": "KCUR",
          "date": "2026-07-25",
          "source_tier": 4
        },
        {
          "title": "Edgerton, Kansas, sues citizens trying to put data center ban before voters - KMBC",
          "url": "https://www.kmbc.com/article/edgerton-kansas-data-center-ban-lawsuit-citizen-petition/73489670",
          "publisher": "KMBC",
          "date": "2026-08-20",
          "source_tier": 4
        },
        {
          "title": "City of Edgerton files lawsuit against two women over putting data center to a vote - FOX4KC.com",
          "url": "https://fox4kc.com/news/city-of-edgerton-files-lawsuit-against-two-women-over-putting-data-center-to-a-vote/",
          "publisher": "FOX4KC.com",
          "date": "2026-08-14",
          "source_tier": 4
        },
        {
          "title": "Edgerton calls citizen petition ‘void and invalid,’ files suit to block data center ban - kctv5.com",
          "url": "https://www.kctv5.com/2026/08/14/edgerton-calls-citizen-petition-void-invalid-files-suit-block-data-center-ban/",
          "publisher": "kctv5.com",
          "date": "2026-08-14",
          "source_tier": 4
        },
        {
          "title": "Who bankrolls Emporia’s data center bid is the $3 million question. The answer is sought in court. - News From The States",
          "url": "https://kansasreflector.com/2026/09/13/who-bankrolls-emporias-data-center-bid-is-the-3-million-question-the-answer-is-sought-in-court/",
          "publisher": "News From The States",
          "date": "2026-09-13",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "data-center-el-dorado-ks",
      "name": "Data Center El Dorado",
      "summary": "Citizens in El Dorado, Kansas petitioned to ban data centers and a judge ruled in favor of the petition.",
      "state": "KS",
      "city": "El Dorado",
      "county": "Butler County",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 37.8211,
      "longitude": -96.8583,
      "location_precision": "county",
      "location_source": "County seat (El Dorado), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/data-center-el-dorado-ks",
      "source": "https://www.kwch.com/2026/08/25/citizen-group-wins-court-fight-over-el-dorado-data-center-petition/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Citizen group wins court fight over El Dorado data center petition - KWCH",
          "url": "https://www.kwch.com/2026/08/25/citizen-group-wins-court-fight-over-el-dorado-data-center-petition/",
          "publisher": "KWCH",
          "date": "2026-08-24",
          "source_tier": 4
        },
        {
          "title": "Judge rules in favor of El Dorado citizens' petition to ban data centers - kake.com",
          "url": "https://www.kake.com/home/judge-rules-in-favor-of-el-dorado-citizens-petition-to-ban-data-centers/article_0b0fc6e8-417f-4298-b6fb-c529a69a786f.html",
          "publisher": "kake.com",
          "date": "2026-08-21",
          "source_tier": 4
        },
        {
          "title": "As people demand answers, El Dorado city manager responds to data center concerns - kake.com",
          "url": "https://www.kake.com/home/as-people-demand-answers-el-dorado-city-manager-responds-to-data-center-concerns/article_0095e29e-faeb-43d9-84fd-63091dbc9862.html",
          "publisher": "kake.com",
          "date": "2026-08-17",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "data-center-leavenworth-ks",
      "name": "Data Center Leavenworth",
      "summary": "A massive data center proposed in Leavenworth, Kansas has drawn organized community protest.",
      "state": "KS",
      "city": "Leavenworth",
      "county": "Leavenworth County",
      "status": "proposed",
      "developer": null,
      "capacity_mw": null,
      "latitude": 39.3111,
      "longitude": -94.9225,
      "location_precision": "county",
      "location_source": "County seat (Leavenworth), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/data-center-leavenworth-ks",
      "source": "https://www.kshb.com/news/local-news/data-centers/leavenworth-county-farmers-concerned-proposed-data-center-could-threaten-crops-local-business",
      "basis": "official_record",
      "sources": [
        {
          "title": "Leavenworth County farmers concerned proposed data center could threaten crops, local business - KSHB 41 Kansas City",
          "url": "https://www.kshb.com/news/local-news/data-centers/leavenworth-county-farmers-concerned-proposed-data-center-could-threaten-crops-local-business",
          "publisher": "KSHB 41 Kansas City",
          "date": "2026-09-16",
          "source_tier": 4
        },
        {
          "title": "To stop a massive data center from moving in, Leavenworth protesters are showing up and getting loud - kcur.org",
          "url": "https://www.kcur.org/politics-elections-and-government/2026-08-14/leavenworth-county-kansas-data-center",
          "publisher": "kcur.org",
          "date": "2026-08-14",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "proposed",
          "effective_at": "2026-08-14",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Developers proposed a commercial data center campus in Leavenworth County, Kansas.",
          "source_url": "https://www.kcur.org/politics-elections-and-government/2026-08-14/leavenworth-county-kansas-data-center",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "data-center-near-hallam-unnamed-developers-ne",
      "name": "Data Center near Hallam (unnamed developers)",
      "summary": "Unnamed data center developers are eyeing land near Hallam, with landowners facing choices about the proposed project.",
      "state": "NE",
      "city": "Hallam",
      "county": "Lancaster",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 40.80917,
      "longitude": -96.67806,
      "location_precision": "county",
      "location_source": "County seat (Lincoln), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/data-center-near-hallam-unnamed-developers-ne",
      "source": "https://nebraskapublicmedia.org/en/news/news-articles/hallam-landowners-face-stark-choice-on-data-center/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Hallam landowners face stark choice on data center - nebraskapublicmedia.org",
          "url": "https://nebraskapublicmedia.org/en/news/news-articles/hallam-landowners-face-stark-choice-on-data-center/",
          "publisher": "nebraskapublicmedia.org",
          "date": "2026-08-24",
          "source_tier": 4
        },
        {
          "title": "Data center developers eyeing land near Hallam - 1011now.com",
          "url": "https://www.1011now.com/2026/08/27/data-center-developers-eyeing-land-near-hallam/",
          "publisher": "1011now.com",
          "date": "2026-08-27",
          "source_tier": 4
        },
        {
          "title": "Hallam landowners face stark choice on data center - nebraskapublicmedia.org",
          "url": "https://nebraskapublicmedia.org/en/news/news-articles/hallam-landowners-face-stark-choice-on-data-center/",
          "publisher": "nebraskapublicmedia.org",
          "date": "2026-08-24",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-08-27",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-27",
          "summary": "Sagebrush Infrastructure Partners LLC obtained options on more than 1,500 acres of land worth over 8 million dollars near Hallam",
          "source_url": "https://www.1011now.com/2026/08/27/data-center-developers-eyeing-land-near-hallam/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-08-27",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-27",
          "summary": "Stark Power, an Israel based company, bought Sagebrush Infrastructure Partners in June",
          "source_url": "https://www.1011now.com/2026/08/27/data-center-developers-eyeing-land-near-hallam/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-08-27",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-27",
          "summary": "The project is located near Nebraska Public Power District's Sheldon Power and Princeton Road stations",
          "source_url": "https://www.1011now.com/2026/08/27/data-center-developers-eyeing-land-near-hallam/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-08-27",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-27",
          "summary": "Developers offered Hallam farmer Darin Schwaninger tens of thousands of dollars per acre in February",
          "source_url": "https://www.1011now.com/2026/08/27/data-center-developers-eyeing-land-near-hallam/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-08-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-24",
          "summary": "Stark Power, based in Tel Aviv, Israel, acquired Sagebrush Infrastructure in June",
          "source_url": "https://nebraskapublicmedia.org/en/news/news-articles/hallam-landowners-face-stark-choice-on-data-center/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-08-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-24",
          "summary": "Purchase agreements signed anywhere from December 2025 to mid March 2026",
          "source_url": "https://nebraskapublicmedia.org/en/news/news-articles/hallam-landowners-face-stark-choice-on-data-center/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-08-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-24",
          "summary": "Nebraska Public Power District's Princeton Road Station in Hallam set to begin operating in 2029",
          "source_url": "https://nebraskapublicmedia.org/en/news/news-articles/hallam-landowners-face-stark-choice-on-data-center/",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "eaton-corp-north-little-rock-manufacturing-site-ar",
      "name": "Eaton Corp. North Little Rock Manufacturing Site",
      "summary": "Eaton Corp. selected North Little Rock for a $242 million data center infrastructure manufacturing site expected to employ 1,200 workers.",
      "state": "AR",
      "city": "North Little Rock",
      "county": "Pulaski County",
      "status": "rumored",
      "developer": "Eaton Corp.",
      "capacity_mw": null,
      "latitude": 34.74444,
      "longitude": -92.28806,
      "location_precision": "county",
      "location_source": "County seat (Little Rock), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/eaton-corp-north-little-rock-manufacturing-site-ar",
      "source": "https://www.arkansasbusiness.com/article/eaton-north-little-rock-242-million-facility-1200-jobs/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Data Center Infrastructure Firm Picks North Little Rock for $242M Manufacturing Site - Arkansas Business",
          "url": "https://www.arkansasbusiness.com/article/eaton-north-little-rock-242-million-facility-1200-jobs/",
          "publisher": "Arkansas Business",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Eaton Corp. to build $242 million factory in North Little Rock, employ 1,200 - arkansasonline.com",
          "url": "https://www.arkansasonline.com/news/2026/sep/02/eaton-corp-to-build-242-million-factory-in-north/",
          "publisher": "arkansasonline.com",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Eaton Corp. to build $242 million factory in North Little Rock, employ 1,200 - arkansasonline.com",
          "url": "https://www.arkansasonline.com/news/2026/sep/02/eaton-corp-to-build-242-million-factory-in-north/",
          "publisher": "arkansasonline.com",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Eaton to locate $242 million facility in North Little Rock, adding 1,200 jobs",
          "url": "https://talkbusiness.net/2026/09/eaton-to-locate-242-million-facility-in-north-little-rock-adding-1200-jobs/",
          "publisher": "talkbusiness.net",
          "date": "2026-09-03",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "el-reno-bitcoin-mining-data-center-ok",
      "name": "El Reno Bitcoin Mining Data Center",
      "summary": "A massive water leak in El Reno, Oklahoma was traced to a Bitcoin mining data center facility.",
      "state": "OK",
      "city": "El Reno",
      "county": "Canadian County",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 35.53028,
      "longitude": -97.9575,
      "location_precision": "county",
      "location_source": "County seat (El Reno), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/el-reno-bitcoin-mining-data-center-ok",
      "source": "https://kfor.com/news/local/massive-el-reno-water-leak-traced-to-bitcoin-mining-data-center-facility/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Massive El Reno water leak traced to Bitcoin mining data center facility - KFOR",
          "url": "https://kfor.com/news/local/massive-el-reno-water-leak-traced-to-bitcoin-mining-data-center-facility/",
          "publisher": "KFOR",
          "date": "2026-08-28",
          "source_tier": 4
        },
        {
          "title": "Water leak at Oklahoma data center sparks concern - 5newsonline.com",
          "url": "https://www.5newsonline.com/video/news/water-leak-oklahoma-data-center-concern/527-54ed0781-7996-4df6-bd9b-1f76844a3cc1",
          "publisher": "5newsonline.com",
          "date": "2026-08-31",
          "source_tier": 4
        },
        {
          "title": "Wasted water: Officials say El Reno ‘failed’ to enforce stop-work order at leaky bitcoin site",
          "url": "https://nondoc.com/2026/09/02/wasted-water-officials-say-el-reno-failed-to-enforce-stop-work-order-at-leaky-bitcoin-site/",
          "publisher": "nondoc.com",
          "date": "2026-09-03",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-08-28",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-28",
          "summary": "Massive water leak in El Reno traced to Bitcoin mining data center facility",
          "source_url": "https://kfor.com/news/local/massive-el-reno-water-leak-traced-to-bitcoin-mining-data-center-facility/",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "evanston-ranchland-data-center-wy",
      "name": "Evanston Ranchland Data Center",
      "summary": "A 1.25 GW data center was approved on ranchland near Evanston, Wyoming.",
      "state": "WY",
      "city": "Evanston",
      "county": "Uinta County",
      "status": "rumored",
      "developer": null,
      "capacity_mw": 1250,
      "latitude": 41.26333,
      "longitude": -110.96472,
      "location_precision": "county",
      "location_source": "County seat (Evanston), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/evanston-ranchland-data-center-wy",
      "source": "https://www.kpcw.org/state-regional/2026-06-19/1-25gw-data-center-approved-on-ranchland-near-evanston-wyoming",
      "basis": "official_record",
      "sources": [
        {
          "title": "1.25GW data center approved on ranchland near Evanston, Wyoming - KPCW",
          "url": "https://www.kpcw.org/state-regional/2026-06-19/1-25gw-data-center-approved-on-ranchland-near-evanston-wyoming",
          "publisher": "KPCW",
          "date": "2026-06-19",
          "source_tier": 4
        },
        {
          "title": "Wyoming judge dismisses challenge to data center permit amid water, safety fears - The Cool Down",
          "url": "https://www.yahoo.com/news/us/articles/wyoming-judge-dismisses-challenge-data-181700833.html",
          "publisher": "The Cool Down",
          "date": "2026-08-31",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "fremont-county-data-center-wy",
      "name": "Fremont County Data Center",
      "summary": "A data center plan in Fremont County drew attention to the county's lax zoning laws.",
      "state": "WY",
      "city": null,
      "county": "Fremont",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 42.83306,
      "longitude": -108.7325,
      "location_precision": "county",
      "location_source": "County seat (Lander), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/fremont-county-data-center-wy",
      "source": "https://newslj.com/data-center-faces-backlash-fremont-county",
      "basis": "official_record",
      "sources": [
        {
          "title": "Data center faces backlash in Fremont County",
          "url": "https://newslj.com/data-center-faces-backlash-fremont-county",
          "publisher": "newslj.com",
          "date": "2026-09-10",
          "source_tier": 4
        },
        {
          "title": "Plan For Data Center Puts Spotlight On Lax Fremont County Zoning Laws - Cowboy State Daily",
          "url": "https://cowboystatedaily.com/2026/08/19/plan-for-small-data-center-in-fremont-county-shines-light-on-permissive-zoning/",
          "publisher": "Cowboy State Daily",
          "date": "2026-08-19",
          "source_tier": 4
        },
        {
          "title": "Data center faces backlash in Fremont County - WyomingNews.com",
          "url": "https://www.wyomingnews.com/data-center-faces-backlash-in-fremont-county/article_472f1945-68b9-488e-816c-3ab9853918b8.html",
          "publisher": "WyomingNews.com",
          "date": "2026-09-08",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-09-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-10",
          "summary": "A small data center taking shape in Lost Cabin",
          "source_url": "https://newslj.com/data-center-faces-backlash-fremont-county",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "google-barber-county-data-center-ks",
      "name": "Google Barber County Data Center",
      "summary": "Barber County commissioners approved an agreement with Google for a data center project on August 31, 2026.",
      "state": "KS",
      "city": null,
      "county": "Barber",
      "status": "approved",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 37.28444,
      "longitude": -98.58111,
      "location_precision": "county",
      "location_source": "County seat (Medicine Lodge), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-barber-county-data-center-ks",
      "source": "https://www.kake.com/home/barber-county-finalizes-deal-with-google-for-data-center-project/article_c160f315-8198-404c-83ca-a2993b6f8664.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "Barber County finalizes deal with Google for data center project - kake.com",
          "url": "https://www.kake.com/home/barber-county-finalizes-deal-with-google-for-data-center-project/article_c160f315-8198-404c-83ca-a2993b6f8664.html",
          "publisher": "kake.com",
          "date": "2026-08-31",
          "source_tier": 4
        },
        {
          "title": "Google’s massive data center approved in Barber County amidst public concern - KSN.com",
          "url": "https://www.ksn.com/news/state-regional/google-data-center-approved-in-barber-county/",
          "publisher": "KSN.com",
          "date": "2026-08-31",
          "source_tier": 4
        },
        {
          "title": "Commissioners approve Google data center in Barber County - kake.com",
          "url": "https://www.kake.com/home/commissioners-approve-google-data-center-in-barber-county/article_3226f1da-42df-4349-87bd-1d713615555c.html",
          "publisher": "kake.com",
          "date": "2026-08-31",
          "source_tier": 4
        },
        {
          "title": "Barber County Commission approves agreement for Google data center - KWCH",
          "url": "https://www.kwch.com/2026/08/31/barber-county-commission-approves-agreement-google-data-center/",
          "publisher": "KWCH",
          "date": "2026-08-31",
          "source_tier": 4
        },
        {
          "title": "Kansas residents pleading for more transparency amid Google data center project - KAKE",
          "url": "https://www.kake.com/news/kansas-residents-pleading-for-more-transparency-amid-google-data-center-project/article_01775316-19ae-453c-9b39-8de0e44e197a.html",
          "publisher": "KAKE",
          "date": "2026-09-14",
          "source_tier": 4
        },
        {
          "title": "Barber County commissioners will meet to finalize Google data center - KWCH",
          "url": "https://www.kwch.com/2026/08/31/barber-county-commissioners-will-meet-vote-google-data-center/",
          "publisher": "KWCH",
          "date": "2026-08-31",
          "source_tier": 4
        },
        {
          "title": "Commissioners approve Google data center in Barber County | Trusted News Source for Wichita & Kansas - kake.com",
          "url": "https://www.kake.com/home/commissioners-approve-google-data-center-in-barber-county/article_3226f1da-42df-4349-87bd-1d713615555c.html",
          "publisher": "kake.com",
          "date": "2026-08-31",
          "source_tier": 4
        },
        {
          "title": "Barber County finalizes deal with Google for data center project | Trusted News Source for Wichita & Kansas - kake.com",
          "url": "https://www.kake.com/home/barber-county-finalizes-deal-with-google-for-data-center-project/article_c160f315-8198-404c-83ca-a2993b6f8664.html",
          "publisher": "kake.com",
          "date": "2026-08-31",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "approved",
          "effective_at": "2026-08-15",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Barber County finalized an economic development agreement with Google for a proposed data center campus in Barber County, Kansas.",
          "source_url": "https://www.kake.com/home/barber-county-finalizes-deal-with-google-for-data-center-project/article_c160f315-8198-404c-83ca-a2993b6f8664.html",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "google-lincoln-data-center-ne",
      "name": "Google Lincoln Data Center",
      "summary": "Google shared an update on its data center project in Lincoln, Nebraska.",
      "state": "NE",
      "city": "Lincoln",
      "county": "Lancaster County",
      "status": "rumored",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 40.80917,
      "longitude": -96.67806,
      "location_precision": "county",
      "location_source": "County seat (Lincoln), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-lincoln-data-center-ne",
      "source": "https://www.1011now.com/2026/08/18/gov-pillen-appoints-17-members-nebraska-data-center-task-force/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Gov. Pillen appoints 17 members to Nebraska Data Center Task Force - KOLN | Nebraska Local News, Weather, Sports | Lincoln, NE",
          "url": "https://www.1011now.com/2026/08/18/gov-pillen-appoints-17-members-nebraska-data-center-task-force/",
          "publisher": "KOLN | Nebraska Local News, Weather, Sports | Lincoln, NE",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "Google shares update on Lincoln data center - KLKN-TV",
          "url": "https://www.klkntv.com/google-shares-update-on-lincoln-data-center/",
          "publisher": "KLKN-TV",
          "date": "2026-08-06",
          "source_tier": 4
        },
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Construction begins on $10 million wastewater line to transport cooling water from Lincoln data center to recovery site - 1011now.com",
          "url": "https://www.1011now.com/2026/06/04/construction-begins-10-million-wastewater-line-transport-cooling-water-lincoln-data-center-recovery-site/",
          "publisher": "1011now.com",
          "date": "2026-06-04",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-08-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-18",
          "summary": "The task force's first meeting was anticipated in September 2026",
          "source_url": "https://www.1011now.com/2026/08/18/gov-pillen-appoints-17-members-nebraska-data-center-task-force/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-06-04",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-06-04",
          "summary": "Construction begins on wastewater line for Lincoln data center cooling water",
          "source_url": "https://www.1011now.com/2026/06/04/construction-begins-10-million-wastewater-line-transport-cooling-water-lincoln-data-center-recovery-site/",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "google-muskogee-county-data-center-ok",
      "name": "Google Muskogee County data center",
      "summary": "Google lists a data center at Muskogee County, Oklahoma and says it is being built.",
      "state": "OK",
      "city": null,
      "county": "Muskogee County",
      "status": "not_verified",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 35.7466,
      "longitude": -95.368,
      "location_precision": "county",
      "location_source": "County seat (Muskogee), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-muskogee-county-data-center-ok",
      "source": "https://datacenters.google/locations/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Muskogee County data center at Muskogee County, Oklahoma on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "google-omaha-data-center-ne",
      "name": "Google Omaha data center",
      "summary": "Google lists a data center at Omaha, Nebraska among the sites it operates.",
      "state": "NE",
      "city": "Omaha",
      "county": "Douglas County",
      "status": "operational",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 41.2635468,
      "longitude": -96.0563975,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-omaha-data-center-ne",
      "source": "https://datacenters.google/locations/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Omaha data center at Omaha, Nebraska on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "google-stillwater-data-center-ok",
      "name": "Google Stillwater data center",
      "summary": "Google lists a data center at Stillwater, Oklahoma and says it is being built.",
      "state": "OK",
      "city": "Stillwater",
      "county": "Payne County",
      "status": "under_construction",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 36.1317,
      "longitude": -97.0742639,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/google-stillwater-data-center-ok",
      "source": "https://datacenters.google/locations/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "State, local leaders advised to do their homework on data centers",
          "url": "https://tulsaworld.com/news/state-regional/government-politics/article_8e4606ca-d0e0-447c-a1ac-b42d1fda34b3.html",
          "publisher": "Tulsa World",
          "date": "2026-10-02",
          "source_tier": 4
        },
        {
          "title": "Stillwater Chamber reports Project Rohan, Google data center win and expanded site outreach - citizenportal.ai",
          "url": "https://citizenportal.ai/articles/6085123/oklahoma/payne-county/stillwater/city-council-sua-and-seda-meetings/stillwater-chamber-reports-project-rohan-google-data-center-win-and-expanded-site-outreach",
          "publisher": "citizenportal.ai",
          "date": "2025-04-07",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Google lists Google Stillwater data center at Stillwater, Oklahoma on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.google/locations/",
          "source_tier": 2
        },
        {
          "status": "under_construction",
          "effective_at": "2025-08-13",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-10-02",
          "summary": "Google announced plans to build a new data center in Stillwater in August 2025.",
          "source_url": "https://tulsaworld.com/news/state-regional/government-politics/article_8e4606ca-d0e0-447c-a1ac-b42d1fda34b3.html",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2025-08-13",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-10-02",
          "summary": "Google announced plans to expand the Pryor facility in August 2025.",
          "source_url": "https://tulsaworld.com/news/state-regional/government-politics/article_8e4606ca-d0e0-447c-a1ac-b42d1fda34b3.html",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "grady-county-data-center-ok",
      "name": "Grady County Data Center",
      "summary": "Landowners in Grady County, Oklahoma raised concerns over a proposed data center.",
      "state": "OK",
      "city": null,
      "county": "Grady",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 35.03833,
      "longitude": -97.94611,
      "location_precision": "county",
      "location_source": "County seat (Chickasha), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/grady-county-data-center-ok",
      "source": "https://www.radiooklahomanews.com/post/grady-county-data-center-concerns-prompt-special-meeting",
      "basis": "official_record",
      "sources": [
        {
          "title": "Grady County Data Center Concerns Prompt Special Meeting",
          "url": "https://www.radiooklahomanews.com/post/grady-county-data-center-concerns-prompt-special-meeting",
          "publisher": "www.radiooklahomanews.com",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Grady County landowners raise concerns over proposed data center - news9.com",
          "url": "https://www.news9.com/grady-county-landowners-raise-concerns-over-proposed-data-center",
          "publisher": "news9.com",
          "date": "2026-08-07",
          "source_tier": 4
        },
        {
          "title": "Grady County officials say county cannot impose data center moratorium - Chickasha Express Star",
          "url": "https://www.chickashanews.com/news/grady-county-officials-say-county-cannot-impose-data-center-moratorium/article_3d3f7620-8212-422d-92e9-bdb3119dcabd.html",
          "publisher": "Chickasha Express Star",
          "date": "2026-09-09",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "grand-island-data-center-ne",
      "name": "Grand Island Data Center",
      "summary": "A data center in east Grand Island was nearing completion as of June 2026, with the city utilities director commenting on its impact.",
      "state": "NE",
      "city": "Grand Island",
      "county": "Hall County",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 40.92428,
      "longitude": -98.33869,
      "location_precision": "county",
      "location_source": "County seat (Grand Island), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/grand-island-data-center-ne",
      "source": "https://www.centralnebraskatoday.com/2026/06/26/data-center-nearing-completion-in-east-grand-island/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Data center nearing completion in east Grand Island - Central Nebraska Today",
          "url": "https://www.centralnebraskatoday.com/2026/06/26/data-center-nearing-completion-in-east-grand-island/",
          "publisher": "Central Nebraska Today",
          "date": "2026-06-26",
          "source_tier": 4
        },
        {
          "title": "City Utilities Director Ryan Schmitz comments about new G.I. data center - Central Nebraska Today",
          "url": "https://www.centralnebraskatoday.com/2026/06/26/city-utilities-director-ryan-schmitz-comments-about-new-g-i-data-center/",
          "publisher": "Central Nebraska Today",
          "date": "2026-06-26",
          "source_tier": 4
        },
        {
          "title": "City Utilities Director Ryan Schmitz comments about new G.I. data center - Central Nebraska Today",
          "url": "https://www.centralnebraskatoday.com/2026/06/26/city-utilities-director-ryan-schmitz-comments-about-new-g-i-data-center/",
          "publisher": "Central Nebraska Today",
          "date": "2026-06-26",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "grant-county-data-center-ar",
      "name": "Grant County Data Center",
      "summary": "A worldwide company is planning a data center in Grant County, Arkansas, with no developer name confirmed.",
      "state": "AR",
      "city": null,
      "county": "Grant",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 34.30704,
      "longitude": -92.40126,
      "location_precision": "county",
      "location_source": "County seat (Sheridan), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/grant-county-data-center-ar",
      "source": "https://www.quiverquant.com/news/Press+Release%3A+Gabe+Vasquez+Backs+Grant+County+Data+Center+Moratorium%2C+Introduces+Bills+on+Developer+Costs",
      "basis": "official_record",
      "sources": [
        {
          "title": "Press Release: Gabe Vasquez Backs Grant County Data Center Moratorium, Introduces Bills on Developer Costs",
          "url": "https://www.quiverquant.com/news/Press+Release%3A+Gabe+Vasquez+Backs+Grant+County+Data+Center+Moratorium%2C+Introduces+Bills+on+Developer+Costs",
          "publisher": "www.quiverquant.com",
          "date": "2026-09-16",
          "source_tier": 4
        },
        {
          "title": "Worldwide company has eye on data center plan for Grant County - Arkansas Times",
          "url": "https://arktimes.com/arkansas-blog/2026/07/21/worldwide-company-has-eye-on-data-center-plan-for-grant-county",
          "publisher": "Arkansas Times",
          "date": "2026-07-21",
          "source_tier": 4
        },
        {
          "title": "A new data center proposed in Grant County and more - KRWG Public Media",
          "url": "https://www.krwg.org/show/silver-city-report/2026-09-09/a-new-data-center-proposed-in-grant-county-and-more",
          "publisher": "KRWG Public Media",
          "date": "2026-09-09",
          "source_tier": 4
        },
        {
          "title": "Grant County residents raise alarm over secretive proposed data center - Searchlight New Mexico",
          "url": "https://searchlightnm.org/grant-county-residents-raise-alarm-over-secretive-proposed-data-center/",
          "publisher": "Searchlight New Mexico",
          "date": "2026-09-09",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "h5-albuquerque-nm",
      "name": "H5 Albuquerque",
      "summary": "H5 Data Centers lists a data center at Albuquerque, New Mexico among the sites it operates.",
      "state": "NM",
      "city": "Albuquerque",
      "county": "Bernalillo County",
      "status": "operational",
      "developer": "H5 Data Centers",
      "capacity_mw": null,
      "latitude": 35.1053263,
      "longitude": -106.6464417,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/h5-albuquerque-nm",
      "source": "https://h5datacenters.com/data-centers.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "H5 Data Centers: Data centers",
          "url": "https://h5datacenters.com/data-centers.html",
          "publisher": "H5 Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "H5 buys 505 Marquette in Albuquerque - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/h5-buys-505-marquette-in-albuquerque/",
          "publisher": "Data Center Dynamics",
          "date": "2022-06-24",
          "source_tier": 3
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "H5 Data Centers lists H5 Albuquerque at Albuquerque, New Mexico on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://h5datacenters.com/data-centers.html",
          "source_tier": 2
        },
        {
          "status": "operational",
          "effective_at": "2022-06-24",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2022-06-24",
          "summary": "H5 bought 505 Marquette in Albuquerque",
          "source_url": "https://www.datacenterdynamics.com/en/news/h5-buys-505-marquette-in-albuquerque/",
          "source_tier": 3
        }
      ]
    },
    {
      "slug": "h5-omaha-ne",
      "name": "H5 Omaha",
      "summary": "H5 Data Centers lists a data center at Omaha, Nebraska among the sites it operates.",
      "state": "NE",
      "city": "Omaha",
      "county": "Douglas County",
      "status": "operational",
      "developer": "H5 Data Centers",
      "capacity_mw": null,
      "latitude": 41.2635468,
      "longitude": -96.0563975,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/h5-omaha-ne",
      "source": "https://h5datacenters.com/data-centers.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "H5 Data Centers: Data centers",
          "url": "https://h5datacenters.com/data-centers.html",
          "publisher": "H5 Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "H5 Data Centers lists H5 Omaha at Omaha, Nebraska on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://h5datacenters.com/data-centers.html",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "kearney-data-center-ne",
      "name": "Kearney Data Center",
      "summary": "Kearney approved the first step to bring a data center to town and its Planning Commission discussed code amendments related to data centers.",
      "state": "NE",
      "city": "Kearney",
      "county": "Buffalo County",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 40.7,
      "longitude": -99.08333,
      "location_precision": "county",
      "location_source": "County seat (Kearney), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/kearney-data-center-ne",
      "source": "https://metro.newschannelnebraska.com/story/363530628/kearney-city-council-unanimously-approves-project-horizon-data-center",
      "basis": "official_record",
      "sources": [
        {
          "title": "Kearney City Council unanimously approves Project Horizon data center - Metro News Channel Nebraska",
          "url": "https://metro.newschannelnebraska.com/story/363530628/kearney-city-council-unanimously-approves-project-horizon-data-center",
          "publisher": "Metro News Channel Nebraska",
          "date": "2026-09-09",
          "source_tier": 4
        },
        {
          "title": "Data center conditional use permit to be discussed at Kearney Planning Commission meeting - Central Nebraska Today",
          "url": "https://www.centralnebraskatoday.com/2026/08/18/data-center-conditional-use-permit-to-be-discussed-at-kearney-planning-commission-meeting/",
          "publisher": "Central Nebraska Today",
          "date": "2026-08-18",
          "source_tier": 4
        },
        {
          "title": "Kearney City Council approves Project Horizon data center - KHGI",
          "url": "https://nebraska.tv/news/local/kearney-city-council-approves-project-horizon-data-center",
          "publisher": "KHGI",
          "date": "2026-09-09",
          "source_tier": 4
        },
        {
          "title": "Kearney OKs first step to bring data center to town - KHGI",
          "url": "https://nebraska.tv/news/local/kearney-oks-first-step-to-bring-data-center-to-town",
          "publisher": "KHGI",
          "date": "2026-08-21",
          "source_tier": 4
        },
        {
          "title": "Kearney Planning Commission to discuss data center code amendments at upcoming meeting - Central Nebraska Today",
          "url": "https://www.centralnebraskatoday.com/2026/08/17/kearney-planning-commission-to-discuss-data-center-code-amendments-at-upcoming-meeting/",
          "publisher": "Central Nebraska Today",
          "date": "2026-08-17",
          "source_tier": 4
        },
        {
          "title": "Data center conditional use permit to be discussed by Kearney city council tonight - Central Nebraska Today",
          "url": "https://kgfw.com/2026/09/08/data-center-conditional-use-permit-to-be-discussed-by-kearney-city-council-tonight/",
          "publisher": "Central Nebraska Today",
          "date": "2026-09-08",
          "source_tier": 4
        },
        {
          "title": "Council OKs data center in Kearney",
          "url": "https://omaha.com/news/state-regional/nebraska/article_ca699e31-c46d-5f64-be36-cd2ad7a9036c.html",
          "publisher": "Omaha World-Herald",
          "date": "2026-09-11",
          "source_tier": 4
        },
        {
          "title": "368 megawatt AI data center approved in Kearney - Omaha World Herald",
          "url": "https://omaha.com/news/state-regional/nebraska/article_4eecddf4-97e4-5e78-8e2d-9bb37f8bd33d.html",
          "publisher": "Omaha World-Herald",
          "date": "2026-09-09",
          "source_tier": 4
        },
        {
          "title": "Kearney OKs first step to bring data center to town - KHGI",
          "url": "https://nebraska.tv/news/local/kearney-oks-first-step-to-bring-data-center-to-town",
          "publisher": "KHGI",
          "date": "2026-08-21",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-09-09",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-09",
          "summary": "Project will replace existing cryptocurrency mining operation at Tech One Crossing",
          "source_url": "https://metro.newschannelnebraska.com/story/363530628/kearney-city-council-unanimously-approves-project-horizon-data-center",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-09",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-09",
          "summary": "Construction could start November or December 2026 with phase one operational in spring 2028",
          "source_url": "https://nebraska.tv/news/local/kearney-city-council-approves-project-horizon-data-center",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-08",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-08",
          "summary": "Proposed facility will have 368 megawatts electrical demand with 100 megawatts existing capacity being repurposed",
          "source_url": "https://kgfw.com/2026/09/08/data-center-conditional-use-permit-to-be-discussed-by-kearney-city-council-tonight/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-08-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-18",
          "summary": "Existing 100 megawatts of capacity from cryptocurrency operation will be repurposed for first phase",
          "source_url": "https://www.centralnebraskatoday.com/2026/08/18/data-center-conditional-use-permit-to-be-discussed-at-kearney-planning-commission-meeting/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-08-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-18",
          "summary": "Sound Study indicates facility will meet maximum sound level of 55 dBA at property lines",
          "source_url": "https://www.centralnebraskatoday.com/2026/08/18/data-center-conditional-use-permit-to-be-discussed-at-kearney-planning-commission-meeting/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-08-18",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-18",
          "summary": "Existing cryptocurrency mining facility will be decommissioned following completion of phase one",
          "source_url": "https://www.centralnebraskatoday.com/2026/08/18/data-center-conditional-use-permit-to-be-discussed-at-kearney-planning-commission-meeting/",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "krambu-bonner-data-center-mt",
      "name": "Krambu Bonner Data Center",
      "summary": "Krambu proposed a 29 MW data center in Bonner, Montana, but withdrew its application following public opposition, and the property owner also backed out.",
      "state": "MT",
      "city": "Bonner",
      "county": "Missoula",
      "status": "cancelled",
      "developer": "Krambu",
      "capacity_mw": 29,
      "latitude": 46.8625,
      "longitude": -114.01167,
      "location_precision": "county",
      "location_source": "County seat (Missoula), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/krambu-bonner-data-center-mt",
      "source": "https://www.datacenterdynamics.com/en/news/plans-for-29mw-data-center-in-bonner-montana-dropped/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Plans for 29MW data center in Bonner, Montana, dropped - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/plans-for-29mw-data-center-in-bonner-montana-dropped/",
          "publisher": "Data Center Dynamics",
          "date": "2026-07-08",
          "source_tier": 3
        },
        {
          "title": "Bonner data center plans halted following public outcry - Montana Public Radio",
          "url": "https://www.mtpr.org/montana-news/2026-07-08/bonner-data-center-plans-halted-following-public-outcry",
          "publisher": "Montana Public Radio",
          "date": "2026-07-08",
          "source_tier": 4
        },
        {
          "title": "Missoula meeting draws opposition to proposed Bonner data center - montanarightnow.com",
          "url": "https://www.montanarightnow.com/missoula/missoula-meeting-draws-opposition-to-proposed-bonner-data-center/article_203cf456-ccf6-4ae5-bd7c-dfa0d73892d4.html",
          "publisher": "montanarightnow.com",
          "date": "2026-07-07",
          "source_tier": 4
        },
        {
          "title": "Krambu withdraws application for proposed Bonner data center - Missoula Current",
          "url": "https://missoulacurrent.com/bonnder-data-center/",
          "publisher": "Missoula Current",
          "date": "2026-07-06",
          "source_tier": 4
        },
        {
          "title": "Proposed Bonner AI data center now dead in the water after property owner removes signature on application - KPAX News",
          "url": "https://www.kpax.com/news/proposed-bonner-ai-data-center-now-dead-in-the-water-after-property-owner-removes-signature-on-application",
          "publisher": "KPAX News",
          "date": "2026-07-06",
          "source_tier": 1
        },
        {
          "title": "Construction of Bonner data center halted at mill location - NBC Montana",
          "url": "https://nbcmontana.com/news/local/construction-of-bonner-data-center-paused-at-mill-location",
          "publisher": "NBC Montana",
          "date": "2026-07-06",
          "source_tier": 1
        },
        {
          "title": "Developer Backs Out of Bonner Data Center - newstalkkgvo.com",
          "url": "https://newstalkkgvo.com/missoula-data-center-project-withdrawn/",
          "publisher": "newstalkkgvo.com",
          "date": "2026-07-07",
          "source_tier": 4
        },
        {
          "title": "Property owner of proposed Bonner data center backs out - Montana Free Press",
          "url": "https://montanafreepress.org/2026/07/06/property-owner-of-proposed-bonner-data-center-backs-out/",
          "publisher": "Montana Free Press",
          "date": "2026-07-06",
          "source_tier": 4
        },
        {
          "title": "Water, energy, land use: Missoula data center proposal prompts questions - Montana Free Press",
          "url": "https://montanafreepress.org/2026/05/21/missoula-panel-highlights-data-center-concerns/",
          "publisher": "Montana Free Press",
          "date": "2026-05-21",
          "source_tier": 4
        },
        {
          "title": "Missoula Co. unanimously passes 1 year moratorium on data centers - NBC Montana",
          "url": "https://nbcmontana.com/news/local/missoula-co-hosts-hearing-on-potential-1-year-halt-on-data-centers",
          "publisher": "NBC Montana",
          "date": "2026-07-09",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "cancelled",
          "effective_at": "2026-07-09",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-09",
          "summary": "Krambu Bonner data center proposal halted after public concerns; general manager withdrew signature",
          "source_url": "https://nbcmontana.com/news/local/missoula-co-hosts-hearing-on-potential-1-year-halt-on-data-centers",
          "source_tier": 4
        },
        {
          "status": "cancelled",
          "effective_at": "2026-07-06",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-06",
          "summary": "Krambu withdrew application for Bonner data center",
          "source_url": "https://missoulacurrent.com/bonnder-data-center/",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "laramie-county-data-center-bit-o-wyo-rezoning-wy",
      "name": "Laramie County Data Center (Bit-O-Wyo rezoning)",
      "summary": "Laramie County commissioners approved rezoning for a data center project alongside Bit-O-Wyo event operations.",
      "state": "WY",
      "city": null,
      "county": "Laramie",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 41.14556,
      "longitude": -104.80194,
      "location_precision": "county",
      "location_source": "County seat (Cheyenne), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/laramie-county-data-center-bit-o-wyo-rezoning-wy",
      "source": "https://www.wyomingnews.com/newsletters/intro/laramie-county-commissioners-give-go-ahead-for-data-center-rezoning-bit-o-wyo-event-operations/article_5d97fa3d-35e7-4f29-8b7a-f00fe361be79.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "Laramie County commissioners give go-ahead for data center rezoning, Bit-O-Wyo event operations - WyomingNews.com",
          "url": "https://www.wyomingnews.com/newsletters/intro/laramie-county-commissioners-give-go-ahead-for-data-center-rezoning-bit-o-wyo-event-operations/article_5d97fa3d-35e7-4f29-8b7a-f00fe361be79.html",
          "publisher": "WyomingNews.com",
          "date": "2026-09-04",
          "source_tier": 4
        },
        {
          "title": "How Many Data Centers Are There Really In Laramie County? Cheyenne LEADS Releases A Statement",
          "url": "https://kgab.com/laramie-county-data-centers/",
          "publisher": "kgab.com",
          "date": "2026-06-04",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "leola-data-center-sd",
      "name": "Leola Data Center",
      "summary": "A data center project in Leola is undergoing permitting, with McPherson County postponing approval of a conditional use permit and state regulators and the county board set to decide its fate, while a potential settlement over powering the facility was reported.",
      "state": "SD",
      "city": "Leola",
      "county": "McPherson",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 45.72111,
      "longitude": -98.93861,
      "location_precision": "county",
      "location_source": "County seat (Leola), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/leola-data-center-sd",
      "source": "https://www.yahoo.com/news/politics/articles/state-regulators-county-board-decide-211918814.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "State regulators, county board to decide Leola Data Center’s fate - Yahoo",
          "url": "https://www.yahoo.com/news/politics/articles/state-regulators-county-board-decide-211918814.html",
          "publisher": "Yahoo",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Leola Data Center electricity to be served by MDU; next faces county permitting",
          "url": "https://www.sdpb.org/politics/2026-09-09/leola-data-center-electricity-to-be-served-by-mdu-next-faces-county-permitting",
          "publisher": "South Dakota Public Broadcasting",
          "date": "2026-09-09",
          "source_tier": 4
        },
        {
          "title": "McPherson County Postpones Approval Of Leola Data Center Conditional Use Permit - Aberdeen Insider",
          "url": "https://aberdeeninsider.com/mcpherson-county-postpones-approval-of-leola-data-center-conditional-use-permit/",
          "publisher": "Aberdeen Insider",
          "date": "2026-09-04",
          "source_tier": 4
        },
        {
          "title": "Potential Settlement Reached Over Powering McPherson County Data Center - Dakota News Network",
          "url": "https://www.dakotanewsnetwork.com/2026/09/03/potential-settlement-reached-over-powering-mcpherson-county-data-center/",
          "publisher": "Dakota News Network",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "State regulators, county board to decide Leola data center’s fate - KELOLAND.com",
          "url": "https://www.keloland.com/news/capitol-news-bureau/state-regulators-county-board-to-decide-leola-datas-fate/amp/",
          "publisher": "KELOLAND.com",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "McPherson County officials want legal assurances on data center pledges - The Dakota Scout",
          "url": "https://www.thedakotascout.com/p/mcpherson-county-officials-want-legal-assurances-on-data-center-pledges",
          "publisher": "The Dakota Scout",
          "date": "2026-09-07",
          "source_tier": 4
        },
        {
          "title": "Leola Data Center, Senate Candidates on Wounded Knee Medals | Sept. 9 - SDPB",
          "url": "https://www.sdpb.org/podcast/sdpb-news/2026-09-09/leola-data-center-senate-candidates-on-wounded-knee-medals-sept-9",
          "publisher": "SDPB",
          "date": "2026-09-09",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "Leola Data Center is a 50 megawatt facility proposed in a one story building 120 feet wide by 400 feet long at 116th Street and 358th Avenue, about four miles west of Leola",
          "source_url": "https://www.yahoo.com/news/politics/articles/state-regulators-county-board-decide-211918814.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "Construction could start this fall after conditional use permit received",
          "source_url": "https://www.yahoo.com/news/politics/articles/state-regulators-county-board-decide-211918814.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "Montana Dakota Utilities would provide electricity to Leola Data Center in second half of 2027",
          "source_url": "https://www.yahoo.com/news/politics/articles/state-regulators-county-board-decide-211918814.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-02",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-02",
          "summary": "In 2023, South Dakota PUC approved Montana Dakota Utilities request to establish new rate available to data center type facilities housing high density computer processing technology",
          "source_url": "https://www.yahoo.com/news/politics/articles/state-regulators-county-board-decide-211918814.html",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "meta-ai-optimized-data-center-tulsa-ok",
      "name": "Meta AI-Optimized Data Center Tulsa",
      "summary": "Meta broke ground on an AI optimized data center in Tulsa, Oklahoma in April 2026.",
      "state": "OK",
      "city": "Tulsa",
      "county": "Tulsa County",
      "status": "rumored",
      "developer": "Meta",
      "capacity_mw": null,
      "latitude": 36.13139,
      "longitude": -95.93722,
      "location_precision": "county",
      "location_source": "County seat (Tulsa), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/meta-ai-optimized-data-center-tulsa-ok",
      "source": "https://about.fb.com/news/2026/04/breaking-ground-new-ai-optimized-data-center-tulsa-oklahoma/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Breaking Ground on a New AI-Optimized Data Center in Tulsa, Oklahoma - Meta Store",
          "url": "https://about.fb.com/news/2026/04/breaking-ground-new-ai-optimized-data-center-tulsa-oklahoma/",
          "publisher": "Meta Store",
          "date": "2026-04-21",
          "source_tier": 4
        },
        {
          "title": "Meta: Our U.S. data center fleet",
          "url": "https://datacenters.atmeta.com/us-locations/",
          "publisher": "Meta",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Tulsa’s data center moratorium expires this year. Here’s what might be next. - Tulsa Flyer",
          "url": "https://tulsaflyer.org/2026/08/24/government/post/tulsa-pause-data-centers-expires-this-year/",
          "publisher": "Tulsa Flyer",
          "date": "2026-08-24",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "meta-data-center-cheyenne-wy",
      "name": "Meta Data Center Cheyenne",
      "summary": "Meta's 715,000 square foot data center in Cheyenne was linked to rare bacteria contamination in the city's water system, traced to a contractor flushing contaminated water, prompting Wyoming to tighten wastewater rules.",
      "state": "WY",
      "city": "Cheyenne",
      "county": "Laramie",
      "status": "operational",
      "developer": "Meta",
      "capacity_mw": null,
      "latitude": 41.14556,
      "longitude": -104.80194,
      "location_precision": "county",
      "location_source": "County seat (Cheyenne), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/meta-data-center-cheyenne-wy",
      "source": "https://www.bgr.com/2210448/wyoming-water-now-safe-after-meta-data-center-contamination/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Wyoming Water Recycling Finally Safe To Restart After Meta's Data Center Contamination - bgr.com",
          "url": "https://www.bgr.com/2210448/wyoming-water-now-safe-after-meta-data-center-contamination/",
          "publisher": "bgr.com",
          "date": "2026-07-08",
          "source_tier": 4
        },
        {
          "title": "Wyoming tightens wastewater rules after Meta datacenter contractor flushed contaminated water - The Guardian",
          "url": "https://www.theguardian.com/us-news/2026/jul/08/meta-datacenter-ai-wyoming-water",
          "publisher": "The Guardian",
          "date": "2026-07-08",
          "source_tier": 3
        },
        {
          "title": "A Wyoming city found a rare bacterium in wastewater tied to a Meta data center - Business Insider",
          "url": "https://www.businessinsider.com/meta-data-center-waste-water-bacterium-cheyenne-wyoming-2026-7",
          "publisher": "Business Insider",
          "date": "2026-07-07",
          "source_tier": 4
        },
        {
          "title": "Cheyenne BOPU traces rare bacteria discharge to Meta data center contractor - WyomingNews.com",
          "url": "https://www.wyomingnews.com/news/local_news/cheyenne-bopu-traces-rare-bacteria-discharge-to-meta-data-center-contractor/article_1c538467-06ec-427d-9a6f-33797cd3c6ce.html",
          "publisher": "WyomingNews.com",
          "date": "2026-07-02",
          "source_tier": 4
        },
        {
          "title": "Is rare bacterium in Wyoming city's water linked to Meta data center? What we know - Snopes",
          "url": "https://www.snopes.com/news/2026/07/17/bacteria-meta-data-center-cheyenne-wyoming/",
          "publisher": "Snopes",
          "date": "2026-07-17",
          "source_tier": 4
        },
        {
          "title": "As data centers flood Wyoming, water pollution fouls good faith - WyoFile",
          "url": "https://wyofile.com/as-data-centers-flood-wyoming-water-pollution-fouls-good-faith/",
          "publisher": "WyoFile",
          "date": "2026-07-15",
          "source_tier": 4
        },
        {
          "title": "Meta: Our U.S. data center fleet",
          "url": "https://datacenters.atmeta.com/us-locations/",
          "publisher": "Meta",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Wyoming officials: Meta's 715,000-square-foot data center responsible for water system contamination - Fortune",
          "url": "https://fortune.com/2026/07/10/wyoming-officials-meta-715000-square-foot-data-center-responsible-contaminating-water-system-rare-bacterium/",
          "publisher": "Fortune",
          "date": "2026-07-10",
          "source_tier": 4
        },
        {
          "title": "Meta AI Data Center Linked To Rare Bacteria In City’s Water System - Forbes",
          "url": "https://www.forbes.com/sites/victoriaforster/2026/07/09/meta-ai-data-center-linked-to-rare-bacteria-in-citys-water-system/",
          "publisher": "Forbes",
          "date": "2026-07-09",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-08-01",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Meta operates its hyperscale data center campus in Cheyenne, Laramie County, Wyoming.",
          "source_url": "https://datacenters.atmeta.com/us-locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "meta-los-lunas-data-center-nm",
      "name": "Meta Los Lunas Data Center",
      "summary": "Meta's Los Lunas data center, described as the largest operating data center in New Mexico, opened in 2019.",
      "state": "NM",
      "city": "Los Lunas",
      "county": "Valencia County",
      "status": "rumored",
      "developer": "Meta",
      "capacity_mw": null,
      "latitude": 34.80944,
      "longitude": -106.73528,
      "location_precision": "county",
      "location_source": "County seat (Los Lunas), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/meta-los-lunas-data-center-nm",
      "source": "https://www.abqjournal.com/news/journal-poll-data-center-opposition-runs-high-in-new-mexico/3112524",
      "basis": "official_record",
      "sources": [
        {
          "title": "NEWS Journal Poll: Data center opposition runs high in New Mexico",
          "url": "https://www.abqjournal.com/news/journal-poll-data-center-opposition-runs-high-in-new-mexico/3112524",
          "publisher": "Albuquerque Journal",
          "date": "2026-09-04",
          "source_tier": 4
        },
        {
          "title": "Meta: Our U.S. data center fleet",
          "url": "https://datacenters.atmeta.com/us-locations/",
          "publisher": "Meta",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "meta-plus-moss-bluff-la",
      "name": "Meta plus Moss Bluff",
      "summary": "A headline raises the question of whether a data center is coming to Moss Bluff, Louisiana, with limited confirmed details.",
      "state": "LA",
      "city": "Moss Bluff",
      "county": "Calcasieu Parish",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 30.21472,
      "longitude": -93.20861,
      "location_precision": "county",
      "location_source": "County seat (Lake Charles), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/meta-plus-moss-bluff-la",
      "source": "https://americanpress.com/2026/09/11/data-center-could-be-coming-to-moss-bluff/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Data center could be coming to Moss Bluff - American Press",
          "url": "https://americanpress.com/2026/09/11/data-center-could-be-coming-to-moss-bluff/",
          "publisher": "American Press",
          "date": "2026-09-11",
          "source_tier": 4
        },
        {
          "title": "Data center planned for north of Lake Charles, developer confirms. Here’s what we know. - The Advocate",
          "url": "https://www.theadvocate.com/lake_charles/moss-bluff-data-center-project-azimuth/article_d9fc7b69-c5ba-40a6-9cf9-facb2f6e3542.html",
          "publisher": "The Advocate",
          "date": "2026-09-10",
          "source_tier": 4
        },
        {
          "title": "Proposed data center north of Moss Bluff still in exploration stage, company says - KPLC 7 News",
          "url": "https://www.kplctv.com/2026/09/10/proposed-data-center-north-moss-bluff-still-exploration-stage-company-says/",
          "publisher": "KPLC 7 News",
          "date": "2026-09-10",
          "source_tier": 4
        },
        {
          "title": "Is a data center coming to Moss Bluff? Here’s what we know. - theadvocate.com",
          "url": "https://www.theadvocate.com/lake_charles/is-a-data-center-coming-to-moss-bluff-here-s-what-we-know/article_ad6f97c0-ed97-4609-99a5-eac05731915e.html",
          "publisher": "theadvocate.com",
          "date": "2026-08-12",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-09-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-11",
          "summary": "Azimuth Renewables considering building a data center on 1,100 acres near Coffey Road in Moss Bluff",
          "source_url": "https://americanpress.com/2026/09/11/data-center-could-be-coming-to-moss-bluff/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-11",
          "summary": "Company has option to purchase 1,100 acres",
          "source_url": "https://americanpress.com/2026/09/11/data-center-could-be-coming-to-moss-bluff/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-11",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-11",
          "summary": "Plans are still in early stages and nothing firm has been decided yet",
          "source_url": "https://americanpress.com/2026/09/11/data-center-could-be-coming-to-moss-bluff/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-10",
          "summary": "Azimuth Renewables signed option to purchase about 1,200 acres in Moss Bluff in April 2026",
          "source_url": "https://www.theadvocate.com/lake_charles/moss-bluff-data-center-project-azimuth/article_d9fc7b69-c5ba-40a6-9cf9-facb2f6e3542.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-10",
          "summary": "Azimuth Renewables has three years to purchase property with optional one year extension",
          "source_url": "https://www.theadvocate.com/lake_charles/moss-bluff-data-center-project-azimuth/article_d9fc7b69-c5ba-40a6-9cf9-facb2f6e3542.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-09-10",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-10",
          "summary": "Data center would occupy fraction of 1,168 acres in wooded rural portion of Moss Bluff",
          "source_url": "https://www.theadvocate.com/lake_charles/moss-bluff-data-center-project-azimuth/article_d9fc7b69-c5ba-40a6-9cf9-facb2f6e3542.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-08-12",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-12",
          "summary": "Discussions appear to be in early stages between landowner Kenny Nichols and a potential developer",
          "source_url": "https://www.theadvocate.com/lake_charles/is-a-data-center-coming-to-moss-bluff-here-s-what-we-know/article_ad6f97c0-ed97-4609-99a5-eac05731915e.html",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "meta-sarpy-data-center-ne",
      "name": "Meta Sarpy Data Center",
      "summary": "Meta lists a data center at Sarpy, Nebraska among the sites it operates.",
      "state": "NE",
      "city": "Papillion",
      "county": "Sarpy County",
      "status": "operational",
      "developer": "Meta",
      "capacity_mw": null,
      "latitude": 41.1150635,
      "longitude": -96.1091254,
      "location_precision": "county",
      "location_source": "U.S. Census Bureau internal point of Sarpy County (GEOID 31153), public domain, until a source places the site",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/meta-sarpy-data-center-ne",
      "source": "https://datacenters.atmeta.com/us-locations/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Meta: Our U.S. data center fleet",
          "url": "https://datacenters.atmeta.com/us-locations/",
          "publisher": "Meta",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Facebook Accelerates its Data Center Expansion - datacenterfrontier.com",
          "url": "https://www.datacenterfrontier.com/cloud/article/11430288/facebook-accelerates-its-data-center-expansion",
          "publisher": "datacenterfrontier.com",
          "date": "2018-03-19",
          "source_tier": 1
        },
        {
          "title": "Facebook to Build Data Center in Clean Energy-Friendly Nebraska - datacenterknowledge.com",
          "url": "https://www.datacenterknowledge.com/hyperscalers/facebook-to-build-data-center-in-clean-energy-friendly-nebraska",
          "publisher": "datacenterknowledge.com",
          "date": "2024-05-30",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Meta lists Meta Sarpy Data Center at Sarpy, Nebraska on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://datacenters.atmeta.com/us-locations/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "microsoft-cheyenne-data-center-annexation-wy",
      "name": "Microsoft Cheyenne Data Center Annexation",
      "summary": "Cheyenne City Council approved Microsoft's 3,460 acre annexation for data center development after hours of public debate, with a subsequent referendum petition filed to reverse the vote.",
      "state": "WY",
      "city": "Cheyenne",
      "county": "Laramie",
      "status": "operational",
      "developer": "Microsoft",
      "capacity_mw": null,
      "latitude": 41.14556,
      "longitude": -104.80194,
      "location_precision": "county",
      "location_source": "County seat (Cheyenne), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/microsoft-cheyenne-data-center-annexation-wy",
      "source": "https://local.microsoft.com/communities/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Microsoft: Microsoft datacenter communities",
          "url": "https://local.microsoft.com/communities/",
          "publisher": "Microsoft",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Microsoft applies for permit for final Bison Data Center building in Cheyenne - Your Wyoming Link",
          "url": "https://www.yourwyominglink.com/news/local/microsoft-applies-for-permit-for-final-bison-data-center-building-in-cheyenne/article_67f1c4eb-4194-4f15-a537-bfbb3db73ab0.html",
          "publisher": "Your Wyoming Link",
          "date": "2026-08-10",
          "source_tier": 1
        },
        {
          "title": "Cheyenne City Council approves Microsoft's 3,460-acre annexation after hours of public debate - WyomingNews.com",
          "url": "https://www.wyomingnews.com/laramieboomerang/news/cheyenne-city-council-approves-microsofts-3-460-acre-annexation-after-hours-of-public-debate/article_fc2daf50-4bfc-4aaf-93d4-39a0754b40d7.html",
          "publisher": "WyomingNews.com",
          "date": "2026-07-16",
          "source_tier": 4
        },
        {
          "title": "Cheyenne is 3,500 acres larger after approving controversial Microsoft annexation - Oil City News",
          "url": "https://capcity.news/latest-news/2026/07/14/cheyenne-passes-microsoft-data-center-land-annexation-after-more-than-5-hours-of-discussion/",
          "publisher": "Oil City News",
          "date": "2026-07-14",
          "source_tier": 4
        },
        {
          "title": "Why Microsoft Can Skip State Review For 3,500 More Data Center Acres In Cheyenne - Cowboy State Daily",
          "url": "https://cowboystatedaily.com/2026/07/14/why-microsoft-can-skip-state-review-for-3-500-more-data-center-acres-in-cheyenne/",
          "publisher": "Cowboy State Daily",
          "date": "2026-07-14",
          "source_tier": 4
        },
        {
          "title": "Referendum petition aims to reverse City Council's 3,460-acre data center annexation vote - WyomingNews.com",
          "url": "https://www.wyomingnews.com/news/local_news/referendum-petition-aims-to-reverse-city-councils-3-460-acre-data-center-annexation-vote/article_f6fd09f6-f67f-4dcc-a021-e0c5274eace1.html",
          "publisher": "WyomingNews.com",
          "date": "2026-07-21",
          "source_tier": 4
        },
        {
          "title": "Microsoft presents data center expansion plans to the public - WyomingNews.com",
          "url": "https://www.wyomingnews.com/news/local_news/microsoft-presents-data-center-expansion-plans-to-the-public/article_3707713e-3e24-41d0-9ba4-897adf85728b.html",
          "publisher": "WyomingNews.com",
          "date": "2026-06-01",
          "source_tier": 4
        },
        {
          "title": "Lummis family could cash in on Microsoft data center expansion through Cheyenne land sales - WyoFile",
          "url": "https://wyofile.com/lummis-family-could-cash-in-on-microsoft-data-center-expansion-through-cheyenne-land-sales/",
          "publisher": "WyoFile",
          "date": "2026-05-29",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-07-15",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Microsoft operates its Bison and Cheyenne hyperscale data center campuses in Cheyenne, Laramie County, Wyoming, and filed permit applications for additional campus buildings.",
          "source_url": "https://www.yourwyominglink.com/news/local/microsoft-applies-for-permit-for-final-bison-data-center-building-in-cheyenne/article_67f1c4eb-4194-4f15-a537-bfbb3db73ab0.html",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "miller-county-data-center-ar",
      "name": "Miller County Data Center",
      "summary": "Records revealed a planned data center site in Miller County north of Texarkana, Arkansas.",
      "state": "AR",
      "city": null,
      "county": "Miller",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 33.43306,
      "longitude": -94.02056,
      "location_precision": "county",
      "location_source": "County seat (Texarkana), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/miller-county-data-center-ar",
      "source": "https://www.arkansasonline.com/news/2026/aug/16/records-reveal-planned-data-center-site-in-miller/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Records reveal planned data center site in Miller County north of Texarkana - arkansasonline.com",
          "url": "https://www.arkansasonline.com/news/2026/aug/16/records-reveal-planned-data-center-site-in-miller/",
          "publisher": "arkansasonline.com",
          "date": "2026-08-16",
          "source_tier": 4
        },
        {
          "title": "Records reveal planned data center site in Miller County north of Texarkana - The Arkansas Democrat-Gazette",
          "url": "https://www.arkansasonline.com/news/2026/aug/16/records-reveal-planned-data-center-site-in-miller/",
          "publisher": "The Arkansas Democrat-Gazette",
          "date": "2026-08-16",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "okmulgee-data-center-ok",
      "name": "Okmulgee Data Center",
      "summary": "Opposition to a data center in Okmulgee, Oklahoma is gaining momentum.",
      "state": "OK",
      "city": "Okmulgee",
      "county": "Okmulgee County",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 35.62347,
      "longitude": -95.96033,
      "location_precision": "county",
      "location_source": "County seat (Okmulgee), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/okmulgee-data-center-ok",
      "source": "https://www.facebook.com/GuerrillaPublishingOK/videos/okmulgee-data-center-drone-2mov/1519919463483465/",
      "basis": "official_record",
      "sources": [
        {
          "title": "The video provides a visual progress update on the construction of the Okmulgee Data Center in Oklahoma. It showcases the initial stages of site preparation, including extensive earthmoving and land grading across a large plot. The footage highlights the sca",
          "url": "https://www.facebook.com/GuerrillaPublishingOK/videos/okmulgee-data-center-drone-2mov/1519919463483465/",
          "publisher": "www.facebook.com",
          "date": "2026-07-21",
          "source_tier": 4
        },
        {
          "title": "Opposition to Okmulgee data center gains momentum - MVSKOKE Media",
          "url": "https://www.mvskokemedia.com/opposition-to-okmulgee-data-center-gains-momentum/",
          "publisher": "MVSKOKE Media",
          "date": "2026-08-17",
          "source_tier": 4
        },
        {
          "title": "New info released on possible Okmulgee data center project - 2 News Oklahoma KJRH Tulsa",
          "url": "https://www.kjrh.com/news/local-news/new-info-released-on-possible-okmulgee-data-center-project",
          "publisher": "2 News Oklahoma KJRH Tulsa",
          "date": "2026-07-07",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-08-17",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-17",
          "summary": "Opposition to Okmulgee data center gaining momentum",
          "source_url": "https://www.mvskokemedia.com/opposition-to-okmulgee-data-center-gains-momentum/",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-07-07",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-07-07",
          "summary": "New information released on a possible Okmulgee data center project as of July 7, 2026",
          "source_url": "https://www.kjrh.com/news/local-news/new-info-released-on-possible-okmulgee-data-center-project",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "one-nuclear-project-cayman-data-center-campus-vermilion-la",
      "name": "One Nuclear / Project Cayman Data Center Campus",
      "summary": "ONE Nuclear Energy executed a binding letter of intent to develop a 2.88 GW gas fired plant and large battery energy storage system to power a co located data center campus in Louisiana near SpaceX's Starbase project.",
      "state": "LA",
      "city": null,
      "county": "Vermilion Parish",
      "status": "rumored",
      "developer": "ONE Nuclear Energy",
      "capacity_mw": 2880,
      "latitude": 29.9725,
      "longitude": -92.12917,
      "location_precision": "county",
      "location_source": "County seat (Abbeville), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/one-nuclear-project-cayman-data-center-campus-vermilion-la",
      "source": "https://www.businesswire.com/news/home/20260831090268/en/ONE-Nuclear-Executes-Binding-LOI-for-Project-Cayman-a-2.88-GW-Louisiana-Energy-Project-with-Co-Located-Data-Center-Campus",
      "basis": "official_record",
      "sources": [
        {
          "title": "ONE Nuclear Executes Binding LOI for Project Cayman, a 2.88 GW Louisiana Energy Project with Co-Located Data Center Campus - Business Wire",
          "url": "https://www.businesswire.com/news/home/20260831090268/en/ONE-Nuclear-Executes-Binding-LOI-for-Project-Cayman-a-2.88-GW-Louisiana-Energy-Project-with-Co-Located-Data-Center-Campus",
          "publisher": "Business Wire",
          "date": "2026-08-31",
          "source_tier": 4
        },
        {
          "title": "ONE Nuclear Energy secures Louisiana site for power, data center project - Daily Energy Insider",
          "url": "https://dailyenergyinsider.com/news/53636-one-nuclear-energy-secures-louisiana-site-for-power-data-center-project/",
          "publisher": "Daily Energy Insider",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "One Nuclear inks binding LOI to develop 2.88GW gas plant and BESS to power data center in Louisiana - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/one-nuclear-inks-binding-loi-to-develop-288gw-gas-plant-and-bess-to-power-data-center-in-louisiana/",
          "publisher": "Data Center Dynamics",
          "date": "2026-09-01",
          "source_tier": 3
        },
        {
          "title": "One Nuclear inks binding LOI to develop 2.88GW gas plant and BESS to power data center in Louisiana",
          "url": "https://www.datacenterdynamics.com/en/news/one-nuclear-inks-binding-loi-to-develop-288gw-gas-plant-and-bess-to-power-data-center-in-louisiana/",
          "publisher": "Data Center Dynamics",
          "date": "2026-09-01",
          "source_tier": 3
        },
        {
          "title": "One Nuclear Signs Deal for 2.88-GW Gas-Fired Plant, Large BESS for Louisiana Data Center Campus - POWER Magazine",
          "url": "https://www.powermag.com/one-nuclear-signs-deal-for-2-88-gw-gas-fired-plant-large-bess-for-louisiana-data-center-campus/",
          "publisher": "POWER Magazine",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "One Nuclear plans gas-fired data center near Musk’s Starbase - thecentersquare.com",
          "url": "https://www.thecentersquare.com/louisiana/article_92d0738f-d1da-40d8-820e-26f824e4f8c1.html",
          "publisher": "thecentersquare.com",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "West Palm Beach energy developer plans data center campus near Louisiana SpaceX project - The Business Journals",
          "url": "https://www.bizjournals.com/southflorida/news/2026/08/31/energy-developer-plans-data-center-campus-spacex.html",
          "publisher": "The Business Journals",
          "date": "2026-08-31",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "pittsburg-county-data-center-ok",
      "name": "Pittsburg County Data Center",
      "summary": "Pittsburg County committee endorsed a deal for a 2,000 acre, $50 billion data center site in May 2026.",
      "state": "OK",
      "city": null,
      "county": "Pittsburg",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 34.93306,
      "longitude": -95.76639,
      "location_precision": "county",
      "location_source": "County seat (McAlester), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/pittsburg-county-data-center-ok",
      "source": "https://nondoc.com/2026/05/14/pittsburg-county-committee-endorses-deal-tied-to-2000-acre-50-billion-data-center-site/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Pittsburg County committee endorses deal tied to 2,000-acre, $50 billion data center site - nondoc.com",
          "url": "https://nondoc.com/2026/05/14/pittsburg-county-committee-endorses-deal-tied-to-2000-acre-50-billion-data-center-site/",
          "publisher": "nondoc.com",
          "date": "2026-05-14",
          "source_tier": 4
        },
        {
          "title": "Commissioners put brakes on incentives for hyperscale data center - KJRH",
          "url": "https://www.kjrh.com/news/local-news/commissioners-put-brakes-on-incentives-for-hyperscale-data-center",
          "publisher": "KJRH",
          "date": "2026-09-12",
          "source_tier": 4
        },
        {
          "title": "Pittsburg County commissioners have delayed a decision on a proposed tax increment district tied to the Emerald Data Center project after hearing concerns from residents.",
          "url": "https://www.facebook.com/fox23news/posts/pittsburg-county-commissioners-have-delayed-a-decision-on-a-proposed-tax-increme/1561407085349332/",
          "publisher": "www.facebook.com",
          "date": "2026-06-22",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "project-clydesdale-google-tulsa-county-ok",
      "name": "Project Clydesdale (Google Tulsa County)",
      "summary": "Google revealed it is the developer behind Project Clydesdale, a 506 acre data center campus being built in Tulsa County, Oklahoma, with plans to fund removal of 2,000 acres of trees for water conservation and partnering with Beale Infrastructure.",
      "state": "OK",
      "city": null,
      "county": "Tulsa",
      "status": "under_construction",
      "developer": "Google",
      "capacity_mw": null,
      "latitude": 36.13139,
      "longitude": -95.93722,
      "location_precision": "county",
      "location_source": "County seat (Tulsa), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/project-clydesdale-google-tulsa-county-ok",
      "source": "https://ktul.com/news/local/google-confirmed-as-end-user-of-tulsa-countys-project-clydesdale-data-center-campus",
      "basis": "official_record",
      "sources": [
        {
          "title": "Google confirmed as end user of Tulsa County s Project Clydesdale data center campus - KTUL",
          "url": "https://ktul.com/news/local/google-confirmed-as-end-user-of-tulsa-countys-project-clydesdale-data-center-campus",
          "publisher": "KTUL",
          "date": "2026-08-19",
          "source_tier": 4
        },
        {
          "title": "Google reveals it is behind 506-acre Project Clydesdale data center in Oklahoma - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/google-reveals-it-is-behind-506-acre-project-clydesdale-data-center-in-oklahoma/",
          "publisher": "Data Center Dynamics",
          "date": "2026-08-19",
          "source_tier": 3
        },
        {
          "title": "Google building 506-acre data center campus in Tulsa County - News On 6",
          "url": "https://www.newson6.com/data-centers-in-oklahoma/google-data-center-campus-tulsa-county-oklahoma",
          "publisher": "News On 6",
          "date": "2026-08-19",
          "source_tier": 4
        },
        {
          "title": "Google and Beale Infrastructure to build new data center campus in Oklahoma - Institutional Real Estate, Inc.",
          "url": "https://irei.com/news/google-and-beale-infrastructure-to-build-new-data-center-campus-in-oklahoma/",
          "publisher": "Institutional Real Estate, Inc.",
          "date": "2026-09-01",
          "source_tier": 4
        },
        {
          "title": "Google will fund removal of 2000 acres of trees in Oklahoma to save water while building new data center - Planetizen",
          "url": "https://www.planetizen.com/news/2026/09/138339-google-will-fund-removal-2000-acres-trees-oklahoma-save-water-while-building",
          "publisher": "Planetizen",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Google: Data center locations",
          "url": "https://datacenters.google/locations/",
          "publisher": "Google",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Google, Beale Infrastructure share details around new data center campus in Tulsa County - KTUL",
          "url": "https://ktul.com/news/local/google-beale-infrastructure-share-details-around-new-data-center-campus-in-tulsa-county-08-19-2026",
          "publisher": "KTUL",
          "date": "2026-08-19",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "under_construction",
          "effective_at": "2026-08-19",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-19",
          "summary": "Google is the end user of Project Clydesdale, a 506 acre data center campus in unincorporated Tulsa County.",
          "source_url": "https://ktul.com/news/local/google-confirmed-as-end-user-of-tulsa-countys-project-clydesdale-data-center-campus",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-19",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-19",
          "summary": "Beale Infrastructure officially broke ground on Project Clydesdale in October 2025.",
          "source_url": "https://ktul.com/news/local/google-confirmed-as-end-user-of-tulsa-countys-project-clydesdale-data-center-campus",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-19",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-19",
          "summary": "The project will include approximately 1.5 miles of new water lines and infrastructure upgrades.",
          "source_url": "https://ktul.com/news/local/google-confirmed-as-end-user-of-tulsa-countys-project-clydesdale-data-center-campus",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-19",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-19",
          "summary": "Located just west of Owasso",
          "source_url": "https://ktul.com/news/local/google-beale-infrastructure-share-details-around-new-data-center-campus-in-tulsa-county-08-19-2026",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-19",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-19",
          "summary": "Support for training more than 160 apprentices in electrical trades by 2030",
          "source_url": "https://ktul.com/news/local/google-beale-infrastructure-share-details-around-new-data-center-campus-in-tulsa-county-08-19-2026",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-19",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-19",
          "summary": "1.5 miles of new water lines and infrastructure upgrades for Washington County Rural Water District #3",
          "source_url": "https://ktul.com/news/local/google-beale-infrastructure-share-details-around-new-data-center-campus-in-tulsa-county-08-19-2026",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-19",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-19",
          "summary": "Construction of a new on site substation funded by Beale",
          "source_url": "https://ktul.com/news/local/google-beale-infrastructure-share-details-around-new-data-center-campus-in-tulsa-county-08-19-2026",
          "source_tier": 4
        },
        {
          "status": "under_construction",
          "effective_at": "2026-08-19",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-08-19",
          "summary": "506 acre campus in unincorporated Tulsa County near Cherokee Industrial Park",
          "source_url": "https://ktul.com/news/local/google-beale-infrastructure-share-details-around-new-data-center-campus-in-tulsa-county-08-19-2026",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "proposed-data-center-near-mandan-nd",
      "name": "Proposed data center near Mandan",
      "summary": "An unidentified developer has proposed a data center near Mandan, drawing public concern over proximity to schools.",
      "state": "ND",
      "city": "Mandan",
      "county": "Morton",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 46.82889,
      "longitude": -100.89111,
      "location_precision": "county",
      "location_source": "County seat (Mandan), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/proposed-data-center-near-mandan-nd",
      "source": "https://www.kfyrtv.com/2026/08/21/proposed-data-center-near-mandan-draws-concern-over-school-proximity/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Proposed data center near Mandan draws concern over school proximity - KFYR TV",
          "url": "https://www.kfyrtv.com/2026/08/21/proposed-data-center-near-mandan-draws-concern-over-school-proximity/",
          "publisher": "KFYR TV",
          "date": "2026-08-21",
          "source_tier": 4
        },
        {
          "title": "An inside look at the Harwood data center as it nears completion - InForum",
          "url": "https://www.inforum.com/news/fargo/an-inside-look-at-the-harwood-data-center-as-it-nears-completion",
          "publisher": "InForum",
          "date": "2026-09-12",
          "source_tier": 4
        },
        {
          "title": "Data center developer secures options to buy land from three Morton County landowners - KX News",
          "url": "https://www.kxnet.com/news/local-news/data-center-developer-secures-options-to-buy-land-from-three-morton-county-landowners/",
          "publisher": "KX News",
          "date": "2026-07-24",
          "source_tier": 1
        },
        {
          "title": "Stark Power hosts first public event on proposed Mandan data center project - KFYR-TV",
          "url": "https://www.kfyrtv.com/2026/08/21/stark-power-hosts-first-public-event-proposed-mandan-data-center-project/",
          "publisher": "KFYR-TV",
          "date": "2026-08-20",
          "source_tier": 4
        },
        {
          "title": "Residents voice concerns over Mandan data center during town hall - North Dakota Monitor",
          "url": "https://www.newsfromthestates.com/article/residents-voice-concerns-over-mandan-data-center-during-town-hall",
          "publisher": "North Dakota Monitor",
          "date": "2026-08-21",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "sabey-butte-data-center-mt",
      "name": "Sabey Butte Data Center",
      "summary": "Sabey backed out of its proposal to build a data center in Butte, Montana.",
      "state": "MT",
      "city": "Butte",
      "county": "Silver Bow",
      "status": "cancelled",
      "developer": "Sabey",
      "capacity_mw": null,
      "latitude": 46.00639,
      "longitude": -112.52972,
      "location_precision": "county",
      "location_source": "County seat (Butte), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/sabey-butte-data-center-mt",
      "source": "https://cleanview.co/data-centers/montana/2082/sabey-butte-data-center",
      "basis": "official_record",
      "sources": [
        {
          "title": "Sabey Butte Data Center , Silver Bow, Montana",
          "url": "https://cleanview.co/data-centers/montana/2082/sabey-butte-data-center",
          "publisher": "cleanview.co",
          "date": "2026-05-15",
          "source_tier": 4
        },
        {
          "title": "Sabey Data Centers officially backs out of Butte agreement",
          "url": "https://nbcmontana.com/news/local/sabey-data-centers-officially-backs-out-of-butte-agreement",
          "publisher": "nbcmontana.com",
          "date": "2026-06-01",
          "source_tier": 4
        },
        {
          "title": "Sabey backs out of proposal to build data center in Butte, Montana - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/sabey-backs-out-of-proposal-to-build-data-center-in-butte-montana/",
          "publisher": "Data Center Dynamics",
          "date": "2026-05-29",
          "source_tier": 3
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "cancelled",
          "effective_at": "2026-05-29",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-29",
          "summary": "Sabey backs out of proposal to build data center in Butte, Montana",
          "source_url": "https://www.datacenterdynamics.com/en/news/sabey-backs-out-of-proposal-to-build-data-center-in-butte-montana/",
          "source_tier": 3
        },
        {
          "status": "rumored",
          "effective_at": "2026-05-15",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-05-15",
          "summary": "Sabey plans a data center in Silver Bow, Montana",
          "source_url": "https://cleanview.co/data-centers/montana/2082/sabey-butte-data-center",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "spacex-starbase-louisiana-orbital-data-center-vermilion-la",
      "name": "SpaceX Starbase Louisiana / orbital data center",
      "summary": "SpaceX unveiled a Starbase launch site in coastal Vermilion Parish, Louisiana, and moved up its orbital data center launch timeline.",
      "state": "LA",
      "city": null,
      "county": "Vermilion Parish",
      "status": "rumored",
      "developer": "SpaceX",
      "capacity_mw": null,
      "latitude": 29.9725,
      "longitude": -92.12917,
      "location_precision": "county",
      "location_source": "County seat (Abbeville), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/spacex-starbase-louisiana-orbital-data-center-vermilion-la",
      "source": "https://www.nola.com/news/spacex-site-louisiana-aerial-view/article_ae347f58-2727-4768-8b65-f9cca7fa29c9.html",
      "basis": "official_record",
      "sources": [
        {
          "title": "Where is new SpaceX site in Louisiana? See coastal Vermilion Parish from above.",
          "url": "https://www.nola.com/news/spacex-site-louisiana-aerial-view/article_ae347f58-2727-4768-8b65-f9cca7fa29c9.html",
          "publisher": "The Times-Picayune and The New Orleans Advocate",
          "date": "2026-08-25",
          "source_tier": 4
        },
        {
          "title": "SpaceX unveils Starbase launch site in Louisiana, moves up orbital data center launch timeline - Yahoo Finance",
          "url": "https://finance.yahoo.com/markets/stocks/article/spacex-unveils-starbase-launch-site-in-louisiana-moves-up-orbital-data-center-launch-timeline-142539276.html",
          "publisher": "Yahoo Finance",
          "date": "2026-08-25",
          "source_tier": 4
        },
        {
          "title": "SpaceX unveils Starbase launch site in Louisiana, moves up orbital data center launch timeline - Yahoo Finance",
          "url": "https://finance.yahoo.com/markets/stocks/article/spacex-unveils-starbase-launch-site-in-louisiana-moves-up-orbital-data-center-launch-timeline-142539276.html",
          "publisher": "Yahoo Finance",
          "date": "2026-08-25",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "tierpoint-little-rock-ar",
      "name": "TierPoint Little Rock",
      "summary": "TierPoint lists a data center at Little Rock, Arkansas among the sites it operates.",
      "state": "AR",
      "city": "Little Rock",
      "county": "Pulaski County",
      "status": "operational",
      "developer": "TierPoint",
      "capacity_mw": null,
      "latitude": 34.7252916,
      "longitude": -92.3559352,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/tierpoint-little-rock-ar",
      "source": "https://www.tierpoint.com/data-centers/",
      "basis": "official_record",
      "sources": [
        {
          "title": "TierPoint: Browse our data centers",
          "url": "https://www.tierpoint.com/data-centers/",
          "publisher": "TierPoint",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "TierPoint lists TierPoint Little Rock at Little Rock, Arkansas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.tierpoint.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "tierpoint-omaha-ne",
      "name": "TierPoint Omaha",
      "summary": "TierPoint lists 2 data centers at Omaha, Nebraska among the sites it operates.",
      "state": "NE",
      "city": "Omaha",
      "county": "Douglas County",
      "status": "operational",
      "developer": "TierPoint",
      "capacity_mw": null,
      "latitude": 41.2635468,
      "longitude": -96.0563975,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/tierpoint-omaha-ne",
      "source": "https://www.tierpoint.com/data-centers/",
      "basis": "official_record",
      "sources": [
        {
          "title": "TierPoint: Browse our data centers",
          "url": "https://www.tierpoint.com/data-centers/",
          "publisher": "TierPoint",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "TierPoint lists TierPoint Omaha - Bellevue Data Center, TierPoint Omaha - Midlands Data Center at Omaha, Nebraska on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.tierpoint.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "tierpoint-sioux-falls-sd",
      "name": "TierPoint Sioux Falls",
      "summary": "TierPoint lists 2 data centers at Sioux Falls, South Dakota among the sites it operates.",
      "state": "SD",
      "city": "Sioux Falls",
      "county": "Minnehaha County",
      "status": "operational",
      "developer": "TierPoint",
      "capacity_mw": null,
      "latitude": 43.5412358,
      "longitude": -96.7317655,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/tierpoint-sioux-falls-sd",
      "source": "https://www.tierpoint.com/data-centers/",
      "basis": "official_record",
      "sources": [
        {
          "title": "TierPoint: Browse our data centers",
          "url": "https://www.tierpoint.com/data-centers/",
          "publisher": "TierPoint",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "TierPoint lists TierPoint Sioux Falls - East Data Center, TierPoint Sioux Falls - West Data Center at Sioux Falls, South Dakota on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.tierpoint.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "tierpoint-tulsa-ok",
      "name": "TierPoint Tulsa",
      "summary": "TierPoint lists 2 data centers at Tulsa, Oklahoma among the sites it operates.",
      "state": "OK",
      "city": "Tulsa",
      "county": "Tulsa County",
      "status": "operational",
      "developer": "TierPoint",
      "capacity_mw": null,
      "latitude": 36.1281873,
      "longitude": -95.9041619,
      "location_precision": "city",
      "location_source": "U.S. Census Bureau TIGERweb city centroid, public domain",
      "location_verified_at": "2026-09-14",
      "coordinate_source": "tigerweb city centroid",
      "location_last_verified": "2026-09-14",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/tierpoint-tulsa-ok",
      "source": "https://www.tierpoint.com/data-centers/",
      "basis": "official_record",
      "sources": [
        {
          "title": "TierPoint: Browse our data centers",
          "url": "https://www.tierpoint.com/data-centers/",
          "publisher": "TierPoint",
          "date": "2026-09-14",
          "source_tier": 2
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "TierPoint lists TierPoint Tulsa - Archer Data Center, TierPoint Tulsa - State Farm Data Center at Tulsa, Oklahoma on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://www.tierpoint.com/data-centers/",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "vantage-data-center-south-of-cheyenne-wy",
      "name": "Vantage Data Center south of Cheyenne",
      "summary": "Vantage held a community open house for a proposed data center south of Cheyenne, and commissioners subsequently approved a zone change for the facility.",
      "state": "WY",
      "city": "Cheyenne",
      "county": "Laramie",
      "status": "approved",
      "developer": "Vantage",
      "capacity_mw": null,
      "latitude": 41.14556,
      "longitude": -104.80194,
      "location_precision": "county",
      "location_source": "County seat (Cheyenne), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/vantage-data-center-south-of-cheyenne-wy",
      "source": "https://newslj.com/vantage-hosts-open-house-proposed-data-center-laramie-county",
      "basis": "official_record",
      "sources": [
        {
          "title": "Vantage hosts open house for proposed data center in Laramie County",
          "url": "https://newslj.com/vantage-hosts-open-house-proposed-data-center-laramie-county",
          "publisher": "newslj.com",
          "date": "2026-06-30",
          "source_tier": 4
        },
        {
          "title": "Vantage data center gets zone change OK from Laramie County on Tuesday - Cap City News",
          "url": "https://capcity.news/community/county-community/2026/09/01/vantage-data-center-gets-zone-change-ok-from-laramie-county-tuesday/",
          "publisher": "Cap City News",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Commissioners approve zone change for Vantage Data Center south of Cheyenne - WyomingNews.com",
          "url": "https://www.wyomingnews.com/news/local_news/commissioners-approve-zone-change-for-vantage-data-center-south-of-cheyenne/article_ee336047-ce8e-4c25-8300-3af52862357c.html",
          "publisher": "WyomingNews.com",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Vantage hosts open house for proposed data center in southern Wyoming - WyomingNews.com",
          "url": "https://www.wyomingnews.com/laramieboomerang/news/vantage-hosts-open-house-for-proposed-data-center-in-southern-wyoming/article_3c663bef-a7d5-496f-a8cb-b887e09d18b5.html",
          "publisher": "WyomingNews.com",
          "date": "2026-07-01",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "approved",
          "effective_at": "2026-08-10",
          "date_basis": "content",
          "date_precision": "day",
          "planned": false,
          "source_date": null,
          "summary": "Laramie County Commissioners approved a zone change for the proposed Vantage Data Centers campus south of Cheyenne, Wyoming.",
          "source_url": "https://www.wyomingnews.com/news/local_news/commissioners-approve-zone-change-for-vantage-data-center-south-of-cheyenne/article_ee336047-ce8e-4c25-8300-3af52862357c.html",
          "source_tier": 4
        },
        {
          "status": "rumored",
          "effective_at": "2026-06-30",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-06-30",
          "summary": "Vantage Data Centers held an open house Friday evening for its proposed Laramie County campus",
          "source_url": "https://newslj.com/vantage-hosts-open-house-proposed-data-center-laramie-county",
          "source_tier": 4
        }
      ]
    },
    {
      "slug": "vantage-shackelford-county-tx",
      "name": "Vantage Shackelford County",
      "summary": "Vantage Data Centers lists a data center at Shackelford County, Texas among the sites it operates.",
      "state": "TX",
      "city": "Albany",
      "county": "Shackelford County",
      "status": "operational",
      "developer": "Vantage Data Centers",
      "capacity_mw": 1400,
      "latitude": 32.72694,
      "longitude": -99.29444,
      "location_precision": "county",
      "location_source": "County seat (Albany), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-14",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/vantage-shackelford-county-tx",
      "source": "https://www.bigcountryhomepage.com/video/1200-acre-data-center-in-shackelford-county-could-boost-local-economy/10938702/",
      "basis": "official_record",
      "sources": [
        {
          "title": "1,200-acre data center in Shackelford County could boost local economy – KTAB - BigCountryHomepage.com",
          "url": "https://www.bigcountryhomepage.com/video/1200-acre-data-center-in-shackelford-county-could-boost-local-economy/10938702/",
          "publisher": "BigCountryHomepage.com",
          "date": "2025-07-30",
          "source_tier": 1
        },
        {
          "title": "Is gas really winning the AI race? - Latitude Media",
          "url": "https://www.latitudemedia.com/news/is-gas-really-winning-the-ai-race/",
          "publisher": "Latitude Media",
          "date": "2025-08-27",
          "source_tier": 1
        },
        {
          "title": "AI-fueled data centers' construction boom moves into West Texas - El Paso Times",
          "url": "https://www.elpasotimes.com/story/money/business/2025/11/10/artificial-intelligence-fueled-data-centers-construction-boom-moves-into-west-texas/87072278007/",
          "publisher": "El Paso Times",
          "date": "2025-11-10",
          "source_tier": 1
        },
        {
          "title": "Vantage Invests US$25bn in Mega-Campus for AI Data Centres - Construction Digital",
          "url": "https://constructiondigital.com/news/inside-vantages-us-25bn-ai-data-centre-mega-campus-in-texas",
          "publisher": "Construction Digital",
          "date": "2025-08-21",
          "source_tier": 1
        },
        {
          "title": "Big Country data centers: Where they are & what’s coming - BigCountryHomepage.com",
          "url": "https://www.bigcountryhomepage.com/news/big-country-data-centers-where-they-are-whats-coming/",
          "publisher": "BigCountryHomepage.com",
          "date": "2026-06-01",
          "source_tier": 1
        },
        {
          "title": "Inside Frontier: Vantage Data Centers’ $25B Hyperscale Campus in Texas - Construction Review",
          "url": "https://constructionreviewonline.com/vantage-data-centers-unveils-25b-1-4gw-frontier-campus-in-texas-its-largest-project-to-date/",
          "publisher": "Construction Review",
          "date": "2026-01-23",
          "source_tier": 1
        },
        {
          "title": "Vantage breaks ground on Texas gigawatt data center campus for OpenAI - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/vantage-breaks-ground-on-texas-gigawatt-data-center-campus-for-openai/",
          "publisher": "Data Center Dynamics",
          "date": "2025-12-15",
          "source_tier": 1
        },
        {
          "title": "Vantage Data Centers: Data center locations",
          "url": "https://vantage-dc.com/data-center-locations/",
          "publisher": "Vantage Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Vantage Data Centers: Vantage Shackelford County",
          "url": "https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx",
          "publisher": "Vantage Data Centers",
          "date": "2026-09-14",
          "source_tier": 2
        },
        {
          "title": "Vantage files to build another data center in San Antonio, Texas - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/vantage-files-to-build-another-data-center-in-san-antonio-texas/",
          "publisher": "Data Center Dynamics",
          "date": "2025-10-15",
          "source_tier": 1
        },
        {
          "title": "Vantage plots 1.4GW data center campus in Texas - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/vantage-plots-14gw-data-center-campus-in-texas/",
          "publisher": "Data Center Dynamics",
          "date": "2025-08-19",
          "source_tier": 1
        },
        {
          "title": "Vantage Breaks Ground on 1.4GW Texas Data Center for OpenAI - constructionowners.com",
          "url": "https://www.constructionowners.com/news/vantage-breaks-ground-on-1-4gw-texas-data-center-campus",
          "publisher": "constructionowners.com",
          "date": "2025-12-16",
          "source_tier": 1
        },
        {
          "title": "OpenAI marks Texas Stargate site as shift toward physical AI infrastructure | ETIH EdTech News - EdTech Innovation Hub",
          "url": "https://www.edtechinnovationhub.com/news/openai-government-affairs-director-says-texas-data-center-marks-shift-to-physical-ai-infrastructure",
          "publisher": "EdTech Innovation Hub",
          "date": "2025-12-15",
          "source_tier": 1
        },
        {
          "title": "Oracle and OpenAI's second Stargate data center in Texas will be powered off the grid - Business Insider",
          "url": "https://www.businessinsider.com/openai-building-natural-gas-microgrid-at-new-texas-data-center-2025-10",
          "publisher": "Business Insider",
          "date": "2025-10-23",
          "source_tier": 1
        },
        {
          "title": "Vantage Data Centers breaks ground on data center campus in Texas - W.Media",
          "url": "https://w.media/vantage-data-centers-breaks-ground-on-data-center-campus-in-texas/",
          "publisher": "W.Media",
          "date": "2025-12-16",
          "source_tier": 1
        },
        {
          "title": "Vantage Data Centers unveils plans for a $25b mega-campus in Texas to meet AI demand - Institutional Real Estate, Inc.",
          "url": "https://irei.com/news/vantage-data-centers-unveils-plans-for-a-25b-mega-campus-in-texas-to-meet-ai-demand/",
          "publisher": "Institutional Real Estate, Inc.",
          "date": "2025-08-19",
          "source_tier": 1
        },
        {
          "title": "Oracle to back massive 1.4-gigawatt gas-powered data center in US - Interesting Engineering",
          "url": "https://interestingengineering.com/culture/oracle-to-back-gas-powered-data-center",
          "publisher": "Interesting Engineering",
          "date": "2025-08-21",
          "source_tier": 1
        },
        {
          "title": "Vantage Data Centers Unveils “Frontier,” a $25B Mega-campus in Texas - Inside Towers",
          "url": "https://insidetowers.com/vantage-data-centers-unveils-frontier-a-25b-mega-campus-in-texas/",
          "publisher": "Inside Towers",
          "date": "2025-08-20",
          "source_tier": 1
        },
        {
          "title": "DigitalBridge-Backed Portfolio Company Vantage Data Centers Launches $25 Billion Texas “Frontier” Mega-Campus - Business Wire",
          "url": "https://www.businesswire.com/news/home/20250818389101/en/DigitalBridge-Backed-Portfolio-Company-Vantage-Data-Centers-Launches-%2425-Billion-Texas-Frontier-Mega-Campus",
          "publisher": "Business Wire",
          "date": "2025-08-19",
          "source_tier": 1
        },
        {
          "title": "Vantage Develops $25B Data Center in Texas - CommercialSearch",
          "url": "https://www.commercialsearch.com/news/vantage-develops-25b-data-center-in-texas/",
          "publisher": "CommercialSearch",
          "date": "2025-08-20",
          "source_tier": 1
        },
        {
          "title": "Vantage’s $25 Billion Texas Data Center Plan Sparks Opportunities—and Water Concerns - CarbonCredits.com",
          "url": "https://carboncredits.com/vantages-25-billion-texas-data-center-plan-sparks-opportunities-and-water-concerns/",
          "publisher": "CarbonCredits.com",
          "date": "2025-08-21",
          "source_tier": 1
        },
        {
          "title": "Vantage Data Centers unveils plans for Frontier, a US$25B mega-campus in Texas - Intelligent CIO",
          "url": "https://www.intelligentcio.com/north-america/2025/08/29/vantage-data-centers-unveils-plans-for-frontier-a-us25b-mega-campus-in-texas/",
          "publisher": "Intelligent CIO",
          "date": "2025-08-29",
          "source_tier": 1
        },
        {
          "title": "Vantage Data Centers to build data center campus in Texas - Inspenet",
          "url": "https://inspenet.com/en/news/vantage-data-centers-to-build-data-center-campus-in-texas/",
          "publisher": "Inspenet",
          "date": "2025-08-21",
          "source_tier": 1
        },
        {
          "title": "Vantage Launching $25B Data Center Campus Near Abilene - Connect CRE",
          "url": "https://www.connectcre.com/stories/vantage-launching-25b-data-center-campus-near-abilene/",
          "publisher": "Connect CRE",
          "date": "2025-08-19",
          "source_tier": 1
        },
        {
          "title": "$25 billion data center campus slated for rural area near Abilene - The Business Journals",
          "url": "https://www.bizjournals.com/dallas/news/2025/08/20/vantage-data-centers-new-frontier-campus.html",
          "publisher": "The Business Journals",
          "date": "2025-08-20",
          "source_tier": 1
        },
        {
          "title": "JPMorgan and MUFG close to securing $22bn financing for Vantage's Texas data center project - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/jpmorgan-and-mufg-close-to-securing-22bn-financing-for-vantages-texas-data-center-project/",
          "publisher": "Data Center Dynamics",
          "date": "2025-08-20",
          "source_tier": 1
        },
        {
          "title": "New data center expected to create 250 full time jobs in Shackelford county - KTXS",
          "url": "https://ktxs.com/news/local/new-data-center-expected-to-create-250-full-time-jobs-in-shackelford-county",
          "publisher": "KTXS",
          "date": "2025-08-01",
          "source_tier": 1
        },
        {
          "title": "Inside Vantage's US$25bn AI Data Centre Mega-Campus in Texas - technologymagazine.com",
          "url": "https://technologymagazine.com/news/inside-vantages-us-25bn-ai-data-centre-mega-campus-in-texas",
          "publisher": "technologymagazine.com",
          "date": "2025-08-19",
          "source_tier": 1
        },
        {
          "title": "Vantage Data Centers to Invest $25B for Mega-Campus in Shackelford County, Texas - REBusinessOnline",
          "url": "https://rebusinessonline.com/vantage-data-centers-to-invest-25b-for-mega-campus-in-shackleford-county-texas/",
          "publisher": "REBusinessOnline",
          "date": "2025-08-19",
          "source_tier": 1
        },
        {
          "title": "Vantage Data Centers Unveils Plans for “Frontier,” a $25B Mega-campus in Texas to Meet Unprecedented AI Demand - Business Wire",
          "url": "https://vantage-dc.com/news/vantage-data-centers-unveils-plans-for-frontier-a-25b-mega-campus-in-texas-to-meet-unprecedented-ai-demand/",
          "publisher": "Business Wire",
          "date": "2025-08-19",
          "source_tier": 1
        },
        {
          "title": "Explore Vantage’s New US$25bn AI Data Centre Campus in Texas - Data Centre Magazine",
          "url": "https://datacentremagazine.com/news/inside-vantages-us-25bn-ai-data-centre-mega-campus-in-texas",
          "publisher": "Data Centre Magazine",
          "date": "2025-08-20",
          "source_tier": 1
        },
        {
          "title": "Vantage Data Centers plans $25 billion AI campus in Texas - Reuters",
          "url": "https://www.reuters.com/business/vantage-data-centers-plans-25-billion-ai-campus-texas-2025-08-19/",
          "publisher": "Reuters",
          "date": "2025-08-19",
          "source_tier": 1
        },
        {
          "title": "OpenAI announces five more US Stargate data centers with Oracle and SoftBank - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/openai-announces-five-more-us-stargate-data-centers-with-oracle-and-softbank/",
          "publisher": "Data Center Dynamics",
          "date": "2025-09-24",
          "source_tier": 1
        },
        {
          "title": "Vantage plots 1,000-acre data center campus in Texas - Data Center Dynamics",
          "url": "https://www.datacenterdynamics.com/en/news/vantage-plots-1000-acre-data-center-campus-in-texas/",
          "publisher": "Data Center Dynamics",
          "date": "2025-07-28",
          "source_tier": 1
        },
        {
          "title": "1,200-acre data center in Shackelford County could boost local economy - BigCountryHomepage.com",
          "url": "https://www.bigcountryhomepage.com/video/1200-acre-data-center-in-shackelford-county-could-boost-local-economy/10938702/",
          "publisher": "BigCountryHomepage.com",
          "date": "2025-07-30",
          "source_tier": 1
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "operational",
          "effective_at": "2026-09-14",
          "date_basis": "read",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-09-14",
          "summary": "Vantage Data Centers lists Vantage Shackelford County at Shackelford County, Texas on its own page of data center locations, read September 14, 2026.",
          "source_url": "https://vantage-dc.com/data-center-locations/north-america/shackelford-county-tx",
          "source_tier": 2
        }
      ]
    },
    {
      "slug": "winnebago-tribe-ai-data-center-ne",
      "name": "Winnebago Tribe AI Data Center",
      "summary": "The Winnebago Tribe of Nebraska hosted an AI data center teach in and announced opposition to data centers near its lands and citizens.",
      "state": "NE",
      "city": "Winnebago",
      "county": "Thurston County",
      "status": "rumored",
      "developer": "Winnebago Tribe of Nebraska",
      "capacity_mw": null,
      "latitude": 42.11167,
      "longitude": -96.71056,
      "location_precision": "county",
      "location_source": "County seat (Pender), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/winnebago-tribe-ai-data-center-ne",
      "source": "https://www.kwit.org/podcast/spm-news/2026-08-21/winnebago-tribe-of-nebraska-announces-opposition-to-data-centers-near-its-lands-citizens",
      "basis": "official_record",
      "sources": [
        {
          "title": "Winnebago Tribe of Nebraska announces opposition to data centers near its lands & citizens - kwit.org",
          "url": "https://www.kwit.org/podcast/spm-news/2026-08-21/winnebago-tribe-of-nebraska-announces-opposition-to-data-centers-near-its-lands-citizens",
          "publisher": "kwit.org",
          "date": "2026-08-21",
          "source_tier": 4
        },
        {
          "title": "KTIC 840 AM/98.3 FM/98.7 FM - AI Data Center Teach-In Hosted by Winnebago Tribe of Nebraska - Rural Radio Network",
          "url": "https://ruralradio.com/ktic/news/ai-data-center-teach-in-hosted-by-winnebago-tribe-of-nebraska/",
          "publisher": "Rural Radio Network",
          "date": "2026-09-02",
          "source_tier": 4
        },
        {
          "title": "Winnebago Tribe of Nebraska announces opposition to data centers near its lands & citizens - kwit.org",
          "url": "https://www.kwit.org/podcast/spm-news/2026-08-21/winnebago-tribe-of-nebraska-announces-opposition-to-data-centers-near-its-lands-citizens",
          "publisher": "kwit.org",
          "date": "2026-08-21",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "yellowstone-county-data-center-eyeing-mt",
      "name": "Yellowstone County data center (eyeing)",
      "summary": "A data center company eyeing Yellowstone County had top employees make matching political donations before announcing plans, while residents are demanding a vote on a moratorium as the county takes no action.",
      "state": "MT",
      "city": null,
      "county": "Yellowstone",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 45.78667,
      "longitude": -108.53722,
      "location_precision": "county",
      "location_source": "County seat (Billings), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/yellowstone-county-data-center-eyeing-mt",
      "source": "https://montanafreepress.org/2026/09/03/data-center-yellowstone-county-political-donations/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Top employees for data center company eyeing Yellowstone County made matching political donations before announcing plans - Montana Free Press",
          "url": "https://montanafreepress.org/2026/09/03/data-center-yellowstone-county-political-donations/",
          "publisher": "Montana Free Press",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Montana residents demand vote on data center moratorium as Yellowstone County takes no action - The Cool Down",
          "url": "https://www.thecooldown.com/green-tech/yellowstone-county-montana-data-center-meeting/",
          "publisher": "The Cool Down",
          "date": "2026-09-03",
          "source_tier": 4
        },
        {
          "title": "Opposition erupts as Yellowstone County files suit over data center initiative - Billings Gazette",
          "url": "https://billingsgazette.com/news/local/government-politics/article_904edc18-04ce-4805-b12c-a11fddcc8291.html",
          "publisher": "Billings Gazette",
          "date": "2026-07-09",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": []
    },
    {
      "slug": "yukon-data-center-ok",
      "name": "Yukon Data Center",
      "summary": "Yukon, Oklahoma city leaders were still deliberating on a proposed data center as of July 28, 2026.",
      "state": "OK",
      "city": "Yukon",
      "county": "Canadian County",
      "status": "rumored",
      "developer": null,
      "capacity_mw": null,
      "latitude": 35.53028,
      "longitude": -97.9575,
      "location_precision": "county",
      "location_source": "County seat (El Reno), Wikidata, placed at county level",
      "location_verified_at": "2026-09-16",
      "coordinate_source": "wikidata county seat",
      "location_last_verified": "2026-09-16",
      "site_address": null,
      "site_address_source_url": null,
      "published": "2026-09-05",
      "last_verified": "2026-09-17",
      "cooling_type": "not_disclosed",
      "cooling_type_source_url": null,
      "cooling_fluid": null,
      "cooling_fluid_source_url": null,
      "developer_source_url": null,
      "contractor": null,
      "contractor_source_url": null,
      "site_acres": null,
      "site_acres_disclosed_as": "not_disclosed",
      "site_acres_source_url": null,
      "power_source": null,
      "power_source_url": null,
      "interconnection_status": "not_disclosed",
      "interconnection_source_url": null,
      "water_measure": null,
      "state_permit_status": null,
      "state_permit_status_source_url": null,
      "state_permit_status_disclosed_as": "not_disclosed",
      "state_permit_status_as_of": null,
      "state_permit_status_last_verified": null,
      "buildings": null,
      "buildings_basis": null,
      "buildings_source_url": null,
      "buildings_verified_at": null,
      "record_url": "https://datacenterrecord.org/projects/yukon-data-center-ok",
      "source": "https://kfor.com/news/yukon-city-leaders-still-contemplating-proposed-data-center/",
      "basis": "official_record",
      "sources": [
        {
          "title": "Yukon city leaders still contemplating proposed data center - KFOR",
          "url": "https://kfor.com/news/yukon-city-leaders-still-contemplating-proposed-data-center/",
          "publisher": "KFOR",
          "date": "2026-07-28",
          "source_tier": 4
        },
        {
          "title": "Yukon City Council set to discuss proposed Beltline Energy data center project - News 9",
          "url": "https://www.news9.com/data-centers-in-oklahoma/yukon-city-council-beltline-energy-data-center-project",
          "publisher": "News 9",
          "date": "2026-06-30",
          "source_tier": 4
        },
        {
          "title": "New data center coming to Yukon, generating contention - KOKH",
          "url": "https://okcfox.com/news/project-oklahoma/new-data-center-coming-to-yukon-generating-contention",
          "publisher": "KOKH",
          "date": "2025-08-22",
          "source_tier": 4
        }
      ],
      "use_types": [
        {
          "use_type": "not_disclosed",
          "share_percent": null,
          "source_url": null
        }
      ],
      "serves": {
        "tenants": [],
        "tenancy": "not_disclosed",
        "local_service_commitments": [],
        "source_url": null
      },
      "status_history": [
        {
          "status": "rumored",
          "effective_at": "2026-06-30",
          "date_basis": "source",
          "date_precision": "day",
          "planned": false,
          "source_date": "2026-06-30",
          "summary": "Beltline Energy is the developer of the proposed data center",
          "source_url": "https://www.news9.com/data-centers-in-oklahoma/yukon-city-council-beltline-energy-data-center-project",
          "source_tier": 4
        }
      ]
    }
  ],
  "grid_region": {
    "code": "spp",
    "label": "SPP",
    "name": "Southwest Power Pool",
    "kind": "iso_rto",
    "parent_iso": null,
    "states": [
      "KS",
      "OK",
      "NE",
      "MO",
      "AR",
      "LA",
      "TX",
      "NM",
      "ND",
      "SD",
      "IA",
      "MN",
      "MT",
      "WY"
    ],
    "primary_states": [],
    "price_effect_2025_mwh": 1.43,
    "price_effect_2025_pct": 4.8,
    "price_effect_2028_mwh": 1.83,
    "price_effect_2028_pct": 5.9,
    "own_dc_share_pct": 2.2,
    "fixed_cost_share": 0.621,
    "wholesale_price_effect_2025": "4.8 percent (+$1.43 per MWh, 2024 to 2025), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.",
    "wholesale_price_effect_2028": "5.9 percent (+$1.83 per MWh, 2028 projected), modeled wholesale price effect, Dallas Fed WP 2606r1, third party estimate.",
    "study_basis": "third party estimate",
    "study_source": "https://www.dallasfed.org/~/media/documents/research/papers/2026/wp2606r1.pdf",
    "study_date": "March 2026, revised October 2026"
  },
  "studies": [
    {
      "id": "dallas-fed-wp2606r1",
      "study": "Plante, Carrasco, Miranda Pineda and Patel, Federal Reserve Bank of Dallas Working Paper 2606r1",
      "title": "Data Centers, Wholesale Electricity Prices, and Retail Rates",
      "publisher": "Federal Reserve Bank of Dallas",
      "document_date": "March 2026, revised October 2026",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "Wholesale electricity price effect and retail electricity rate pass through",
      "finding": "Data center demand accounts for an average 6.5 percent increase in wholesale electricity prices across 23 regional markets in 2024 and 2025, reaching 15.0 percent (+$5.22 per MWh) in SERC Virginia and Carolina North and 15.4 percent (+$5.68 per MWh) in the Northwest Power Pool, with wholesale changes passing into retail prices roughly in proportion to the wholesale share of the retail bill over 12 to 24 months.",
      "years_covered": "2019 to 2025 historical and 2026 to 2028 scenario projections",
      "method": "Synthetic supply stack model across 23 regional power markets combined with reduced form retail pass through regressions",
      "who_funded_or_published": "Federal Reserve Bank of Dallas (government research working paper; views are the authors')",
      "primary_url": "https://www.dallasfed.org/~/media/documents/research/papers/2026/wp2606r1.pdf",
      "corroborating_url": null,
      "corroborating_label": null,
      "notes": "Uses BloombergNEF data center tracker as a model input alongside EIA Form 860, Form 861M, Form 923 and Form 930.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    },
    {
      "id": "epri-watten-bistline-blanford-2026",
      "study": "Watten, Bistline and Blanford, Electric Power Research Institute (arXiv:2606.19777)",
      "title": "Retail Electricity Price Implications of Data Center Load Growth",
      "publisher": "Electric Power Research Institute (EPRI)",
      "document_date": "June 2026",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "State level retail electricity rate change across all customer classes",
      "finding": "Where data centers pay standard industrial rates and improve grid utilization, state average retail rates could fall by roughly 1 percent nationally by 2030 (up to 4 percent in high growth states, or roughly $7 billion per year in fixed cost spreading); outcomes reverse toward higher residential bills if new generation and transmission upgrades outpace load revenues.",
      "years_covered": "2026 to 2030",
      "method": "Capacity expansion and utility revenue requirement model allocating fixed transmission and distribution costs across customer classes",
      "who_funded_or_published": "Electric Power Research Institute (nonprofit energy research institute funded primarily by member electric utilities)",
      "primary_url": "https://arxiv.org/abs/2606.19777",
      "corroborating_url": "https://fortune.com/2026/07/26/data-centers-electricity-costs-cheaper-7billion-buildout-ai-demand/",
      "corroborating_label": "Fortune, July 26, 2026",
      "notes": "Assumes data centers pay full tariff rates and operate at high load factors that spread existing fixed system costs.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    },
    {
      "id": "mit-ceepr-who-pays-2025",
      "study": "Meeks, Pless, Qi and Wang, MIT Center for Energy and Environmental Policy Research",
      "title": "Who Pays for Growth? Evidence from Datacenters and the Grid",
      "publisher": "MIT Center for Energy and Environmental Policy Research (CEEPR)",
      "document_date": "December 2025",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "Realized utility revenue and customer bill changes from historical data center openings",
      "finding": "In the 6 years following data center entry (1998 to 2018), average electric utility revenue rose 8 percent (+$104 million per utility per year), residential bills rose 2 percent (+$30 per household per year) and commercial bills rose 4 percent (+$262 per customer per year), driven by peak coincident demand charges and infrastructure capital additions.",
      "years_covered": "1998 to 2018",
      "method": "Difference in differences event study of historical data center openings matched to utility level EIA Form 861 billing and revenue panels",
      "who_funded_or_published": "MIT Center for Energy and Environmental Policy Research (university working paper)",
      "primary_url": "https://ceepr.mit.edu/workingpaper/who-pays-for-growth-evidence-from-datacenters-and-the-grid/",
      "corroborating_url": null,
      "corroborating_label": null,
      "notes": "Measures historical realized utility billing outcomes prior to the post 2023 hyperscale AI buildout.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    },
    {
      "id": "duke-ni-26-04",
      "study": "Norris, Profeta, Patino Echeverri and Cowie, Duke University Nicholas Institute (NI R 26-04)",
      "title": "Rethinking Load Growth: Assessing the Potential for Integration of Large Flexible Loads in US Power Systems",
      "publisher": "Nicholas Institute for Energy, Environment & Sustainability, Duke University",
      "document_date": "February 2026",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "Grid headroom and new gigawatts of large load accommodated under minimal peak hour curtailment",
      "finding": "Across 22 major US balancing authorities, roughly 76 GW of new data center load can be integrated without building new peaking capacity if facilities curtail load by 0.25 percent of annual operating hours (roughly 22 hours per year), expanding to 98 GW at 0.5 percent annual curtailment and 126 GW at 1.0 percent annual curtailment.",
      "years_covered": "2025 to 2035",
      "method": "Hourly balancing authority load duration and reserve margin modeling across 22 US power systems",
      "who_funded_or_published": "Duke University Nicholas Institute for Energy, Environment & Sustainability (university research institute)",
      "primary_url": "https://nicholasinstitute.duke.edu/publications/data-centers-and-generation-capacity-over-next-decade",
      "corroborating_url": "https://nicholasinstitute.duke.edu/articles/key-takeaways-data-center-flexibility-and-generation-capacity-over-next-decade",
      "corroborating_label": "Duke Nicholas Institute summary",
      "notes": "Evaluates operational curtailment during system peak hours rather than unconditional firm interconnection.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    },
    {
      "id": "ncsu-erl-2026",
      "study": "Jeremiah Johnson et al., North Carolina State University (Environmental Research Letters)",
      "title": "Power System Costs and Emissions from Data Center and Cryptocurrency Mining Expansion in the United States",
      "publisher": "Environmental Research Letters (IOP Publishing) / North Carolina State University",
      "document_date": "May 2026",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "Wholesale electricity prices, residential bills by state and power sector carbon emissions through 2030",
      "finding": "Projected data center and crypto load growth raises US electricity demand 6 to 12 percent by 2030 and increases residential electricity bills up to 57 percent in the most heavily affected states (including Virginia at roughly $32 per month or $384 per year for an average household) while adding 49 to 125 million metric tons of CO2 per year.",
      "years_covered": "2024 to 2030",
      "method": "National capacity expansion and unit commitment dispatch model (TEMOA) across US grid regions",
      "who_funded_or_published": "North Carolina State University researchers in Environmental Research Letters (peer reviewed journal)",
      "primary_url": "https://doi.org/10.1088/1748-9326/ae6c3d",
      "corroborating_url": "https://news.ncsu.edu/2026/05/data-centers-power-bills/",
      "corroborating_label": "NC State University News, May 2026",
      "notes": "Models combined data center and cryptocurrency mining load growth across regional interconnects.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    },
    {
      "id": "e3-rising-electricity-rates-2026",
      "study": "Energy and Environmental Economics (E3), Understanding the Drivers of Rising Electricity Rates and the Role of Data Centers",
      "title": "Understanding the Drivers of Rising Electricity Rates and the Role of Data Centers",
      "publisher": "Energy and Environmental Economics, Inc. (E3)",
      "document_date": "May 2026",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 2,
      "basis": "third party estimate",
      "what_it_measured": "Historical drivers of US retail electricity rate increases and utility rate design for large loads",
      "finding": "Historical US retail electricity rate increases from 2020 to 2025 were driven primarily by distribution capital spending, wildfire mitigation, natural gas price spikes and inflation rather than data centers, and well designed large load tariffs can keep new data center additions net neutral or beneficial for existing ratepayers.",
      "years_covered": "2020 to 2025 historical and forward rate design case studies",
      "method": "Decomposition of historical utility revenue requirements and illustrative utility tariff cost of service modeling",
      "who_funded_or_published": "Energy and Environmental Economics (E3), industry commissioned consulting report",
      "primary_url": "https://www.ethree.com/wp-content/uploads/2026/05/Understanding-the-Drivers-of-Rising-Electricity-Rates-and-the-Role-of-Data-Centers_E3-2026.pdf",
      "corroborating_url": null,
      "corroborating_label": null,
      "notes": "Industry commissioned study evaluating historical rate drivers prior to the 2025/2026 PJM capacity delivery year.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    },
    {
      "id": "nber-wp35100-muller-2026",
      "study": "Nicholas Z. Muller, National Bureau of Economic Research Working Paper 35100",
      "title": "The Environmental Externalities of the Data Center Boom",
      "publisher": "National Bureau of Economic Research (NBER)",
      "document_date": "April 2026",
      "last_verified": "October 28, 2026",
      "source_type": "study",
      "tier": 1,
      "basis": "third party estimate",
      "what_it_measured": "Monetized air pollution and greenhouse gas health and climate damages per megawatt hour of data center electricity use",
      "finding": "Marginal air pollution and greenhouse gas damages from fossil fuel generation serving US data centers average $49 to $94 per MWh ($0.049 to $0.094 per kWh), rivaling or exceeding the direct wholesale price of electricity in coal and gas heavy interconnects such as PJM, MISO and SERC.",
      "years_covered": "2022 to 2025",
      "method": "Integrated assessment marginal emissions and air quality transport model (AP4T) coupled with EPA CEMS unit level generation data",
      "who_funded_or_published": "National Bureau of Economic Research (university working paper by Nicholas Z. Muller, Carnegie Mellon University)",
      "primary_url": "https://www.nber.org/papers/w35100",
      "corroborating_url": "https://www.spglobal.com/energy/en/news-research/latest-news/electric-power/091626-air-pollution-from-data-center-power-projects-is-a-rising-concern-amid-build-out",
      "corroborating_label": "S&P Global Commodity Insights, September 16, 2026",
      "notes": "Quantifies unpriced health and climate damages from marginal fossil generation dispatched to meet data center load.",
      "scope_regions": [
        "all"
      ],
      "scope_states": [
        "all"
      ]
    }
  ]
}